W912QR21B0007_Plans-0000.pdf
PDF 26 MB Posted
- Attached to
- WPAFB Reno Lab/Admin B33
- Solicitation number
- W912QR21B0007
About this file
This document provides details on a federal contract opportunity for facility renovation work at Wright Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District intends to issue a solicitation for interior renovation of approximately 38,700 square feet of lab and administrative space in a three-story building. The renovation work includes HVAC, electrical, and plumbing repairs, architectural demolition and interior repairs, fire protection modernization, and hazardous material abatement. An option for selective communications work such as data cabling replacement is also included. The contract type will be firm-fixed-price, with a North American Industry Classification System code of 236220. The acquisition is a full and open competition with sealed bids evaluated based on lowest price. The construction value is estimated between $1,000,000 to $5,000,000. The solicitation is anticipated for release on May 26, 2021 and will be available electronically on SAM.gov. Offerors must have active SAM registration. The point of contact for questions is the listed contracting specialist.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON G0.01.
REVIEWED BY:*
QUALITY CONTROL DATE
APPROVAL RECOMMENDED:*
PE/A DATE
APPROVED:*
ENGINEERING DIVISION, CHIEF DATE
*THIS PROJECT WAS DESIGNED UNDER THE SUPERVISION OF THE U.S. ARMY CORPS OF
ENGINEERS, LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE SCOPE OF
THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
STRUCTURAL RCDD
FIRE PROTECTION MECHANICAL ELECTRICAL
ARCHITECTURAL
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
M
AR
K D
ES
C
R
IP
TI
O
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-001
C O
VE
R
S H
EE
T
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
JM
B
JR
F
JM
B
JQ
B
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 2
R
EN
O
VA
TI
O N
P H
AS
E
PR
O
JE
C
T #Z
H
TV
LOUISVILLE DISTRICT
W912QR19D0039
3 MAY 2021
WRIGHT-PATTERSON AIR FORCE BASE, OH
WPAFB BLDG. 20033 RENOVATION PHASE 2
PROJECT #ZHTV180028
TETRATECH, INC.
245 Browenton Place Louisville, Kentucky 40022-6409
(502) 584 - 5555 Fax: (502) 584-4696 www.tetratech.com
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
E-111 POWER PROPOSED PLAN - FIRST FLOOR
E-112 EQUIPMENT POWER PROPOSED PLAN - FIRST FLOOR
E-120 LIGHTING PROPOSED PLAN - SECOND FLOOR
E-121 POWER PROPOSED PLAN - SECOND FLOOR
E-122 EQUIPMENT POWER PROPOSED PLAN - SECOND FLOOR
E-130 LIGHTING PROPOSED PLAN - THIRD FLOOR
E-131 EQUIPMENT POWER PROPOSED PLAN - THIRD FLOOR
E-140 EQUIPMENT POWER PROPOSED PLAN - ROOF
E-401 ENLARGED ELECTRICAL PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-601 ONE-LINE DIAGRAM - MCC-A & MPP
E-602 ONE-LINE DIAGRAM - MDP
E-603 ELECTRICAL PANEL SCHEDULES - LP-1, LP-2, LP-3, LP-B
E-604 ELECTRICAL PANEL SCHEDULES - M3
E-605 ELECTRICAL PANEL SCHEDULES - LDP, PP-B, PP-1, PP-2
E-606 ELECTRICAL PANEL SCHEDULES - RP1, RP1-1, RP1-2, RP1-3
E-607 ELECTRICAL PANEL SCHEDULES - RP2-1, RP2-2, RP2-3A, RP2-3B
E-608 ELECTRICAL PANEL SCHEDULES - RP1-COMM, RP2-COMM,
RP3-COMM, RPB-1
E-609 ELECTRICAL PANEL SCHEDULES - RPB-2, RPB-3, PR3
E-610 LIGHTING FIXTURE SCHEDULE
TELECOMMUNICATIONS
T-001 LEGEND, ABBREVIATIONS AND NOTES
TD101 TELECOMMUNICATIONS DEMOLITION PLAN - BASEMENT
TD110 TELECOMMUNICATIONS DEMOLITION PLAN - FIRST FLOOR
TD120 TELECOMMUNICATIONS DEMOLITION PLAN - SECOND FLOOR
TD130 TELECOMMUNICATIONS DEMOLITION PLAN - THIRD FLOOR
T-101 TELECOMMUNICATIONS PROPOSED PLAN - BASEMENT
T-110 TELECOMMUNICATIONS PROPOSED PLAN - FIRST FLOOR
T-120 TELECOMMUNICATIONS PROPOSED PLAN - SECOND FLOOR
T-130 TELECOMMUNICATIONS PROPOSED PLAN - THIRD FLOOR
T-401 ENLARGED TELECOMMUNICATIONS PLANS
T-501 TELECOMMUNICATIONS DETAILS
T-502 TELECOMMUNICATIONS DETAILS
T-601 TELECOMMUNICATIONS RISER DIAGRAM
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
M-110 FIRST FLOOR - MECHANICAL FLOOR PLAN - DUCTWORK
M-111 FIRST FLOOR - MECHANICAL FLOOR PLAN - PIPING
M-120 SECOND FLOOR - MECHANICAL FLOOR PLAN - DUCTWORK
M-121 SECOND FLOOR - MECHANICAL FLOOR PLAN - PIPING
M-130 THIRD FLOOR - MECHANICAL FLOOR PLAN - DUCTWORK
M-131 THIRD FLOOR - MECHANICAL FLOOR PLAN - PIPING
M-140 ROOF PLAN
M-301 MECHANICAL SECTIONS
M-401 ENLARGED PLAN - SECOND FLOOR MECHANICAL
M-402 ENLARGED PLAN - THIRD FLOOR MECHANICAL ROOM
M-403 ENLARGED PLAN -THIRD FLOOR WEST MECHANICAL
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS - INDEX, SYMBOLS AND LEGEND
M-702 MECHANICAL CONTROLS - POINTS SCHEDULE INSTRUCTIONS
FOR THE INSTALLING CONTRACTOR
M-703 MECHANICAL CONTROLS - VAV TERMINAL UNITS WITH HW
REHEAT
M-704 MECHANICAL CONTROLS - VAV AIR HANDLING UNIT - SCHEMATIC
AND SEQUENCES
M-705 MECHANICAL CONTROLS - VAV AIR HANDLING UNIT - POINTS
SCHEDULE
M-706 MECHANICAL CONTROLS - CHILLED WATER SYSTEM -
SCHEMATIC AND SEQUENCES
M-707 MECHANICAL CONTROLS - CHILLED WATER SYSTEM - POINTS
SCHEDULE
M-708 MECHANICAL CONTROLS - EXHAUST FAN
M-709 MECHANICAL CONTROLS - BLOWER COIL UNIT
M-901 ISOMETRIC - THIRD FLOOR MECHANICAL ROOM
ELECTRICAL
E-001 LEGEND, ABBREVIATIONS AND NOTES
ED101 LIGHTING DEMOLITION PLAN - BASEMENT
ED102 POWER DEMOLITION PLAN - BASEMENT
ED110 LIGHTING DEMOLITION PLAN - FIRST FLOOR
ED111 POWER DEMOLITION PLAN - FIRST FLOOR
ED120 LIGHTING DEMOLITION PLAN - SECOND FLOOR
ED121 POWER DEMOLITION PLAN - SECOND FLOOR
ED130 LIGHTING DEMOLITION PLAN - THIRD FLOOR
ED131 POWER DEMOLITION PLAN - THIRD FLOOR
ED140 POWER DEMOLITION PLAN - ROOF
ED601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
E-101 LIGHTING PROPOSED PLAN - BASEMENT
E-102 POWER PROPOSED PLAN - BASEMENT
E-103 EQUIPMENT POWER PROPOSED PLAN - BASEMENT
E-110 LIGHTING PROPOSED PLAN - FIRST FLOOR
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
A-403 ENLARGED PLANS AND ELEVATIONS
A-404 ENLARGED LL. RAMP PLAN AND DETAILS
A-501 PARTITION TYPES AND DETAILS
A-502 ARCHITECTURAL DETAILS
A-601 DOORS SCHEDULE AND DETAILS
INTERIORS
I-601 FINISH SCHEDULES
I-602 FINISH SCHEDULES
I-603 SIGNAGE SCHEDULES & TYPICALS
FIRE PROTECTION
F-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
FA101 LOWER LEVEL FIRE ALARM/MNS PLAN
FA110 FIRST FLOOR FIRE ALARM/MNS PLAN
FA120 SECOND FLOOR FIRE ALARM/MNS PLAN
FA130 THIRD FLOOR FIRE ALARM/MNS PLAN
FA501 FIRE ALARM/MNS DETAILS
FA601 FIRE ALARM/MNS RISER DIAGRAM
FX101 LOWER LEVEL FIRE PROTECTION PLAN
FX110 FIRST FLOOR FIRE PROTECTION PLAN
FX120 SECOND FLOOR FIRE PROTECTION PLAN
FX130 THIRD FLOOR FIRE PROTECTION PLAN
FX501 FIRE PROTECTION DETAILS
PLUMBING
P-001 ABBREVIATIONS, LEGENDS AND GENERAL NOTES
P-101 LOWER LEVEL - PLUMBING OVERALL PLAN
P-110 FIRST FLOOR - PLUMBING OVERALL PLAN
P-120 SECOND FLOOR - PLUMBING OVERALL PLAN
P-401 LOWER LEVEL - PLUMBING ENLARGED PLANS
P-410 FIRST FLOOR - PLUMBING ENLARGED PLANS
P-420 SECOND FLOOR - PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-901 PLUMBING RISERS - SANITARY AND VENT
P-902 PLUMBING RISERS - DOMESTIC WATER
PD101 LOWER LEVEL - PLUMBING DEMOLITION PLAN
PD110 FIRST FLOOR - PLUMBING DEMOLITION PLAN
PD120 SECOND FLOOR - PLUMBING DEMOLITION PLAN
MECHANICAL
M-001 ABBREVIATIONS, LEGENDS AND GENERAL NOTES
MD101 LOWER LEVEL - MECHANICAL DEMOLITION PLAN
MD110 FIRST FLOOR - MECHANICAL DEMOLITION PLAN
MD120 SECOND FLOOR - MECHANICAL DEMOLITION PLAN
MD130 THIRD FLOOR - MECHANICAL DEMOLITION PLAN
MD140 ROOF PLAN - MECHANICAL DEMOLITION
MD601 MECHANICAL DEMOLITION SCHEDULES
M-101 LOWER LEVEL - MECHANICAL FLOOR PLAN - DUCTWORK
M-102 LOWER LEVEL - MECHANICAL FLOOR PLAN - PIPING
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
GENERAL
G-001 COVER SHEET
G-002 PROJECT NOTES
G-003 PHASING PLANS
G-004 CODE SUMMARY
G-005 CODE SUMMARY
G-006 ROOM OCCUPANCY TABLES
G-101 LOWER LEVEL LIFE SAFETY PLAN
G-110 FIRST FLOOR LIFE SAFETY PLAN
G-120 SECOND FLOOR LIFE SAFETY PLAN
G-130 THIRD FLOOR LIFE SAFETY PLAN
HAZARDOUS MATERIAL
HM-110 HAZARDOUS MATERIAL PLAN - LOWER LEVEL
HM-111 HAZARDOUS MATERIAL PLAN - FIRST FLOOR
HM-112 HAZARDOUS MATERIAL PLAN - SECOND FLOOR
HM-113 HAZARDOUS MATERIAL PLAN - THIRD FLOOR
HM-114 HAZARDOUS MATERIAL PLAN - ROOF
HM-601 HAZARDOUS MATERIAL TABLES
HM-602 HAZARDOUS MATERIAL TABLES
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 STRUCTURAL GENERAL NOTES
S-003 SPECIAL INSPECTION TABLES
S-004 SPECIAL INSPECTION TABLES
S-111 FLOOR PLANS - NORTH ADDITION
S-113 THIRD FLOOR FRAMING PLAN & DETAILS - MECH ROOM 327
S-114 MECHANICAL PLATFORM FRAMING PLAN & DETAILS
S-301 STRUCTURAL SECTIONS & DETAILS
S-302 STRUCTURAL SECTIONS & DETAILS
ARCHITECTURE
A-001 ARCHITECTURAL ABBREVIATIONS AND GENERAL NOTES
A-002 ARCHITECTURAL STANDARDS
AD110 LOWER LEVEL DEMOLITION PLAN
AD111 FIRST FLOOR DEMOLITION PLAN
AD112 SECOND FLOOR DEMOLITION PLAN
AD113 THIRD FLOOR DEMOLITION PLAN
A-110 LOWER LEVEL - NEW CONSTRUCTION PLAN
A-111 FIRST FLOOR - NEW CONSTRUCTION PLAN
A-112 SECOND FLOOR - NEW CONSTRUCTION PLAN
A-113 THIRD FLOOR - NEW CONSTRUCTION PLAN
A-114 ROOF PLAN
A-160 LOWER LEVEL - REFLECTED CEILING PLAN
A-161 FIRST FLOOR - REFLECTED CEILING PLAN
A-162 SECOND FLOOR - REFLECTED CEILING PLAN
A-163 THIRD FLOOR - REFLECTED CEILING PLAN
A-401 ENLARGED LAVATORY PLANS AND ELEVATIONS
A-402 ENLARGED PLANS AND ELEVATIONS
ENTRANCE GATE
BLD 20033
PLAN NORTH
SUGGESTED
HAUL ROUTE
P2#: 479879
PROJECT DESCRIPTION:
THE PROJECT IS AN INTERIOR RENOVATION. THIS IS THE SECOND
PHASE OF STAGED RENOVATION TO UPGRADE THE BUILDING TO
REPAIR HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
SYSTEMS, MECHANICAL, ELECTRICAL, AND PLUMBING (MEP)
SYSTEMS, AND RECONFIGURE AND RENOVATE THE INTERIOR OF
BUILDING 33 (F/20033). WORK INCLUDES HVAC, ELECTRICAL, AND
PLUMBING REPAIR, ARCHITECTURAL DEMOLITION AND INTERIOR
REPAIRS, FIRE PROTECTION MODERNIZATION, AND HAZARDOUS
MATERIAL ABATEMENT.
ENTRANCE GATE
CORPS OF
ENGINEERS
AREA OFFICE
FIRE STATION
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
28 May 2021
W912QR21B0007
W
2Q R
B0
7-
CONSTRUCTION SEQUENCING NOTES
1. THE PROJECT SHALL BE CONSTRUCTED IN THREE PHASES. THE PHASE DESCRIPTIONS BELOW
DESCRIBE THE GENERAL SCOPE OF WORK FOR EACH PHASE. THE FACILITY WILL BE OCCUPIED
DURING CONSTRUCTION. ALL FLOORS WILL HAVE OCCUPIED SPACES.
2. SEE SHEET G-003 FOR A DIAGRAM OF THE GENERAL AFFECTED AREAS FOR EACH PHASE. SEE
DISCIPLINE SHEET FOR FURTHER INFORMATION.
3. THE OCCUPANTS OF THE BUILDING SHALL HAVE ACCESS TO STAIR 1 AND STAIR 2 DURING
BUSINESS, HOURS 0700-1700. ALL WORK REQUIRED IN CORRIDORS CONNECTING AND
ACCESSING STAIR 1 AND STAIR 2 ON ALL LEVELS SHALL BE CONDUCTED AFTER HOURS, THIS
INCLUDES CORRIDOR C001, C002, C101, C102, C103, C201, C202, C301, AND C302. THE
CONTRACTOR SHALL REMOVE ALL MATERIAL, EQUIPMENT, AND DEBRIS FROM THE CORRIDORS
EACH NIGHT BEFORE THE COMMENCEMENT OF THE BUSINESS HOURS THE FOLLOWING DAY.
TEMPORARY LIGHTING AND EXIT SIGNAGE SHALL BE PROVIDED FOR EGRESS.
4. COORDINATE BUILDING ACCESS AND MOVEMENT OF MATERIALS WITH GOVERNMENT.
MATERIALS SHALL NOT BE STORED, STAGED, OR PLACED IN AREAS OUTSIDE THE DESIGNATED
PHASES OR IN THE CORRIDORS.
5. PHASE A: PHASE A WORK WILL INCLUDE THE FOLLOWING WORK:
a. ALL WORK IN WEST WING BETWEEN COLUMN LINES A AND D. EXISTING RESTROOM
EAST OF COLUMN LINE D SHALL REMAIN IN OPERATIONAL AND ACCESSABLE TO THE
OCCUPANTS DURING BUSINESS HOURS.
b. REMOVAL AND REPLACEMENT OF EXISTING CHILLER IN ROOM M3XX.
6. THE CONTRACTOR SHALL NOT COMMENCE WITH PHASE B WORK UNTIL 30 DAYS AFTER THE
ACCEPTANCE OF PHASE A AREA OF WORK.
7. PHASE B: PHASE B WORK WILL INCLUDE THE FOLLOWING WORK:
a. ALL WORK EAST OF COLUMN LINE D ON THE BASEMENT LEVEL, FIRST FLOOR, AND
SECOND FLOOR.
b. ALL WORK EAST OF COLUMN LINE D WITH THE EXCEPTION OF THE FRONT OFFICE SUITE
WHICH BEGINS WITH CORRDOR 316 (ROOMS 316-326).
8. THE CONTRACTOR SHALL NOT COMMENCE WITH PHASE C WORK UNTIL 30 DAYS AFTER THE
ACCEPTANCE OF PHASE B AREA OF WORK.
9. PHASE C: PHASE C WORK WILL INCLUDE THE FOLLOWING WORK:
a. BEFORE COMMENCING WITH OTHER WORK. CONDUCT ALL WORK ASSOCIATED WITH
STAIR 2. STAIR 2 WORK SHALL BE COMPLETED IN 14 CALENDAR DAYS.
b. RENOVATION OF THE FRONT OFFICE SUITE ON THE THRID FLOOR WHICH BEGINS
WITH.CORRDOR 316 (ROOMS 316-326).
c. REPLACEMENT OF THE AC-3 SERVING FRONT OFFICE SUITE WHICH BEGINS WITH
CORRDOR 316 (ROOMS 316-326).
10. FURNISHINGS WILL BE MOVED BY THE GOVERNMENT.
GENERAL DEMOLITION NOTES
A. ALL AREAS DESIGNATED BY DASHED LINES ARE TO BE REMOVED.
B. ALL AREAS AND PARTITIONS NOT DASHED OR NOTED TO BE REMOVED SHALL REMAIN
INTACT. PATCH AND REPAIR EXISTING ADJACENT SURFACES AS REQUIRED AFTER
DEMOLITION TO MATCH EXISTING OR IN ACCORDANCE WITH PROPOSED RENOVATIONS.
C. PROVIDE INTERIOR AND EXTERIOR SHORING, BRACING, OR OTHER SUPPORT TO PREVENT
MOVEMENT, SETTLEMENT, OR COLLAPSE OF ELEMENTS TO BE DEMOLISHED AND
ADJACENT EXISTING ELEMENTS TO REMAIN.
D. LOCATE AND IDENTIFY EXISTING UTILITIES, INCLUDING SANITARY SEWER SYSTEM, AND
ASCERTAIN THEIR CONDITION TO ENSURE ADEQUATE PERFORMANCE OF ALL UTILITIES IN
NEW CONSTRUCTION. PROTECT UTILITY LINES AND HARDWARE DURING DEMOLITION AND
CONSTRUCTION PHASES.
E. SEE PRE-RENOVATION HAZARDOUS MATERIAL REPORT IN SPECIFICATIONS FOR
HAZARDOUS MATERIALS.
F. CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED OF STUDS, PLYWOOD AND 10 MIL
PLASTIC DUST BARRIER. ALL WOOD PRODUCTS SHALL BE CLASS 3 OR BETTER FLAME
SPREAD RATE. PLASTIC SHEATHING SHALL BE LESS THAN 450 SMOKE DENSITY AS
MEASURED BY ASTM E84. PROVIDE AN ACCESS DOOR.
G. CONTRACTOR IS RESPONSIBLE TO REMOVE FROM BUILDING SITE DEBRIS, TRASH, AND
OTHER DISCARDED MATERIALS AND/OR EQUIPMENT RESULTING FROM DEMOLITION
OPERATIONS. TRANSPORT AND LEGALLY DISPOSE OFF SITE.
H. BURNING OF REMOVED MATERIALS IS NOT PERMITTED ON THE PROJECT SITE.
I. SEE MEP DRAWINGS FOR COORDINATION AND FURTHER INFORMATION ON MECHANICAL,
PLUMBING AND ELECTRICAL DEMOLITION. INCLUDING BUT NOT LIMITED TO EXISTING
PLUMBING FIXTURES. DRAINAGE AND VENT PIPING, AND SURFACE MOUNTED CONDUIT AND
WIREMOLD. REMOVE OR RELOCATE INTERIOR SURFACE MOUNTED ITEMS WHERE THEY
CONFLICT WITH NEW WORK.
J. COORDINATE ALL DEMOLITION WITH THE CONTRACTOR QUALITY CONTROL MANAGER AND
OTHER TRADES.
K. IN ALL AREAS OF CONSTRUCTION REMOVE ALL EXISTING WALL MOUNTED ITEMS INCLUDING
BUT NOT LIMITED TO TACKBOARDS, PHOTOGRAPHS, FRAMED ITEMS, SIGNAGE, SAFETY
EQUIPMENT AND ALL ASSOCIATED HANGERS AND SUPPORS. TURN OVER, CAREFULLY
STORE FOR RE-USE/REINSTALLATION OR DISPOSE OF AS DIRECTED BY THE CONTRACTOR
QUALITY CONTROL MANAGER.
L. VERIFY DIMENSIONS AND LOCATIONS. IT IS ANTICIPATED THAT EXISTING CONDITIONS
SHALL REQUIRE SLIGHT ADJUSTMENTS.
M. PATCH AND REPAIR WALLS AT ALL REMOVED WALL MOUNTED EQUIPMENT, INCLUDING FIRE
EXTINGUISHER CABINETS, SIGNAGE, HOOKS AND HANGERS AND ALL OTHER
MISCELLANEOUS ITEMS, TO MATCH ADJACENT WALL SURFACES.
N. PROVIDE TEMPORARY SUPPORT AND REATTACHMENT FOR CEILING MOUNTED FIXTURES
AND EQUIPMENT NOT SCHEDULED FOR REMOVAL.
O. REMOVE EXISTING WINDOW SHADES, MOUNTING BRACKETS AND ALL ASSOCIATED
COMPONENTS, PATCH WALL DAMAGE PRIOR TO MOUNTING NEW SHADING DEVICES AND
APPLYING NEW WALL FINISH. TYPICAL OF ALL EXTERIOR WINDOWS IN AREA OF WORK.
P. IN AREAS OF CEILING DEMOLITION, REMOVE EXISTING CEILING HUNG ITEMS, INCLUDING
BUT NOT LIMITED TO: PROJECTOR SCREENS AND TELEVISIONS. REFER TO MEP FOR
ADDITIONAL REMOVAL INFORMATION.
Q. PRIOR TO STARTING WORK, THE DEMOLITION CONTRACTOR IS TO FIELD VERIFY NOTED
AREAS OF DEMOLITION TO DETERMINE ACTUAL SCOPE OF DEMOLITION WORK AND TO
REVIEW SCOPE WITH THE CONTRACOR QUALITY CONTROL MANAGER TO DETERMINE
SPECIFIC EXISTING ITEMS TO BE REMOVED, REINSTALLED, OR SALVAGED AND STORED FOR
REUSE.
R. REMOVE DECAYED, VERMIN-INFESTED OR OTHERWISE DANGEROUS OR UNSUITABLE
MATERIALS AND PROMPTLY DISPOSE OF OFF-SITE.
S. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS GOVERNMENT'S MINIMUM
REQUIREMENTS AND ARE NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS. UNLESS
INDICATED OTHERWISE ON THE PLANS AND SPECIFICATIONS (E.G. SOLE-SOURCE), ALL
LISTED MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN
PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD
OF QUALITY AND CHRACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEETS OR
EXCEEDS THE STANDARD QUAILITY AND CHARACTERISTICS OF THE BASIS OF DESIGN.
GENERAL CONSTRUCTION NOTES
A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION
01 02 20.
B. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
C. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN
ACRE OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE.
FOR PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE
APPROVED BY THE OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE
CONTACT THE 88 CEG/CEIEA WATER PM MIKE VAUGHN, (937-257-8028 OR
MICHAEL.VAUGHN.3@US.AF.MIL) FOR ADDITIONAL INFORMATION.
D. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED
DUST SUPPRESSING METHODS SUCH AS WATER SPRAYS ON AREA OF HIGH DUST
GENERATION. FOR ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM
CHRIS TUMBUSCH. CHRIS CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT
CHRISTOPHER.TUMBUSCH@US.AF.MIL
E. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 01 02 20.
F. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING
ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
G. DEMOLITION OF LOAD-BEARING WALLS OR STRUCTURALCOMPONENTS REQUIRE
NOTIFICATION OF DEMOLITION AND RENOVATION TO THE REGIONAL AIR POLLUTION AND
CONTROL AGENCY (RAPCA) A MINIMUM OF 10 WORK DAYS PRIOR TO BEGINNING
CONSTRUCTION.
H. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORD- ANCE WITH WPAFB SPECIFICATION
SECTION 02 09 10
I. IF ANY REFRIGERANT-CONTAINING EQUIPMENT SCHEDULED FOR NEW INSTALLATION,
INCLUDING WATER COOLERS, THEY MUST UTILIZE AN HFC REFRIGERANT. CFC AND HCFC
REFRIGERANTS ARE NOT AUTHORIZED FOR NEW EQUIPMENT INSTALLATIONS. FOR
ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH.
CHRIS CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT HYPERLINK
"mailto:CHRISTOPHER.TUMBUSCH@US.AF.MIL" CHRISTOPHER.TUMBUSCH@US.AF.MIL.
J. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY
HAZARDOUS WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE
PROPERLY CHARACTERIZED, LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE
CONTRACTOR WITH KNOWLEDGE OF THE ACTIVITY / PROCESS WHERE THE WASTE WAS
GENERATED. ALL HAZARDOUS WASTE WILL BE TURNED OVER TO THE GOV'T FOR
DISPOSAL. IN ADDITION PROPER COORDINATION IS NEEDED WITH 88 CEG/ CEIEC.
QUESTIONS CONCERNING THE REQUIREMENTS FOR STORAGE AND DISPOSAL OF ANY
HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88 CEG/CEIEC HAZARDOUS
MATERIALS PM, KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 OR 88
CEG/CEIEC HAZARDOUS WASTE PM, EMILY EDREI (937-257- 0023 OR HYPERLINK
"mailto:EMILY.ERDEI@US.AF.MIL" EMILY.ERDEI@US.AF.MIL).
K. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER.
THE WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE
DISPOSAL. ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING
CENTER. ALL RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT
937-257-5060 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-
IN. THE CONTRACTOR SHALL SUBMIT A QUARTERLY SUMMARY REPORT TO THE
GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB SPECIFICATION SECTION 01 02 20
STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO MULCH
AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED,
(4) THE COST FOR WASTE-TO-ENERGY AND THE TON- NAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL
AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE
COST TO INCINERATE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS
INCINERATED, AND (7) EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE
QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND
JANUARY 7 COVERING THE THREE MONTHS PRIOR. THE QUARTERLY SUMMARY RE- PORTS
SHALL BE ON THE WPAFB DIVERSION FORM.FOR AD- DITIONAL INFORMATION CONTACT THE
RECYCLING PM, DAVE DALTON, AT 937-257-5060 OR DAVID.DATON.2@US.AF.MIL.
L. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88
CEG/CEIE IN AC- CORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR
RECYCLING.
M. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG\ CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 02 20.
N. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 01 02 20.
O. 30 DAYS PRIOR TO START OF WORK, THE CONTRACT- OR SHALL TAKE A REPRESENTATIVE
SAMPLE OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED
DIRECTLY INTO THE SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL
LEVEL OF EACH OF THE FOLLOWING: ARSENIC, CADMIUM, CHROMIUM, COPPER, CYANIDE,
LEAD, MERCURY, MOLYBDENUM,NIC- KEL, SELENIUM, SILVER, ZINC, SULFIDE, OIL AND
GREASE, PHOSPHORUS, COD, BOD. THE LAB PERFORMING THE ANALYSES MUST BE
CERTIFIED BY OHIO EPA TO ANALYZE FOR THESE PAR- AMETERS. PROVIDE A COPY OF THE
LAB'S REPORT TO THE CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88
CEG/CEIEA FOR A DETERMINATION ON THE WASTEWATER DISPOSAL METHOD.
P. COORDINATE DISPOSITION OF EXCESS RADIOACTIVE COMMODITIES, E.G. IONIZATION TYPE
SMOKE DETECT- ORS, RADIOLUMINESCENT EMERGENCY EXIT SIGNS, OR ANY OTHER
RADIOACTIVE COMMODITY AND/OR RADIO- ACTIVE CONTAMINANT THROUGH THE
INSTALLATION RADIATION SAFETY OFFICER, 88 AMDS/SGPB
Q. NO TREE CUTTING BETWEEN 01 APRIL AND 30 SEPTEMBER W/ OUT THE WRITTEN
APPROVAL FROM THE 88 CEG/CEIEA NATURAL RESOURCE PROGRAM MANAGER (NR PM).
SUBMIT A LIST OF THE TREES TO BE REMOVED AND REPLACED. THREE TREES SHALL BE
REPLACED FOR EVERY ONE TREE REMOVED. THE GENERAL 10-20-30 DIVERSITY RULE
SHALL BE FOLLOWED WHEN PLANTING TREES. ONLY PLANTS/TREES ON THE APPROVED
PLANTING LIST CAN BE PLANTED AND MUST BE OHIO NATIVES. CONTACT NATURAL
RESOURCE PM DARRYN WARNER BY EMAIL AT DARRYN.WARNER@US.AF.MIL OR BY PHONE
AT 937-257-4857 FOR ADDITIONAL INFORMATION.
R. LANDSCAPE PLANT MATERIALS SHALL BE SELECTED FROM THE LIST OF APPROVED
SPECIES, OUTLINED IN THE BASE FACILITY STANDARD, WRIGHT-PATTERSON AFB, OH,
MARCH 2016. PLANTINGS MUST BE MAINTAINED (WATERED) FOR ONE YEAR. CONTACT
NATURAL RESOURCE PM DARRYN WARNER BY EMAIL AT DARRYN.WARNER@US.AF.MIL OR
BY PHONE AT 937-257-4857 FOR ADDITIONAL INFORMATION.
S. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE GOVERNMEN'TS
MINIMUM REQUIREMENTS AND NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS.
UNLESS INDICATED OTHERWISE ON THE PLANS OR SPECIFICATIONS(E.G. SOLE-SOURCE),
ALL LISTED MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN
PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD
OF QUALITY AND CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR
EXCEED THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE BASIS OF DESIGN.
NEW BUILDING RENOVATION
CONTRACTOR LAYDOWN AREA
MAINTAIN ACCESS TO
BUILDING ENTERANCE
THROUGH
CONSTRUCTION
MAINTAIN
PEDESTRIAN
ACCESS TO
BUILDING
ENTERANCE
TEMPORARY
CHAIN-LINK
CONSTRUCTION
FENCE (6'-0") HIGH
WITH PRIVACY
AXPROXIMATE CONTRACT TRAILER LOCATION
PROPOSED LAYDOWN AREA NOTES
1. CONTRACTOR SHALL RESTORE ALL PAVEMENT, LANDCAPING AND
OTHER FEATURES (TO REMAIN) WITHIN CONSTRUCTION LIMITS TO
RE-CONSTRUCTION CONDITION.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-002
PR
O
JE
C
T N
O
TE
S
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
JM
B
JR
F
JM
B
JQ
B
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 2
R
EN
O
VA
TI
O N
P H
AS
E
PR
O
JE
C
T #Z
H
TV
SCALE: 1 1/2" = 1'-0"
PROPOSED LAYDOWN AREA
NTS
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
UP UP
UP
UP
UP
UP UP
UP
UP
DN
UP
UP
UP UP
DN
A B C D
A B C D
A B C D
A B C D
CONSTRUCTION SEQUENCE LEGEND
SEQUENCE A - WEST WING AND
CHILLER REPLACEMENT
SEQUENCE B - CENTRAL WING
SEQUENCE C - THIRD FLOOR F.O.G.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
8' 16' 32'
1/16"=1'-0SCALE:
PLAN NORTH
G-003
PH
AS
IN
G
P
LA
N S
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
JM
B
JR
F
JM
B
JQ
B
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 2
R
EN
O
VA
TI
O N
P H
AS
E
PR
O
JE
C
T #Z
H
TV
1/16" = 1'-0"A1 LOWER LEVEL - PHASING PLAN
1/16" = 1'-0"H1 FIRST FLOOR - PHASING PLAN
1/16" = 1'-0"A11 SECOND FLOOR - PHASING PLAN
1/16" = 1'-0"H11 THIRD FLOOR - PHASING PLAN
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
LIFE SAFETY CODE ANALYSIS
• UFC 1-200-01: DOD BUILDING CODE, 8 OCTOBER 2019
• UFC 3-490-06: ELEVATORS, 8 JUNE 2018
• UFC 3-600-01: FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 5, 24 SEPTEMBER 2020
• UFC 4-021-01: DESIGN AND O&M: MASS NOTIFICATION SYSTEMS, CHANGE 1, JANUARY 2010
• IBC 2018: INTERNATIONAL BUILDING CODE
• NFPA 1, FIRE CODE, 2018
• NFPA 101, LIFE SAFETY CODE, 2018
• NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018
• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019
• NFPA 70, NATIONAL ELECTRICAL CODE, 2020
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2019
• NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019
• NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2019
• NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS,
• NFPA 291, RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS, 2019
• ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY STANDARDS
• ECB 2018-17: NEW REQUIREMENTS FOR VISUAL NOTIFICATION FOR MASS NOTIFICATION SYSTEMS
PRIMARY APPLICABLE CODES
NEW BUSINESS (CHAPTER 38)
EXISTING BUSINESS (CHAPTER 39)
EXISTING ASSEMBLY (CHAPTER 13)
THE OCCUPANT LOAD WILL BE CALCULATED IN ACCORDANCE WITH NFPA 101 BASED ON
THE INTENDED USE OF EACH SPACE AND THE FOLLOWING OCCUPANT LOAD FACTORS.
ASSEMBLY USE - LESS CONCENTRATED: 15 NSF/OCC.
BUSINESS USE: 150 GSF/OCC.
BUSINESS USE - COLLABORATION RM > 450 SF: 15 GSF/OCC.
IT EQUIPMENT ROOM: 300 GSF/OCC.
STORAGE USE: 500 GSF/OCC.
MECHANICAL, ELECTRICAL & OTHER BLDG. EQUIPMENT SPACES: 500 GSF/OCC.
THE EXIT CAPACITY FACTORS ARE 0.3 INCHES OF EXIT WIDTH PER PERSON FOR
STAIRWAYS, AND 0.2 INCHES OF EXIT WIDTH PER PERSON FOR OTHER COMPONENTS
LIKE DOORS AND CORRIDORS.
LOCATION REQUIRED PROVIDED
LOWER LEVEL 2 4
1ST FLOOR 2 3
2ND FLOOR 2 2
3RD FLOOR 2 2
IN BUILDINGS PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED, AUTOMATIC
SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13, THE MINIMUM SEPARATION
BETWEEN TWO EXITS, EXIT ACCESSES, OR EXIT DISCHARGES WILL BE NOT LESS THAN
ONE-THIRD THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE
BUILDING OR AREA SERVED.
THE MAXIMUM DIAGONAL DIMENSION OF THE BUILDING IS 210'-4" (MEASURED ON THIRD
FLOOR), THEREFORE THE MINIMUM SEPARATION REQUIRED BETWEEN THE DOORS TO
THE TWO EXIT STAIRS IS 69'-4". THE DOORS TO THE TWO EXIT STAIRS ARE PROVIDED
WITH A SEPARATION DISTANCE OF 107'-2".
ACCESSIBLE MEANS OF EGRESS ARE NOT REQUIRED FOR AN EXISTING BUSINESS
OCCUPANCY (NFPA 101 §7.5.4.1).
MAX. PERMITTED ACTUAL
BUSINESS
TRAVEL DISTANCE W/ SPRINKLER SYSTEM: 300 FT. 154 FT. 7 IN.
COMMON PATH OF TRAVEL: 100 FT. 98 FT. 6 IN.
DEAD END CORRIDOR: 50 FT. 48 FT. 6 IN.
MAX. PERMITTED ACTUAL
ASSEMBLY
TRAVEL DISTANCE W/ SPRINKLER SYSTEM: 250 FT. 74 FT. 9 IN.
COMMON PATH OF TRAVEL: 20 FT. / 75 FT. N/A
DEAD END CORRIDOR: 20 FT. 18 FT. 6 IN.
STAIRS AND EGRESS PATHS ARE PROVIDED WITH A MINIMUM OF 10 FT-CANDLE AND 1-FT
CANDLE, RESPECTIVELY, IN ACCORDANCE WITH NFPA 101 §7.8.1.3.
EMERGENCY LIGHTING IS REQUIRED FOR EXISTING BUSINESS OCCUPANCIES THREE OR
MORE STORIES IN HEIGHT. EMERGENCY LIGHTING IS PROVIDED IN ACCORDANCE WITH
NFPA 101 §7.9. EMERGENCY LIGHTING MUST BE PROVIDED FOR A MINIMUM OF 1-1/2
HOURS UPON FAILURE OF NORMAL LIGHTING. THE EMERGENCY LIGHTING MUST BE
DESIGNED TO PROVIDE NOT LESS THAN AN AVERAGE OF 1 FOOT-CANDLE AND, AT ANY
POINT, NOT LESS THAN 0.1 FOOT-CANDLE, MEASURED ALONG THE PATH OF EGRESS AT
FLOOR LEVEL.
EXITS, OTHER THAN MAIN EXTERIOR EXIT DOORS THAT OBVIOUSLY AND CLEARLY ARE
IDENTIFIABLE AS EXITS, SHALL BE MARKED BY AN APPROVED SIGN THAT IS READILY
VISIBLE FROM ANY DIRECTION OF EXIT ACCESS. NEW SIGN PLACEMENT SHALL BE SUCH
THAT NO POINT IN AN EXIT ACCESS CORRIDOR IS IN EXCESS OF THE RATED VIEWING
DISTANCE, OR 100 FT, WHICHEVER IS LESS, FROM THE NEAREST SIGN.
NEW INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A OR B IN ENCLOSED EXIT
STAIRWAYS, AND CLASS A, B OR C IN OTHER AREAS. NEW CARPET AND CARPET LIKE
FLOOR FINISHES MUST COMPLY WITH ASTM D2859, STANDARD TEST METHOD FOR
IGNITION CHARACTERISTICS OF FINISHED TEXTILE FLOOR COVERING MATERIALS. OTHER
FLOOR FINISH MATERIALS MUST HAVE A MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2.
THE SIMPLEX FA/MNS CONTROL PANEL IS EXISTING TO REMAIN. FIRE ALARM/MASS
NOTIFICATION SYSTEM NOTIFICATION APPLIANCES WILL BE LOCATED THROUGHOUT THE
MODIFIED SPACES. EXISTING MANUAL PULL STATIONS ARE PROVIDED WITHIN 5 FEET OF
EACH EXIT, EXCEPT AT STAIR 2 ON THE SECOND AND THIRD FLOORS. MANUAL PULL
STATIONS WILL BE PROVIDED AT THOSE LOCATIONS.
PORTABLE FIRE EXTINGUISHERS ARE REQUIRED IN ALL NEW AND EXISTING BUSINESS
OCCUPANCIES (NFPA 101 §39.3.5). FIRE EXTINGUISHERS SHALL BE SPACED IN
ACCORDANCE WITH NFPA 10.
CORRIDORS IN AN EXISTING ASSEMBLY OR BUSINESS OCCUPANCY ARE NOT REQUIRED
TO HAVE A FIRE-RESISTANCE RATING (NFPA 101 §13.3.6 & §39.3.6.).
FIRE DAMPERS SHALL BE DYNAMIC TYPE, RATED FOR 3,000 FT/MIN OR GREATER.
• FIRE RATED DAMPERS SHALL BE INSTALLED IN DUCTS PASSING THROUGH
PARTITIONS OR WALLS HAVING A FIRE RESISTANCE RATING OF 2 HOURS OR
GREATER.
• FIRE DAMPERS SHALL BE INSTALLED IN DUCTS PASSING THROUGH FIRE
RESISTANCE RATED SHAFTS.
• FIRE DAMPERS SHALL BE INSTALLED IN AIR TRANSFER OPENINGS IN FIRE
RESISTANCE RATED PARTITIONS.
• FIRE DAMPERS SHALL BE INSTALLED IN DUCTS PASSING THROUGH FLOORS
EXCEPT
WHERE THE FLOOR PENETRATION IS WITHIN A FIRE RATED SHAFT.
PROVIDE ISOLATION SMOKE DAMPER WHEN AIR HANDLING EQUIPMENT SYSTEMS HAVE A
CAPACITY GREATER THAN 15,000 CFM TO ISOLATE THE AIR-HANDLING EQUIPMENT,
INCLUDING FILTERS, FROM THE REMAINDER OF THE SYSTEM ON BOTH THE BUILDING
SUPPLY AND RETURN SIDES, IN ORDER TO RESTRICT THE CIRCULATION OF SMOKE.
NOT APPLICABLE - NEW AIR HANDLING EQUIPMENT DOES NOT HAVE A CAPACITY OF
GREATER THAN 15,000 CFM
A. CLASSIFICATION OF OCCUPANCY:
B. OCCUPANT LOAD:
C. CAPACITY OF MEANS OF EGRESS:
D. NUMBER OF EXITS:
E. ARRANGEMENT OF MEANS OF
EGRESS:
F. ACCESSIBLE MEANS OF EGRESS:
G. TRAVEL DISTANCE TO EXITS:
NFPA 101: 7.6 & CHAPTERS 12-42
H. ILLUMINATION OF MEANS OF EGRESS:
NFPA 101: 7.8 & CHAPTERS 12-42
I. EMERGENCY LIGHTING:
NFPA 101: 7.9 & CHAPTERS 12-42
J. MARKING OF MEANS OF EGRESS:
NFPA 101: 7.10 & CHAPTERS 12-42
K. INTERIOR FINISH CLASSIFICATION
LIMITS:
NFPA 101: TABLE A.10.2.2
L. DETECTION, ALARM, &
COMMUNICATIONS:
UFC 3-600-01: CHAPTER 9-18
NFPA 101: 9.6 & CHAPTERS 12-42
M. PORTABLE FIRE EXTINGUISHERS:
UFC 3-600-01, 9-17
NFPA 10
N. CORRIDORS:
NFPA 101: CHAPTERS 12-42
O. FIRE DAMPERS:
NFPA 90A: 5.3.1, 5.4.1 & 5.4.2
P. SMOKE DAMPERS:
IBC: SECTION 716
NFPA 90A: 4.3.10.2, 5.3.5.1
LIFE SAFETY CODE ANALYSIS - CONTINUED
USE GROUP B (BUSINESS)
USE GROUP S-2 (LOW-HAZARD STORAGE)
ACCESSORY USE GROUP A-3 (ASSEMBLY)
TYPE IIB (NON-COMBUSTIBLE, UNPROTECTED)
NON-SEPARATED MIXED-USE BUILDING, GROUP B & GROUP S-2
ALLOWABLE AREA
GROUP B: 69,000 SF
GROUP S-2: 78,000 SF
AREA DETERMINATION
AT = 69,000 SF > ACTUAL = 14,581 SF PER FLOOR
MAXIMUM HEIGHT ALLOWED: 75 FEET, 4 STORIES
ACTUAL HEIGHT: < 75 FEET, 3 STORIES
NEW 4-STORY SHAFT ENCLOSURES - 2 HOUR RATING; EXISTING SHAFTS - 1/2 HOUR RATING;
EXISTING EXIT ENCLOSURES IN NON-HIGH-RISE BUILDINGS -1 HOUR RATING
DOORS LOCATED IN 1-HOUR OR 2-HOUR FIRE-RESISTANCE RATED SHAFTS AND EXIT
ENCLOSURES REQUIRES A 60 MIN. OR 90 MIN RATING, RESPECTIVELY. DOORS LOCATED IN
OTHER 1-HOUR OR 2-HOUR RATED FIRE BARRIERS REQUIRE A 45 MIN OR 90 MIN RATING
RESPECTIVELY.
NO SEPARATION REQUIRED BETWEEN OCCUPANCIES. FLOORS SHALL BE CONSTRUCTED
AS A SMOKE BARRIER IAW NFPA 101.
PRIMARY STRUCTURAL FRAME – 0 HOUR RATING
BEARING WALLS:
EXTERIOR WALLS – 0 HOUR RATING *
INTERIOR WALLS – 0 HOUR RATING **
NON-BEARING WALLS:
EXTERIOR PARTITIONS – 0 HOUR RATING *
INTERIOR PARTITIONS – 0 HOUR RATING **
FLOOR CONSTRUCTION AND SECONDARY MEMBERS – 0 HOUR RATING
ROOF CONSTRUCTION AND SECONDARY MEMBERS – 0 HOUR RATING
* EXTERIOR WALLS DO NOT REQUIRE A FIRE RESISTANCE RATING UNLESS OTHERWISE
REQUIRED BASED ON FIRE SEPARATION DISTANCE
**REFER TO NFPA 101 & UFC REQUIREMENTS FOR INTERIOR WALL RATINGS AND ROOF
CONSTRUCTION.
NO AREAS REQUIRING SPECIAL HAZARD PROTECTION WITHIN THE SCOPE OF WORK.
THE BUILDING IS PROTECTED WITH AN EXISTING AUTOMATIC SPRINKLER SYSTEM
THROUGHOUT, THE SPRINKLER SYSTEM WILL BE MODIFIED TO ACCOMMODATE THE
ARCHITECTURAL CHANGES.
THE OFFICE BUILDING IS PRIMARILY LIGHT HAZARD (LH), THE LABORATORIES, MECHANICAL, ELECTRICAL AND STORAGE ROOMS ARE CLASSIFIED AS ORDINARY HAZARD (OH).
HAZARD DENSITY AREA MIN. K-FACTOR HOSE
LIGHT HAZARD 0.1 GPM/SF 1500 SF 5.6 250 GPM
ORDINARY HAZARD 0.2 GPM/SF 2500 SF 8.0 250 GPM
N/A: NO STORAGE OVER 12 FEET IN HEIGHT
COVERAGE PER SPRINKLER MUST BE IN ACCORDANCE WITH NFPA 13, NOT EXCEEDING 225
SF FOR LIGHT HAZARD OR 130 SF FOR ORDINARY HAZARD. EXTENDED COVERAGE HEADS
ARE NOT PERMITTED.
DATE: 10/6/2020
PERFORMED BY: DALMATIAN FIRE & AMERICAN WATER
WITNESSED BY: ROBERT VIALL, PE
STATIC PRESSURE: 135 PSI
RESIDUAL PRESSURE: 82 PSI WHILE FLOWING 901 GPM
PROJECTED FLOW @ 20 PSI: 1369 GPM
BASED ON THIS FLOW TEST DATA, A FIRE PUMP WILL NOT BE REQUIRED FOR THIS
PROJECT.
NOT APPLICABLE.
THE SYSTEM IS PROVIDED WITH AN EXISTING 6" BACKFLOW PREVENTER. AN 8 PSI
PRESSURE LOSS HAS BEEN INCLUDED IN THE HYDRAULIC CALCULATIONS FOR THE
BACKFLOW PREVENTER.
NOT APPLICABLE. A FIRE PUMP IS NOT REQUIRED FOR THIS PROJECT.
BUILDING CODE ANALYSIS
A. OCCUPANCY CLASSIFICATION:
IBC CHAPTER 3
B. CONSTRUCTION TYPE
IBC CHAPTER 6
TABLE 601
C. MIXED USE & OCCUPANCY
SEPARATION
D. AREA LIMITATIONS / MODIFICATIONS
E. HEIGHT LIMITATIONS
F. VERTICAL ENCLOSURES, CONTINUITY,
PROTECTION
G. OPENING PROTECTIVES & THRU-
PENETRATIONS
H. HORIZONTAL SEPARATIONS
I. FIRE RESISTIVE REQUIREMENTS
J. ENCLOSURE PROTECTION
K. FIRE PROTECTION SYSTEM
L. AVAILABLE WATER SUPPLY TESTING
M. WATER STORAGE TANK
REQUIREMENTS
N. BACKFLOW PREVENTER & TESTING
O. FIRE PUMP(S)
DUCT SMOKE DETECTORS INSTALLED DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF
ANY BRANCH CONNECTIONS IN AIR SUPPLY SYSTEMS HAVING A CAPACITY GREATER
THAN 2,000 CFM, AND AT EACH STORY PRIOR TO THE CONNECTION TO A COMMON
RETURN AND PRIOR TO ANY RECIRCULATION OR FRESH AIR INLET CONNECTION IN
RETURN AIR SYSTEMS HAVING A CAPACITY GREATER THAN 15,000 CFM AND SERVING
MORE THAN ONE STORY.
NOT APPLICABLE - NEW AIR HANDLING EQUIPMENT DOES NOT HAVE A CAPACITY OF
GREATER THAN 2,000 CFM
THE EXISTING ELEVATORS ARE NOT BEING MODIFIED AS PART OF THIS PROJECT.
THE BUILDING HAS EXISTING ROOF ACCESS VIA STAIR 1.
N/A
FIRE DEPT. VEHICLE ACCESS IS EXISTING TO REMAIN.
EXISTING FIRE HYDRANTS ARE PROVIDED AROUND THE BUILDING.
N/A
Q. DUCT SMOKE DETECTORS
NFPA 90A: 6.4.2.1
R. ELEVATORS
S. ROOF ACCESS:
UFC 3-600-01: 10-4
IBC CHAPTER 1011.12
T. HAZARDOUS LOCATIONS IN
COMMERCIAL GARAGES
NFPA 70: NEC ARTICLES 500 & 511
U. FIRE DEPT VEHICLE ACCESS
UFC 3-600-01: 9-1
NFPA 1: 18.2.3.4.1
V. FIRE HYDRANT INSTALLATION
UFC 3-600-01: 9-3.5
W. KITCHEN COOKING EXHAUST
EQUIPMENT
NFPA 101: 9.2.3, CHAPTERS 12-42
NFPA 96
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-004
C O
D E
SU
M
M
AR
Y
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
R D
V
R D
V
JM
B
SC
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 3
R
EN
O
VA
TI
O
N P
H
AS
E
PR
O
JE
C
T #Z
H
TV
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
EXISTING FACILITIES (CONTINUED)EXISTING FACILITIES
FACILITIES AS THEY EXIST PRIOR TO PROJECT, MUST MEET NFPA 101
FOR EXISTING OCCUPANCY. THE FOLLOWING EXISTING FACILITY
DEFICIENCIES HAVE BEEN IDENTIFIED:
- EXISTING CONFERENCE ROOM 023 HAS A CALCULATED OCCUPANT
LOAD OF MORE THAN 50 OCCUPANTS AND THEREFORE REQUIRES A
SECOND EXIT
- STAIR 2 CONSTRUCTED OF GLASS BLOCK AT LOWER LEVEL AND DOES
NOT EXTEND ALL THE WAY TO THE ROOF - WILL BE REBUILT AS PART OF
THIS PROJECT
- STAIR 2 DOORS DO NOT HAVE PANIC HARDWARE OR LATCHES, AND
WILL BE REPLACED WITH COMPLIANT DOORS.
- NO MANUAL PULL STATIONS ARE PROVIDED AT STAIR 2 ON THE
SECOND AND THIRD FLOORS.
- EXISTING COMMUNICATIONS CONDUIT IS ROUTED THROUGH THE STAIR
2 EXIT ENCLOSURE. EXISTING PENETRATIONS ARE PERMITTED TO
REMAIN PER NFPA 101 SEC. 7.1.3.2.1(10)(I).
- STAIR 2 DISCHARGES ON THE FIRST FLOOR, BUT EXTENDS DOWN TO
THE LOWER LEVEL. NO GATE OR SIGNAGE IS PROVIDED TO PREVENT
OCCUPANTS FROM EGRESSING PAST THE LEVEL OF EXIT DISCHARGE.
- THE UTILITY SHAFT LOCATED BEHIND THE RESTROOMS IS NOT
CONTINUOUS, AND WILL BE RECONSTRUCTED AS PART OF THIS
PROJECT.
- THE DOOR TO THE ELEVATOR EQUIP ROOM ON THE LOWER LEVEL
DOES NOT HAVE THE APPROPRIATE FIRE RATING AND WILL BE
REPLACED. THE RAISED FLOOR WILL ALSO BE REMOVED IN LAB 011
WHICH ACCESSES THE ELEVATOR EQUIP ROOM.
- THE ELEVATOR MACHINE ROOM OPENS DIRECTLY INTO STAIR 1 ON THE
ROOF LEVEL. NFPA 101 PERMITS EXISTING OPENINGS TO MECHANICAL
EQUIPMENT ROOMS PROTECTED BY AN APPROVED EXISTING FIRE
RATED DOOR PROVIDED THE SPACE IS USED SOLELY FOR NON-FUEL
FIRED MECHANICAL EQUIPMENT, THE SPACE CONTAINS NO STORAGE
OF COMBUSTIBLE MATERIALS, AND THE BUILDING IS FULLY
SPRINKLERED ( §7.1.3.2.1(9)(E)).
THE BUILDING IS PROVIDED WITH AN EXISTING SPRINKLER SYSTEM
THROUGHOUT. THE EXISTING SPRINKLER SYSTEM WILL BE MODIFIED TO
ACCOMMODATE ARCHITECTURAL CHANGES.
A. EXISTING FACILITY DEFICIENCY
UPGRADE:
UFC 3-600-01: 34-1.1
NFPA 101: CHAPTERS 12-42
B. AUTOMATIC SPRINKLER SYSTEMS:
UFC 3-600-01: 34-1.2.6 & 9-7.2
C. WORK IN EXISTING FACILITIES:
UFC 3-600-01: 34-1.2.2
CATEGORY LIST AFFECTED
RM NOS.
CATEGORY
TOTAL SQ.FT. (x)
TOTAL GROSS
AREA (y)
AFFECTED
PERCENT (X
DIVIDED BY Y)
NO WORK
REPAIR
RENOVATION
MODIFICATION
RECONSTRUCTION
SEE PLANS
N/A
SEE PLANS
SEE PLANS
32% < 50% THEREFORE NO TRIGGER FOR RECONSTRUCTION
MASS NOTIFICATION
THE EXISTING FIRE ALARM/MASS NOTIFICATION SYSTEM WILL BE
MODIFIED TO ACCOMMODATE ARCHITECTURAL CHANGES. CLEAR
STROBES MARKED "ALERT" WILL BE PROVIDED IN RENOVATED AREAS
AS REQUIRED BY CURRENT CODES. THE EXISTING DUAL STROBES WILL
REMAIN IN AREAS NOT MODIFIED BY THIS PROJECT. THE BUILDING
DOES NOT HAVE ANY EXISTING MNS TEXT SIGNS. EXISTING LOCS ARE
PROVIDED ON EACH FLOOR AND WILL REMAIN.
UFC 4-021-01
ECB 2018-17
ACCESSIBILITY REQUIREMENTS
ALL NEW WORK SHALL BE COMPLETELY ACCESSIBLE IN ACCORDANCE
WITH ABA.
ABA CHAPTERS 1-10
D. REPAIR CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.3
E. RENOVATION CATEGORY:
UFC 3-600-01: 34-1.2.2 & 1.4
F. MODIFICATION CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.5
G. RECONSTRUCTION CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.6
H. ADDITION CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.7
I. CHANGE IN USE CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.8
J. VACANT BLDG CATEGORY:
UFC 3-600-01:34-1.2.2 & 1.9
K. PHASED PROJECTS:
UFC 3-600-01:34-3
L. COOKING AREAS:
UFC 3-600-01:34-1.2.2 & 1.9
M. ELECTRONIC EQUIPMENT AREAS:
UFC 3-600-01:34-5
N. FIRE ALARM SYSTEM:
UFC 3-600-01:34-8
NOT APPLICABLE
THE EXIT ENCLOSURE FOR STAIR 2 WILL BE RENOVATED TO COMPLY
WITH NFPA 101. THERE ARE ALSO CERTAIN AREAS ON EACH FLOOR
THAT ARE NOT BEING RECONFIGURED THAT WILL RECEIVE NEW PAINT,
FLOORING, AND/OR CEILINGS. ALL NEW INTERIOR FINISHES WILL
COMPLY WITH NFPA 101 FOR NEW CONSTRUCTION.
IN THIS PHASE, MODIFICATIONS GENERALLY OCCUR ONLY IN LOWER
LEVEL, FIRST FLOOR, AND SECOND FLOOR. IN THIS PHASE,
MODIFICATIONS ON THE THIRD FLOOR ARE LIMITED TO THE EXPANSION
OF THE COMM. ROOM. DURING PHASE 1, MODIFICATIONS WERE LIMITED
TO THE FIRST FLOOR, CENTRAL WING (RECONFIGURED THE CHASE
NEAR STAIR 2), THIRD FLOOR, CENTRAL WING (RECONFIGURED THE
CHASE NEAR STAIR 2), AND THIRD FLOOR, WEST WING (RESTROOMS,
LAB, LAB, SERVER). REFER TO PLANS FOR LOCATIONS. ALL NEW WORK
SHALL COMPLY WITH UFC 3-600-01 AND NFPA 101 FOR NEW
CONSTRUCTION. THE AREA OF ARCHITECTURAL MODIFICATIONS DOES
NOT EXCEED 50% OF THE AREA OF ANY ONE FLOOR, INCLUDING PHASE
1 WORK.
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
NOT APPLICABLE
THIS PROJECT IS PHASE 2. PHASE 1 CONSISTED LARGELY OF THE
REPLACEMENT OF THE BUILDING'S HVAC SYSTEMS. THE CHASE NEAR
STAIR 2, SOME LABS AND THE BATHROOMS ON THE THIRD FLOOR WERE
ALSO MODIFIED IN PHASE 1. THE ONLY MODIFICATIONS TO THE THIRD
FLOOR AS PART OF PHASE 2 IS THE EXPANSION OF THE
COMMUNICATIONS ROOM.. THE PROJECT WILL NOT EXCEED THE 50%
AREA THRESHOLD ON ANY FLOOR WHEN CONSIDERING BOTH PHASE 1
AND 2.
NOT APPLICABLE.
NOT APPLICABLE. NO ELECTRONIC EQUIPMENT AREAS IN THE SCOPE
OF WORK.
THE BUILDING IS PROVIDED WITH AN EXISTING FIRE ALARM/MASS
NOTIFICATION SYSTEM. THE EXISTING FIRE ALARM/MASS NOTIFICATION
SYSTEM WILL BE MODIFIED TO ACCOMMODATE ARCHITECTURAL
CHANGES.
LOWER LEVEL
4993 15624 32
CATEGORY LIST AFFECTED
RM NOS.
CATEGORY
TOTAL SQ.FT. (x)
TOTAL GROSS
AREA (y)
AFFECTED
PERCENT (X
DIVIDED BY Y)
NO WORK
REPAIR
RENOVATION
MODIFICATION
RECONSTRUCTION
SEE PLANS
N/A
SEE PLANS
SEE PLANS
38% < 50% THEREFORE NO TRIGGER FOR RECONSTRUCTION
1ST FLOOR
6255 16434 38
CATEGORY LIST AFFECTED
RM NOS.
CATEGORY
TOTAL SQ.FT. (x)
TOTAL GROSS
AREA (y)
AFFECTED
PERCENT (X
DIVIDED BY Y)
NO WORK
REPAIR
RENOVATION
MODIFICATION
RECONSTRUCTION
SEE PLANS
N/A
SEE PLANS
SEE PLANS
44% < 50% THEREFORE NO TRIGGER FOR RECONSTRUCTION
2ND FLOOR
6438 14658 44
CATEGORY LIST AFFECTED
RM NOS.
CATEGORY
TOTAL SQ.FT. (x)
TOTAL GROSS
AREA (y)
AFFECTED
PERCENT (X
DIVIDED BY Y)
NO WORK
REPAIR
RENOVATION
MODIFICATION
RECONSTRUCTION
SEE PLANS
N/A
SEE PLANS
SEE PLANS
11% < 50% THEREFORE NO TRIGGER FOR RECONSTRUCTION
3RD FLOOR
1551 14306 11
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-005
C O
D E
SU
M
M
AR
Y
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
R D
V
R D
V
JM
B
SC
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 3
R
EN
O
VA
TI
O
N P
H
AS
E
PR
O
JE
C
T #Z
H
TV
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-006
R O
O M
O C
C U
PA
N
C Y
TA
BL
ES
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
R D
V
R D
V
JM
B
SC
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 3
R
EN
O
VA
TI
O
N P
H
AS
E
PR
O
JE
C
T #Z
H
TV
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
A B C D
EQUIPMENT
STORAGE
2381 SF
LOADING
125 SF
ELEV 1
E001
137 SF
STAIR 1
S001
133 SF
CORRIDOR
C000
509 SF
CONFERENCE
ROOM
1131 SF
MECHANICAL
1009 SF
LAB
1336 SF
MECH
M003
124 SF
ELEV 2
E002
78 SF
ELEV EQ.
011A
78 SF
STORAGE
287 SF
OPEN YARD ELEC
018B
384 SF
ELECTRICAL
018A
238 SF
CORRIDOR
C001
536 SF
UNISEX LAV.
T042
118 SF
MECH
M002
42 SF
MECHANICAL
548 SF
CORRIDOR
C002
445 SF
ELEC
90 SF
HALL
H001
81 SF
TELECOM
38 SF
STAIR 2
S002
116 SF
CP=68'-1"
CP=68'-11"
TD=127'-0"
F M
C P
LIFE SAFETY LEGEND
CP= X'-X"
COMMON PATH OF TRAVEL
DE= X'-X"
DEAD END
TD= X'-X"
TRAVEL DISTANCE
FIRE EXTINGUISHER
(E DENOTES EXIST. TO REMAIN)
1-HR FIRE BARRIER
2-HR FIRE BARRIER
XX
XX
EGRESS WIDTH (INCHES)
EXIT CAPACITY (# OF OCCUPANTS)
KB
LAB
278 SF
HALL
H002
90 SF
ELEC
015A
58 SF
MECHANICAL
3046 SF
PIPE CLST
T042A
66 SF
OFFICE
130 SF
CP=61'-3"
L O
C
E
E
E
E
E
STAIR 1
STAIR 2
146 OCC.
146 OCC.
TOTAL EXIT
CAPACITY =
292 OCC.
OFFICE
120 SF
M
AX. D
IA
G
O
NAL =
66'-0
REQ'D EXIT SEPARATION = 55'-3"
ACTUAL EXIT SEPARATION = 106'-9"
# OF OCCUPANTS USING THAT EXIT
WORK ROOM
359 SF
OFFICE
361 SF
LAB
199 SF
JANITOR
23 SF
DE=16'-3"
D E
TD=74'-9"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
G-101
L O
W E
R L
E V
E L L
IF
E
S A
F E
T Y
P L A
N
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
U R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R D
V
R D
V
J M
B
S C
M
A Y
W Q
R B
W Q
R D
P
R E
A D
Y T
O A
D V
E R
T
IS
E
W P
A F
B B
L D
G R
E N
O V
A T
IO
N
P H
A S
E
P R
O J E
C T
Z
H T
V
SCALE: 1/8" = 1'-0"
LOWER LEVEL LIFE SAFETY PLAN
1. THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE CONSTRUCTION
CONTRACT AND ALL INFORMATION CONTAINED HERE IS LOCATED ON
CONSTRUCTION DOCUMENTS.
GENERAL NOTES
R
E A
D Y
T O
A D
V E
R T
IS
E
/0
/2
1KEYNOTES
A 1-HOUR FIRE RATED ENCLOSURE IS PERMITTED FOR THE EXISTING STAIR 2
ENCLOSURE PER NFPA 101.
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
A B C D
LAB
460 SF
LAB
464 SF
LAB
121A
269 SF
LAB
119A
260 SF
LAB
274 SF
HALL
H103
206 SF
LAB
185 SF
SECURE
CONFERENCE
ROOM
532 SF
OFFICE
355 SF
STORAGE
123A
184 SF
TLT-M
T142
207 SF
ELEV 1
E101
124 SF
OFFICE
118A
138 SF
STAIR 1
168 SF COMM
9 SF
OFFICE
102 SF
OFFICE
91 SF
OFFICE
147 SF
HALL
H101
149 SF
OFFICE
107 SF
OFFICE
116 SF
VEST
V100
71 SF
CORRIDOR
C101
663 SF
LAB
362 SF
LAB
1891 SF
CONFERENCE
469 SF CONTROL ROOM
491 SF
ELEV 2
E102
76 SF
FACILITIES
STORAGE
784 SF
STAIR
100D
114 SF
SIMULATOR
1808 SF
STORAGE
100B
159 SF
STAIR
100A
266 SF
OFFICE
112B
114 SF
OFFICE
112A
126 SF
OFFICE
125 SF VEST
V115
40 SF
CORRIDOR
C103
127 SF
STAIR 2
S102
122 SFSTORAGE
46 SF
JAN.
13 SF
OFFICE
61 SF
CORRIDOR
C102
592 SF
CP=98'-6"
TD=154'-7"
D E
CP=68'-1"
LIFE SAFETY LEGEND
CP= X'-X"
COMMON PATH OF TRAVEL
DE= X'-X"
DEAD END
TD= X'-X"
TRAVEL DISTANCE
FIRE EXTINGUISHER
(E DENOTES EXIST. TO REMAIN)
1-HR FIRE BARRIER
2-HR FIRE BARRIER
XX
XX
EGRESS WIDTH (INCHES)
EXIT CAPACITY (# OF OCCUPANTS)
D E
STORAGE
120A
83 SF
COMM
122A
80 SF
JANITOR
22 SF
LOC
E
E
E
VEST 100
VEST 115
340 OCC.
170 OCC.
TOTAL EXIT
CAPACITY =
656 OCC.
STAIR 1 146 OCC.
MAX. D
IAGONAL = 199'-6
REQ'D EXIT SEPARATION = 66'-6"
ACTUAL EXIT SEPARATION = 112'-11"
CP=91'-7"
# OF OCCUPANTS USING THAT EXIT
LAB
557 SF
OFFICE
114A
109 SF
TLT-W
T141
183 SF
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
G-110
F
IR
S T
F L O
O R
L
IF
E S
A F
E T
Y P
L A
N
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
U R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
R D
V
R D
V
J M
B
S C
M
A Y
W Q
R B
W Q
R D
P
R E
A D
Y T
O A
D V
E R
T
IS
E
W P
A F
B B
L D
G R
E N
O V
A T
IO
N
P H
A S
E
P R
O J E
C T
Z
H T
V
SCALE: 1/8" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
1. THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE CONSTRUCTION
CONTRACT AND ALL INFORMATION CONTAINED HERE IS LOCATED ON
CONSTRUCTION DOCUMENTS.
GENERAL NOTES
R
E A
D Y
T O
A D
V E
R T
IS
E
/0
/2
1KEYNOTES
A 1-HOUR FIRE RATED ENCLOSURE IS PERMITTED FOR THE EXISTING STAIR 2
ENCLOSURE PER NFPA 101.
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
UP
A B C D
LAB
225A
441 SF
CUBICLES
274 SF
LAB
277 SF
HALL
H201
161 SF
LAB
224A
279 SF
STAIR 1
S201
168 SF
LAB
189 SF
COMM
227A
80 SF
LAB
525 SF
OFFICE
152 SF
OFFICE
124 SF
OFFICE
144 SF
OFFICE
138 SF
OFFICE
96 SF
MECH
139 SF
LAB
324 SF
COMM
T244
13 SF
CLST
63 SF
CORRIDOR
C202
686 SF
SIMULATOR
151 SF
SERVER
301 SF
ELEV 2
E202
76 SF
MECH
785 SF
CORRIDOR
C202
686 SF
STAIR 2
S202
123 SF
ELEV 1
E201
117 SF
D E=
'-7
D E=
'-6
CP=68'-1"
STAIR 1
STAIR 2
146 OCC.
146 OCC.
TOTAL EXIT
CAPACITY =
292 OCC.
CORRIDOR
C201
OFFICE
246 SF
LIFE SAFETY LEGEND
CP= X'-X"
COMMON PATH OF TRAVEL
DE= X'-X"
DEAD END
TD= X'-X"
TRAVEL DISTANCE
FIRE EXTINGUISHER
(E DENOTES EXIST. TO REMAIN)
1-HR FIRE BARRIER
2-HR FIRE BARRIER
XX
XX
EGRESS WIDTH (INCHES)
EXIT CAPACITY (# OF OCCUPANTS)
LAB
206 SF
LAB
210 SF
HALL
187 SF
LAB
441 SF
LAB
344 SF
LAB
771 SF
TLT-W
T241
250 SF
BREAK ROOM
256 SF
JANITOR
22 SF
MECHANICAL
559 SF
TLT-M
T242
113 SF
LOC
E
E
MAX. DIAGONAL = 199'-6"REQ'D EXIT SEPARATION = 66'-6"
ACTUAL EXIT SEPARATION = 103'-7"
C P=
-1
0"
CP=74'-0"
# OF OCCUPANTS USING THAT EXIT
CORRIDOR
C201
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
G-120
SE
C
O N
D F
LO
O
R L
IF
E
SA
FE
TY
P
LA
N
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
R D
V
R D
V
JM
B
SC
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 3
R
EN
O
VA
TI
O
N P
H
AS
E
PR
O
JE
C
T #Z
H
TV
SCALE: 1/8" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
1. THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE CONSTRUCTION
CONTRACT AND ALL INFORMATION CONTAINED HERE IS LOCATED ON
CONSTRUCTION DOCUMENTS.
GENERAL NOTES
R
EA
D
Y
TO
A D
VE
R
TI
SE
/0
3/
21KEYNOTES
A 1-HOUR FIRE RATED ENCLOSURE IS PERMITTED FOR THE EXISTING STAIR 2
ENCLOSURE PER NFPA 101.
C
ER
TI
FI
ED
F
IN
AL
C
ER
TI
FI
ED
F
IN
AL
ARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
B0
7-
UP
UP
A B C D
LAB
251 SF
LAB
500 SF
LAB
276 SF
LAB
289 SF
OFFICE
92 SF
LAB
100 SF
STAIR
S301
169 SF
ELEV 1
E301
117 SFSERVER
337A
129 SF
LAB
349 SF
CORRIDOR
C301
375 SF
OFFICE
141 SF
OFFICE
91 SF
OFFICE
133 SF
OFFICE
138 SF
OFFICE
137 SF
OFFICE
142 SF
CORRIDOR
C301
539 SF
TLT-W
T341
191 SF
TLT-M
T342
192 SF
LAB
337B
192 SF
ELEV 2
E302
76 SF
CONFERENCE
ROOM
247 SF
SIPIRNET
OFFICE
160 SF
BREAK ROOM
320F
151 SF
CORRIDOR
198 SF
OPEN WORK
AREA
702 SF
OFFICE
486 SF
UNOCCUPIED
374 SF
OFFICE
335 SF
OFFICE
320E
158 SF OFFICE
320D
118 SF
OFFICE
320C
116 SF
OFFICE
320B
113 SF
OFFICE
320A
110 SF
STAIR 2
S302
127 SFCLST
313A
32 SF
CLOSET
62 SF
CP=80'-9"
CP=94'-0"
D E=
'-5
STAIR 1
STAIR 2
146 OCC.
146 OCC.
TOTAL EXIT
CAPACITY =
292 OCC.
LIFE SAFETY LEGEND
CP= X'-X"
COMMON PATH OF TRAVEL
DE= X'-X"
DEAD END
TD= X'-X"
TRAVEL DISTANCE
FIRE EXTINGUISHER
(E DENOTES EXIST. TO REMAIN)
1-HR FIRE BARRIER
2-HR FIRE BARRIER
XX
XX
EGRESS WIDTH (INCHES)
EXIT CAPACITY (# OF OCCUPANTS)
OFFICE
132 SF
OFFICE
356 SF
OFFICE
183 SF
OFFICE
107 SF
SHARED
CONFERENCE
ROOM
440 SF
VEST.
320G
30 SF
OFFICE
79 SF
OFFICE
130 SF
CORRIDOR
C303
875 SF
LAB
870 SF
STORAGE
101 SF
OFFICE
348 SF
CP=64'-6"
STAIR S301 PROVIDES
ACCESS TO ROOF
LOC
E
E
E
MECH
423 SF
LOC
MAX. DIAGONAL = 210'-4"
REQ'D EXIT SEPARATION = 69'-4"
ACTUAL EXIT SEPARATION = 107'-2"
# OF OCCUPANTS USING THAT EXIT
HALL
227 SF
JANITOR
19 SF
CORRIDOR
369 SF
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
4' 8' 16'
1/8"=1'-0SCALE:
PLAN NORTH
G-130
TH
IR
D F
LO
O
R L
IF
E
SA
FE
TY
P
LA
N
W R
IG
H
T-
PA
TT
ER
SO
N
A
IR
F O
R C
E
BA
SE
, O
H
LO
U
IS
VI
LL
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
U
R K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
R D
V
R D
V
JM
B
SC
M
AY
W
2Q R
B0
W
2Q R
D
P2
R
EA
D Y
TO
A
D
VE
R
TI
SEW
PA
FB
B
LD
G
. 3
R
EN
O
VA
TI
O
N P
H
AS
E
PR
O
JE
C
T #Z
H
TV
SCALE: 1/8" = 1'-0"
THIRD FLOOR LIFE SAFETY PLAN
1. THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE CONSTRUCTION
CONTRACT AND ALL INFORMATION CONTAINED HERE IS LOCATED ON
CONSTRUCTION DOCUMENTS.
GENERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .