W912QR20R0076Specs_Vol2-0000.pdf
PDF 3 MB Posted
- Attached to
- Full Facility Restoration (FFR) project of buildings 207, 208, and 230 located at Fort Hunter Liggett, CA
- Solicitation number
- W912QR20R0076
About this file
This solicitation is for a full facility restoration project of three barracks located at Fort Hunter Liggett, California. The project cost is estimated between $10-25 million. It is a 100% small business set-aside for NAICS code 236220, with a size determination of $39.5 million. The Army Corps of Engineers Engineering District Louisville is the contracting agency. Offerors must register in the System for Award Management, which has replaced the Central Contractor Registration and Online Representations and Certifications Application. Technical inquiries should be submitted through Bidder Inquiry in ProjNet. The solicitation includes specifications for products and services required to complete the restoration of buildings 207, 208, and 230.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Transient Training Barracks – Bldgs 207, 208, & 230 Full Facility Renovation Fort Hunter Liggett, CA
P2: 475738
Design Bid Build
Specifications - Volume 2 of 2 Certified Final
17 August 2020
W912QR20R0076
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0076-0000
This Page Intentionally Left Blank
Solicitation for Design Build
Transient Training (TT) Barracks – Bldgs 207, 208, & 230 Full Facility Renovation Fort Hunter Liggett, CA
Certified Final Submission Specifications
VOLUME 2 – Division 08 – Division 33
U.S. Army Corps of Engineers, Louisville District
Contract No: W912QR-14-D-0020 Project No: 92847 P2 No: 475738 Date: 31 July 2020
Airside Office Park 100 Airside Drive Moon Township, PA 15108
This Page Intentionally Left Blank
PROJECT TABLE OF CONTENTS
VOLUME 1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION
- EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16
02 84 33
HANDLING OF LIGHTING BALLASTS AND LAMPS
AND MERCURY
REMOVAL AND DISPOSAL OF POLYCHLORINATED
CONTAINING PCBs
BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 36 00 POLISHED CONCRETE FLOOR FINISHING
DIVISION 05 - METALS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
VOLUME 2
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 24 23 CEMENT STUCCO PATCHING
09 29 00 GYPSUM BOARD AND CEMENTITIOUS BACKER UNITS
09 30 10 PORCELAIN TILE
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL PROTECTION
10 28 13 TOILET ACCESSORIES
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02
23 23 00
BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
REFRIGERANT PIPING
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
DIVISION 33 - UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
Transient Training Barracks Buildings 207, 208 & 230 Fort Hunter Liggett P2#475738
SECTION 08 11 13
STEEL DOORS AND FRAMES
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M (2019) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A879/A879M (2012) Standard Specification for Steel Sheet, zinc Coated by the Electrolytic Process for Applications Requiring Designation of the Coating Mass on Each Surface
ASTM A924/A924M (2018) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591 (2019a) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C612 (2014; R 2019) Mineral Fiber Block and Board Thermal Insulation
ASTM D2863 (2019) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)
ASTM E1300 (2016) Standard Practice for Determining Load Resistance of Glass in Buildings
ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
SECTION 08 11 13 Page 1 Certified Final Submission
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.115 (2016) Hardware Preparation in Steel Doors and Steel Frames
NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)
NAAMM HMMA 810 (2009) Hollow Metal Doors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives
NFPA 105 (2016; TIA 16-1) Standard for Smoke Door Assemblies and Other Opening Protectives
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
STEEL DOOR INSTITUTE (SDI/DOOR)
SDI/DOOR 111 (2009) Recommended Selection and Usage Guide for Standard Steel Doors, Frames and Accessories
SDI/DOOR 113 (2001; R2006) Standard Practice for Determining the Steady State Thermal Transmittance of Steel Door and Frame Assemblies
SDI/DOOR A250.6 (2003; R2009) Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames
SDI/DOOR A250.8 (2003; R2008) Recommended Specifications for Standard Steel Doors and Frames
SDI/DOOR A250.11 (2001) Recommended Erection Instructions for Steel Frames
UNDERWRITERS LABORATORIES (UL)
UL 10C (2016) UL Standard for Safety Positive Pressure Fire Tests of Door Assemblies
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Doors ; G
SECTION 08 11 13 Page 2
Recycled Content for Steel Door Product ; S Frames ; G
Recycled Content for Steel Frame Product ; S
Accessories
Weatherstripping
Show elevations, construction details, metal gages, hardware provisions, method of glazing, and installation details.
Schedule of Doors ; G
Schedule of Frames ; G
Submit door and frame locations.
SD-03 Product Data
Doors ; G
Frames ; G
Accessories
Weatherstripping
Submit manufacturer's descriptive literature for doors, frames, and accessories. Include data and details on door construction, panel (internal) reinforcement, insulation, and door edge construction. When "custom hollow metal doors" are provided in lieu of "standard steel doors," provide additional details and data sufficient for comparison to SDI/DOOR A250.8 requirements.
SD-04 Samples
Where colors are not indicated, submit manufacturer's standard colors and patterns for selection.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver doors, frames, and accessories undamaged and with protective wrappings or packaging. Provide temporary steel spreaders securely fastened to the bottom of each welded frame. Store doors and frames on platforms under cover in clean, dry, ventilated, and accessible locations, with 1/4 inch airspace between doors. Remove damp or wet packaging immediately and wipe affected surfaces dry. Replace damaged materials with new.
