W912QR22R0054_Specs_V2-0000.pdf
PDF 7 MB Posted
- Solicitation number
- W912QR22R0054
About this file
This solicitation is for renovation of the Physical Fitness Center Project located at Fort Buchanan, Puerto Rico. The estimated price range for the project is between $5,000,000 and $10,000,000. The procurement will utilize a single phase Design/Bid/Build acquisition method. In accordance with FAR 19.1307, the solicitation requires at least 10% of the price evaluation be based on HUBZone small business participation. The Department of the Army Corps of Engineers Engineering District Louisville is the issuing agency. Offerors must register in the System for Award Management, which combines the former Central Contractor Registration and Online Representations and Certifications Application systems. Technical questions should be submitted through the Bidder Inquiry function in ProjNet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Ft. Buchanan Fitness Center - FFR Guaynabo, Puerto Rico
P2: 474153
Design-Bid-Build
Specifications Vol. 2 of 2 (Div. 13-33) Certified Final Design
22 July 2022
W912QR22R0054
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0054_Specs_V2-0000
Specifications (Vol 2 of 2)
Certified final submittal
Ft. Buchanan Fitness Center - FFR
Guaynabo, Puerto Rico Contract Number: W912QR17D0025 | P2 Number: 474153
25 February 2022
300 West Vine Street, Suite 1500, Lexington, KY 40507 | 859.252.9980
Louisville District
07/22/202007/27/202011/6/202012-4-202005/04/202107/22/202108/25/202102/14/202202/15/202202/25/2022
2/25/2022
2/15/2022
P2#474153 Ft. Buchanan Fitness Center
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 07/18 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.10 06 08/17 TOTAL BUILDING COMMISSIONING
(INDEPENDENT CxA)
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10, CHG 2: 02/19 DEMOLITION
02 83 00 11/18 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 2: 05/21 CAST-IN-PLACE CONCRETE
03 53 00 12/21 SELF-LEVELING FLOORING RESURFACER
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 52 00.00 48 10/10 SBS-MODIFIED BITUMINOUS MEMBRANE
ROOFING SYSTEM
07 62 00.00 48 10/10 FLASHING AND SHEET METAL
07 92 00.00 48 10/10 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 51 14.00 48 03/06 ALUMINUM AND ENVIRONMENTAL CONTROL
ALUMINUM WINDOWS
08 60 45 08/20 TRANSLUCENT PANELS
08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE
08 81 00.00 48 09/06 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 65 66 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 00.00 48 04/06 TOILET AND BATH ACCESSORIES
10 51 26 05/11 PLASTIC LOCKERS
10 56 13.00 48 10/05 METAL STORAGE SHELVING
10 71 13.13 04/06 STORM SHUTTERS
10 90 00.00 48 04/06 MISCELLANEOUS SPECIALTIES (PARTIAL
OMAR FUNDED)
DIVISION 11 - EQUIPMENT
11 66 23.13 11/21 BASKETBALL EQUIPMENT
11 66 53 11/21 GYMNASIUM DIVIDERS
DIVISION 12 - FURNISHINGS
12 48 13 08/17 ENTRANCE FLOOR MATS
DIVISION 13 - SPECIAL CONSTRUCTION
13 24 16 11/21 SAUNAS
DIVISION 21 - FIRE SUPPRESSION
PROJECT TABLE OF CONTENTS Page 2
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00.00 48 2/07 PLUMBING, GENERAL PURPOSE
22 33 30.00 10 08/20 SOLAR WATER HEATING EQUIPMENT
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 02.00 48 04/06 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - HVAC
25 05 11.02 05/21 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FAMNS
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 20 00 08/19, CHG 2: 05/21 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15, CHG 1: 08/17 SWITCHBOARDS
26 29 23 02/20, CHG: 1 - 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 1: 05/21 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 48 04/20 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00.00 48 10/20 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 51 16 05/20 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 3
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 92 19 08/17 SEEDING
DIVISION 33 - UTILITIES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 71 02 02/15, CHG 1: 11/19 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00.00 48 04/20 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 13 24 16
SAUNAS
11/21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Plan and elevations of sauna design, indicating construction details.
Include electrical rough-in and wiring requirements for heater/control, including pre-installation and final hookup.
SD-03 Product Data
Manufacturer's descriptive literature for saunas and components specified in this section.
SD-08 Manufacturer's Instructions
Manufacturer's printed installation instructions for sauna, benches, and accessories.
SD-10 Operation and Maintenance Data
Sauna enclosure, heater, and control/monitoring equipment.
1.2 DELIVERY, STORAGE, AND HANDLING
A. Store products of this section in manufacturer's unopened packaging until installation.
B. Maintain dry, heated storage area for products of this section until installation of products.
1.3 WARRANTY
Provide manufacturer's standard one year warranty on heaters, controls, room materials and workmanship when installed according to manufacturer's specifications and wiring information.
PART 2 PRODUCTS
2.1 MATERIALS
A. Provide prefabricated modular sauna panels approx. 2 feet wide x 7 feet high with concealed locking system for assembly, concealed electrical conduit, and finished exterior. Wall paneling runs vertical direction.
Verify that size of space shall be larger than the exterior size of the
SECTION 13 24 16 Page 1 prefabricated sauna and that job site ceiling height is at least 7 feet 3 inches for proper assembly. Prefab saunas 8 feet x 8 feet size or larger require 7 feet 5 inches ceiling height for proper assembly.
1. Size: 84" wide by 120" deep
2. Size: 4-sided.
3. Wall and Ceiling Framing: 2x2 Oregon Douglas Fir.
4. Wall and Ceiling Insulation: R-11 fiberglass batts.
5. Wall and Ceiling Vapor Barrier: Type C building foil.
6. Interior Wall and Ceiling Finish: "A" export grade, clear, kiln-dried (8 percent -11 percent moisture) 1x4, 11/16 inch thick material.
a. Western Red Cedar
7. Exterior Siding: 11/32 inch rough-sawn mahogany plywood.
8. Exterior Paneling: 1/2 x 4 tongue-and-groove
9. Assembled benches, clear, V.G., S4S, kiln-dried, 2x2, 1-1/2 inches x 1-1/2 inches tops with 3/8 inch spacing.
a. Facing: 2x4, 1-1/2 inches x 3-1/2 inches
b. Fastening: From bottom without exposed metal.
10. Pre-hung glass door 24 inches wide; interior casing provided to match room wood species.
11. Heater fence.
12. Assembled headrest/backrest No. 079 for upper benches.
13. Trim (1x1) for ceiling.
14. Flooring sufficient quantity for walking area of sauna room.
15. Heater.
16. Peridotite stones.
17. Control/contactor panel if required by heater.
18. Wall-mounted, vapor-proof light, Progress P5511, satin finish cast aluminum, 100 watt bulb max.
19. Vents: One lower vent slot cut neatly into 2x4 base. One upper vent for installation in precut space (usually front wall).
a. Metal vent set V10, register and grill.
20. Accessories including wooden thermometer, wooden bucket with bucket liner, wooden dipper, and bathing sign.
SECTION 13 24 16 Page 2
B. Flooring: 12 inch x 12 inch x 1/2 inch flooring squares for walking areas over concrete, tile, or vinyl; removable, washable, sanitary, non-skid, synthetic injected molded plastic material.
1. Color: Beige.
C. Doors
1. Door Rails: Solid wood laminated on both faces with clear, vertical grain Douglas fir veneer.
2. Assembled Door Unit: Frame of Hemlock, Casing (1x2) to match room species.
3. Door Size: 24 inches inch wide x 6 feet 2 3/4 inches
4. Glass: Hermetically-sealed double glass (insulated), tempered.
a. Clear
5. Hinges: Three 4 inch x 4 inch (102 mm x 102 mm) butt hinges, chrome finish.
6. Roller catch latch, chrome finish.
7. Door Pulls: Two wood pulls each door.
D. Sauna Heater: Finlandia FIN; wall mounted with exterior wall mounted controls; for room size up to 425 cu ft.
1. Electrical Characteristics: 208 VAC three phase.
2. Size: 16 inches wide, 11 inches deep, 24 inches high.
3. Capacity: As recommended by manufacturer for room volume.
4. Controls:
a. F-2T mechanical Wall Control with thermostat, 60-minute timer, light switch, and indicator light; for heaters 8kw and greater or any 3ph heater; proper contactor specified by manufacturer.
5. Construction: Three-wall pressed metal construction, stainless steel heating elements, large rock capacity, 50 pounds stones, direct rock contact with heating elements, free air flow.
6. Surfaces: Stainless steel interior and top, and optional stainless steel exterior.
7. UL listed heater and ETL listed control.
2.2 ACCESSORIES
1. Wood bucket, 1 gallon with plastic liner
2. Wood dipper, 16 inch long.
3. Tapered headrest.
SECTION 13 24 16 Page 3
4. Birch thermometer.
5. Plexiglas bathing sign.
6. Vapor-proof wall light.
7. Interlocking flooring, 12 inch square.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that utility services are of correct type and in correct locations.
B. Verify that construction activities affecting work of this section are correct and complete.
C. Examine conditions under which work of this section is to be performed.
1. Submit written notification if such conditions are unacceptable.
2. Beginning work of this section before unacceptable conditions have been corrected is prohibited.
3. Beginning construction activities of this section indicates installer's acceptance of conditions.
3.2 INSTALLATION
A. Install saunas and accessories in accordance with shop drawings and manufacturer's printed installation instructions.
B. Connection of heater, lighting, and control/monitoring equipment, to electrical service as specified.
3.3 CLEANING
A. Clean soiled surfaces in accordance with manufacturer's instructions.
3.4 PROTECTION OF INSTALLED PRODUCTS
A. Protect sauna and components from damage to finishes and operation until Substantial Completion.
-- End of Section --
SECTION 13 24 16 Page 4
SECTION 21 13 13
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.1 (2020) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1015 (2011) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied
AWWA M14 (2015) Manual: Recommended Practice for Backflow Prevention and Cross-Connection Control
ASTM INTERNATIONAL (ASTM)
ASTM A47/A47M (1999; R 2018; E 2018) Standard
SECTION 21 13 13 Page 1
Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A135/A135M (2020) Standard Specification for Electric-Resistance-Welded Steel Pipe
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
FM GLOBAL (FM)
FM 1637 (2010) Flexible Sprinkler Hose with Threaded End Fittings
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2019; Errata 19-1; Errata 19-2; TIA 19-1;
TIA 19-2; TIA 19-3; TIA 19-4; Errata 19-3;
Errata 20-4; TIA 19-5; TIA 19-6) Standard for the Installation of Sprinkler Systems
NFPA 24 (2019; TIA 19-1) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 101 (2021) Life Safety Code
NFPA 291 (2016) Recommended Practice for Fire Flow Testing and Marking of Hydrants
NFPA 1963 (2019) Standard for Fire Hose Connections
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler
SECTION 21 13 13 Page 2
System Layout
UNDERWRITERS LABORATORIES (UL)
UL 199 (2020) UL Standard for Safety Automatic Sprinklers for Fire-Protection Service
UL 262 (2004; Reprint Oct 2011) Gate Valves for Fire-Protection Service
UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection Service
UL 405 (2013; Bul. 2020) UL Standard for Safety Fire Department Connection Devices
UL 668 (2004; Reprint Jul 2016) UL Standard for Safety Hose Valves for Fire-Protection Service
UL 789 (2004; Reprint May 2017) UL Standard for Safety Indicator Posts for Fire-Protection Service
UL 2443 (2015; Reprint May 2020) UL Standard for Safety Flexible Sprinkler Hose with Fitings for Fire Protection Service
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Provide wet pipe sprinkler system(s) in all areas of the building. Except as modified herein, the system must meet the requirements of NFPA 13 .
Pipe sizes which are not indicated on the Contract drawings must be determined by hydraulic calculations.
1.2.1 Hydraulic Design
1.2.1.1 Basis for Calculations
A waterflow test was performed on July 21, 2021 at Building 167 at intersection of Constitution Ave & Patriot Way and resulted in a static pressure of 89 psi with a residual pressure of 54 psi while flowing 979 gpm.
Perform a fire hydrant flow test prior to shop drawing submittal in accordance with NFPA 291 . Results must include hydrant elevations relative to the building and hydrant number/identifiers for the tested hydrants, including which were flowed, which had a gauge. This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations.
Hydraulic calculations must be based on flow test noted in this paragraph, unless approved by Contracting Officer. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping, and 150 for existing underground piping. The minimum residual pressure in a service lateral (lead-in) at the design flow rate must be 20 psi at the inlet to the backflow preventer.
SECTION 21 13 13 Page 3
1.2.1.2 Hydraulic Calculations
a. Water supply curves and system requirements must be plotted on semi-logarithmic graph (N^1.85) paper so as to present a summary of the complete hydraulic calculation.
b. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, minimum discharge pressures and minimum flows. Elevations of hydraulic reference points (nodes) must be indicated.
c. Documentation must identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
d. Where the sprinkler system is supplied by interconnected risers, the sprinkler system must be hydraulically calculated using the hydraulically most demanding single riser. The calculations must not assume the simultaneous use of more than one riser.
e. All calculations must include the backflow preventer manufacturer's stated friction loss at the design flow or 8 psi for double check backflow preventer, whichever is greater.
f. All calculations must be performed back to the actual location of the flow test, taking into account the direction of flow in the service main at the test location.
g. For gridded systems, calculations must show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. A flow diagram indicating the quantity and direction of flows must be included.
1.2.1.3 Design Criteria
Hydraulically design the system to discharge a minimum density of 0.20 gpm/square foot over the hydraulically most demanding 2,500 square feet of floor area , as indicated on the drawings. Hydraulic calculations must be in accordance with the Area/Density Method of NFPA 13 . Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand.
1.2.2 Sprinkler Coverage
Sprinklers must be uniformly spaced on branch lines. Provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms (regardless of the fire resistance rating of the enclosure), boiler rooms, switchgear rooms, transformer rooms, attached electrical vaults and other electrical and mechanical spaces. Coverage per sprinkler must be in accordance with NFPA 13 . Provide sprinklers below all obstructions in accordance with NFPA 13 . Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .
SECTION 21 13 13 Page 4
1.2.3 Qualified Fire Protection Engineer (QFPE)
An individual who is a licensed professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience. Services of the QFPE must include:
a. Reviewing SD-02, SD-03, and SD-05 submittal packages for completeness and compliance with the provisions of this specification. Working (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations, and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.
b. Provide a letter documenting that the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting all outstanding comments.
c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).
d. Witnessing pre-Government and final Government functional performance testing and performing a final installation review.
e. Signing applicable certificates under SD-07.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Partial submittals and submittals not fully complying with NFPA 13 and this specification section must be returned disapproved without review.
SD-02, SD-03 and SD-05 must be submitted simultaneously.
Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their professional engineer stamp and signature. Partial submittals and submittals not reviewed by the QFPE must be returned disapproved without review.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer (QFPE) ; G
Sprinkler System Designer ; G
Sprinkler System Installer ; G
SECTION 21 13 13 Page 5
SD-02 Shop Drawings
Shop Drawing ; G, AE
SD-03 Product Data
Pipe ; G, AE
Fittings ; G, AE
Valves , including gate, check, butterfly, and globe; G, AE
Relief Valves ; G, AE
Sprinklers ; G, AE
Pipe Hangers and Supports ; G, AE
Sprinkler Alarm Switch ; G, AE
Valve Supervisory (Tamper) Switch ; G, AE
Fire Department Connection ; G, AE
Backflow Prevention Assembly ; G, AE
Air Vent ; G, AE
Hose Valve ; G, AE
Seismic Bracing ; G, AE
Nameplates ; G, AE
SD-05 Design Data
Seismic Bracing ; G, AE
Load calculations for sizing of seismic bracing
Hydraulic Calculations ; G, AE
SD-06 Test Reports
Test Procedures ; G, AE
SD-07 Certificates
Verification of Compliant Installation ; G, AE
Request for Government Final Test ; G, AE
SD-10 Operation and Maintenance Data
Operating and Maintenance (O&M) Instructions ; G
Spare Parts Data; G
SD-11 Closeout Submittals
SECTION 21 13 13 Page 6
As-built drawings
1.4 QUALITY ASSURANCE
1.4.1 Preconstruction Submittals
Within 36 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit the following for review and approval. SD-02, SD-03 and SD-05 submittals received prior to the review and approval of the qualifications will be returned Disapproved Without Review.
1.4.1.1 Shop Drawing
3 copies of the shop drawings, no later than 28 days prior to the start of system installation. Working drawings conforming to the requirements prescribed in NFPA 13 and must be no smaller than the Contract Drawings.
Each set of drawings must include the following:
a. A descriptive index with drawings listed in sequence by number. A legend sheet identifying device symbols, nomenclature, and conventions used in the package.
b. Floor plans drawn to a scale not less than 1/8-inch equals 1-foot clearly showing locations of devices, equipment, risers, and other details required to clearly describe the proposed arrangement.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail must show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal and transverse building sections showing typical branch line and cross main pipe routing, elevation of each typical sprinkler above finished floor and elevation of "cloud" or false ceilings in relation to the building ceilings.
e. Plan and elevation views which establish that the equipment will fit the allotted spaces with clearance for installation and maintenance.
f. Riser layout drawings drawn to a scale of not less than 1/2-inch equals 1-foot to show details of each system component, clearances between each other and from other equipment and construction in the room.
g. Details of each type of riser assembly, pipe hanger, sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. The dimension from the edge of vertical piping to the nearest adjacent wall(s) must be indicated on the drawings when vertical piping is located in stairs or other portions of the means of egress.
h. Details of each type of pipe hanger, seismic bracing/restraint and related components.
SECTION 21 13 13 Page 7
1.4.1.2 Product Data
3 copies of annotated catalog data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal.
1.4.1.3 Hydraulic Calculations
Calculations must be as outlined in NFPA 13 except that calculations must be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings.
Calculations must include isometric diagram indicating hydraulic nodes and pipe segments.
1.4.1.4 Operating and Maintenance (O&M) Instructions
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modified by this specification section.
Provide six manuals and one pdf version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted must be capable of providing 4-hour on-site response to a service call on an emergency basis.
Submit spare parts data for each different item of material and equipment specified. The data must include a complete list of parts and supplies, and a list of parts recommended by the manufacturer to be replaced after 1-year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
1.4.2 Qualifications
1.4.2.1 Sprinkler System Designer
The sprinkler system designer must be certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .
1.4.2.2 Sprinkler System Installer
The sprinkler system installer must be regularly engaged in the installation of the type and complexity of system specified in the contract documents, and must have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.3 Regulatory Requirements
Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an
SECTION 21 13 13 Page 8 item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.
1.5 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. All pipes must be either capped or plugged until installed.
1.6 EXTRA MATERIALS
Spare sprinklers and wrench(es) must be provided as spare parts in accordance with NFPA 13 .
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard Products
Provide materials, equipment, and devices listed for fire protection service when so required by NFPA 13 or this specification. Select material from one manufacturer, where possible, and not a combination of manufacturers, for a classification of material. Material and equipment must be standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid.
2.1.2 Nameplates
Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or equipment. Nameplates must be etched metal or plastic, permanently attached by screws to control units, panels or adjacent walls.
2.1.3 Identification and Marking
Pipe and fitting markings must include name or identifying symbol of manufacturer and nominal size. Pipe must be marked with ASTM designation. Valves and equipment markings must have name or identifying symbol of manufacturer, specific model number, nominal size, name of device, arrow indicating direction of flow, and position of installation (horizontal or vertical), except if valve can be installed in either position. Markings must be included on the body casting or on an etched or stamped metal nameplate permanently on the valve or cover plate.
2.1.4 Pressure Ratings
Valves, fittings, couplings, alarm switches, and similar devices must be rated for the maximum working pressures that can be experienced in the system, but in no case less than 175 psi .
SECTION 21 13 13 Page 9
2.2 UNDERGROUND PIPING COMPONENTS
2.2.1 Pipe
Pipe must comply with NFPA 24 . Minimum pipe size is 6 inches . Piping more than 5 feet outside the building walls must comply with Section 33 11 00 WATER UTILITY DISTRIBUTION PIPING. A continuous section of welded stainless steel fire water service piping from a point outside the building perimeter to a flanged fitting at least 1-foot above the finished floor within the building is acceptable.
2.2.2 Fittings and Gaskets
Fittings must be ductile-iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4 . Gaskets must be suitable in design and size for the pipe with which such gaskets are to be used.
Gaskets for ductile-iron pipe joints must conform to AWWA C111/A21.11 .
2.2.3 Gate Valve and Indicator Posts
Installation must comply with NFPA 24 . Gate valves for use with indicator post must conform to UL 262 . Indicator posts must conform to UL 789 .
Provide each indicator post with one coat of primer and two coats of red enamel paint.
2.2.4 Buried Utility Warning and Identification Tape
Provide detectable aluminum foil plastic backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping. Tape must be detectable by an electronic detection instrument. Provide tape, 3 inches minimum width, color coded for the utility involved with warning and identification imprinted in bold block letters continuously and repeatedly over the entire tape length.
Warning and identification must read "CAUTION BURIED WATER PIPING BELOW" or similar wording. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material.
2.3 ABOVEGROUND PIPING COMPONENTS
2.3.1 Steel Piping Components
2.3.1.1 Steel Pipe
Except as modified herein, steel pipe must be black as permitted by NFPA 13 and conform to the applicable provisions of ASTM A53/A53M, ASTM A135/A135M or ASTM A153/A153M .
Steel pipe must be minimum Schedule 40 for sizes 2 inches and less; and minimum Schedule 10 for sizes larger than 2 inches . Steel piping with wall thickness less than Schedule 40 must not be threaded. Grooved pipe must be roll -grooved.
2.3.1.2 Fittings
Fittings must be welded, threaded, or grooved-end type. Threaded fittings must be cast-iron conforming to ASME B16.4 , malleable-iron conforming to ASME B16.3 or ductile-iron conforming to ASTM A536. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, steel press fittings and field welded fittings are not
SECTION 21 13 13 Page 10 permitted. Fittings, mechanical couplings, and rubber gaskets must be supplied by the same manufacturer. Threaded fittings must use Teflon tape or manufacturer's approved joint compound. Reducing couplings are not permitted except as allowed by NFPA 13 .
2.3.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings must be designed for not less than 175 psi service and the product of the same manufacturer. Field welded fittings must not be used. Fitting and coupling housing must be malleable-iron conforming to ASTM A47/A47M, Grade 32510; ductile-iron conforming to ASTM A536, Grade 65-45-12. Rubber gasketed grooved-end pipe and fittings with mechanical couplings are permitted in pipe sizes 2 inches and larger. Gasket must be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts must be heat-treated steel conforming to ASTM A183 and must be cadmium-plated or zinc-electroplated.
2.3.1.4 Flanges
Flanges must conform to NFPA 13 and ASME B16.1 . Gaskets must be non-asbestos compressed material in accordance with ASME B16.21 , 1/16-inch thick, and full face or self-centering flat ring type.
2.3.2 Flexible Sprinkler Hose
The use of flexible hose is permitted. Flexible sprinkler hose must comply with UL 2443 and FM 1637 .
2.3.3 Pipe Hangers and Supports
Provide galvanized pipe hangers, supports and seismic bracing in accordance with NFPA 13 . Design and install seismic protection in accordance with the requirements of NFPA 13 section titled "Protection of Piping Against Damage Where Subject to Earthquakes for Seismic Design Category "D".
2.3.4 Valves
Provide valves of types approved for fire service. Valves must open by counterclockwise rotation.
2.3.4.1 Control Valve
Manually operated sprinkler control/gate valve must be outside stem and yoke (OS&Y) type as indicated on the drawings and must be listed.
2.3.4.2 Check Valves
Check valves must comply with UL 312 . Check valves 4 inches and larger must be of the swing type, have a clear waterway and meet the requirements of MSS SP-71 , for Type 3 or 4. Inspection plate must be provided on valves larger than 6 inches .
2.3.4.3 Hose Valve
Valve must comply with UL 668 .
SECTION 21 13 13 Page 11
2.3.5 Riser Check Valves
Provide riser check valve, pressure gauges and main drain.
2.4 ALARM INITIATING AND SUPERVISORY DEVICES
2.4.1 Sprinkler Alarm Switch
Vane or pressure-type flow switch(es). Connection of switch must be by the fire alarm installer. Vane type alarm actuating devices must have mechanical diaphragm controlled retard device adjustable from 10 to 60 seconds and must instantly recycle.
2.4.2 Valve Supervisory (Tamper) Switch
Switch must be integral to the control valve or suitable for mounting to the type of control valve to be supervised open. The switch must be tamper resistant and contain SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
2.5 BACKFLOW PREVENTION ASSEMBLY
Double-check valve assembly backflow preventer complying with ASSE 1015 and AWWA M14. Each check valve must have a drain. Backflow prevention assemblies must have current "Certificate of Approval from the Foundation for Cross-Connection Control and Hydraulic Research, FCCCHR List" and be listed for fire protection use. Listing of the specific make, model, design, and size in the FCCCHR List is acceptable as the required documentation.
2.5.1 Backflow Preventer Test Connection
Test connection must consist of a series of listed hose valve s with 2 1/2-inch National Standard male hose threads with cap and chain.
2.6 FIRE DEPARTMENT CONNECTION
Fire department connection must be flush type with cast-brass body, matching wall escutcheon lettered "Auto Spkr" with a polished-brass finish. The connection must have individual self-closing clappers, caps with drip drains and chains. Female inlets must have 2 1/2-inch diameter merican National Fire Hose Connection Screw Threads (NH) per NFPA 1963 .
Comply with UL 405 .
2.7 SPRINKLERS
Sprinklers must comply with UL 199 and NFPA 13 . Sprinklers with internal O-rings are not acceptable. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters must have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers are permitted for loading docks, residential occupancies and high-piled storage applications only.
2.7.1 Pendent Sprinkler
Pendent sprinkler must be recessed and quick-response type with nominal K-factor of 5.6 and 8.0 . Pendent sprinklers must have a polished chrome finish. Assembly must include an integral escutcheon.
SECTION 21 13 13 Page 12
2.7.2 Upright Sprinkler
Upright sprinkler must be brass or chrome-plated quick-response type and have a nominal K-factor of 5.6 and 8.0 .
2.7.3 Sidewall Sprinkler
Sidewall sprinkler must be the quick-response type. Sidewall sprinkler must have a nominal K-factor of 5.6 and 8.0 . Sidewall sprinkler must have a brass or polished-chrome finish.
2.7.4 Concealed Sprinkler
Concealed sprinkler must be chrome-platedquick-response type and have a nominal K-factor of 5.6 and 8.0 as indicated on the drawings . Coverplate must be white.
2.8 ACCESSORIES
2.8.1 Sprinkler Cabinet
Provide spare sprinklers in accordance with NFPA 13 and must be placed in a suitable metal or plastic cabinet of sufficient size to accommodate all the spare sprinklers and wrenches in designated locations. Spare sprinklers must be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed as required by NFPA 13 . At least one wrench of each type required must be provided.
2.8.2 Pendent Sprinkler Escutcheon
Escutcheon must be one-piece metallic type with a depth of less than 3/4-inch and suitable for installation on pendent sprinklers. The escutcheon must have a factory finish that matches the pendent sprinkler.
2.8.3 Pipe Escutcheon
Provide split hinge metal plates for piping entering walls, floors, and ceilings in exposed spaces. Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces.
2.8.4 Sprinkler Guard
Listed guard must be a steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards must be provided on sprinklers located within 7 feet of the floor.
2.8.5 Relief Valve
Relief valves must be listed and installed at the riser in accordance with
NFPA 13 .
2.8.6 Air Vent
Air vents must be of the automatic type and piped to drain to the building exterior.
SECTION 21 13 13 Page 13
2.8.7 Identification Sign
Valve identification sign must be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gage steel or 0.024-inch aluminum with red letters on a white background or white letters on red background. Wording of sign must include, but not be limited to "main drain", "auxiliary drain", "inspector's test", "alarm test", "alarm line", and similar wording as required to identify operational components. Where there is more than one sprinkler system, signage must include specific details as to the respective system.
PART 3 EXECUTION
3.1 VERIFYING ACTUAL FIELD CONDITIONS
Before commencing work, examine all adjoining work on which the contractor's work that is dependent for perfect workmanship according to the intent of this specification section, and report to the Contracting Officer's Representative a condition that prevents performance of first class work. No "waiver of responsibility" for incomplete, inadequate or defective adjoining work will be considered unless notice has been filed before submittal of a proposal.
3.2 INSTALLATION
The installation must be in accordance with the applicable provisions of NFPA 13 , NFPA 24 and publications referenced therein. Locate sprinklers in a consistent pattern with ceiling grid, lights, and air supply diffusers. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively affect or disrupt the sprinkler discharge pattern and coverage.
a. Piping offsets, fittings, and other accessories required must be furnished to provide a complete installation and to eliminate interference with other construction.
b. Wherever the contractor's work interconnects with work of other trades the Contractor must coordinate with other Contractors to insure all Contractors have the information necessary so that they may properly install all necessary connections and equipment. Identify all work items needing access (dampers and similar equipment) that are concealed above hung ceilings by permanent color coded pins/tabs in the ceiling directly below the item.
c. Provide required supports and hangers for piping, conduit, and equipment so that loading will not exceed allowable loadings of structure. Submittal of a bid must be a deemed representation that the contractor submitting such bid has ascertained allowable loadings and has included in his estimates the costs associated in furnishing required supports.
3.2.1 Waste Removal
At the conclusion of each day's work, clean up and stockpile on site all waste, debris, and trash which may have accumulated during the day as a result of work by the contractor and of his presence on the job.
Sidewalks and streets adjoining the property must be kept broom clean and free of waste, debris, trash and obstructions caused by work of the contractor, which will affect the condition and safety of streets, walks, SECTION 21 13 13 Page 14 utilities, and property.
3.3 UNDERGROUND PIPING INSTALLATION
The fire protection water main must be laid, and joints anchored, in accordance with NFPA 24 . Minimum depth of cover must be 3 feet or the frost line, whichever is deeper. The supply line must terminate inside the building with a flanged piece, the bottom of which must be set not less than 1-foot above the finished floor. A blind flange must be installed temporarily on top of the flanged piece to prevent the entrance of foreign matter into the supply line. A concrete thrust block must be provided at the elbow where the pipe turns up toward the floor. In addition, joints must be anchored in accordance with NFPA 24 . Buried steel components must be provided with a corrosion protective coating in accordance with AWWA C203. Piping more than 5 feet outside the building walls must meet the requirements of Section 33 11 00 WATER UTILITY
DISTRIBUTION PIPING.
3.4 ABOVEGROUND PIPING INSTALLATION
The methods of fabrication and installation of the aboveground piping must fully comply with the requirements and recommended practices of NFPA 13 and this specification section.
3.4.1 Protection of Piping Against Earthquake Damage
Seismic restraint is required.
3.4.2 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, must be installed to provide maximum headroom.
3.4.3 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping must be concealed above ceilings. Piping must be inspected, hydrostatically tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas must be concealed.
3.4.4 Pendent Sprinklers
a. Drop nipples to pendent sprinklers must consist of minimum 1-inch pipe with a reducing coupling into which the sprinkler must be threaded.
b. Where sprinklers are installed below suspended or dropped ceilings, drop nipples must be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling must not extend below the underside of the ceiling.
c. Recessed pendent sprinklers must be installed such that the distance from the sprinkler deflector to the underside of the ceiling must not exceed the manufacturer's listed range and must be of uniform depth throughout the finished area.
d. Pendent sprinklers in suspended ceilings must be located in the center
SECTION 21 13 13 Page 15 of the tile (plus or minus 2 inches).
e. Where the maximum static or flowing pressure, whicever is greater at the sprinkler, applied other than through the fire department connection, exceeds 100 psi and a branch line above the ceiling supplies sprinklers in a pendent position below the ceiling, the cumulative horizontal length of an unsupported armover to a sprinkler or sprinkler drop must not exceed 12 inches for steel pipe.
3.4.5 Upright Sprinklers
Riser nipples or "sprigs" to upright sprinklers must contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
3.4.6 Pipe Joints
Pipe joints must conform to NFPA 13 , except as modified herein. Not more than four threads must show after joint is made up. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints must be provided where indicated or required by NFPA 13 . Grooved pipe and fittings must be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools must be products of the same manufacturer. For copper tubing, pipe and groove dimensions must comply with the tolerances specified by the coupling manufacturer. The diameter of grooves made in the field must be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe must be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances.
3.4.7 Reducers
Reductions in pipe sizes must be made with one-piece tapered reducing fittings. When standard fittings of the required size are not manufactured, single bushings of the face or hex type will be permitted.
Where used, face bushings must be installed with the outer face flush with the face of the fitting opening being reduced. Bushings cannot be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2-inch .
3.4.8 Pipe Penetrations
a. Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate concrete or masonry walls or concrete floors must be core-drilled and provided with pipe sleeves. Each sleeve must be Schedule 40 galvanized steel, ductile-iron or cast-iron pipe and extend through its respective wall or floor and be cut flush with each wall surface. Sleeves must provide required clearance between the pipe and the sleeve per NFPA 13 .
The space between the sleeve and the pipe must be firmly packed with mineral wool insulation.
b. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe must be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable
SECTION 21 13 13 Page 16 mass or with a mechanically adjustable segmented elastomer seal.
3.4.9 Escutcheons
Escutcheons must be provided for pipe penetration in finished areas of ceilings, floors and walls. Escutcheons must be securely fastened to the pipe at surfaces through which piping passes.
3.4.10 Inspector's Test Connection
Unless otherwise indicated, the test connection must consist of 1-inch pipe connected at the riser as a combination test and drain valve; a test valve located approximately 7 feet above the floor; a smooth bore brass outlet equivalent to the smallest orifice sprinkler used in the system;
and a painted metal identification sign…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .