W912QR23R0042_Specs_Vol1-0000.pdf

PDF 7 MB Posted

Attached to
Homestead Corrosion Wash Rack Facility
Solicitation number
W912QR23R0042
Issued by

View the file

Other files

File Type Posted
W912QR23R0042-0002.pdf PDF
W912QR23R0042_Specs-0001.pdf PDF
Site Visit Roster.pdf PDF
W912QR23R0042_Plans-0000.pdf PDF
W912QR23R0042_Specs_Vol2-0000.pdf PDF
W912QR23R0042_Specs_Vol3-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Corrosion Facility/ Washrack, Homestead Air Reserve Base, Homestead, FL

P2: 480262

Design-Bid-Build

Specifications - Vol. 1 of 3 Certified Final Design

09 June 2023

W912QR23R0042

ARIMS: 200A Disposition: Maintain for 15yrs after construction

W912QR23R0042_Specs_Vol1-0000

W22W9K11441133

Design/Bid/Build for the construction of the Corrosion Facility/Wash Rack hangar at Homestead Air Reserve Base, Florida.

Estimated Construction Cost is betw een $10,000,000.00 and $25,000,000.00.

NAICS Code is 236220. Size Determination is $45.0M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business w ill be considered other than a small business.

This is a full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation preference.

Contractors must register and complete the representation and certif ication requirements in the System for Aw ard Management (SAM) database, available at https://sam.gov. PLEASE ensure your annual SAM registration is current. Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other representation and certif ication requirements in this solicitation through SAM. PLEASE NOTE:

SAM is completely f ree of charge for both registrants and users.

LINDSAY B LAWRENCE 502.315.6900

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Jun-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________650 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Jul 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 502.315.7494 TEL: FAX:

W912QR23R0042 99

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR23R0042

Section 00 10 00 - Solicitation

PRICE BREAKOUT SCHEDULE

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE-ITEM SCHEDULE

Line Item No. Description Unit Amount

BASE PROPOSAL

0001. Primary Facility: All work, materials, and labor required to construct the Corrosion Facility/ Job $ ______________________ Wash Rack; includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No.

0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011.

0002. Secondary Facility: All work, materials, and labor required to construct Supporting Facilities; Job $ ______________________ includes all Base Proposal construction work required outside a line five feet outside of the building, except that work covered by Items No. 0001, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011.

Total Base Proposal $ ______________________

OPTIONS

0003. Option 0001: All work, materials, and labor required to provide Compressed Air Systems Job $ ______________________ for Tools, Shops, and Breathing Air; includes the air compressor, air dryer, receiver tank, distribution piping, air purifier, terminal devices including regulators, filters, and outlets, for fully functional shop air and breathing air systems.

This option may be exercised within 365 calendar days from Notice To Proceed.

0004. Option 0002: All work, materials, and labor required to provide Utility Fans; includes two (2), Job $ ______________________ ceiling mounted destratification fans in the Wash Rack Bay, controls, structural support, and power Circuits. PEMB design shall assume fans will be installed.

This option may be exercised within 30 calendar days from Notice To Proceed.

0005. Option 0003: All work, materials, and labor required to provide Bird Netting: includes Job $ ______________________ bird netting on the underside of the roof, and on the walls that have exposed wall girts in the Wash Rack Bay and in the Corrosion Hangar Bay.

This option may be exercised within 30 calendar days from Notice To Proceed.

0006. Option 0004: All work, materials, and labor required to provide Metal Liner Panels as indicated Job $ ______________________ on the drawings on the north and west interior walls of the Wash Rack Bay, and on the interior side of both hangar doors.

This option may be exercised within 30 calendar days from Notice To Proceed.

0007. Option 0005: All work, materials, and labor required to provide Fall Protection System in Job $ ______________________ the Wash Rack Bay; includes structural steel support. PEMB design shall assume system will be installed.

This option may be exercised within 180 calendar days from Notice To Proceed.

0008. Option 0006: All work, materials, and labor required to provide a 1-Ton Bridge Crane in the Job $ ______________________ Wash Rack Bay; includes electric power supply and structural steel support. PEMB design shall assume crane will be installed.

This option may be exercised within 180 calendar days from Notice To Proceed.

0009. Option 0007: All work, materials, and labor required to provide a 1-Ton Monorail and Hoist in the Job $ ______________________ Paint Booth/Paint Prep Room; includes electric power supply and structural steel support. PEMB design shall assume hoist will be installed.

This option may be exercised within 180 calendar days from Notice To Proceed.

0010. Option 0008: All work, materials, and labor required to provide two (2) insulated glass windows Job $ ______________________ in each panel of each sliding Hangar Door; includes structural steel framing required for the openings.

This option may be exercised within 30 calendar days from Notice To Proceed.

0011. Option 0009: All work, materials, and labor required to provide Translucent Wall Panels as Job $ ______________________ indicated on the Building Elevations on Drawings A-201 and A-202; includes structural steel framing required for the openings. Deduct the price for providing insulated metal wall panels where translucent wall panels are located from the Base Bid.

This option may be exercised within 30 calendar days from Notice To Proceed.

Total Options $ ______________________

TOTAL PROPOSAL $ ______________________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule.

Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated for best value to the Government. The basis for award is the trade-off process. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

--END OF CLIN SCHEDULE—

Section 00 21 00 - Instructions

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W912QR23R0042

The Bidder Inquiry Key is: 3N23Y5-MJ42PF

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your SecretQuestion.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs.

Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.

ELECTRONIC SUBMISSION of PROPOSALS

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.

Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.

a. Lindsay Lawrence, Contract Specialist at Lindsay.B.Lawrence@usace.army.mil

b. Levi Speth , Contracting Officer at Levi.R.Speth@usace.army.mil

2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two

(2) business days prior to the proposal due date.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter

W912QR23R0042-FIRMNAME.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912QR23R0042-FIRMNAME-VOLUME I

W912QR23R0042-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes, such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e., doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-20 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

NOV 2021

252.215-7008 Only One Offer DEC 2022 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors

JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers – LRL ATTN: Levi Speth, Rm. 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 23 June 2023 @ 1000 with background form due COB 13 June 2023.

Contractor’s wishing to visit the project site shall complete and submit a request form attached to both Juan Diaz at juan.c.diaz@usace.army.mil and Ileana Burns ileana.burns@usace.army.mil. Information will be utilized by Base Security personnel to perform appropriate background checks prior to site visit.

(c) Participants will meet at-- Visitor Control Center (VCC) Building 346 next to front gate. Participants will meet at the visitor’s center where they will be issued access badges and escorted on the base by USACE personnel. They will be permitted to investigate the site and take photos relevant to the project at hand.

BACKGROUND INVESTIGATION REQUEST

FOR OFFICIAL USE ONLY

HOMESTEAD ARB

COMPANY NAME: __________________ REQUESTER NAME: __________________

JOBSITES: _________________________ REQUEST DATE: _____________________

JOB END DATE: ____________________ REQUESTER PHONE #:________________

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE

OF

ISSUE

US

CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

ISSUE

US

CITIZEN?

YES OR NO

ISSUE

US

CITIZEN?

YES OR NO

ISSUE

US

CITIZEN?

YES OR NO

ISSUE

US

CITIZEN?

YES OR NO

ISSUE

US

CITIZEN?

YES OR NO

ISSUE

US

CITIZEN?

YES OR NO

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

The full text of FAR clauses and provisions can be found at:

https://www.acquisition.gov/

The full text of DFARS clauses and provisions can be found at:

https://www.acq.osd.mil/dpap/

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defence Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 00 - Supplementary Instructions

SECTION 00 22 12

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview.

1.1 The intent of this solicitation is to select one contractor for construction of the Corrosion Facility/Wash

Rack Hangar at Homestead Air Reserve Base, Florida. The Government will evaluate the proposals in accordance with the criteria described herein and award a firm-fixed-price contract to the responsible offeror whose proposal conforms to all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, all factors considered. All non-priced factors combined are considered pproximately equal to price. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.2 The basis of award is the Best Value Trade-Off Process. The Contracting Officer will award a firm-fixed-price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest-priced offer or to reject all offers.

1.3 This project is for construction of an approximate 19,500-SF two-bay hangar facility for aircraft corrosion mitigation/maintenance and wash rack functions. Project will include reinforced concrete foundation, concrete slab, apron paving, structural steel frame, roofing, exterior, electrical work, site improvements, utilities, fire alarm, fire sprinklers, fire suppression, wash water retention, worker fall protection, bridge cranes, and all necessary supporting facilities and controls for a complete and usable facility. Facility will have individual work surfaces, restrooms, locker/transfer and changing areas/showers, lockers, break area, offices, computer training area, and corrosion (maintenance)/wash bays. Facilities will be of permanent construction in accordance with the DoD Unified Facilities Criteria requirements.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.3 and 2.4 below. All proposal materials shall be submitted with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified herein.

2.3 Volume I shall be submitted electronically in accordance with the Proposal Submission Instructions in

Section 00 21 00 and include the following information:

Volume I – Factor I: Past Performance Volume I – Factor II: Management Plan Volume I – Factor III: Schedule Narrative Volume I – Factor IV: Small Business Participation Plan

NOTE: Failure to place the required submission information under the appropriate section (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit will not be evaluated.

2.4 Volume II shall be submitted electronically in accordance with the Proposal Submission Instructions in Section 00 21 00 and include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan (Large Business Only)

NOTE: Failure to place the required submission information under the appropriate section (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit will not be evaluated.

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance/Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Management Approach Plan and Factor III – Schedule Narrative will be rated using Table 3 below. Factor IV – Small Business Participation Plan will be rated using Table 4 below.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Proposals will be evaluated in accordance with the factors and sub factors below, listed in relative order of importance. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

4.2 Volume I – Factor I – Past Performance 1st

4.3 Volume I – Factor II – Management Plan 2nd

4.4 Volume I – Factor III – Schedule Narrative 3rd

4.5 Volume I – Factor IV – Small Business Participation Plan 4th

4.6 Volume II - Price and Pro Forma Information (Separate file from Volume I)

Tab A Standard Form 1442 and Price Breakout Schedule Not Rated

Tab B Joint Venture Agreement Not Rated

Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability

Tab D Pre-Award Information Not Rated

Tab E Subcontracting Plan Acceptable / Unacceptable

4.7 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

TABLE 1

Past Performance Relevancy Ratings

Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

TABLE 2

Performance Confidence Assessments Ratings

Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

TABLE 3

Combined Technical / Risk Assessment Ratings

Adjectival Rating Description Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

TABLE 4

Small Business Participation Plan Ratings Adjectival Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.

Good Proposal indicates a thorough approach and understanding of the small business objectives.

Acceptable Proposal indicates an adequate approach and understanding of small business objectives.

Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet small business objectives.

4.8 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offeror’s proposal with merit or will exceed specified performance or capability requirements to the advantage of the Government during contract performance.

3. Significant Strength. An aspect of an offeror’s proposal with appreciable merit or will exceed specified performance or capability requirements to the considerable advantage of the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation. Adverse past performance that must be addressed with Offerors includes unfavorable comments received from sources such as those received from respondents from past performance questionnaires or interviews that have not been finalized within a formal rating system.

9. Discussions. Exchanges (i.e., negotiations) in a competitive environment that are undertaken with the intent of allowing the offeror to revise its proposal. Discussions take place after establishment of the competitive range. See FAR 15.306(d).

10. Risk: As it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

5.0 Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if 95% of the construction has been completed. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size shall include: A minimum of 16,000 square feet of new construction.

5.1.3 Projects considered similar in scope to this project shall include: New construction of aircraft hangars with administrative and/or shop spaces; airfield apron paving; construction of administrative spaces including architectural finishes; construction of HVAC ductwork and equipment; and/or construction of electrical and telecommunication systems.

5.1.4 The prime contractor must have self-performed at least 15 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.

5.1.5 Additional consideration may be given for projects that contain the following features:

a) Projects completed for United States Army Corps of Engineers (USACE) or Naval Facilities Engineering Command (NAVFAC).

b) Projects performed within Florida’s coastal environments.

c) Aircraft hangars with a clear span (no interior support columns) of more than 150 feet and height of at least 40 feet.

5.1.6 The following information shall be provided for each project:

a) Project Title, Location, and Contract Number/Unique Identifier

b) Current percentage of construction complete and the date it was or will be complete

a. For projects that are not yet complete, provide description of work remaining to be completed.

c) Scope of the project, to include purpose/use of facility

d) Size of the project, differentiate square footage of new construction versus renovation if the project includes both

e) Role of firm: Provide a description of the type of work performed and the percentage of work that was self-performed

f) Two References: Customer primary point of contact (POC) and alternate POC for each project. (Name, relationship to project, agency/firm affiliation, city, state, current and correct phone number, and current and correct email address)

NOTE: There is a page limit of fifteen (15) 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Past Performance factor. Past-Performance Questionnaires/CPARS Evaluations do not count toward this page count.

5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).

5.2 Evaluation Criteria:

5.2.1 The SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.

5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all Unique Entity Identifier (UEI) numbers identified in the offeror’s proposal. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.2.3 The SSEB will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.

6.0 Volume I – Factor II: Management Approach

6.1 Submission Requirements:

Provide a Management Approach narrative that addresses the following requested information:

a) Describe the following relative to Subcontracting:

Identify the work which will be subcontracted.

Your process for selecting subcontractors.

Who in your firm will select subcontractors.

Who in your firm provides oversight of subcontractors.

Your process for coordinating subcontractors.

Your process for correcting poor subcontractor performance.

b) Identify and describe your Total Building commissioning firm relevant to the requirements outlined in Specification Section 01 46 00.00 .06. Narratives shall include the following:

Your commissioning firm’s certifications and qualifications.

Your commissioning firm’s Years of experience.

Information demonstrating your commissioning firm’s experience with two projects of complexity similar to this project.

A summary of systems to be commissioned.

c) Identify and describe the single Qualified Fire Protection Engineer (QFPE) that will be responsible for all fire protection system requirements outlined in Division 21 Specifications and Specification Section 28 31 76 including the design, testing, commissioning, and reports for all fire alarm, mass notification, and fire sprinkler. Provide a list of the QFPE’s prior relevant experience that demonstrates capabilities necessary for this contract.

d) Identify significant areas of risk and provide your plan for mitigating risk during contract performance

NOTE: The single Qualified Fire Protection Engineer (QFPE) that is submitted for evaluation under this factor and meeting the minimum contract requirements shall be used on the contract. Deviations or substitutions will not be permitted after award unless approved in writing by the Contracting Officer, and shall not be approved by the Contracting Officer unless the replacement QFPE is considered equal or better in comparison to the QFPE submitted with the proposal.

NOTE: There is a page limit of ten (10) 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Management Approach factor. Any information that exceeds these page limits will not be evaluated.

6.2 Evaluation Criteria:

Management Approach will be evaluated based on the contractor’s approach to coordination of subcontractors; level of understanding of the contract Total Building Commissioning requirements; level of understanding of the contract requirements for design, testing, and commissioning of the fire protection systems; and level of understanding of risks inherit to this project.

This is the start of the file's text. The full file is on GovTribe.