PART 2 PRODUCTS
2.1 STANDARD STEEL DOORS
SDI/DOOR A250.8 , except as specified otherwise. Prepare doors to receive door hardware as specified in Section 08 71 00 . Undercut where indicated. Provide exterior doors with top edge closed flush and sealed to prevent water intrusion. Provide doors at 1-3/4 inch thick, unless otherwise indicated. Provide door material that uses a minimum of 25
SECTION 08 11 13 Page 3 percent recycled content. Provide data indicating percentage of recycled content for steel door product . Provide exterior glazing in accordance with ASTM F2248 and ASTM E1300.
2.1.1 Classification - Level, Performance, Model
2.1.1.1 Standard Duty Doors
SDI/DOOR A250.8 , Level 1, physical performance Level C, Model 2, of size(s) and design(s) indicated and core construction as required by the manufacturer. Provide for closet doors .
2.1.1.2 Heavy Duty Doors
SDI/DOOR A250.8 , Level 2, physical performance Level B, Model 2, with core construction as required by the manufacturer for interior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners must be filled with mineral board insulation. Provide Level 2 for storage room and bathroom doors .
2.1.1.3 Extra Heavy Duty Doors
SDI/DOOR A250.8 , Level 3, physical performance Level A, Model 2 with core construction as required by the manufacturer for interior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners must be filled with mineral board insulation. Provide Level 3 for Sleeping Barracks doors and interior egress doors.
2.1.1.4 Maximum Duty Doors
SDI/DOOR A250.8 , Level 4, physical performance Level A, Model 2 with core construction as required by the manufacturer for interior doors and for indicated exterior doors, of size(s) and design(s) indicated. Where vertical stiffener cores are required, the space between the stiffeners must be filled with mineral board insulation. Provide Level 4 for exterior doors and circulation corridor doors .
2.2 CUSTOM HOLLOW METAL DOORS
Provide custom hollow metal doors where nonstandard steel doors are indicated. At the Contractor's option, custom hollow metal doors may be provided in lieu of standard steel doors. Provide standard steel doors in the door size(s), design(s), materials, construction, gages, and finish as specified for standard steel doors and complying with the requirements of NAAMM HMMA 810. Fill all spaces in doors with insulation. Close top and bottom edges with steel channels not lighter than 16 gage . Close tops of exterior doors flush with an additional channel and seal to prevent water intrusion. Prepare doors to receive hardware specified in Section 08 71 00 DOOR HARDWARE. Provide doors at 1-3/4 inch thick, unless otherwise indicated.
2.3 ACCESSORIES
2.3.1 Astragals
For pairs of exterior steel doors which will not have aluminum astragals or removable mullions, as specified in Section 08 71 00 DOOR HARDWARE provide overlapping steel astragals with the doors. For interior pairs of fire rated and smoke control doors, provide stainless steel astragals
SECTION 08 11 13 Page 4 complying with NFPA 80 for fire rated assemblies and NFPA 105 for smoke control assemblies.
2.3.2 Moldings
Provide moldings around glass of interior and exterior doors and louvers of interior doors. Provide nonremovable moldings on outside of exterior doors and on corridor side of interior doors. Other moldings may be stationary or removable. Secure inside moldings to stationary moldings, or provide snap-on moldings. Provide muntins that interlock at intersections and are fitted plus welded to stationary moldings.
2.4 INSULATION CORES
Provide insulating cores of the type specified, and provide an apparent U-factor of .48 in accordance with SDI/DOOR 113 and conforming to:
a. Rigid Cellular Polyisocyanurate Foam: ASTM C591, Type I or II, foamed-in-place or in board form, with oxygen index of not less than 22 percent when tested in accordance with ASTM D2863; or
b. Rigid Polystyrene Foam Board: ASTM C578, Type I or II; or
c. Mineral board: ASTM C612, Type I.
2.5 STANDARD STEEL FRAMES
SDI/DOOR A250.8 , Level as indicated . Form frames to sizes and shapes indicated, with welded corners or knock-down field-assembled corners.
Provide steel frames for doors, unless otherwise indicated. Provide frame product that uses a minimum of 25 percent recycled content. Provide data indicating percentage of recycled content for steel frame product .
2.5.1 Welded Frames
Continuously weld frame faces at corner joints. Mechanically interlock or continuously weld stops and rabbets. Grind welds smooth.
Weld frames in accordance with the recommended practice of the Structural Welding Code Sections 1 through 6, AWS D1.1/D1.1M and in accordance with the practice specified by the producer of the metal being welded.
2.5.2 Knock-Down Frames
Design corners for simple field assembly by concealed tenons, splice plates, or interlocking joints that produce square, rigid corners and a tight fit and maintain the alignment of adjoining members. Provide locknuts for bolted connections.
2.5.3 Stops and Beads
Form stops and beads from 20 gage steel. Provide for glazed and other openings in standard steel frames. Secure beads to frames with oval-head, countersunk Phillips self-tapping sheet metal screws or concealed clips and fasteners. Space fasteners approximately 12 to 16 inch on center.
Miter molded shapes at corners. Butt or miter square or rectangular beads at corners.
SECTION 08 11 13 Page 5
2.5.4 Anchors
Provide anchors to secure the frame to adjoining construction. Provide steel anchors, zinc-coated or painted with rust-inhibitive paint, not lighter than 18 gage .
2.5.4.1 Wall Anchors
Provide at least three anchors for each jamb. For frames which are more than 7.5 feet in height, provide one additional anchor for each jamb for each additional 2.5 feet or fraction thereof.
a. Masonry: Provide anchors of corrugated or perforated steel straps or 3/16 inch diameter steel wire, adjustable or T-shaped;
b. Stud partitions: Weld or otherwise securely fasten anchors to backs of frames. Design anchors to be fastened to closed steel studs with sheet metal screws, and to open steel studs by wiring or welding;
c. Completed openings: Secure frames to previously placed concrete or masonry with expansion bolts in accordance with SDI/DOOR 111 ;
and
2.5.4.2 Floor Anchors
Provide floor anchors drilled for 3/8 inch anchor bolts at bottom of each jamb member. Where floor fill occurs, terminate bottom of frames at the indicated finished floor levels and support by adjustable extension clips resting on and anchored to the structural slabs.
2.6 FIRE AND SMOKE DOORS AND FRAMES
NFPA 80 and NFPA 105 and this specification. The requirements of NFPA 80 and NFPA 105 takes precedence over details indicated or specified.
2.6.1 Labels
Provide fire doors and frames bearing the label of Underwriters Laboratories (UL), Factory Mutual Engineering and Research (FM), or Warnock Hersey International (WHI) attesting to the rating required.
Testing must be in accordance with NFPA 252 or UL 10C . Provide labels that are metal with raised letters, bearing the name or file number of the door and frame manufacturer. Labels must be permanently affixed at the factory to frames and to the hinge edge of the door. Do not paint door and labels.
2.6.2 Oversized Doors
For fire doors and frames which exceed the size for which testing and labeling are available, furnish certificates stating that the doors and frames are identical in design, materials, and construction to a door which has been tested and meets the requirements for the class indicated.
2.6.3 Astragal on Fire and Smoke Doors
On pairs of labeled fire doors, conform to NFPA 80 and UL requirements.
SECTION 08 11 13 Page 6
On smoke control doors, conform to NFPA 105 .
2.7 WEATHERSTRIPPING
As specified in Section 08 71 00 DOOR HARDWARE.
2.8 HARDWARE PREPARATION
Provide minimum hardware reinforcing gages as specified in SDI/DOOR A250.6 .
Drill and tap doors and frames to receive finish hardware. Prepare doors and frames for hardware in accordance with the applicable requirements of SDI/DOOR A250.8 and SDI/DOOR A250.6 . For additional requirements refer to ANSI/BHMA A156.115 . Drill and tap for surface-applied hardware at the project site. Build additional reinforcing for surface-applied hardware into the door at the factory. Locate hardware in accordance with the requirements of SDI/DOOR A250.8 , as applicable. Punch door frames , with the exception of frames that will have weatherstripping gasketing, to receive a minimum of two rubber or vinyl door silencers on lock side of single doors and one silencer for each leaf at heads of double doors. Set lock strikes out to provide clearance for silencers.
2.9 FINISHES
2.9.1 Factory-Primed Finish
Thoroughly clean all surfaces of doors and frames then chemically treat and factory prime with a rust inhibiting coating as specified in SDI/DOOR A250.8 . , or paintable A25 galvannealed steel without primer.
Where coating is removed by welding, apply touchup of factory primer.
2.9.2 Hot-Dip Zinc-Coated and Factory-Primed Finish
Fabricate exterior doors and frames from hot dipped zinc coated steel, alloyed type, that complies with ASTM A924/A924M and ASTM A653/A653M . The coating weight must meet or exceed the minimum requirements for coatings having 0.4 ounces per square foot , total both sides, i.e., A40. Repair damaged zinc-coated surfaces by the application of zinc dust paint.
Thoroughly clean and chemically treat to insure maximum paint adhesion.
Factory prime as specified in SDI/DOOR A250.8 . Provide for exterior doors.
2.9.3 Electrolytic Zinc-Coated Anchors and Accessories
Provide electrolytically deposited zinc-coated steel in accordance with ASTM A879/A879M , Commercial Quality, Coating Class A. Phosphate treat and factory prime zinc-coated surfaces as specified in SDI/DOOR A250.8 .
2.10 FABRICATION AND WORKMANSHIP
Provide finished doors and frames that are strong and rigid, neat in appearance, and free from defects, waves, scratches, cuts, dents, ridges, holes, warp, and buckle. Provide molded members that are clean cut, straight, and true, with joints coped or mitered, well formed, and in true alignment. Dress exposed welded and soldered joints smooth. Design door frame sections for use with the wall construction indicated. Corner joints must be well formed and in true alignment. Conceal fastenings where practicable. Design frames in exposed masonry walls or partitions to allow sufficient space between the inside back of trim and masonry to receive caulking compound.
SECTION 08 11 13 Page 7
2.10.1 Grouted Frames
For frames to be installed in exterior walls and to be filled with mortar or grout, fill the stops with strips of rigid insulation to keep the grout out of the stops and to facilitate installation of stop-applied head and jamb seals.
2.11 PROVISIONS FOR GLAZING
Materials are specified in Section 08 81 00 , GLAZING.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Frames
Set frames in accordance with SDI/DOOR A250.11 . Plumb, align, and brace securely until permanent anchors are set. Anchor bottoms of frames with expansion bolts or powder-actuated fasteners. Build in or secure wall anchors to adjoining construction. Where frames require ceiling struts or overhead bracing, anchor frames to the struts or bracing. Backfill frames with mortar. Coat inside of frames with corrosion-inhibiting bituminous material. For frames in exterior walls, ensure that stops are filled with rigid insulation before grout is placed.
3.1.2 Doors
Hang doors in accordance with clearances specified in SDI/DOOR A250.8 .
After erection and glazing, clean and adjust hardware.
3.1.3 Fire and Smoke Doors and Frames
Install fire doors and frames, including hardware, in accordance with NFPA 80 . Install fire rated and smoke doors and frames in accordance with NFPA 80 and NFPA 105 .
3.2 PROTECTION
Protect doors and frames from damage. Repair damaged doors and frames prior to completion and acceptance of the project or replace with new, as directed. Wire brush rusted frames until rust is removed. Clean thoroughly. Apply an all-over coat of rust-inhibitive paint of the same type used for shop coat.
3.3 CLEANING
Upon completion, clean exposed surfaces of doors and frames thoroughly.
Remove mastic smears and other unsightly marks.
-- End of Section --
SECTION 08 11 13 Page 8
SECTION 08 31 00
ACCESS DOORS AND PANELS
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A653/A653M (2019) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A666 (2015) Standard Specification for Annealed or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate and Flat Bar
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM E119 (2019) Standard Test Methods for Fire Tests of Building Construction and Materials
MASTER PAINTERS INSTITUTE (MPI)
MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
UNDERWRITERS LABORATORIES (UL)
UL 10B (2008; Reprint Feb 2015) Fire Tests of Door Assemblies
UL 263 (2011; Reprint Jan 2019) UL Standard for
SECTION 08 31 00 Page 1
Safety Fire Tests of Building Construction and Materials
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Access Doors And Panels ; G
SD-03 Product Data
Access Doors And Panels ; G
Hardware Including Locks and Keys; G
Accessories ; G
Recycled Content ; S
SD-04 Samples
Finishes ; G
SD-06 Test Reports
Fire-rating(s) of Assemblies ; G
1.3 MISCELLANEOUS REQUIREMENTS
For access doors and panels provide the following:
1.3.1 Shop Drawings
For field assembled access doors and panels, provide plans, elevations, sections, and details for each type of access door and panel assembly.
Indicate frame, surface and edge construction, materials, and accessories. Indicate types of finished surfaces and details for panel edge conditions. Provide a door schedule with a unique number for each access door and panel, specific location in the project, location of hinges and hardware for each door. Indicate fire-rating(s) of assemblies .
1.3.2 Product Data
For shop assembled access doors and panels, provide literature indicating sizes, types, frame and edge construction, finishes, hardware , accessories such as gaskets, seals and weatherstripping, and location of each door and panel in the project. Indicate fire-ratings of assemblies,. Provide details of adjoining work for each condition indicated.
SECTION 08 31 00 Page 2
1.3.3 Finish Samples
Submit two color charts from manufacturer's standard color and finish options for each type of frame and panel assembly finish indicated.
1.4 PERFORMANCE REQUIREMENTS
1.4.1 Structural Requirements
Provide floor access assemblies to support live loads indicated for floors. Deflection must not exceed 1/180 of span.
1.4.2 Fire-Rating Requirements
Provide access panels with a minimum fire-rating of as indicated on the Drawings.
1.4.3 Access Panels for Wet Areas
Provide panel assemblies that will be located in wet areas with corrosion resistant finishes and hardware and water resistant gasketing.
1.5 DELIVERY, STORAGE, AND PROTECTION
Protect from corrosion, deformation, and other types of damage. Store items in an enclosed area free from contact with soil and weather. Remove and replace damaged items with new items.
PART 2 PRODUCTS
2.1 RECYCLED CONTENT
Provide products with recycled content. Provide data for each product with recycled content, identifying percentage of recycled content.
2.2 MATERIALS
2.2.1 Steel Plates, Shapes, and Bars
Provide in accordance with ASTM A36/A36M.
2.2.2 Sheet Steel
Provide cold rolled steel sheet substrate in accordance with ASTM A1008/A1008M , Commercial Steel (CS), exposed.
2.2.3 Stainless Steel
Provide in accordance with ASTM A666, type 302 or 304.
2.2.4 Metallic Coated Steel Sheet
Provide in accordance with ASTM A653/A653M , Commercial Steel (CS), Type B;
with minimum G60 (Z180) or A60 (ZF180) metallic coating.
2.2.5 Hardware
Provide automatic closing devices. Provide latch releases operable from insides of doors. Provide anchors in accordance with applicable fire test
SECTION 08 31 00 Page 3 parameters.
2.2.6 Hinges
Provide concealed spring hinges, 175 degrees of opening, with non-removable hinge pins to allow removal of door panel from frame. Provide hinges of same steel as door and frame or in accordance with manufacturer's written recommendations. If providing non-continuous hinges, provide in numbers required to maintain alignment of door panel with frame. Provide coatings as necessary to permanently protect dissimilar metals from contact with one another; see Part 3 herein for more information.
2.2.7 Locks
Unless otherwise indicated, provide flush screwdriver operated cam lock.
Provide plastic sleeve or stainless steel bushings to protect holes in surface finishes for screwdriver to access lock.
2.2.8 Accessories
Provide anchors in size, number and location on four sides to secure access door to substrate. Provide anchors in types as recommended by manufacturer's written installation instructions for each substrate indicated. Provide shims, bushings, clips, gaskets, and other devices as necessary for a complete installation.
2.3 FABRICATION
2.3.1 Thickness, Size, Edges
Fabricate frames for access doors of steel not lighter than 16 gage with welded joints and anchorage for securing to adjacent construction.
Provide doors a minimum of 24 by 24 inches and of not lighter than 16 gage steel, with stiffened edges and welded attachments. Provide with eased (lightly rounded) edges, without burrs, snags or sharpness and exposed welds ground smooth.
2.3.2 Welding
Provide in accordance with AWS D1.1/D1.1M .
2.4 ACCESS ASSEMBLY TYPES
Unless indicated otherwise, provide flush-face steel access doors and panels with steel frames and flanges.
2.4.1 Fire-rated Doors
2.4.1.1 Door Construction
Provide ceiling access door construction in accordance with ASTM E119 or UL 263 . Provide wall access doors in accordance with NFPA 252 or UL 10B .
2.4.1.2 Labels
Provide class B opening according to UL 10B or test by another nationally recognized laboratory, approved by the Contracting Officer. Provide fire-rating as indicated herein, with a maximum temperature rise of 216
SECTION 08 31 00 Page 4 degrees F .
2.4.1.3 Door Panel and Frame
Steel sheet, with mineral fiber insulation core, insulated sandwich type construction.
2.5 FINISHES
Provide steel frame and panel surfaces with a shop applied prime coat.
Field paint frames and panels to match wall and ceiling surfaces in which they occur. Provide exposed fastenings that approximately match the color and finish of the each material to which fastenings are applied.
PART 3 EXECUTION
3.1 PREPARATION
Field verify all measurements prior to fabrication. Verify access door locations and sizes provide required maintenance access to installed building services components. Protect existing construction and completed work from damage during installation.
3.2 GENERAL INSTALLATION REQUIREMENTS
Install items at locations indicated, in accordance with manufacturer's written instructions. Include materials and parts as necessary for a complete installation of each item. Conceal fastenings where practicable. Poor matching of holes to fasteners is cause for rejection of the work.
3.3 ACCESS LOCATIONS
Install removable access panels directly below each valve, flow indicator, damper, air splitter or other utility requiring access that is located above ceilings, other than at acoustical panel ceilings, and that would otherwise not be accessible. Install access doors and panels permitting access to service valves, traps, dampers, cleanouts, and other mechanical, electrical and conveyor control items concealed in walls and partitions.
3.4 ACCESS LOCATIONS IN WET AREAS
When possible, avoid locating access panels in wet areas. When such locations cannot be avoided, provide moisture resistant assemblies as indicated in Part I herein.
3.5 FIELD PAINTING
Field painting primed access doors in accordance with the requirements of Section 09 90 00 PAINTS AND COATINGS.
3.6 DISSIMILAR MATERIALS
Where dissimilar metals are in contact, protect surfaces with a coating in accordance with MPI 79 to prevent galvanic or corrosive action.
3.7 ADJUSTMENT
Adjust hardware so that door panel opens freely. Adjust door when closed
SECTION 08 31 00 Page 5 center door panel in frame.
3.8 ENVIRONMENTAL CONDITIONS
Do not paint surfaces when damp or exposed to weather, when surface temperature is below 45 degrees F or over 95 degrees F , unless approved by the Contracting Officer.
-- End of Section --
SECTION 08 31 00 Page 6
SECTION 08 51 13
ALUMINUM WINDOWS
05/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF45 (2003; Reaffirmed 2009) Designation System for Aluminum Finishes
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA 611 (2014) Voluntary Specification for Anodized Architectural Aluminum
AAMA 907 (2015) Voluntary Specification for Corrosion Resistant Coatings on Carbon Steel Components Used in Windows, Doors and Skylights
AAMA 1503 (2009) Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors and Glazed Wall Sections
AAMA/WDMA/CSA 101/I.S.2/A440 (2011; Update 1 2014) North American Fenestration Standard/Specification for Windows, Doors, and Skylights
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 169 (2013) Climate Data for Building Design Standards
ASTM INTERNATIONAL (ASTM)
ASTM E1300 (2016) Standard Practice for Determining Load Resistance of Glass in Buildings
ASTM F1642/F1642M (2017) Standard Test Method for Glazing and Glazing Systems Subject to Airblast Loadings
ASTM F2248 (2012) Standard Practice for Specifying an Equivalent 3-Second Duration Design Loading for Blast Resistant Glazing Fabricated with Laminated Glass
SECTION 08 51 13 Page 1
NATIONAL FENESTRATION RATING COUNCIL (NFRC)
NFRC 100 (2014) Procedure for Determining Fenestration Product U-Factors
NFRC 200 (2014) Procedure for Determining Fenestration Product Solar Heat Gain Coefficient and Visible Transmittance at Normal Incidence
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Windows ; G
Fabrication Drawings
SD-03 Product Data
Windows ; G
Recycled Content of Aluminum Windows ; S
Fasteners ; G
Window Performance ; G
Thermal-Barrier Windows ; G
Accessories ; G
Adhesives
Thermal Performance ; G
SD-04 Samples
Finish Sample
Window Sample
SD-05 Design Data
Structural Calculations for Deflection ; G
Design Analysis ; G
SD-06 Test Reports
SECTION 08 51 13 Page 2
Minimum Condensation Resistance Factor
SD-07 Certificates
Engineer's Qualifications
SD-10 Operation and Maintenance Data
Windows , Data Package 1; G
Submit in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
1.3 QUALITY ASSURANCE
1.3.1 Qualification of Manufacturer
Window manufacturer must specialize in designing and manufacturing the type of aluminum windows specified in this section, and have a minimum of 10 years of documented successful experience. Manufacturer must have the facilities capable of meeting contract requirements, single-source responsibility and warranty.
1.3.2 Shop Drawing Requirements
Take field measurements prior to preparation of drawings and fabrications. Provide drawings that indicate elevations of windows, full-size sections, thickness and gages of metal, fastenings, proposed method of anchoring, size and spacing of anchors, details of construction, method of glazing, mullion details, material and method of attaching subframes, stools, casings, sills, trim, installation details, and other related items.
1.3.3 Engineer's Qualifications for Blast Design
All blast design calculations must be performed by or under the direct supervision of a registered engineer with a minimum of 5 years experience performing blast design. The engineer performing the blast design must be able to demonstrate experience on similar size projects using similar design methods to meet the requirements outlined in this specification.
1.3.4 Sample Requirements
1.3.4.1 Finish Sample Requirements
Submit color chart of standard factory color coatings when factory-finish color coating is to be provided.
1.3.4.2 Window Sample Requirements
Submit one full-size corner of each window type proposed for use.
SECTION 08 51 13 Page 3
1.3.5 Design Data Requirements
Submit calculations to substantiate compliance with deflection requirements and Antiterrorism Performance Requirements. A registered Professional Engineer must provide calculations.
Submit design analysis with calculations showing that the design of each different size and type of aluminum window unit and its anchorage to the structure meets the requirements of paragraph ANTITERRORISM PERFORMANCE REQUIREMENTS. Calculations verifying the structural performance of each window proposed for use, under the given loads, must be prepared and signed by a registered professional engineer. Reflect the window components and anchorage devices to the structure, as determined by the design analysis, in the shop drawings.
1.3.6 Test Report Requirements
Submit test reports for each type of window attesting that identical windows have been tested and meet the requirements specified herein for conformance to AAMA/WDMA/CSA 101/I.S.2/A440 including test size, and minimum condensation resistance factor (CRF), and, for Antiterrorism windows, in lieu of a Design Analysis, results of a Standard Airblast Test.
For Antiterrorism windows, in lieu of a Design Analysis, results of airblast testing, whether by arena test or shock tube, must be included in a test report, providing information in accordance with ASTM F1642/F1642M , as prepared by the independent testing agency performing the test. The test results must demonstrate the ability of each window proposed for use to withstand the airblast loading parameters and achieve the hazard level rating specified in paragraph STANDARD AIRBLAST TEST METHOD.
1.3.7 Certification
Each prime window unit must bear the AAMA Label warranting that the product complies with AAMA/WDMA/CSA 101/I.S.2/A440 . Certified test reports attesting that the prime window units meet the requirements of AAMA/WDMA/CSA 101/I.S.2/A440 , including test size, will be acceptable in lieu of product labeling.
1.4 DELIVERY AND STORAGE
Deliver windows to project site in an undamaged condition. Use care in handling and hoisting windows during transportation and at the jobsite.
Store windows and components out of contact with the ground, under a weathertight covering, so as to prevent bending, warping, or otherwise damaging the windows. Repair damaged windows to an "as new" condition as approved. If windows can not be repaired, provide a new unit.
1.5 PERFORMANCE REQUIREMENTS
1.5.1 Wind Loading Design Pressure
Design window components, including and anchors, to withstand a wind-loading design pressure imposed by a minimum ultimate wind speed of 110 mph 3 second gust wind speed with pressures calculated in accordance with ASCE / SEI 7-10 .
1.5.2 Tests
Test windows proposed for use in accordance with
SECTION 08 51 13 Page 4
AAMA/WDMA/CSA 101/I.S.2/A440 for the particular type and quality window specified.
Perform tests by a nationally recognized independent testing laboratory equipped and capable of performing the required tests. Submit the results of the tests as certified laboratory reports required herein.
Minimum design load for a uniform-load structural test must be 50 psf .
1.6 DRAWINGS
Submit the Fabrication Drawings for aluminum window units showing complete window assembly including weatherstripping, and subframe assembly details.
1.7 WINDOW PERFORMANCE
Aluminum windows must meet the following performance requirements.
Perform testing requirements by an independent testing laboratory or agency.
1.7.1 Structural Performance
Structural test pressures on window units must be for positive load (inward) and negative load (outward). After testing, there will be no glass breakage, permanent damage to fasteners, hardware parts, support arms or actuating mechanisms or any other damage which could cause window to be inoperable. There must be no permanent deformation of any main frame, sash or ventilator member in excess of the requirements established by AAMA/WDMA/CSA 101/I.S.2/A440 for the window types and classification specified in this section.
1.7.2 Air Infiltration
Air infiltration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.7.3 Water Penetration
Water penetration must not exceed the amount established by AAMA/WDMA/CSA 101/I.S.2/A440 for each window type.
1.7.4 Thermal Performance
Windows (including frames and glass) will be independently tested and certified with a Solar Heat Gain Coefficient (SHGC) determined according to NFRC 200 procedures and a whole window U-factor determined in accordance with NFRC 100 within the ranges as indicated below according to the ASHRAE 169 Climate Zone of the project location. Provide visual Transmittance (VT) of 0.5 or greater.
1.7.4.1 South-Central Climate
Windows installed within Climate Zone 3 will have a U-Factor of 0.50 BTU/h .
ft 2. °F or less and a SHGC of 0.25 or less.
1.8 WARRANTY
Provide Manufacturer's standard performance guarantees or warranties that
SECTION 08 51 13 Page 5 extend beyond a 1 year period.
PART 2 PRODUCTS
2.1 WINDOWS
Provide prime windows that comply with AAMA/WDMA/CSA 101/I.S.2/A440 and the requirements specified herein. In addition to compliance with AAMA/WDMA/CSA 101/I.S.2/A440 , window framing members for each individual light of glass must not deflect to the extent that deflection perpendicular to the glass light exceeds L/175 of the glass edge length when subjected to uniform loads at specified design pressures. Provide Structural calculations for deflection to substantiate compliance with deflection requirements. Provide windows of types, performance classes, performance grades, combinations, and sizes indicated or specified.
Provide aluminum window frames with a minimum recycled content of 20 percent. Provide data identifying percentage of recycled content of aluminum windows . Design windows to accommodate hardware, glass, weatherstripping, and accessories to be furnished. Each window must be a complete factory assembled unit with or without glass installed.
Dimensions shown are minimum. Provide windows with insulating glass and thermal break necessary to achieve a minimum Condensation Resistance Factor (CRF) of 65 when tested in accordance with AAMA 1503. Provide manufacturer's standard hardware fabricated from aluminum, stainless steel, carbon steel complying with AAMA 907, or other corrosion-resistant material compatible with adjacent materials; designed to smoothly operate, tightly close, and securely lock windows, and sized to accommodate sash weight and dimensions.
2.1.1 Fixed Windows (F)
Type minimum F-CW30 and with enhanced performance grade as required to meet specified wind and blast loads per ASTM F2248, ASTM E1300, ASCE / SEI 7-10, and AAMA / WDMA / CSA 101/I.S.2/A440 .
2.1.2 Glass and Glazing
Materials are specified in Section 08 81 00 GLAZING.
2.1.3 Caulking and Sealing
Are specified in Section 07 92 00 JOINT SEALANTS.
2.2 FABRICATION
Fabrication of window units must comply with AAMA/WDMA/CSA 101/I.S.2/A440 .
2.2.1 Provisions for Glazing
Design windows and rabbets suitable for glass thickness shown or specified .
For minimum antiterrorism windows, attach glazing to its supporting frame using structural silicone sealant or adhesive glazing tape in accordance with ASTM F2248. Design sash for outside double glazing and for securing glass with metal beads, glazing clips, glazing channels, or glazing compound.
For laminated glass, provide glazing frame bite in accordance with
ASTM F2248.
SECTION 08 51 13 Page 6
2.2.2 Fasteners
Use window manufacturer's standard for windows, trim, and accessories.
Self-tapping sheet-metal screws are not acceptable for material more than 1/16 inch thick.
2.2.3 Adhesives
Provide joint sealants as specified in Section 07 92 00 JOINT SEALANTS.
For interior application of joint sealants, comply with applicable regulations regarding reduced VOC's, and as specified in Section 07 92 00
JOINT SEALANTS.
2.2.4 Drips and Weep Holes
Provide continuous drips over heads of top ventilators. Where fixed windows adjoin ventilators, drips must be continuous across tops of fixed windows. Provide drips and weep holes as required to return water to the outside.
2.2.5 Combination Windows
Windows used in combination must be factory assembled of the same class and grade. Where factory assembly of individual windows into larger units is limited by transportation considerations, prefabricate, match mark, transport, and field assemble.
2.2.6 Accessories
Provide windows complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation and proper operation. Furnish extruded aluminum subframe receptors and subsill with each window unit.
2.2.6.1 Fasteners
Provide concealed anchors of the type recommended by the window manufacturer for the specific type of construction. Anchors and fasteners must be compatible with the window and the adjoining construction. Provide a minimum of three anchors for each jamb located approximately 6 inches from each end and at midpoint.
2.2.6.2 Window Anchors
Anchoring devices for installing windows must be made of aluminum, cadmium-plated steel, stainless steel, or zinc-plated steel conforming to
AAMA/WDMA/CSA 101/I.S.2/A440 .
2.2.7 Finishes
Comply with NAAMM's "Metal Finishes Manual" for applying and designating finishes. Exposed aluminum surfaces must be factory finished with an anodic coating. Color must be bronze, to match the window finish on the existing Operational Readiness Training Complex (ORTC) Building on the Base .
All windows must have the same finish.
2.2.7.1 Anodic Coating
Clean exposed aluminum surfaces and provide an anodized finish conforming
SECTION 08 51 13 Page 7 to AA DAF45 and AAMA 611. Finish must be:
b. Architectural Class I ( 0.7 mil or thicker), designation AA-M10-C22- A42, integral color anodized.
2.3 THERMAL-BARRIER WINDOWS
Provide thermal-barrier windows, complete with accessories and fittings, where indicated.
Specify material and construction except as follows:
a. Aluminum alloy must be 6063-T6.
b. Frame construction, must be factory-assembled and factory-sealed inner and outer aluminum completely separated from metal-to-metal contact. Join assembly by a continuous, concealed, low conductance divider housed in an interlocking extrusion of the inner frame. Metal fasteners, straps, or anchors must not bridge the connection between the inner and outer frame.
c. Sash must be completely separated from metal-to-metal contact by means of woven-pile weatherstripping, plastic, or elastomeric separation members.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Method of Installation
Install in accordance with the window manufacturer's printed instructions and details. Build in windows as the work progresses or install without forcing into prepared window openings. Set windows at proper elevation, location, and reveal; plumb, square, level, and in alignment; and brace, strut, and stay properly to prevent distortion and misalignment. Protect ventilators and operating parts against accumulation of dirt and building materials by keeping ventilators tightly closed and locked to frame. Bed screws or bolts in sill members, contacts of windows with sills, built-in fins, and subframes in mastic sealant of a type recommended by the window manufacturer. Install and caulk windows in a manner that will prevent entrance of water and wind.
Any materials that show visual evidence of biological growth due to the presence of moisture must not be installed on the building project.
3.1.2 Dissimilar Materials
Where aluminum surfaces are in contact with, or fastened to masonry, concrete, wood, or dissimilar metals, except stainless steel or zinc, protect the aluminum surface from dissimilar materials as recommended in the Appendix to AAMA/WDMA/CSA 101/I.S.2/A440 . Do not coat surfaces in contact with sealants after installation with any type of protective material. Do not apply coatings or lacquers to surfaces to which caulking and glazing components must adhere.
3.1.3 Anchors and Fastenings
Make provision for securing units to each other, to masonry, and to other
SECTION 08 51 13 Page 8 adjoining construction. Windows installed in masonry walls must have head and jamb members designed to recess into masonry wall not less than 7/16 inch .
3.1.4 Adjustments After Installation
After installation of windows and completion of glazing and field painting, adjust all ventilators and hardware to operate smoothly and to provide weathertight sealing when ventilators are closed and locked.
Lubricate hardware and operating parts as necessary. Verify that products are properly installed, connected, and adjusted.
3.2 CLEANING
Clean interior and exterior surfaces of window units of mortar, plaster, paint spattering spots, and other foreign matter to present a neat appearance, to prevent fouling of weathering surfaces and weather-stripping, and to prevent interference with the operation of hardware. Replace all stained, discolored, or abraded windows that cannot be restored to their original condition with new windows.
-- End of Section --
SECTION 08 51 13 Page 9
SECTION 08 71 00
DOOR HARDWARE
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM F883 (2013) Padlocks
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.1 (2016) Butts and Hinges
ANSI/BHMA A156.2 (2017) Bored and Preassembled Locks and Latches
ANSI/BHMA A156.3 (2014) Exit Devices
ANSI/BHMA A156.4 (2013) Door Controls - Closers
ANSI/BHMA A156.5 (2014) Cylinder and Input Devices for Locks
ANSI/BHMA A156.6 (2015) Architectural Door Trim
ANSI/BHMA A156.7 (2016) Template Hinge Dimensions
ANSI/BHMA A156.8 (2015) Door Controls - Overhead Stops and Holders
ANSI/BHMA A156.13 (2017) Mortise Locks & Latches Series 1000
ANSI/BHMA A156.14 (2013) Sliding and Folding Door Hardware
ANSI/BHMA A156.15 (2015) Release Devices Closer Holder, Electromagnetic and Electromechanical
ANSI/BHMA A156.16 (2018) Auxiliary Hardware
ANSI/BHMA A156.17 (2019) Self Closing Hinges & Pivots
ANSI/BHMA A156.18 (2016) Materials and Finishes
ANSI/BHMA A156.21 (2019) Thresholds
SECTION 08 71 00 Page 1
ANSI/BHMA A156.22 (2017) Door Gasketing and Edge Seal Systems
ANSI/BHMA A156.25 (2013) Electrified Locking Devices
ANSI/BHMA A156.26 (2012) Continuous Hinges
ANSI/BHMA A156.31 (2013) Electric Strikes and Frame Mounted Actuators
ANSI/BHMA A156.36 (2010) Auxiliary Locks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2019; TIA 19-1; TIA 19-2; TIA 19-3; TIA
19-4; ERTA 1 2019) National Electrical Code
NFPA 72 (2019; TIA 19-1; ERTA 2019) National Fire Alarm and Signaling Code
NFPA 80 (2016; TIA 16-1) Standard for Fire Doors and Other Opening Protectives
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
NFPA 252 (2017) Standard Methods of Fire Tests of Door Assemblies
STEEL DOOR INSTITUTE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .