W912QR22B0002_PLANS-0003.pdf

PDF 5 MB Posted

Attached to
DLA Bldg 10 Decentralized Boiler Project Federal contract opportunity
Solicitation number
W912QR22B0002
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

About this file

This federal contract opportunity notice seeks bids for a project to remove an existing steam heating system and install a new gas-fired hot water boiler system at a Defense Supply Center building in Columbus, Ohio. The project includes replacing electric heating coils in air handling units with new hot water coils. The contract value is estimated between $1-5 million. Bids are due via www.sam.gov by a deadline of April 15, 2022. The contract will be a firm-fixed-price, 100% small business set-aside awarded to the lowest price bidder. The U.S. Army Corps of Engineers Louisville District will administer the contract over a 420-day period. The point of contact is the listed Contract Specialist.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Bldg 10 Decentralized Boiler Project, newest first.
File Type Posted
W912QR22B0002 Bid Opening Results.pdf PDF
W912QR22B0002-0004.pdf PDF
W912QR22B0002_SPECS-0003.pdf PDF
W912QR22B0002-0002.pdf PDF
W912QR22B0002-0001.pdf PDF
Site Visit Sign-In Sheet.pdf PDF
W912QR22B0002_SPECS-0000.pdf PDF
W912QR22B0002_PLANS-0000.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PRUS Army Corps of

Engineers ®

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

P2

CERTIFIED FINAL

KE

R

R Y

PR

AT

H

ER

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

LO

U

IS

VI

LL

E D

IS

TR

IC

T

D R

. M

AR

TI

N

L U

TH

ER

K

IN

G J

R . P

LA

C

E

LO

U

IS

VI

LL

E, K

Y

SOLICITATION NO. W912QR22B0002

LOUISVILLE DISTRICT

LOUISVILLE, KENTUCKY

W

2Q R

B0

TB

D

11/22/2021 3:54:41 PM

C:\Users\h2eddkbp\Documents\480807_V2020_M_BLDG 10 HWS_h2eddkbp.rvt

G-001

HWS

C O

VE

R

S H

EE

T

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

/2

8/

09/28/2021

DEFENSE SUPPLY CENTER COLUMBUS (DSCC)

COLUMBUS, OH

BUILDING 10 DECENTRALIZE BOILER

FY22, P2 480807

INDEX OF DRAWINGS

SHEET

NUMBER SHEET TITLE

G-001 COVER SHEET

G-002 SITE LOCATION AND VICINITY MAPS

G-003 HVAC GENERAL NOTES AND LEGEND

G-004 INSTALLATION PLAN

G-005 PROJECT PHASING

MA-101 ACCESS PLAN - SECTION 9

MA-102 ACCESS PLAN - SECTIONS 10 AND 11

MA-103 ACCESS PLAN - SECTIONS 12 AND 13

MA-501 ACCESS DETAILS

MA-502 ACCESS DETAILS

MD-101 HVAC DEMOLITION PLAN - BUILDING 10

MD-102 HVAC DEMOLITION PLAN - CROSS-OVER PIPING

MD-103 HVAC DEMOLITION PLAN - SECTIONS 1 & 2

MD-104 HVAC DEMOLITION PLAN - SECTIONS 3 & 4

MD-105 HVAC DEMOLITION PLAN - SECTIONS 5 & 6

MD-106 HVAC DEMOLITION PLAN - SECTIONS 10 & 11

MD-107 HVAC DEMOLITION PLAN - SECTIONS 12 & 13

MD-401 ENLARGED MECHANICAL ROOM DEMOLITION AND RENOVATION PLAN

M-101 HVAC PLAN - HEATING HOT WATER SYSTEM

M-102 HVAC PLAN - HEATING HOT WATER SYSTEM, SECTIONS 1 AND 2

M-103 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 3 AND 4

M-104 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 5 AND 6

M-105 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 7 AND 8

M-106 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTION 9

M-107 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 10 AND 11

M-108 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 12 AND 13

M-401 ENLARGED MECHANICAL ROOM PLAN

M-402 ENLARGED MECHANICAL ROOM SECTIONS

M-403 ENLARGED MECHANICAL ROOM SECTIONS

M-404 ENLARGED MECHANICAL ROOM SECTIONS

M-405 ENLARGED MECHANICAL ROOM SECTIONS

M-406 ENLARGED MECHANICAL ROOM SECTIONS

M-407 ENLARGED MECHANICAL ROOM SANITARY WASTE PLAN

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-601 MECHANICAL SCHEDULE

M-700 CONTROLS LEGEND AND ABBREVIATIONS

M-701 POINT SCHEDULE INSTRUCTIONS

M-702 SCHEDULING AND ALARM SEQUENCE

M-703 CONTROL NETWORK SCHEMATIC

M-704A HOT WATER SYSTEM CONTROL SCHEMATIC

M-704B HOT WATER SYSTEM LADDER DIAGRAMS

M-704C HOT WATER SYSTEM LOGIC DIAGRAMS

M-704D HOT WATER SYSTEM POINTS SCHEDULE

M-705 HOT WATER UNIT HEATER CONTROLS

M-706 BUILDING 10 AHU HEATING COIL CONTROLS

M-707 GAS-FIRED UNIT HEATER CONTROLS

E-001 LEGEND AND ABBREVIATIONS

E-110 MECHANICAL POWER PLAN - COMPREHENSIVE

E-111 MECHANICAL POWER PLAN - SECTIONS 1 AND 2

E-112 MECHANICAL POWER PLAN - SECTIONS 3 AND 4

E-113 MECHANICAL POWER PLAN - SECTIONS 5 AND 6

E-114 MECHANICAL POWER PLAN - SECTION 7 AND 8

E-115 MECHANICAL POWER PLAN - SECTION 9

E-116 MECHANICAL POWER PLAN - SECTION 10 AND 11

E-117 MECHANICAL POWER PLAN SECTIONS 12 AND 13

E-401 ENLARGED MECHANICAL ROOM

E-402 MECHANICAL ROOM LIGHTING PLAN

E-601 PANEL SCHEDULES

E-602 PANEL SCHEDULES

E-603 PANEL SCHEDULES

E-604 MECHANICAL FEEDER SCHEDULE

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

C:\Users\h2eddkbp\Documents\480807_V2020_M_BLDG 10 HWS_h2eddkbp.rvt

11/22/2021 3:54:53 PM

G-005

HWS

PR

O

JE

C

T

PH

AS

IN

G

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

GENERAL PHASING NOTES

1. THE PROJECT IS DIVIDED INTO FOUR PHASES. CONTRACTOR SHALL

DETERMINE THE SEQUENCE OF THE PHASING AS PART OF THE CONSTRUCTION

PLAN, WITH THE REQUIREMENT THAT PHASE 1 WORK BE COMPLETED PRIOR

TO ANY OTHER WORK IN THE PROJECT, AND SHALL BE COMPLETED AS QUICKLY

AS POSSIBLE. WITH THE APPROVAL OF THE CONTRACTING OFFICER'S

REPRESENTATIVE, WORK IN THE DIFFERENT PHASES MAY BE COMPLETED

CONCURRENTLY.

2. PHASE 1: BUILDING 10 AHU DECK ACCESS

3. PHASE 2: BUILDING 10 STEAM CROSS-OVER PIPING DEMOLITION.

4. PHASE 3: BUILDING 10 HOT WATER HEATING PLANT INSTALLATION.

5. PHASE 4: BUILDING 10 HEATING SYSTEM REPLACEMENT.

6. PHASE 5: BUILDING 10 AHU HEATING COIL REPLACEMENTS.

7. HEATING TO ALL SECTIONS OF THE BUILDING SHALL BE PROVIDED WHEN

REQUIRED. CONTRACTOR SHALL PROVIDE ALL PROVISIONS OR EQUIPMENT

NECESSARY TO MAINTAIN HEATING TO ALL SECTIONS OF THE BUILDING DURING

PERIODS WHERE HEATING IS REQUIRED.

8. BALANCING ACTIVITIES ARE NOTED IN EACH PHASE. BALANCING SHALL BE

COMPLETED FOR THE ENTIRE SYSTEM. BALANCING MAY BE COMPLETED IN

PHASES. IF COMPLETED IN PHASES, THE BALANCER VERIFY THE WATER

FLOWS OF PREVIOUS PHASES TO ENSURE THE PREVIOUS BALANCING HAS

NOT CHANGED.

9. COMMISSIONING ACTIVITIES ARE NOTED IN EACH PHASE. COMMISSIONING FOR

THE NEW HVAC CONTROL SYSTEM IN SECTIONS 1 THRU 9 MAY BE COMPLETED

IN PHASES OR MAY BE COMPLETED AT ONE TIME. THE SEQUENCES OF

OPERATIONS FOR AHU SYSTEMS IN SECTIONS 10 THRU 12 SHALL BE COMPLETED

AT ONE TIME.

PHASE 2 - BUILDING 10 STEAM CROSS-OVER PIPING DEMOLITION

1. SEE GENERAL PHASING NOTES, THIS SHEET.

2. WORK INCLUDES THE REMOVAL OF THE MAIN STEAM AND STEAM CONDENSATE

CROSS-OVER PIPING FROM THE STEAM PLANT IN BUILDING 11 TO THE

MECHANICAL ROOM IN BUILDING 10, SECTION 5.

3. WORK SHALL BE COMPLETED DURING THE COOLING SEASON WHEN THE

HEATING PLANT WILL BE DISABLED.

4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND

DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS

(SHEET MD-101 AND MD-102).

(A) WITH THE HEATING PLANT IN BUILDING 11 DOWN, CUT AND CAP

EXISTING STEAM AND CONDENSATE PIPING INSIDE THE MECHANICAL

ROOM IN BUILDING 11.

(B) REMOVE EXISTING STEAM AND CONDENSATE PIPING SUPPORTED

BY PIPING SUPPORTS FROM THE EXIT OF THE BUILDING 11 MECHANICAL

ROOM TO THE ENTRANCE INTO THE BUILDING 10, SECTION 5 MECHANICAL

ROOM.

(C) PATCH THE WALLS OF THE BUILDING 11 MECHANICAL ROOM WHERE

THE PIPING HAD BEEN REMOVED.

PHASE 3 - BUILDING 10 HEATING PLANT INSTALLATION

1. SEE GENERAL PHASING NOTES, THIS SHEET.

2. WORK INCLUDES THE RENOVATION OF THE MECHANICAL ROOM IN SECTION 5

OF BUILDING 10, AND THE INSTALLATION OF THE NEW HOT WATER HEATING

PLANT FOR THE BUILDING PLANT.

3. INSTALLATION OF NEW HEATING PLANT SHALL BE COMPLETED DURING THE

COOLING SEASON WHEN THE HEATING PLANT WILL NOT BE NEEDED.

INSTALLATION OF BOILERS, PUMPS, AND PIPING MAY BE COMPLETED PRIOR TO

THE DEMOLITION OF THE EXISTING STEAM PIPING IN THE MECHANICAL ROOM.

THE EXISTING STEAM SYSTEM OR THE HEATING PLANT SHALL BE IN OPERATION

DURING THE HEATING SEASON TO PROVIDE HEAT TO THE BUILDING. WORK

FOR THE RENOVATION OF THE MECHANICAL ROOM SHALL BE COMPLETED

PRIOR TO THE INSTALLATION OF THE NEW HEATING PLANT.

4. PAINT ON THE WALLS AND ROOF OF THE MECHANICAL ROOM HAS BEEN TESTED

AND FOUND TO CONTAIN LEAD. PRIOR TO ANY OTHER WORK IN THE MECHANICAL

ROOM, REMOVE ALL EXISTING PAINT FROM THE WALLS AND ROOF. LEAD BASED

PAINT SHALL BE ABATED IN ACCORDANCE WITH SPECIFICATION 02 83 00 LEAD

REMEDIATION.

5. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND

DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS

AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-105, M-101, M-104, M-401,

M-402, AND M-403).

(A) ABATE LEAD BASED PAINT IN MECHANICAL ROOM.

(B) REMOVE EXISTING STEAM AND CONDENSATE PIPING SUPPLYING THE

BUILDING IN THE MECHANICAL ROOM. PATCH EXTERIOR WALL

PENETRATIONS.

(C) PATCH HOLES AT FORMER ROOF PENETRATIONS.

(D) REMOVE EXISTING CONCRETE PEDESTALS IN THE MECHANICAL ROOM.

(E) CLEAN OR REPLACE EXISTING FLOOR DRAINS. CLEAN EXISTING

SANITARY SEWER PIPING FROM FLOOR DRAINS.

(F) PREPARE WALLS AND ROOF FOR NEW PAINT. PAINT WALLS.

(G) CLEAN FLOOR. SEAL FLOOR.

(H) INSTALL NEW EQUIPMENT PADS.

(I) INSTALL NEW HOT WATER HEATING PIPING AND NEW GAS PIPING.

(J) INSTALL NEW EQUIPMENT (BOILERS, PUMPS, ACCESSORIES, ETC.).

(K) INSTALL NEW MECHANICAL ROOM GAS UNIT HEATER.

(L) INSTALL HVAC CONTROL SYSTEM FOR HEATING SYSTEM.

(M) INSTALL NEW LIGHT FIXTURES FOR THE MECHANICAL ROOM.

(N) REPLACE ELECTRICAL RECEPTACLES.

(O) BALANCE HOT WATER SYSTEM.

(P) COMMISSION NEW HEATING SYSTEM IN MECHANICAL ROOM.

(Q) FINAL CLEANING OF MECHANICAL ROOM.

PHASE 4 - BUILDING 10 HEATING SYSTEM REPLACEMENT

1. SEE GENERAL PHASING NOTES, THIS SHEET.

2. WORK INCLUDES THE REPLACEMENT OF THE EXISTING STEAM AND

CONDENSATE PIPING WITH NEW HOT WATER PIPING, AND THE REPLACEMENT OF

EXISTING STEAM UNIT HEATERS WITH NEW HOT WATER UNIT HEATERS IN

SECTIONS 1 THRU 6. WORK ALSO INCLUDES THE INSTALLATION OF NEW HOT

WATER PIPING AND UNIT HEATERS IN SECTIONS 7 THRU 9. WORK IN THIS PHASE

MAY BE COMPLETED IN ANY OF SECTIONS 1 THRU 9 AS SCHEDULED. THE

CONTRACTOR SHALL DETERMINE THE SEQUENCE IN WHICH THE CONSTRUCTION

IS COMPLETED. THE CONTRACTOR SHALL NOTIFY THE USER THRU THE

CONTRACTING OFFICER'S REPRESENTATIVE OF THE START OF CONSTRUCTION IN

THESE AREAS A MINIMUM OF 30 DAYS PRIOR TO THE START OF CONSTRUCTION.

3. WORK SHALL BE COMPLETED DURING THE COOLING SEASON. THE NEW HEATING

SYSTEM SHALL BE IN OPERATION TO PROVIDE HEAT TO THE STORAGE AREAS

DURING THE HEATING SEASON.

4. MATERIALS ARE STORED IN THE STORAGE AREAS. THE CONTRACTOR SHALL

MOVE THE MATERIALS AS NECESSARY TO COMPLETE THE WORK. SOME AREAS

HAVE CAGES CONSTRUCTED FOR THE STORAGE OF MATERIALS. THE

CONTRACTOR SHALL BE PROVIDED ACCESS TO THOSE AREAS. THE

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE

OF THE NEED TO WORK IN THE CAGED AREAS A MINIMUM OF 5 DAYS PRIOR TO

THE START OF THE WORK SO ACCESS TO THE AREAS IS ARRANGED. ANY

STORED MATERIALS MOVED TO COMPLETE THE WORK SHALL BE RETURNED TO

THE ORIGINAL POSITIONS WHEN THE WORK IS COMPLETED. CAGING MAY BE

DECONSTRUCTED IN PART TO PROVIDE ACCESS FOR THE COMPLETION OF

WORK. ANY CAGING DECONSTRUCTED SHALL BE RE-ASSEMBLED TO THE

ORIGINAL CONDITION WHEN THE WORK IS COMPLETED.

5. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND

DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS

AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-102, MD-103, MD-104,

MD-105, M-101, M-102, M-103, M-104, M-105, AND M-106).

(A) STEAM SHALL BE DISCONNECTED FROM THE SYSTEM AND THE

SYSTEM ALLOWED TO COOL.

(B) MOVE STORED MATERIALS AS NECESSARY FOR ACCESS.

(C) DISCONNECT ELECTRIC POWER TO THE UNIT HEATERS.

(D) DISCONNECT PIPING FROM THE UNIT HEATERS.

(E) REMOVE EXISTING STEAM UNIT HEATERS.

(F) INSTALL NEW HOT WATER PIPING.

(G) INSTALL NEW HOT WATER UNIT HEATERS.

(H) INSTALL NEW ELECTRIC WIRING AND CONDUIT TO SUPPLY NEW

UNIT HEATERS.

(I) CONNECT NEW HOT WATER PIPING TO THE NEW HOT WATER UNIT

HEATERS.

(J) INSTALL HVAC CONTROLS FOR UNIT HEATERS AND UNIT HEATER HOT

WATER CONTROL VALVES.

(K) BALANCE HOT WATER FLOWS TO UNIT HEATERS.

(L) COMMISSION HOT WATER HEATING SYSTEM (BOILERS, PUMPS, UNIT

HEATERS, ETC.).

(M) RELOCATE STORED MATERIALS.

(N) FINAL CLEANUP.

PHASE 5 - BUILDING 10 AHU HEATING COIL REPLACEMENTS

1. SEE GENERAL PHASING NOTES, THIS SHEET.

2. WORK INCLUDES THE REPLACEMENT OF EXISTING ELECTRIC HEATING COILS

IN AIR HANDLING UNITS IN BUILDING SECTIONS 10 THRU 13 WITH NEW HOT

WATER HEATING COILS. WORK IN THIS PHASE MAY BE COMPLETED IN ANY OF

SECTIONS 10 THRU 13. NEW HOT WATER PIPING MAY BE INSTALLED AT ANY

TIME DURING THE DURATION OF THE CONTRACT AS SCHEDULED. IN EACH

SECTION, ONLY ONE AHU SHALL BE INOPERABLE AT ANY ONE TIME.

3. WORK IN THIS PHASE IS IN AREAS ABOVE OFFICE SPACES. WORK SHALL BE

COMPLETED WHILE THE SPACES ARE OCCUPIED. CONTRACTOR SHALL FOLLOW

ALL ACCESS REQUIREMENTS AS SPECIFIED. CONTRACTOR SHALL NOTIFY THE

USER THRU THE CONTRACTING OFFICER'S REPRESENTATIVE OF THE SCHEDULE

OF CONSTRUCTION FOR THESE SPACES A MINIMUM OF 30 DAYS PRIOR TO THE

START OF CONSTRUCTION.

4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND

DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE DEMOLITION SHEETS

AND ON THE NEW WORK SHEETS (SHEETS MD-101, MD-106, MD-107, M-101, M-107,

AND M-108).

(A) INSTALL NEW HOT WATER PIPING IN SECTIONS 10 THRU 13.

(B) SHUT DOWN EACH AHU IN TURN. PERFORM THE FOLLOWING ITEMS

ON EACH AHU IN TURN.

(C) DISCONNECT ELECTRIC POWER FROM EXISTING ELECTRIC HEATING

COIL.

(D) REMOVE EXISTING CONTROLS FROM ELECTRIC HEATING COIL.

(E) REMOVE EXISTING ELECTRIC HEATING COIL FROM AHU.

(F) INSTALL NEW HOT WATER HEATING COIL IN AHU.

(G) INSTALL NEW HOT WATER PIPING CONNECTIONS FROM NEW PIPING

TO NEW HOT WATER HEATING COIL, INCLUDING NEW HOT WATER CONTROL

VALVE.

(H) INSTALL NEW CONTROLS FOR HOT WATER CONTROL VALVE. REVISE

SEQUENCE OF CONTROL FOR VALVE.

(I) BALANCE HOT WATER FLOW TO HOT WATER COIL.

(J) COMMISSION HOT WATER VALVE SEQUENCE OF CONTROL.

(K) FINAL CLEANUP.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

PHASE 1 - BUILDING 10 AHU DECK ACCESS

1. SEE GENERAL PHASING NOTES, THIS SHEET.

2. WORK INCLUDES THE INSTALLATION OF ACCESS STAIRS, DECK ACCESS

STAIRS, ACCESS DOORS AND HARDWARE, BMS DOOR SWITCHES, AND

WIRING AND CONDUIT FOR BMS POWER AND MONITORING.

3. WORK SHALL BE COMPLETED PRIOR TO ANY OTHER WORK IN THE PROJECT.

4. WORK IN THIS PHASE SHALL INCLUDE THE FOLLOWING ITEMS. DETAILS AND

DESCRIPTIONS OF THESE ITEMS ARE INCLUDED ON THE ACCESS PLAN

SHEETS (SHEETS MA-101, MA-102, MA-103, MA-501, AND MA-502).

(A) INSTALL ACCESS STAIRS IN BUILDING SECTION 9.

(B) INSTALL DECK ACCESS STAIRS IN BUILDING SECTIONS 10, 11, 12, AND 13.

(C) CREATE OPENINGS FOR NEW ACCESS DOORS IN CMU WALLS BETWEEN

BUILDING SECTIONS 9 AND 10, 10 AND 11, 11 AND 12, AND 12 AND 13.

(D) INSTALL ACCESS DOORS AND BMS DOOR SWITCHES.

(E) INSTALL POWER AND CONTROL WIRING AND CONDUIT FOR BMS

SWITCHES.

1 1

W

2Q R

B0

2_

PL

AN

S-

TRANE

MODEL

S/N: K9

TRANE

MODEL

S/N: K9

TRANE

MODE

S/N:K9

TRANE A

MODEL:

S/N: K93

VHVH

BUILDING ACCESS STAIR.

INSTALL STAIR FOR ACCESS

TO AHU DECK IN SECTIONS

10 THRU 13. TYPICAL OF 4.

SEE ACCESS STAIR DETAIL,

THIS SHEET.

DECK ACCESS STAIR.

INSTALL STAIR FOR ACCESS

TO AHU DECK IN SECTIONS

10 THRU 13. TYPICAL OF 4.

SEE DECK ACCESS STAIR

DETAIL, SHEET MA-502.

MA-502

NOTE:

LOCATIONS OF STAIRS MAY BE MOVED FROM

THE LOCATIONS SHOWN TO CREATE THE

LEAST INTERFERENCE WITH EXISTING

CONDITIONS.

2'

0" 6'

6"

3' - 0"

5'

0"

3' - 0"

7'

4"

3'

0"

PLAN VIEW

ELEVATION VIEW

CMU WALL

FLOOR

GUARDRAIL

LANDING

LANDING

ACCESS DOOR.

SEE NOTE 3.

0'

8"

0' - 11"

NOTES:

1. CONTRACTOR SHALL FABRICATE AND INSTALL ACCESS STAIRS IN ACCORDANCE WITH CONTRACT SPECIFICATION 05 51 00. DETAIL IS TYPICAL FOR ALL STAIRS. ONE SET OF STAIRS SHALL BE OPPOSTIE HAND AS SHOWN.

2. LANDING ELEVATIONS ARE SET BASED ON EXISTING SPRINKLER PIPING ELEVATIONS. EXISTING ELEVATIONS ARE TAKEN FROM PHOTOS AND AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY ACTUAL ELEVATIONS OF PIPING IN

FIELD AND SHALL SET LANDING ELEVATIONS ABOVE THE EXISTING PIPING.

3. STAIRS SHALL BE INSTALLED A MINIMUM OF 2'-0" FROM WALL AS SHOWN TO AVOID EXISTING PIPING AND TO ALLOW

SPACE FOR NEW HOT WATER PIPING TO BE INSTALLED.

4. STAIR RISER SHALL BE 8 INCHES MINIMUM. STAIR TREAD SHALL BE 11 INCHES MINIMUM. STAIRS SHALL BE A MINIMUM

OF 36 INCHES WIDE. GUARDRAIL SHALL BE INSTALLED 42 INCHES ABOVE STAIR TREAD.

5. ACCESS DOOR. SEE DETAIL, SHEET MA-502.

6. COMMERCIALLY AVAILABLE STAIRS CONSTRUCTED IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATION

05 51 00 ARE ACCEPTABLE.

SEE NOTE 3.

3'

6"

UP

UP

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:56:37 PM

MA-101

HWS

AC

C

ES

S

PL

AN

SE

C

TI

O N

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

3/32" = 1'-0"

ACCESS PLAN - SECTION 9

NTS2 ACCESS STAIR DETAIL

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

S S S S S

S

S

S

S

S

S

DCIS

EXIT

EXIT

EXIT

EWC

EWC

1103 1104

1106 1105

1009 1010

1109 1110

1007 1005 1003 1002

1006 1004

1009 1010

10241025102610271028

1030 1000

1007 1005 1003 1002

1006 1004

1009 1010

010E-E-026

010E-E-027

010E-E-030

010W-E-040

010E-E-029010E-E-028

010-I-1001A

010-I-1011

010-I-1012

010-I-1100

010-I-1000

010-I-1109

010-I-1108

010-I-1106

0W

-W -0

0W

-W -0

010-I-1024

010-I-1100

010-I-1109

010-I-1108

VHVH

SECTION

010-I-1113

AHU-10-10-4

AHU-10-10-3

AHU-10-10-2

AHU-10-10-1

AHU-10-11-3

AHU-10-11-2

AHU-10-11-1

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK HANDRAILS.

LOCATE WITH DECK

ACCESS STAIRS.

SEE NOTE 2.

(TYPICAL)

BEB-1

P/S6-1

P/S6-2

BEB-5A

P/S6-9

P/S6-10

BEB-5

P/S6-11

P/S-1000

P/S6-11

BEB-6

P/S6-12

P/S-040

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:56:44 PM

MA-102

HWS

AC

C

ES

S

PL

AN

SE

C

TI

O N

S

A N

D

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

3/32" = 1'-0"

ACCESS PLAN - SECTIONS 10 AND 11

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

NOTES:

1. LOCATIONS OF DECK ACCESS STAIRS MAY BE MOVED

FROM THE LOCATIONS SHOWN TO AVOID EXISTING

INTERFERENCES.

2. EXISTING ACCESS LADDERS (SHOWN ON SHEETS MD-106

AND MD-107) ARE EQUIPPED WITH DECK HAND RAILS.

DECK HANDRAILS SHALL BE RELOCATED AS NECESSARY

SO THAT THE HAND RAILS TIE TO THE NEW DECK ACCESS

STAIR HAND RAILS.

3. BEB-X: BUILDING EQUIPMENT BOX

P/S6-X: POWER SUPPLY ENCLOSURE

LOCATIONS OF POWER SUPPLIES AND BUILDING EQUIPMENT

BOXES ARE SHOWN ON THE DRAWINGS. WIRE DOOR BMS

SWITCHES TO BUILDING EQUIPMENT BOXES AND POWER

SUPPLIES (SEE WIRING DIAGRAM, SHEET MA-503). CONTRACTOR

SHALL COORDINATE THE DESTINATIONS OF THE WIRING AND

CONDUIT FOR BMS SWITCHES WITH DLA SECURITY OFFICE

THRU CONTRACTING OFFICER'S REPRESENTATIVE.

CONTRACTOR SHALL INSTALL WIRING AND CONDUIT FOR

ACCESS DOOR BMS SWITCHES FROM DOORS TO POWER

SUPPLIES AND BEB PANELS, AND SHALL COORDINATE THE

FINAL CONNECTIONS TO THE POWER SUPPLIES AND BEB

PANELS BY THE GOVERNMENT. FOR BIDDING PURPOSES,

ASSUME THE DOOR SWITCHES SHALL BE WIRED TO THE

POWER SUPPLY AND BEB PANEL NEAREST THE ACCESS

DOOR LOCATIONS.

W

2Q R

B0

2_

PL

AN

S-

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

2 H

IG

H C

LO

SE

D O

H

2 H

IG

H C

LO

SE

D O

H

2 H

IG

H C

LO

SE

D O

H

HIGHCLOSED

OH

SH

O

R T

W

AL

L

FL

AP

H

IG

H

2 H

IG

H

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

CLOSED

OH

Short Short

Sh or t Sh or t

Sh or t Sh or t

Sh or t

Sh or t

RAISE

THESE3

TABLETOPSTO ONE

HIGH

W

AL

L C

H

AN

G

ED

W

AL

L M

O

VE

D E

AS

T

O N

E

PA

N

EL

WALLS & CUBICLES

REMOVED

42" DOOR

INSTALLED

C O

U C

H

Sh or t Sh or t

Sh or t

NEW WALL

PANEL

W O

O D

EN

WOODEN

FURNITURE

C

AB

IN

ET

C H

AN

G

E

TO

SH

O

R T

W

AL

LS

COUCH

WOOD

FURNITURE

WOOD

FURNITURE

High HighHigh

Sh or t Sh or t

Short Short

WOODEN

FURNITUREMOVED

HEREBY

NAVY

TABLE

TOP

RELOCATED

FURNITURE

TEKNION

RELOCATED

FURNITURE

TEKNION

HIGH

INSTALL

SHORT

WALLS

NEW

DOOR

WAY

NEW

DOOR

WAY

High

High

EWC

EWC

12021203

1308130913101311 1307

1211 1212

1314 1315

13171312

1322 1321 1320

13261325

1215 1216 1217 1218 1219

010E-E-030 010E-E-031

010E-E-032

010E-E-033

010W-E-040

010-I-1112

010-I-1106

010-I-1105

010-I-1100A

010-I-1111

010-I-1100B

010-I-1101

010-I-1110

0W

-W -0

0W

-W -0

0W

-W -0

010-I-1215

010-I-1111

010-I-1100B

010-I-1101

010-I-1110

EXIST. ELEC.

PANEL

EXIST. ELEC.

PANEL

EXIST. ELEC.

PANEL

VH

S SS

AHU-10-12-4

AHU-10-12-3

AHU-10-12-2

AHU-10-12-1

AHU-10-13-4

AHU-10-13-3

AHU-10-13-2

AHU-10-13-1

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK ACCESS STAIR.

SEE DETAIL, SHEET

MA-501.

DECK HANDRAILS.

LOCATE WITH DECK

ACESS STAIRS.

SEE NOTE 2.

(TYPICAL)

ACCESS LADDER

AT THIS LOCATION.

BEB-4

BEB-4A

P/S6-7

P/S6-8

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:56:50 PM

MA-103

HWS

AC

C

ES

S

PL

AN

SE

C

TI

O N

S

A N

D

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

3/32" = 1'-0"

ACCESS PLAN - SECTIONS 12 AND 13

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

NOTES:

1. LOCATIONS OF DECK ACCESS STAIRS MAY BE MOVED

FROM THE LOCATIONS SHOWN TO AVOID EXISTING

INTERFERENCES.

2. EXISTING ACCESS LADDERS (SHOWN ON SHEETS MD-106

AND MD-107) ARE EQUIPPED WITH DECK HAND RAILS.

DECK HANDRAILS SHALL BE RELOCATED AS NECESSARY

SO THAT THE HAND RAILS TIE TO THE NEW DECK ACCESS

STAIR HAND RAILS.

3. BEB-X: BUILDING EQUIPMENT BOX

P/S6-X: POWER SUPPLY ENCLOSURE

LOCATIONS OF POWER SUPPLIES AND BUILDING EQUIPMENT

BOXES ARE SHOWN ON THE DRAWINGS. WIRE DOOR BMS

SWITCHES TO BUILDING EQUIPMENT BOXES AND POWER

SUPPLIES (SEE WIRING DIAGRAM, SHEET MA-503). CONTRACTOR

SHALL COORDINATE THE DESTINATIONS OF THE WIRING AND

CONDUIT FOR BMS SWITCHES WITH DLA SECURITY OFFICE

THRU CONTRACTING OFFICER'S REPRESENTATIVE.

CONTRACTOR SHALL INSTALL WIRING AND CONDUIT FOR

ACCESS DOOR BMS SWITCHES FROM DOORS TO POWER

SUPPLIES AND BEB PANELS, AND SHALL COORDINATE THE

FINAL CONNECTIONS TO THE POWER SUPPLIES AND BEB

PANELS BY THE GOVERNMENT. FOR BIDDING PURPOSES,

ASSUME THE DOOR SWITCHES SHALL BE WIRED TO THE

POWER SUPPLY AND BEB PANEL NEAREST THE ACCESS

DOOR LOCATIONS.

W

2Q R

B0

2_

PL

AN

S-

5' - 0"

3'

0"

3'

0"

3'

0"

3'

0"

DECK

DECK

CMU WALL

GUARDRAIL

LANDING

STAIRSSTAIRS

LANDING

GUARDRAIL

EXISTING WALL OF

INTERIOR BUILDING

EXISTING WALL OF

INTERIOR BUILDING

ACCESS

DOOR

PLAN VIEW

ELEVATION VIEW

PLAN VIEW

ELEVATION VIEW

NOTES:

1. CONTRACTOR SHALL FABRICATE AND INSTALL DECK ACCESS STAIRS IN ACCORDANCE WITH CONTRACT

SPECIFICATION 05 51 00. DETAIL IS TYPICAL FOR ALL DECK ACCESS STAIRS.

2. LANDING ELEVATIONS ARE SET BASED ON EXISTING SPRINKLER PIPING ELEVATIONS. LANDING ELEVATIONS SHALL BE THE SAME ON BOTH SIDES OF THE CMU WALL. EXISTING ELEVATIONS ARE TAKEN FROM PHOTOS AND AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY ACTUAL ELEVATIONS OF PIPING IN FIELD AND SHALL SET LANDING

ELEVATIONS ABOVE THE EXISTING PIPING.

3. CONTRACTOR SHALL DETERMINE AND INSTALL ADEQUATE SUPPORTS FOR THE STAIRS. INTERIOR BUILDING

DECK SHALL NOT BE CONSIDERED ADEQUATE TO SUPPORT THE STAIRS.

4. STAIR RISER SHALL BE 8 INCHES MINIMUM. STAIR TREAD SHALL BE 11 INCHES MINIMUM. STAIRS SHALL BE A MINIMUM

OF 36 INCHES WIDE. GUARDRAIL SHALL BE INSTALLED 42 INCHES ABOVE STAIR TREAD.

5. COMMERCIALLY AVAILABLE STAIRS CONSTRUCTED IN ACCORDANCE WITH REQUIREMENTS OF SPECIFICATION

05 51 00 AND MEETING THE DIMENSIONS NECESSARY AT THE LOCATIONS ARE ACCEPTABLE.

DECK ACCESS

STAIR.

ACCESS STIAR.

SEE SHEET MA-101.

EXISTING

SPRINKLER

PIPING

EXISTING

SPRINKLER

PIPING

INTERIOR BUILDING

WALL

ACCESS

DOORGUARDRAIL

LANDING

GUARDRAIL

LANDING

STAIRS

EXISTING

SPRINKLER

PIPING

STAIR

EXISTING CMU

WALL EXISTING WALL OF

INTERIOR BUILDING

EXISTING

SPRINKLER

PIPING

EXISTING

SPRINKLER

PIPING

INTERIOR BUILDING

WALL

EXISTING

CMU WALL

INTERIOR

BUILDING

WALL

EXISTING

CMU WALL

DECK ACCESS

STAIR

DECK ACCESS

STAIR

EXISTING

SPRINKLER

PIPING

EXISTING

SPRINKLER

PIPING

EXISTING

SPRINKLER

PIPING

FLOORFLOOR

LENGTH VARIES.

LENGTH TO BE DETERMINED

BY DISTANCE FROM CMU

WALL TO INTERIOR BUILDING

WALL.

DECK

LENGTH VARIES.

LENGTH TO BE DETERMINED

BY DISTANCE FROM CMU

WALL TO INTERIOR BUILDING

WALL.

NOTE: BETWEEN SECTIONS 9 AND 10. NOTE: TYPICAL FOR STAIRS BETWEEN SECTIONS 10 AND 11, BETWEEN SECTIONS 11 AND 12, AND BETWEEN SECTIONS 12 AND 13.

DECK

HANDRAIL

DECK

HANDRAIL

DECK

HANDRAIL

DECK

HANDRAIL

DECK

HANDRAIL

DECK

HANDRAIL

PHOTO OF EXISTING DECK HANDRAIL

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:56:56 PM

MA-501

HWS

AC

C

ES

S

D

ET

AI

LS

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

NTS1 DECK ACCESS STAIR DETAIL

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

BARREL ARCH

CONCRETE ROOF

BARREL ARCH

CONCRETE ROOF

REMOVE EXISTING

CMU TO PREPARE FOR

NEW ACCESS DOOR

LINTEL. SEE NOTE 2.

REMOVE EXISTING CMU

TO PREPARE FOR ACCESS

DOOR INSTALLATION.

SEE NOTE 1.

EXISTING CMU

WALL BETWEEN

SECTIONS.

INSTALL NEW LINTEL

IN OPENING.

SEE NOTE 1.

DOOR LOCK

NEW DOOR

FRAME.

2'-0" WIDE BY

4'-0" HIGH ACCESS

DOOR. SEE NOTE 2.

ACCESS DOOR OPENING ACCESS DOOR INSTALLATION

NOTES:

1. PREPARE OPENING IN CMU WALL FOR INSTALLATION OF

NEW ACCESS DOOR. BOTTOM OF OPENING SHALL BE

LOCATED SO THE FRAME THRESHOLD IS THE SAME

ELEVATION AS THE STAIR LANDING (ALL ACCESS DOORS).

OPENING SHALL BE SIZED AS RECOMMENDED BY THE DOOR

MANUFACTURER TO ALLOW PROPER INSTALLATION

OF THE NEW ACCESS DOOR FRAME. CONTRACTOR SHALL

DETERMINE THE ACTUAL LOCATION OF THE ACCESS DOOR

BASED ON THE STAIR DESIGN.

2. PREPARE OPENING IN CMU WALL FOR INSTALLATION OF

NEW LINTEL ABOVE ACCESS DOOR.

NOTES:

1. INSTALL NEW LINTEL IN OPENING AS SHOWN.

2. NEW ACCESS DOOR SHALL BE A HIGH SECURITY, FIRE RATED

ACCESS DOOR. DOOR SHALL BE 2'-0" WIDE BY 4'-0"

HIGH, WITH LATCH AND LOCK CYLINDER. LOCK CYLINDER

SHALL BE A BEST CORE 7 PIN LOCK IN ACCORDANCE WITH

DSCC STANDARDS. ACCESS DOOR AND FRAME SHALL BE

INSTALLED IN ACCORDANCE WITH MANUFACTURER'S

RECOMMENDATIONS. ACCESS DOOR SHALL BE 3 HOUR

FIRE RATED. DOOR SWING AS SHOWN ON PLANS.

3. ALL ACCESS DOORS SHALL BE EQUIPPED WITH BMS SWITCHES

AND SHALL BE CONNECTED TO THE EXISTING ELECTRONIC

SECURITY SYSTEM (ESS). CONTRACTOR SHALL COORDINATE

WITH GOVERNMENT TO DETERMINE THE LOCATION OF THE ESS

PANELS. CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL

THE BMS SWITCHES AND INSTALL WIRING AND CONDUIT FROM

THE SWITCHES TO THE EXISTING ESS PANEL. GOVERNMENT

SHALL LAND THE WIRES IN THE ESS PANEL. SEE DETAIL, THIS

SHEET.

BMS SWITCH.

SEE DETAIL,

THIS SHEET.

CMU WALL

ACCESS DOOR

FRAME

ACCESS

DOOR

BMS SWITCH. ATTACH

TO FRAME. WIRE AND

CONDUIT TO ESS

PANEL.

BMS SWITCH. ATTACH

TO DOOR.

BMS SWITCH INSTALLATION

MONITORING

PANEL

(BUILDING

EQUIPMENT

BOX (BEB))

PANEL

POWER

SUPPLY

(P/S)

MAGNETIC SWITCH

(SHOWN WITH DOOR SHUT)

BMS SWITCH WIRING DIAGRAM

NOTE: WIRING DIAGRAM SHOWS A TYPICAL ARRNGEMENT FOR A BMS SWITHC TO SHOW

ALARM WHEN DOOR IS OPENED. WIRING SHALL BE COORDINATED WITH DLA SECURITY

OFFICE. CONTRACTOR SHALL INSTALL WIRING AND CONDUITS. GOVERNMENT WILL

MAKE FINAL CONNECTIONS OF WIRING TO POWER SUPPLY AND BEB PANELS. SEE ACCESS

PLANS, SHEETS MA-101, MA-102, AND MA-103.

EXISTING 3"

BRANCH

LINE.

EXISTING 6"

MAIN

SPRINKLER

BRANCH (TYPICAL)

TOP OF

PIPE 12'-1"

14'-8"

TOP OF

PLATFORM

ACCESS STAIR.

SEE SHEET MA-101.

ACCESS STAIR.

SEE SHEET MA-101.

ACCESS STAIR.

SEE SHEET MA-101.

ACCESS STAIR.

SEE SHEET MA-101.

ACCESS DOOR

ACCESS

DOOR

ACCESS

DOOR

ACCESS

DOOR

NOTE:

LOCATIONS OF STAIRS MAY BE MOVED FROM

THE LOCATIONS SHOWN TO CREATE THE

LEAST INTERFERENCE WITH EXISTING

CONDITIONS.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:57:03 PM

MA-502

HWS

AC

C

ES

S

D

ET

AI

LS

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

NTS1 ACCESS DOOR DETAILS

NTS2 BUILDING SECTION - ACCESS STAIRS, SECTION 9

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

MOTIVAIR AIR COOLED CHILLER:

MLC-FC930-E-DP-VFD-HG

EXISTING 4" STEAM

AND 2" CONDENSATE

TRANE AHU:

MODEL:CMCCA017NAC00A000B0

S/N:K92E24907

1" domestic water line with heat tape

3'x3'x3' expansion loops

6" pipes

4" pipes

4" pipes

3" pipes

TYPICAL

AHU

C

C

301 601

8"

8"

39'-9" 39'-7"40'-0"

119'-4"

39'-9"

8"

40'-0"

119'-4"

39'-7"

8"

SHELF

POWER

POLE

SHELF

OHOH

OH OH

OH

OH

OH

SLIDING

DOOR

SLIDING

DOOR

OH

OH

OH

CAPPNCAPM GCAPM CCAPQTCAPDHCAPGC

'-3

"X

'-6

W O

M

EN

'S R

ES

TR

O O

M

HO

US

E

'-3

"X

'-0

M

EN

'S R

ES

TR

O O

M

M

EC

H

AN

IC

AL

R O

O M

'-9

"X 5'

-9

MEN'S

RESTROOM

WOMEN'S

RESTROOM

DTCDHRC-C

DHRC-C

127 68

CUT AND CAP EXISTING 4" STEAM

AND 2" CONDENSATE PIPING IN

MECHANICAL ROOM. REMOVE

STEAM AND CONDENSATE PIPING.

PATCH HOLES IN BRICK WALL AT

PIPE PENETRATIONS.

REMOVE EXISTING 4" STEAM AND

2" CONDENSATE PIPING. EXISTING

VERTICAL PIPING SUPPORT

STRUCTURES SHALL REMAIN.

EXISTING BRIDGING BETWEEN

VERTICAL STRUCTURES SHALL

BE REMOVED WITH PIPING.

REMOVE 4" STEAM AND

2" CONDENSATE PIPING.

PATCH HOLES IN BRICK

WALL AT PIPING PENETRATIONS.

REMOVE EXISTING 4" STEAM AND

2" CONDENSATE PIPING.

EXISTING VERTICAL PIPING

SUPPORT STRUCTURES SHALL

REMAIN. EXISTING BRIDGING

BETWEEN VERTICAL

STRUCTURES SHALL BE

REMOVED WITH PIPING.

REMOVE SECOND SET OF PIPING

(EXISTING 4" STEAM AND

2" CONDENSATE PIPING).

REMOVE SECOND SET OF PIPING

(EXISTING 4" STEAM AND

2" CONDENSATE PIPING).

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 4:03:40 PM

MD-102

HWS

H

VA

C D

EM

O

LI

TI

O N

P

LA

N

C R

O

SS

-O

VE

R P

IP

IN

G

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"MD-101

1 HVAC DEMOLITION PLAN - CROSS-OVER PIPING

NOTES:

1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.

2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES, PIPE

LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM AS-BUILT

DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM THE AS-BUILT

DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL SIZES, LOCATIONS,

AND ELEVATIONS OF EXISTING MECHANICAL EQUIPMENT AND PIPING.

3. REMOVE THE EXISTING STEAM AND CONDENSATE CROSS-OVER PIPING

FROM BUILDING 11 TO BUILDING 10. TWO SETS OF STEAM PIPING ARE

TO BE REMOVED. BRIDGING BETWEEN THE VERTICAL PIPING SUPPORTS

SUPPORTING THE PIPING SHALL BE REMOVED WITH THE PIPING. PIPING TO BE

REMOVED IS HIGHLIGHTED WITH CROSSHATCH PATTERN.

4. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING PIPE

INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION, INSULATION

IS FOUND WHICH IS SUSPECTED OF CONTAINING ASBESTOS, CONTRACTOR

SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.

SCALE: 3/32" = 1'-0"

0 8'-0" 16'-0" 32'-0"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

INDEECO C

CATALOG #

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14741

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14953

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N:K93C14939

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14722

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14667

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N:K93C13562

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14403

T M S

3'x2'x3' expansion loop (typ.) 3'x2'x3' expansion loop (typ.)

21_ 2" pipes

21_ 2" pipes

11_ 2" pipes

21_ 2" pipes

21_ 2" pipes

11_ 2" pipes

11_ 2" pipes pipes

Provide

1_ 2" gate valves with chain operators(4 locations)

EH-1

T

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

S S S S S

S

S

S

S

S

S

DCIS

EXIT

EXIT

EXIT

EWC

EWC

1103 1104

1106 1105

1009 1010

1109 1110

1007 1005 1003 1002

1006 1004

1009 1010

10241025102610271028

1030 1000

1007 1005 1003 1002

1006 1004

1009 1010

010E-E-026

010E-E-027

010E-E

010W-E

010E-E-029010E-E-028

010-I-1001A

010-I-1011

010-I-1012

010-I-1100

010-I-1000

010-I-1109

010-I-1108

010-I-110

0W

-W -0

0W

-W -0

010-I-1024

010-I-1100

010-I-1109

010-I-1108

VHVH

SECTION

NO.10

010-I-1113

REMOVE EXISTING ELECTRIC

HEATING COIL FROM AHU.

SEE NOTE 3. TYPICAL OF 7

THIS SHEET.

AHU-10-10-1

AHU-10-10-2

AHU-10-10-3

AHU-10-10-4

AHU-10-11-3

AHU-10-11-1

AHU-10-11-2

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

LADDERS FOR DECK ACCESS

LOCATED IN CORRIDOR.

EXISTING CHILLED

WATER PIPING TO

UNIT CHW COIL TO

REMAIN. TYPICAL OF

7 THIS SHEET.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED

IN CORRIDOR.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

LADDER FOR DECK ACCESS

LOCATED IN CORRIDOR.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:57:20 PM

MD-106

HWS

H

VA

C D

EM

O

LI

TI

O N

P

LA

N

SE

C

TI

O

N S

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"MD-101

1 HVAC DEMOLITION PLAN - SECTIONS 10 AND 11

NOTES:

1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.

2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM

AS-BUILT DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM

THE AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL

SIZES, LOCATIONS, AND ELEVATIONS OF EXISTING MECHANICAL

EQUIPMENT AND PIPING.

3. REMOVE THE EXISTING ELECTRIC HEATING COILS FROM AIR HANDLING

UNITS AS SHOWN. PREPARE UNIT FOR INSTALLATION OF NEW HOT

WATER HEATING COIL.

4. REMOVE EXISTING ELECTRIC CIRCUITRY FROM EACH ELECTRIC

HEATING COIL. CIRCUITRY SHALL BE DEMOLISHED BACK TO THE

PANEL. CIRCUITRY INCLUDES CONDUIT AND WIRING. SEE

ELECTRICAL PLANS FOR PANEL LOCATIONS.

5. EXISTING AIR HANDLING UNITS ARE LOCATED ON A DECK ABOVE

THE CEILINGS. ACCESS TO THE DECK IS BY LADDERS AS SHOWN.

6. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING

PIPE INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION,

INSULATION IS FOUND WHICH IS SUSPECTED OF CONTAINING

ASBESTOS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

SCALE: 3/32" = 1'-0"

0 8'-0" 16'-0" 32'-0"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

CO CABINET UNIT HEATER:

OG #: 922U12000UWD1-D1R1

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C15275

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14981

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N:K93C16122

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C14915

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C15593

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C15572

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N:K93C15622

TRANE AHU:

MODEL:MCCA017GAE0AAA000E0E

S/N: K93C15306

1" domestic water line with heat tape

4" pipes pipes

3'x2'x3' expansion loop (typ.)

21_

2" pipes

21_ 2" pipes

11_ 2" pipes

3" pipes

21_ 2" pipes

21_ 2" pipes

3" pipes

3'x2'x3' expansion loop (typ.)

11_ 2" pipes

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

C

C C

H

C

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

POLE

POWER

2 H

IG

H C

LO

SE

D O

H

2 H

IG

H C

LO

SE

D O

H

2 H

IG

H C

LO

SE

D O

H

HIGHCLOSED

OH

SH

O

R T

W

AL

L

FL

AP

H

IG

H

2 H

IG

H

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

HIGHCLOSED

OH

CLOSED

OH

Short Short

Sh or t Sh or t

Sh or t Sh or t

Sh or t

Sh or t

RAISE

THESE3

TABLETOPSTO ONE

HIGH

W

AL

L C

H

AN

G

ED

W

AL

L M

O

VE

D E

AS

T

O N

E

PA

N

EL

WALLS & CUBICLES

REMOVED

42" DOOR

INSTALLED

C O

U C

H

Sh or t Sh or t

Sh or t

NEW WALL

PANEL

W O

O D

EN

WOODEN

FURNITURE

C

AB

IN

ET

C H

AN

G

E

TO

SH

O

R T

W

AL

LS

COUCH

WOOD

FURNITURE

WOOD

FURNITURE

High HighHigh

Sh or t Sh or t

Short Short

WOODEN

FURNITUREMOVED

HEREBY

NAVY

TABLE

TOP

RELOCATED

FURNITURE

TEKNION

RELOCATED

FURNITURE

TEKNION

HIGH

INSTALL

SHORT

WALLS

NEW

DOOR

WAY

NEW

DOOR

WAY

High

High

EWC

EWC

12021203

1308130913101311 1307

1211 1212

1314 1315

13171312

1322 1321 1320

13261325

1215 1216 1217 1218 1219

010E-E-030 010E-E-031

010E-E-032

010E-E-033

10W-E-040

010-I-1112

0-I-1106

010-I-1105

010-I-1100A

010-I-1111

010-I-1100B

010-I-1101

010-I-1110

0W

-W -0

0W

-W -0

010-I-1215

010-I-1111

010-I-1100B

010-I-1101

010-I-1110

EXIST. ELEC.

PANEL

EXIST. ELEC.

PANEL

EXIST. ELEC.

PANEL

VH

S SS

REMOVE EXISTING ELECTRIC

HEATING COIL FROM AHU.

SEE NOTE 3. TYPICAL OF 8

THIS SHEET.

AHU-10-12-1

AHU-10-12-2

AHU-10-12-3

AHU-10-12-4

AHU-10-13-3

AHU-10-13-4

AHU-10-13-1

AHU-10-13-2

EXISTING CHILLED WATER

PIPING TO UNIT CHW COIL

TO REMAIN. TYPICAL OF 8

THIS SHEET.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

EXISTING CHILLED

WATER PIPING TO

REMAIN.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDERS FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

LADDER FOR DECK

ACCESS LOCATED IN

CORRIDOR.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 3:57:29 PM

MD-107

HWS

H

VA

C D

EM

O

LI

TI

O N

P

LA

N

SE

C

TI

O

N S

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"MD-101

1 HVAC DEMOLITION PLAN - SECTIONS 12 AND 13

NOTES:

1. FOR GENERAL HVAC NOTES AND LEGEND, SEE SHEET G-002.

2. EXISTING PLANS ARE BASED ON AS-BUILT DRAWINGS. PIPE SIZES,

PIPE LOCATIONS, AND EQUIPMENT ELEVATIONS ARE TAKEN FROM

AS-BUILT DRAWINGS. PIPING ELEVATIONS ARE ESTIMATED FROM

THE AS-BUILT DRAWINGS. CONTRACTOR SHALL VERIFY THE ACTUAL

SIZES, LOCATIONS, AND ELEVATIONS OF EXISTING MECHANICAL

EQUIPMENT AND PIPING.

3. REMOVE THE EXISTING ELECTRIC HEATING COILS FROM AIR HANDLING

UNITS AS SHOWN. PREPARE UNIT FOR INSTALLATION OF NEW HOT

WATER HEATING COIL.

4. REMOVE EXISTING ELECTRIC CIRCUITRY FROM EACH ELECTRIC

HEATING COIL. CIRCUITRY SHALL BE DEMOLISHED BACK TO THE

PANEL. CIRCUITRY INCLUDES CONDUIT AND WIRING. SEE

ELECTRICAL PLANS FOR PANEL LOCATIONS.

5. EXISTING AIR HANDLING UNITS ARE LOCATED ON A DECK ABOVE

THE CEILINGS. ACCESS TO THE DECK IS BY LADDERS AS SHOWN.

6. BASED ON INFORMATION PROVIDED BY THE INSTALLATION, EXISTING

PIPE INSULATION CONTAINS NO ASBESTOS. IF DURING DEMOLITION,

INSULATION IS FOUND WHICH IS SUSPECTED OF CONTAINING

ASBESTOS, CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER IMMEDIATELY.

SCALE: 3/32" = 1'-0"

0 8'-0" 16'-0" 32'-0"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

W

2Q R

B0

2_

PL

AN

S-

VH

REMOVE EXISTING

EQUIPMENT PAD.

REMOVE EXISTING

CONCRETE PEDESTAL.

REMOVE EXISTING

CONCRETE PEDESTAL.

REMOVE EXISTING

CONCRETE PEDESTAL.

REMOVE EXISTING

CONCRETE PEDESTAL.

REMOVE EXISTING

STEAM PIPING

REMOVE EXISTING

CONDENSATE PIPING

REMOVE EXISTING

CONDENSATE TANK

AND PUMP

REMOVE EXISTING

CONDENSATE PIPING

PATCH WALL WHERE

PIPING IS REMOVED

PATCH WALL WHERE

PIPING IS REMOVED

EXISTING VENT PIPING

THRU ROOF ABANDONED

IN PLACE WHEN BOILERS WERE

REMOVED. CAP VENT PIPING

ABOVE ROOF. TYPICAL OF 2.

ONE PIPE IS 6", ONE PIPE IS 4".

VERIFY PIPE SIZES IN FIELD.

EXISTING VENT PIPING

THRU ROOF ABANDONED

IN PLACE WHEN BOILERS WERE

REMOVED. CAP VENT PIPING

ABOVE ROOF. TYPICAL OF 2.

ONE PIPE IS 6", ONE PIPE IS 4".

VERIFY PIPE SIZES IN FIELD.REPAINT

WALLS.

SEE NOTE 4.

REPAINT WALLS.

SEE NOTE 4.

REPAINT WALLS.

SEE NOTE 4.

REPAINT WALLS.

SEE NOTE 4.

REPAINT WALLS.

SEE NOTE 4.

EXISTING 4" SAN.

WASTE.

SEE NOTE 5.

REMOVE EXISTING

FLOOR DRAIN. SEE

NOTE 5.

REMOVE EXISTING

FLOOR DRAIN. SEE

NOTE 5.

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 4:03:41 PM

MD-401

HWS

EN

LA

R G

ED

M

EC

H

AN

IC

AL

R

O O

M D

EM

O

LI

TI

O N

AN

D

R

EN

O

VA

TI

O

N P

LA

N

KE

R

R Y

PR

AT

H

ER

KE

R

R Y

PR

AT

H

ER

ER

IC

D

AV

IS

1/2" = 1'-0"MD-105

1 ENLARGED MECHANICAL ROOM DEMOLITION AND RENOVATION PLAN

6. REMOVE THE EXISTING LIGHTS IN THE MECHANICAL ROOM. INSTALL NEW

LIGHTS IN MECHANICAL ROOM. SEE MECHANICAL ROOM LIGHTING PLAN,

SHEET E-402.

7. REPLACE EXISTING ELECTRICAL RECEPTACLES.

8. PIPE INSULATION IN MECHANICAL ROOM CONTAINS NO ASBESTOS.

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

NOTES:

1. REMOVE EXISTING STEAM AND CONDENSATE PIPING AND EQUIPMENT AS

SHOWN ON THIS PLAN AND SHEET MD-101. PIPING AND EQUIPMENT MAY BE

REMOVED PRIOR TO LEAD ABATEMENT.

2. REMOVE EXISTING CONCRETE BOILER PEDESTALS AND EXISTING EQUIPMENT

PADS AS SHOWN.

3. CLEAN EXISTING FLOOR. APPLY SEALANT TO CONCRETE FLOOR.

4. REMOVE EXISTING LOOSE PAINT FROM WALLS AND ROOF INSIDE THE

MECHANICAL ROOM. EXISTING PAINT ON WALLS AND ROOF CONTAINS LEAD.

EXISTING PAINT SHALL BE REMOVED AS SPECIFIED IN SECTION 02 83 00 LEAD

REMEDIATION. CLEAN WALLS AND ROOF. PREPARE WALLS AND ROOF FOR

NEW PAINT. PAINT WALLS AND ROOF. PAINT COLOR: WHITE. LEAD ABATEMENT

SHALL BE PERFORMED BEFORE ANY RENOVATION WORK IN THE MECHANICAL

ROOM.

5. LOCATIONS OF EXISTING FLOOR DRAINS AND EXISTING WASTE PIPING

ARE BASED ON AS-BUILT INFORMATION. REMOVE EXISTING FLOOR DRAINS

AS SHOWN. CONTRACTOR SHALL DETERMINE THE ACTUAL LOCATION OF

EXISTING SANITARY PIPING. CONTRACTOR SHALL ENSURE EXISTING

SANITARY PIPING IS CLEAR TO ALLOW DRAINAGE TO THE MAIN WASTE LINE

IN THE BUILDING. EXISTING SANITARY PIPING IN MECHANICAL ROOM SHALL

BE FLUSHED AND PREPARED FOR INSTALLATION OF NEW FLOOR DRAINS

AND NEW WASTE PIPING. NEW FLOOR DRAINS AND NEW WASTE PIPING

SHALL BE INSTALLED AS SHOWN ON SHEET M-407. REPAIR FLOOR AT

LOCATIONS WHERE EXISTING FLOOR DRAINS AND PIPING ARE REMOVED,

AND WHERE NEW FLOOR DRAINS AND PIPING ARE INSTALLED. CLEAN AND

SEAL THE FLOOR AS NOTED ABOVE.

W

2Q R

B0

2_

PL

AN

S-

100 200

(DOWN)

RAMP

SECTION

NO.1

CAGE

CAGE

R

AC

KS

R

AC

KS

R

AC

KS

VH

OFFICE

LOADING

CAGE

CAGE

CAGE

RESTROOM

COVERED

DOCK

EL.

VAULT

PR

IN

TE

R

W O

R K

BE

N

C H

FRIDGEMICROWAVE&

COFFEE

TABLE

W/

TABLE

W/

TA

BL

E

DESK

#2

DESK

#1

DESK

#3

COMM

UH-1

1" HWR

UH-1

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWR

1" HWR

1" HWS

UH-1

1 1/4" HWS

1 1/4" HWR

UH-1

1" HWS

1" HWR

UH-1

1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

1" HWR

1" HWS

UH-1

1 1/4" HWR

1 1/4" HWS

UH-1

1" HWR 1" HWS

UH-1

1" HWR

1" HWS

1 1/4" HWR 1 1/4" HWS

2" HWS 2" HWR 1" HWS 1" HWR

UH-1

1" HWR

1" HWS

UH-1

2" HWS 2" HWR

UH-1

1" HWS

1" HWR

UH-1

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWR

2" HWS

UH-2

UH-2

1/2" HWS

1/2" HWS

1/2" HWR

3/4" HWS

3/4" HWR

UH-1

1" HWS

1" HWR

1" HWS

1" HWR

2 1/2" HWR

2 1/2" HWS

1" HWS

2" HWR

1/2" HWR

A A A

EXPANSION LOOP,

BOTH PIPES.

3'-0" x 2'-0" x 3'-0"

EXPANSION LOOP,

BOTH PIPES.

4'-0" x 2'-0" x 4'-0"

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PIPE

ANCHOR

(TYPICAL)

PIPE LOOPS

AROUND STRUCTURAL

BEAM (TYPICAL).

A

A

A

A

A

A A

A

A

(UH-1-4)

(UH-1-1)

(UH-1-2)

(UH-1-3)

(UH-1-6)

(UH-1-5)

(UH-2-1)

(UH-2-2)

(UH-2-3)

(UH-2-5)

(UH-2-4)

(UH-2-1)

(UH-2-1)

(UH-3-1)

(UH-3-2)

T T

T T T T

TT

(1-2,1-3) (1-6)

(1-1) (1-4,1-5)

(2-1,2-2)

(2-3)

(2-5)

(2-4)

T

T

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 4:01:47 PM

M-102

HWS

H

VA

C P

LA

N

H

EA

TI

N G

H O

T W

AT

ER

S

YS

TE

M

SE

C

TI

O N

S

AN

D

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"M-101

1 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 1 AND 2

NOTES:

1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.

2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.

3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.

4. PIPING SHALL BE INSULATED AS SPECIFIED.

5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT

DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE

EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER

PIPING AND HOT WATER COILS.

6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR

ELEVATION TO THE REMOVED STEAM UNIT HEATERS.

7. INSTALL FIRESTOPPING AT ALL PIPING PENETRATIONS IN

WALLS AS SPECIFIED. WALLS ARE 3 HOUR RATED FIRE

WALLS.

8. UNIT HEATERS ARE SHOWN WITH TWO DESIGNATIONS. THE

UH-X DESIGNATION DENOTES THE TYPE, SIZE, AND CAPACITY

OF THE UNIT HEATERS AS SHOWN IN THE HOT WATER UNIT

HEATER SCHEDULE ON SHEET M-601. THE DESIGNATION

SHOWN IN PARENTHESES (UH-X-X) DENOTES THE UNIQUE

IDENTIFIER FOR EACH UNIT HEATER.

SCALE: 3/32" = 1'-0"

0 8'-0" 16'-0" 32'-0"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

1 1

W

2Q R

B0

2_

PL

AN

S-

GE

VH

6,00 SF

2 1/2" HWS

2 1/2" HWR

UH-1 UH-1

1" HWR

1" HWS

1" HWS

1" HWR

1 1/4" HWS 1 1/4" HWR

1 1/4" HWS 1 1/4" HWR

1" HWS

UH-1

1" HWR

1 1/4" HWS 1 1/4" HWR

UH-1

UH-1

1" HWS

1" HWR

1" HWR

3" HWS

3" HWR

UH-1

1" HWR

1" HWS

UH-1

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWS 1 1/4" HWR

UH-1

1" HWR

1" HWS

1 1/4" HWS 1 1/4" HWR

1" HWR 1" HWR

1" HWS1" HWS

UH-1 UH-1

3" HWR

UH-1

1" HWS

1" HWR

1 1/4" HWS

1 1/4" HWR

UH-1

1" HWS

1" HWR

1/2" HWR

1/2" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3" HWS

1" HWS

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

EXPANSION LOOP,

BOTH PIPES.

4'-0" x 2'-0" x 4'-0"

A A A

EXPANSION LOOP,

BOTH PIPES.

4'-6" x 2'-6" x 4'-6"

1 1/4" HWR

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PIPE

ANCHOR

(TYPICAL)

PIPE LOOPS

AROUND STRUCTURAL

BEAM (TYPICAL).

A

A

A

A

A

A A

A

A

(UH-3-1)

(UH-3-2)

(UH-3-3)

(UH-3-4)

(UH-3-5)

(UH-4-1)

(UH-4-2)

(UH-4-3)

(UH-4-4)

(UH-4-5)

(UH-5-1)

(UH-5-2)

T T

T T (3-2) (3-5)

(3-1) (3-3)

T (3-4)

T T

T T (4-2) (4-5)

(4-1) (4-3)

T (4-4)

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 4:01:48 PM

M-103

HWS

H

VA

C P

LA

N

H

EA

TI

N G

H O

T W

AT

ER

S

YS

TE

M

PL

AN

, S

EC

TI

O

N S

AN

D

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"M-101

2 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 3 AND 4

NOTES:

1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.

2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.

3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.

4. PIPING SHALL BE INSULATED AS SPECIFIED.

5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT

DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE

EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER

PIPING AND HOT WATER COILS.

6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR

ELEVATION TO THE REMOVED STEAM UNIT HEATERS.

7. INSTALL FIRESTOPPING AT ALL PIPING PENETRATIONS IN

WALLS AS SPECIFIED. WALLS ARE 3 HOUR RATED FIRE

WALLS.

8. UNIT HEATERS ARE SHOWN WITH TWO DESIGNATIONS. THE

UH-X DESIGNATION DENOTES THE TYPE, SIZE, AND CAPACITY

OF THE UNIT HEATERS AS SHOWN IN THE HOT WATER UNIT

HEATER SCHEDULE ON SHEET M-601. THE DESIGNATION

SHOWN IN PARENTHESES (UH-X-X) DENOTES THE UNIQUE

IDENTIFIER FOR EACH UNIT HEATER.

SCALE: 3/32" = 1'-0"

0 8'-0" 16'-0" 32'-0"

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AM

D T.

M

IS

C

. C H

AN

G

E S

-2 2-

1 1

1 1

W

2Q R

B0

2_

PL

AN

S-

FRIDGE

ELECTRICAL

PANEL

LOADING

VH

CAGECAGE

UH-2

UH-2

SEE SHEET M-401 FOR ENLARGED

MECHANICAL ROOM PLAN

UH-1

1" HWS

1" HWR

UH-1

1" HWS

1" HWR

1 1/4" HWR 1 1/4" HWS

UH-1

1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

3" HWR

1/2" HWR

1/2" HWR

1/2" HWS

3/4" HWR

UH-1

UH-1

1" HWS

1" HWR

1" HWS

1" HWR

1 1/4" HWS 1 1/4" HWR

UH-1

1" HWS

1" HWR

1 1/4" HWS 1 1/4" HWR

4" HWR

4" HWS

UH-1

1" HWS

1" HWRUH-1

1" HWR1" HWS

4" HWS

4" HWR

6" HWR 6" HWS

UH-1

1" HWS

1" HWR

3" HWS

UH-1

1" HWS

1" HWR

UH-1

1" HWS

1" HWR

UH-1

1" HWS

1" HWR

4" HWR

4" HWS

1/2" HWS

3/4" HWS

A A

EXPANSION LOOP,

BOTH PIPES.

4'-6" x 2'-6" x 4'-6"

PIPE

ANCHOR

(TYPICAL)

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

1 1/4" HWS

1 1/4" HWR

1 1/4" HWR

1 1/4" HWS

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

EXPANSION LOOP,

BOTH PIPES.

5'-0" x 2'-6" x 5'-0"

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PROVIDE FIRESTOPPING

AT PIPE PENETRATIONS

THRU WALLS (TYPICAL).

SEE NOTE 7.

PIPE LOOPS

AROUND STRUCTURAL

BEAM (TYPICAL).

A

A

A

A

A

A A

A

A

A

(UH-5-1)

(UH-5-4)

(UH-5-3)

(UH-5-5)

(UH-5-2)

(UH-6-1)

(UH-6-2)

(UH-6-3)

(UH-6-4)

(UH-6-5)

(UH-6-6)

(UH-6-7)

T T

T T (5-2) (5-5)

(5-1) (5-3)

T (5-4)

T T (6-2) (6-5)

T (6-3,6-4)

T (6-1)

T

T

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

SO

LI

C

IT

AT

IO

N N

O

D R

AW

IN

G C

O D

E:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

AP

PR

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

/2 8/

TB

D

TB

D

W

2Q R

B0

KE

R

R Y

PR

AT

H

ER

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R . M

AR

TI

N L

U

TH

ER

K

IN

G

J R

. P

LA

C E

LO

U

IS

VI

LL

E, K Y

CERTIFIED FINAL

N O

D

SC

C , C

O

LU

M

BU

S, O

H

IO

D

SC

C B

U

IL

D

IN

G

D

EC

EN

TR

AL

IZ

E

BO

IL

ER

FY

2, P

11/22/2021 4:01:50 PM

M-104

HWS

H

VA

C P

LA

N

H

EA

TI

N G

H O

T W

AT

ER

S

YS

TE

M

PL

AN

, S

EC

TI

O

N S

AN

D

ER

IC

D

AV

IS

ER

IC

D

AV

IS

KE

R

R Y

PR

AT

H

ER

3/32" = 1'-0"M-101

3 HVAC PLAN - HEATING HOT WATER SYSTEM PLAN, SECTIONS 5 AND 6

NOTES:

1. FOR HVAC GENERAL NOTES AND LEGEND, SEE SHEET G-002.

2. FOR MECHANICAL EQUIPMENT SCHEDULES, SEE SHEET M-601.

3. FOR MECHANICAL DETAILS, SEE SHEETS M-501 AND M-502.

4. PIPING SHALL BE INSULATED AS SPECIFIED.

5. EQUIPMENT LOCATIONS ARE TAKEN FROM AS-BUILT

DRAWINGS. VERIFY THE ACTUAL LOCATIONS OF THE

EQUIPMENT PRIOR TO INSTALLATION OF NEW HOT WATER

PIPING AND HOT WATER COILS.

6. NEW UNIT HEATERS SHALL BE INSTALLED AT A SIMILAR

ELEVATION TO THE REMOVED STEAM UNIT HEATERS.

7. INSTALL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .