W912QR24NFARS_0001_Price Breakout Schedule.pdf

PDF 385 KB Posted

Attached to
Boom Operator Weapons System Trainer addition and building renovation at Niagara Falls Air Reserve Station
Solicitation number
W912QR-24-NFARS
Issued by

About this file

This document is a Price Breakout Schedule for a federal contract opportunity related to the Boom Operator Weapons System Trainer (BOWST) Addition and building renovation at the Niagara Falls Air Reserve Station.

The Price Breakout Schedule lists various contract line items (CLINs) including the base bid for demolition, site work, renovation, and new construction, as well as optional items such as modifications to Building 321, installation of shelving, a bridge crane, and additional allowances for soil and groundwater disposal and importation. Offerors must provide pricing for all numbered items. The contract is part of the Northeast MATOC (Multiple Award Task Order Contract) pool, and the contracting agency is the U.S. Army Corps of Engineers, Louisville District. Options 1-3 must be exercised within 90 days of contract award, while Options 4-6 can be exercised as needed during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912QR24NFARS_Specs-0001

SECTION 00 10 00

PRICE BREAKOUT SCHEDULE

OFFEROR’S NAME: ________________________________________

ITEM DESCRIPTION UNIT AMOUNT

NO.

Amdt. #0001********************************************************************

0001 BASE BID JOB $____________________

All demolition, site work, renovation and new construction associated with the Boom Operator Weapons System Trainer (BOWST) Addition as identified on the drawings and specifications, except as included in CLIN 0005 - 0010.

This work is to include modifications to the storm water management system components (other than associated with the modification to the existing parking area) and all related construction necessary to make the new addition and the portions of the existing building indicated as Base Bid complete and fully operational.

Boundaries of Base Bid and Option 1 as shown on Drawing A-101 apply to all disciplines unless otherwise noted.

0002 BASE BID - SOIL DISPOSAL ALLOWANCE JOB $_____________________

1750 CY Soil

Materials excavated from the site must be managed as PFAS waste. Materials that cannot be reused on the site must be characterized and disposed of outside the NFARS boundary per current Air Force, federal, and New York State regulations. Proposal shall include a lump sum allowance for the identified quantities.

******************************************************************Amdt. #0001

0003 BASE BID - GROUNDWATER DISPOSAL JOB $_____________________

ALLOWANCE 550-GAL Groundwater

All groundwater collected from the site must be managed as PFAS waste, characterized, and disposed of outside the NFARS boundary per current Air Force, federal, and New York State regulations. Proposal shall include a lump sum allowance for the identified quantity.

Amdt. #0001********************************************************************

0004 BASE BID - SOIL IMPORT ALLOWANCE JOB $___________________

600 CY SOIL

All soils used for structural fill must be imported to the project site per current Air Force, federal, and New York State regulations. Proposal shall include a lump sum allowance for the identified quantity.

TOTAL BASE BID (ITEMS 0001 through 0004) …………………………………… $_____________________

OPTION ITEMS:

0005 OPTION 1 - MODIFICATIONS TO B-321 JOB $ _____________________

OFT INSTALLATION AND FACILITY

IMPROVEMENTS / REPAIRS

All demolition, site work, renovation and modification construction associated with the maintenance and repair of B-321 and modifications for the installation of an Operational Flight Trainer (OFT) as shown on the drawings and specifications not included in CLIN 0001 - 0004, or 0006-0010. This work will include but is not limited to modifications to the existing parking area and the stormwater management system (e.g. piping and catch basins) associated with the parking area; modifications to the high-bay area for the new bridge crane support structure and all collateral and associated work necessary for the B-321 to be fully operational and complete. Including design of the bridge support structure and foundation as required for the loads imposed by the specific bridge crane selected by the Contractor (Option 3). Boundaries of Base Bid and Option 1 as shown on Drawing A-101 apply to all disciplines unless otherwise noted.

0006 OPTION 2- SHELVING IN ROOM 114 JOB $_____________________

SUPPLY AND MAINTENCANCE AND

ROOM 131 STORAGE

All work and materials required to provide and install shelving in Room 114 SUPPLY AND MAINTENANCE and Room 131 STORAGE as shown on the drawings and specifications, complete. This option may be exercised up to 90 days from Notice to Proceed.

0007 OPTION 3 JOB $_____________________

BRIDGE CRANE IN ROOM 107

SIMULATOR HIGH BAY

All work and materials required to provide and install the bridge crane in Room 107 SIMULATOR HIGH BAY.

This work is to include but is not limited to all required connections to power, operational controls and training as shown on the drawings and specifications for a complete and operational system. This option may be exercised up to 90 days from Notice to Proceed.

Amdt. #0001********************************************************************

0008 OPTION 4 JOB $_____________________

700 CY SOIL DISPOSAL

Materials excavated from the site must be managed as PFAS waste. Materials that cannot be reused on the site must be characterized and disposed of outside the NFARS boundary per current Air Force, federal, and New York State regulations. This option will provide an additional allowance quantity of soil for disposal. This option can be exercised up to three times.

******************************************************************Amdt. #0001

0009 OPTION 5 JOB $_____________________

200-GAL GROUNDWATER DISPOSAL

All groundwater collected from the site must be managed as PFAS waste, characterized, and disposed of outside the NFARS boundary per current Air Force, federal, and New York State regulations. This option will provide an additional allowance quantity of water for disposal. This option can be exercised up to three times throughout the life of the contract.

Amdt. #0001********************************************************************

0010 OPTION 6 JOB $_____________________

150 CY SOIL IMPORTATION

All soils used for structural fill must be imported to the project site. This option will provide an additional allowance quantity for the importation of soil to the site. This option can be exercised up to three times.

TOTAL OPTIONS 1-3 (ITEMS 0005 through 0007) ………………………………..$____________________

TOTAL BASE BID AND OPTIONS 1,2 and 3 (ITEMS 0001 through 0007) ………$_____________________

TOTAL OPTIONS 4, 5 and 6 (ITEMS 0008QW through 0010, first use) ………………..$___________________

NOTE NO. 1. Offerors must insert a price on all numbered items of the Schedule. Failure to do so will disqualify the bid.

NOTE NO. 2. The field overhead costs through the contract duration are inclusive in the offered price for the contract.

NOTE NO. 3. Options 1, 2 and 3 will be exercised within 90 days of contract award.

NOTE NO. 4. Options 4, 5 and 6 will be exercised as needed during the course of construction.

-- End of Section --