This document provides details for a federal design-build solicitation for full facility restoration work at an Army Reserve Center in Salem, Virginia. The solicitation seeks proposals for repair and renovation of two buildings and associated site work, with an estimated construction cost between $10-25 million. Proposals are due in August 2022, with award anticipated thereafter pending available funds. The solicitation is set aside for small businesses and requires compliance with wage determinations, as well as a 20% small business participation goal. The Corps of Engineers is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: ADAM WANTLAND
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 52
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR22R0040
X 9B. DATED (SEE ITEM 11)
05-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2022
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912QR
FACILITY CODECODE
EMAIL:TEL:
W912QR22R0040_Specs-0002
00 10 00 - 2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMEND 0002
Solicitation W912QR22R0040 for D/B Full Facility Restoration for PFC Cloyse E. Hall US Army Reserve Center at Salem, Virginia is hereby modified as follows:
1. The following Specification Attachments have been replaced in their entirety:
APPENDIX B Area Summary APPENDIX Q Site Lighting Analysis APPENDIX T Lightning Protection Risk Assessment
2. The following Specification Sections have been replaced in their entirety:
DIVISION 00– PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 Solicitation Contract Form 00 80 00.00 06 Special Provisions
DIVISION 01 – GENERAL REQUIREMENTS
01 02 00.00 48 Part 1 - Design Objectives, and Functional and Area Requirements 01 02 00.00 48 Part 2 – Applicable Criteria and Coordination with Local Authorities 01 02 00.00 48 Part 6 - Design - Architectural and Interior Design 01 02 00.00 48 Part 9 - Design - Plumbing 01 02 00.00 48 Part 10 - Design - Electrical 01 02 00.00 48 Part 11 - Design - HVAC 01 02 00.00 48 Part 13 - Design - Fire Protection 01 02 00.00 48 Part 15 - Design – Telecommunications 01 03 00.00 48 Design Submission Requirements After Award 01 50 00 Temporary Construction Facilities and Controls
3. The following Drawings have been replaced in their entirety
C-101 SITE PLAN
A-101 TRAINING CENTER FIRST FLOOR CONSTRUCTION PLAN
4. The Native/CAD files have been added in their entirety.
5. Draft Watermark is hereby removed from SECTION 00 22 18 - PHASE II Evaluation Criteria.
6. Electronic Submission Instructions are hereby added to SECTION 00 22 18 - PHASE II Evaluation
Criteria.
7. Wage Determination VA20220172, Modification 02, Dated 1 July 2022, has been replaced in its entirety by Wage Determination VA20220172, Modification 03, Dated 19 August 2022 and must be adhered to.
8. The proposal due date is hereby extended from Thursday, 25 August 2022 10:00 AM to Thursday, 29
August 2022 at 2:00 PM Eastern Time.
*** SAFETY PAYS ***
P2 #: 499678 ADD-ALT Repair Training Building Army Reserve Center, Salem, Virginia
00 10 00 - 1 Amendment 0002
ADD-ALT SALEM VA – REPAIR TRAINING BUILDING
DESIGN BUILD REQUEST FOR PROPOSAL
Section 00010 – Solicitation Contract Form
PRICE BREAKOUT SCHEDULE
PROJECT: ADD-ALT SALEM VA – REPAIR TRAINING BUILDING
LOCATION: Salem VA
PROPOSER’S NAME:
BASE PROPOSAL
ITEM
NO.
DESCRIPTION UNIT BID
AMOUNT
BID
AMOUNT
0001 Primary Facilities – TC Building Repair / Exit Stair JOB $
0002 Primary Facilities – VMS Building Repair JOB
0003 Project Repair Sitework JOB
0004 Project Base Repair Design Fees JOB
SUB-TOTAL BASE PROPOSAL – REPAIR WORK
0005 Primary Facilities – New Infill Addition
JOB
0006 Project Base New Design Fees JOB $
SUB-TOTAL BASE PROPOSAL – NEW WORK
SUB-TOTAL BASE PROPOSAL – REPAIR AND NEW WORK $
OPTION PROPOSAL
0007 Repair - Roofing Replacement JOB $
0008 Roofing Replacement Design Fees JOB $
0009 Repair – Roof Patching JOB $
0010 Repair: Ground Source Heat Pump (GSHP) JOB $
0011 Ground Source Heat Pump Design Fees JOB $
SUB-TOTAL OPTION PROPOSAL – REPAIR WORK $
0012 CFCI OMAR Funded Items JOB $
0013 CFCI Bona Fide Need OMAR Funded Items JOB $
0014 New Unheated Storage (UHS) Building JOB $
0015 UHS Building Design Fees JOB $
SUB-TOTAL OPTION PROPOSAL - NEW $
TOTAL BASE BID PLUS OPTION PROPOSAL – REPAIR WORK $
TOTAL BASE BID PLUS OPTION PROPOSAL – NEW WORK $
TOTAL BASE PLUS OPTION PROPOSAL – REPAIR AND NEW WORK $
Army Reserve Center, Salem, Virginia
00 10 00 - 2
NOTES FOR PROPOSAL SCHEDULE
1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest proposal schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to proposal items, all proposers should state their revised prices for each item. The company name should be indicated on the face of the proposal schedule to preclude being misplaced.
2. Proposers must insert a price on all numbered items of the Proposal Schedule. The price may be zero dollars or a deduct amount. Failure to do so will disqualify the proposal.
3. Attach a separate sheet describing each Option and Betterment, with the Option Items keyed to the Proposal Item Number and providing sufficient information for the Government to evaluate the quality and quantity of the Option or Betterment being offered.
4. If a modification to a proposal is submitted which provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price in the proposal schedule must be stated or, if it is not stated, the proposer agrees that the lump-sum adjustment shall be applied on a pro rata basis to every proposal item in the proposal schedule.
5. CONDITIONS GOVERNING EVALUATION OF PROPOSALS AND AWARD OF
CONTRACT.
One contract only will be awarded on this project and evaluation will be made on the Total Base Proposal plus Option Proposal, in accordance with the paragraph entitled "Evaluation of Options" in the Instructions to Offerors.
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule.
6. Description of Proposal Items - The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form. Further descriptions of the Options may be found in the Statement of Work.
Description of Base Proposal Items
Item No. 0001 “Primary Facilities – TC Building Repair / Exit Stair” includes Base Proposal construction work required within a line five feet outside of the building except that work covered by Item No. 0005. This work includes a two-story building addition outside of the existing exterior wall at the west side of the Training Center. This is a “Repair” line item
Army Reserve Center, Salem, Virginia
00 10 00 - 3
Item No. 0002 “Primary Facilities – VMS Building Repair” includes Base Proposal construction work required within a line five feet outside of the building. This is a “Repair” line item
Item No. 0003 “Project Repair Sitework” includes Base Proposal demolition and construction work required beyond a line five feet outside the buildings. Includes all work required to repair existing pavement, and to furnish and install additional pavement, sidewalks, MKT pad and fencing, as indicated on civil site drawings of this solicitation.
This is a “Repair” line item. The work in Item No. 0010 below is excluded from this line item.
Item No. 0004 “Project Base REPAIR Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Base Proposal Items 0001 and 0002. This is a “Repair” line item
Item No. 0005 “Primary Facilities – New Infill Addition” includes one-story building addition between the Training Center west wing and the Assembly Hall and Kitchen.
This is a “New Work” line item
Item No. 0006 “Project Base New Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Base Proposal Item 0005. This is a “New Work” line item
Description of Option Proposal Items
Item No. 0007 “Repair - Roofing Replacement” includes work required to replace existing insulation and roofing with new insulation and roofing. This option and the Roof Patching Option are mutually exclusive. This is a “Repair” line item.
** This Option item can be exercised within 90 calendar days from Notice to Proceed.
Item No. 0008 “Roofing Repair Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0007. This is a “Repair” line item
** This Option item can be exercised within 90 calendar days from Notice to Proceed with Option 0007 above.
Item No. 0009 “Repair – Roof Patching” includes work required to patch the roof following the installation of RFP scope items. Work includes modification of manufacturer’s warranty based on acceptance of scope items. This option and the Roofing Replacement Option are mutually exclusive. This is a “Repair” line item.
Army Reserve Center, Salem, Virginia
00 10 00 - 4
Item No. 0010 “Repair Work: Ground Source Heat Pump (GSHP): This work includes work required for the installation of drilling a well field, all system piping and building interior equipment to provide HVAC. This is a “Repair” line item.
Item No. 0011 “Ground Source Heat Pump Design Fees ” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0010. This is a “Repair” line item with Option 0008 above.
Item No. 0012 “CFCI OMAR Funded Items” includes work required to furnish and install “CFCI OMAR funded” items. CFCI OMAR funded items are to be contractor provided and installed, unless otherwise noted in this RFP. Refer to publication entitled “Army Reserve OMAR Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include:
Metal lockers Caging for Storage
** This Option item can be exercised within 425 calendar days from Notice to Proceed.
Item No. 0013 “CFCI Bona Fide Need OMAR Funded Items” includes work required to furnish and install “CFCI Bona Fide Need OMAR Items. CFCI Bona Fide Need OMAR Items are to be contractor provided and installed, unless otherwise noted in this RFP.
Refer to publication entitled “Army Reserve OMAR Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include:
Refrigerator and Microwave in Break Room(s) Metal shelving Fire extinguishers and window blinds Food service equipment
** This Option item can be exercised within 675 calendar days from Notice to Proceed.
Amendment 0002 **************************************************************************
Item No. 0014 “New Work – UHS”: Provide Unheated Storage building. Storage caging as indicated on the drawings/specs to be included under Item 0012. This is a “New Work” line item
**************************************************************************Amendment 0002
Army Reserve Center, Salem, Virginia
00 10 00 - 5
Item No. 0015 “UHS Building Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0014. This is a “New Work” line item with Option 0019 above.
*** End of Section ***
*** End of Section ***
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
EVALUATION CRITERIA
SECTION 00 22 18 - PHASE II
SECTION 00 22 18
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE TWO
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the Design and Construction of a Full
Facility Restoration (FFR) project to renovate and repair a two-story training building and the vehicle maintenance shop at the Army Reserve Center located in the city of Salem (Roanoke County), Virginia.
1.2 This is a two-phase procurement and the basis of award is the Best Value Trade-Off Process. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase II. The selected offerors for Phase II will be invited to submit the information described in this Section 00 22 18, Procedures for Submittal and Evaluation of Offers for Phase II, for review and evaluation by the Government. Following completion of the Phase II evaluation, the Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. For Phase II submittals, requirements stated in this RFP are minimums.
NOTE: The rating information from Phase I will not be considered in Phase II or in the final selection.
1.3 The target ceiling for contract award is $10,500,000.00 based on the funds made available for this project.
The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.
2. Submittal of Offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. For Phase II, requirements stated in this Request for Proposal (RFP) are minimums.
Innovative, creative, or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals electronically in accordance with the Proposal Submission
Instructions in Section 00 21 00 of the solicitation. Please follow the instructions precisely as proposals must complete the upload no later than the time and date specified in Block 13 of Standard Form 1442.
NOTE: The Louisville District is in the Eastern Time Zone.
2.3 The Government is using a two-phase procurement approach for this design/build project. For Phase II, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be electronically in accordance with the Proposal Submission Instructions in Section 0 21 00 of the solicitation. The sections should parallel the submission requirements identified herein.
2.4 Volume I for Phase II shall be submitted electronically and include the following information:
Volume I – Factor I: Design Narrative Volume I – Factor II: Design Drawings Volume I – Factor III: Small Business Participation Plan
*NOTE: Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.
*NOTE: Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.
Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.
a. Adam Wantland, Contract Specialist at Adam.M.Wantland@usace.army.mil
b. Jesse Scharlow, Contracting Officer at Jesse.E.Scharlow@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912QR22R0040 -FIRMNAME.
4. Click Upload button to send documents.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912QR22R0040-FIRMNAME -VOLUME I
W912QR22R0040-FIRMNAME -VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Upload Completion & Deadline: Interested offerors shall submit proposals no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
2.5 Volume II for Phase II shall be submitted electronically in accordance with the Proposal Submission Instructions in Section 00 21 00 of the solicitation and shall include the following information:
Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan
NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process.
3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical (Volume I) proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.
Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.
3.2 The evaluation process for Phase II essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.
3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Phase II Volume I proposals against the RFP requirements. Factors I and II (Design Narrative and Design Drawings) will be rated using Table 4 below.
Factor III – Small Business Participation Plan will be rated using Table 5 below.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors.
4.1 Phase II proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
4.2 Volume I – Factor I: Design Narrative 1st
4.3 Volume I – Factor II: Design Drawings 2nd
4.4 Volume I – Factor III: Small Business Participation Plan 3rd
4.5 Volume II - Price and Pro Forma Information
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Pre-Award Information Not Rated
Tab E Subcontracting Plan Acceptable/ Unacceptable
4.6 Ratings
Evaluators will apply the rating for the definition that most closely matches the evaluation.
TABLE 4
Technical / Risk Assessment Ratings Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
TABLE 5
Small Business Ratings
Rating Description
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet the small business objectives.
4.7 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5. Volume I – Factor I: Design Narrative
5.1 Submission Requirements:
5.1.1 Provide a clear and concise narrative describing your proposed design process for this project, especially with regard to sequencing of work within a multi-story renovation. Proposed narratives shall also address the design process and logic/rationale for the following project features:
Architectural – Address ceiling height restrictions and coordination including design/placement of
HVAC, plumbing, electrical, and fire protection in the corridors; and auditorium design Structural – Address elevator design and seismic requirements HVAC System Abatement of Hazardous Materials Energy Conservation Techniques Sustainable Design Strategies
The narrative shall also note any improvements exceeding the RFP requirements, including an explanation of proposed building systems, as outlined in Section 01 02 00.00 48, Statement of Work
NOTE: There is a limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 10 and a minimum margin of one-half inch on all sides, for the Design Narrative factor.
5.2 Evaluation Criteria:
5.2.1 The Design Narrative will be evaluated for completeness and thoroughness according to the building features of the RFP as outlined in Section 01 02 00.00 48, Statement of Work. Proposals that demonstrate a complete understanding of the project requirements in Section 01 02 00.00 48, Statement of Work, may receive additional consideration.
6. Volume I – Factor II: Design Drawings
6.1 Submission Requirements:
6.1.1 Submit ANSI D half size scalable to fit 11” x 17” sheets. The proposed design drawings shall provide the information as follows:
BUILDING FUNCTION & AESTHETICS
Floor Plan Exterior Elevations (show all four sides)
NOTE: There is a limit of twenty (20) drawings for the Design Drawings factor using 11” x 17” sheets.
All information must be clearly legible. Any information that is not clearly legible may result in a lower rating if the evaluators cannot readily find the appropriate information.
6.2 Evaluation Criteria:
6.2.1 Design Drawings will be reviewed for thoroughness, functionality, quality of materials, and an understanding of the project requirements. Drawings that exceed the minimum requirements within the RFP, may receive additional consideration.
7.0 Volume I – Factor III: Small Business Participation Plan
7.1 Submission Requirements
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN. The Small Business Participation Plan shall be based on the offeror’s best effort and is required to address each of the following areas individually:
The extent to which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;
The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e., teaming agreements signed, are to be considered more heavily than non-enforceable ones);
The complexity and variety of the work small firms are to perform on this acquisition;
The practicality of the Small Business Participation Plan, i.e., aggressive goals.
The Small Business Participation Plan shall be organized as follows:
(1) Prime Contractor type of business (check all that apply):
( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business
(2) Percentage of your participation as a prime contractor: __________________ %
NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.
(3) Percentage of total contract value of subcontracts planned for:
% of Total
Contract Value Large % Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned %
Small Service Disabled Veteran Owned %
Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.
NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.
(4) List principal supplies/services (be specific) to be subcontracted to:
Name of Company
Type of Service/Supply
Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone Small Veteran Owned Small Service Disabled Veteran Owned
(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.
(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.
(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.
(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).
7.2 Evaluation Criteria:
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN.
The Small Business Participation Plan will be evaluated based on the offeror’s best efforts, the level of small business commitment that is being demonstrated for the proposed acquisition, and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of 20% of the total contract value (through collective small business participation from any type of small business or sub-category small business).
Pursuant to DFARS PGI 215.304(c)(i)(A), the following elements will be considered in evaluating an offeror’s Participation Plan:
The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;
The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);
The complexity and variety of the work such firms are to perform;
The realism of the plans;
Past performance of offerors in complying with the requirements of the Subcontracting Plan Goals for such firms and monetary targets for participation;
The extent of participation of such firms in terms of the proposed subcontracted value; and The extent to which the offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals to help ensure small business receives a fair proportion of DOD awards.
8.0 Volume II - Price and Proforma Information
8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.
8.1.1 Submission Requirements:
The offeror shall complete and submit Standard Form 1442 and Section 00 10 00, Proposal Price Breakout Schedule.
8.1.2 Evaluation Criteria:
The price will be evaluated on base proposal plus all options. The price will be evaluated for fairness and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items.
Offerors are cautioned to distribute costs appropriately. For HUBZone offerors the HUBZone price evaluation preference of 10% in accordance with FAR 52.219-4 will be applied for evaluation purposes only.
8.2 Tab B – Joint Venture Agreements
8.2.1 Submission Requirements:
If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.
Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.
8.2.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business-related price preference.
8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
8.3.1 Submission Requirements:
A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address, and telephone number of offeror's banking institution. If the offeror is a joint venture, submit this information for all joint venture members.
B. Bonding Capability. Submit information showing offeror's ability to be bonded for this project. Include the name, address, and telephone number of the offeror's bonding company, which must be on the approved Treasury list available at https://fiscal.treasury.gov/surety-bonds/list-certified-companies.html.
8.3.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
See FAR Part 28 for information related to bonds.
8.4 Tab D – Pre-Award Information
8.4.1 Submission Requirements:
A. The offeror shall submit one completed copy of Section 00 45 00, Representations and Certification.
B. The offeror shall submit the following information:
a) Number of years the firm has been in business
b) Name, address, and telephone numbers of two credit/trade references
c) A list of present commitments, including the dollar value
If the offeror is a joint venture, submit this information for all joint venture members.
8.4.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
9.5 Tab E - Subcontracting Plan
9.5.1 Submission Requirements:
Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 5119.705. The offeror may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.
9.5.2 Evaluation Criteria:
Submitted information will be evaluated for acceptability in accordance with FAR 19.705, DFARS 219.705-4, and AFARS 5119.705. To be acceptable, subcontracting plans must:
(a) Adequately address the required statutory elements.
(b) Provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD (AFARS 5119.705), a copy of which is attached.
(c) To be acceptable, subcontracting plans must meet all of the requirements outlined in Appendix DD, Part 3, AFARS 5119.705. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.
AFARS – APPENDIX DD
SUBCONTRACTING PLAN EVALUATION GUIDE
Part 1 – Introduction
DD-100 Purpose.
The guide provides a methodology for uniform and consistent evaluation of subcontracting plans within the Army. It is designed to facilitate compliance with the mandates of 15 U.S.C. § 637(d) to increase opportunities for small and small disadvantaged businesses.
DD-101 Applicability.
In accordance with requirements of FAR 19.705-4, DFARS 219.705-4 and AFARS 5119.705-4, the contracting officer shall use this guide to review all subcontracting plans (except those for commercial items), including those submitted in response to the provisions in FAR 19.705-2(d) and (e). When the contract will require subcontracting plans, use the clauses designated by FAR 19.708(b)(1) and (2) and DFARS 219.708(b)(1)(A) in the solicitation. A copy of the completed evaluation shall be included in the contract file.
DD-102 Goals.
Contracting officers must place special emphasis on negotiating subcontracting goals that are realistic, challenging and attainable. The plan must express goals in terms of percentages of total planned subcontracting dollars and must be comparable to the dollar commitments in the small business participation plan. In accordance with FAR 19.705- 4(d), the contracting officer must review enough evidence to determine that the:
1. Offeror can meet subcontracting plan goals;
2. Offeror’s goals are consistent with their cost or pricing data or information other than cost or pricing data;
3. Offeror will honor the terms of subcontract agreements (i.e., timely payments of amounts owed, use of firms cited in proposal, etc.); and
4. Offeror’s make or buy policy or program does not conflict with the proposed subcontracting plan and is in the Government’s best interest.
5. Plan includes the contractor’s commitment to adopt and comply with its requirements and goals for small business utilization.
DD-103 Evaluation Rating.
Either the contracting officer, the small business representative, or both, shall evaluate and rate the subcontracting plan as “acceptable” or “unacceptable,” in the context of the particular procurement. For instance, in smaller dollar value contracts, or contracts for uniquely manufactured items, it might be impracticable or not cost effective for offerors to take the type of actions that might be appropriate in contracts for larger dollar values or commercial components. To receive an “Acceptable” rating, the contractor must satisfy all objectives in Part 2 and meet each statutory subcontracting plan requirement outlined in Part 3. Failure to receive a subcontracting plan rating of acceptable could jeopardize the offeror’s selection for contract award. The contracting officer must document the decisions in the contract file.
DD-104 Modification of Guide.
Pursuant to AFARS 5101.403, only principal assistants responsible for contracting may approve individual deviations to this evaluation guide. This approval authority may not be further delegated.
DD-105 Use of Preaward Surveys.
For contracts administered by the Defense Contract Management Agency, obtain information needed to assess contractor compliance with subcontracting plans in current and previous contracts by requesting a preaward survey in accordance with FAR 9.106, DFARS 209.106 and DFARS PGI 209.106.
Part 2 – Rating System
DD-201 Acceptable Plans.
Objective: The subcontracting plan meets all of the requirements outlined in Part 3. The offeror has provided details that demonstrate an acceptable approach to assisting, promoting and utilizing small businesses, small disadvantaged businesses, women-owned small businesses, historically underutilized business zone small businesses, veteran-owned small businesses, service disabled veteran-owned small businesses and, for Defense Research Programs, historically black colleges and universities and minority serving institutions. The offeror has demonstrated an ability to meet prior subcontracting plan goals and honor the terms of subcontract agreements. Offeror has outlined an approach utilizing mentor protégé firms, joint venture teams, or other partners. The subcontracting goals are realistic, challenging, and attainable. Clarifications and minor rework of the submission may be required to correct slight omissions that do not prejudice other offers.
DD-202 Unacceptable Plans.
Objective: The subcontracting plan fails to meet a requirement outlined in Part 3. The offeror has not provided an acceptable approach to assisting, promoting, and utilizing small businesses. The offeror has a history of failing to honor subcontract agreements. The offeror did not discuss the establishment of mentor protégé relationships, teaming, or joint venture agreements with other firms. Ensure the proposed subcontracting goals are attainable in light of the contractor’s past performance in meeting subcontracting goals. Proposed subcontracting goals reflect less than a good faith effort. Substantial rework of the document is required to correct omissions and establish realistic, challenging, and attainable goals. Failure to receive a rating of acceptable may jeopardize offeror’s eligibility for contract award. See FAR 19.702(a)(1).
Part 3 – Subcontracting Plan Requirements
DD-301 Requirements.
If any of the following are answered “NO”, the plan is not acceptable, and the offeror must revise it before contract award. Does the plan:
1. Contain a policy statement or evidence of internal guidance to company buyers that commits to complying with the Small Business Act (Public Law 99-661, Section 1207 and Public Law 100-180)?
2. Identify separate percentage goals for utilizing small businesses (including Alaska Native Corporations (ANCs) and Indian tribes), veteran-owned small businesses (VOSB), service-disabled veteran-owned small businesses (SDVOSB), historically underutilized business zone small businesses (HUBZone), small disadvantaged businesses (SDB), women-owned small businesses (WOSB), and, for Defense Research Programs, historically black colleges and universities and minority serving institutions where applicable? Negotiated subcontracting goals must correlate with percentages of small business utilization identified in the contractor’s small business participation plan, see FAR 15.304 and DFARS 215-304, and/or minimum targets identified in the solicitation or contract modification.
FAR 19.704(a)(1)
3. Project the total dollars planned to be subcontracted and a separate statement of the total dollars planned to be subcontracted to small business (including ANCs and Indian tribes), VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns? FAR 19.704(a)(2)
4. Describe the principal types of supplies and services to be subcontracted and identify the types planned for subcontracting to small business (including ANCs and Indian tribes), VOSB, SDVOSB, HUBZone, SDB and WOSB concerns?
5. Describe the method to be used to develop the subcontracting goals? FAR 19.704(a)(4)
6. Describe the method for identifying potential sources for solicitation purposes? FAR 19.704(a)(5)
7. State if the offeror included indirect costs in establishing subcontracting goals, and a description of the method used to determine the proportionate share of indirect costs to be incurred with small business, VOSB, SDVOSB, HUBZone, SDB (including ANCs and Indian tribes), and WOSB concerns? FAR 19.704(a)(6)
8. Identify the name of the employee who will administer the offeror’s subcontracting program and describe that person’s duties? FAR 19.704(a)(7)
9. Provide an approach for ensuring that small businesses, VOSB, SDVOSB, HUBZone, SDB, (including ANCs and Indian tribes) and WOSB concerns will have an…