W912QR21B0001Plans-0002.pdf
PDF 3 MB Posted
- Solicitation number
- W912QR21B0001
About this file
This solicitation package describes a firm-fixed-price construction contract opportunity for renovations and an addition to Building 5028 at Scott Air Force Base. The project scope includes an approximately 5,900 square foot addition and 3,500 square feet of renovations to existing space to provide open office, conference room, storage room, break room, restrooms, secure open storage, office spaces, and event control rooms. The work will be designed to Unified Facilities Criteria standards and comply with DoD antiterrorism requirements. The solicitation number is W912QR21B0001 and will be set aside 100% for small businesses. The construction magnitude is estimated between $1,000,000 to $5,000,000. The selection method will be lowest price technically acceptable. The solicitation will be posted at SAM.gov and sealed bids are due on unspecified dates. The point of contact is listed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR21B0001 ADAL MAF B5028 Bid Opening Results.pdf | ||
| W912QR21B0001CADFiles-0003.zip | ZIP file | |
| W912QR21B0001Plans-0003.pdf | ||
| W912QR21B0001Specs-0003.pdf | ||
| W912QR21B0001_Native CAD Files-0002.zip | ZIP file | |
| W912QR21B0001_Site Visit Photos-0002.zip | ZIP file | |
| W912QR21B0001Specs-0002.pdf | ||
| B5028 MAF Site Visit Roster.xlsx | XLSX spreadsheet | |
| W912QR21B0001-0001.pdf | ||
| W912QR21B0001Specs-0001.pdf | ||
| W912QR21B0001Specs_Vol1-0000.pdf | ||
| W912QR21B0001Plans-0000.pdf | ||
| W912QR21B0001Specs_Vol2-0000.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHOLORIDE
R RADIUS, RANGE, RISER
RCP REFLECTED CEILING PLAN
RD REINFORCING STEEL BARS REBAR
REF REFERENCE, REFRIGERATOR
REG REGISTER
REINF REINFORCE
RET RETURN
REV REVISION
RH RIGHT HAND
RM ROOM
ROW RIGHT OF WAY
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FOOT(FEET)
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS SERVICE SINK
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TE TOP ELEVATION
TEL TELEPHONE
TOC TOP OF CONCRETE
TOS TOP OF SLAB, TOP OF STEEL
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VTR VENT THROUGH ROOF
W WASHER, WEST, WIDE
W/ WITH
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WP WATERPROOFING
WSCT WAINSCOT
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, ADJUSTABLE
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
BD BOARD
BLDG BUILDING
BOT BOTTOM
BRG BEARING
BRG PL BEARING PLATE
BUR BUILT-UP ROOFING
CF/CI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CF/GI CONTRACTOR FURNISHED/
GOVERNMENT INSTALLED
CID COMPREHENSIVE INTERIOR
DESIGN PACKAGE
CIP CAST-IN-PLACE, CAST IRON PIPE
CJ CONSTRUCTION JOINT/CONTROL
JOINT
CL CENTER LINE, CLASS, CLOSE
CLG CEILING
CLR CLEAR, COLOR, COOLER
CMU CONCRETE MASONRY UNIT
CPT CARPET
COL COLUMN
CONC CONCRETE
CONT CONTINUE, CONTINUOUS
CONTR CONTRACT, CONTRACTOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
COTR CONTRACTING OFFICER
TECHNICAL REPRESENTATIVE
CU FT CUBIC FEET
CU YD CUBIC YARD
D DRYER
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWS EYE WASH STATION
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FIN GR FINISH GRADE
FLR FLOOR
FP FIREPROOF
FT FEET, FOOT
FTG FOOTING
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GF/GI GOVERNMENT FURNISHED/
GOVERNMENT INSTALLED
GF/CI GOVERNMENT FURNISHED/
CONTRACTOR INSTALLED
GL GLASS
GLZ GLAZING
GMS GALVANIZED METAL STUD
GYP BD GYPSUM BOARD
HB HOSE BIBB
HC HANDICAP
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATING/AIR COND
IBC INTERNATIONAL BUILDING CODE
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MS MOP SINK
MT MOUNT
MTD MOUNTED
MTG MEETING
MTL METAL
MW MICROWAVE
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OF/OI OWNER FURNISH/
OWNER INSTALLED
OF/CI OWNER FURNISH/
CONTRACTOR INSTALLED
OH OVERHANG, OVERHEAD
OH DR OVERHEAD (COILING) DOOR
OPNG OPENING
OPP OPPOSITE
PCF POUNDS PER CUBIC FOOT
SYMBOLS LEGEND
ROOM NAME / NUMBER
DESIGNATION
DOOR NUMBER
WINDOW / LOUVER
TYPE
WALL TYPE
ELEVATION
TARGET
ELEVATION NUMBER
INTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION NUMBER
EXTERIOR ELEVATION
SYMBOL
SHEET ON WHICH
ELEVATION IS DRAWN
NORTH ARROW
SECTION NUMBER
SECTION SYMBOL
SHEET ON WHICH
SECTION IS DRAWN
DETAIL NUMBER
DETAIL SYMBOL
SHEET ON WHICH
DETAIL IS DRAWN
PLAN
NORTH
A101
SIM
A
A
4 A-200
ROOM NAME
A-201
PLAN NORTH
TRUE NORTH A-201
SHEET NOTE1
GENERAL NOTES
1. The BUILDING 5028 ALLOCATES PERSONNEL FOR TWO MISSION
OPERATIONS OF THE US AIR FORCE, EACH MISSION OCCUPIES A UNIQUE AREA
WITHIN THE BUILDING, THESE AREAS ARE B5028-A AND B5028-B. THE BUILDING
ADDITION/RENOVATION AS DEFINED IN THE DRAWINGS AND SPECIFICATIONS
IS FOR AREA B5028-A. INCIDENTAL WORK IN 5028-B IS LIMITED. REFER TO
DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. DUE TO THE
DIFFERENT ACCESS PROTOCOLS ESTABLISHED BY EACH MISSION, THE
CONTRACTOR MUST PROVIDE ADVANCED NOTIFICATION TO THE
GOVERNMENT CONTRACTING OFFICER REPRESENTATIVE BEFORE ENTERING
TO A SECURE AND NON- SECURE AREAS OF B5028-B TO PERFORM
CONSTRUCTION WORK REQUIRED BY THIS PROJECT.
2. DESIGN OF THE ADDITION/ RENOVATION FOR B5028-A INCORPORATES THE
CRITERIA REQUIREMENTS FOR A SECURE OPEN STORAGE FACILITY
ACCORDING TO DoD 5200.01, VOLUME 3, APPENDIX TO ENCLOSURE 3, PHYSICAL SECURITY STANDARDS. CONSTRUCTION WORK FOR THIS FACILITY
MUST FOLLOW THE SAME DoD CRITERIA STANDARDS REQUIRED FOR THIS
PROJECT.
3. AREA B5028-A WILL NOT BE OCCUPIED DURING CONSTRUCTION. WORK T
PERFORMED IN B5028-B MUST BE SCHEDULED DURING THE NIGHT HOURS TO
AVOID UTILITY INTERRUPTIONS WHEN BASE PERSONNEL IS IN THE BUILDING
DURING DAY HOURS. THE CONTRACTOR MUST COORDINATE WORKING HOURS
IN B5028-B WITH THE CONTRACTING OFFICER REPRESENTATIVE.
4. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE
GOVERNMENT'S MINIMUM REQUIREMENTS AND NOT IN CONFLICT WITH OTHER
CONTRACTORS’ PROVISIONS. UNLESS INDICATED OTHERWISE ON THE PLANS
OR SPECIFICATIONS (E.G. SOLE SOURCE), ALL LISTED MANUFACTURERS ARE
THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN PRODUCTS, OTHER
MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD OF
QUALITY AND
CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR EXCEED
THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE BASIS OF
DESIGN."
1. THE GOVERNMENT WILL REMOVE EQUIPMENT AND FURNISHINGS PRIOR
TO THE BUILDING DEMOLITION.
2. GENERAL DEMOLITION WORK TO THE EXISTING BUILDING FOR THE
INSTALLATION OF NEW UTILITIES AND SERVICES SHALL BE INCLUDED IN THE
SCOPE OF WORK. SAW-CUTTING AND EXCAVATION; FILLING AND PATCHING
OF EXISTING CONCRETE FLOOR SLABS TO REMAIN AFTER INSTALLATION OF
NEW UTILITIES AND SERVICES SHALL ALSO BE INCLUDED IN THE SCOPE OF
WORK. REFER TO PLUMBING AND ELECTRICAL DRAWINGS FOR NEW
UTILITIES AND SERVICES.
3. PATCHING OF EXISTING STUD WALLS AND GYPSUM WALLBOARD TO
REMAIN SHALL ALSO BE INCLUDED IN SCOPE OF WORK.
4. REFER TO ELECTRICAL, PLUMBING AND MECHANICAL DRAWINGS FOR
ADDITIONAL DEMOLITION REQUIREMENTS.
5. DEMOLISH PORTION OF EXISTING WALLS TO ACCOMMODATE NEW
DUCTWORK, PIPING, CONDUITS, ETC. REFER TO MECHANICAL, ELECTRICAL,
PLUMBING AND FIRE PROTECTION DRAWINGS.
6. CONTRACTOR MUST PATCH AND REPAIR DAMAGE RESULTING FROM ANY
TYPE OF DEMOLITION AND REMOVAL OF BUILDING MATERIALS AND SYSTEM
COMPONENTS.
7. ANY EXISTING MECHANICAL, ELECTRICAL DEVICES OR EQUIPMENT
AFFECTED BY ANY RENOVATION AND NOT CALLED FOR TO BE REMOVED OR
DISCONNECTED, SHALL BE RESTORED AND LEFT IN FULL OPERATING
CONDITION.
8. THE CONTRACTOR MUST PROVIDE TEMPORARY ENCLOSURES/BARRIERS
IN REQUIRED LOCATIONS TO SEPARATE AREAS B5028-A AND B5028-B AT THE
LIMITS OF CONSTRUCTION WITHOUT BLOCKING DEFINED FIRE EXIT ROUTES
AND DOORS TO THE EXTERIOR..
DEMOLITION GENERAL NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S
E C
E R
V A
N T
E S
S T
R E
E T
S
U
IT
E B
P E
N S
A C
O L
A F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y x
D:\_RVT2019\Projects\145616-11_Scott_AFB-B5028_ka.white@bulltice.com.rvt
10/21/2020 2:14:23 PM
A-001
L E
G E
N D
N
O T
E S
A
N D
A B
B R
E V
IA
T
IO
N
S
S C
O T
T A
IR
F
O R
C E
B A
S E
IL
L
IN
O
IS
J u ly
CERTIFIED FINAL DESIGN SUBMITTAL
A D
A L
M A
F D
IS
T
R
IB
U T
E D
M
IS
S
IO
N O
P E
R A
T
IO
N S
B
(4
D A
R R
IA
G
A
K W
H
IT
E
B M
A G
G
IO
R E
B T
A
P A
-0
A
M E
N D
M E
N T
/2
/2
/202010/23
W
2Q R
B0
1P la ns
-0
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM COMM COMM
COMM
COMM
E
E
E
E
E
E
E
E
E
G
G
G
C O
M M
C O
M M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
COMM
G
G
G
G
G
W W
W W
W W
W W
W
SD SD
SD
SD
SD
SD
SA
N
SA
N
SD
SD
SD
SD SD SD SD SD
SD
CB CB
D
AC
AC
AC
AC
AC
AC
ACAC
ACAC
C
CO
CO
CO
CO
G
E
C
C
G
G
COM
H
H
CB
C
CB
CB
CB CBCB
CB
BUILDING
N 684,207.88 E 2,389,411.69
W
CPRYOR
DRIV
E
BUILDING 3677
FFE =
433.89
SI
D
EW
AL
K
SIDEWALK
5' S
ID
EW
AL
K
' S
ID
EW
AL
K
4' S
ID
EW
AL
K
6' SIDEWALK
ASPHALT PARKING LOT
ASPHALT PARKING LOT
6"
COVERED
CONCRETE
PAD
ASPHALT PARKING LOT
SD
SD
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
SAN
SAN
SAN
S
SD
SD
CB
CB
CO CO
CO
CO
CO
WWW FH
SD
SD
SD
SD
CB
SDSD
0+00
1+00
2+00
3+00 3+33
0+00
0+56
0+00
0+50 0+66
143' ~ 6" PVC @ 0.40%185' ~ 6" PVC @ 0.40%
CO101
RIM 432.86
6" PVC = 423.15
MH102
STA: 1+89.78
RIM 432.15
6" INV = 422.22 - NW
6" INV = 422.12 - SE
MH103
STA: 3+32.61
RIM 432.33
6" INV = 421.51
EX 8" VCP = 420.28
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
T.
B
AR
D
EN
T.
B
AR
D
EN
S.
S
C H
U
LT
Z
JU
LY
8, W
2Q R
-2 0-
F-
W
2Q R
-1 6-
D -0
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
B5
8_
C U
1.
D W
G
" x
4"
BT
A
FT
EV
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E, D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
BA
R
G E
D
ES
IG
N
S O
LU
TI
O N
S
V
AN
G
U
AR
D B
LV
D
M
IA
M
IS
BU
R
G , O
H
IO
SC
O
TT
A
IR
F
O R
C E
B A
SE
, I
LL
IN
O
IS
A D
A L
M A
F D
IS
TR
IB
U
TE
D
M
IS
SI
O
N O
PE
R
A
TI
O N
S B
(4
9)
BUSH
COMMUNICATIONS MANHOLE
COMMUNICATIONS PANEL
CONIFEROUS TREE
DRAIN
Drainage - Catch Basin
Drainage - Catch Basin - Round
ELECTRIC HANDHOLE
ELECTRICAL MANHOLE
FIRE HYDRANT
Generic Tree
HVAC EQUIPMENT
MAGNAIL
NATURAL GAS METER
POST
SANITARY CLEANOUT
SANITARY MANHOLE
Sign
SOIL BORING
STORM DRAINAGE DEVICE
STORM MANHOLE
TRANSFORMER
UTILITY POLE
YARD LITE
C
COM
CB
CB
H
E
FH
AC
G
CO
S
D
D
COMM COMMUNICATIONS
W W WATER
G GAS
E E ELECTRIC
VEGETATION
FLOWER BED
SAN SANITARY
SD STORM
GENERAL NOTES
1. SANITARY SHALL BE 18" VERTICAL AWAY FROM ANY WATER OR STORM
UTILITIES.
2. WATER LINE SHALL BE BURIED AT A MINIMUM OF 38" (48" PREFERRED) TO
THE TOP OF THE PIPE. 38" IS THE ACCEPTED FROST DEPTH.
3. DOWNSPOUTS ARE 5" DIAMETER AND MUST BE CONNECTED TO THE 6"
DIAMETER PIPE WITH APPROPRIATE FITTING. VERIFY DOWNSPOUT
LOCATIONS WITH ARCHITECTURAL PLANS.
4. AMERICAN WATER SHALL PROVIDE ALL WORK, LABOR, MATERIALS, AND
EQUIPMENT REQUIRED TO CONSTRUCT THE NEW WATERLINE BEYOND
THE 5 FOOT BUILDING LINES OF THE FACILITY. WORK INCLUDES BUT IS
NOT LIMITED TO TRENCHING, BACK FILLING, AND ROUGH GRADING;
PROVIDING AND INSTALLING THE WATERLINE PIPING, FIRE HYDRANT, AND
PIV; AS WELL AS COMPLETING THE REQUIRED TESTING.
SITE PLAN KEYNOTES
1. 6" SANITARY (PVC)
SEE SHEET C-201 FOR PROFILE AND INVERTS
2. CLEANOUT
SEE DETAIL A4/C-501
3. SANITARY MANHOLE
SEE DETAIL A1/C-501
4. REPLACE SANITARY MANHOLE
SEE DETAIL A1/C-501
5. POST INDICATOR VALVE
SEE DETAIL B9/C-501
6. UTILITY CROSSING
CONTRACTOR TO USE HAND TOOLS WITHIN 2' OF EXISTING COMM LINE
7. NEW FIRE HYDRANT LOCATION, HYDRANT BRANCH, AND TAPPING VALVE
AND SLEEVE. SEE D5/C-503
8. 4" x 6" CONNECTION SEE SHEET P-101 FOR CONTINUATION
LEGEND
PLAN NORTH
CIVIL UTILITY PLAN
SCALE: 1" =20'
20 400 A1
C
IV
IL
U
TI
LI
TY
P
LA
N
CU101
56' ~ 6" DUCTILE IRON
CATCH BASIN
CLEANOUT
CONCRETE
DOWNSPOUT
FIRE HYDRANT
OUTLET STRUCTURE
SANITARY MANHOLE
CO
CB
S
FH
CB
EXISTING NEW
A1/CU201
AM
EN
D
M
EN
T
/2 3/
2020-10-23
W
2Q R
B0
1P la ns
-0
STAIR
S1
20"x6" EA
ERV-1
"x
O A
10"x8" EA
"x
O A
10"x8" EA
24"x24" SA
"x
S A
1 1/4" HWS DN
1 1/4" HWR DN
1 1/4" HWS DN
1 1/4" HWR DN
12" x 12" OA UP
12" x 12" SA UP
16" x 26" RA UP
E1 M-302
B1 M-302
20"x16" RA
"x
R A
18"x18" SA
30"x8" SA
R R
14"x8" RA 14"x8" RA DN
"x
E A
16"x10" RA
R R
DSD
12"x10" EA
5 F
F5
F5
F5
20"x18" RA
F
/D5 M-303
12"x12" SA
1" HWS UP
1" HWR UP
MECH
UH-1
/2
H
W S
1/2" HWR
H W
R
1 1/4" HWR
1 1/4" HWS
T
1" R
3/4" R
B-2B-1
(EXISTING) (EXISTING)
P-1
P-2
(EXISTING)
(EXISTING)
16"x10" RA
14" x 8" RA UP
ACCU-1
/A5 M-303 F
KEY PLAN
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
PLAN NORTH
B U
L L
O C
K T
IC
E
A S
S O
C
IA
T E
S
E C
E R
V A
N T
E S
S T
R E
E T
S
U
IT
E B
P E
N S
A C
O L
A F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
E N
T U
C K
Y x
M-401
M E
C H
A N
IC
A
L E
N L
A R
A G
E D
P L
A N
S
S C
O T
T A
IR
F
O R
C E
B A
S E
IL
L
IN
O
IS
J u ly
CERTIFIED FINAL DESIGN
A D
A L
M A
F D
IS
T
R
IB
U T
E D
M
IS
S
IO
N O
P E
R A
T
IO
N S
B
(4
D L A
W
D H
A S
E N
K A
M P
J S
P R
A G
U E
B T
A
P M
-4
1/4" = 1'-0"C1
MECHANICAL ENLARGED PLAN -
MEZZANINE
0 2' 4' 8' 1/2" = 1'-0"C5
MECHANICAL ENLARGED PLAN -
MECHANICAL ROOM 159
2'1' 4'0
GENERAL NOTES
KEYED NOTES#
1. REFER TO GENERAL NOTES ON SHEET M-001.
1. RUN DUCT TIGHT TO OVERHEAD STRUCTURE.
2. ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DRAWINGS FOR MORE
INFORMATION.
3. PROVIDE DUCT SECURITY BARS IN ACCORDANCE WITH DETAIL C7/M-503.
4. SECURE AREA PIPING PENETRATION. SEAL PENETRATION WITH ACOUSTICAL
SEALANT IN ACCORDANCE WITH DETAIL A1/M-503.
5. FIRE DAMPER REQUIRED AT MEZZANINE WALL PENETRATION IN
ACCORDANCE WITH NFPA 90.
6. SAW-CUT MASONRY WALL TO INSTALL DUCT/FIRE DAMPER ASSEMBLY.
COORDINATE OPENING SIZE WITH MAXIMUM DIMENSIONS REQUIRED TO
INSTALL FIRE DAMPER. INSTALL HEADER AT EXISTING CMU WALL IN
ACCORDANCE WITH DETAIL C4/S-511.
7. EXTENT OF RECOMMENDED EQUIPMENT SERVICE CLEARANCE. INSTALL
SYSTEMS SO THERE ARE NO OBSTRUCTIONS WITHIN THE INDICATED AREA.
8. UNIT-MOUNTED VFD.
9. AHU-1 CONTROL PANEL.
10. REUSE EXISTING WALL OPENING FOR DUCT PENETRATION. PATCH ANNULAR
SPACE AROUND DUCT TO MAINTAIN 1-HOUR FIRE BARRIER.
A
M E
N D
M E
N T
/2
/2
1 1
1 1
W
2Q R
B0
1P la ns
-0
| A-001 |
| CU101 |
| M-401 |
File details come from the government source that posted it. Updated .