WPAFB AFMC PH-1 Industry Day Powerpoint.pdf

PDF 4 MB Posted

Attached to
Industry Day; Renovation of WPAFB Air Force Materiel Command Headquarters; Phase 1
Solicitation number
W912QR-22-AFMCHQ_Industry_Day
Issued by

About this file

This document provides details for an industry day and upcoming federal contract opportunity to renovate Air Force Materiel Command headquarters buildings at Wright Patterson Air Force Base. The Air Force Materiel Command will release a solicitation in Q1 of fiscal year 2023 for Phase 1 of the renovation, with an estimated value between $100-250 million. This phase will include interior and exterior work as well as mechanical, electrical, and plumbing system replacements. The industry day will be held on September 7th, 2022 at a hotel in Dayton, Ohio, where contractors can learn more about the project and have the opportunity to ask questions. The completed solicitation will be posted on SAM.gov, and contractors must register in SAM to download bid documents and any amendments. The best value source selection method will be used to evaluate past performance, technical merit, small business participation plans, and pricing.

View the file

Other files

File Type Posted
WPAFB AFMC PH-1 Sign-In Sheet.pdf PDF
Pre-Registration Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDUSTRY DAY

AFMC HEADQUARTERS RENOVATION

April Judd – Contracting Officer Blake Gevedon – Senior Contract Specialist

Steve Skaggs – Design Manager Dale Polston – Project Manager

AFMC LOCATION

File Name

10266 10262

AFMC HQ

- Agenda

- AFMC HQ Renovation

- Procurement Process

- Questions

Bldg 10262 – 541,000 SF

Purpose of Renovation: Replace site utility services, address water intrusion, modernize the facility, and optimize the current space.

Portions of the building will be occupied during renovation.

Phases of Renovation:

Phase 1 – FY23. Exterior work & interior renovation of parts of all three floors.

Phase 2 – ~FY26. Continued renovation of parts of all three floors.

Phase 3 – ~FY28. Finish renovations to remaining floors and provide new roof.

AFMC HQ RENOVATION

One AFMC… Powering the World’s Greatest Air ForceControlled Unclassified Information (CUI) Briefer: Jacobs Engineering Group Inc.

AFMC RENOVATION | BASEMENT

N

B10262

Phase 1 Work Area

Phase 2 Work Area

Phase 3 Work Area

Phase 1 Work Area

Phase 2 Work Area

Phase 3 Work Area

AFMC RENOVATION | 1ST FLOOR

N

B10262

B10264 B10263

B10271

AFMC RENOVATION | 2ND FLOOR

N

B10262

Phase 1 Work Area

Phase 2 Work Area

Phase 3 Work Area

Phase 1 Work Area

Phase 2 Work Area

Phase 3 Work Area

AFMC RENOVATION | ROOF

N

B10266 B10262

Phase 1 advertisement is planned for Q1.

Tentative Schedule:

Post solicitation – 01 November Pre-Proposal Site Visit – 15 (16, 17) November Proposals due – 27 December

Phase 1 of Renovation (some features of work):

Civil - Waterproofing the building perimeter, sidewalks, van-accessible ABA parking spots, pavement for improved traffic circulation around the building, truck delivery dock with new concrete pavement, utilities, and landscaping.

Structural - Construction of a new vestibule, rooftop elevator penthouse, and egress stairs. Mechanical equipment and associated wall penetrations, floor openings for vertical HVAC and plumbing services.

Interior Design - Improvements in phase 1 are limited to the second-floor area on the east side of the building, commonly referred to as the bump-out area.

Phase 1 of Renovation (some features of work):

Mechanical / Electrical – HVAC system, chillers, electrical service entrance, generators, and lightning protection system.

Life Safety - New fire alarm and mass notification (FAMNS) system. New fire suppression water supply service and new fire pump assembly.

AFMC Renovation Phase 1 | Site Work Utility upgrade and relocation

Entrapment area

Pavement/ Parking

Waterproofing

B10277 Demolition

Temporary Gate Access and Laydown area

N

Storm Drainage

Electrical Relocate

Chilled WaterSanitary Sewer

Natural Gas

Domestic Water

Electrical Upgrade

New dumpster location

AFMC RENOVATION PHASE 1 | BASEMENT

N

B10262

Interior Work Area

Temporary Work Areas Above ceiling work

Interior Work Area

Temporary Work Areas

AFMC RENOVATION PHASE 1 | 1ST FLOOR

N

B10262

B10264 B10263

B10271

Temporary Wall construction (3’ buffer)

Above ceiling work

AFMC RENOVATION PHASE 1 | 2ND FLOOR

N

B10262

Interior Work Area

Temporary Work Areas

Roof Replacement

HVAC Replacement

Lightning Protection

AFMC RENOVATION PHASE 1 | ROOF

N

B10266 B10262

PROCUREMENT PROCESS

April Judd – Contracting Officer Louisville District

Office Phone: 502-315-7403 Email: April.C.Judd@usace.army.mil

Blake Gevedon – Senior Contract Specialist Louisville District

Office Phone: 502-315-6791 Email: William.b.gevedon@usace.army.mil

HOW TO OBTAIN THE SOLICITATION

• System for Award Management (SAM) – https://sam.gov/

• Solicitation Number W912QR22R0028

• View interested vendors list and register as an interested vendor.

• Register to receive notifications and updates / amendments.

• RFP technical information will be posted on the SAM website at:

https://sam.gov/.

https://sam.gov/ https://sam.gov/

OBTAINING THE ISSUE DOCUMENTS

• Requirements to download Technical Data Package:

1) Need to be registered in System for Award Management (SAM)

2) Need to be registered in SAM

• Any amendments issued to the RFP will also be posted on SAM.

• Pre-Solicitation Notice – will be posted to SAM at least 15 days prior to the initial issuance of the Solicitation package.

• Advertisement – minimum 30 days to prepare proposals.

THE PROCUREMENT PROCESS

• This project will be Design-Bid-Build (D-B-B) Request for Proposal

(RFP).

• Project award will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.

• Proposals must be submitted on time.

* The Louisville District is in the Eastern time zone.

• The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposal based on specific factors which are defined in the RFP Package.

PROPOSAL REQUIREMENTS

• Source Selection Criteria for an Unrestricted “Best Value Trade-off” usually consists of four elements:

1) Past Performance Evaluation

2) Technical Evaluation (i.e. Management Plan, Schedule, etc.)

3) Small Business Participation Plan

4) Pro-Forma Evaluation (Price, JV agreements, Bonding, etc.)

• Submit your best proposal the 1st time. If we receive an initial proposal that is awardable, discussions may not be opened.

PROPOSAL REQUIREMENTS (cont.)

• Assuming an Unrestricted procurement, each offeror is to submit a Small Business Participation Plan

• This is an evaluated element in your proposal (Reference Section 00 22 12 in the RFP).

• Must be submitted by both Large AND Small business offerors.

• The Small Business Participation Plan is based on Total Contract Value

• Large Business offerors MUST also submit a Small Business Subcontracting Plan.

• Although this is not a rated element as a part of the Source Selection process, it is a condition of award.

• Subcontracting Plans are required for Construction Contracts greater than $1.5M and $700K for all other Contracts

• Pro Forma Evaluation (Price, JV agreements, Bonding, etc.)

• Louisville District only recognizes formal joint venture agreements.

• No Teaming Arrangements or Partnering

• Joint Ventures Agreement must be approved prior to proposal submission (Exception:

8(a) Program Participants)

• Agreements are reviewed by Office of Counsel

• 8(a) Program Participants

• Joint Venture Agreement does not have to be approved prior to proposal submission

• SBA usually does not approve until notified as the apparent success

• Instructions for submitting a Request for Information (RFI) will be included in the Solicitation.

• RFIs for this project will be received and answered through the ProjNet system

• Any RFIs submitted directly to the project team will not receive a response, and will be directed to the ProjNet system.

• The project will have a Projnet Bidder’s Key, which is used to post your Bidder Inquiries in ProjNet.

ADDITIONAL OPPORTUNITIES

• Contracting opportunities are posted in the System for Award Management (SAM) website at https://sam.gov/. Use “W912QR” to search for Louisville District projects.

• Actively Respond to Sources Sought Notices (Market Surveys) posted to SAM

• Actively Respond to Competitive Requirements posted to SAM (limited number of sole source opportunities)

• Review Agency Forecast maintained on the Small Business page of LRL website, www.lrl.usace.army.mil

To view all Louisville District prime contract holders, please visit https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/ https://sam.gov/ http://www.lrl.usace.army.mil/ https://www.lrl.usace.army.mil/Business-With-Us/Small-Business/

QUESTIONS?

INDUSTRY DAY�AFMC HEADQUARTERS RENOVATION�
AFMC Location
AFMC HQ
�
AFMC Renovation | Basement
AFMC Renovation | 1st Floor
AFMC Renovation | 2nd Floor
AFMC Renovation | Roof
�
�
�
AFMC Renovation Phase 1 | Site Work
AFMC Renovation Phase 1 | Basement
AFMC Renovation Phase 1 | 1st Floor
AFMC Renovation Phase 1 | 2nd Floor
AFMC Renovation Phase 1 | Roof
PROCUREMENT PROCESS
HOW TO OBTAIN THE SOLICITATION�
OBTAINING THE ISSUE DOCUMENTS�
THE PROCUREMENT PROCESS�
PROPOSAL REQUIREMENTS�
PROPOSAL REQUIREMENTS (cont.)�
PROPOSAL REQUIREMENTS (cont.)�
PROPOSAL REQUIREMENTS (cont.)
PROPOSAL REQUIREMENTS (cont.)�
Additional Opportunities
Questions?