This performance work statement outlines environmental remediation services required at a Superfund site in Evansville, Indiana. The indefinite delivery, indefinite quantity contract has a base period of three years with a capacity of $51 million and two one-year options that would increase capacity by $8 million each. Services include excavating and disposing of contaminated soil from residential properties according to EPA remedial designs, backfilling, restoring properties, transportation, and reporting. Offerors must propose firm fixed prices for tasks like project management, community involvement, and remediation of individual properties. Evaluation will use a best value tradeoff process. Up to 400 residential cleanups may be completed each field season through 2027.

View the file

Other files

File Type Posted
W912QR22R0056 0004.pdf PDF
W912QR22R0056 0003.pdf PDF
W912QR22R0056 0002.pdf PDF
W912QR22R0056 0001.pdf PDF
SOP_PIEE_ProposalManager_Offeror_.pdf PDF
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 01:00 PM local t ime 24 Oct 2022

A X B X C

D

EX

X G F 107 - 119

120 - 122 H 123

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 123

(If other than Item 7) W912QR

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912QR 8. ADDRESS OFFER TO

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

4 - 88 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

90 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

91 - 106

PART II - CO NTRACT CLAUSES

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: KURT EGNER

600 DR M L KING JR PL, RM 821

LOUISVILLE KY 40202-2236502.315.7494

FAX:

TEL:

FAX:

TEL: 502.315.7050

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

22 Sep 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912QR22R0056

Section A - Solicitation/Contract Form

ADDENDUM

-The basis of award will be the best value tradeoff process. Therefore, all offerors need to thoroughly review the Procedures for Submittal of Offers and Proposal Evaluation Criteria found in Section M prior to submitting a proposal.

-Box 9 references hardcopy proposals; however, proposals shall be submitted electronically in accordance with the Procedures for Submittal of Offers and Proposal Evaluation Criteria.

-Box 9 references clauses 52.214-7 in Section L; however, it is not included in this solicitation as this is not an Invitation for Bids.

-Minimum Guarantee: The Government hereby obligates itself to obtain not less than $10,000.00 in services under the contract resulting from this solicitation.

-Davis Bacon Wage Determinations, available on SAM.gov, may be applicable on a task order basis.

-Bonding requirements will be determined on a task order basis.

-The base three year ordering period has a capacity of $51,000,000.00. There are two one-year options that if exercised will increase the ordering capacity by $8,000,000.00 each. These options may be exercised in accordance with FAR 52.217-9.

-- The following supporting documents will be available by the PIEE Solicitation Module: Design drawings_April 2022, Jacobsville P6&7 APP, Jacobsville P6&7 DMP, Jacobsville P6&7 HASP, Jacobsville P6&7 QAPP Addendum, Jacobsville P6&7 QCP, Jacobsville P6&7 RAWP, Jacobsville P6&7 SAP FSP and Jacobsville P6&7 SMP.

NOTE: Page numbering in this document may not be accurate

Section B - Supplies or Services and Prices

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $10,000.00 6,700.00 $67,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $10,000.00 1,700.00 $17,000,000.00

Price Breakout Schedule Jacobsville Neighborhood Soil Contamination Site Operable Unit 2 Evansville, Vanderburgh County, Indiana

CLIN Task Description Unit of Measure

Unit Price Estimated Quantity

(NOTE 1)

Total Item Price

1 1 General conditions to include temporary facilities MO 8 2 2 Project Planning to include: Kickoff meeting; Remedial Action Work Plan; Site-specific plans JOB 1 3 2 Update to Project Planning to include: Updates to Remedial Action Work Plan and Site- JOB N/A

4 3 Project management and reporting MO 12

5 4 Community involvement and engagement (two meetings and/or availability sessions with two Contractor personnel in attendance)

JOB 1

6 5 Hosting and maintenance of CLEANUP database: Initial startup and training (NOTE 2) JOB 1

7 5 Hosting and maintenance of CLEANUP database: Monthly hosting and maintenance (NOTE 2) MO 12

8 6.1, 6.2 6.3, 6.4, 6.8, 6.9 Properties, site sketches, and access; Pre-Excavation site walks; Identify utilities, onsite REMEDIAL 400 9 6.5 Manual/mechanical excavation of properties - 100 BCY (NOTE 3) JOB 279

10 6.6 Transportation and disposal of excavated soil - 100 TON (NOTE 4) JOB

11 6.7 Backfill quality for 1000 CY JOB 56 12 6.7 Backfill - topsoil - 100 LCY JOB 148 13 6.7 Backfill - premium topsoil - 10 LCY JOB 100 14 6.7 Backfill - backfill (non-topsoil) - 100 LCY JOB 239 15 6.7 Backfill - gravel for driveways, garage floors, walkways, parking areas, and other previously JOB 439 16 6.7 Filling and capping one cistern JOB 45

6.9 (excluding sod maintenance)

Landscaping and vegetation - sod - 1000 SQ FT JOB 828 18 6.9 Landscaping and vegetation - decorative cover (e.g., mulch, landscape rock) - 100 SQ FT JOB 223

19 6.10 Preparation of property for excavation and returning the property to pre-excavation conditions

REMEDIAL

DESIGN

DRAWING

$ 1,000.00 400

20 7 Recordkeeping JOB 1

21 8 Remedial Action Completion Report and Air Monitoring Report for one field season JOB 1

22 9 Geospatial mapping of properties JOB 1 23 10 Small repair work items JOB $ 785.00 64

Abbreviations: BCY = bank cubic yard; LCY = loose cubic yard; N/A = not applicable; SQ FT = square foot NOTE 1: This is the total estimated quantity for the year/field season. The total estimated quantity for the year/field season may be achieved using more than one task order.

NOTE 2: This CLIN is intended only to pay subcontractor costs associated with the CLEANUP database; Contractor costs for CLEANUP database regular updating should be captured under Task 9: Recordkeeping.

NOTE 3: Assume the ratio of mechanical excavation (BCY) to manual excavation (BCY) is 1.96 :1.

NOTE 4: The cost should include waste chracterization for landfill acceptance of excavated soil.

Base Year 1/ 2023 field season

Operable Unit 2

Evansville, Vanderburgh County, Indiana

CLIN Task Description Unit of Measure

Unit Price Estimated Quantity

(NOTE 1)

Total Item Price

1 1 General conditions to include temporary facilities MO 12 2 2 Project Planning to include: Kickoff meeting; Remedial Action Work Plan; Site-specific plans JOB N/A 3 2 Update to Project Planning to include: Updates to Remedial Action Work Plan and Site-specific JOB 1

4 3 Project management and reporting MO 12

5 4 Community involvement and engagement (two meetings and/or availability sessions with two Contractor personnel in attendance)

JOB 1

6 5 Hosting and maintenance of CLEANUP database: Initial startup and training (NOTE 2) JOB 1

7 5 Hosting and maintenance of CLEANUP database: Monthly hosting and maintenance (NOTE 2) MO 12

8 6.1, 6.2 6.3, 6.4, 6.8, 6.9 Properties, site sketches, and access; Pre-Excavation site walks; Identify utilities, onsite sewage REMEDIAL 400 9 6.5 Manual/mechanical excavation of properties - 100 BCY (NOTE 3) JOB 279

10 6.6 Transportation and disposal of excavated soil - 100 TON (NOTE 4) JOB 362

11 6.7 Backfill quality for 1000 CY JOB 56 12 6.7 Backfill - topsoil - 100 LCY JOB 148 13 6.7 Backfill - premium topsoil - 10 LCY JOB 100 14 6.7 Backfill - backfill (non-topsoil) - 100 LCY JOB 239 15 6.7 Backfill - gravel for driveways, garage floors, walkways, parking areas, and other previously JOB 439 16 6.7 Filling and capping one cistern JOB 45

6.9 (excluding sod maintenance)

Landscaping and vegetation - sod - 1000 SQ FT JOB 828

18 6.9 Landscaping and vegetation - decorative cover (e.g., mulch, landscape rock) - 100 SQ FT JOB 223

19 6.10 Preparation of property for excavation and returning the property to pre-excavation conditions

REMEDIAL

DESIGN

$ 1,000.00 400

20 7 Recordkeeping JOB 1

21 8 Remedial Action Completion Report and Air Monitoring Report for one field season JOB 1

22 9 Geospatial mapping of properties JOB 1 23 10 Small repair work items JOB $ 785.00 64

Base Year 2/ 2024 field season

Operable Unit 2

Evansville, Vanderburgh County, Indiana

CLIN Task Description Unit of Measure

Unit Price Estimated Quantity

(NOTE 1)

Total Item Price

1 1 General conditions to include temporary facilities MO 12 2 2 Project Planning to include: Kickoff meeting; Remedial Action Work Plan; Site-specific plans JOB N/A 3 2 Update to Project Planning to include: Updates to Remedial Action Work Plan and Site-specific JOB 1

4 3 Project management and reporting MO 18

5 4 Community involvement and engagement (two meetings and/or availability sessions with two Contractor personnel in attendance)

JOB 1

6 5 Hosting and maintenance of CLEANUP database: Initial startup and training (NOTE 2) JOB 1

7 5 Hosting and maintenance of CLEANUP database: Monthly hosting and maintenance (NOTE 2) MO 18

8 6.1, 6.2 6.3, 6.4, 6.8, 6.9 Properties, site sketches, and access; Pre-Excavation site walks; Identify utilities, onsite sewage REMEDIAL 400 9 6.5 Manual/mechanical excavation of properties - 100 BCY (NOTE 3) JOB 279

10 6.6 Transportation and disposal of excavated soil - 100 TON (NOTE 4) JOB 362

11 6.7 Backfill quality for 1000 CY JOB 56 12 6.7 Backfill - topsoil - 100 LCY JOB 148 13 6.7 Backfill - premium topsoil - 10 LCY JOB 100 14 6.7 Backfill - backfill (non-topsoil) - 100 LCY JOB 239 15 6.7 Backfill - gravel for driveways, garage floors, walkways, parking areas, and other previously JOB 439 16 6.7 Filling and capping one cistern JOB 45

6.9 (excluding sod maintenance)

Landscaping and vegetation - sod - 1000 SQ FT JOB 828

18 6.9 Landscaping and vegetation - decorative cover (e.g., mulch, landscape rock) - 100 SQ FT JOB 223

19 6.10 Preparation of property for excavation and returning the property to pre-excavation conditions

REMEDIAL

DESIGN

$ 1,000.00 400

20 7 Recordkeeping JOB 1

21 8 Remedial Action Completion Report and Air Monitoring Report for one field season JOB 1

22 9 Geospatial mapping of properties JOB 1

Base Year 3/ 2025 field season

Operable Unit 2

Evansville, Vanderburgh County, Indiana

CLIN Task Description Unit of Measure

Unit Price Estimated Quantity

(NOTE 1)

Total Item Price

1 1 General conditions to include temporary facilities MO 12 2 2 Project Planning to include: Kickoff meeting; Remedial Action Work Plan; Site-specific plans JOB N/A 3 2 Update to Project Planning to include: Updates to Remedial Action Work Plan and Site-specific JOB 1

4 3 Project management and reporting MO 12

5 4 Community involvement and engagement (two meetings and/or availability sessions with two Contractor personnel in attendance)

JOB 1

6 5 Hosting and maintenance of CLEANUP database: Initial startup and training (NOTE 2) JOB 1

7 5 Hosting and maintenance of CLEANUP database: Monthly hosting and maintenance (NOTE 2) MO 12

8 6.1, 6.2 6.3, 6.4, 6.8, 6.9 Properties, site sketches, and access; Pre-Excavation site walks; Identify utilities, onsite sewage REMEDIAL 200 9 6.5 Manual/mechanical excavation of properties - 100 BCY (NOTE 3) JOB 139

10 6.6 Transportation and disposal of excavated soil - 100 TON (NOTE 4) JOB 181

11 6.7 Backfill quality for 1000 CY JOB 28 12 6.7 Backfill - topsoil - 100 LCY JOB 74 13 6.7 Backfill - premium topsoil - 10 LCY JOB 50 14 6.7 Backfill - backfill (non-topsoil) - 100 LCY JOB 120 15 6.7 Backfill - gravel for driveways, garage floors, walkways, parking areas, and other previously JOB 219 16 6.7 Filling and capping one cistern JOB 23

6.9 (excluding sod maintenance)

Landscaping and vegetation - sod - 1000 SQ FT JOB 414

18 6.9 Landscaping and vegetation - decorative cover (e.g., mulch, landscape rock) - 100 SQ FT JOB 112

19 6.10 Preparation of property for excavation and returning the property to pre-excavation conditions

REMEDIAL

DESIGN

$ 1,000.00 200

20 7 Recordkeeping JOB 1

21 8 Remedial Action Completion Report and Air Monitoring Report for one field season JOB 1

22 9 Geospatial mapping of properties JOB 1

Option Year 1/ 2026 field season

Operable Unit 2

Evansville, Vanderburgh County, Indiana

CLIN Task Description Unit of Measure

Unit Price Estimated Quantity

(NOTE 1)

Total Item Price

1 1 General conditions to include temporary facilities MO 12 2 2 Project Planning to include: Kickoff meeting; Remedial Action Work Plan; Site-specific plans JOB N/A 3 2 Update to Project Planning to include: Updates to Remedial Action Work Plan and Site-specific JOB 1

4 3 Project management and reporting MO 18

5 4 Community involvement and engagement (two meetings and/or availability sessions with two Contractor personnel in attendance)

JOB 1

6 5 Hosting and maintenance of CLEANUP database: Initial startup and training (NOTE 2) JOB 1

7 5 Hosting and maintenance of CLEANUP database: Monthly hosting and maintenance (NOTE 2) MO 18

8 6.1, 6.2 6.3, 6.4, 6.8, 6.9 Properties, site sketches, and access; Pre-Excavation site walks; Identify utilities, onsite sewage REMEDIAL 200 9 6.5 Manual/mechanical excavation of properties - 100 BCY (NOTE 3) JOB 139

10 6.6 Transportation and disposal of excavated soil - 100 TON (NOTE 4) JOB 181

11 6.7 Backfill quality for 1000 CY JOB 28 12 6.7 Backfill - topsoil - 100 LCY JOB 74 13 6.7 Backfill - premium topsoil - 10 LCY JOB 50 14 6.7 Backfill - backfill (non-topsoil) - 100 LCY JOB 120 15 6.7 Backfill - gravel for driveways, garage floors, walkways, parking areas, and other previously JOB 219 16 6.7 Filling and capping one cistern JOB 23

6.9 (excluding sod maintenance)

Landscaping and vegetation - sod - 1000 SQ FT JOB 414

18 6.9 Landscaping and vegetation - decorative cover (e.g., mulch, landscape rock) - 100 SQ FT JOB 112

19 6.10 Preparation of property for excavation and returning the property to pre-excavation conditions

REMEDIAL

DESIGN

$ 1,000.00 200

20 7 Recordkeeping JOB 1

21 8 Remedial Action Completion Report and Air Monitoring Report for one field season JOB 1

22 9 Geospatial mapping of properties JOB 1

Option Year 2/ 2027 field season

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or selfregister into system.

The Solicitation Number is: W912QR22R0056

The Bidder Inquiry Key is: 8CXBSB-7EM5DV

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your

SecretQuestion.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

-2-

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.

Section C - Descriptions and Specifications

Performance Work Statement Jacobsville Neighborhood Soil Contamination Site

Operable Unit 2 Evansville, Vanderburgh County, Indiana

1 Introduction

The performance work statement (PWS) is for environmental services to remediate lead- and arsenic-contaminated soil specified on remedial design drawings for residential properties within Operable Unit 2 (OU2) of the Jacobsville Neighborhood Soil Contamination Superfund Site in Evansville, Vanderburgh County, Indiana. This is an Indefinite Delivery, Indefinite Quantity Contract. The base ordering period will be three years from date of award and have an ordering capacity of $51 million. There are two (2) options to extend the ordering period by one year. Each option, if exercised, would increase the ordering capacity by $8 million. The total maximum capacity of this contract will be $67 million if all options are exercised. All task orders will be negotiated firm-fixed priced task orders. There may be multiple task orders awarded during a single field season.

The Government requests that offerors provide firm-fixed-price proposals for the tasks listed in this PWS in the quantities listed on the attached proposal bid schedule. The basis of award is the Trade-off Process. The Contracting Officer will award a firm-fixed-price Single Award Task Order Contract (SATOC) to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation; is fair and reasonable; and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. Evaluation criteria may be found in Section M of this document.

In general, remedial action includes excavation of residential lead- and arsenic-contaminated soil per EPA-provided remedial designs, backfill/restoration of disturbed areas, transportation and disposal of contaminated soil, and completion of remediation reports documenting cleanup. USACE anticipates that 400 remedial designs will require remediation during each of the first two field seasons. Up to 400 remedial designs may be remediated during each field season thereafter. A field season may last from March through mid-December but is dependent on weather, approval of all planning documents and suitable backfill, and the number of remedial designs to be remediated. It should be noted that the Contractor’s schedule for gaining approval of all planning documents and backfill in advance of starting excavation for the first field season will need to be aggressive so field work can commence in a time frame that will allow for remediation of 400 properties during the first field season.

Most remedial design drawings encompass one property as identified by a single Vanderburgh County tax identification number. However, some remedial design drawings encompass more than one adjacent property, each having a separate Vanderburgh County tax identification number but the same property owner. These properties were combined into one remedial design drawing by EPA during the remedial design phase for ease of reporting and sampling because they have the same property owner. Other remedial design drawings encompass one property with two adjacent street numbers and a single Vanderburgh County tax identification number and property owner.

Therefore, one remedial design drawing may encompass more than one residence.

All actions shall be conducted consistent with:

• EPA Region 5 Record of Decision (ROD) dated September 2009 (https://semspub.epa.gov/work/05/352479.pdf);

• relevant EPA policies including, but not limited to, the EPA Office of Solid Waste and Emergency Response [OSWER] 9285.7-50; Superfund Lead-Contaminated Residential Sites Handbook (Handbook), August 2003 (this document can be found at https://www.epa.gov/superfund/lead-superfund-sites-guidance); and all other guidance used by EPA in conducting remedial action (Appendix A);

• Hazardous Waste Operations Emergency Response Standard (HAZWOPER) 29CFR 1910.120 / 29CFR 1926.65; and

• this PWS.

Definitions of key terms used in the PWS are included in Appendix B.

The remedial action is being conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA), and National Contingency Plan (NCP) requirements. Tasks described in this PWS are consistent with the ROD and the NCP. These response actions are necessary to protect human health and environmental risks posed by exposure to contaminated soil containing lead and arsenic.

For the purpose of this project, the portion of OU2 that will be addressed as part of this PWS will commonly be referred throughout the PWS as the “residential cleanup”.

2 Background

2.1 Site Description

The Jacobsville Neighborhood Soil Contamination Site is located in the City of Evansville, Vanderburgh County, Indiana (Appendix C). The site was named the Jacobsville Neighborhood Soil Contamination Site because the contamination was initially found in the Jacobsville neighborhood of Evansville; however, after further investigations, EPA found that contamination extended to other areas of Evansville. The site consists of residential soils contaminated by lead and arsenic.

Land use within the site boundaries is a mix of residential, commercial, and industrial properties. The area also includes schools, churches, playgrounds, parks, and small businesses. The Jacobsville site and the associated remediation, however, is restricted to residential properties and those properties to which residents and children may have frequent access, such as schools, playgrounds, parks, and day care facilities. These types of properties are referred to as “high-access” properties in the ROD, the remedial design, and other site documents.

2.2 History of Contamination

In 2000, as a follow-up to a removal action at a plating shop in the Jacobsville neighborhood, Indiana Department of Environmental Management (IDEM) collected soil samples in the neighborhood near the plating shop and analyzed them for metals using a portable X-ray fluorescence device (XRF). Results showed elevated lead concentrations in a number of residential yards. IDEM identified four former facilities that may have contributed to the contamination at the site: Blount Plow Works (operated from the 1880s to about the 1940s), Advance Stove Works (operated from approximately the 1900s to the 1950s), Newton-Kelsay (operated from approximately the 1900s to the 1950s), and Sharpes Shot Works (operated from 1878 to an unknown date). It is believed that airborne dust, soot and smoke from plant operations deposited lead on neighborhood soil. Arsenic may have been deposited by airborne dust from foundries, the burning of coal, and from other industrial processes.

Based on initial sampling, the Jacobsville site was originally defined by IDEM as bounded to the west by Edgar Street, to the south by Lloyd Expressway, to the east by Heidelbach Street, and to the north by Iowa Street. Operable Unit 1 (OU1) coincides approximately with the original IDEM site boundaries and is bounded by Mary Street to the west, Iowa Street to the north, Elliot Street to the east, and Division and Illinois Streets to the south (Appendix C). OU1 encompasses 141 acres and approximately 500 residential properties and is where the facilities listed above and thought to be the possible sources of the contamination were located. Previous remedial action within OU1 cleaned up 263 OU1 properties.

Based on additional sampling conducted by EPA in 2004, 2005, and 2006, OU2 (Appendix C) was defined as extending outward from OU1 and covering approximately 4.5 square miles. At least 12 different neighborhoods, including the Jacobsville neighborhood, are encompassed in whole or in part by the OU2 boundaries. Of the approximately 10,000 residences in OU2, it is anticipated that approximately 4,000 will require cleanup based on information in the ROD dated September 2009.

This PWS focuses on the phases of OU2 beyond project seven which is presently underway. Example remedial design drawings are provided as part of the Request for Proposal (RFP) for informational purposes only. The actual remedial design drawings for properties to be remediated may be different but will require the same level of effort.

For more information and background related to this Superfund Site, please visit the Superfund Site Profile page at:

https://cumulis.epa.gov/supercpad/SiteProfiles/index.cfm?fuseaction=second.scs&id=0508142&doc=Y& colid=30365&requestTimeout=480

2.3 Selected Remedy

The ROD finalized in September 2009 sets forth the selected remedy in order to accomplish Remedial Action Objectives (RAO) for the site.

The RAO for the Jacobsville site is to control concentrations of arsenic and lead in residential soil that present a human health risk by minimizing the potential for dermal contact, ingestion, and inhalation exposures. The RAO is to be achieved by excavating and disposing of residential soils above the following risk-based cleanup levels based on site-specific background levels and the Human Health Risk Assessment (HHRA) for the Jacobsville site:

• The site-specific cleanup level for lead is 400 ppm, based on the Integrated Exposure Uptake Bio-kinetic (IEUBK) modeling of site data. The cleanup level for lead corresponds to a less than 5- percent probability of the child population at the Jacobsville Site having Blood Lead Levels greater than 10 micrograms per deciliter (μg/dL), which is the recommended target per EPA guidance.

• The site-specific cleanup level for arsenic is 30 ppm, based on risk assessments and site background concentrations of arsenic. The cleanup level for arsenic corresponds to an ELCR of 1 × 10-4, which is within the range of 1 × 10-4 to 1 × 10-6 required by the National Contingency Plan.

As described in the ROD, the major components of the selected remedy for OU2 include:

• Residential soils containing concentrations greater than the arsenic and/or lead cleanup levels will have the soils excavated to the depth that the elevated concentrations were found, up to 18 inches. If physical barriers exist, such as large trees, soil will be excavated around the barrier to the extent possible. Engineering controls will be implemented during the remedial action to prevent exposure to lead and arsenic from dust created by the excavation of the soils. Building foundations, permanent walkways and fixtures will not be affected by the soil excavation.

• Once excavation is complete, clean fill will be placed in the excavated areas and the lawns will be returned to as close to their original condition as possible.

• Excavated soils will be transported to a Resource Conservation and Recovery Act (RCRA) Subtitle D landfill. This remedy assumes that the excavated soil will not be characterized as hazardous waste.

Based on a PAH background study performed at the site in 2015, using IDEM Office of Land Quality (OLQ) 2016 Screening Levels for Direct Contact with Residential Soils for PAHs (http://www.in.gov/idem/landquality/2395.htm) is more appropriate for screening clean fill than EPA Regional Screening Levels (RSLs) which have been used at the site for previous work. Therefore, when testing for the suitability of backfill, the concentrations of PAHs in backfill selected for the site shall not exceed these IDEM screening levels. Additionally, the Contractor shall not use the previously employed river backfill source along the Ohio River that did not meet backfill requirements for this project.

The Contractor shall haul contaminated soil directly to a landfill in accordance with all applicable federal, state, and local laws and regulations. Stockpiling or staging of contaminated soil overnight may be permitted with approval from the USACE Contracting Officer Representative (COR) if the following conditions are met:

• contaminated soil is stockpiled or staged indoors;

• the location is not within a half mile of a school, park/playground, or child care;

• air monitoring is performed to ensure no offsite migration of contaminants; and

• the area used for stockpiling is cleaned after use to minimize cross contamination.

USACE expects the Contractor to follow the EPA guidance for lead-contaminated residential soils (Superfund Lead Contaminated Residential Sites Handbook; EPA, 2003) for the remediation of individual properties, including removal of drip zone (see Appendix B) soils that are accessible in the opinion of the Contractor’s Site Superintendent.

3 Points of Contact

Several USACE and EPA personnel will be associated with this contract including, but not limited to: the EPA Remedial Project Manager (RPM), the USACE Contracting Officer (KO), the USACE Project Manager (PM), the USACE Technical Manager (TM), the USACE onsite project engineer, and USACE COR. The USACE onsite project engineer will be onsite fulltime. Submittals should be sent to the appropriate USACE personnel as stated in this PWS.

IDEM will be reviewing some project deliverables (e.g., plans, Remedial Action Report, Final Air Monitoring Report). The USACE TM will inform the Contractor if any Points of Contact change or are newly identified.

Other stakeholders include local officials, community organizations, property owners, and others having a personal interest or involvement or a monetary or commercial involvement in the properties being remediated.

4 General Requirements

This is a performance-based contract. The Contractor shall complete remedial action that meets the objectives and performance criteria specified in the ROD issued on September 22, 2009 and the remedial design within the period of performance. The Contractor shall ensure onsite supervision and management of the cleanup.

Based on the solicitation, all references contained therein, all other information identified or made available by the Government, and all other information otherwise known or available to the Contractor, the Contractor is responsible for achieving the required performance objectives within the contract duration.

The Contractor is responsible for fully executing this contract by conducting required environmental services for which the EPA is statutorily responsible; addressing all environmental and regulatory issues within the scope of the objectives identified in this PWS; scheduling project activities; and achieving the performance objectives identified in this PWS.

It is the Contractor's responsibility to comply with all applicable federal, state, and local laws and regulations and to fulfill the performance objectives of this PWS in a manner that is consistent with any applicable orders or permits, all existing cleanup agreements or guidance, and relevant USACE and EPA policy and guidance for the duration of the contract. Payment will not be provided for work or services that are not in full compliance with the USACE and EPA policy or applicable federal, state, and local laws and regulations.

Where work described in this PWS is required to be in compliance with a guidance document, policy, or regulation, it is the Contractor’s responsibility to ensure that the most recent version is used. Any proposed or realized deviation from the guidance, policy, or regulation shall be immediately brought to the attention of and coordinated with

USACE.

Project Manager (PM) – The PM is the lead company representative responsible for all Contractor actions during the performance period. The PM must meet the minimum requirements as follows:

* The individual proposed as the Project Manager shall have a college degree in engineering, construction management, geology, chemistry, or related field.

* The individual proposed as the Project Manager shall have five (5) years of experience in Project Management for other contracts/programs and shall have a minimum of one year of working experience at USEPA-funded Superfund sites remediating residential properties.

* The individual proposed as the Project Manager shall report professional registration, in their respective field, where applicable or available.

Site Superintendent (SS) – The SS is the onsite point person overseeing all construction and is required to be onsite throughout the project while work is occurring. The SS must meet the minimum requirements as follows:

* The individual proposed as the SS shall have experience overseeing the direct handling and disposal of contaminated soil.

* The resume of the individual proposed as the SS shall highlight his/her experience in managing and scheduling supplies and materials delivery, multiple subcontractors, and the public during a large, complex remediation project.

* The individual proposed for the SS shall have at least one year of working experience managing cleanup at USEPA-funded Superfund sites remediating residential properties.

Site Safety and Health Officer (SSHO) – The SSHO is the onsite employee responsible for assuring that all operations comply with the Contractor’s Health and Safety Plan and that all aspects of the activities occurring on properties meet all required regulations to ensure a healthy and safe work environment. The SSHO must meet the minimum requirements as follows:

* The individual proposed as the SSHO shall have a minimum of one year of working experience implementing safety and occupational health procedures at USEPA-funded Superfund sites remediating residential properties.

* The individual proposed as the SSHO shall have training and a minimum of two (2) years of experience conducting exposure monitoring/air sampling and selecting/adjusting protective equipment use.

Contractor Quality Control Supervisor (CQCS) – The CQCS is the onsite employee responsible for performing Contractor Quality Control (CQC) over remedial activities in the field. The CQCS must meet the minimum requirements as follows:

* The individual proposed as the CQCS shall have appropriate education and experience in a specialized area related to HTRW remediation (e.g., chemistry, geology, or hydrogeology).

* The individual proposed as the CQCS shall have a minimum of one year working experience in quality control at USEPA-funded Superfund sites remediating residential properties Resumes with additional experience at USEPA-funded Superfund sites will be viewed more favorably * The individual proposed as the CQCS shall have formal education or training in field sampling related to HTRW remediation.

5 Performance Objectives and Standards

In general, the performance objectives and standards for the remedial action activities described in this PWS require compliance with

• the September 2009 ROD;

• the Remedial Design;

• the Restoration Agreements; and

• in a manner that protects the health and safety of site workers, residents, and the public.

It should be noted that the PWS governs when the Remedial Design Report and the PWS differ.

When conducting the work defined by this PWS, the Contractor shall communicate to the residential property owner, the following general principles:

• The goal of the remedial action is to remove arsenic- and lead-contaminated material that poses a risk to human health, not to enhance or improve property.

• Decisions made on property-specific items (e.g., tree/stump removal or dig around it, etc.) are based on the health of the community and the Remedial Design (RD).

Payments will be based on successful preparation and submission of invoices with approval by the COR and consistency with the Performance Requirements Summary in Table 1.

Table 1: Performance Requirements Summary

Desired Outcomes

Required Services

Performance Standards Monitoring Method

Incentive/Disincentives for Meeting or Not Meeting the Acceptable Quality Level

Quality Performance

Compliance with PWS and referenced applicable guidance and regulations

Satisfactory or higher performance rating for all ratings metrics

COR report of failure to deliver acceptable product or service in accordance with Performance-Based Milestones/ Objectives; COR report of failure to deliver acceptable product or service in accordance with PWS and referenced applicable guidance and regulations.

Issuance of a cure notice and possible termination of contract for uncorrected performance deficiencies, or for failure to complete Performance-Based Milestones/Objectives. Adverse past performance reports, including in the Contractor Performance Assessment Reporting System (CPARS). The Contractor may be in danger of not having subsequent options exercised.

Evaluation of Contractor performance on this contract will be completed by the COR/TM and consider the following performance rating metrics:

a . Technical (quality of product);

b. Schedule;

c. Cost control;

d. Management;

e. Business relations; and

f. Other (e.g., regulatory compliance, safety, environmental).

Ratings that may be assigned for each metric include Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory. Appendix D of this PWS provides evaluation ratings definitions. Contractor performance evaluations will be documented by the USACE in the Contractor Performance Assessment Reporting System (CPARS).

6 Description of Tasks

The following descriptions of the tasks are provided to communicate requirements for the PWS. They are not intended to be all-inclusive, and absence of a requirement from these descriptions does not relieve the Contractor from responsibility to perform all work required to achieve the performance objectives. Where applicable, the description of the performance objective is intentionally generalized, and detailed specifications are not provided. This approach is in conformance with the performance-based nature of this work statement and allows flexibility for the selected Contractor to determine and implement the best approach to meet the Government’s performance objectives established in Section 5 of this PWS above.

The deliverables for the tasks are described below and listed in Table 2.

6.1 Task 1: General Conditions

The Contractor shall provide temporary facilities which include all labor, equipment, materials, and incidentals required to provide, maintain, and operate field offices, temporary utilities, temporary roads and construction entrances, temporary fencing, decontamination areas, staging areas, portable toilets and other sanitary facilities, and trash dumpsters for the entire duration of field work. The cleaning of all temporary facilities and all streets in the project vicinity (i.e., The Contractor shall brush clean at the end of each day all subdivision streets onto which the Contractor tracks mud.) shall be included in this task. The Contractor shall also provide field office space (i.e., separate room in one of the Contractor’s trailers with desk, chair, file cabinet, phone, and Wi-Fi) for the USACE onsite project engineer under this task. The Contractor shall provide the FFP of this task on a per month basis. This task will be paid monthly.

6.2 Task 2: Project Planning

This task involves planning for each field season. The Contractor shall provide the FFP of this task on a per job basis.

The task will be paid monthly based on percentage complete.

For the first field season, the Contractor shall perform the following activities (described in greater detail below) under this task prior to beginning any excavation:

• Schedule/hold kickoff meeting (via teleconference)

• Prepare a Remedial Action Work Plan (RAWP)

• Schedule/hold an in-person pre-construction meeting

• Prepare all site-specific plans including Site Management Plan (SMP), Sampling and Analysis Plan (SAP) and Quality Management Plan (QMP), Data Management Plan (DMP), and Accident Prevention Plan (APP) with Health and Safety Plan (HASP)

For all field seasons after the first, the Contractor shall perform the following activities (described in greater detail below) under this task prior to beginning any excavation:

• Update Remedial Action Work Plan (RAWP)

• Schedule/hold an in-person pre-construction meeting

• Update all site-specific plans including Site Management Plan (SMP), Sampling and Analysis Plan (SAP) and Quality Management Plan (QMP), Data Management Plan (DMP), and Accident Prevention Plan (APP) with Health and Safety Plan (HASP)

Prior to beginning site work, the Contractor shall complete and obtain approval of the RAWP and all site-specific plans or updated plans.

The Contractor shall adhere to the following when developing their plans, schedule, and methods for conducting remedial activities:

• All work for a single field season, to include planning; excavation, disposal and restoration of properties; and post-remedial action reporting, shall be completed by 30 June of the calendar year following the year in which the field season takes place. For example, all work for the 2023 field season shall be completed by 30 June 2024.

• In general, field work shall be confined to the following times: 7:00 am – 6:00 pm, Monday – Saturday, except national holidays. The Contractor shall obtain written approval from the COR to modify the stated work schedule.

• The Contractor shall conduct activities in a reasonable manner that minimizes adverse impacts to the property owners and the general community and promotes good public relations.

• The Contractor shall be aware of local activities such as local fairs, funerals, weddings, parades, processions, etc., and schedule work to minimize interference with these local events.

• Anyone hauling material for the project shall disclose in writing to the COR whether they have hauled lead (lead ore, concentrate, slag, batteries, etc.) or any other hazardous materials before performing such services at this Site.

• The Contractor shall inspect and maintain documentation on haul trucks at the beginning of each workday for any signs of lead-bearing or any other hazardous materials on the inside of the bed, undercarriage, tires, etc.

• All equipment (owned, rented, subcontracted) shall be inspected prior to use on the project for contamination, defects and damages, or other pre-existing conditions.

• All equipment used for hauling or handling contaminated material shall be thoroughly decontaminated prior to being de-mobilized from the site. This includes, but is not limited to, any local sub-contract hauling service that, if approved by the COR, may perform odd jobs after work hours and on holidays or weekends.

Decontamination procedures shall be documented (protocol followed, photographs of equipment, date decontaminated, personnel involved, etc.).

• The Contractor shall appoint crew leaders for each crew and maintain current contact information, credentials, certifications, etc., accessible to the COR.

• The Contractor shall notify the COR and/or other pertinent regulatory authority in writing of non-compliance with any federal, state and local laws and regulations as pertains to this contract.

• After mobilization, the Contractor and USACE shall conduct meetings on mutually agreed upon dates on a weekly basis (hereafter referred to as Weekly Meetings). The Contractor shall provide agendas for Weekly Meetings and submit Weekly Meeting minutes (see Task 3 for additional information regarding meeting agendas/minutes). Attendance at these meetings shall consist of, at a minimum, USACE personnel (PM, COR, TM, onsite project engineer), the EPA RPM, the IDEM Representative, and the Contractor’s project manager and site superintendent. Other personnel may attend these meetings as needed. Meetings shall be conducted at the Contractor field office, and teleconference capabilities shall be provided as needed.

Meetings will address site progress, issues, and future planning. Weekly Reports shall be provided to USACE (PM, COR, TM, onsite project engineer) prior to or at these meetings. Additional details regarding Weekly Reports can be found in Section 6.9 and Appendix E.

• If potential cultural resources (e.g., building foundations, burials, cisterns, prehistoric features, privies, root cellars, summer kitchens, and wells) are uncovered during excavation, the Contractor shall immediately stop work and notify the USACE onsite project engineer. The Contractor may only resume excavation after coordination with the USACE onsite project engineer.

• After consulting with the project archeologist and the USACE onsite project engineer, the Contractor can coordinate all backfilling operations of properties where cultural resources are uncovered during excavation. The Contractor shall assume that archeologists will be onsite one day per week to complete documentation of cultural resources uncovered since their last visit.

6.2.1.1 Task 2.1: Kickoff Meeting (via Teleconference)

Within seven (7) calendar days after Notice to Proceed (NTP), the Contractor shall contact the TM and schedule the kickoff meeting to be held at via teleconference with USACE and EPA personnel.

The Contractor shall provide an agenda two (2) business days in advance of the meeting. The Contractor shall provide draft minutes electronically to stakeholders/participants within three (3) business days of the meeting, for review by stakeholders/participants within three (3) business days. Minutes shall be finalized within 15 calendar days following the meeting.