W912QR22B0010_Plans-0001.pdf
PDF 12 MB Posted
- Attached to
- Pittsburgh ARS Apron Federal contract opportunity
- Solicitation number
- W912QR22B0010
About this file
This solicitation is for design/build services for Phase 1 and Phase 2 of the Pittsburgh ARS East/West Apron Project. The estimated construction cost is between $25-100 million, and the NAICS code is 237310 with a size standard of $39.5 million. Bids must be submitted in hard copy by the closing date, and the procurement will utilize the HUBZone 10% price evaluation preference. The project is subject to availability of funding. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results W912QR22B0010 Pittsburgh ARS Repair East-West Apron.pdf | ||
| W912QR22B0010_Specs-0001.pdf | ||
| W912QR22B0010_Specs-0000 .pdf | ||
| W912QR22B0010_Plans_Vol2-0000.pdf | ||
| W912QR22B0010_Plans_Vol1-0000 .pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A
\P A
G
-0
.d w g
:4
:1
P M
/8
/2
P D
A
E C p d f.
p lt c fg
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
O M
A H
A D
IS
T
R
IC
T
C A
P
IT
O L
A V
E
O M
A H
A
N E
C O
N T
R A
C T
D E
C E
M B
E R
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P
IT
T S
B U
R G
H A
IR
R
E S
E R
V E
S T
A T
IO
N
P
E N
N S
Y L
V A
N
IA
R E
P L
A C
E E
A S
T /W
E S
T A
P R
O N
T A
X
IW
A Y
P A
V E
M E
N T
P
H A
S E
P
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M M
E N
D M
E N
T
S E
P
A F
X X
-X X
X -X
X
P A
G
-0 .d w g
M H
U C
K L
E
B
G O
L
IB
E R
B
G O
L
IB
E R
K
H A
L
IN
D
E X
O F
D R
A W
IN
G
S
G-002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C E
R T
IF
IE
D F
IN
A
L S
E T
INDEX
DESIGN FILE SHEET NO. DESCRIPTION
ELECTRICAL
PA26_ES501.DWG
PA26_ES101.DWG
ES501
ES101
ELECTRICAL DETAILS
ELECTRICAL SITE PLAN - AREA 1
STRUCTURAL
PA26_S-003.DWG
PA26_S-002.DWG
PA26_S-001.DWG
S-003
S-002
S-001
BLAST DEFLECTOR ELEVATIONS AND FOUNDATION DETAILS
BLAST DEFLECTOR ELEVATIONS AND ANCHOR BOLT LAYOUT PLAN
STRUCTURAL NOTES
DESIGN FILE SHEET NO. DESCRIPTION
GENERAL
CIVIL
GC503
GC502
GC501
GC104
GC103
GC102
GC101B
GC101A
GC100
G-004
G-003
G-002
G-001
MISCELLANEOUS CONSTRUCTION DETAILS
TEMPORARY CONSTRUCTION FENCE DETAILS
LOW PROFILE BARRICADE, CLOSED TAXIWAY CROSS & ROPE AND BARREL FENCING DETAILS
CONSTRUCTION SAFETY AND PHASING PLAN SHEET 2 OF 2
CONSTRUCTION SAFETY AND PHASING PLAN SHEET 1 OF 2
PHASING PLAN - CAZ #2
PHASING PLAN - CAZ #1B
PHASING PLAN - CAZ #1A
OVERALL PHASING PLAN
BATCH PLANT & HAUL ROUTE LOCATION PLAN
PROJECT VICINITY MAP
INDEX OF DRAWINGS
COVER SHEET
PA26_CU501.DWG
PA26_CU204.DWG
PA26_CU203.DWG
PA26_CU202.DWG
PA26_CU201.DWG
PA26_CU102.DWG
PA26_CU101.DWG
PA26_CU100.DWG
PA26_CG502.DWG
PA26_CG501.DWG
PA26_CG403.DWG
PA26_CG402.DWG
PA26_CG401.DWG
PA26_CG103.DWG
PA26_CG102.DWG
PA26_CG101.DWG
PA26_CE501.DWG
PA26_CE101.DWG
PA26_CP503.DWG
PA26_CP502.DWG
PA26_CP501.DWG
PA26_CP403.DWG
PA26_CP402.DWG
PA26_CP401.DWG
PA26_CP201.DWG
PA26_CP103.DWG
PA26_CP102.DWG
PA26_CP101.DWG
PA26_CS503.DWG
PA26_CS502.DWG
PA26_CS501.DWG
PA26_CS103.DWG
PA26_CS102.DWG
PA26_CS101.DWG
PA26_CD201.DWG
PA26_CD103.DWG
PA26_CD102.DWG
PA26_CD101.DWG
CU501
CU204
CU203
CU202
CU201
CU102
CU101
CU100
CG502
CG501
CG403
CG402
CG401
CG103
CG102
CG101
CE501
CE101
CP503
CP502
CP501
CP403
CP402
CP401
CP201
CP103
CP102
CP101
CS503
CS502
CS501
CS103
CS102
CS101
CD201
CD103
CD102
CD101
PA26_GC503.DWG
PA26_GC502.DWG
PA26_GC501.DWG
PA26_GC104.DWG
PA26_GC103.DWG
PA26_GC102.DWG
PA26_GC101B.DWG
PA26_GC101A.DWG
PA26_GC100.DWG
PA26_G-004.DWG
PA26_G-003.DWG
PA26_G-002.DWG
PA26_G-001.DWG
WATER LINE DETAILS
WATER LINE PROFILE SHEET 4 OF 4
WATER LINE PROFILE SHEET 3 OF 4
WATER LINE PROFILE SHEET 2 OF 4
WATER LINE PROFILE SHEET 1 OF 4
UTILITY PLAN - AREA 2
UTILITY PLAN - AREA 1
OVERALL UTILITY PLAN
SUBDRAIN AND MISCELLANEOUS DRAINAGE DETAILS
AREA INLET DETAILS
SPOT ELEVATION PLAN - AREA 3
SPOT ELEVATION PLAN - AREA 2
SPOT ELEVATION PLAN - AREA 1
GRADING AND DRAINAGE PLAN - AREA 3
GRADING AND DRAINAGE PLAN - AREA 2
GRADING AND DRAINAGE PLAN - AREA 1
EROSION AND SEDIMENT CONTROL DETAILS
EROSION AND SEDIMENT CONTROL PLAN & NOTES
REINFORCEMENT DETAILS
JOINT SEALANT DETAILS
JOINT DETAILS
JOINT LAYOUT PLAN - AREA 3
JOINT LAYOUT PLAN - AREA 2
JOINT LAYOUT PLAN - AREA 1
PAVEMENT REPLACEMENT SECTIONS
PAVING PLAN - AREA 3
PAVING PLAN - AREA 2
PAVING PLAN - AREA 1
AIR FORCE TIE DOWN AND STATIC GROUND DETAILS
PAVEMENT MARKING DETAILS SHEET 2 OF 2
PAVEMENT MARKING DETAILS SHEET 1 OF 2
SITE PLAN - AREA 3
SITE PLAN - AREA 2
SITE PLAN - AREA 1
PAVEMENT REMOVAL SECTIONS
REMOVAL PLAN - AREA 3
REMOVAL PLAN - AREA 2
REMOVAL PLAN - AREA 1
EXISTING CONDITIONS
PA26_VF103.DWG
PA26_VF102.DWG
PA26_VF101.DWG
PA26_VF100.DWG
VF103
VF102
VF101
VF100
EXISTING CONDITIONS PLAN - AREA 3
EXISTING CONDITIONS PLAN - AREA 2
EXISTING CONDITIONS PLAN - AREA 1
TOPOGRAPHIC SURVEY INFORMATION PLAN
GEOTECHNICAL
PA26_B-302.DWG
PA26_B-301.DWG
PA26_B-101.DWG
B-302
B-301
B-101
SOIL BORING LOGS - SHEET 2 OF 2
SOIL BORING LOGS - SHEET 1 OF 2
BORING LOCATION PLAN
W
2Q R
B0
0_
Pl an s-
ARIMS: 200A Disposition: Maintain for 15yrs after construction
326337
319318425
DRMO PAD
RAPID RUNWAY REPAIR
CONC. DOCK
SAND&GRAVEL STORAGE
STAND
TEST
ENGINE
c
E
E
C
C
C
C
T8 320
GATE
DOUBLE
F
ILS
P A
\P A
G
-0
.d w g
:4
:1
A
M
/2
/2
P
D
A E
C p d f.
p lt c fg
D S
A
E C
S c re e n F u ll
S iz e .d s c ri
A H
A D
IS
T
R
IC
T
C A
P
IT
O L
A V
E
O M
A H
A
N E
C O
N T
R A
C T
D E
C E
M B
E R
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P
IT
T S
B U
R G
H A
IR
R
E S
E R
V E
S T
A T
IO
N
P
E N
N S
Y L
V A
N
IA
R E
P L
A C
E E
A S
T /W
E S
T A
P R
O N
T A
X
IW
A Y
P A
V E
M E
N T
P
H A
S E
P
F
X X
-X X
X -X
X
P A
G
-0 .d w g
M H
U C
K L
E
B
G O
L
IB
E R
B
G O
L
IB
E R
K
H A
B
T C
H P
L A
N T
H
A U
L R
O U
T E
L O
C A
T
IO
N P
L A
N
G-004
EXISTING AIRFIELD GATE
HAUL ROUTE NOTE 4
EXISTING FENCE - SEE
POTENTIAL CONTRACTOR HAUL ROUTE
STAGING AREA NOTE 3
EXISTING FENCE - SEE
SEE HAUL ROUTE NOTE 3
EXISTING TURF
CENTERLINE ELEVATION
RELATIVE TO RUNWAY
HEIGHT CONTOURS
MAXIMUM EQUIPMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C E
R T
IF
IE
D F
IN
A
L S
E T
STAGING AREA
CONTRACTOR
0 8
0 1 0 11 0 1 0 1 0 1
NORTH
PLAN
A1
SCALE: 1" = 200' - 0"
PROJECT LOCATION PLAN
CONSTRUCTION CONDITION.
OF THE PROJECT AND THE BATCH PLANT AREA RETURNED TO ITS ORIGINAL PRE-
EQUIPMENT. ALL NEW IMPROVEMENTS SHALL BE REMOVED AT THE COMPLETION
MATERIALS TO PROVIDE A STABLE WORKING PLATFORM FOR CONSTRUCTION
LIMITED TO: GRADING, INSTALLING DRAINAGE SYSTEMS, IMPORTING AGGREGATE
PLANT AREA TO MEET HIS NEEDS. IMPROVEMENTS INCLUDE BUT ARE NOT
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IMPROVE THE BATCH
JACK-AND-BORE WATER LINE UNDER ANY EXISTING ROADS, AS REQUIRED.
UTILITY COMPANY THROUGH THE CONTRACTING OFFICER. CONTRACTOR SHALL
SHALL COORDINATE ACCESS TO FIRE HYDRANT WITH PITTSBURGH ARS AND THE
AND MEANS OF CONVEYING WATER TO THE BATCH PLANT SITE. CONTRACTOR
CIVIL ENGINEERING. THE CONTRACTOR SHALL PROVIDE HIS OWN CONNECTION
THE WATER CONSUMPTION AND REPORT THE WATER USAGE TO PITTSBURGH ARS
FLOW PREVENTER DOWNSTREAM OF THE EXISTING FIRE HYDRANT TO MEASURE
REQUIREMENTS, THE CONTRACTOR SHALL INSTALL A WATER METER AND BACK
THE LINE FOR USE AT THE BATCH PLANT SITE. IN ADDITION TO UTILITY OWNER
INFORMATION ON THE EXISTING WATER LINE AND TO REQUEST CONNECTING TO
THE CONTRACTOR SHALL CONTACT THE UTILITY OWNER DIRECTLY FOR
2. WATER MAY BE AVAILABLE FOR CONTRACTOR USE AT THE LOCATION SHOWN.
CONTRACTOR SHALL PROVIDE HIS OWN POWER SOURCE.
FOR THE BATCH PLANT AND OTHER FACILITIES. IF NOT AVAILABLE, THE
REQUIRED TO PROVIDE HIS OWN TRANSFORMER TO PROVIDE USABLE POWER
THE SIZE OF THE EXISTING TRANSFORMER. THE CONTRACTOR SHALL BE
CONTRACTOR SHALL CONTACT THE ELECTRIC UTILITY COMPANY TO DETERMINE
REIMBURSE THE UTILITY COMPANY DIRECTLY FOR ALL POWER CONSUMED. THE
IF POWER IS AVAILABLE, THE CONTRACTOR SHALL INSTALL A METER AND
1. POWER MAY BE AVAILABLE FOR CONTRACTOR USE AT THE LOCATION SHOWN.
BATCH PLANT LOCATION NOTES
REQUIREMENTS ON THE APRON.
13. SEE PHASING PLAN SHEETS FOR HAUL ROUTE LOCATION AND FENCING
OPERATE CONTINUOUSLY DURING CONTRACTOR HAULING OPERATIONS.
MANUFACTURED TO CLEAN AIRFIELD PAVEMENTS. THE VACUUM TRUCK SHALL
CONTAINED PAVEMENT VACUUMING TRUCK WHICH IS SPECIFICALLY
SWEPT AND VACUUMED CLEAN. THE CONTRACTOR SHALL PROVIDE A SELF-
THE CONTRACTOR'S CONSTRUCTION EQUIPMENT SHALL BE CONTINUOUSLY
CONTRACTOR'S VEHICLES. ALL ACTIVE AIRFIELD PAVEMENTS TRAFFICKED BY
CONTROL ON ALL AIRFIELD PAVEMENT THAT IS TRAVERSED BY THE
12. THE CONTRACTOR SHALL PERFORM DAILY FOD (FOREIGN OBJECT DEBRIS)
THE CONTRACTOR'S HEAVY EQUIPMENT.
AREA, HAUL ROUTE, AND CONSTRUCTION FREE ZONE ARE OFF LIMITS TO ALL OF
11. ALL AREAS ON PITTSBURGH ARB OTHER THAN THE CONTRACTOR'S STAGING
AND USACE TO THE USACE STATING THAT THE ROAD HAS BEEN ACCEPTED.
ROAD RELEASE SIGNED BY THE ENTITY IN CHARGE OF THE ROAD, CONTRACTOR
THAT MAY REQUIRE MAJOR REPAIRS. CONTRACTOR SHALL PROVIDE A HAUL
PRIOR TO FINAL HAUL ROAD INSPECTION FOR PURPOSE OF DISCUSSING AREAS
CONTRACTOR AND USACE. THE CONTRACTOR MAY SCHEDULE AN INSPECTION
AN INSPECTION SHALL TAKE PLACE WITH THE ENTITY IN CHARGE OF THE ROAD,
THE HAUL ROADS HAVE BEEN RESTORED TO ORIGINAL OR BETTER CONDITION,
WHILE WORKING ON THE PROJECT. UPON COMPLETION OF PROJECT AND AFTER
SUBMITTED TO THE USACE. THE CONTRACTOR SHALL MAINTAIN ALL ROADS
DETAILED REPORT AND EITHER VIDEO RECORDED OR PHOTOGRAPHED AND
AND USACE. INSPECTION WILL BE DOCUMENTED BY THE CONTRACTOR WITH
PRE-HAUL ROAD INSPECTION WITH ENTITY IN CHARGE OF ROAD, CONTRACTOR
10. ALL ROADS USED FOR HAULING, EITHER ON OR OFF BASE, SHALL REQUIRE A
PASSABLE AT ALL TIMES.
9. THE CONTRACTOR SHALL MAINTAIN THE HAUL ROUTE SO IT REMAINS
TO ENSURE SAFE OPERATIONS.
OTHER BASE PERSONNEL. COORDINATION WITH ALL USERS WILL BE REQUIRED
8. THE HAUL ROUTE WILL BE USED BY AIRPORT SECURITY PERSONNEL AND
COORDINATE ALL HAULING ACTIVITIES WITH ACAA AIRPORT OPERATIONS.
FLAGGERS WILL BE REQUIRED AT THE LOCATIONS SHOWN ON THIS SHEET.
7. THE HAUL ROUTE WILL IMPACT THE RUNWAY 28-L/10-R SAFETY AREA.
RUTS, AND SOFT YIELDING SPOTS.
ALL HAUL ROUTES BACK TO ORIGINAL CONDITION BY REPAIRING POTHOLES,
6. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL RESTORE
ORIGINAL PRE-CONSTRUCTION CONDITION.
REMOVED AT THE COMPLETION OF THE PROJECT AND RETURNED TO ITS
PASSAGE OF CONSTRUCTION EQUIPMENT. ALL NEW IMPROVEMENTS SHALL BE
WIDENING OF UNIMPROVED PORTIONS OF THE HAUL ROUTE TO ALLOW FOR SAFE
GRADING; INSTALLING CULVERTS, IMPORTING AGGREGATE MATERIALS FOR
ROUTE TO MEET HIS NEEDS. IMPROVEMENTS INCLUDE, BUT ARE NOT LIMITED TO:
5. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO IMPROVE THE HAUL
THE GATE SHALL BE REMOVED AND THE PERMANENT FENCE REINSTALLED.
NECESSARY FOR AIRPORT OPERATIONS. AT THE COMPLETION OF THE PROJECT,
AIRFIELD OPERATIONS SO THAT AIRFIELD PERSONNEL CAN UTILIZE THE GATE AS
UNLESS THE HAUL ROUTE IS IN USE BY THE CONTRACTOR. PROVIDE A KEY TO
UTILIZED FOR THEIR HAULING OPERATIONS. THE GATE SHALL REMAIN LOCKED
CONTRACTOR SHALL PROVIDED A GATE GUARD AT ALL TIMES THAT THE GATE IS
CONTRACTOR SHALL CONSTRUCT A TEMPORARY GATE AT THIS LOCATION. THE
ROAD ADJACENT TO THE AIRFIELD ACCESS GATE WILL BE UTILIZED. THE
4. IN ORDER TO FACILITATE CONSTRUCTION TRAFFIC MOVEMENTS, THE EXISTING
LOCATION.
SHALL CONSTRUCT A 30-FOOT WIDE HAUL ROAD, OF HIS OWN DESIGN, AT THIS
THE STAGING AREA AND THE EXISTING APRON) IS TURF. THE CONTRACTOR
3. APPROXIMATELY 500-FEET OF THE PROPOSED HAUL ROUTE SHOWN (BETWEEN
SITE.
CONCRETE AND OTHER CONSTRUCTION MATERIALS TO THE CONSTRUCTION
ROUTE TO ENSURE SAFE VEHICLE OPERATIONS AND TIMELY DELIVERY OF
2.THE CONTRACTOR SHALL DEVELOP A TRAFFIC CONTROL PLAN FOR THE HAUL
VEGETATION.
HAUL ROUTE, THIS WILL NOT BE POSSIBLE DUE TO EXISTING GRADES AND
ALLOW FOR TWO WAY CONSTRUCTION TRAFFIC. ALONG SOME AREAS OF THE
CONDITION. THE CONTRACTOR WILL NEED TO IMPROVE THE UNPAVED AREA TO
1. THE EXISTING HAUL ROUTE IS A ONE-LANE ASPHALT ROAD IN GOOD
HAUL ROUTE NOTES
LEGEND
POTENTIAL CONTRACTOR HAUL ROUTE
BATCH PLANT LOCATION
POTENTIAL CONCRETE
CONSTRUCTION AREA
400'0 200'
STAGING AREA LOCATION NOTES
AND THE PERMENANT FENCE REINSTALLED.
TEMPORARY GATE SHALL BE REMOVED AT THE COMPLETION OF THE PROJECT
STAGING AREA. SEE SHEET GC502 FOR GATE LOCKING REQUIREMENTS. THE
3. THE CONTRACTOR SHALL INSTALL A TEMPORARY SWING GATE TO ACCESS THE
AREA.
LOCKING GATE AROUND THE ENTIRE PERIMETER OF THE CONTRACTOR STAGING
2. THE CONTRACTOR SHALL INSTALL A CHAIN LINK SECURITY FENCE WITH
CONSTRUCTION CONDITION.
PROJECT AND THE STAGING AREA RETURNED TO ITS ORIGINAL PRE-
ALL NEW IMPROVEMENTS SHALL BE REMOVED AT THE COMPLETION OF THE
TO PROVIDE A STABLE WORKING PLATFORM FOR CONSTRUCTION EQUIPMENT.
GRADING, INSTALLING DRAINAGE SYSTEMS, IMPORTING AGGREGATE MATERIALS
AREA TO MEET HIS NEEDS. IMPROVEMENTS INCLUDE BUT ARE NOT LIMITED TO:
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IMPROVE THE STAGING
DURING HAULING OPERATIONS- SEE NOTE 7
FLAGGER REQUIRED AT THIS LOCATION
PLANT LOCATION NOTE 2
EXISTING FIRE HYDRANT - SEE BATCH
R
EV
IS
ED
IN
A
C C
O R
D A
N C
E W
IT
H
A M
EN
D
M
EN
T
SE
P
W
2Q R
B0
0_
Pl an s-
ARIMS: 200A Disposition: Maintain for 15yrs after construction g6edxmah Polygon g6edxmah Polygon g6edxmah Polygon g6edxmah Line g6edxmah Polygon g6edxmah Line
326337
319318425
3 10
D E F E
N S E
A V
E
B U S
IN
E S S
IN
T E
R S T
A T
E
D E F E
N S E A
V E
C A
R T E
R S
T
AI
RLI
FT
A
VE
CARTER ST
S A B R E S
T
B R
O W
N S
T
SA
BRE
ST
DEF
EN
SE
A
VE
MILLER ST
AVE
D E F
E N
S E
A
V E
SE
RGEANTS
W
AY
SA
BR
E S
T
B R
O W
N S T
H E
R M
A N
S T
CARTER ST
ALP
HA
ST
DEFENSE
ALPHA ST
ROCKY LANE
SABRE
ST
DRMO PAD
RAPID RUNWAY REPAIR
PI
C N
IC
P
A V
V O L L E Y B A L L
CONC. DOCK
SAND&GRAVEL STORAGE
STAND
TEST
ENGINE
SS
SS
GATE
DOUBLE
GATE
DOUBLE
GATE
SLIDING
GATE
DOUBLE
GATE
DOUBLEGATE
DOUBLE
GATE
DOUBLE
GATE
DOUBLE
GATE
SLIDING
GATE
DOUBLE
GATE
MAIN
GATE
DOUBLE
GATES
DOUBLE
MAT. STOR.
HAZARD
to we rwa te r
B U
S
IN
E S
S
IN
T E
R S
T A
T E
M f a g b o l c k j i n d p h
E
Q
R
GATE
DOUBLE
GATE
SLIDING
C18
ECP
GATE
SLIDING
N -3
N
E
E
N -2
N
E
M
SS
C
C
C
C
T8 320
P
S
A
B
C
G
H
I
J
K
L
M
N
O
P
Q
S
GATE
DOUBLE
F
GATE
DOUBLE
E
GATE
DOUBLE
D
GATE
DOUBLE
GATE
DOUBLE
GATE
DOUBLE
R
O B S T A C L E
C O
U R S E
N-2
B A S K E T B A L L
E
E
E
H
CP CP
CP
CP
CP
G
G
G
OF WORK WITHIN CAZ #1B
AND REPLACED PRIOR TO COMPLETION
CONCRETE TO BE REMOVED IN CAZ #1A
FENCE
EXISTING SECURITY
GATE
EXISTING SLIDING
MARKING
TAXILANE CENTERLINE
NEW TEMPORARY
P A
\P A
G
C
A .d w g
:3
:4
P M
/8
/2
P D
A
E C p d f.
p lt c fg
D S
A
E C
S c re e n F u ll
S iz e .d s c ri
A H
A D
IS
T
R
IC
T
C A
P
IT
O L
A V
E
O M
A H
A
N E
C O
N T
R A
C T
D E
C E
M B
E R
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P
IT
T S
B U
R G
H A
IR
R
E S
E R
V E
S T
A T
IO
N
P
E N
N S
Y L
V A
N
IA
R E
P L
A C
E E
A S
T /W
E S
T A
P R
O N
T A
X
IW
A Y
P A
V E
M E
N T
P
H A
S E
P
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M M
E N
D M
E N
T
S E
P
A F
X X
-X X
X -X
X
P A
G
C
A .d w g
M H
U C
K L
E
B
G O
L
IB
E R
B
G O
L
IB
E R
K
H A
P H
A S
IN
G
P L
A N
C
A Z
GC101A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C E
R T
IF
IE
D F
IN
A
L S
E T
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
STAGING AREA
CONTRACTOR
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
R =
R = 9 0'
GATE
DOUBLE
NORTH
PLAN
A1
SCALE: 1" = 100' - 0"
CAZ #1A PHASING PLAN
MANAGER AND THE CONTRACTING OFFICER.
FIRE DEPARTMENT ACCESS. COORDINATE THE LOCATION WITH THE AIRFIELD
11. CONTRACTOR SHALL PROVIDE AMINIMUM 12' WIDE GAP IN THE FENCING FOR
CONTRACTING OFFICER.
COORDINATE BARRICADE LOCATIONS WITH THE AIRFIELD MANAGER, THROUGH THE
WORK TO PREVENT AIRCRAFT OR PERSONNEL FROM ENTERING THE REPAIR AREA.
PROFILE BARRICADES AROUND THE WORK ZONE AT ALL TIME DURING THE REPAIR
THROUGH THE CONTRACTING OFFICER. THE CONTRACTOR SHALL INSTALL LOW
OPERATIONS. COORDINATE THE WORK TIMELINE WITH AIRFIELD OPERATIONS,
SHALL BE COMPLETELY REPAIRED WITHIN 10 DAYS OF BEGINNING REMOVAL
10. THE CONCRETE REPAIR AREAS OUTSIDE OF THE CONTRACTOR FREE ZONE
OPERATIONS AND THE CONTRACTING OFFICER.
WEEKEND SHALL BE COORDINATED WITH THE AIRFIELD MANAGER, AIRFIELD
NON-FLYING WEEKEND BETWEEN 1700 FRIDAY AND 0600 ON MONDAY. THE
9. THE ASPHALT REPAIR AREAS SHALL BE REMOVED AND REPLACED OVER ONE
CONSTRUCTION ACTIVITIES WITHIN CAZ #1A.
8. FOUR AIRCRAFT PARKING POSITIONS WILL BE AVAILABLE FOR USE DURING
CROSS DETAILS AND ROPE & BARREL FENCING DETAILS.
7. SEE SHEET GC501 FOR LOW PROFILE BARRICADE DETAILS, CLOSED TAXIWAY
6. SEE SHEET GC502 FOR SECURITY FENCING DETAILS.
OBJECT FREE AREA (TOFA).
5. THE CONTRACTORS HAUL ROUTE SHALL BE OUTSIDE OF THE TAXIWAY ECHO
OFFICER.
SECURITY FORCES AND THE AIRFIELD MANAGER, THROUGH THE CONTRACTING
AIRCRAFT. COORDINATE LOCATIONS OF ANY REQUIRED ACCESS GATES WITH
PARKING POSITION CENTERLINE TO PROVIDE 50' WINGTIP CLEARANCE TO A PARKED
CAPABILITY, THE BARRIERS SHALL BE A MINIMUM OF 135' FROM THE ADJACENT
THROUGH THE CONTRACTING OFFICER. IN ORDER TO MAINTAIN FULL OPERATIONAL
TO BE COORDINATE WITH SECURITY FORCES AND THE AIRFIELD MANAGER
BEGINNING ANY WORK WITHIN CAZ #1A. EXACT LOCATION OF SECURITY FENCING
4. BARRIER MOUNTED SECURITY FENCING SHALL BE INSTALLED PRIOR TO
NEW SUBDRAIN SYSTEM AND REMARKING THE EXISTING APRON.
CONSTRUCTING NEW ASPHALT AND CONCRETE PAVEMENT SECTIONS; INSTALLING A
STORM DRAIN PIPING AND AREA INLETS; REMOVING EXISTING SUBDRAIN PIPING;
EXISTING CONCRETE AND ASPHALT PAVEMENT SECTIONS; REMOVING EXISTING
3. WORK WITHIN CAZ #1A INCLUDES BUT IS NOT LIMITED TO: REMOVING THE
NOTES.
2. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN
1. SEE SHEET G-004 FOR PROPOSED BATCH PLANT AND HAUL ROUTE INFORMATION.
CONSTRUCTION AREA ZONECAZ
POTENTIAL CONTRACTOR HAUL ROUTE
400'0 200'
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTES
NOTES 9 & 10.
4. ASPHALT AND CONCRETE REPAIR AREAS TO BE INLCUDED IN PHASE 1A - SEE
3. ROPE & BARREL FENCING - SEE NOTE 7
2. LOW PROFILE BARRICADES - SEE NOTE 7
1. BARRIER MOUNTED SECURITY FENCING - SEE NOTES 4 & 6
CAZ #1A
PHASE 1A APRON REPAIR AREA
PHASE 1A ASPHALT REPAIR AREA
DURING CONTRACTOR HAULING OPERATIONS
FLAGGER REQUIRED AT THIS LOCATION
W
2Q R
B0
0_
Pl an s-
326337
319318425
3 10
D E F E
N S E
A V
E
B U S
IN
E S S
IN
T E
R S T
A T
E
D E F E
N S E A
V E
C A
R T E
R S
T
AI
RLI
FT
A
VE
CARTER ST
S A B R E S
T
B R
O W
N S
T
SA
BRE
ST
DEF
EN
SE
A
VE
MILLER ST
AVE
D E F
E N
S E
A
V E
SE
RGEANTS
W
AY
SA
BR
E S
T
B R
O W
N S T
H E
R M
A N
S T
CARTER ST
ALP
HA
ST
DEFENSE
ALPHA ST
ROCKY LANE
SABRE
ST
DRMO PAD
RAPID RUNWAY REPAIR
PI
C N
IC
P
A V
V O L L E Y B A L L
CONC. DOCK
SAND&GRAVEL STORAGE
STAND
TEST
ENGINE
SS
SS
GATE
DOUBLE
GATE
DOUBLE
GATE
SLIDING
GATE
DOUBLE
GATE
DOUBLEGATE
DOUBLE
GATE
DOUBLE
GATE
DOUBLE
GATE
SLIDING
GATE
DOUBLE
GATE
MAIN
GATE
DOUBLE
GATES
DOUBLE
MAT. STOR.
HAZARD
to we rwa te r
B U
S
IN
E S
S
IN
T E
R S
T A
T E
M f a g b o l c k j i n d p h
E
Q
R
GATE
DOUBLE
GATE
SLIDING
C18
ECP
GATE
SLIDING
N -3
N
E
E
N -2
N
E
M
SS
C
C
C
C
T8 320
P
S
A
B
C
G
H
I
J
K
L
M
N
O
P
Q
S
GATE
DOUBLE
F
GATE
DOUBLE
E
GATE
DOUBLE
D
GATE
DOUBLE
GATE
DOUBLE
GATE
DOUBLE
R
O B S T A C L E
C O
U R S E
N-2
B A S K E T B A L L
E
E
E
H
CP CP
CP
CP
CP
G
G
G
FENCE - SEE NOTE 12
EXISTING SECURITY
GATE
EXISTING SLIDING
ACC ACCESS ROADE
NEW 30' WIDE TEMPORARY
P A
\P
A G
C .d w g
:4
:2
P M
/8
/2
P D
A
E C p d f.
p lt c fg
D S
A
E C
S c re e n F u ll
S iz e .d s c ri
A H
A D
IS
T
R
IC
T
C A
P
IT
O L
A V
E
O M
A H
A
N E
C O
N T
R A
C T
D E
C E
M B
E R
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
A N
S I
D
S O
L
IC
IT
A
T
IO
N
P
IT
T S
B U
R G
H A
IR
R
E S
E R
V E
S T
A T
IO
N
P
E N
N S
Y L
V A
N
IA
R E
P L
A C
E E
A S
T /W
E S
T A
P R
O N
T A
X
IW
A Y
P A
V E
M E
N T
P
H A
S E
P
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M M
E N
D M
E N
T
S E
P
A F
X X
-X X
X -X
X
P A
G
C
.d w g
M H
U C
K L
E
B
G O
L
IB
E R
B
G O
L
IB
E R
K
H A
P H
A S
IN
G
P L
A N
C
A Z
GC102
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
C E
R T
IF
IE
D F
IN
A
L S
E T
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
C-
A Gl ob em as te r
III
C
A
G lo b e m a s te r
III
STAGING AREA
CONTRACTOR
GATE
DOUBLE
NORTH
PLAN
A1
SCALE: 1" = 100' - 0"
CAZ #2 PHASING PLAN
AIRFIELD MANAGER AND THE CONTRACTING OFFICER.
MATCH THE ORIGINAL FENCE LOCATION AND CONDITION. COORDINATE WITH THE
AT THE COMPLETION OF WORK WITHIN CAZ #2, REINSTALL THE SECURITY FENCE TO
OPERATION AND MAINTENENCE ACTIVITIES DUIRNG CONSTRUCTION WITHIN CAZ #2.
12. REMOVE AS MUCH OF THE EXISTING FENCE AS REQUIRED TO FACILITATE
MANAGER AND THE CONTRACTING OFFICER.
FIRE DEPARTMENT ACCESS. COORDINATE THE LOCATION WITH THE AIRFIELD
11. CONTRACTOR SHALL PROVIDE A MINIMUM 12' WIDE GAP IN THE FENCING FOR
10. SEE VOLUME 2 FOR CAZ #2 REQUIREMENTS.
CONSTRUCTION ACTIVITIES WITHIN CAZ #2.
9. THREE AIRCRAFT PARKING POSITIONS WILL BE AVAILABLE FOR USE DURING
ACCESS ROAD, TOPSOIL (4-INCHES) AND SEED THE DISTURBED AREA.
1557. AFTER COMPLETION OF ALL WORK WITHIN CAZ #2, REMOVE THE TEMPORARY
ABC / 12" COMPACTED SUBGRADE. COMPACT THE SUBGRADE TO 95% OF ASTM D
8. NEW TEMPORARY ACC ACCESS ROAD PAVEMENT SECTION SHALL BE 3" ACC / 12"
CROSS DETAILS AND ROPE & BARREL FENCING DETAILS.
7. SEE SHEET GC501 FOR LOW PROFILE BARRICADE DETAILS, CLOSED TAXIWAY
NON-BARRIER MOUNTED SECURITY FENCING.
6. SEE SHEET GC502 FOR BARRIER MOUNTED SECURITY FENCING DETAILS AND
OBJECT FREE AREA (TOFA).
5. THE CONTRACTORS HAUL ROUTE SHALL BE OUTSIDE OF THE TAXIWAY ECHO
CONTRACTING OFFICER.
GATES WITH SECURITY FORCES AND THE AIRFIELD MANAGER, THROUGH THE
THE CONTRACTING OFFICER. COORDINATE LOCATIONS OF ANY REQUIRED ACCESS
BE COORDINATE WITH SECURITY FORCES AND THE AIRFIELD MANAGER THROUGH
BEGINNING ANY WORK WITHIN CAZ #2. EXACT LOCATION OF SECURITY FENCING TO
4. BARRIER MOUNTED SECURITY FENCING SHALL BE INSTALLED PRIOR TO
SYSTEM AND REMARKING THE EXISTING APRON.
NEW ASPHALT AND CONCRETE PAVEMENT SECTIONS; INSTALLING A NEW SUBDRAIN
PIPING AND AREA INLETS; REMOVING EXISTING SUBDRAIN PIPING; CONSTRUCTING
CONCRETE AND ASPHALT PAVEMENT SECTIONS; REMOVING EXISTING STORM DRAIN
3. WORK WITHIN CAZ #2 INCLUDES BUT IS NOT LIMITED TO: REMOVING THE EXISTING
NOTES.
2. SEE SHEETS GC103 AND GC104 FOR CONSTRUCTION SAFETY AND PHASING PLAN
1. SEE SHEET G-004 FOR PROPOSED BATCH PLANT AND HAUL ROUTE INFORMATION.
CONSTRUCTION AREA ZONECAZ
CONTRACTOR HAUL ROUTE
400'0 200'
GENERAL SHEET NOTES
LEGEND
SHEET KEYNOTES
3. ROPE AND BARREL FENCING - SEE NOTE 7.
2. TEMPORARY SECURITY FENCING - SEE NOTES 4 & 6
1. BARRIER MOUNTED SECURITY FENCING - SEE NOTES 4 & 6
CAZ #2
PHASE 2 APRON REPAIR AREA
PHASE 2 ASPHALT REPAIR AREA
W
2Q R
B0
0_
Pl an s-
| 01 - G-002 |
| PA26_G-002 |
| 02 - G-004 |
| W912QR22B0010_Plans_Vol1-0000+.pdf |
| Plans VOL 1 - East-West-Apron-Taxiway-Pavement .pdf |
| GENERAL |
| G-004 BATCH PLANT & HAUL ROUTE LOCATION PLAN |
| 03 - GC-101A |
| PA26_GC101A |
| 04 - CG-102 |
| PA26_GC102 |
File details come from the government source that posted it. Updated .