This is a solicitation for a design-build construction project at Pittsburgh Air Reserve Station in Pennsylvania. The project involves replacing the east-west apron and taxiway pavement in two phases, with an estimated construction cost between $25-100 million. The NAICS code is 237310 and business size standard is $39.5 million. Bids are due by September 16, 2022. The solicitation is full and open with a HUBZone 10% price evaluation preference. The project is subject to availability of funds. The agency is the Department of the Army Corps of Engineers Engineering District Louisville. The scope includes concrete, asphalt, and general construction work. Options include additional phases, different pavement marking materials, and contaminated soil removal. Pricing is by contract line item schedule.

View the file

Other files for this federal contract opportunity

Other files attached to Pittsburgh ARS Apron, newest first.
File Type Posted
Bid Opening Results W912QR22B0010 Pittsburgh ARS Repair East-West Apron.pdf PDF
W912QR22B0010_Plans-0001.pdf PDF
W912QR22B0010_Specs-0001.pdf PDF
W912QR22B0010_Plans_Vol2-0000.pdf PDF
W912QR22B0010_Plans_Vol1-0000 .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Replace East-West Apron & Taxiway Pavement, Pittsburgh ARS,PA

P2: 496302

Design-Bid-Build

Specifications Certified Final Design

17 August 2022

W912QR22B0010

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR22B0010_Specs-0000

THIS PROJECT IS SUBJECT TO THE AVAILABILITY OF FUNDS.

Design/Bid/Build for the Pittsburgh ARS East/West Apron Phase 1 & Phase 2 Project

Estimated Construction Cost is betw een $25,000,000 and $100,000,000 in accordance w ith DFARS 236.204.

NAICS Code is 237310. Size determination is $39.5M. Please note that business size in the System for Aw ard Management (SAM) is determined by the NAICS Code. If the vendor size is not listed correctly for a particular NAICS code in SAM, the business w ill be considered other than a small business.

BIDS AND BID MODIFICATIONS RECEIVED BY EMAIL OF FACSIMILY WILL NOT BE CONSIDERED.

This is a full and open procurement. In accordance w ith Federal Acquisition Regulation (FAR) 19.1307, this project required the HUBZone 10% price evaluation.

Please see Section 00 10 00, SF 1442 BLOCK 10 Continuation for further instructions.

X

ADAM WANTLAND 502.315.6197

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Aug-2022

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________450 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________16 Sep 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:

W912QR22B0010 77

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR22B0010

Section 00 10 00 - Solicitation

BLOCK 10 CONTINUATION

Central Contractor Registration and ORCA are available through SAM, available at www.sam.gov. Offerors must comply with the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

Technical Inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at: http://projnet.org/projnet

PRICE BREAKOUT SCHEDULE

00 10 00

PRICE BREAKOUT SCHEDULE

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

Line Item No. Description Unit Quantity Amount

BASE PROPOSAL

0001. Concrete Construction - All work, materials, Job 1 $ and labor required to complete concrete construction within

PHASE 1a and 1b as indicated in the Design Documents.

0002. Hot-Mix Asphalt Construction - All work, materials, Job 1 $ and labor required to complete Hot-Mix Asphalt construction within PHASE 1a and 1b as indicated in the Design Documents.

0003 Blast Deflector - All work, materials, Job 1 $ and labor required to complete blast deflector and blast deflector foundation construction as indicated in the Design Documents.

0004 General Construction - All work, materials, Job 1 $ and labor required to complete construction within

PHASE 1a and 1b excluding all CLIN’s listed separately, above. as indicated in the Design Documents.

Total Base Proposal $

OPTIONS

0005. Option 1: PHASE 2 Job 1 $ All work, materials and labor required to complete construction within PHASE 2 as indicated in the Design Documents.

The Contracting Officer may exercise this option by written notice within 450 calendar days from NTP

** If and when this option is exercised, the period of performance of the contract will be extended by an additional 240 calendar.

0006. Option 2: Type III Retroreflective Beads Job 1 $ All work, materials and labor required for airfield pavement marking in PHASE 1a and 1b using Type III retroreflective beads in accordance with the drawings and Section 32 17 23 PAVEMENT MARKINGS in lieu of

Type I retroreflective beads.

The Contracting Officer may exercise this option by written

0007 Option 3: Type III Retroreflective Beads Job 1 $ All work, materials and labor required for airfield pavement marking in PHASE 2 using Type III retroreflective beads in accordance with the drawings and Section 32 17 23 PAVEMENT MARKINGS in lieu of

Type I retroreflective beads.

0008 Option 4: Contaminated Soil Job 1 $ All work, materials and labor required for the removal, testing and transporting of contaminated soil as indicated in the drawings and specifications and replacement with clean uncontaminated soil up to 5000 cubic yards.

The Contracting Officer may exercise this option by written notice within 690 calendar days from NTP

0009 Option 5: Contaminated Soil Job 1 $ All work, materials and labor required for the removal, testing and transporting of contaminated soil as indicated in the drawings and specifications and replacement with clean uncontaminated soil up to 5000 cubic yards.

The Contracting Officer may exercise this option by written notice within 690 calendar days from NTP

0010 Option 6: Contaminated Soil Job 1 $ All work, materials and labor required for the removal, testing and transporting of contaminated soil as indicated in the drawings and specifications and replacement with clean uncontaminated soil up to 5000 cubic yards.

notice within 690 calendar days from NTP

Total Options $

TOTAL Bid $

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1: To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2: Offerors must insert a price on all numbered items including options of the Bid Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3: In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the base requirement.

NOTE NO. 4: Each Option may be executed exclusively of other options. Each option listed may be executed only once unless noted otherwise.

NOTE NO. 5: Offeror’s shall rely upon the contract documents for project requirements associated with each CLIN.

Descriptions and titles given for overall project coordination and convenience.

--END OF CLIN SCHEDULE—

Section 00 21 00 - Instructions

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W912QR22B0010

The Bidder Inquiry Key is: 9I7J38-W76XW7

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret

Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your SecretQuestion.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs.

Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.

ELECTRONIC BID SUBMISSION

Electronic Submission of Bids

ALL SEALED BIDS MUST BE DELIVERED ELECTRONICALLY. BID SUBMISSION SHALL BE

EMAILED TO ADAM WANTLAND AT ADAM.M.WANTLAND@USACE.ARMY.MIL BY THE DUE

DATE AND TIME STATED IN THIS SOLICITATION.

Bid Opening

The bid opening will be conducted telephonically via the below conference call-in number. Bids must be received by the time specified in the solicitation, otherwise they will be deemed late and unacceptable. The bid opening teleconference will begin promptly thirty (30) minutes after the bid submission time. The conference call-in number is as follows:

Conference Call-In Number: +1-844-800-2712 Access Code: 43390844

The Contracting Officer with assistance from the assigned Contract Specialist will download all of the bid submissions and record all of the pertinent information prior to the conference call. The bid opening teleconference will begin promptly 30 minutes after the submission time and at that time the bid opening officer will 1) read the names of the submitting contractors and their bids, and 2) read the independent government estimate. Once the information has been disseminated, the call will come to an end. The bid abstract will be posted to the beta.sam website by close of business of the day bids are opened.

Immediately following the bid opening, and upon notice by the Contracting Officer, the apparent low offeror will be requested to mail in their original bid and original bid bonds, respectively.

NOTE: Due to the potential of no Government Personnel being available to inspect the original bonds, the Contracting Officer may contact the bonding company to verify the information in the bond is accurate and complete.

BIDDER CHECKLIST

In preparing your bid -----

1. Have you signed the bid? Are all blank spaces filled in?

2. If signing on behalf of your company, have you attached evidence of your authority to sign the bid?

3. Have you acknowledged receipt of all amendments?

4. Have you checked your bid for possible errors? Arithmetically?

5. Have you furnished all information required by the invitation for bids and/or the specifications?

6. Are you submitting your bid on time? If mailed, will it reach the place of bid opening at the designated hour?

7. If required by the invitation for bid, have you submitted a bid bond? Is it signed? Is it in the proper amount?

8. Have you identified on the face of the envelope containing your bid, the invitation number to which it pertains, and the date and hour of opening? See 52.214-5, Submission of Bids.

9. Have you completed the ‘Representations and Certifications’, Section 00 45 00, as part of your bid submission?

SUBCONTRACTING PLAN

SMALL BUSINESS SUBCONTRACTING PLAN (SAMPLE)

Federal Acquisition Regulation (FAR), paragraph 19.708(b)(1)) prescribes the use of the clause at FAR 52.219-9 entitled "Small Business Subcontracting Plan.” The following is a suggested model for use when formulating such subcontracting plan. While this model plan has been designed to be consistent with FAR 52.219-9, other formats of a subcontracting plan may be acceptable. However, failure to include the essential information as exemplified in this model may be cause for either a delay in acceptance or the rejection of a bid or offer where the clause is applicable.

Further, the use of this model is not intended to waive other requirements that may be applicable under FAR 52.219-

9. "SUBCONTRACT," as used in this clause, means any agreement (other than one involving an employer-employee relationship) entered into by a federal government prime contractor or subcontractor calling for supplies or services required for performance of the contract or subcontract.

I. IDENTIFICATION DATA:

Company Name:

Address:

Date Prepared: Solicitation Number:

Description:

Estimated Contract Dollar Value:

II. TYPE OF PLAN (circle one)

A. Individual Plan (All elements developed specifically for this contract and applicable for the full term of this contract, including any option periods.)

B. Master Plan (Goals developed for this contract; all other elements standard; must be renewed every three years)

C. Commercial Plan Commercial products/service plan, including goals, covers the offeror’s fiscal year and applies to the entire production of commercial items or delivery of services sold by either the entire company or a portion thereof (e.g., division, plant, or product line); this includes planned subcontracting for both commercial and Government business. In accordance with FAR 19.704(d), “A commercial plan (as defined in FAR 19.701) is the preferred type of subcontracting plan for contractors furnishing commercial items.”(Contractor sells large quantities of off-the-shelf commodities to many Government agencies. Plans/goals negotiated by a lead agency on a company-wide basis rather than for individual contracts. Plan effective only during the year for which it is approved. The contractor must provide a copy of the lead agency approval.)

III. GOALS:

(For information purposes only: FAR 19.704(a)(1) requires separate percentage goals for using Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns as subcontractors; and a statement of the total dollars planned to be subcontracted to Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns. NOTE: The dollar amounts planned for subcontracting must be expressed as percentages of total subcontracting dollars as shown below.)

State separate dollar and percentage goals, expressed in terms of percentages of total subcontracting dollars, for the use of Large Business, Small Business, Veteran-Owned Small Business, Service Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, Woman-Owned Small Business, and Historically Black Colleges and Universities/Minority Institutions concerns as subcontractors. The offeror shall include all subcontracts that contribute to contract performance, and may include a proportionate share of products and services that are normally allocated as indirect costs in the following format. (For a contract with options, provide a separate statement for the basic contract and individual statements for each option year.)

A. BASE BID ONLY: The following percentage goals (expressed in terms of a percentage of total planned subcontracting dollars) and dollar amounts are applicable to the contract cited above or to the contract awarded under the solicitation cited. Total Base Bid is $______________________.

(i) Total estimated dollar value of all planned subcontracting for an individual contract plan; or the offerors total projected sales, expressed in dollars, and the total value of projected subcontracts to support the sales for a commercial plan; i.e., the sum of a and b above: $ (100 Percent) $__________________ and

(ii) Total estimated dollar value and percent of planned subcontracting with Small Business (including Veteran-Owned Small Business, Service Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, Woman-Owned Small Business, and Historically Black Colleges and Universities/Minority Institutions concerns): (% of "(i)") $__________________ and

(iii) Total estimated dollar value and percent of planned subcontracting with large businesses (all business concerns classified as "other than small"): (% of "(i)") $__________________ and ________________ %

(iv) Total estimated dollar value and percent of planned subcontracting with Small Disadvantaged Business concerns (SDB): $__________________ and ________________ % of total planned subcontracting dollars under this contract will be awarded to subcontractors who are small concerns owned and controlled by socially and economically disadvantaged individuals and appear on the Small Business Administration’s list. (% of "(i)")

(v) Total estimated dollar value and percent of planned subcontracting with Women-Owned Small Business concerns (WOSB): $__________________ and ________________ % of total planned subcontracting dollars under this contract will be awarded to subcontractors who are WOSB. (% of "(i)")

(vi) Total estimated dollar value and percent of planned subcontracting with Veteran-Owned Small Business concerns (VOSB): $__________________ and ________________ % of total planned subcontracting dollars under this contract will be awarded to subcontractors who are VOSB. (% of "(i)")

(vii) Total estimated dollar value and percent of planned subcontracting with Service-Disabled Veteran- Owned Small Business concerns (SDVOSB): $__________________ and ________________ % of total planned subcontracting dollars under this contract will be awarded to subcontractors who are SDVOSB. (% of "(i)")

(viii) Total estimated dollar value and percent of planned subcontracting with Historically Black Colleges and Universities/Minority Institutions (HBCU/MI): $__________________ and ________________ % of total planned subcontracting dollars under this contract will go to HBCU’s who are an institution determined by the Secretary of Education to meet the requirements of 34 CFR 608.2, the term also includes any nonprofit research institution that was an integral part of such a college or university before November 14, 1986; or MI’s who are an institution of higher education meeting the requirements of Section 1046(3) of the Higher Education Act of 1965 (20 U.S.C. 1135d-5(3)) which, includes a Hispanic-serving institution of higher education as defined in Section 316(b)(1) of the Act (20 U.S.C. 1059c(b)(1)). (% of "(i)")

(ix) Total estimated dollar value and percent of planned subcontracting with HUBZone Small Business concerns: $__________________ and ________________ % of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns located in a historically underutilized business zone which is an area located within one or more qualified census tracts, qualified non-metropolitan counties, or lands within the external boundaries of an Indian reservation and appear on the Small Business Administration’s HUBZONE web site at www.sba.gov/HUBZONE. (% of "(i)")

The following principal products and/or services will be subcontracted under the Base Bid of this contract, and the distribution among Large Business, Small Business, Veteran-Owned Small Business, Service Disabled Veteran- Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, Woman-Owned Small Business, and Historically Black Colleges and Universities/Minority Institutions is as follows: (Check all that apply)

Subcontractor Name

Product or Service/ Description

Large Busines s

Small Busines s

VOSB SDVOSB HSB SDB WOSB HBCU/

MI

(ATTACHMENT MAY BE USED IF ADDITIONAL SPACE IS REQUIRED)

B. OPTIONS: You must include a separate goal for each option. See the attached Continuation Sheet for Paragraph A for each option.

C. The following method was used in developing subcontract goals (i.e., Statement explaining how the product and service areas to be subcontracted were established, how the areas to be subcontracted to Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns were determined, and how Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns' capabilities were determined, to include identification of source lists utilized in making those determinations. Also a statement as to what efforts will be taken to improve on past goals and how SB and SDB firms will be included in areas without previous SB/SDB involvement).

D. A description of the method used to identify potential SOURCES for solicitation purposes (e.g., whether you used existing company source lists, the System for Award Management (SAM)) of the Small Business

Administration (SBA), veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce, or small, HUBZone, disadvantaged, and women-owned small business trade associations. A firm may rely on the information contained in SAM as an accurate representation of a concern's size and ownership characteristics for the purposes of maintaining a small, veteran-owned, service-disabled veteran-owned, HUBZone small, small disadvantaged and women-owned small business source list. Use of SAM as its source list does not relieve a firm of its responsibilities e.g., outreach, assistance, counseling, and publicizing subcontracting opportunities) in this clause.

E. Indirect and overhead costs (check one): ____ HAVE ____ HAVE NOT been included in the goals specified in Paragraph A and Paragraph B.

F. If "HAVE" was selected in Paragraph E, explain the method used in determining the proportionate share of indirect and overhead cost to be allocated as subcontracts to Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns. (NOTE: Commercial Plans Must Include Indirect Costs).

IV. PROGRAM ADMINISTRATOR:

(For information purposes only: FAR 19.704(a)(7) requires information about the company employee who will administer the subcontracting program. Please provide the name, title, address, telephone number, fax machine number, email address, position within the corporate structure, and the duties of that employee.)

Name:

Title:

Position:

Address:

Telephone No:

Fax No:

Email Address:

This individual's specific duties, as they relate to the firm's subcontracting program, are as follows:

General overall responsibility for this company's Small Business Program, the development, preparation and execution of individual subcontracting plans and for monitoring performance relative to contractual subcontracting requirements contained in this plan, including but not limited to:

A. Developing and maintaining offerors/bidders lists of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns from all possible sources. Our firm may rely on the information contained in the SBA Small Business Source System, as an accurate representation of a concern’s size and ownership characteristics for the purposes of maintaining a Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business source list. The Small Business Administration’s (SBA’s) list of Small Disadvantaged Businesses and small HUBZone businesses can be accessed through www.sam.gov. Select “Dynamic Small Business Search” to access the SBA small business source system.

B. Ensuring that procurement packages are structured to permit Small Business, Veteran-Owned Small

Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns to participate to the maximum extent possible.

C. Assuring inclusion of Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned

Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns in all solicitations for products or services that they are capable of providing.

D. Reviewing solicitations to remove statements, clauses, etc., which may tend to restrict or prohibit Small

Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business participation, including recommendations to set aside competitions for SDB’s

E. Ensuring periodic rotation of potential subcontractors on bidders’ lists.

F. Ensuring that the bid proposal review board documents its reasons for not selecting low bids submitted by

Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns.

G. Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.

H. Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.

I. Conducting or arranging for conduct of motivational training for purchasing personnel pursuant to the intent of Public Laws 95-507, 99-661, and 100-180.

J. Monitoring attainment of proposed goals.

K. Preparing and submitting timely, required subcontract reports

L. Coordinating contractor's activities during the conduct of compliance reviews by Federal agencies.

M. Coordinating the conduct of contractor's activities involving its Small Business, Veteran-Owned Small

Disadvantaged Business, and Women-Owned Small Business subcontracting program.

N. Ensuring Individual Subcontract Reports (ISRs) and Summary Subcontract Reports (SSRs) are submitted using eSRS (http://www.esrs.gov), following the instructions in the eSRS.

O. Notifying the Contracting Officer or his representative in writing of any substitutions of firms that are not

Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business for the firms listed in the subcontracting plan.

P. Additions to (or deletions from) the duties specified above are as follows:

V. EQUITABLE OPPORTUNITY:

(For information purposes only: FAR 19-704(8) requires a description of the efforts the contractor will make to ensure that Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns will have an equitable opportunity to compete for subcontracts.)

The following efforts will be taken to assure that Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concerns will have an equitable opportunity to compete for subcontracts, including items not traditionally awarded to SB or SDB firms:

A. Outreach efforts will be made by:

(i) Contacts with minority and small business trade associations such as veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce.

(ii) Contacts with business development organizations.

(iii) Attendance at small and minority business procurement conferences and trade fairs.

(iv) Sources will be requested from Small Business Administration's small business source system.

(v) Reviews to determine the competence, ability, experience and capacity available from SB and SDB firms and providing technical assistance to same.

(vi) Evaluations of our SB, SDB, WOSB, VOSB, SDVOSB and HUBZone award performance and program effectiveness against goals established company-wide.

B. The following internal efforts will be made to guide and encourage buyers:

(i) Workshops, seminars and training programs will be conducted.

(ii) Activities will be monitored to evaluate compliance with this subcontracting plan, evaluating SB, SDB, WOSB, VOSB, SDVOSB and HUBZone award performance and program effectiveness.

(iii) Small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concern source lists, guides and other data identifying small, small disadvantaged and women-owned small business concerns will be maintained and utilized by buyers in soliciting subcontracts.

(iv) Additions to (or deletion from) the above listed efforts are as follows:

VI. FLOW DOWN CLAUSE:

(For information purposes only: FAR 19-704(a)(9) requires that your company include FAR 52.219-8, "Utilization of Small Business Concerns," in all subcontracts that offer further subcontracting opportunities. Your company must require all subcontractors, except small business concerns, that receive subcontracts in excess of $700,000 ($1,500,000 for construction) to adopt a plan that complies with the requirements of FAR 52.219-9, "Small Business Subcontracting Plan.") The offeror (contractor) agrees that the clause entitled "Utilization of Small Business Concerns" at FAR 52.219-8 will be included in all subcontracts that offer further subcontracting opportunities, and all subcontractors (except small business concerns) who receive subcontracts in excess of $700,000 ($1,500,000 for construction) will be required to adopt a subcontracting plan that complies with FAR 52.219-9. Such plans will be reviewed by comparing them with the provisions of Public Law 95-507, and assuring that all minimum requirements of an acceptable subcontracting plan have been satisfied. The acceptability of percentage goals shall be determined on a case-by-case basis depending on the supplies/services involved, the availability of potential Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business subcontractors, and prior experience. Once approved and implemented, plans will be monitored through the submission of periodic reports, and/or, as time and availability of funds permit, periodic visits to subcontractors facilities to review applicable records and subcontracting program progress.

VII. REPORTING AND COOPERATION:

(For information purposes only: FAR 19-704(a)(10) requires your company (i) cooperate in any studies or surveys as may be required, (ii) submit periodic reports which show compliance with the subcontracting plan;

(iii) submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (eSRS);, (iv) ensure that subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using eSRS, (v) provide the prime contract number, DUNS number, and the e-mail address of the offeror’s official responsible for acknowledging receipt of or rejecting the ISRs, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs, and (vi) require that each subcontractor with a subcontracting plan provide the prime contract number, its own DUNS number, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans.)

The offeror/contractor agrees to submit such periodic reports and cooperate in any studies or surveys as may be required by the contracting agency or the Small Business Administration in order to determine the extent of compliance by the offeror/contractor with the subcontracting plan and with the clause entitled "Utilization of Small Business Concerns," contained in the contract. The above reports will include submission of its Individual Subcontracting Report (ISR) and Summary Subcontract Report (SSR)

The offeror/contractor further agrees to ensure that its subcontractors agree to submission of ISRs and SSRs.

ISRs and SSRs shall be submitted via the Electronic Subcontracting Reporting System (eSRS) website www.esrs.gov

Reporting Period Report Due Due Date Oct 1 - Mar 31 ISR/SF294 4/30 Apr 1 - Sept 30 ISR/SF294 10/30

Oct 1 – Mar 31 SSR/SF295 4/30 (for contracts with the DOD)

Apr 1 – Sept 30 SSR/SF295 10/30 (for contracts with DOD)

Oct 1 - Sept 30 SSR/SF295 10/30 (for civilian agencies)

Contract Completion SSR/SF295 30 days after close of contractor’s fiscal year (Commercial Plan)

VIII. RECORDKEEPING:

(For information purpose only: FAR 19-704(a)(11) requires a list of the types of records your company will maintain to demonstrate the procedures adopted to comply with the requirements and goals in the subcontracting plan.)

The offeror/contractor agrees that he will maintain at least the following types of records to document compliance with this subcontracting plan:

A. Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business concern source lists, guides and other data identifying SB/SDB concerns.

B. Organizations contacted for Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-

Owned Small Business, HUBZone Small Business, Small Disadvantaged Business, and Women-Owned Small Business sources.

C. On a contract-by-contract basis, records on all subcontract solicitations over $150,000, indicating on each solicitation (i) whether small business concerns were solicited, and if not, why not; (ii) whether Veteran- Owned Small Business concerns were solicited, and if not, why not; (iii) whether Service-Disabled Veteran-Owned Small Business concerns were solicited, and if not, why not; (iv) whether HUBZone Small Business concerns were solicited, and if not, why not; (v) whether Small Disadvantaged business concerns were solicited, and if not, why not; (vi) whether Women-Owned Small Business concerns were solicited, and if not, why not; and (vii) reasons for the failure of solicited Small Business, Veteran-Owned Small

Disadvantaged Business, and Women-Owned Small Business concerns to receive the subcontract award.

D. Records to support other outreach efforts: Contacts with veteran service organizations, Minority and Small

Business Trade Associations, etc., and attendance at small and minority business procurement conferences and trade fairs.

E. Records to support internal activities to guide and encourage buyers: Workshops, seminars, training programs, etc., monitoring activities to evaluate compliance.

F. On a contract-by-contract basis, records to support subcontract award data to include name and address and business size of each subcontractor. Contractors having commercial plans need not comply with this requirement.

G. Records to be maintained in addition to the above are as follows:

IX. ASSURANCES

(For information purpose only: FAR 19.704(a)(12-15) requires assurances from your company)

A. Assurances that the offeror will make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that the offeror used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal. Responding to a request for a quote does not constitute use in preparing a bid or proposal. An offeror used a small business concern in preparing the bid or proposal if--

(i) The offeror identifies the small business concern as a subcontractor in the bid or proposal or associated small business subcontracting plan, to furnish certain supplies or perform a portion of the contract; or

(ii) The offeror used the small business concern's pricing or cost information or technical expertise in preparing the bid or proposal, where there is written evidence of an intent or understanding that the small business concern will be awarded a subcontract for the related work if the offeror is awarded the contract;

B. Assurances that the contractor will provide the contracting officer with a written explanation if the contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in (a)(12) of this section. This written explanation will be submitted to the contracting officer within 30 days of contract completion; and

C. Assurances that the contractor will not prohibit a subcontractor from discussing with the contracting officer any material matter pertaining to payment to or utilization of a subcontractor.

D. Assurances that the offeror will pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor (see 52.242-5).

X. SIGNATURES REQUIRED:

This subcontracting plan was SUBMITTED by:

Signature: ________________________________________________ Date: ________________

Typed Name and Title: ____________________________________________________________

Phone Number: ______________________________________________

Agency Small Business Review

U.S. Small Business Administration

Contracting Officer Approval: _______________________________________ Date: ________________

CONTINUATION OF PARAGRAPH A

(SUBMIT ADDITIONAL OPTION PAGES FOR EACH OPTION)

NAME OF OPTION: _______________________________________________________

Dollars Percentage

1. Total option contract price ____________

2. Total to be subcontracted (to all types of businesses) ____________ _______

a. To Large Business ____________ _______

b. To Small Business ____________ _______

i. To Veteran-Owned Small Business _____________ _______

ii. To Service-Disabled Veteran-Owned Small Business _____________ _______

iii. To HUBZone Small Business _____________ _______

iv. To Small Disadvantaged Business _____________ _______

v. To Women-Owned Small Business _____________ _______

The following principal products and/or services will be subcontracted under Option 1 of this contract, and the distribution among LB, SB, SDB, WOSB, VOSB, SDVOSB, HBCU/MI, and HUBZone SB is as follows: (Check all that apply)

Subcontractor Name

Product or Service/ Description

Large Busines s

Small Busines s

VOSB SDVOSB HSB SDB WOSB HBCU/

MI

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.217-5 Evaluation Of Options JUL 1990

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be A DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Marcel D. Hull, Contracting Officer Room 821, 600 Dr. Martin Luther King Jr. Pl.

Louisville, Ky 40202

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 25 August 2022 at 9:30 AM Eastern Time (ET).

(c) Participants will meet at--

Pittsburgh ARS, PA Main Gate 2110 Defense Ave Moon Twp, PA 15108

*Proceed to Building 419 after admittance on Base. A visitor information memorandum and a site map have been included as attachments for reference.*

Prospective offerors must RSVP for the site visit AT LEAST 2 business days prior to the site visit date. To RSVP, please send an email to kristopher.tilley@us.af.mil, edward.rosemeier.1@us.af.mil, and adam.m.wantland@usace.army.mil…