This advance notice describes an upcoming invitation for bid for facility renovation services. The U.S. Army Corps of Engineers Louisville District will solicit bids for interior renovation work at Building 33 at Wright Patterson Air Force Base in Ohio. Renovations will upgrade HVAC, MEP, and interior spaces in approximately 38,700 square feet of lab and administrative areas. Work includes HVAC, electrical, and plumbing repairs, architectural demolition and interior repairs, fire protection modernization, and hazardous material abatement. An option for communications work such as cabling, outlets, and equipment is also included. The firm-fixed-price contract will be full and open competition with bids evaluated based on lowest price. The project value is estimated between $1,000,000 to $5,000,000. The solicitation is expected to release on May 26, 2021 on SAM.gov. The point of contact is provided for any questions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR21B0007 for B33 Renovation of Lab/Admin Phase 2 project is hereby amended as follow s:
1. Bid due date has now been extended to 2 July 2021 at 10:00 AM Eastern Time.
2. See attached Summary of Changes AMDT 0001.
3. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21B0007
X 9B. DATED (SEE ITEM 11)
28-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE
DATE
21-Jun-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR21B0007-0001
W912QR21B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
Renovate Bldg. 20033 Phase 2
WPAFB, OH
W912QR21B0007
Amendment 0001
SUMMARY OF CHANGES
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
TABLE OF CONTENTS
REGISTER
08 71 00 DOOR HARDWARE
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
2. The following SPECIFICATION SECTIONS have been added in their entirety:
04 20 00 MASONRY
PLANS:
3. The following PLAN SHEETS have been revised and replaced in their entirety:
A-001 ARCHITECTURAL ABBREVIATIONS AND GENERAL NOTES
A-114 ROOF PLAN
A-601 DOORS SCHEDULE AND DETAILS
4. The following PLAN SHEETS have been added new:
I-601 FINISH SCHEDULES
I-602 FINISH SCHEDULES
I-603 SIGNAGE SCHEDULE AND DETAILS
5. All other terms and conditions remain unchanged.
W912QR21B0007
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 29-Jun-2021 10:00 AM to 02-Jul-2021 10:00 AM.
(End of Summary of Changes)
Building 33 Renovation Phase 2 P2# 479879 Wright-Patterson AFB, Ohio ZHTV 180028
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 35 43 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 BUILDING INSULATION
07 51 13 BUILT-UP ASPHALT ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
PROJECT TABLE OF CONTENTS Page 1
AMENDMENT 0001
W912QR21B0007-0001
JOE.BRINK
Text Box *****************************************************************Amendment 0001
JOE.BRINK
Text Box Amendment 0001*****************************************************************
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
PROJECT TABLE OF CONTENTS Page 2
AMENDMENT 0001
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 52 PAGES
Repair/Construct B33 WPAFB, OH
00 80 00.00 06 SD-01 Preconstruction Submittals
1.28 GLabor, Equipment, and Material
Report
1.28 GDaily Equipment Report
1.37 GRadioactive Material/Equipment
SD-02 Shop Drawings
1.41 GMechanical/Electrical Room
Layout SD-04 Samples
1.16 GEquipment Warranty
Identification Tags
SD-05 Design Data 1.12SF1413 Statement and
Acknowledgement 1.14Local Agency Check 1.45Progress Photographs
SD-07 Certificates 1.16Warranty of Construction
1.15 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.32Insurance 1.30Sales and Use Tax
SD-11 Closeout Submittals
1.7.4 GPreliminary (Working) As-Built
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W912QR21B0007-0001
JOE.BRINK
Amendment 0001************************************************************************************************************
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 52 PAGES
00 80 00.00 06 1.7.1 GFinal As-Built Drawings
1.7.1.2 GCAD Working As-Built Drawings
1.7.3 GContour Map
1.9.1Equipment-in-Place List 1.9.1Maintenance and Parts Data
1.16 GWarranty Management Plan
01 11 00 SD-01 Preconstruction Submittals 1.7.1Utility Outage Requests 1.7.1Utility Connection Requests
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4 GProject Schedule
GProject Scheduler Qualifications SD-05 Design Data
3.5.2Narrative Report 3.5.4Schedule Reports
3.4.4 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
3.1 G ROSubmittal register
01 35 26.00 06 SD-01 Preconstruction Submittals 1.7Accident Prevention Plan (APP) 1.7Fatigue Management Plan 1.7Bloodborne Pathogen Plan 1.7Exposure Control Plan 1.7Site Layout Plan 1.7Hearing Conservation Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 52 PAGES
01 35 26.00 06 1.7Respiratory Protection Plan 1.7Health Hazard Control Program 1.7Hazard Communication Program 1.7Asbestos Abatement Plan &
Specifications 1.7Heat Stress Monitoring Plan 1.7Cold Stress Monitoring Plan 1.7Indoor Air Quality Management
Plan 1.7Mold Remediation Plan 1.7Crystalline Silica Assessment 1.7Fire Prevention Plan 1.7Hazardous Energy Control Plan 1.7Standard Pre-Lift Plan (LHE) 1.7Critical Lift Plan - LHE 1.7Fall Protection and Prevention
Plan 1.7Demolition/Renovation Plan (to include engineering survey) 1.7Masonry Bracing Plan 1.7Confined Space Entry
Procedures 1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 52 PAGES
01 35 26.00 06 1.12.7 G ROProof of qualification for Crane Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports 1.12.1Accident Reports 1.12.3Monthly Exposure Reports 1.12.5Crane Reports 1.12.4Regulatory Citations and
Violations SD-07 Certificates
1.12.8Confined Space Entry Permit 1.13Hot work permit 1.12.6Crane Certificate of Compliance
01 35 43 SD-01 Preconstruction Submittals 1.4.3Environmental Coordinator
Designation and Application for RCRA Training
3.3.3 GApplication For Authorization -
Environmental Restoration Site Disturbance
3.2.2 GErosion Control Plan
3.2.3 GStorm Water Pollution Prevention
Plan (SWPPP)
3.2.3 GNotice of Intent (NOI) for
Coverage Under NPDES Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 52 PAGES
01 35 43 3.2.4 GSanitary or Wastewater Permit to Install (PTI)
3.2.5 GDrinking Water Plans Approval
3.1.1Ohio EPA Notification of
Demolition and Renovation/Abatement
3.1.2 GAsbestos Work Plan
3.1.10Fuel-Fired Equipment Startup
Information 3.6.2HAZMAT Inventory
3.6.2 GSite Specific Spill Plan
3.7.2WPAFB Worksheet 1433 -
Hazardous Waste Storage Permit
3.8 GPermit Applications for UST Work
SD-06 Test Reports 3.1.4Asbestos Abatement Clearance
Air Sampling Report
3.2.6 GHVAC System Water Analysis
3.5.3Quarterly Recycling and Solid
Waste Summary Report 3.6.5Refrigerant Record
SD-07 Certificates 1.5.2Certification of Recovered and
Biobased Products 3.6.5Section 608 Technician
Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 52 PAGES
01 35 43 3.6.5Refrigerant Recovery Equipment Certification
3.1.9Certificate of Conformity 3.8STI SP001 Inspector's Training
Certification SD-11 Closeout Submittals
1.5.3 FGreen Products Determination
Form (GPDF)
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals 3.1.2Written NDT Practices
SD-06 Test Reports 3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates 2.1AISC Certified Steel Fabricator 2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
01 46 00.00 06 SD-01 Preconstruction Submittals
1.4 G DOCommissioning Specialists
1.4.4 G DOCommissioning Specialists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 52 PAGES
01 46 00.00 06 1.9 G DOProject Schedule SD-05 Design Data
3.1.4 G DODesign Review Report
SD-06 Test Reports
3.1.3 G DOConstruction Phase
Commissioning Plan
3.1.6.3 G DOPre-Functional Checklists
1.7Issues Log 3.1.6.6Trend Log Report 3.8.1Post-Construction Trend Log
Report
3.7 G DOCommissioning Report
3.8 G DOPost-Construction
Commissioning Report
3.8 G DOPost-Construction
Commissioning Report G DOMonthly Monitoring Based
Commissioning Update G DOMonitoring Based Commissioning
Report SD-07 Certificates
1.8 G DOCertificate of Readiness
SD-10 Operation and Maintenance Data
3.2 G DOSystems Training
3.3 G ROTraining Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 52 PAGES
01 46 00.00 06 3.3 G ROTraining Attendance Rosters
3.4 G DOSystems Manual
3.8 G DOPost-Construction Systems
Manual
3.8 G DOPost-Construction Systems
Manual
3.5 G DOMaintenance and Service Life
Plans SD-11 Closeout Submittals
S DOFinal Commissioning Report SFinal Construction Phase
Commissioning Plan 01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance Statements
SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports 2.5Backflow Preventer Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 52 PAGES
01 50 00 SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan SD-06 Test Reports
1.9.2Quarterly Reports Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report 01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.10 GExisting Conditions
SD-07 Certificates 1.2.1Demolition Plan 1.6Notification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 52 PAGES
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications 1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
SD-02 Shop Drawings 1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor
Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.6Reinforcing Fibers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 52 PAGES
03 30 00 2.6.2Mechanical Reinforcing Bar Connectors
2.2.2Waterstops 2.2.3Biodegradable Form Release
Agent 1.6.3.2Pumping Concrete 1.6.3.4Finishing Plan 2.4.2Nonshrink Grout
SD-04 Samples 1.6.5.1Slab Finish Sample 1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates
1.6.4.4 GFiber-Reinforced Concrete
3.9.2.1Tolerance Report
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete 3.13.2.6Chloride Ion Concentration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 52 PAGES
03 30 00 3.13.2.4Air Content 3.13.2.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.8Welder Qualifications 1.6.3.3Silica Fume Manufacturer's
Representative 1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets 1.6.7.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants 2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.3.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 52 PAGES
04 20 00 2.4.1.1 GCementitious Materials SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2.2 GConcrete Masonry Units (CMU)
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.5 GBracing Calculations
SD-07 Certificates 2.2.2.2Concrete Masonry Units (CMU)
Admixtures for Masonry Mortar Admixtures for Grout
2.6.2Anchors, Ties, and Bar Positioners
2.6.3Joint Reinforcement SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.2.2.2.2Recycled Content 05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 52 PAGES
05 12 00 1.4.2 GFabrication Drawings SD-03 Product Data
2.6.2Shop Primer 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts
SD-05 Design Data
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Structural Steel Fabricator
Quality Certification 1.3AISC Structural Steel Erector
Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 52 PAGES
05 12 00 1.4.3.1Welding Procedures and Qualifications
2.4.1Welding Electrodes and Rods 3.7.1.1Certified Welding Inspector 3.7.1.2NDT Technician 3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories 2.1Deck Units 2.1.5Galvanizing Repair Paint 2.2.14Mechanical Fasteners 2.1.5Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.1.1Metal Roof Deck Units
Metal Floor Deck Units 2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 52 PAGES
05 30 00 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.10Stud Manufacture's Certification 2.2.10Stud Manufacture's Test Reports
05 50 13 SD-02 Shop Drawings
2.3 GFloor Gratings
SD-03 Product Data
2.3 GFloor Gratings
FCertificates of Compliance
2.1 FCertified Mill
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 52 PAGES
05 51 00 2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.4 GConcrete Inserts
2.3.5 GMasonry Anchorage Devices
2.2.4 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
2.3.2 GSteel Stairs, Circular
SD-07 Certificates
1.3.1 GWelding Procedures
GWelder Qualification SD-08 Manufacturer’s Instructions
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 52 PAGES
05 51 00 2.2.4 GProtective Coating
2.3.5 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings 2.3Ladders
SD-03 Product Data 2.3Ladders 2.3.1Ladder Safety Devices
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 05 52 00 SD-02 Shop Drawings
1.2.1Fabrication Drawings SD-03 Product Data
2.2.1 GConcrete Inserts
2.1.2 GProtective Coating
2.1.1 GStainless Steel Railings and
Handrails
1.2.1 GAnchorage and Fastening
Systems SD-07 Certificates
1.4.1 GWelding Procedures
SD-08 Manufacturer’s Instructions
3.2Installation Instructions 06 10 00 SD-03 Product Data
1.8Fire-retardant Treatment SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 52 PAGES
06 10 00 1.9.1Certificates of Grade 1.7Preservative Treatment
06 41 16.00 10 SD-02 Shop Drawings
2.10 GShop Drawings
3.1Installation
SD-03 Product Data 2.1Wood Materials 1.4.2Certification
SD-04 Samples 2.3Plastic Laminates 2.6Cabinet Hardware
SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
2.1 GDetail Drawings
3.1Installation
SD-03 Product Data 2.1Solid Polymer Material 1.5.1Qualifications 2.3Fabrications
SD-04 Samples
2.1 FMaterial
2.3.6 FCounter and Vanity Tops
SD-06 Test Reports 2.1Solid Polymer Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 52 PAGES
06 61 16 SD-07 Certificates 2.3Fabrications 1.5.1Qualifications 2.1Indoor Air Quality for solid surface fabrication products SD-10 Operation and Maintenance Data
3.2Clean-up 07 21 16 SD-03 Product Data
2.1Sound Attenuation Batt Insulation 2.1.2Recycled Content for Insulation
Materials 2.4.3Spray Polyurethane Foam
Insulation - Thermal SPF 2.3Vapor Retarder 2.4Accessories
SD-07 Certificates 2.1.4Indoor Air Quality for Insulation
Materials 2.4.1Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions 3.3.1Insulation
07 51 13 SD-03 Product Data
1.4.3 GWind Uplift Calculations
2.4Asphalt
3.3.3 GFelts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 52 PAGES
07 51 13 3.3.3 GFelts
2.5.1 GGranule Surface Modified
Bitumen Cap Sheet
2.3 GFlashing Membrane
2.10Fasteners 2.6Primer 2.7Asphalt Roof Cement 2.8Cant Strips
2.11 GPre-Manufactured Accessories
2.11 GPre-Manufactured Accessories
1.8Warranties
SD-06 Test Reports 3.5.3Samples of Built-Up Roofing
SD-07 Certificates 1.5.1Bill of Lading 1.4.1Qualifications of Applicator
SD-08 Manufacturer’s Instructions
3.3.3 GFelts
3.3.3 GFelts
3.5.2 GFlashings
2.5.1 GGranule Surface Modified
Bitumen Cap Sheet 2.4Asphalt 2.6Primer 3.2.1.2Roof Cement 2.10Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 52 PAGES
07 51 13 SD-11 Closeout Submittals 1.8Warranty 3.6Information Card
07 60 00 SD-02 Shop Drawings
2.1.1 GExposed Sheet Metal
3.1.14 GExpansion Joints
3.1.13 GFlashing for Roof Drains
3.1.10 GBase Flashing
3.1.11 GCounterflashing
3.1.15 GFlashing at Roof Penetrations
and Equipment Supports
3.1.12 GDrip Edges
SD-07 Certificates GCertificates of Compliance
SD-11 Closeout Submittals Recycled Content
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials
1.5.1 GInstaller Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 52 PAGES
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates 2.1.1Indoor Air Quality For Interior
Sealants 2.1.3Indoor Air Quality For Interior
Floor Joint Sealants 2.1.4Indoor Air Quality For Interior
Acoustical Sealants 2.5Indoor Air Quality For Interior
Caulking 08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 52 PAGES
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1Recycled Content
SD-04 Samples
2.5 GFinishes
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting 08 91 00 SD-02 Shop Drawings
1.4Wall louvers 1.5Wall louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 52 PAGES
08 91 00 SD-03 Product Data 2.2Metal Wall Louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data 2.1Metal Support Systems 2.1Recycled Content for Metal
Support Systems 09 29 00 SD-03 Product Data
2.1.1Gypsum Board SD-07 Certificates
2.1 FAsbestos Free Materials
09 51 00 SD-03 Product Data
FAcoustical Ceiling Systems 09 65 00 SD-03 Product Data
2.7 GResilient Flooring and
Accessories
2.3Adhesives SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 52 PAGES
09 65 00 3.1 FInstallation SD-10 Operation and Maintenance Data
2.7 FResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
FCarpet Cushion
2.4 FMoldings
SD-04 Samples
2.1 GCarpet
2.4 FMoldings
FCarpet Cushion SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-08 Manufacturer’s Instructions
3.1Surface Preparation SD-10 Operation and Maintenance Data
3.5Cleaning and Protection SD-11 Closeout Submittals
1.5Warranty 09 90 00 SD-03 Product Data
2.1Coating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 52 PAGES
09 90 00 2.1Manufacturer's Technical Data Sheets
SD-04 Samples
1.9 GColor
SD-07 Certificates 1.3Applicator's qualifications 1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions 3.2.1Application instructions 3.6.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
10 14 00.20 SD-02 Shop Drawings
1.3.1 GDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.5 GWarranty
SD-04 Samples
1.5 GInterior Signage
GSoftware SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 52 PAGES
10 14 00.20 3.1 FApproved Manufacturer's Instructions
3.1.2 FProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data 2.1Cleaning and Maintenance
Instructions 2.7Colors And Finishes 2.2.1Anchoring Devices and
Fasteners 2.2.3Hardware and Fittings 2.2.2Brackets 2.2.4Door Hardware 2.5Pilaster Shoes
2.2.3.2 FFinishes
2.3.1Toilet Enclosures 2.3.2Urinal Screens
SD-07 Certificates 1.6Warranty
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 FCorner Guards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 52 PAGES
10 26 00 SD-10 Operation and Maintenance Data
2.2 GCorner Guards
10 28 13 SD-03 Product Data
2.1.2 FFinishes
SD-04 Samples
2.1.2 FFinishes
2.2Accessory Items
10 44 16 SD-02 Shop Drawings
2.1.1 GFire Extinguishers
Part 2 GAccessories Part 2 GCabinets 2.2.2Wall Brackets
1.5 GSchedule
SD-03 Product Data
2.1.1 FFire Extinguishers
Part 2 FAccessories Part 2 FCabinets
2.2.2 FWall Brackets
3.2.1 FReplacement Parts List
SD-07 Certificates 2.1.1Fire Extinguishers Certifications 1.4Manufacturer's Warranty with
Inspection Tag 12 36 00 SD-02 Shop Drawings
2.2 GFabrication
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 52 PAGES
12 36 00 3.1 GInstallation Drawings SD-03 Product Data
2.2.1 FSynthetic Resin
2.3 FParticle Board
2.3Recycled Content for
Particleboard
2.3 FFasteners
2.3 FStainless Steel Sinks
2.4.2 FJoint Sealants
Indoor Air Quality for Joint Sealants
SD-07 Certificates 2.1Indoor Air Quality for Countertop
Products 2.3Indoor Air Quality for
Particleboard SD-08 Manufacturer’s Instructions
2.1Manufacturer's Instructions 21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection
Engineer (QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.4.1.1 G AEShop Drawing
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 52 PAGES
21 13 13 2.2.1.1 GPipe
2.2.1.2 GFittings
2.3 GSprinklers
2.2.3 GPipe Hangers and Supports
2.1.2 GNameplates
2.4 GAccessories
SD-05 Design Data
1.2.1.2 G AEHydraulic Calculations
SD-06 Test Reports
3.6.1 GTest Procedures
SD-07 Certificates
3.6.2.1 GVerification of Compliant
Installation
3.6.2.2 GRequest for Government Final
Test SD-10 Operation and Maintenance Data
1.4.1.4 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.8As-built drawings 22 00 00 SD-03 Product Data
2.4Fixtures 2.4.2Flush Valve Water Closets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 52 PAGES
22 00 00 2.4.2WaterSense Label for Flush Valve Water Closet
2.4.3Flush Valve Urinals 2.4.3WaterSense Label for Urinal 2.4.4Wall Hung Lavatories 2.4.4WaterSense Label for Lavatory
Faucet 2.4.5Kitchen Sinks 2.4.8Precast Terrazzo Mop Sinks
2.4.6 GDrinking-Water Coolers
2.4.6Energy Star Label for Electric
Water Cooler 2.4.7Energy Star Label for Wheelchair
Electric Water Cooler
3.6.1.1 FBackflow Prevention Assemblies
1.5.1Welding
SD-06 Test Reports 3.6Tests, Flushing and Disinfection
3.6.1.1 FTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.6.1 FPlumbing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 52 PAGES
22 07 19.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.3 FAdhesives
2.3 FCoatings
2.3 FInsulation Materials
2.3 FTape
SD-08 Manufacturer’s Instructions
3.1 FInstallation Manual
SD-11 Closeout Submittals 3.4Record Drawings 2.3Adhesives 2.3Coatings 2.3Insulation Materials 1.3.1Recycled Materials
23 05 15 SD-01 Preconstruction Submittals
1.2 FMaterial, Equipment, and Fixture
Lists SD-02 Shop Drawings
1.2 GRecord Drawings
1.2Connection Diagrams
1.2 GCoordination Drawings
1.2Fabrication Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.1 FPipe and Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 52 PAGES
23 05 15 2.2 FPiping Specialties
2.3 FValves
2.4 FMiscellaneous Materials
2.5Supporting Elements
SD-05 Design Data
2.1 FPipe and Fittings
2.2 FPiping Specialties
2.3 GValves
SD-06 Test Reports
3.1 FHydrostatic Tests
3.1Pneumatic Tests 3.1Valve-Operating Tests 3.1Drainage Tests 3.1Non-Destructive Electric Tests
3.1 FSystem Operation Tests
SD-07 Certificates 1.4.2Record of Satisfactory Field
Operation 1.4.3List of Qualified Permanent
Service Organizations 1.2Listing of Product Installations
1.2 GRecords of Existing Conditions
3.1Surface Resistance 3.1Shear and Tensile Strengths 3.1Temperature Ratings 3.1Bending Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 52 PAGES
23 05 15 3.1Flattening Tests 3.1Transverse Guided Weld Bend
Tests SD-10 Operation and Maintenance Data
3.9 GOperation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 FEquipment and Performance
Data
2.1.1.1 FIsolators
SD-06 Test Reports
2.4 FType of Isolator
2.4 FType of Base
2.4 FAllowable Deflection
2.4 FMeasured Deflection
23 05 93.00 06 SD-02 Shop Drawings
3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
3.2TAB Related HVAC Submittals
3.6.1 GDuct Air Leakage Test
Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 52 PAGES
23 05 93.00 06 3.4 GTAB Procedures
3.5 GCalibrations
3.6Duct Air Leakage Tests 3.7Systems Readiness Check
3.8.2 GTAB Field Work
3.10 GTAB Verification
SD-06 Test Reports
3.1 GDesign Review Report
3.6.4 GDraft Duct Air Leakage Test
Report
3.6.6 GFinal Duct Air Leakage Test
Report
3.7 GSystems Readiness Check
Report
3.9.1 GDraft TAB Report
3.9.2 GFinal TAB Report
SD-07 Certificates
1.5.1 GTAB Firm
1.5.2 GTAB Specialist
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION…