W912QR23R0042_Plans-0000.pdf
PDF 30 MB Posted
- Attached to
- Homestead Corrosion Wash Rack Facility
- Solicitation number
- W912QR23R0042
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR23R0042-0002.pdf | ||
| W912QR23R0042_Specs-0001.pdf | ||
| Site Visit Roster.pdf | ||
| W912QR23R0042_Specs_Vol1-0000.pdf | ||
| W912QR23R0042_Specs_Vol2-0000.pdf | ||
| W912QR23R0042_Specs_Vol3-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPTIONS
1. AIR COMPRESSOR, DRYER, RECEIVER TANK, AND AIR PURIFIER
2. CEILING FANS IN WASH RACK BAY
3. BIRD NETTING
4. METAL LINER PANELS IN WASH RACK 101
5. FALL PROTECTION: WASH RACK BAY
6. BRIDGE CRANE: WASH RACK BAY
7. MONORAIL HOIST: PAINT PREP ROOM
8. WINDOWS IN HANGAR DOORS
9. TRANSLUCENT WALL PANELS
HOMESTEAD AIR RESERVE BASE
PROJECT SITE
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
US Army Corps of Engineers ®
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
FISCAL YEAR:
ISSUE DATE:
P2#: 480262
PROJECT #:
CERTIFIED FINAL DESIGN
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_ARCH_CF18.rvt
4/17/2023 3:12:35 PM
G-001
C O
V E
R S
H E
E T
H O
M E
S T
E A
D A
R B
F
L C
B
U N
A L
H T
H O
M A
S
M B
U T
L E
R
C B
U N
A L
.1
.2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
/W A
S H
R A
C K
K Y
J M
HOMESTEAD ARB, FL
CORROSION FACILITY/WASH RACK
KYJM179021
04.19.2023
PROJECT DESCRIPTION:
THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW ONE-STORY, TWO-BAY HANGAR FACILITY FOR AIRCRAFT
CORROSION MITIGATION/WASH RACK FUNCTIONS, APPROXIMATELY 19,575 SQUARE FEET IN AREA. THE BUILDING WILL
INCLUDE REINFORCED CONCRETE FOUNDATION, CONCRETE FLOOR SLABS, METAL BUILDING SYSTEMS STEEL
BUILDING FRAME, ROOFING, LIGHTNING PROTECTION SYSTEM, ELECTRICAL, MECHANICAL, AND PLUMBING WORK, SITE
IMPROVEMENTS, UTILITIES, FIRE DETECTION/PROTECTION SYSTEMS, AND CONTROLS FOR A COMPLETE AND USABLE
FACILITY. IN ADDITION TO THE CORROSION/WASH BAYS, THE NEW FACILITY WILL CONTAIN SPACES FOR ALL
NECESSARY SUPPORTING FUNCTIONS, INCLUDING RESTROOMS, LOCKER AND CHANGING AREAS, SHOWERS, A BREAK
AREA, OFFICES, AND A COMPUTER TRAINING ROOM. THE CORROSION CONTROL BAY WILL HOUSE AN AIRCRAFT PAINT
BOOTH INSERT THAT WILL BE PROVIDED AND INSTALLED BY THE GOVERNMENT AFTER THE BUILDING CONSTRUCTION
IS COMPLETE. ALSO, A SMALLER PAINT BOOTH WILL BE PROVIDED AND INSTALLED BY THE GOVERNMENT IN THE
PAINT SHOP AFTER THE BUILDING CONSTRUCTION IS COMPLETE.
NO SCALE
2 VICINITY MAP
NO SCALE
1 PROJECT MAP
ARCHITECT CIVIL ENGINEER FIRE PROTECTION ENGINEER MECHANICAL ENGINEER
PLUMBING ENGINEER ELECTRICAL ENGINEER TECHNOLOGY ENGINEERSTRUCTURAL ENGINEER
04-19-2023 04-19-2023 04-19-2023
04-19-202304-19-202304-19-2023
04-19-2023
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
09 June 2023
W912QR23R0042
GENERAL NOTES
1. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE GOVERNMENT'S MINIMUM REQUIREMENTS AND NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS. UNLESS INDICATED OTHERWISE ON THE PLANS OR
SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED MANUFACTURERS
ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR EXCEED THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE BASIS
OF DESIGN.
2. IN THE CASE OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, SPECIFICATIONS SHALL TAKE PRECEDENCE. CONTRACTOR SHALL NOTIFY THE GOVERNMENT REPRESENTATIVE OF ANY CONFLICT BEFORE
PROCEEDING WITH THE WORK.
3. THE SPECIFICATIONS AND ALL CONSULTANT DRAWINGS ARE SUPPLEMENTAL TO THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE DRAWINGS BEFORE THE INSTALLATION OF ANY OF THE CONSULTANT'S WORK AND TO BRING ANY DISCREPANCIES OR CONFLICTS TO THE GOVERNMENT REPRESENTATIVE IN WRITING, FOR CLARIFICATION. IMPROPERLY INSTALLED WORK SHALL BE CORRECTED BY THE GENERAL
CONTRACTOR AT HIS EXPENSE AND AT NO EXPENSE TO THE GOVERNMENT.
4. ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE. NOTIFY THE CONTRACTING OFFICER'S
DESIGNATED REPRESENTATIVE OF ANY ABBREVIATIONS IN QUESTION.
5. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE VARIOUS TRADE ITEMS WITHIN THE SPACE ABOVE ALL CEILINGS (INCLUDING, BUT NOT LIMITED TO: STRUCTURAL MEMBERS, MECHANICAL DUCTS AND INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEM, LIGHT FIXTURES, CEILING SYSTEMS, AND ANY SPECIAL STRUCTURAL SUPPORTS REQUIRED) AND SHALL BE RESPONSIBLE FOR MAINTAINING THE FINISH CEILING HEIGHT ABOVE THE FINISH FLOOR INDICATED IN THE DRAWINGS AND THE FINISH SCHEDULE. CEILING HEIGHT DIMENSIONS ARE TO THE
FINISH SURFACE OF CEILING.
6. SIZE OF MECHANICAL AND ELECTRICAL EQUIPMENT PADS AND BASES ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL VERIFY DIMENSIONS WITH RESPECTIVE EQUIPMENT MANUFACTURER. ANY REQUIRED CHANGE IN THE SIZE
OF THE EQUIPMENT PAD SHALL BE PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_ARCH_CF18.rvt
4/17/2023 3:12:36 PM
G-002
G E
N E
R A
L N
O T
E S
A N
D D
R A
W
IN
G L
IS
T
H O
M E
S T
E A
D A
R B
F
L C
B
U N
A L
H T
H O
M A
S
M B
U T
L E
R
C B
U N
A L
.1
.2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
/W A
S H
R A
C K
K Y
J M
SHT No SHEET NAME
1400-MECHANICAL
M-001 NOTES, SYMBOLS AND ABBREVIATIONS
M-101 FIRST FLOOR HVAC PLAN
M-131 FIRST FLOOR PIPING PLAN
M-401 ENLARGED PLANS AND SECTIONS
M-501 HVAC DETAILS
M-511 PIPING DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-604 HVAC SCHEDULES
M-605 HVAC SCHEDULES
M-611 PIPING SCHEDULES
M-612 PIPING SCHEDULES
M-701 MECHANICAL SCHEMATICS
M-801 CONTROL SCHEMATICS
M-802 AHU-1/DOAS-1 CONTROL SEQUENCES AND SCHEMATICS
M-803 AHU-1 POINTS SCHEDULE
M-804 DOAS-1 POINTS SCHEDULE
M-805 CHILLER CONTROL SEQUENCE AND SCHEMATIC
M-806 CHILLER POINTS SCHEDULE
M-807 VAV TERMINAL CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-808 EF-1/EF-2 CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-809 EF-3/EF-4/EF-5 CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-810 EF-6 CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-811 CRAC-1/DF-1/DF-2 CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-812 FCU-1 CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-813 SHUTDOWN SWITCH CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-814 ELEC/WATER METER CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
M-815 EXTERIOR LIGHTING/AIR COMPRESSOR CONTROL SEQUENCE/SCHEMATIC/POINTS
SCHEDULE
M-816 WATER HEATER CONTROL SEQUENCE/SCHEMATIC/POINTS SCHEDULE
1500-ELECTRICAL
E-001 NOTES, SYMBOLS & ABBREVIATIONS
E-011 ELECTRICAL SITE PLAN
E-101 FIRST FLOOR POWER PLAN
E-102 LIGHTNING PROTECTION AND GROUNDING PLAN
E-103 HAZARDOUS AREA CLASSIFICATION PLAN
E-111 LIGHTING PLAN
E-112 HANGAR LIGHTING PHOTOMETRICS
E-113 BUILDING LIGHTING PHOTOMETRICS
E-114 EXTERIOR LIGHTING PHOTOMETRICS
E-501 DETAILS
E-502 DETAILS
E-503 DETAILS
E-601 LIGHTING SCHEDULES
E-602 LIGHTING SCHEDULES
E-603 EQUIPMENT SCHEDULE
E-604 PANEL SCHEDULES
E-605 PANEL SCHEDULES
E-606 PANEL SCHEDULES
E-701 ONE-LINE DIAGRAM
1700-TELECOMM
T-001 NOTES, SYMBOLS & ABBREVIATIONS
T-100 TECHNOLOGY SITE PLAN
T-101 FIRST FLOOR COMMUNICATIONS PLAN
T-401 ENLARGED PLANS, ELEVATIONS & SECTIONS
T-501 DETAILS
T-502 DETAILS
T-701 ONE-LINE DIAGRAMS
SHT No SHEET NAME
0800 - ARCHITECTUAL
A-001 GENERAL NOTES, SYMBOLS, & ABBREVIATIONS
A-002 AIR BARRIER PLAN
A-003 AIR BARRIER WALL SECTIONS
A-101 FLOOR PLAN
A-102 ROOF PLAN
A-111 REFLECTED CEILING PLAN
A-201 BUILDING ELEVATIONS
A-202 BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-321 WALL SECTIONS
A-322 WALL SECTIONS
A-323 WALL SECTIONS
A-401 ENLARGED PLANS AND ELEVATIONS
A-402 INTERIOR ELEVATIONS
A-403 PLANS AT HANGAR DOOR POCKETS
A-501 PARTITION TYPES
A-502 PARTITION TYPES
A-531 SECTION DETAILS
A-551 ROOF DETAILS
A-561 MILLWORK DETAILS
A-601 DOOR SCHEDULE, DOOR & FRAME TYPES
A-602 DOOR DETAILS
A-611 WINDOW SCHEDULE & TYPES
A-612 WINDOW DETAILS
Q-701 FURNITURE & EQUIPMENT PLAN
Q-702 EQUIPMENT SCHEDULE
0900 - INTERIORS
I-121 SIGNAGE PLAN
I-601 FINISH SCHEDULE & MATERIAL LEGEND
I-602 SIGNAGE SCHEDULE & DETAILS
1100 - FIRE PROTECTION
FA001 FIRE ALARM AND MASS NOTIFICATION SYSTEM LEGEND, NOTES AND DETAILS
FA100 FIRE ALARM AND MASS NOTIFICATION SYSTEMS FLOOR PLAN
FA501 FIRE ALARM AND MASS NOTIFICATION SYSTEM DETAILS
FA600 FIRE ALARM AND MASS NOTIFICATION SYSTEM MATRIX
FA601 FIRE ALARM AND MASS NOTIFICATION SYSTEM RISER DIAGRAM
FX001 FIRE SUPPRESION SYSTEMS GENERAL NOTES AND DETAILS
FX010 FIRE PROTECTION SITE PLAN
FX100 WET SPRINKLER SYSTEMS FLOOR PLAN
FX401 ENLARGED FIRE PROTECTION ROOM FLOOR PLAN
FX501 FIRE SUPPRESSION SYSTEM DETAILS
FX601 FIRE SUPPRESION SYSTEM DIAGRAM
1200 - PLUMBING
P-001 LEGENDS AND ABBREVIATIONS
P-100 FOUNDATION PLAN
P-101 PLUMBING PLAN
P-500 PLUMBING DETAILS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-600 PLUMBING SCHEDULES
P-700 PLUMBING ISOMETRICS
SHT No SHEET NAME
0000 - GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES AND DRAWING LIST
GI001 LIFE SAFETY CODE ANALYSIS
GI002 FIRE PROTECTION / LIFE SAFETY / ACCESSILIBLITY CODE REVIEW
GI110 LIFE SAFETY PLAN - LEVEL 1 COMPOSITE
GI111 FIRE PROTECTION CODE COMPLIANCE SITE PLAN
0500 - CIVIL
C100 LEGEND, ABBREVIATIONS, & NOTES
VF101 EXISTING CONDITIONS
VF102 EXISTING CONDITIONS
VF103 SITE PHOTOS
GC121 SURVEY CONTROL PLAN
GC141 CONSTRUCTION ACCESS & LOCATION PLAN
GC142 CONSTRUCTION OPERATIONS & PHASING PLAN- OVERALL
GC143 CONSTRUCTION OPERATIONS & SAFETY PHASING PLAN PHASE 1
GC144 CONSTRUCTION OPERATIONS & SAFETY PHASING PLAN PHASE 2
GC145 CONSTRUCTION OPERATION PLAN NOTES
BB101 SOIL BORINGS PLAN
BB102 SOIL BORINGS LOGS
BB103 SOIL BORINGS LOGS
EC101 EROSION CONTROL PLAN
EC501 EROSION CONTROL DETAILS
CD101 DEMOLITION PLAN
CD501 DEMOLITION DETAILS
CS111 SITE PLAN
CS171 MARKING LAYOUT PLAN
CS172 MARKING DETAILS
CS501 SITE DETAILS
CS502 SITE DETAILS
CS503 SITE DETAILS
CG111 GRADING & DRAINAGE PLAN
CP121 JOINTING PLAN
CP301 TYPICAL SECTIONS
CP302 TYPICAL SECTIONS
CP501 JOINTING DETAILS
CP502 JOINTING DETAILS
CU111 UTILITY PLAN
CU112 ENLARGED UTILITY PLAN
CU113 UTILITY PLAN- COMMUNICATIONS HOMERUN
CU301 SANITARY SEWER PROFILE
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
CU503 UTILITY DETAILS
CU504 UTILITY DETAILS
CU505 UTILITY DETAILS
CU506 UTILITY DETAILS
0700 - STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 GENERAL STRUCTURAL NOTES
S-004 GENERAL STRUCTURAL NOTES
S-005 STRUCTURAL ABBREVIATIONS
S-010 TYPICAL CONCRETE SLAB-ON-GRADE SECTIONS AND DETAILS
S-011 TYPICAL CONCRETE MASONRY WALL DETAILS
S-101 FOUNDATION PLAN
S-401 ENLARGED FOUNDATION PLAN - HANGAR DOOR
S-402 ENALRGED FRAMING PLAN - EQUIPMENT SUPPORT
S-501 FOUNDATION SECTIONS AND DETAILS
S-502 FOUNDATION SECTIONS AND DETAILS
S-601 FOUNDATION SCHEDULES AND DETAILS
S-602 FOUNDATION SCHEDULES AND DETAILS
04.19.2023
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_FIRE_CF18.rvt
4/13/2023 8:29:18 AM
GI001
L
IF
E S
A F
E T
Y C
O D
E A
N A
L Y
S
IS
H O
M E
S T
E A
D A
R B
F
L K
C
L A
Y
P C
H E
N
M B
U T
L E
R
N S
A N
M A
N N
/2
/2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
W
A S
H R
A C
K
K Y
J M
1. REFERENCED CODES AND STANDARDS
UNIFIED FACILITIES CRITERIA (UFC)
UFC 1-200-01: GENERAL BUILDING REQUIREMENTS; 8 OCT 2019
UFC 1-200-02: HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENTS CHANGE 04, 01 OCT 2019
UFC 3-600-01: FIRE PROTECTION ENGINEERING FOR FACILITIES; CHANGE 4, 7 FEB. 2020
UFC 4-010-01: DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS; 12 DEC 2018
UFC 4-021-01: DESIGN AND O&M: MASS NOTIFICATION SYSTEMS; CHANGE 1, 1 JAN 2010
UFC 4-211-01: AIRCRAFT MAINTENANCE HANGARS; CHANGE 1, NOV 2017
UFC 4-211-02; AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES; 1 DEC 2012
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 1, FIRE CODE, 2018 EDITION
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION, 2019 EDITION NFPA 24, INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR APPURTENANCES, 2019 EDITION
NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, 2018 EDITION
NFPA 33, STANDARD FOR SPRAY APPLICATION USING FLAMMABLE OR COMBUSTIBLE MATERIALS, 2018 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2017 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNAL CODE, 2019 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2018 EDITION
NFPA 409, STANDARD ON AIRCRAFT HANGARS, 2016 EDITION
OTHER REFERENCES
INTERNATIONAL CODE COUNCIL, INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION (AS MODIFIED BY UFC 1-200-01).
ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY STANDARD FOR DEPARTMENT OF DEFENSE FACILITIES, 2015 HOMESTEAD ARB ELECTRICAL, FIRE ALARM / MASS NOTIFICATION AND ENERGY CONSERVATION DESIGN
REQUIREMENTS / GUIDELINES - MAY 2016, REVSION 9
2. BUILDING DESCRIPTION
CONSTRUCTION TYPE: TYPE IIB
BUILDING HEIGHT: 44 FEET (TO HIGHEST ROOF PEAK)
BUILDING AREA: 19,454 SQ. FT.
FIRE PROTECTION: FULLY-SPRINKLERED
IBC OCCUPANCY: NON-SEPARATED, MIXED USE
-STORAGE GROUP S-1 AIRCRAFT HANGAR, SERVICE AREA
-FACTORY F-1 SHOP SPACE
-BUSINESS OFFICE
NFPA 101 OCCUPANCY*: MIXED OCCUPANCY
-BUSINESS OFFICE SPACE
-INDUSTRIAL HANGARS - SERVICE AREA, SHOP SPACE
*PER NFPA 101, A MIXED OCCUPANCY BUILDING IS WHEN DIFFERENT OCCUPANCY TYPES ARE INTERMINGLED WITHOUT FIRE- RATED SEPARATION. FOR MIXED OCCUPANCIES, THE BUILDING SHALL COMPLY WITH THE MOST RESTRICTIVE REQUIREMENTS OF THE OCCUPANCIES INVOLVED, UNLESS SEPARATE SAFEGUARDS ARE APPROVED.
3. MAXIMUM ALLOWABLE HEIGHT AND AREA
THE HANGAR WILL BE CONSIDERED AN "UNLIMITED AREA" BUILDING PER IBC SECTION 507.6. THEREFORE, THE HANGAR WILL BE REQUIRED TO BE FULLY-SPRINKLERED AND HAVE AT LEAST 60 FOOT OPENING AROUND THE BUILDING EXTERIOR.
THE HEIGHT OF THE HANGAR IS ALLOWED TO BE UNLIMITED WHEN CONSTRUCTED IN ACCORDANCE WITH UFC 4-211-1.
4. FIRE RESISTANCE REQUIREMENTS
STRUCTURAL FRAME (INCLUDING COLUMNS, GIRDERS, AND TRUSSES)
BEARING WALLS
EXTERIOR WALLS
INTERIOR WALLS
NONBEARING WALLS
EXTERIOR WALLS WITH FIRE SEPARATION DISTANCE < 5 FT
EXTERIOR WALLS WITH FIRE SEPARATION DISTANCE >= 5 FT OR <10 FT
INTERIOR WALLS
FLOOR CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS)
ROOF CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS)
BARRIERS SEPARATING THE HANGAR FROM SUPPORT AREAS
BARRIERS BETWEEN FIRE AREAS
FIRE RESISTANCE RATINGS FOR LIQUID STORAGE AREAS LESS THAN 151 FT2
SEPARATION OF SPRAY BOOTHS FROM OTHER OPERATIONS
CORRIDORS PROVIDING ACCESS TO AN EXIT
PROTECTION FROM HAZARDS
IBC § 602.2 & TABLE 601
IBC § 503
IBC § 503
UFC 3-600-01 § 9-7.2.1
IBC § 508.3
IBC § 311.2
IBC § 306.2
IBC § 304.1
NFPA 101 § 6.1.14.2.2
NFPA 101 § 6.1.11.1
NFPA 101 § 6.1.12.1
0 HOUR IBC TABLE 601
0 HOUR IBC TABLE 601
0 HOUR IBC TABLE 601
1 HOUR IBC TABLE 602
1 HOUR IBC TABLE 602
0 HOUR IBC TABLE 601
0 HOUR IBC TABLE 601
0 HOUR IBC TABLE 601
1 HOUR UFC 4-211-1 § 3-3.1.3
1 HOUR UFC 4-211-1 § 3-3.1.3
1 HOUR NFPA 30 TABLE 9.9.1
1 HOUR or 3 FEET NFPA 33 § 5.5
0 HOUR NFPA 101 § 38.3.6.1(3)
1-HOUR OR SMOKE PARTITION NFPA 101 § 38.3.2.1 & 8.7
NFPA 101 § 7.4.1.3
NFPA 101 § 38.2.6.3
NFPA 101 TABLE 40.2.6.1
NFPA 101 § 38.2.5.3.1
NFPA 101 TABLE 40.2.5.1
NFPA 101 § 38.2.5.2.1
NFPA 101 TABLE 40.2.5.1
NFPA 101 § TABLE 7.3.3.1
NFPA 101 § TABLE 7.3.3.1
UFC 4-22-1 § 3-3.1.9
UFC 3-600-01, TABLE 10-1
UFC 3-600-01, TABLE 10-1
NFPA 101 TABLE 7.3.1.2
NFPA 101 TABLE 7.3.1.2
NFPA 101 TABLE 7.3.1.2
UFC 3-600-01, TABLE 10-1
NFPA 101 TABLE 7.3.1.2
UFC 3-600-01, TABLE 10-1
5. INTERIOR FINISHES
INTERIOR WALL AND CEILING FINISH IN CORRIDORS AND LOBBIES
INTERIOR WALL AND CEILING FINISH IN EXITS
INTERIOR WALL AND CEILING FINISH IN ALL OTHER AREAS
-BUSINESS OCCUPANCY
-INDUSTRIAL OCCUPANCY
INTERIOR FLOOR FINISH IN EXITS AND EXIT ACCESS CORRIDORS
6. FIRE SUPPRESSION AND ALARM:
COMPLETE AUTOMATIC FIRE SPRINKLER PROTECTION SHALL BE PROVIDED THROUGHOUT THE FACILITY.
AN INTEGRATED FIRE ALARM AND MASS NOTIFICATION SYSTEM SHALL BE PROVIDED.
SYSTEM REPORTING SHALL BE TO THE BASE PRIMARY AND SECONDARY CENTRAL MONITORING STATIONS.
7. PORTABLE FIRE EXTINGUISHERS:
MUST BE PROVIDED WHERE NFPA 101 REQUIRES (UFC 3-600-1 § 9-17.1)
REQUIRED FOR BUSINESS OCCUPANCY (NFPA 101 § 38-3.5)
HAZARD CLASSIFICATION:
LIGHT (LOW) HAZARD CLASS A AND C HAZARDS NFPA 10 § 5.2 & 5.4
DESIGN BASIS: 10 POUND DRY CHEM; 4A:40BC
MAXIMUM TRAVEL DISTANCE TO FE: 75 FEET
MAXIMUM FLOOR AREA PER UNIT A: 3,000 SQ.FT.
MAXIMUM FLOOR AREA FOR FE: 11,250 SQ.FT.
EXTINGUISHER FOR CLASS C HAZARDS SHALL BE LOCATED ON THE BASIS OF THE ANTICIPATED CLASS A
HAZARDS (NFPA 10 SECTION 6.4.3).
EXTINGUISHERS TO BE PROVIDED AND INSTALLED BY THE GOVERNMENT.
8. ADDITIONAL BUILDING CONSTRUCTION REQUIREMENTS:
BUILDING SHALL HAVE AT LEAST ONE MEANS OF ALL-WEATHER GROUND ACCESS TO ALLOW EMERGENCY VEHICLES UNIMPEDED ACCESS TO THE BUILDING. ALL WEATHER GROUND ACCESS MUST BE PAVED, OR APPROVED BY THE AHJ, STARTING FROM THE ROAD, AND TERMINATE NO FARTHER THAN 33 FEET FROM THE
BUILDING. (UFC 3-600-01 § 9-1.1)
PROVIDE SUITABLE EXTERIOR FIRE APPARATUS ACCESS ON AT LEAST TWO COMPLETE SIDES OF THE BUILDING. SUITABLE ACCESS SURFACES INCLUDE RAMPS, AIRCRAFT PARKING APRONS, AUTOMATIC PARKING AREAS, FIRE APPARATUS ACCESS ROADS, AND STABILIZED LANDSCAPED AREAS. (UFC 4-211-01 § 3-3.1.11)
THE CLEAR SPACE AROUND GROUP I HANGARS SHALL BE 15 FT. (NFPA 409 TABLE 5.3.1)
9. MEANS OF EGRESS:
MINIMUM NUMBER OF MEANS OF EGRESS REQUIRED:
-OCCUPANT LOAD 1-500: NOT LESS THAN 2 EXITS REQUIRED
TRAVEL DISTANCE TO AN EXIT LIMIT:
-BUSINESS OCCUPANCY: 300 FEET
-INDUSTRIAL OCCUPANCY: 250 FEET
COMMON PATH LIMIT:
-BUSINESS OCCUPANCY: 100 FEET
-INDUSTRIAL OCCUPANCY; 100 FEET
DEAD-END LIMITS:
-BUSINESS OCCUPANCY: 50 FEET
-INDSTRIAL OCCUPANCY: 50 FEET
EGRESS CAPACITY FACTORS:
-STAIRWAYS*: 0.3 INCHES PER OCCUPANT SERVED
-LEVEL COMPONENTS & RAMPS: 0.2 INCHES PER OCCUPANT SERVED
PROVIDE EXITS OR EXIT ACCESS DOORS AROUND THE ENTIRE PERIMETER
OF THE HANGAR BAY AT A MAXIMUM SPACING OF 150 FEET. TRAVEL
DISTANCE LIMITATIONS BEGIN AT THE DOOR FROM THE HANGAR BAY.
10. OCCUPANT LOAD:
AIRCRAFT HANGAR: 500SF / PERSON 19 PERSONS
MANUFACTURING: 200SF / PERSON 19 PERSONS
STORAGE: 500SF / PERSON 2 PERSONS
BUSINESS: 150SF / PERSON 12 PERSONS
INDUSTRIAL: 100SF / PERSON 3 PERSONS
LOCKER ROOM: 50SF / PERSON 10 PERSONS
BREAKROOM/TRAINING: 15SF / PERSON 25 PERSONS
BUILDING EQUIPMENT: 500SF / PERSON 4 PERSONS
TOTAL OCCUPANT LOAD: 94 PERSONS
CLASS A OR B NFPA 101 § 38.3.3.2.1
CLASS A NFPA 101 § 38.3.3.2.1
CLASS A, B, OR C NFPA 101 § 38.3.3.2.2
CLASS A, B, OR C NFPA 101 § 40.3.3.2.2
CLASS II NFPA 101 § 38.3.3.3.2
GENERAL INSTRUCTION BUILDING - CODE ANALYSIS
W
2Q R
R
_P la ns -0
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_FIRE_CF18.rvt
4/13/2023 8:29:27 AM
GI002
F
IR
E P
R O
T E
C T
IO
N
L
IF
E
S A
F E
T Y
A
C C
E S
S
IL
IB
L
IT
Y C
O D
E R
E V
IE
W
H O
M E
S T
E A
D A
R B
F
L K
C
L A
Y
P C
H E
N
N S
A N
M A
N N
/2
/2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
W
A S
H R
A C
K
K Y
J M
W
2Q R
R
_P la ns -0
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
A
S
S
S S
R
R
P
P
CO
P
A
S
ELECTRICAL ROOM
COMM ROOM
BREAK ROOM
TRAINING ROOM
VESTIBULE
TOOL EQUIPMENT
SHOP
119CORRIDOR
VESTIBULE
MECHANICAL ROOM
MEN
111A
WOMEN
112A
WOMEN'S SHOWER
112B
MEN'S SHOWER
111B
PPE ROOM
STENCIL ROOM
PAINT MIXING
PAINT STORAGE
SHOP
FIRE PROTECTION
ROOM
JANITOR/ STORAGE
109 VEST
NCOIC OFFICE
PAINT SHOP
BEAD BLAST
STORAGE
WASH RACK
CORROSION HANGAR
C
C
D E.1
E.1
F G H
H
K
K
124A
119B 100A
101A
102A
122B
120C
0.2
0.2
0.2
0.2
0.2
0.2
0.2
1:200
1:200
1:500
1:200
1:200
1:150
1:100
1:50
1:150
1:150
1:50
1:50
1:15
1:15
1:500
1:500
1:500
1:500
1:100
1:150
1:500
1:200
1:200
1:500
1:500
21' - 11 1/4"
TD 93 FT
CP 55 FT
A J
B
B
FMCP
TRAN
MESH
LOC
35' - 6 1/2"
/4
29' - 0 1/2"
/2
FECFEC
FEC
FEB
FEB
FEB
FEB
FEB
FEB
FEB
FEB
FEB
TD 54 FT
37' - 11"
/4
FIRE
WINDOWS
KB
LS
EQCP
2 HOUR FIRE
RATED WALL
FIRE RATED WALL SYMOLOGY
1 HOUR FIRE
RATED WALL
KEYED NOTES :
1. DOOR(S) MUST BE NORMALLY CLOSED
2. STEEL TO BE TREATED WITH THIN-FILM
INTUMESCENT COATING.
3. INTUMESCENT COATING AT EXPOSED FLOOR FLANGE
WALL MOUNTED FIRE ALARM /MASS NOTIFICATION SPEAKER
STROBE (CANDELA SHOWN ON PLANS)
WALL MOUNTED FIRE ALARM /MASS NOTIFICATION STROBE
ONLY (CANDELA SHOWN ON PLANS)
CEILING MOUNTED FIRE ALARM /MASS NOTIFICATION STROBE
ONLY (CANDELA SHOWN ON PLANS)
CEILING MOUNTED FIRE ALARM /MASS NOTIFICATION SPEAKER
STROBE (CANDELA SHOWN ON PLANS)
SPEAKER - HORN TYPE
ELECTRIC BELL; 10": BELL SIZE
ADDRESSABLE PHOTOELECTRIC SMOKE DETECTOR
DUCT DETECTOR REMOTE ALARM AND TEST STATION
ADDRESSABLE DUCT SMOKE DETECTOR, S: SUPPLY; R: RETURN
ADDRESSABLE MANUAL PULL STATION
FIRE SPRINKLER FLOW SWITCH
FIRE SPRINKLER TAMPER SWITCH
PRESSURE DETECTION SWITCH
FLAME DETECTOR: DET-TRONICS MODEL X3301
ADDRESSABLE MONITOR MODULE
ADDRESSABLE RELAY MODULE
WALL MOUNTED RADIO ANTENNA
CARBON MONOXIDE DETECTOR
WALL / CEILING MOUNTED SPEAKER
FAN MOTOR STARTER
GROUNDED SHIELDED CIRCUIT
CONCENTRATE TANK ELECTRONIC LEVEL SWITCH
SECURE KEYED BOX
FIRE ALARM SYMBOLS AND LEGEND:
MM
R
A
P
S
CO
P
RTS
#CD
#CD
10"
#CD
#CD
SS
LS
KB
EXIT ACCESS TRAVEL PATH
TD=EXIT TRAVEL DISTANCE
CP=COMMON PATH OF TRAVEL
ACCESSBILE ENTRANCE/EXIT
EXIT LIGHT CEILING MOUNT
EMERGENCY LIGHT
FIRE EXTINGUISHER CABINET
(FEC) 4A:40BC
FIRE EXTINGUISHER BRACKET
(FEB) 4A:40BC
FIRE RATED DOOR (X=DOOR
RATING)
# OCCUPANTS USING EXIT
LIFE SAFETY LEGEND
EXIT CAPACITY
OCCUPANCY CLASSIFICATION
ROOM OCCUPANT LOAD
OCCUPANT LOAD FACTOR1:X
XX
XX
XX
NFPA 101: INDUSTRIAL
IBC: FACTORY (F-1)
NFPA 101: BUSINESS
IBC: BUSINESS
NFPA 101: INDUSTRIAL
IBC: STORAGE (S-1)
FEC
FEB
DOOR NUMBERXXXX
XX"
.X
XXX
XX
CLEAR WIDTH
WIDTH FACTOR
EXIT CAPACITY
X
# OCCUPANTS USING EXIT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_FIRE_CF18.rvt
4/13/2023 8:29:32 AM
GI110
L
IF
E S
A F
E T
Y P
L A
N
L E
V E
L
C O
M P
O S
IT
E
H O
M E
S T
E A
D A
R B
F
L K
C
L A
Y
P C
H E
N
M B
U T
L E
R
N S
A N
M A
N N
/2
/2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
W
A S
H R
A C
K
K Y
J M
1/8" = 1'-0"1
LIFE SAFETY PLAN
SCALE IN FEET - 1/8" = 1'-0"
170 170
CONVENIENCE DOOR
1 1
TYP
W
2Q R
R
_P la ns -0
F F
W W
W W F
F Ø
B185
F
W W W
WWW W
W W
W
W W
W
W
W W
FIRE DEPARTMENT
APPARATUS ACCESS
49' - 10"
78' - 4"
F
B4710
NEW CORROSION
HANGAR
5 6
20' - 0"
W
W W
W W
W W
6"
87' - 5"
69' - 0"
2"
294 FT
Ø 6"
Ø6"
29' - 7 3/4"
1/ 4"
KB
SITE SAFETY SYMBOLS AND LEGEND:
EXISTING CITY WATER SUPPLY
NEW WATER SUPPLY LINE
NEW DEDICATED FIRE WATER LINE
SECTION CONTROL VALVE
POST INDICATOR VALVE (PIV)
BUILDING FIRE SPRINKLER RISER
FIRE HYDRANT
DISTANCE BETWEEN TWO HYDRANTS
(FT)
1. FIRE RISERS ARE ALL IN FIRE PROTECTION ROOM.
REFER TO SHEET FX401 FOR MORE DETAILS.
2. DISTANCES FROM FIRE HYDRANTS TO CORNERS OF
HANGAR.
3. NEW FIRE HYDRANT.
4. EXISTING OIL-WATER SEPARATOR.
5. FIRE DEPARTMENT MAIN ENTRANCE WITH SECURE
KEYED BOX.
6. MAIN FIRE ALARM, MNS AND EAGLE QUANTUM
PREMIER FIRE DETECTION CONTROL PANELS.
7. FIRE DEPARTMENT CONNECTION
8. 15 FT. CLEAR SPACE IAW NFPA 409 TABLE 5.3.1
9. SUITABLE EXTERIOR FIRE APPARATUS ACCESS
KEYED NOTES :#
GENERAL NOTES:
1. BUILDINGS, FIRE LINE, AND WATER LINE SHOWN FOR
GENERAL LIFE SAFETY INFORMATION ONLY. REFER TO CIVIL
DRAWINGS FOR MORE DETAILS.
2. FIRE HYDRANTS ARE ALL ON DOMESTIC WATER SUPPLY
LOOPS.
3. DEDICATED FIRE LINE IS TO BE FROM EXISTING FIRE PUMP
HOUSE B217. REFER TO SHEET FX010 FOR MORE
INFORMATION.
XX FT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
F
IL
E N
U M
B E
R
P
BIM 360://1500561 BMHJV Homestead Corros Ctrl Hg_R2018/1500561_FIRE_CF18.rvt
4/13/2023 8:29:35 AM
GI111
F
IR
E P
R O
T E
C T
IO
N
C O
D E
C O
M P
L
IA
N C
E S
IT
E
P L A
N
H O
M E
S T
E A
D A
R B
F
L K
C
L A
Y
P C
H E
N
M B
U T
L E
R
N S
A N
M A
N N
/2
/2
CERTIFIED FINAL DESIGN
C O
R R
O S
IO
N
F A
C
IL
IT
Y
W
A S
H R
A C
K
K Y
J M
1" = 20'-0"1
FIRE PROTECTION CODE COMPLIANCE SITE PLAN
0 402010 W
2Q R
R
_P la ns -0
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
LIGHT POLE
SURVEY CONTROL POINT
CHAIN LINK FENCE
ELECTRIC LINE
PROJECT LIMITS / LIMITS OF
GRADING
STORM DRAIN PIPE
LOW PROFILE BARRICADES
SYMBOLS
AB AGGREGATE BASE
AC ASPHALT CONCRETE
ALT ALTERNATE
AOA AIR OPERATIONS AREA
APCH APPROACH
APPROX APPROXIMATE
ARFF AIR RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
ATO AIR TRAFFIC ORGANIZATION
AWG AMERICAN WIRE GAUGE
BC BEGINNING OF CURVE
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
BVC BEGINNING OF VERTICAL CURVE
C-C CENTER TO CENTER
C CURVE
CB CATCH BASIN
CIPCP CAST-IN-PLACE CONCRETE PIPE
CJ CONSTRUCTION JOINT
CFS CUBIC FEET PER SECOND
CL, C/L CENTERLINE
CLF CHAIN-LINK FENCE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CONT CONTINUOUS
CRGO CARGO
CP CONTROL POINT
DB DIRECT BURIAL
DEG DEGREE
DI DROP INLET
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DP DEPTH
(E) EXISTING
E ELECTRICAL LINE, EASTING
EC END OF CURVE
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EVC END OF VERTICAL CURVE
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOW LINE
FNC FENCE
FOD FOREIGN OBJECT DEBRIS
FPS FEET PER SECOND
FT FEET
G NATURAL GAS LINE
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GND GROUND
GPM GALLONS PER MINUTE
GS GROUND SHOT
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HIRL HIGH INTENSITY RUNWAY LIGHT
HITHL HIGH INTENSITY THRESHOLD LIGHT
HORIZ HORIZONTAL
HMA HOT MIX ASPHALT
HWY HIGHWAY
IE INVERT ELEVATION
IN INCHES
IP IN-PAVEMENT
L LENGTH, LEFT, LINE, LIGHT
LAT LATITUDE
LBS POUNDS
LED, (L) LIGHT EMITTING DIODE
LF LINEAL FEET
LOC LOCALIZER
LONG LONGITUDE
LWL LOW WATER LEVEL
MH MANHOLE
MAX MAXIMUM
MG MILLED GRADE
MID MIDPOINT
MIN MINIMUM
MALS MEDIUM APPROACH LIGHTING SYSTEM
MIRL MEDIUM INTENSITY RUNWAY LIGHT
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(N) NEW
N NORTHING
NAVAIDS NAVIGATION AIDS
NIC NOT IN CONTRACT
NO. OR # NUMBER
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OFF, O/S OFFSET
OC ON CENTER
OH OVERHEAD
PAPI PRECISION APPROACH PATH INDICATOR
PB PULL BOX
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCF POUNDS PER CUBIC FOOT
PFC POROUS FRICTION COURSE
PERF PERFORATED
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POC POINT OF CURVE
POE POINT OF ENDING
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT POINT, POINT OF TANGENCY
PVC POINT OF VERTICAL CURVE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
QTY QUANTITY
R RIGHT, RADIUS
R&R REMOVE AND REPLACE
RAIL RUNWAY ALIGNMENT INDICATOR LIGHT
RC RELATIVE COMPACTION
REL RELOCATE EXISTING
REIL RUNWAY END IDENTIFIER LIGHT
RCP REINFORCED CONCRETE PIPE
REQ REQUIRED
RGL RUNWAY GUARD LIGHT
RPR RESIDENT PROJECT REPRESENTATIVE
ROW RIGHT OF WAY
RTR REMOTE TRANSMITTER/RECEIVER
RWA RESTRICTED WORK AREA
RWAPP RUNWAY APPROACH LIGHT
RWY RUNWAY
S SANITARY LINE, SALVAGED
SF SQUARE FOOT
SG STRAIGHT GRADE
SH SHOULDER
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SMGS SURFACE MOVEMENT GUIDANCE AND
CONTROL SYSTEM
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
SS STAINLESS STEEL
SD STORM DRAIN
STA STATION
STD STANDARD
STL STEEL
SY SQUARE YARDS
T TELEPHONE LINE
TC TOP OF CURB
TG TOP OF GRATE
T/L TAXILANE
TOE TOE OF BANK
TOP TOP OF BANK
TDZ TOUCHDOWN ZONE
TWY TAXIWAY
TYP TYPICAL
UD UNDERDRAIN
OFA OBJECT FREE AREA
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
USA UNITED STATES OF AMERICA
V VELOCITY
V VOLT
VC VERTICAL CURVE
VERT VERTICAL
VG VALLEY GUTTER
VIF VERIFY IN FIELD
VASI VISUAL APPROACH SLOPE INDICATOR
W
WIDTH, WEST, WATER LINE
W/
WITH
W/O WITHOUT
WSE WATER SURFACE ELEVATION
WSP WELDED STEEL PIPE
WV WATER VALVE
WWM WELDED WIRE MESH
BM#1
x
E
SD
NATURAL GAS LINEG
SANITARY SEWER LINESAN
WATER LINEW W
HAUL ROUTE
NEW PCC PAVEMENT
FIRE HYDRANT AND VALVE
SEWER CLEAN OUT
CATCH BASIN
STORM DRAIN MANHOLE
SANITARY SEWER
MANHOLE
LINES
PATTERNS
GENERAL ABBREVIATIONS
B
F
H
J
D
THICKENED EDGE ISOLATION
JOINT
DOWELED CONTRACTION JOINT
NON-DOWELED CONTRACTION
JOINT
ASPHALT/CONCRETE EDGE JOINT
DOWELED CONSTRUCTION JOINT
SF SILT FENCE
ALIGNMENT
EXISTING ELEVATION CONTOUR
HARB HOMESTEAD AIR RESERVE BASE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER REPRESENTATIVE
T ASPHALT/CONCRETE TRANSITION JOINT
NEW FULL STRENGTH ASPHALT PAVEMENT
FR FLUSHING RISER
W
EXISTING DRAINAGE FLOW ARROW
DEMOLITION
FIRE SERVICE LINEF F
C-100
LE
G
EN
D
A
BB
R
EV
IA
TI
O N
S
N O
TE
S
D.
S
CH
MI
DG
AL
L
D .R
AN
EY
P.
BU
H
LE
R
M .B
U
TL
ER
NEW ELEVATION CONTOUR4
TREE
MILKPEA (PROTECTED SPECIES)
04-19-2023
W
2Q R
R
_P la ns -0
X
X
X
X X
X X
X X
X X
X
SAN
SAN
LS
E
E
E
E
E
E
E E
E
E
E E
E
E
E
E E
E
E
E
E
E
E
E
E
E E E E E E E E E E
E E
E E
E E
E E E E E E E E E E E E E E E
E E
E E
E E
E E
E
E E
EEEE
E E
E E
E
W W W W W W
W W W W
W
W
W
W
W
W W
W W W
WWWWWWW
W
COMM
COMM
C O
M M
C O
M M
COMM
COMM
COMM COMM
C O
M M
C O
M M
COMM COMM
CO
M
M
CO
M
M
COMM
COMM
W
W
W
W W
WW
WWWWW
W
W
W W
W
F
W
W
W
W
W
F F
F F
F F
F
F F
F F
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W
W
W W
W
W
F F
EEEEE
E
E
E
E
E
E
E
E
EEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SAN
SAN
SAN
SAN
SAN
SAN SAN
SANSAN
SAN
SAN SAN
SAN
SAN
SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN SAN SAN SAN SAN SAN
SAN
SAN
SAN
SAN
SAN
E
E
W W
5.0
6.0
6.0
7.0
5.0
6.0
4.0
4.
5.0
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
BLDG 185
WESTOVER AVENUE
BLDG 187
BLDG 194
BLDG 191
WASH
RACK
00 40 80
EXISTING TUG DRIVE
(HEAVY DUTY ASPHALT)
EXISTING OIL-WATER
SEPARATOR
EXISTING SANITARY SEWER MANHOLE
TOP ELEV= 6.26'
8" METAL INV. ELEV (N)=2.81'
8" METAL INV. ELEV (S)=2.68'
4" METAL INV. ELEV (W)=4.46'
6" METAL (SEALED) (SW)= 2.71'
6" METAL (SEALED) (SE)= 2.91'
EXISTING SANITARY SEWER MANHOLE
TOP ELEV= 6.29'
8" METAL INV. ELEV (NE)=2.03'
8" METAL INV. ELEV (SW)=1.92'
8" METAL INV. ELEV (S)= 1.96'
2" PVC INV. ELEV (E)= 5.09'
2" PVC INV. ELEV (SE)= 5.09'
EXISTING ASPHALT RAMP
EXISTING TOP OF BANK
EXISTING PROPANE
TANK
EXISTING RAISED
CONCRETE WATER TANK
EXISTING HEADWALL
TOP ELEV.= 2.5'
INV. ELEV.=0.2'
EXISTING HEADWALL
TOP ELEV.= 2.0'
INV. ELEV.=-0.1'
EXISTING BUILDING FIRE
BACKFLOW PREVENTER
EXISTING SLIDE GATE
EXISTING
EDGE OF
PAVEMENT
EXISTING DOMESTIC/FIRE
WATER LINE
EXISTING
UNDERGROUND
ELECTRICAL LINES
EXISTING RESTRICTED
AREA BOUNDARY MARKING
EXISTING
WATERLINE
EXISTING FIRE
HYDRANT
EXISTING
FENCE
EXISTING
GRASS
LIMITS OF MILKPEA
(10' BUFFER)
LEGEND AND NOTES:
1. SEE SHEET GC121 FOR SURVEY CONTROL DATA
2. EXISTING SITE PHOTO - SEE SHEET VF103
FOR REFERENCED PHOTOS
TBM#1
TBM#2
ENTRY CONTROL POINT
MARKING
EXISTING WASH RACK
INDUSTRIAL WASTE
PUMP
EXISTING ASPHALT RAMP
EXISTING ELECTRICAL
TRANSFORMERS
VF101
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
6/V6/V
COMM
SIREN
POINT
X X
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
PROJECT LOCATION
BLDG 185
WESTOVER AVENUE
BLDG 187
BLDG 194
BLDG 191
WASH
RACK
EXISTING TUG
DRIVE
(HEAVY DUTY
ASPHALT)
EXISTING OIL-WATER
SEPARATOR
EXISTING
ASPHALT
RAMP
EXISTING
CONCRETE
DELINEATOR
EXISTING TOP OF BANK
EXISTING
PROPANE TANK
EXISTING RAISED
CONCRETE WATER TANK
EXISTING HEADWALL
TOP ELEV.= 2.5'
INV. ELEV.=0.2'
EXISTING HEADWALL
TOP ELEV.= 2.0'
INV. ELEV.=-0.1'
VF102
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
EXISTING SITE (LOOKING NORTH)
EXISTING RAMP AND TUG DRIVE
EXISTING RAMP (LOOKING WEST)
EXISTING GRASS AREA AND TREES (LOOKING EAST)
EXISTING GATE
EXISTING OIL/WATER SEPARATOR
EXISTING SWALE (LOOKING EAST)
EXISTING SWALE AND DITCH (LOOKING WEST)
EXISTING DITCH (LOOKING WEST) VF103
SI
TE
P H
O
TO
S
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023 W
2Q R
R
_P la ns -0
X
X
X X
X X
X X
X X
X
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
1.) THE HORIZONTAL DATUM UTILIZED FOR THIS PROJECT IS NAD 1983 FLORIDA EAST ZONE, 2011 ADJUSTMENT , U.S. SURVEY FEET. SAID DATUM WAS ESTABLISHED BY UTILIZING THE FLORIDA
PERMANENT REFERENCE NETWORK (FPRN).
2.) THE VERTICAL DATUM UTILIZED FOR THIS PROJECT IS NAVD 1988, U.S. SURVEY FEET. THE
BENCHMARK UTILIZED WAS A GEOMAP TECHNOLOGIES, INC SURVEY MARK "F5-7G" WITH AN
ELEVATION OF 5.77 FEET.
3.) NO UNDERGROUND FOUNDATIONS OR FOOTERS WERE EXCAVATED OR LOCATED FOR THIS
SURVEY.
4.) ACCESS TO SOME LOCATIONS WAS RESTRICTED DURING TIME OF FIELD SURVEY. THIS MAY
EFFECT THE FINAL SURVEY.
5.) SURVEYOR DID NOT CONTACT SUBSURFACE UTILITY LOCATOR SERVICE. ALL SUBSURFACE
UTILITY LOCATION WAS PERFORMED BY SURVTECH SOLUTIONS, INC.
6.) NO EXCAVATION WAS DONE IN PREPARATION OF THIS SURVEY. THE TYPE OF UTILITIES
SHOWN HEREON ARE BASED ON OBSERVATIONS OF ABOVE GROUND FEATURES AND THEIR
HORIZONTAL LOCATIONS WERE DETECTED USING GROUND PENETRATING RADAR AND
ELECTROMAGNETIC UTILITY LOCATORS.
7.) PRIOR TO EXCAVATION IT IS THE CONTRACTORS RESPONSIBILITY TO SECURE LOCATION OF PUBLIC UTILITIES BY CONTACTING SUNSHINE STATE ONE CALL OF FLORIDA (800-432-4770).
8.) SITE SPECIFIC CONDITIONS THAT COULD CONTRIBUTE TO HIGHER INACCURACIES INCLUDE
SLOPED BANKS, VEGETATION AND HIGHER WATER CONTENT IN THE SOILS AROUND THE
UNDERGROUND UTILITIES. MARKINGS FOR UNDERGROUND UTILITIES HAVE VARYING
DEGREES OF ACCURACIES BASED ON MANY DIFFERENT VARIABLES, SUCH AS BUT NOT
LIMITED TO, HIGH WATER TABLE, SOIL CONDITIONS, AND UTILITY SIZE AND MATERIAL. ALWAYS
HAND DIG WITHIN 2-3 FEET OF ANY UTILITIES OR MARKINGS.
9.) UTILITIES DEPICTED HEREON WERE OBTAINED USING A GSSI-MANUFACTURED UTILITYSCAN
DF DIGITAL IMAGING CONTROLLER WITH A 300MHZ/800MHZ ANTENNA AND A VIVAX
METROTECH VLOCPRO UTILITY LOCATOR.
10.) THERE MAY BE OTHER UNDERGROUND UTILITIES NOT DEPICTED HEREON WITHIN THE
PROJECT LIMITS.
11.) EVERY EFFORT HAS BEEN MADE TO OBTAIN UNDERGROUND SANITARY PIPE TYPE AND SIZE, AS SHOWN. IT IS THE RESPONSIBILITY OF THE END USER TO VERIFY THE INVERT AND PIPE
SIZE DIMENSIONS PRIOR TO DESIGN OF NEW FACILITIES.
12.) THIS IS NOT A BOUNDARY SURVEY
BENCHMARK INFORMATION: NAVD 1988
TBM #1
ELEVATION = 6.54'
SET PK NAIL & DISK "SURVTECH TRAV PT" IN ASPHALT; ±85 FEET SOUTHEAST OF A WATER
VALVE; ±222 FEET WESTERLY OF A SANITARY MANHOLE.
TBM #2
ELEVATION = 5.29'
SET PK NAIL & DISK "SURVTECH TRAV PT" IN ASPHALT; ±131 FEET SOUTHEAST OF A FIRE
HYDRANT; ±180 FEET SOUTHEAST OF A PUMP.
SURVEY NOTES
TBM#1
TBM#2
BLDG 185 BLDG 187
BLDG 194
BLDG 191
WASH RACK
00 40 80
BLDG 4710
13.) TOPOGRAPHIC SURVEY COMPLETED BY SURVTECH SOLUTIONS, INC. ON OCTOBER 24, 2019
E = 854859.27 N = 421171.27
E = 854673.05 N = 420940.85
GC121
SU
R
VE
Y
C O
N
TR
O L
PL
AN
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
LS
LS
LS
LS
LS
NO PARKING
LS
6/V6/V
COMM
SIREN
POINT
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
00 300 600
PROJECT AREA
-SEE SHEET GC142
ENTRANCE GATE
BISCAYNE DRIVE BOUGAINVILLE BLVD.
ARIZONA BLVD.
N
EV
AD
A
AV
E.
NEVADA AVE.
ST. NAZAIRE BLVD.
HAUL ROUTE
(TYP)
CORAL SEA BLVD
BASE CIVIL
ENGINEER OFFICE
RESIDENT
ENGINEER OFFICE
FIRE STATION
GC141
C O
N
ST
R U
C
TI
O N
A C
C
ES
S
LO
C
AT
IO
N P
LA
N
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
BU
H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
X
X
X X
X X
X X
X X
X
X X X X X
X X X X X X X
X X
X X
X
X X
X
X
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
BLDG 185 BLDG 187
BLDG 194
BLDG 191
WASH
RACK
00 40 80
BLDG
SAFETY AND PHASING NOTES:
1. CONTRACTOR SHALL INSTALL TEMPORARY FENCE PRIOR TO BEGINNING ANY WORK ON THE
SITE. UPON INSTALLATION OF TEMPORARY FENCE, EXISTING FENCE SHALL BE REMOVED AS
SHOWN.
2. SEE SHEET GC144 FOR AIRFIELD SAFETY AND PHASING REQUIREMENTS.
WESTOVER DRIVE
X X
X X
XXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXX
PHASE 1 WORK LIMITS (SEE SHEET GC143)
PHASE 2 WORK LIMITS (SEE SHEET GC144)
TEMPORARY FENCE
-SEE DETAIL 3/CS503
EXISTING FENCE TO BE
REMOVED UPON INSTALLATION
OF TEMPORARY FENCE
AIRFIELD ENTRY CONTROL POINT
60'- TOWWAY
HORIZONTAL
CLEARANCE
CONSTRUCTION EXIT
-SEE DETAIL 3/EC501
CONTRACTOR LAYDOWN AREA
(SEE GENERAL NOTES GC145)
TEMPORARY ACCESS
GATE-SEE DETAIL 3/CS503
GC142
C O
N
ST
R U
C
TI
O N
O
PE
R
AT
IO
N
S
PH
AS
IN
G
P
LA
N
- O
VE
R
AL
L
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
X
X X
X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X
X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X
X X
X X
X
X
X
X
X
X N 420984.08 E 854635.07
N 420984.07 E 854773.77
N 421136.28 E 854774.17
N 421197.02 E 854824.08
N 421270.18 E 854824.08
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
BLDG 191
WASH RACK
00 20 40
BLDG 4710
SAFETY AND PHASING NOTES:
WESTOVER DRIVE
ACCESS THROUGH WESTOVER DRIVE
GATE TO BE MAINTAINED THROUGH
PHASE 1
60'- TOWWAY HORIZONTAL CLEARANCE-
CONTRACTOR TO REMAIN CLEAR OF THIS
AREA AT ALL TIMES DURING PHASE 1
COMMUNICATIONS LINE
INSTALLATION- SEE SHEET
CU113 FOR CONTINUATION-
INCLUDED IN PHASE 1 WORK
WORK WITHIN 10' OF WESTOVER DRIVE INCLUDING
TRENCHING OF NEW ELECTRICAL LINE AND NEW GATE
INSTALLATION TO BE COORDINATED WITH CONTRACTING
OFFICER SO THAT DISTURBANCE TO WESTOVER DRIVE GATE
IS MINIMIZED
PHASE 1 WORK LIMITS
1. THERE SHALL BE NO IMPACT TO APRON AND EXISTING TUGWAY OPERATIONS DURING PHASE 1.
THE CONTRACTOR SHALL STAY WITHIN THE LIMITS OF THE TEMPORARY FENCE THROUGHOUT
THIS PHASE. NO PAVEMENT BARRICADES ARE REQUIRED DURING THIS PHASE.
2. CONTRACTOR SHALL INSTALL TEMPORARY FENCE PRIOR TO BEGINNING WORK. THE SITE MUST
BE SECURED AND FENCE INSTALLATION APPROVED BY THE CONTRACTING OFFICER PRIOR TO
PROCEEDING WITH WORK.
3. ACCESS THROUGH WESTOVER AVENUE GATE SHALL BE MAINTAINED THROUGHOUT PHASE 1.
4. WORK WITHIN 10 FT. OF WESTOVER AVENUE SHALL BE COORINDATED WITH THE CONTRACTING
OFFICER.
5. PAVING LIMITS SHOWN ON CONCRETE APRON ARE BASED UPON THE PAVING AND JOINTING
PLAN ON SHEET CP121. IF AN ALTERNATE PHASING PLAN IS UTILIZED IT MUST BE COORDINATED
WITH THE PAVING PLAN.
X X
X X
X X
X
XXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXXX
EXISTING FENCE TO BE
REMOVED UPON INSTALLATION
OF TEMPORARY FENCE
EXISTING TOWWAY
TEMPORARY FENCE
-SEE DETAIL 3/CS503
TEMPORARY ACCESS GATE
-SEE DETAIL 3/CS503
NO TENANT PARKING
ALLOWED IN THESE SPACES
DURING CONSTRUCTION
GC143
C O
N
ST
R U
C
TI
O N
O
PE
R
AT
IO
N
S
SA
FE
TY
P
H
AS
IN
G
P
LA
N P
H
AS
E
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023 W
2Q R
R
_P la ns -0
X X
X X X X X X X X
X
X
X
X
X X
X
X
X
X X X X
X X X X X X X X X X
X X
X X
X
XXXXXXXXXXXXXX
1 2 3 4 5
US Army Corps of Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
BLDG 191
WASH
RACK
00 40 80
BLDG
SAFETY AND PHASING NOTES:
WESTOVER DRIVE
FIREMAIN LINE INSTALLATION-
SEE SHEET CU111 FOR
CONTINUATION- INCLUDED IN
PHASE 2 WORK
PHASE 2 WORK LIMITS
1. THIS PHASE SHALL INCLUDE WORK WITHIN THE 60' TOWWAY HORIZONTAL CLEARANCE ZONE. THIS 45 DAYS WILL BE NON-CONSECUTIVE AND INCLUDE UTILITY INSTALLATION, PAVEMENT DEMOLITION AND CONSTRUCTION, AND PAVEMENT MARKINGS. THE TOWING OF AIRCRAFT ON THE EXISTING TOWWAY WILL BE LIMITED AS MUCH AS POSSIBLE DURING THIS PHASE OF WORK AND THE CONTRACTOR SHALL BE ON ALERT TO WORK ON A "PULL BACK" BASIS. EXTREME CAUTION SHALL BE TAKEN WHEN THE TOWING OF AIRCRAFT IS TAKING PLACE AND HARB OPERATIONS STAFF IS OPERATING IN THIS AREA. WHEN TOWING TO BUILDING 194 IS REQUIRED THE CONTRACTOR SHALL BE NOTIFIED AND PAUSE WORK WHILE THE TOWING OPERATION IS
OCCURRING. THIS SHALL INCLUDE THE TEMPORARY MOVING OF BARRICADES AS REQUIRED.
2. A PORTION OF THE TEMPORARY FENCE INSTALLED IN PHASE 1 CAN BE REMOVED AS SHOWN SO THAT PHASE 2 CONSTRUCTION CAN BEGIN. REMOVAL OF THIS CANNOT BEGIN UNTIL NEW PERMANENT FENCE IS INSTALLED AND THE SITE SECURE. AIRFIELD CONSTRUCTION BARRICADES SHALL BE INSTALLED AS SHOWN IMMEDIATELY FOLLOWING THE REMOVAL OF THIS FENCE SO THAT THE CONSTRUCTION LIMITS ARE MAINTAINED. CONTRACTOR SHALL NOT CROSS THESE BARRICADES WITHOUT
COORDINATION WITH CONTRACTING OFFICER.
3. WORK CAN CONTINUE ON PHASE 1 WHILE PHASE 2 OCCURS. THE INTENT OF THIS SEPARATE PHASE IS TO KEEP THE CONTRACTOR'S WORK AREA SEPARATED FROM HARB OPERATIONS. WHEN WORK NEEDS TO OCCUR IN THIS AREA IT SHALL BE
COORDINATED WITH HARB.
LOW PROFILE BARRICADE AROUND CONSTRUCTION
LIMITS- SEE DETAIL SHEET GC145- CONTRACTOR
TO COORDINATE TEMPORARY RELOCATION OF
BARRICADES WHEN TOWWAY ACCESS IS NEEDED
TEMPORARY FENCE
-SEE DETAIL 3/CS503
TEMPORARY ACCESS GATE
-SEE DETAIL 3/CS503
PERMANENT
SECURITY FENCE
(INSTALLED IN
PHASE 1)
GC144
C O
N
ST
R U
C
TI
O N
O
PE
R
AT
IO
N
S
SA
FE
TY
P
H
AS
IN
G
P
LA
N P
H
AS
E
D.
SC
HM
ID
GA
LL
D .R
AN
EY
P.
B
U H
LE
R
M .B
U
TL
ER
04-19-2023
W
2Q R
R
_P la ns -0
Engineers ®
D
C
B
A
H O
M
ES
TE
AD
A R
B, F
L C
O R
R O
SI
O
N F
AC
IL
IT
Y/
W
AS
H R
AC
K
KY
JM
P2
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AN
SI
D
FI
LE
N U
M
BE
R
/1
9/
C H
EC
KE
D B
Y:
D
AT
E
SHEET ID
D
ES
C
R
IP
TI
O
N M
AR
K
CERTIFIED FINAL DESIGN
GENERAL CONSIDERATIONS:
COORDINATE THE FOLLOWING AS REQUIRED:
A. CONTRACTORS ARE REQUIRED TO ATTEND WEEKLY COORDINATION MEETINGS AT WHICH OPERATIONAL SAFETY WILL BE A
STANDING AGENDA ITEM DURING EVERY PROGRESS MEETING.
B. ALL CONTRACTOR PERSONNEL SHALL COMPLETE THE BASES' BACKGROUND CHECK, BADGING, AIRFIELD SAFETY AND DRIVERS
TRAINING REQUIREMENTS PRIOR TO BEING ALLOWED ACCESS TO THE PROJECT.
C. THE CONTRACTOR SHALL NOT INTERFERE WITH THE NORMAL OPERATIONS OF THE BASE FACILITIES THAT ARE DESIGNATED UNDER THIS CONTRACT TO REMAIN OPEN TO AIR TRAFFIC, AND SHALL IMPLEMENT ALL SPECIFIED AND OTHER APPROPRIATE MEASURES TO
ENSURE THE SAFETY OF ALL USERS OF THE BASE.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY:
A. APRON SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. WHEN ANY AREA IS REQUIRED TO BE CLOSED TO
AIRCRAFT TRAFFIC, IT SHALL BE BARRICADED AND MARKED, PER THE REQUIREMENTS STATED.
NAVAIDS:
A. THIS PROJECT DOES NOT AFFECT ANY NAVAIDS.
CONTRACTOR ACCESS:
A. DURING TEMPORARY SECURITY FENCE CONSTRUCTION, A GATE GUARD SUPPLIED BY THE CONTRACTOR AND IS REQUIRED AT ALL
POINTS OF ENTRY USED BY THE CONTRACTOR. THE CONTRACTOR SHALL INFORM THE BASE A MINIMUM OF 7 DAYS PRIOR TO NEEDING THE GATE GUARD. ALL GATES MUST BE LOCKED WHEN NOT IN USE OR NOT MANNED BY THE GATE GUARD. CONTRACTOR MUST TAKE CARE TO MAINTAIN A HIGH LEVEL OF SAFETY AND SECURITY DURING CONSTRUCTION WHEN ACCESS POINTS ARE CREATED IN THE SECURITY FENCING TO PERMIT THE PASSAGE OF CONSTRUCTION VEHICLES OR PERSONNEL. TEMPORARY GATES SHOULD BE EQUIPPED SO THEY CAN BE SECURELY CLOSED AND LOCKED TO PREVENT ACCESS BY ANIMALS AND PEOPLE.
PROCEDURES SHOULD BE IN PLACE TO ENSURE THAT ONLY AUTHORIZED PERSONS AND VEHICLES HAVE ACCESS TO THE AIRFIELD OR PROJECT LIMITS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER OPERATION AND PRESERVATION OF ALL AIRFIELD
PERIMETER GATES, EITHER MANUAL OR AUTOMATED.
B. FOR THE PURPOSES OF THIS CONTRACT, ALL FENCING/GATES SHALL BE CONSIDERED PART OF CONTRACTOR HAUL ROUTES. AS SUCH, ANY DAMAGE TO FENCING/GATES AS A RESULT OF CONSTRUCTION TRAFFIC SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. IF ANY CONSTRUCTION GATE IS FOUND OPEN AND UNATTENDED BY THE BASE STAFF, THE CONTRACTOR WILL BE REPRIMANDED PER OCCURRENCE BY THE GOVERNMENT. SEE "ENFORCEMENT / PENALTIES" FOR ADDITIONAL INFO.
C. KEY CONTRACTOR PERSONNEL (IE/WASTE REMOVAL) MAY BE EXPECTED TO TRAVEL ON OR NEAR ACTIVE AOA'S. THESE INDIVIDUALS MUST COMPLY WITH THE RULES AND REGULATIONS BY PARTICIPATING IN ANY APPLICABLE AIRFIELD DRIVER'S TRAINING
PROCEDURES PROVIDED BY THE BASE.
D. THE CONTRACTORS' EQUIPMENT IS STRICTLY LIMITED TO THE CONSTRUCTION AREAS DURING CONSTRUCTION AND TO THE CONTRACTOR STORAGE AREA DURING NON-CONSTRUCTION PERIODS, EXCEPT AS PROVIDED ON THE PLANS, IN THE CONTRACT PROVISIONS, OR AS MAY BE AUTHORIZED BY THE COR IN WRITING. CONTRACTOR PARKING SHALL BE LIMITED TO THE STAGING AREA, EXCEPT AS ALLOWED BY THE COR.
E. HAUL ROUTES AND ACCESS TO THE CONSTRUCTION SITE(S) WILL BE AS SHOWN AND DISCUSSED AT THE PRE-BID MEETING. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL HAUL ROADS, STAGING AND STORAGE AREAS TO ORIGINAL CONDITION AND TO THE SATISFACTION OF THE CONTRACTING OFFICER. THIS WILL INCLUDE BUT NOT BE LIMITED TO GRADING (FILLING IF NECESSARY) AND SEEDING AND MULCHING ALL TURF AREAS USED BY THE CONTRACTOR. ANY PAVEMENT AREAS USED BY THE CONTRACTOR AS A HAUL ROUTE WHICH ARE DAMAGED WILL BE REPAVED AS APPROVED BY THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL INSPECT ALL HAUL ROUTES PRIOR TO START OF CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY DOCUMENTATION OF EXISTING HAUL ROUTES, EITHER WITH PICTURES OR VIDEO. COSTS ASSOCIATED WITH DOCUMENTING EXISTING HAUL ROUTE CONDITIONS, OR RECONSTRUCTING OR RESTORING HAUL ROUTES AND
STORAGE AREAS, WILL BE CONSIDERED INCIDENTAL TO THE PROJECT.
CONSTRUCTION EQUIPMENT:
ALL CONSTRUCTION EQUIPMENT MUST BE MARKED WITH A 3 FEET BY 3 FEET ORANGE AND WHITE CHECKERED FLAG AND/OR AMBER
BEACON. FOR NIGHT CONSTRUCTION, ALL EQUIPMENT MUST BE EQUIPPED WITH AN AMBER BEACON. ALL CONSTRUCTION VEHICLES
MUST BE CLEARLY MARKED WITH THE COMPANY NAME/LOGO AT ALL TIMES.
WILDLIFE MANAGEMENT:
CONTRACTOR MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE WASTE OR LOOSE MATERIALS THAT CAN CREATE WILDLIFE
HAZARDS OR ATTRACTANTS. THESE INCLUDE TRASH, STANDING WATER, TALL GRASS, SCATTERED SEEDS, POORLY MAINTAINED
FENCING, AND DISRUPTION OF EXISTING HABITAT.
HAZARDOUS MATERIALS (HAZMAT) MANAGEMENT:
A. ANY TYPE OF FUELING SUPPORT FACILITY OR DEVICE USED TO REFUEL CONSTRUCTION EQUIPMENT IS SUBJECT TO LOCAL FIRE
INSPECTION. LOCAL FIRE CODES AND SAFETY STANDARDS SHALL BE MET PRIOR TO COMMENCEMENT OF WORK.
B. CONTRACTOR'S OPERATING CONSTRUCTION VEHICLES AND EQUIPMENT ON THE BASE MUST BE PREPARED TO EXPEDITIOUSLY
CONTAIN AND CLEAN UP SPILLS RESULTING FROM FUEL OR HYDRAULIC FLUID LEAKS.
C. TRANSPORT AND HANDLING OF OTHER HAZARDOUS MATERIALS ALSO REQUIRE SPECIAL PROCEDURES (SEE SPECIFICATIONS FOR
REQUIREMENTS).
D. ALL DISTURBED ON-SITE SOILS WILL BE REMOVED FROM THE BASE AND DISPOSED OF OFF-SITE. CONTACT MIAMI-DADE COUNTY FOR
TESTING AND APPROVAL BEFORE REMOVING FROM SITE.
THOMAS KUX, PROFESSIONAL GEOLOGIST
MIAMI-DADE COUNTY DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT
PHONE: (305)-372-6700
NOTIFICATION OF CONSTRUCTION ACTIVITIES:
A. THE CONTRACTOR SHALL INCLUDE IN THE CONSTRUCTION OPERATIONS PLAN A PROCEDURE FOR IMMEDIATE NOTIFICATION OF THE
COR OF ANY ADVERSE CONDITIONS AFFECTING SAFETY ON THE AIRFIELD. THE CONTRACTOR SHALL OBTAIN CONTACT INFORMATION FOR ALL INVOLVED PARTIES AND PROCEDURES FOR CONTACTING THEM 24 HOURS A DAY, 7 DAYS A WEEK.
B. IF APPLICABLE, A LIST OF AIRFIELD OPERATIONS PERSONNEL, FIRE DEPARTMENT EMERGENCY PERSONNEL WILL BE DISTRIBUTED.
C. THE BASE OPERATIONS OFFICE SHALL ISSUE ALL NOTAMS RELEVANT TO THE CONSTRUCTION PROGRESS AND ANY OTHER
REQUIRED NOTAMS OR CONTACT NUMBERS.
D. THE CONTRACTOR SHALL PREPARE AND SUBMIT CONTACT INFORMATION FOR LOCAL MEDICAL, FIRE FIGHTING, AND POLICE
RESPONSE IN CASE OF EMERGENCIES DURING CONSTRUCTION TO ALL EMPLOYEES.
E. THE CONTRACTOR MAY BE REQUIRED TO COORDINATE WITH BASE AIRCRAFT RESCUE AND FIRE FIGHTING (ARFF) PERSONNEL EVEN
FOR NON-EMERGENCIES.
F. THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER 60 DAYS PRIOR TO THE START OF WORK, AN APPROVED FAA FORM 7460-1 "NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION." FOR ALL PROPOSED CRANES/ELEVATED EQUIPMENT TO BE USED, ON SITE. ADDITIONALLY, THE CONTRACTOR SHALL SUBMIT AN APPROVED FAA FORM 7460-1 FOR THE FINAL BUILDING ROOF ELEVATION CLOSEST TO THE RUNWAY. BE ADVISED, FAA APPROVAL OF THE FORMS MAY TAKE UP TO 45 DAYS.
G. THE CONTRACTOR SHALL COORDINATE WITH THE BASE ANY SAFETY AND/OR SECURITY ORIENTED ASPECT CHANGES TO THE
CONSTRUCTION PLAN ONCE IT IS ISSUED.
INSPECTION REQUIREMENTS:
A. AIRFIELD SAFETY SELF-INSPECTIONS SHOULD BE CONDUCTED BY THE CONTRACTOR AT LEAST DAILY, BUT MORE FREQUENTLY IF
NECESSARY.
B. A PRE-FINAL AND FINAL INSPECTION MEETING WILL BE HELD FOR THIS PROJECT.
UNDERGROUND UTILITIES:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING BASE UTILITIES, AND ELECTRICAL CIRCUITS, WHETHER
OWNED BY THE BASE OR OTHER AGENCIES OPERATING AT THE AIRFIELD. LOCATIONS OF EXISTING UTILITIES AND CABLES SHOWN IN THE PLANS ARE BASED ON AVAILABLE SURVEY AND AS-BUILT DATA AND ARE APPROXIMATE ONLY.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT:
A. THE CONTRACTOR SHALL DEVELOP, IMPLEMENT, AND MONITOR A FOD PREVENTION PLAN. A PERSON SHALL BE DESIGNATED BY THE
CONTRACTOR TO CONTINUOUSLY MONITOR THE PAVEMENTS FOR FOD, HAUL ROUTES AND ROADWAYS. THIS PERSON SHALL HAVE THE CAPABILITY TO ASSIGN PERSONNEL AND EQUIPMENT TO REMOVE DEBRIS OR REPAIR ROADWAYS WHEN REQUIRED IN A TIMELY
MANNER.
B. DEBRIS SHALL NOT BE DEPOSITED ON ANY PORTION OF AN OPERATIONAL APRON. SHOULD ANY DEBRIS BE ACCIDENTALLY DEPOSITED ON ACTIVE OPERATIONAL AREAS, IT SHALL BE REMOVED IMMEDIATELY. THE CONTRACTORS SWEEPER SHALL HAVE VACUUMING CAPABILITIES AND BE ASSIGNED TO THE PROJECT AND BE ON-SITE AT ALL TIMES.
C. PRIOR TO OPENING AIRCRAFT MOVEMENT AREAS CLOSED FOR THIS PROJECT, THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE SITE, INCLUDING ADJACENT PAVEMENTS AND HAUL ROUTES, IS CLEAR OF ANY FOREIGN OBJECT DEBRIS (FOD) AND IS
ACCEPTABLE TO THE COR.
D. THE CONTRACTOR SHALL CONDUCT DAILY INSPECTIONS OF THE WORK AND ADJACENT AREAS FOR SAFETY AND CLEANLINESS. THE
AIRFIELD OPERATIONS AND SHALL PERFORM DAILY INSPECTIONS OF THIS PROJECT SITE.
E. CONTRACTOR SHALL USE ALL…