This federal contract opportunity notice seeks bids for a project to remove an existing steam heating system and install a new gas-fired hot water boiler system at a Defense Supply Center building in Columbus, Ohio. The project includes replacing electric heating coils in air handling units with new hot water coils. The contract value is estimated between $1-5 million. Bids are due via www.sam.gov by a deadline of April 15, 2022. The contract will be a firm-fixed-price, 100% small business set-aside awarded to the lowest price bidder. The U.S. Army Corps of Engineers Louisville District will administer the contract over a 420-day period. The point of contact is the listed Contract Specialist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912QR22B0002 Bid Opening Results.pdf | ||
| W912QR22B0002-0004.pdf | ||
| W912QR22B0002_SPECS-0003.pdf | ||
| W912QR22B0002-0002.pdf | ||
| W912QR22B0002-0001.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| W912QR22B0002_SPECS-0000.pdf | ||
| W912QR22B0002_PLANS-0000.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PRUS Army Corps of
Engineers ®
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
P2
CERTIFIED FINAL
KE
R
R Y
PR
AT
H
ER
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
. M
AR
TI
N
L U
TH
ER
K
IN
G J
R . P
LA
C
E
LO
U
IS
VI
LL
E, K
Y
SOLICITATION NO. W912QR22B0002
LOUISVILLE DISTRICT
LOUISVILLE, KENTUCKY
W
2Q R
B0
TB
D
11/22/2021 3:54:41 PM
C:\Users\h2eddkbp\Documents\480807_V2020_M_BLDG 10 HWS_h2eddkbp.rvt
G-001
HWS
C O
VE
R
S H
EE
T
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
/2
8/
09/28/2021
DEFENSE SUPPLY CENTER COLUMBUS (DSCC)
COLUMBUS, OH
BUILDING 10 DECENTRALIZE BOILER
FY22, P2 480807
INDEX OF DRAWINGS
SHEET
NUMBER SHEET TITLE
G-001 COVER SHEET
G-002 SITE LOCATION AND VICINITY MAPS
G-003 HVAC GENERAL NOTES AND LEGEND
G-004 INSTALLATION PLAN
G-005 PROJECT PHASING
MA-101 ACCESS PLAN - SECTION 9
MA-102 ACCESS PLAN - SECTIONS 10 AND 11
MA-103 ACCESS PLAN - SECTIONS 12 AND 13
MA-501 ACCESS DETAILS
MA-502 ACCESS DETAILS
MD-101 HVAC DEMOLITION PLAN - BUILDING 10
MD-102 HVAC DEMOLITION PLAN - CROSS-OVER PIPING
MD-103 HVAC DEMOLITION PLAN - SECTIONS 1 & 2
MD-104 HVAC DEMOLITION PLAN - SECTIONS 3 & 4
MD-105 HVAC DEMOLITION PLAN - SECTIONS 5 & 6
MD-106 HVAC DEMOLITION PLAN - SECTIONS 10 & 11
MD-107 HVAC DEMOLITION PLAN - SECTIONS 12 & 13
MD-401 ENLARGED MECHANICAL ROOM DEMOLITION AND RENOVATION PLAN
M-101 HVAC PLAN - HEATING HOT WATER SYSTEM
M-102 HVAC PLAN - HEATING HOT WATER SYSTEM, SECTIONS 1 AND 2
M-103 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 3 AND 4
M-104 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 5 AND 6
M-105 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 7 AND 8
M-106 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTION 9
M-107 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 10 AND 11
M-108 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 12 AND 13
M-401 ENLARGED MECHANICAL ROOM PLAN
M-402 ENLARGED MECHANICAL ROOM SECTIONS
M-403 ENLARGED MECHANICAL ROOM SECTIONS
M-404 ENLARGED MECHANICAL ROOM SECTIONS
M-405 ENLARGED MECHANICAL ROOM SECTIONS
M-406 ENLARGED MECHANICAL ROOM SECTIONS
M-407 ENLARGED MECHANICAL ROOM SANITARY WASTE PLAN
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-601 MECHANICAL SCHEDULE
M-700 CONTROLS LEGEND AND ABBREVIATIONS
M-701 POINT SCHEDULE INSTRUCTIONS
M-702 SCHEDULING AND ALARM SEQUENCE
M-703 CONTROL NETWORK SCHEMATIC
M-704A HOT WATER SYSTEM CONTROL SCHEMATIC
M-704B HOT WATER SYSTEM LADDER DIAGRAMS
M-704C HOT WATER SYSTEM LOGIC DIAGRAMS
M-704D HOT WATER SYSTEM POINTS SCHEDULE
M-705 HOT WATER UNIT HEATER CONTROLS
M-706 BUILDING 10 AHU HEATING COIL CONTROLS
M-707 GAS-FIRED UNIT HEATER CONTROLS
E-001 LEGEND AND ABBREVIATIONS
E-110 MECHANICAL POWER PLAN - COMPREHENSIVE
E-111 MECHANICAL POWER PLAN - SECTIONS 1 AND 2
E-112 MECHANICAL POWER PLAN - SECTIONS 3 AND 4
E-113 MECHANICAL POWER PLAN - SECTIONS 5 AND 6
E-114 MECHANICAL POWER PLAN - SECTION 7 AND 8
E-115 MECHANICAL POWER PLAN - SECTION 9
E-116 MECHANICAL POWER PLAN - SECTION 10 AND 11
E-117 MECHANICAL POWER PLAN SECTIONS 12 AND 13
E-401 ENLARGED MECHANICAL ROOM
E-402 MECHANICAL ROOM LIGHTING PLAN
E-601 PANEL SCHEDULES
E-602 PANEL SCHEDULES
E-603 PANEL SCHEDULES
E-604 MECHANICAL FEEDER SCHEDULE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
C:\Users\h2eddkbp\Documents\480807_V2020_M_BLDG 10 HWS_h2eddkbp.rvt
11/22/2021 3:54:53 PM
G-005
HWS
PR
O
JE
C
T
PH
AS
IN
G
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
GENERAL PHASING NOTES
1. THE PROJECT IS DIVIDED INTO FOUR PHASES. CONTRACTOR SHALL
DETERMINE THE SEQUENCE OF THE PHASING AS PART OF THE CONSTRUCTION
PLAN, WITH THE REQUIREMENT THAT PHASE 1 WORK BE COMPLETED PRIOR
TO ANY OTHER WORK IN THE PROJECT, AND SHALL BE COMPLETED AS QUICKLY
AS POSSIBLE. WITH THE APPROVAL OF THE CONTRACTING OFFICER'S
REPRESENTATIVE, WORK IN THE DIFFERENT PHASES MAY BE COMPLETED
CONCURRENTLY.
2. PHASE 1: BUILDING 10 AHU DECK ACCESS
3. PHASE 2: BUILDING 10 STEAM CROSS-OVER PIPING DEMOLITION.
4. PHASE 3: BUILDING 10 HOT WATER HEATING PLANT INSTALLATION.
5. PHASE 4: BUILDING 10 HEATING SYSTEM REPLACEMENT.
6. PHASE 5: BUILDING 10 AHU HEATING COIL REPLACEMENTS.
7. HEATING TO ALL SECTIONS OF THE BUILDING SHALL BE PROVIDED WHEN
REQUIRED. CONTRACTOR SHALL PROVIDE ALL PROVISIONS OR EQUIPMENT
NECESSARY TO MAINTAIN HEATING TO ALL SECTIONS OF THE BUILDING DURING
PERIODS WHERE HEATING IS REQUIRED.
8. BALANCING ACTIVITIES ARE NOTED IN EACH PHASE. BALANCING SHALL BE
COMPLETED FOR THE ENTIRE SYSTEM. BALANCING MAY BE COMPLETED IN
PHASES. IF COMPLETED IN PHASES, THE BALANCER VERIFY THE WATER
FLOWS OF PREVIOUS PHASES TO ENSURE THE PREVIOUS BALANCING HAS
NOT CHANGED.
9. COMMISSIONING ACTIVITIES ARE NOTED IN EACH PHASE. COMMISSIONING FOR
THE NEW HVAC CONTROL SYSTEM IN SECTIONS 1 THRU 9 MAY BE COMPLETED
IN PHASES OR MAY BE COMPLETED AT ONE TIME. THE SEQUENCES OF
OPERATIONS FOR AHU SYSTEMS IN SECTIONS 10 THRU 12 SHALL BE COMPLETED
AT ONE TIME.
PHASE 2 - BUILDING 10 STEAM CROSS-OVER PIPING DEMOLITION
1. SEE GENERAL PHASING NOTES, THIS SHEET.
2. WORK INCLUDES THE REMOVAL OF THE MAIN STEAM AND STEAM CONDENSATE
CROSS-OVER PIPING FROM THE STEAM PLANT IN BUILDING 11 TO THE
MECHANICAL ROOM IN BUILDING 10, SECTION 5.
3. WORK SHALL BE COMPLETED DURING THE COOLING SEASON WHEN THE
HEATING PLANT WILL BE DISABLED.
4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND
DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS
(SHEET MD-101 AND MD-102).
(A) WITH THE HEATING PLANT IN BUILDING 11 DOWN, CUT AND CAP
EXISTING STEAM AND CONDENSATE PIPING INSIDE THE MECHANICAL
ROOM IN BUILDING 11.
(B) REMOVE EXISTING STEAM AND CONDENSATE PIPING SUPPORTED
BY PIPING SUPPORTS FROM THE EXIT OF THE BUILDING 11 MECHANICAL
ROOM TO THE ENTRANCE INTO THE BUILDING 10, SECTION 5 MECHANICAL
ROOM.
(C) PATCH THE WALLS OF THE BUILDING 11 MECHANICAL ROOM WHERE
THE PIPING HAD BEEN REMOVED.
PHASE 3 - BUILDING 10 HEATING PLANT INSTALLATION
1. SEE GENERAL PHASING NOTES, THIS SHEET.
2. WORK INCLUDES THE RENOVATION OF THE MECHANICAL ROOM IN SECTION 5
OF BUILDING 10, AND THE INSTALLATION OF THE NEW HOT WATER HEATING
PLANT FOR THE BUILDING PLANT.
3. INSTALLATION OF NEW HEATING PLANT SHALL BE COMPLETED DURING THE
COOLING SEASON WHEN THE HEATING PLANT WILL NOT BE NEEDED.
INSTALLATION OF BOILERS, PUMPS, AND PIPING MAY BE COMPLETED PRIOR TO
THE DEMOLITION OF THE EXISTING STEAM PIPING IN THE MECHANICAL ROOM.
THE EXISTING STEAM SYSTEM OR THE HEATING PLANT SHALL BE IN OPERATION
DURING THE HEATING SEASON TO PROVIDE HEAT TO THE BUILDING. WORK
FOR THE RENOVATION OF THE MECHANICAL ROOM SHALL BE COMPLETED
PRIOR TO THE INSTALLATION OF THE NEW HEATING PLANT.
4. PAINT ON THE WALLS AND ROOF OF THE MECHANICAL ROOM HAS BEEN TESTED
AND FOUND TO CONTAIN LEAD. PRIOR TO ANY OTHER WORK IN THE MECHANICAL
ROOM, REMOVE ALL EXISTING PAINT FROM THE WALLS AND ROOF. LEAD BASED
PAINT SHALL BE ABATED IN ACCORDANCE WITH SPECIFICATION 02 83 00 LEAD
REMEDIATION.
5. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND
DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS
AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-105, M-101, M-104, M-401,
M-402, AND M-403).
(A) ABATE LEAD BASED PAINT IN MECHANICAL ROOM.
(B) REMOVE EXISTING STEAM AND CONDENSATE PIPING SUPPLYING THE
BUILDING IN THE MECHANICAL ROOM. PATCH EXTERIOR WALL
PENETRATIONS.
(C) PATCH HOLES AT FORMER ROOF PENETRATIONS.
(D) REMOVE EXISTING CONCRETE PEDESTALS IN THE MECHANICAL ROOM.
(E) CLEAN OR REPLACE EXISTING FLOOR DRAINS. CLEAN EXISTING
SANITARY SEWER PIPING FROM FLOOR DRAINS.
(F) PREPARE WALLS AND ROOF FOR NEW PAINT. PAINT WALLS.
(G) CLEAN FLOOR. SEAL FLOOR.
(H) INSTALL NEW EQUIPMENT PADS.
(I) INSTALL NEW HOT WATER HEATING PIPING AND NEW GAS PIPING.
(J) INSTALL NEW EQUIPMENT (BOILERS, PUMPS, ACCESSORIES, ETC.).
(K) INSTALL NEW MECHANICAL ROOM GAS UNIT HEATER.
(L) INSTALL HVAC CONTROL SYSTEM FOR HEATING SYSTEM.
(M) INSTALL NEW LIGHT FIXTURES FOR THE MECHANICAL ROOM.
(N) REPLACE ELECTRICAL RECEPTACLES.
(O) BALANCE HOT WATER SYSTEM.
(P) COMMISSION NEW HEATING SYSTEM IN MECHANICAL ROOM.
(Q) FINAL CLEANING OF MECHANICAL ROOM.
PHASE 4 - BUILDING 10 HEATING SYSTEM REPLACEMENT
1. SEE GENERAL PHASING NOTES, THIS SHEET.
2. WORK INCLUDES THE REPLACEMENT OF THE EXISTING STEAM AND
CONDENSATE PIPING WITH NEW HOT WATER PIPING, AND THE REPLACEMENT OF
EXISTING STEAM UNIT HEATERS WITH NEW HOT WATER UNIT HEATERS IN
SECTIONS 1 THRU 6. WORK ALSO INCLUDES THE INSTALLATION OF NEW HOT
WATER PIPING AND UNIT HEATERS IN SECTIONS 7 THRU 9. WORK IN THIS PHASE
MAY BE COMPLETED IN ANY OF SECTIONS 1 THRU 9 AS SCHEDULED. THE
CONTRACTOR SHALL DETERMINE THE SEQUENCE IN WHICH THE CONSTRUCTION
IS COMPLETED. THE CONTRACTOR SHALL NOTIFY THE USER THRU THE
CONTRACTING OFFICER'S REPRESENTATIVE OF THE START OF CONSTRUCTION IN
THESE AREAS A MINIMUM OF 30 DAYS PRIOR TO THE START OF CONSTRUCTION.
3. WORK SHALL BE COMPLETED DURING THE COOLING SEASON. THE NEW HEATING
SYSTEM SHALL BE IN OPERATION TO PROVIDE HEAT TO THE STORAGE AREAS
DURING THE HEATING SEASON.
4. MATERIALS ARE STORED IN THE STORAGE AREAS. THE CONTRACTOR SHALL
MOVE THE MATERIALS AS NECESSARY TO COMPLETE THE WORK. SOME AREAS
HAVE CAGES CONSTRUCTED FOR THE STORAGE OF MATERIALS. THE
CONTRACTOR SHALL BE PROVIDED ACCESS TO THOSE AREAS. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE
OF THE NEED TO WORK IN THE CAGED AREAS A MINIMUM OF 5 DAYS PRIOR TO
THE START OF THE WORK SO ACCESS TO THE AREAS IS ARRANGED. ANY
STORED MATERIALS MOVED TO COMPLETE THE WORK SHALL BE RETURNED TO
THE ORIGINAL POSITIONS WHEN THE WORK IS COMPLETED. CAGING MAY BE
DECONSTRUCTED IN PART TO PROVIDE ACCESS FOR THE COMPLETION OF
WORK. ANY CAGING DECONSTRUCTED SHALL BE RE-ASSEMBLED TO THE
ORIGINAL CONDITION WHEN THE WORK IS COMPLETED.
5. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND
DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS
AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-102, MD-103, MD-104,
MD-105, M-101, M-102, M-103, M-104, M-105, AND M-106).
(A) STEAM SHALL BE DISCONNECTED FROM THE SYSTEM AND THE
SYSTEM ALLOWED TO COOL.
(B) MOVE STORED MATERIALS AS NECESSARY FOR ACCESS.
(C) DISCONNECT ELECTRIC POWER TO THE UNIT HEATERS.
(D) DISCONNECT PIPING FROM THE UNIT HEATERS.
(E) REMOVE EXISTING STEAM UNIT HEATERS.
(F) INSTALL NEW HOT WATER PIPING.
(G) INSTALL NEW HOT WATER UNIT HEATERS.
(H) INSTALL NEW ELECTRIC WIRING AND CONDUIT TO SUPPLY NEW
UNIT HEATERS.
(I) CONNECT NEW HOT WATER PIPING TO THE NEW HOT WATER UNIT
HEATERS.
(J) INSTALL HVAC CONTROLS FOR UNIT HEATERS AND UNIT HEATER HOT
WATER CONTROL VALVES.
(K) BALANCE HOT WATER FLOWS TO UNIT HEATERS.
(L) COMMISSION HOT WATER HEATING SYSTEM (BOILERS, PUMPS, UNIT
HEATERS, ETC.).
(M) RELOCATE STORED MATERIALS.
(N) FINAL CLEANUP.
PHASE 5 - BUILDING 10 AHU HEATING COIL REPLACEMENTS
1. SEE GENERAL PHASING NOTES, THIS SHEET.
2. WORK INCLUDES THE REPLACEMENT OF EXISTING ELECTRIC HEATING COILS
IN AIR HANDLING UNITS IN BUILDING SECTIONS 10 THRU 13 WITH NEW HOT
WATER HEATING COILS. WORK IN THIS PHASE MAY BE COMPLETED IN ANY OF
SECTIONS 10 THRU 13. NEW HOT WATER PIPING MAY BE INSTALLED AT ANY
TIME DURING THE DURATION OF THE CONTRACT AS SCHEDULED. IN EACH
SECTION, ONLY ONE AHU SHALL BE INOPERABLE AT ANY ONE TIME.
3. WORK IN THIS PHASE IS IN AREAS ABOVE OFFICE SPACES. WORK SHALL BE
COMPLETED WHILE THE SPACES ARE OCCUPIED. CONTRACTOR SHALL FOLLOW
ALL ACCESS REQUIREMENTS AS SPECIFIED. CONTRACTOR SHALL NOTIFY THE
USER THRU THE CONTRACTING OFFICER'S REPRESENTATIVE OF THE SCHEDULE
OF CONSTRUCTION FOR THESE SPACES A MINIMUM OF 30 DAYS PRIOR TO THE
START OF CONSTRUCTION.
4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND
DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS
AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-106, MD-107, M-101, M-107,
AND M-108).
(A) INSTALL NEW HOT WATER PIPING IN SECTIONS 10 THRU 13.
(B) SHUT DOWN EACH AHU IN TURN. PERFORM THE FOLLOWING ITEMS
ON EACH AHU IN TURN.
(C) DISCONNECT ELECTRIC POWER FROM EXISTING ELECTRIC HEATING
COIL.
(D) REMOVE EXISTING CONTROLS FROM ELECTRIC HEATING COIL.
(E) REMOVE EXISTING ELECTRIC HEATING COIL FROM AHU.
(F) INSTALL NEW HOT WATER HEATING COIL IN AHU.
(G) INSTALL NEW HOT WATER PIPING CONNECTIONS FROM NEW PIPING
TO NEW HOT WATER HEATING COIL, INCLUDING NEW HOT WATER CONTROL
VALVE.
(H) INSTALL NEW CONTROLS FOR HOT WATER CONTROL VALVE. REVISE
SEQUENCE OF CONTROL FOR VALVE.
(I) BALANCE HOT WATER FLOW TO HOT WATER COIL.
(J) COMMISSION HOT WATER VALVE SEQUENCE OF CONTROL.
(K) FINAL CLEANUP.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
PHASE 1 - BUILDING 10 AHU DECK ACCESS
1. SEE GENERAL PHASING NOTES, THIS SHEET.
2. WORK INCLUDES THE INSTALLATION OF ACCESS STAIRS, DECK ACCESS
STAIRS, ACCESS DOORS AND HARDWARE, BMS DOOR SWITCHES, AND
WIRING AND CONDUIT FOR BMS POWER AND MONITORING.
3. WORK SHALL BE COMPLETED PRIOR TO ANY OTHER WORK IN THE PROJECT.
4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND
DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE ACCESS PLAN
SHEETS (SHEETS MA-101, MA-102, MA-103, MA-501, AND MA-502).
(A) INSTALL ACCESS STAIRS IN BUILDING SECTION 9.
(B) INSTALL DECK ACCESS STAIRS IN BUILDING SECTIONS 10, 11, 12, AND 13.
(C) CREATE OPENINGS FOR NEW ACCESS DOORS IN CMU WALLS BETWEEN
BUILDING SECTIONS 9 AND 10, 10 AND 11, 11 AND 12, AND 12 AND 13.
(D) INSTALL ACCESS DOORS AND BMS DOOR SWITCHES.
(E) INSTALL POWER AND CONTROL WIRING AND CONDUIT FOR BMS
SWITCHES.
1 1
W
2Q R
B0
2_
PL
AN
S-
TRANE
MODEL
S/N: K9
TRANE
MODEL
S/N: K9
TRANE
MODE
S/N:K9
TRANE A
MODEL:
S/N: K93
VHVH
BUILDING ACCESS STAIR.
INSTALL STAIR FOR ACCESS
TO AHU DECK IN SECTIONS
10 THRU 13. TYPICAL OF 4.
SEE ACCESS STAIR DETAIL,
THIS SHEET.
DECK ACCESS STAIR.
INSTALL STAIR FOR ACCESS
TO AHU DECK IN SECTIONS
10 THRU 13. TYPICAL OF 4.
SEE DECK ACCESS STAIR
DETAIL, SHEET MA-502.
MA-502
NOTE:
LOCATIONS OF STAIRS MAY BE MOVED FROM
THE LOCATIONS SHOWN TO CREATE THE
LEAST INTERFERENCE WITH EXISTING
CONDITIONS.
2'
0" 6'
6"
3' - 0"
5'
0"
3' - 0"
7'
4"
3'
0"
PLAN VIEW
ELEVATION VIEW
CMU WALL
FLOOR
GUARDRAIL
LANDING
LANDING
ACCESS DOOR.
SEE NOTE 3.
0'
8"
0' - 11"
NOTES:
1. CONTRACTOR SHALL FABRICATE AND INSTALL ACCESS STAIRS IN ACCORDANCE WITH CONTRACT SPECIFICATION 05 51 00. DETAIL IS TYPICAL FOR ALL STAIRS. ONE SET OF STAIRS SHALL BE OPPOSTIE HAND AS SHOWN.
2. LANDING ELEVATIONS ARE SET BASED ON EXISTING SPRINKLER PIPING ELEVATIONS. EXISTING ELEVATIONS ARE TAKEN FROM PHOTOS AND AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY ACTUAL ELEVATIONS OF PIPING IN
FIELD AND SHALL SET LANDING ELEVATIONS ABOVE THE EXISTING PIPING.
3. STAIRS SHALL BE INSTALLED A MINIMUM OF 2'-0" FROM WALL AS SHOWN TO AVOID EXISTING PIPING AND TO ALLOW
SPACE FOR NEW HOT WATER PIPING TO BE INSTALLED.
4. STAIR RISER SHALL BE 8 INCHES MINIMUM. STAIR TREAD SHALL BE 11 INCHES MINIMUM. STAIRS SHALL BE A MINIMUM
OF 36 INCHES WIDE. GUARDRAIL SHALL BE INSTALLED 42 INCHES ABOVE STAIR TREAD.
5. ACCESS DOOR. SEE DETAIL, SHEET MA-502.
6. COMMERCIALLY AVAILABLE STAIRS CONSTRUCTED IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATION
05 51 00 ARE ACCEPTABLE.
SEE NOTE 3.
3'
6"
UP
UP
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:56:37 PM
MA-101
HWS
AC
C
ES
S
PL
AN
SE
C
TI
O N
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
3/32" = 1'-0"
ACCESS PLAN - SECTION 9
NTS2 ACCESS STAIR DETAIL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
S S S S S
S
S
S
S
S
S
DCIS
EXIT
EXIT
EXIT
EWC
EWC
1103 1104
1106 1105
1009 1010
1109 1110
1007 1005 1003 1002
1006 1004
1009 1010
10241025102610271028
1030 1000
1007 1005 1003 1002
1006 1004
1009 1010
010E-E-026
010E-E-027
010E-E-030
010W-E-040
010E-E-029010E-E-028
010-I-1001A
010-I-1011
010-I-1012
010-I-1100
010-I-1000
010-I-1109
010-I-1108
010-I-1106
0W
-W -0
0W
-W -0
010-I-1024
010-I-1100
010-I-1109
010-I-1108
VHVH
SECTION
010-I-1113
AHU-10-10-4
AHU-10-10-3
AHU-10-10-2
AHU-10-10-1
AHU-10-11-3
AHU-10-11-2
AHU-10-11-1
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK HANDRAILS.
LOCATE WITH DECK
ACCESS STAIRS.
SEE NOTE 2.
(TYPICAL)
BEB-1
P/S6-1
P/S6-2
BEB-5A
P/S6-9
P/S6-10
BEB-5
P/S6-11
P/S-1000
P/S6-11
BEB-6
P/S6-12
P/S-040
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:56:44 PM
MA-102
HWS
AC
C
ES
S
PL
AN
SE
C
TI
O N
S
A N
D
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
3/32" = 1'-0"
ACCESS PLAN - SECTIONS 10 AND 11
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
NOTES:
1. LOCATIONS OF DECK ACCESS STAIRS MAY BE MOVED
FROM THE LOCATIONS SHOWN TO AVOID EXISTING
INTERFERENCES.
2. EXISTING ACCESS LADDERS (SHOWN ON SHEETS MD-106
AND MD-107) ARE EQUIPPED WITH DECK HAND RAILS.
DECK HANDRAILS SHALL BE RELOCATED AS NECESSARY
SO THAT THE HAND RAILS TIE TO THE NEW DECK ACCESS
STAIR HAND RAILS.
3. BEB-X: BUILDING EQUIPMENT BOX
P/S6-X: POWER SUPPLY ENCLOSURE
LOCATIONS OF POWER SUPPLIES AND BUILDING EQUIPMENT
BOXES ARE SHOWN ON THE DRAWINGS. WIRE DOOR BMS
SWITCHES TO BUILDING EQUIPMENT BOXES AND POWER
SUPPLIES (SEE WIRING DIAGRAM, SHEET MA-503). CONTRACTOR
SHALL COORDINATE THE DESTINATIONS OF THE WIRING AND
CONDUIT FOR BMS SWITCHES WITH DLA SECURITY OFFICE
THRU CONTRACTING OFFICER'S REPRESENTATIVE.
CONTRACTOR SHALL INSTALL WIRING AND CONDUIT FOR
ACCESS DOOR BMS SWITCHES FROM DOORS TO POWER
SUPPLIES AND BEB PANELS, AND SHALL COORDINATE THE
FINAL CONNECTIONS TO THE POWER SUPPLIES AND BEB
PANELS BY THE GOVERNMENT. FOR BIDDING PURPOSES,
ASSUME THE DOOR SWITCHES SHALL BE WIRED TO THE
POWER SUPPLY AND BEB PANEL NEAREST THE ACCESS
DOOR LOCATIONS.
W
2Q R
B0
2_
PL
AN
S-
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
2 H
IG
H C
LO
SE
D O
H
2 H
IG
H C
LO
SE
D O
H
2 H
IG
H C
LO
SE
D O
H
HIGHCLOSED
OH
SH
O
R T
W
AL
L
FL
AP
H
IG
H
2 H
IG
H
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
CLOSED
OH
Short Short
Sh or t Sh or t
Sh or t Sh or t
Sh or t
Sh or t
RAISE
THESE3
TABLETOPSTO ONE
HIGH
W
AL
L C
H
AN
G
ED
W
AL
L M
O
VE
D E
AS
T
O N
E
PA
N
EL
WALLS & CUBICLES
REMOVED
42" DOOR
INSTALLED
C O
U C
H
Sh or t Sh or t
Sh or t
NEW WALL
PANEL
W O
O D
EN
WOODEN
FURNITURE
C
AB
IN
ET
C H
AN
G
E
TO
SH
O
R T
W
AL
LS
COUCH
WOOD
FURNITURE
WOOD
FURNITURE
High HighHigh
Sh or t Sh or t
Short Short
WOODEN
FURNITUREMOVED
HEREBY
NAVY
TABLE
TOP
RELOCATED
FURNITURE
TEKNION
RELOCATED
FURNITURE
TEKNION
HIGH
INSTALL
SHORT
WALLS
NEW
DOOR
WAY
NEW
DOOR
WAY
High
High
EWC
EWC
12021203
1308130913101311 1307
1211 1212
1314 1315
13171312
1322 1321 1320
13261325
1215 1216 1217 1218 1219
010E-E-030 010E-E-031
010E-E-032
010E-E-033
010W-E-040
010-I-1112
010-I-1106
010-I-1105
010-I-1100A
010-I-1111
010-I-1100B
010-I-1101
010-I-1110
0W
-W -0
0W
-W -0
0W
-W -0
010-I-1215
010-I-1111
010-I-1100B
010-I-1101
010-I-1110
EXIST. ELEC.
PANEL
EXIST. ELEC.
PANEL
EXIST. ELEC.
PANEL
VH
S SS
AHU-10-12-4
AHU-10-12-3
AHU-10-12-2
AHU-10-12-1
AHU-10-13-4
AHU-10-13-3
AHU-10-13-2
AHU-10-13-1
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK ACCESS STAIR.
SEE DETAIL, SHEET
MA-501.
DECK HANDRAILS.
LOCATE WITH DECK
ACESS STAIRS.
SEE NOTE 2.
(TYPICAL)
ACCESS LADDER
AT THIS LOCATION.
BEB-4
BEB-4A
P/S6-7
P/S6-8
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:56:50 PM
MA-103
HWS
AC
C
ES
S
PL
AN
SE
C
TI
O N
S
A N
D
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
3/32" = 1'-0"
ACCESS PLAN - SECTIONS 12 AND 13
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
NOTES:
1. LOCATIONS OF DECK ACCESS STAIRS MAY BE MOVED
FROM THE LOCATIONS SHOWN TO AVOID EXISTING
INTERFERENCES.
2. EXISTING ACCESS LADDERS (SHOWN ON SHEETS MD-106
AND MD-107) ARE EQUIPPED WITH DECK HAND RAILS.
DECK HANDRAILS SHALL BE RELOCATED AS NECESSARY
SO THAT THE HAND RAILS TIE TO THE NEW DECK ACCESS
STAIR HAND RAILS.
3. BEB-X: BUILDING EQUIPMENT BOX
P/S6-X: POWER SUPPLY ENCLOSURE
LOCATIONS OF POWER SUPPLIES AND BUILDING EQUIPMENT
BOXES ARE SHOWN ON THE DRAWINGS. WIRE DOOR BMS
SWITCHES TO BUILDING EQUIPMENT BOXES AND POWER
SUPPLIES (SEE WIRING DIAGRAM, SHEET MA-503). CONTRACTOR
SHALL COORDINATE THE DESTINATIONS OF THE WIRING AND
CONDUIT FOR BMS SWITCHES WITH DLA SECURITY OFFICE
THRU CONTRACTING OFFICER'S REPRESENTATIVE.
CONTRACTOR SHALL INSTALL WIRING AND CONDUIT FOR
ACCESS DOOR BMS SWITCHES FROM DOORS TO POWER
SUPPLIES AND BEB PANELS, AND SHALL COORDINATE THE
FINAL CONNECTIONS TO THE POWER SUPPLIES AND BEB
PANELS BY THE GOVERNMENT. FOR BIDDING PURPOSES,
ASSUME THE DOOR SWITCHES SHALL BE WIRED TO THE
POWER SUPPLY AND BEB PANEL NEAREST THE ACCESS
DOOR LOCATIONS.
W
2Q R
B0
2_
PL
AN
S-
5' - 0"
3'
0"
3'
0"
3'
0"
3'
0"
DECK
DECK
CMU WALL
GUARDRAIL
LANDING
STAIRSSTAIRS
LANDING
GUARDRAIL
EXISTING WALL OF
INTERIOR BUILDING
EXISTING WALL OF
INTERIOR BUILDING
ACCESS
DOOR
PLAN VIEW
ELEVATION VIEW
PLAN VIEW
ELEVATION VIEW
NOTES:
1. CONTRACTOR SHALL FABRICATE AND INSTALL DECK ACCESS STAIRS IN ACCORDANCE WITH CONTRACT
SPECIFICATION 05 51 00. DETAIL IS TYPICAL FOR ALL DECK ACCESS STAIRS.
2. LANDING ELEVATIONS ARE SET BASED ON EXISTING SPRINKLER PIPING ELEVATIONS. LANDING ELEVATIONS SHALL BE THE SAME ON BOTH SIDES OF THE CMU WALL. EXISTING ELEVATIONS ARE TAKEN FROM PHOTOS AND AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY ACTUAL ELEVATIONS OF PIPING IN FIELD AND SHALL SET LANDING
ELEVATIONS ABOVE THE EXISTING PIPING.
3. CONTRACTOR SHALL DETERMINE AND INSTALL ADEQUATE SUPPORTS FOR THE STAIRS. INTERIOR BUILDING
DECK SHALL NOT BE CONSIDERED ADEQUATE TO SUPPORT THE STAIRS.
4. STAIR RISER SHALL BE 8 INCHES MINIMUM. STAIR TREAD SHALL BE 11 INCHES MINIMUM. STAIRS SHALL BE A MINIMUM
OF 36 INCHES WIDE. GUARDRAIL SHALL BE INSTALLED 42 INCHES ABOVE STAIR TREAD.
5. COMMERCIALLY AVAILABLE STAIRS CONSTRUCTED IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATION
05 51 00 AND MEETING THE DIMENSIONS NECESSARY AT THE LOCATIONS ARE ACCEPTABLE.
DECK ACCESS
STAIR.
ACCESS STIAR.
SEE SHEET MA-101.
EXISTING
SPRINKLER
PIPING
EXISTING
SPRINKLER
PIPING
INTERIOR BUILDING
WALL
ACCESS
DOORGUARDRAIL
LANDING
GUARDRAIL
LANDING
STAIRS
EXISTING
SPRINKLER
PIPING
STAIR
EXISTING CMU
WALL EXISTING WALL OF
INTERIOR BUILDING
EXISTING
SPRINKLER
PIPING
EXISTING
SPRINKLER
PIPING
INTERIOR BUILDING
WALL
EXISTING
CMU WALL
INTERIOR
BUILDING
WALL
EXISTING
CMU WALL
DECK ACCESS
STAIR
DECK ACCESS
STAIR
EXISTING
SPRINKLER
PIPING
EXISTING
SPRINKLER
PIPING
EXISTING
SPRINKLER
PIPING
FLOORFLOOR
LENGTH VARIES.
LENGTH TO BE DETERMINED
BY DISTANCE FROM CMU
WALL TO INTERIOR BUILDING
WALL.
DECK
LENGTH VARIES.
LENGTH TO BE DETERMINED
BY DISTANCE FROM CMU
WALL TO INTERIOR BUILDING
WALL.
NOTE: BETWEEN SECTIONS 9 AND 10. NOTE: TYPICAL FOR STAIRS BETWEEN SECTIONS 10 AND 11, BETWEEN SECTIONS 11 AND 12, AND BETWEEN SECTIONS 12 AND 13.
DECK
HANDRAIL
DECK
HANDRAIL
DECK
HANDRAIL
DECK
HANDRAIL
DECK
HANDRAIL
DECK
HANDRAIL
PHOTO OF EXISTING DECK HANDRAIL
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:56:56 PM
MA-501
HWS
AC
C
ES
S
D
ET
AI
LS
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
NTS1 DECK ACCESS STAIR DETAIL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
BARREL ARCH
CONCRETE ROOF
BARREL ARCH
CONCRETE ROOF
REMOVE EXISTING
CMU TO PREPARE FOR
NEW ACCESS DOOR
LINTEL. SEE NOTE 2.
REMOVE EXISTING CMU
TO PREPARE FOR ACCESS
DOOR INSTALLATION.
SEE NOTE 1.
EXISTING CMU
WALL BETWEEN
SECTIONS.
INSTALL NEW LINTEL
IN OPENING.
SEE NOTE 1.
DOOR LOCK
NEW DOOR
FRAME.
2'-0" WIDE BY
4'-0" HIGH ACCESS
DOOR. SEE NOTE 2.
ACCESS DOOR OPENING ACCESS DOOR INSTALLATION
NOTES:
1. PREPARE OPENING IN CMU WALL FOR INSTALLATION OF
NEW ACCESS DOOR. BOTTOM OF OPENING SHALL BE
LOCATED SO THE FRAME THRESHOLD IS THE SAME
ELEVATION AS THE STAIR LANDING (ALL ACCESS DOORS).
OPENING SHALL BE SIZED AS RECOMMENDED BY THE DOOR
MANUFACTURER TO ALLOW PROPER INSTALLATION
OF THE NEW ACCESS DOOR FRAME. CONTRACTOR SHALL
DETERMINE THE ACTUAL LOCATION OF THE ACCESS DOOR
BASED ON THE STAIR DESIGN.
2. PREPARE OPENING IN CMU WALL FOR INSTALLATION OF
NEW LINTEL ABOVE ACCESS DOOR.
NOTES:
1. INSTALL NEW LINTEL IN OPENING AS SHOWN.
2. NEW ACCESS DOOR SHALL BE A HIGH SECURITY, FIRE RATED
ACCESS DOOR. DOOR SHALL BE 2'-0" WIDE BY 4'-0"
HIGH, WITH LATCH AND LOCK CYLINDER. LOCK CYLINDER
SHALL BE A BEST CORE 7 PIN LOCK IN ACCORDANCE WITH
DSCC STANDARDS. ACCESS DOOR AND FRAME SHALL BE
INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS. ACCESS DOOR SHALL BE 3 HOUR
FIRE RATED. DOOR SWING AS SHOWN ON PLANS.
3. ALL ACCESS DOORS SHALL BE EQUIPPED WITH BMS SWITCHES
AND SHALL BE CONNECTED TO THE EXISTING ELECTRONIC
SECURITY SYSTEM (ESS). CONTRACTOR SHALL COORDINATE
WITH GOVERNMENT TO DETERMINE THE LOCATION OF THE ESS
PANELS. CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL
THE BMS SWITCHES AND INSTALL WIRING AND CONDUIT FROM
THE SWITCHES TO THE EXISTING ESS PANEL. GOVERNMENT
SHALL LAND THE WIRES IN THE ESS PANEL. SEE DETAIL, THIS
SHEET.
BMS SWITCH.
SEE DETAIL,
THIS SHEET.
CMU WALL
ACCESS DOOR
FRAME
ACCESS
DOOR
BMS SWITCH. ATTACH
TO FRAME. WIRE AND
CONDUIT TO ESS
PANEL.
BMS SWITCH. ATTACH
TO DOOR.
BMS SWITCH INSTALLATION
MONITORING
PANEL
(BUILDING
EQUIPMENT
BOX (BEB))
PANEL
POWER
SUPPLY
(P/S)
MAGNETIC SWITCH
(SHOWN WITH DOOR SHUT)
BMS SWITCH WIRING DIAGRAM
NOTE: WIRING DIAGRAM SHOWS A TYPICAL ARRNGEMENT FOR A BMS SWITHC TO SHOW
ALARM WHEN DOOR IS OPENED. WIRING SHALL BE COORDINATED WITH DLA SECURITY
OFFICE. CONTRACTOR SHALL INSTALL WIRING AND CONDUITS. GOVERNMENT WILL
MAKE FINAL CONNECTIONS OF WIRING TO POWER SUPPLY AND BEB PANELS. SEE ACCESS
PLANS, SHEETS MA-101, MA-102, AND MA-103.
EXISTING 3"
BRANCH
LINE.
EXISTING 6"
MAIN
SPRINKLER
BRANCH (TYPICAL)
TOP OF
PIPE 12'-1"
14'-8"
TOP OF
PLATFORM
ACCESS STAIR.
SEE SHEET MA-101.
ACCESS STAIR.
SEE SHEET MA-101.
ACCESS STAIR.
SEE SHEET MA-101.
ACCESS STAIR.
SEE SHEET MA-101.
ACCESS DOOR
ACCESS
DOOR
ACCESS
DOOR
ACCESS
DOOR
NOTE:
LOCATIONS OF STAIRS MAY BE MOVED FROM
THE LOCATIONS SHOWN TO CREATE THE
LEAST INTERFERENCE WITH EXISTING
CONDITIONS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:57:03 PM
MA-502
HWS
AC
C
ES
S
D
ET
AI
LS
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
NTS1 ACCESS DOOR DETAILS
NTS2 BUILDING SECTION - ACCESS STAIRS, SECTION 9
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
MOTIVAIR AIR COOLED CHILLER:
MLC-FC930-E-DP-VFD-HG
EXISTING 4" STEAM
AND 2" CONDENSATE
TRANE AHU:
MODEL:CMCCA017NAC00A000B0
S/N:K92E24907
1" domestic water line with heat tape
3'x3'x3' expansion loops
6" pipes
4" pipes
4" pipes
3" pipes
TYPICAL
AHU
C
C
301 601
8"
8"
39'-9" 39'-7"40'-0"
119'-4"
39'-9"
8"
40'-0"
119'-4"
39'-7"
8"
SHELF
POWER
POLE
SHELF
OHOH
OH OH
OH
OH
OH
SLIDING
DOOR
SLIDING
DOOR
OH
OH
OH
CAPPNCAPM GCAPM CCAPQTCAPDHCAPGC
'-3
"X
'-6
W O
M
EN
'S R
ES
TR
O O
M
HO
US
E
'-3
"X
'-0
M
EN
'S R
ES
TR
O O
M
M
EC
H
AN
IC
AL
R O
O M
'-9
"X 5'
-9
MEN'S
RESTROOM
WOMEN'S
RESTROOM
DTCDHRC-C
DHRC-C
127 68
CUT AND CAP EXISTING 4" STEAM
AND 2" CONDENSATE PIPING IN
MECHANICAL ROOM. REMOVE
STEAM AND CONDENSATE PIPING.
PATCH HOLES IN BRICK WALL AT
PIPE PENETRATIONS.
REMOVE EXISTING 4" STEAM AND
2" CONDENSATE PIPING. EXISTING
VERTICAL PIPING SUPPORT
STRUCTURES SHALL REMAIN.
EXISTING BRIDGING BETWEEN
VERTICAL STRUCTURES SHALL
BE REMOVED WITH PIPING.
REMOVE 4" STEAM AND
2" CONDENSATE PIPING.
PATCH HOLES IN BRICK
WALL AT PIPING PENETRATIONS.
REMOVE EXISTING 4" STEAM AND
2" CONDENSATE PIPING.
EXISTING VERTICAL PIPING
SUPPORT STRUCTURES SHALL
REMAIN. EXISTING BRIDGING
BETWEEN VERTICAL
STRUCTURES SHALL BE
REMOVED WITH PIPING.
REMOVE SECOND SET OF PIPING
(EXISTING 4" STEAM AND
2" CONDENSATE PIPING).
REMOVE SECOND SET OF PIPING
(EXISTING 4" STEAM AND
2" CONDENSATE PIPING).
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 4:03:40 PM
MD-102
HWS
H
VA
C D
EM
O
LI
TI
O N
P
LA
N
C R
O
SS
-O
VE
R P
IP
IN
G
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"MD-101
1 HVAC DEMOLITION PLAN - CROSS-OVER PIPING
NOTES:
1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.
2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES, PIPE
LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM AS-BUILT
DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM THE AS-BUILT
DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES, LOCATIONS,
AND ELEVATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.
3. REMOVE THE EXISTING STEAM AND CONDENSATE CROSS-OVER PIPING
FROM BUILDING 11 TO BUILDING 10. TWO SETS OF STEAM PIPING ARE
TO BE REMOVED. BRIDGING BETWEEN THE VERTICAL PIPING SUPPORTS
SUPPORTING THE PIPING SHALL BE REMOVED WITH THE PIPING. PIPING TO BE
REMOVED IS HIGHLIGHTED WITH CROSSHATCH PATTERN.
4. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING PIPE
INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION, INSULATION
IS FOUND WHICH IS SUSPECTED OF CONTAINING ASBESTOS, CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.
SCALE: 3/32" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
INDEECO C
CATALOG #
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14741
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14953
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N:K93C14939
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14722
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14667
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N:K93C13562
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14403
T M S
3'x2'x3' expansion loop (typ.) 3'x2'x3' expansion loop (typ.)
21_ 2" pipes
21_ 2" pipes
11_ 2" pipes
21_ 2" pipes
21_ 2" pipes
11_ 2" pipes
11_ 2" pipes pipes
Provide
1_ 2" gate valves with chain operators(4 locations)
EH-1
T
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
S S S S S
S
S
S
S
S
S
DCIS
EXIT
EXIT
EXIT
EWC
EWC
1103 1104
1106 1105
1009 1010
1109 1110
1007 1005 1003 1002
1006 1004
1009 1010
10241025102610271028
1030 1000
1007 1005 1003 1002
1006 1004
1009 1010
010E-E-026
010E-E-027
010E-E
010W-E
010E-E-029010E-E-028
010-I-1001A
010-I-1011
010-I-1012
010-I-1100
010-I-1000
010-I-1109
010-I-1108
010-I-110
0W
-W -0
0W
-W -0
010-I-1024
010-I-1100
010-I-1109
010-I-1108
VHVH
SECTION
NO.10
010-I-1113
REMOVE EXISTING ELECTRIC
HEATING COIL FROM AHU.
SEE NOTE 3. TYPICAL OF 7
THIS SHEET.
AHU-10-10-1
AHU-10-10-2
AHU-10-10-3
AHU-10-10-4
AHU-10-11-3
AHU-10-11-1
AHU-10-11-2
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
LADDERS FOR DECK ACCESS
LOCATED IN CORRIDOR.
EXISTING CHILLED
WATER PIPING TO
UNIT CHW COIL TO
REMAIN. TYPICAL OF
7 THIS SHEET.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED
IN CORRIDOR.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
LADDER FOR DECK ACCESS
LOCATED IN CORRIDOR.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:57:20 PM
MD-106
HWS
H
VA
C D
EM
O
LI
TI
O N
P
LA
N
SE
C
TI
O
N S
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"MD-101
1 HVAC DEMOLITION PLAN - SECTIONS 10 AND 11
NOTES:
1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.
2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM
AS-BUILT DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM
THE AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL
SIZES, LOCATIONS, AND ELEVATIONS OF EXISTING MECHANICAL
EQUIPMENT AND PIPING.
3. REMOVE THE EXISTING ELECTRIC HEATING COILS FROM AIR HANDLING
UNITS AS SHOWN. PREPARE UNIT FOR INSTALLATION OF NEW HOT
WATER HEATING COIL.
4. REMOVE EXISTING ELECTRIC CIRCUITRY FROM EACH ELECTRIC
HEATING COIL. CIRCUITRY SHALL BE DEMOLISHED BACK TO THE
PANEL. CIRCUITRY INCLUDES CONDUIT AND WIRING. SEE
ELECTRICAL PLANS FOR PANEL LOCATIONS.
5. EXISTING AIR HANDLING UNITS ARE LOCATED ON A DECK ABOVE
THE CEILINGS. ACCESS TO THE DECK IS BY LADDERS AS SHOWN.
6. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING
PIPE INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION,
INSULATION IS FOUND WHICH IS SUSPECTED OF CONTAINING
ASBESTOS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
SCALE: 3/32" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
CO CABINET UNIT HEATER:
OG #: 922U12000UWD1-D1R1
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C15275
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14981
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N:K93C16122
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C14915
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C15593
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C15572
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N:K93C15622
TRANE AHU:
MODEL:MCCA017GAE0AAA000E0E
S/N: K93C15306
1" domestic water line with heat tape
4" pipes pipes
3'x2'x3' expansion loop (typ.)
21_
2" pipes
21_ 2" pipes
11_ 2" pipes
3" pipes
21_ 2" pipes
21_ 2" pipes
3" pipes
3'x2'x3' expansion loop (typ.)
11_ 2" pipes
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
C
C C
H
C
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
POLE
POWER
2 H
IG
H C
LO
SE
D O
H
2 H
IG
H C
LO
SE
D O
H
2 H
IG
H C
LO
SE
D O
H
HIGHCLOSED
OH
SH
O
R T
W
AL
L
FL
AP
H
IG
H
2 H
IG
H
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
HIGHCLOSED
OH
CLOSED
OH
Short Short
Sh or t Sh or t
Sh or t Sh or t
Sh or t
Sh or t
RAISE
THESE3
TABLETOPSTO ONE
HIGH
W
AL
L C
H
AN
G
ED
W
AL
L M
O
VE
D E
AS
T
O N
E
PA
N
EL
WALLS & CUBICLES
REMOVED
42" DOOR
INSTALLED
C O
U C
H
Sh or t Sh or t
Sh or t
NEW WALL
PANEL
W O
O D
EN
WOODEN
FURNITURE
C
AB
IN
ET
C H
AN
G
E
TO
SH
O
R T
W
AL
LS
COUCH
WOOD
FURNITURE
WOOD
FURNITURE
High HighHigh
Sh or t Sh or t
Short Short
WOODEN
FURNITUREMOVED
HEREBY
NAVY
TABLE
TOP
RELOCATED
FURNITURE
TEKNION
RELOCATED
FURNITURE
TEKNION
HIGH
INSTALL
SHORT
WALLS
NEW
DOOR
WAY
NEW
DOOR
WAY
High
High
EWC
EWC
12021203
1308130913101311 1307
1211 1212
1314 1315
13171312
1322 1321 1320
13261325
1215 1216 1217 1218 1219
010E-E-030 010E-E-031
010E-E-032
010E-E-033
10W-E-040
010-I-1112
0-I-1106
010-I-1105
010-I-1100A
010-I-1111
010-I-1100B
010-I-1101
010-I-1110
0W
-W -0
0W
-W -0
010-I-1215
010-I-1111
010-I-1100B
010-I-1101
010-I-1110
EXIST. ELEC.
PANEL
EXIST. ELEC.
PANEL
EXIST. ELEC.
PANEL
VH
S SS
REMOVE EXISTING ELECTRIC
HEATING COIL FROM AHU.
SEE NOTE 3. TYPICAL OF 8
THIS SHEET.
AHU-10-12-1
AHU-10-12-2
AHU-10-12-3
AHU-10-12-4
AHU-10-13-3
AHU-10-13-4
AHU-10-13-1
AHU-10-13-2
EXISTING CHILLED WATER
PIPING TO UNIT CHW COIL
TO REMAIN. TYPICAL OF 8
THIS SHEET.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
EXISTING CHILLED
WATER PIPING TO
REMAIN.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDERS FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
LADDER FOR DECK
ACCESS LOCATED IN
CORRIDOR.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 3:57:29 PM
MD-107
HWS
H
VA
C D
EM
O
LI
TI
O N
P
LA
N
SE
C
TI
O
N S
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"MD-101
1 HVAC DEMOLITION PLAN - SECTIONS 12 AND 13
NOTES:
1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.
2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,
PIPE LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM
AS-BUILT DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM
THE AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL
SIZES, LOCATIONS, AND ELEVATIONS OF EXISTING MECHANICAL
EQUIPMENT AND PIPING.
3. REMOVE THE EXISTING ELECTRIC HEATING COILS FROM AIR HANDLING
UNITS AS SHOWN. PREPARE UNIT FOR INSTALLATION OF NEW HOT
WATER HEATING COIL.
4. REMOVE EXISTING ELECTRIC CIRCUITRY FROM EACH ELECTRIC
HEATING COIL. CIRCUITRY SHALL BE DEMOLISHED BACK TO THE
PANEL. CIRCUITRY INCLUDES CONDUIT AND WIRING. SEE
ELECTRICAL PLANS FOR PANEL LOCATIONS.
5. EXISTING AIR HANDLING UNITS ARE LOCATED ON A DECK ABOVE
THE CEILINGS. ACCESS TO THE DECK IS BY LADDERS AS SHOWN.
6. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING
PIPE INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION,
INSULATION IS FOUND WHICH IS SUSPECTED OF CONTAINING
ASBESTOS, CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY.
SCALE: 3/32" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
W
2Q R
B0
2_
PL
AN
S-
VH
REMOVE EXISTING
EQUIPMENT PAD.
REMOVE EXISTING
CONCRETE PEDESTAL.
REMOVE EXISTING
CONCRETE PEDESTAL.
REMOVE EXISTING
CONCRETE PEDESTAL.
REMOVE EXISTING
CONCRETE PEDESTAL.
REMOVE EXISTING
STEAM PIPING
REMOVE EXISTING
CONDENSATE PIPING
REMOVE EXISTING
CONDENSATE TANK
AND PUMP
REMOVE EXISTING
CONDENSATE PIPING
PATCH WALL WHERE
PIPING IS REMOVED
PATCH WALL WHERE
PIPING IS REMOVED
EXISTING VENT PIPING
THRU ROOF ABANDONED
IN PLACE WHEN BOILERS WERE
REMOVED. CAP VENT PIPING
ABOVE ROOF. TYPICAL OF 2.
ONE PIPE IS 6", ONE PIPE IS 4".
VERIFY PIPE SIZES IN FIELD.
EXISTING VENT PIPING
THRU ROOF ABANDONED
IN PLACE WHEN BOILERS WERE
REMOVED. CAP VENT PIPING
ABOVE ROOF. TYPICAL OF 2.
ONE PIPE IS 6", ONE PIPE IS 4".
VERIFY PIPE SIZES IN FIELD.REPAINT
WALLS.
SEE NOTE 4.
REPAINT WALLS.
SEE NOTE 4.
REPAINT WALLS.
SEE NOTE 4.
REPAINT WALLS.
SEE NOTE 4.
REPAINT WALLS.
SEE NOTE 4.
EXISTING 4" SAN.
WASTE.
SEE NOTE 5.
REMOVE EXISTING
FLOOR DRAIN. SEE
NOTE 5.
REMOVE EXISTING
FLOOR DRAIN. SEE
NOTE 5.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 4:03:41 PM
MD-401
HWS
EN
LA
R G
ED
M
EC
H
AN
IC
AL
R
O O
M D
EM
O
LI
TI
O N
AN
D
R
EN
O
VA
TI
O
N P
LA
N
KE
R
R Y
PR
AT
H
ER
KE
R
R Y
PR
AT
H
ER
ER
IC
D
AV
IS
1/2" = 1'-0"MD-105
1 ENLARGED MECHANICAL ROOM DEMOLITION AND RENOVATION PLAN
6. REMOVE THE EXISTING LIGHTS IN THE MECHANICAL ROOM. INSTALL NEW
LIGHTS IN MECHANICAL ROOM. SEE MECHANICAL ROOM LIGHTING PLAN,
SHEET E-402.
7. REPLACE EXISTING ELECTRICAL RECEPTACLES.
8. PIPE INSULATION IN MECHANICAL ROOM CONTAINS NO ASBESTOS.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
NOTES:
1. REMOVE EXISTING STEAM AND CONDENSATE PIPING AND EQUIPMENT AS
SHOWN ON THIS PLAN AND SHEET MD-101. PIPING AND EQUIPMENT MAY BE
REMOVED PRIOR TO LEAD ABATEMENT.
2. REMOVE EXISTING CONCRETE BOILER PEDESTALS AND EXISTING EQUIPMENT
PADS AS SHOWN.
3. CLEAN EXISTING FLOOR. APPLY SEALANT TO CONCRETE FLOOR.
4. REMOVE EXISTING LOOSE PAINT FROM WALLS AND ROOF INSIDE THE
MECHANICAL ROOM. EXISTING PAINT ON WALLS AND ROOF CONTAINS LEAD.
EXISTING PAINT SHALL BE REMOVED AS SPECIFIED IN SECTION 02 83 00 LEAD
REMEDIATION. CLEAN WALLS AND ROOF. PREPARE WALLS AND ROOF FOR
NEW PAINT. PAINT WALLS AND ROOF. PAINT COLOR: WHITE. LEAD ABATEMENT
SHALL BE PERFORMED BEFORE ANY RENOVATION WORK IN THE MECHANICAL
ROOM.
5. LOCATIONS OF EXISTING FLOOR DRAINS AND EXISTING WASTE PIPING
ARE BASED ON AS-BUILT INFORMATION. REMOVE EXISTING FLOOR DRAINS
AS SHOWN. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF
EXISTING SANITARY PIPING. CONTRACTOR SHALL ENSURE EXISTING
SANITARY PIPING IS CLEAR TO ALLOW DRAINAGE TO THE MAIN WASTE LINE
IN THE BUILDING. EXISTING SANITARY PIPING IN MECHANICAL ROOM SHALL
BE FLUSHED AND PREPARED FOR INSTALLATION OF NEW FLOOR DRAINS
AND NEW WASTE PIPING. NEW FLOOR DRAINS AND NEW WASTE PIPING
SHALL BE INSTALLED AS SHOWN ON SHEET M-407. REPAIR FLOOR AT
LOCATIONS WHERE EXISTING FLOOR DRAINS AND PIPING ARE REMOVED,
AND WHERE NEW FLOOR DRAINS AND PIPING ARE INSTALLED. CLEAN AND
SEAL THE FLOOR AS NOTED ABOVE.
W
2Q R
B0
2_
PL
AN
S-
100 200
(DOWN)
RAMP
SECTION
NO.1
CAGE
CAGE
R
AC
KS
R
AC
KS
R
AC
KS
VH
OFFICE
LOADING
CAGE
CAGE
CAGE
RESTROOM
COVERED
DOCK
EL.
VAULT
PR
IN
TE
R
W O
R K
BE
N
C H
FRIDGEMICROWAVE&
COFFEE
TABLE
W/
TABLE
W/
TA
BL
E
DESK
#2
DESK
#1
DESK
#3
COMM
UH-1
1" HWR
UH-1
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
1" HWR
1" HWS
UH-1
1 1/4" HWS
1 1/4" HWR
UH-1
1" HWS
1" HWR
UH-1
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
1" HWR
1" HWS
UH-1
1 1/4" HWR
1 1/4" HWS
UH-1
1" HWR 1" HWS
UH-1
1" HWR
1" HWS
1 1/4" HWR 1 1/4" HWS
2" HWS 2" HWR 1" HWS 1" HWR
UH-1
1" HWR
1" HWS
UH-1
2" HWS 2" HWR
UH-1
1" HWS
1" HWR
UH-1
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
2" HWS
UH-2
UH-2
1/2" HWS
1/2" HWS
1/2" HWR
3/4" HWS
3/4" HWR
UH-1
1" HWS
1" HWR
1" HWS
1" HWR
2 1/2" HWR
2 1/2" HWS
1" HWS
2" HWR
1/2" HWR
A A A
EXPANSION LOOP,
BOTH PIPES.
3'-0" x 2'-0" x 3'-0"
EXPANSION LOOP,
BOTH PIPES.
4'-0" x 2'-0" x 4'-0"
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PIPE
ANCHOR
(TYPICAL)
PIPE LOOPS
AROUND STRUCTURAL
BEAM (TYPICAL).
A
A
A
A
A
A A
A
A
(UH-1-4)
(UH-1-1)
(UH-1-2)
(UH-1-3)
(UH-1-6)
(UH-1-5)
(UH-2-1)
(UH-2-2)
(UH-2-3)
(UH-2-5)
(UH-2-4)
(UH-2-1)
(UH-2-1)
(UH-3-1)
(UH-3-2)
T T
T T T T
TT
(1-2,1-3) (1-6)
(1-1) (1-4,1-5)
(2-1,2-2)
(2-3)
(2-5)
(2-4)
T
T
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 4:01:47 PM
M-102
HWS
H
VA
C P
LA
N
H
EA
TI
N G
H O
T W
AT
ER
S
YS
TE
M
SE
C
TI
O N
S
AN
D
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"M-101
1 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 1 AND 2
NOTES:
1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.
2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.
3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.
4. PIPING SHALL BE INSULATED AS SPECIFIED.
5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT
DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE
EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER
PIPING AND HOT WATER COILS.
6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR
ELEVATION TO THE REMOVED STEAM UNIT HEATERS.
7. INSTALL FIRESTOPPING AT ALL PIPING PENETRATIONS IN
WALLS AS SPECIFIED. WALLS ARE 3 HOUR RATED FIRE
WALLS.
8. UNIT HEATERS ARE SHOWN WITH TWO DESIGNATIONS. THE
UH-X DESIGNATION DENOTES THE TYPE, SIZE, AND CAPACITY
OF THE UNIT HEATERS AS SHOWN IN THE HOT WATER UNIT
HEATER SCHEDULE ON SHEET M-601. THE DESIGNATION
SHOWN IN PARENTHESES (UH-X-X) DENOTES THE UNIQUE
IDENTIFIER FOR EACH UNIT HEATER.
SCALE: 3/32" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
1 1
W
2Q R
B0
2_
PL
AN
S-
GE
VH
6,00 SF
2 1/2" HWS
2 1/2" HWR
UH-1 UH-1
1" HWR
1" HWS
1" HWS
1" HWR
1 1/4" HWS 1 1/4" HWR
1 1/4" HWS 1 1/4" HWR
1" HWS
UH-1
1" HWR
1 1/4" HWS 1 1/4" HWR
UH-1
UH-1
1" HWS
1" HWR
1" HWR
3" HWS
3" HWR
UH-1
1" HWR
1" HWS
UH-1
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWS 1 1/4" HWR
UH-1
1" HWR
1" HWS
1 1/4" HWS 1 1/4" HWR
1" HWR 1" HWR
1" HWS1" HWS
UH-1 UH-1
3" HWR
UH-1
1" HWS
1" HWR
1 1/4" HWS
1 1/4" HWR
UH-1
1" HWS
1" HWR
1/2" HWR
1/2" HWS
3/4" HWR
3/4" HWS
1" HWS
1" HWR
3" HWS
1" HWS
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
EXPANSION LOOP,
BOTH PIPES.
4'-0" x 2'-0" x 4'-0"
A A A
EXPANSION LOOP,
BOTH PIPES.
4'-6" x 2'-6" x 4'-6"
1 1/4" HWR
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PIPE
ANCHOR
(TYPICAL)
PIPE LOOPS
AROUND STRUCTURAL
BEAM (TYPICAL).
A
A
A
A
A
A A
A
A
(UH-3-1)
(UH-3-2)
(UH-3-3)
(UH-3-4)
(UH-3-5)
(UH-4-1)
(UH-4-2)
(UH-4-3)
(UH-4-4)
(UH-4-5)
(UH-5-1)
(UH-5-2)
T T
T T (3-2) (3-5)
(3-1) (3-3)
T (3-4)
T T
T T (4-2) (4-5)
(4-1) (4-3)
T (4-4)
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 4:01:48 PM
M-103
HWS
H
VA
C P
LA
N
H
EA
TI
N G
H O
T W
AT
ER
S
YS
TE
M
PL
AN
, S
EC
TI
O
N S
AN
D
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"M-101
2 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 3 AND 4
NOTES:
1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.
2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.
3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.
4. PIPING SHALL BE INSULATED AS SPECIFIED.
5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT
DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE
EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER
PIPING AND HOT WATER COILS.
6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR
ELEVATION TO THE REMOVED STEAM UNIT HEATERS.
7. INSTALL FIRESTOPPING AT ALL PIPING PENETRATIONS IN
WALLS AS SPECIFIED. WALLS ARE 3 HOUR RATED FIRE
WALLS.
8. UNIT HEATERS ARE SHOWN WITH TWO DESIGNATIONS. THE
UH-X DESIGNATION DENOTES THE TYPE, SIZE, AND CAPACITY
OF THE UNIT HEATERS AS SHOWN IN THE HOT WATER UNIT
HEATER SCHEDULE ON SHEET M-601. THE DESIGNATION
SHOWN IN PARENTHESES (UH-X-X) DENOTES THE UNIQUE
IDENTIFIER FOR EACH UNIT HEATER.
SCALE: 3/32" = 1'-0"
0 8'-0" 16'-0" 32'-0"
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T.
M
IS
C
. C H
AN
G
E S
-2 2-
1 1
1 1
W
2Q R
B0
2_
PL
AN
S-
FRIDGE
ELECTRICAL
PANEL
LOADING
VH
CAGECAGE
UH-2
UH-2
SEE SHEET M-401 FOR ENLARGED
MECHANICAL ROOM PLAN
UH-1
1" HWS
1" HWR
UH-1
1" HWS
1" HWR
1 1/4" HWR 1 1/4" HWS
UH-1
1" HWR
1" HWS
1 1/4" HWR
1 1/4" HWS
3" HWR
1/2" HWR
1/2" HWR
1/2" HWS
3/4" HWR
UH-1
UH-1
1" HWS
1" HWR
1" HWS
1" HWR
1 1/4" HWS 1 1/4" HWR
UH-1
1" HWS
1" HWR
1 1/4" HWS 1 1/4" HWR
4" HWR
4" HWS
UH-1
1" HWS
1" HWRUH-1
1" HWR1" HWS
4" HWS
4" HWR
6" HWR 6" HWS
UH-1
1" HWS
1" HWR
3" HWS
UH-1
1" HWS
1" HWR
UH-1
1" HWS
1" HWR
UH-1
1" HWS
1" HWR
4" HWR
4" HWS
1/2" HWS
3/4" HWS
A A
EXPANSION LOOP,
BOTH PIPES.
4'-6" x 2'-6" x 4'-6"
PIPE
ANCHOR
(TYPICAL)
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
1 1/4" HWS
1 1/4" HWR
1 1/4" HWR
1 1/4" HWS
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
EXPANSION LOOP,
BOTH PIPES.
5'-0" x 2'-6" x 5'-0"
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PROVIDE FIRESTOPPING
AT PIPE PENETRATIONS
THRU WALLS (TYPICAL).
SEE NOTE 7.
PIPE LOOPS
AROUND STRUCTURAL
BEAM (TYPICAL).
A
A
A
A
A
A A
A
A
A
(UH-5-1)
(UH-5-4)
(UH-5-3)
(UH-5-5)
(UH-5-2)
(UH-6-1)
(UH-6-2)
(UH-6-3)
(UH-6-4)
(UH-6-5)
(UH-6-6)
(UH-6-7)
T T
T T (5-2) (5-5)
(5-1) (5-3)
T (5-4)
T T (6-2) (6-5)
T (6-3,6-4)
T (6-1)
T
T
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
/2 8/
TB
D
TB
D
W
2Q R
B0
KE
R
R Y
PR
AT
H
ER
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
D
SC
C , C
O
LU
M
BU
S, O
H
IO
D
SC
C B
U
IL
D
IN
G
D
EC
EN
TR
AL
IZ
E
BO
IL
ER
FY
2, P
11/22/2021 4:01:50 PM
M-104
HWS
H
VA
C P
LA
N
H
EA
TI
N G
H O
T W
AT
ER
S
YS
TE
M
PL
AN
, S
EC
TI
O
N S
AN
D
ER
IC
D
AV
IS
ER
IC
D
AV
IS
KE
R
R Y
PR
AT
H
ER
3/32" = 1'-0"M-101
3 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 5 AND 6
NOTES:
1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.
2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.
3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.
4. PIPING SHALL BE INSULATED AS SPECIFIED.
5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT
DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE
EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER
PIPING AND HOT WATER COILS.
6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR
ELEVATION TO THE REMOVED STEAM UNIT HEATERS.