W912QR20R0065Plans-0000.pdf

PDF 10 MB Posted

Attached to
Chiller Repairs at Wright-Patterson Air Force Base
Solicitation number
W912QR20R0065
Issued by

About this file

This document provides details on a federal contract opportunity for chiller repairs at Wright-Patterson Air Force Base. The U.S. Army Corps of Engineers Louisville District is seeking proposals to replace three chillers, chilled water pumps, condenser water pumps, and related electrical systems at Building 620. Additional work includes installing variable speed drives, a refrigerant monitoring system, chilled water control panels, suction and discharge headers, balancing valves, centrifugal water separators, an exhaust fan, water softening system, HVAC unit, make-up water piping, and an emergency eye wash station. The project also requires replacing three cooling towers, sluice gates, and isolation valves and repairing concrete basins and piers in the cooling tower area. The contract value is estimated between $5-10 million, and the period of performance is 420 calendar days from notice to proceed. Proposals are due in response to Solicitation Number W912QR20R0065 and will be evaluated using best value tradeoff procedures.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOUISVILLE DISTRICT

US Army Corps of Engineers ®

WRIGHT PATTERSON AIR FORCE BASE

REPAIR CHILLED WATER SYSTEM,

FACILITY 20620

CONTRACT NO.:

ISSUE DATE.:

W912QR-18-D0026

JULY 2020

PROJECT #ZHTV 130071

A DVANCED

E NGINEERING

C ONSULTANTS

Mechanical | Electrical | Plumbing | Fire Protection 1405 Dublin Road Tel: (614) 486-4778 Columbus, Ohio 43215 Fax: (614) 486-4082

P2 #486296

DRAWING INDEX:

G-001 TITLE SHEET

G-002 GENERAL PROJECT NOTES

G-003 PROJECT PHASING

G-101 OVERALL SITE PLAN

G-102 AREA B BASE MAP

G-111 CHEMICAL TREATMENT BUILDING LAYOUT

S-001 GENERAL INFORMATION - STRUCTURAL

S-101 PARTIAL BASEMENT PLAN - STRUCTURAL

S-111 COOLING TOWER YARD PLAN - STRUCTURAL

S-112 CHEMICAL BUILDING - EXTERIOR SLAB PLAN - STRUCTURAL

S-501 DETAILS - STRUCTURAL

A-101 EXISTING AREA WELL - DEMOLITION AND NEW WORK - ARCHITECTURAL

A-301 AREA WELL SECTION AND DETAILS - ARCHITECTURAL

P-001 GENERAL INFORMATION - PLUMBING

P-111 CHEMICAL TREATMENT BUILDING - PLUMBING

P-501 DETAILS AND ISOMETRICS - PLUMBING

M-001 GENERAL INFORMATION - MECHANICAL

MD101 PARTIAL BASEMENT PLAN - MECHANICAL - DEMOLITION

MD111 COOLING TOWER YARD PLAN - MECHANICAL - DEMOLITION

MD801 SCHEMATICS - MECHANICAL - DEMOLITION

M-101 PARTIAL BASEMENT PLAN - MECHANICAL

M-102 PARTIAL BASEMENT PLANS - MECHANICAL

M-103 PARTIAL BASEMENT PLANS - MECHANICAL

M-104 MECHANICAL ROOM INGRESS PLAN - MECHANICAL

M-111 COOLING TOWER YARD PLAN - MECHANICAL

M-121 PARTIAL SECOND FLOOR PLAN - MECHANICAL

M-301 SECTIONS - MECHANICAL

M-501 DETAILS - MECHANICAL

M-502 DETAILS - MECHANICAL

M-601 SCHEDULES - MECHANICAL

M-701 CONTROL TERMS, ABBREVIATIONS AND GENERAL INFORMATION - MECHANICAL

M-702 CHILLED WATER SYSTEM CONTROLS - MECHANICAL

M-703 CHILLED WATER SYSTEM CONTROLS - MECHANICAL

M-704 CHILLED WATER SYSTEM CONTROLS - MECHANICAL

M-705 CHILLED WATER SYSTEM CONTROLS - MECHANICAL

M-706 CHILLED WATER SYSTEM CONTROLS - MECHANICAL

M-801 SCHEMATICS - MECHANICAL

E-001 GENERAL INFORMATION - ELECTRICAL

ED101 PARTIAL BASEMENT PLAN - ELECTRICAL - DEMOLITION

ED111 COOLING TOWER YARD PLAN - ELECTRICAL - DEMOLITION

ED112 PIPE TUNNEL PLAN - ELECTRICAL - DEMOLITION

ED121 PARTIAL SECOND FLOOR PLAN - ELECTRICAL - DEMOLITION

ED601 SCHEDULES - ELECTRICAL - DEMOLITION

ED701 PARTIAL ELECTRICAL ONE-LINES - DEMOLITION

ED702 PARTIAL ELECTRICAL ONE-LINES - DEMOLITION

E-101A PARTIAL BASEMENT PLAN - LIGHTING

E-101B PARTIAL BASEMENT PLAN - POWER AND SYSTEMS

E-103 PARTIAL BASEMENT PLANS - ELECTRICAL

E-111A COOLING TOWER YARD PLAN - LIGHTING

E-111B COOLING TOWER YARD PLAN - POWER AND SYSTEMS

E-112 PIPE TUNNEL PLAN - ELECTRICAL

E-501 DETAILS - ELECTRICAL

E-601 SCHEDULES - ELECTRICAL

E-602 SCHEDULES - ELECTRICAL

E-701 PARTIAL ELECTRICAL ONE-LINES

E-702 PARTIAL ELECTRICAL ONE-LINES

W912QR20R0065SOLICITATION NO.:

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CERTIFIED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W

PA

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

US Army Corps of Engineers

7/17/2020

G-001

C O

V E

R S

H E

E T

E .L

A R

U E

K .F

IE

LD

S

G .L

E

IT

C H G

-0

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

021 July 2020

W912QR20R0065

PROJECT GENERAL NOTES:

1. COORDINATE ALL WORK THROUGH THE GOVERNMENT CONTRACTING OFFICER.

2. ANY NEW TYPES OF HAZARDOUS MATERIALS TO BE USED, AND THE WASTES THAT MAY BE

GENERATED AS A RESULT OF THAT USE NEED TO BE CONSIDERED IN THE DESIGN. IF

APPROPRIATE, DEDICATED SPACE FOR STORAGE OF HAZARDOUS MATERIALS AND WASTE

NEED TO BE PROVIDED. IN ADDITION PROPER COORDINATION IS NEEDED WITH 88 CEG/CEIEC.

QUESTIONS CONCERNING THE REQUIREMENTS FOR STORAGE AND DISPOSAL OF ANY

HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88 CEG/CEIEC HAZARDOUS MATERIALS

PM, MIKE VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) OR 88 CEG/CEIEC

HAZARDOUS WASTE PM, GARY SELBY (937-257-3349 OR GARY.SELBY@US.AF.MIL).

3. BECAUSE IT IS NOT POSSIBLE TO DEFINITELY KNOW THE LOCATION OF ALL POTENTIAL

ASBESTOS CONTAINING MATERIALS (ACM) WITHIN A FACILITY, FOR INSTANCE ACM FIRE WALLS

OR ACM FLOOR TILE, THE CONTRACTOR PERFORMING THIS WORK SHALL COMPLY WITH ALL

RELEVANT PARTS OF 29 CFR 1910.1001 AND/OR 29 CFR 1926.1101 AS MAY BE APPLICABLE. A

LIMITED ASBESTOS AND LEAD-BASED PAINT SURVEY WAS PERFORMED ON 12 JUN 2017. THIS

REPORT CAN BE FOUND IN THE PROJECT SPECIFICATIONS. IDENTIFIED AREAS ARE NOTED ON

THE DRAWINGS. IF ADDITIONAL SUSPECT ASBESTOS-CONTAINING MATERIAL IS FOUND THE

CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER.

4. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE HIS OWN TELEPHONE AND COMPUTER

CONNECTIONS FOR HIS CONSTRUCTION TRAILER ON SITE.

5. BUILDING WILL REMAIN OCCUPIED. CONTRACTOR SHALL COORDINATE ALL ACTIVITIES

REQUIRED IN BASE OCCUPIED AREAS WITH THE GOVERNMENT PROJECT MANAGER,

CONTRACTING OFFICER, AND BUILDING SECURITY OPERATIONS OFFICER.

6. CONTRACTOR SHALL REQUEST AND RECEIVE PERMISSION PRIOR TO ANY UTILITY OUTAGE A

MINIMUM OF 2 WEEKS PRIOR TO OUTAGE.

7. CONTRACTOR SHALL KEEP CONSTRUCTION SITE CLEAN AT ALL TIMES.

8. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL

REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE

OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO DISTURBANCE. FOR PROJECTS

THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE

OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION

PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. THE CONSTRUCTION CONTRACTOR

SHALL PREPARE AND SUBMIT THE SWPPP AND DRAFT NOI TO THE CONTRACTING OFFICER'S

REPRESENTATIVE TO BE FORWARDED TO ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA, FOR

REVIEW. ONCE THE SWPPP AND DRAFT NOI HAVE BEEN APPROVED BY THE COR AND

ENVIRONMENTAL MANAGEMENT, THE CONTRACTOR SHALL PREPARE AND FORWARD THE FINAL

NOI TO THE OHIO EPA. PLEASE CONTACT AND 88 CEG/CEIEA WATER PM, KAREN BEASON, BY

EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT (937) 257-5899 FOR ADDITIONAL

INFORMATION.

9. ANY FIRE SUPPRESSION EQUIPMENT CONTAINING IONIZING RADIOACTIVE MATERIAL (SMOKE

DETECTORS) AND ANY EMERGENCY EXIT SIGNS CONTAINING IONIZING RADIOACTIVE MATERIAL

SHALL BE TURNED INTO 88 CEG/CEIEC. COORDINATE THIS TURN-IN WITH WPAFB 88 CEG/CEIEC

RADIATION SAFETY BRANCH AT 937-257-7320.

10. THE WPAFB RECYCLING CENTER IS AVALLABLE FOR CONTRACTOR USE TO REDUCE WASTE

DISPOSAL. ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING

CENTER. ALL RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH THE WPAFB

SPECIFICATION SECTION 01 02 20. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT

937-257-5060 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN.

THE CONTRACTOR SHALL SUBMIT A QUARTERLY SUMMARY REPORT TO THE GOVERNMENT

CONTRACT REPRESENTATIVE IAW WPAFB SPECIFICATION SECTION 01 02 20 STATING (1) THE

COST TO RECYCLE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS

RECYCLED, (2) THE COST TO DIVERT/REUSE THE TONNAGE OF CONSTRUCTION AND

DEMOLITION MATERIALS DIVERTED/REUSED, (3) THE COST TO MULCH AND THE TONNAGE AND

COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED, (4) THE COST FOR

WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS

CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE OF

CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND

THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7)

EXPLANATION OF THE DIVERSION RATE APRIL 7, JULY 7, OCTOBER 7, JANUARY 7 COVERING THE

THREE MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB

DIVERSION FORM. FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, DAVE

DALTON, AT (937) 257-5060 OR DAVID.DALTON.2@US.AF.MIL.

11. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE

IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR RECYCLING.

12. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB

SPECIFICATION SECTION 02 08 34.

13. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB

SPECIFICATION SECTION 02 08 33.

14. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH

WPAFB SPECIFICATION SECTION 02 08 10.

15. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE

WITH WPAFB SPECIFICATION 02 09 00.

16. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION

SECTION 02 09 10.

17. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.

18. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING

ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.

19. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED

DUST SUPPRESSION METHODS SUCH AS WATER SPRAYS ON AREAS OF HIGH DUST

GENERATION. FOR ADDITIONAL INFORMATION PLEASE CONTACT 88 CEG/CEIE AIR PM CHRIS

TUMBUSCH (937-257-2455 OR CHRISTOPHER.TUMBUSCH@US.AF.MIL).

20. 30 DAYS PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE

SAMPLE OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY

INTO THE SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH

OF THE FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY,

MOLYBDENUM, NICKEL, SILVER, ZINC AND SULFIDE. THE LAB PERFORMING THE ANALYSIS

MUST BE CERTIFIED BY OHIO EPA TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF

THE LAB'S REPORT TO THE CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88

CEG/CEIEA FOR A DETERMINATION ON THE WASTEWATER DISPOSAL METHOD.

21. ALL CONTRACT WORK SHALL BE COMPLETED UNDER SUPERVISION OF A FACILITY ESCORT.

22. THERE WILL BE NO WORK ACCOMPLISHED ON ALL FEDERAL HOLIDAYS. (NEW YEAR'S DAY, MLK

DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY,

VETERANS DAY, THANKSGIVING, AND CHRISTMAS DAY).

23. DEMOLITION OF LOAD-BEARING WALLS OR STRUCTURAL COMPONENTS REQUIRE NOTIFICATION

OF DEMOLITION AND RENOVATION TO THE REGIONAL AIR POLLUTION AND CONTROL AGENCY

(RAPCA) A MINIMUM OF 10 WORK DAYS PRIOR TO BEGINNING CONSTRUCTION.

24. ALL METAL AND WIRING NEEDS TO BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER.

CONTACT DAVE DALTON AT 937-257-5060 OR DAVID.DALTON.2@WPAFB.AF.MIL FOR ADDITIONAL

INFORMATION.

25. IF ANY DRINKING WATER MAINS ARE BEING EXTENDED, UPSIZED, OR NEW MAINS ARE BEING

INSTALLED, A PLANS APPROVAL MAY BE REQUIRED FROM THE OHIO EPA PRIOR TO BEGINNING

MAIN INSTALLATION. THE CONSTRUCTION CONTRACTOR SHALL PREPARE AND SUBMIT A

DRAFT PLANS APPROVAL PACKAGE TO THE CONTRACTING OFFICER'S REPRESENTATIVE,

INCLUDING A CHECK FOR ANY APPLICABLE OHIO EPA FEES, FOR REVIEW AND PROCESSING BY

ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA. ENVIRONMENTAL MANAGEMENT SHALL

ENDORSE THE PACKAGE AS THE UTILITY OWNER AND SHALL SUBMIT IT TO OHIO EPA. PLEASE

CONTACT THE 88 CEG/CEIEA WATER PM, KAREN BEASON, BY EMAIL AT

KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL INFORMATION.

26. IF ANY SANITARY SEWER MAINS ARE BEING EXTENDED, UPSIZED OR NEW MAINS ARE BEING

INSTALLED A PERMIT TO INSTALL (PTI) MAY BE REQUIRED FROM THE OHIO EPA PRIOR TO

BEGINNING MAIN INSTALLATION. THE CONSTRUCTION CONTRACTOR SHALL PREPARE AND

SUBMIT A DRAFT PTI PACKAGE TO THE CONTRACTING OFFICER'S REPRESENTATIVE, INCLUDING

A CHECK FOR ANY APPLICABLE OHIO EPA FEES, FOR REVIEW AND PROCESSING BY

ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA. ENVIRONMENTAL MANAGEMENT SHALL

ENDORSE THE PACKAGE AS THE UTILITY OWNER AND SHALL SUBMIT IT TO OHIO EPA. PLEASE

CONTACT THE 88 CEG/CEIEA WATER PM, KAREN BEASON, BY EMAIL AT

KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL INFORMATION.

27. IF ANY REFRIGERANT-CONTAINING EQUIPMENT SCHEDULED FOR NEW INSTALLATION,

INCLUDING WATER COOLERS, THEY MUST UTILIZE AN HFC REFRIGERANT. CFC AND HCFC

REFRIGERANTS ARE NOT AUTHORIZED FOR NEW EQUIPMENT INSTALLATIONS. FOR

ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH.

CHRIS CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT

CHRISTOPHER.TUMBUSCH@US.AF.MIL.

28. IF AN EMERGENCY GENERATOR OR BOILER WILL BE INSTALLED, AN AIR SOURCE PERMIT MAY

BE REQUIRED FOR THE GENERATOR AND POSSIBLY THE FUEL TANK. FOR ADDITIONAL

INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH. CHRIS CAN BE

REACHED AT 937-257-2455 OR BY EMAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL.

29. ANY TRANSFORMERS, SWITCH GEAR, OR ELECTRICAL PANELS CONTAINING OIL SCHEDULED

FOR REMOVAL MUST HAVE THE EQUIPMENT OIL VERIFIED TO BE NON PCB-CONTAINING PRIOR

TO TURN-IN. 88 CEG/CEIE MAINTAINS A BASE-WIDE PCB DATA-BASE FOR OIL CONTAINING

EQUIPMENT. IF THE EQUIPMENT CANNOT BE LOCATED IN THE DATA-BASE THE OIL FROM EACH

INDIVIDUAL PIECE OF EQUIPMENT MUST BE SAMPLED FOR PCB. PLEASE CONTACT THE 88

CEG/CEIEC USED OIL TECHNICIAN BOB JARUSIEWIC BY EMAIL AT

ROBERT.JARUSIEWIC@US.AF.MIL OR BY PHONE AT 937-257-2889 FOR ADDITIONAL

INFORMATION.

30. STORM WATER INNOVATIVE DESIGN MEASURES MUST BE INCORPORATED INTO THE DESIGN

IAW SECTION 438 OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA) IF THE PROJECT HAS A FOOTPRINT THAT EXCEEDS 5000 SQ FT. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM

KAREN BEASON BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR

ADDITIONAL INFORMATION.

31. ALL FACILITY PROJECTS REGARDLESS OF FUNDING SOURCE THAT RESULT IN DOD REAL

PROPERTY ASSETS MUST COMPLY WITH UFC 1-200-02, HIGH PERFORMANCE AND SUSTAINABLE

BUILDING REQUIREMENTS. PLEASE ENSURE THESE REQUIREMENTS ARE INCORPORATED INTO

THE DESIGN AS APPROPRIATE.

32. COORDINATION OF THIS PROJECT WITH SHPO MAY BE REQUIRED IF WORK IS DONE TO A

BUILDING OR AREA LISTED AS HISTORIC. PLEASE CONTACT THE 88 CEG/CEIE CULTURAL

RESOURCES PM PAUL WOODRUFF. CONTACT PAUL BY EMAIL AT PAUL.WOODRUFF@US.AF.MIL

OR BY PHONE AT 937-257- 1374 FOR ADDITIONAL INFORMATION.

33. A CRANE PLAN SUBMITTAL IS REQUIRED FOR GOVERNMENT APPROVAL. THE CRANE PLAN

SHALL INCLUDE THE CRANE LOCATION, HEIGHT, DATES OF USE AND POINT OF CONTACT.

PLEASE NOTE THAT AN FAA FORM 7460-1 WILL BE REQUIRED IF CRANE IS OVER 200FT AND

THESE DOCUMENTS MAY TAKE 60 DAYS OR MORE TO PROCESS.

34. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE GOVERNMENT'S MINIMUM

REQUIREMENTS AND NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS. UNLESS

INDICATED OTHERWISE ON THE PLANS OR SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED

MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN PRODUCTS,

OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD OF QUALITY AND

CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR EXCEED THE STANDARD

OF QUALITY AND CHARACTERISTICS OF THE BASIS OF DESIGN.

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CORRECTED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W

PA

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

US Army Corps of Engineers

7/17/2020

G-002

G E

N E

R A

L P

R O

JE

C

T N

O

TE

S

E . L

A R

U E

K . F

IE

LD

S

G . L

E

IT

C H G

-0

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

CHILLER/PUMP CONSTRUCTION SEQUENCE:

* TWO CHILLER SYSTEMS SHALL ALWAYS BE OPERATIONAL DURING CONSTRUCTION.

1. ISOLATE AND DECOMMISSION CHILLER FROM ALL HYDRONIC SYSTEMS. EVACUATE

REFRIGERANT. REMOVE ASSOCIATED HYDRONIC PIPING TO THE NEAREST ISOLATION

VALVES.

2. ISOLATE, DECOMMISSION AND DRAIN COOLING TOWER. DEMOLISH COOLING TOWER

AND PERFORM CONCRETE SUMP REPAIR CONCURRENT WITH CHILLER WORK.

DEMOLISH BOLTED PLATE, WHICH COVERS OPENING BETWEEN CT SUMPS AND

PROVIDE A SLUICE GATE OVER THAT OPENING. REFER TO MD111 AND M-111 FOR MORE

INFORMATION. INSTALL COOLING TOWER. REFER TO MD111 AND M-111 FOR MORE

INFORMATION.

3. REMOVE CHILLED WATER PUMP AND ALL ASSOCIATED PIPING CONNECTIONS TO

BRANCH TEE CONNECTION ON EXISTING 18"Ø HEADER. REFER TO MD801. **THIS WILL

REQUIRE A CHILLED WATER PLANT DRAIN AND SHUTDOWN. UTILIZE CHILLED WATER

BRANCH ISOLATION VALVES SHOWN ON THIS SHEET.**

4. CUT IN NEW 12"Ø ISOLATION VALVES (CODED NOTE 6) ON PUMPS SUCTION PIPING NEAR

TEE CONNECTION. THIS VALVE WILL BE USED IN FUTURE PHASING AND PREVENT

ADDITIONAL PLANT SHUTDOWN AND DRAINAGE.

5. DEMOLISH CHILLER. UTILIZE HATCH OPENING.

6. REMOVE CONDENSER WATER PUMP, CENTRIFUGAL SEPARATOR AND ALL ASSOCIATED

PIPING CONNECTIONS TO THE NEAREST ISOLATION VALVES. REFER TO MD801. **THIS

WILL REQUIRE A CONDENSER WATER PLANT DRAIN AND SHUTDOWN. UTILIZE

CONDENSER WATER BRANCH ISOLATION VALVE SHOWN ON THIS SHEET.**

7. REMOVE REHEAT PIPING TO NEAREST VALVE CONNECTION.

8. INSTALL CHILLER RETURN HEADERS SUPPORT STEEL. REFER TO STRUCTURAL PLANS

FOR MORE INFORMATION.

9. INGRESS THROUGH HATCH AND INSTALL CONDENSER WATER PUMP, AND ASSOCIATED

VALVES AND PIPING. INSTALL CENTRIFUGAL SEPARATOR. REFER TO M-801.

10. INGRESS THROUGH HATCH AND INSTALL CHILLER, AND ASSOCIATED VALES AND

PIPING. REFER TO M-801.

11. INGRESS THROUGH HATCH AND INSTALL CHILLED WATER PUMP. REFER TO M-801.

12. INSTALL 18X18X18 TEE CONNECTION INTO EXISTING 18"Ø HEADER. INSTALL CHILLED

WATER RETURN HEADERS WITH VALVED BRANCH CONNECTIONS. REFER TO M-101 AND

M-801.

13. REPLACE REDUCED PRESSURE ZONE VALVE (RPZ-1) ON THE DOMESTIC WATER

MAKEUP WATER LINE. REFER TO M-111 FOR MORE INFORMATION.

14. DEMO AND INSTALL NEW CONDENSER WATER MAKEUP WATER PIPING. REFER TO M-111

FOR MORE INFORMATION.

15. **FILL CHILLED WATER SYSTEM, CONDENSER WATER SYSTEM AND COOLING TOWER

SUMP. CHILLED WATER AND CONDENSER WATER SYSTEM OUTAGE COMPLETE**

16. INSTALL NEW COOLING TOWER.

17. INSTALL WATER SOFTENING SYSTEM. REFER TO M-111 FOR MORE INFORMATION.

18. CONNECT CHILLED WATER PUMP SUCTION AND DISCHARGE TO HEADER PIPING.

19. CONNECT CHILLER TO HEADER PIPING.

20. TEST, COMMISSION AND GOVERNMENT SHALL ACCEPT CHILLER, COOLING TOWER,

CHILLED WATER PUMP, CONDENSER WATER PUMP, AND RELATED COMPONENTS FOR

OPERATION PRIOR TO WORKING ON THE NEXT CHILLER SYSTEM. THIS IS TO ENSURE

CHILLER PERFORMANCE AND MAINTAIN CHILLER PLANT CAPACITY BEFORE

SUBSEQUENT SYSTEMS ARE DEMOLISHED.

· REPEAT STEPS ABOVE WITH RESPECTS TO THE NEXT CHILLER AND COOLING TOWER.

CHILLED WATER AND CONDENSER WATER OUTAGE SHOULD NOT BE NECESSARY. AT

THIS POINT, NEW HEADER PIPING IS INSTALLED. CHILLER INGRESS (DISASSEMBLED)

MUST PASS BELOW PIPING NEW HEADER PIPING. REFER TO M-301.

· WHEN COOLING TOWER'S SUMP IS DRAINED, DEMOLISH TWO BOLTED PLATES WHICH

COVER OPENINGS AT EACH DEMISING SUMP WALL AND PROVIDE A SLUICE GATE OVER

THE OPENING.

· REPEAT STEPS ABOVE WITH RESPECTS TO THE FINAL CHILLER AND COOLING TOWER.

CHILLED WATER AND CONDENSER WATER OUTAGE SHOULD NOT BE NECESSARY.

WHEN COOLING TOWER'S SUMP IS DRAINED, DEMOLISH BOLTED PLATE WHICH COVERS

THE OPENING.

· **IMPORTANT** PRIOR TO REMOVING THE REHEAT PIPING FROM CHILLER, INSTALL

FULL SIZE BRIDGE PIPING ON THE REHEAT RETURN PIPING AS DESCRIBED ON THE

MD101 AND M-101. FAILURE TO BRIDGE THE REHEAT RETURN PIPING WILL DEADHEAD

THE BUILDING REHEAT PUMPS. THIS WILL REQUIRE A BUILDING HEAT PLANT ISOLATION

AND SHUT DOWN TO REMOVE AND INSTALL BRIDGE PIPING. COORDINATE THIS WORK

DURING ANNUAL STEAM PLANT SHUTDOWN, TYPICALLY IN JUNE.

ELECTRICAL CONSTRUCTION SEQUENCE:

A. PRIOR TO ANY SHUTDOWN

1. INSTALL CONDUITS BETWEEN SWITCHGEAR PR1 AND THE CHILLER STARTERS. LEAVE

SUFFICIENT PULLING ELBOWS. PROVIDE POWER FEEDS BETWEEN THE MCC'S 4A AND

4B AND PUMPS P-1 THROUGH P-6.

2. REMOVE COMMS EQUIPMENT IN THE ALCOVE NEAR PR1. PROVIDE VARIABLE

FREQUENCY DRIVES, ISOLATION TRANSFORMERS, LOAD REACTORS IN THIS ALCOVE.

3. PROVIDE TEMPORARY STARTERS IN THE VICINITY OF PUMPS P-2, P-3, P-5 AND P-6.

B.TOTAL CHILLER SYSTEM SHUTDOWN

1. TRIP SWITCHGEAR PR1 MAIN AND BRANCH BREAKERS. PROVIDE NEW OVERHEAD

POWER FEED, CAP BANK AND ELECTRONIC SOFT STARTER FOR CHILLER 1.

2. RE-FEED EXISTING CHILLERS 2, 3 STARTERS WITH OVERHEAD CONDUIT AND CABLE

FROM PR1. PROVIDE PULLING ELBOWS, SLACK CABLE FOR STARTER CHANGE OUT.

3. CLOSE SWITCHGEAR PR1 MAIN AND BRANCH BREAKERS. CONFIGURE NEW STARTER

FOR CHILLER 1.

4. DE - ENERGIZE MCC 4B. REMOVE STARTER BUCKETS FOR CONDENSER WATER PUMPS

1, 2 AND 3. PROVIDE NEW BREAKER BUCKETS, BLANK DOORS IN THE MCC.

5. DE-ENERGIZE MCC 4A. REMOVE STARTER BUCKETS FOR CHILLED WATER PUPS P-4, P-5

AND P-6. PROVIDE NEW BREAKER BUCKETS AND BLANK DOORS IN THE MCC.

6. PROVIDE TEMPORARY STARTERS FOR THE CONDENSER AND CHILLED WATER PUMPS.

PROVIDE POWER FEEDS BETWEEN THE MCC'S, THE STARTERS AND THE PUMPS.

C.CHILLERS 2, 3 UPGRADE

1. OPEN MCC 4A BREAKER 1 AND MCC 4B BREAKER 1. REMOVE TEMPORARY STARTERS

AND INSTALL FUSED DISCONNECT SWITCHES FOR PUMPS P-1, P-4. PROVIDE POWER

FEEDS BETWEEN THE MCC'S, ISOLATION TRANSFORMERS, VFD'S, SWITCHES AND

PUMPS.

2. TRIP SWITCHGEAR BRANCH BREAKER FOR CHILLER 2 AND 3. OPEN MCC BREAKERS

FOR PUMPS P-2 AND P-5

3. PROVIDE NEW CHILLER 2 SOFT STARTER AND CAP BANK. PROVIDE WIRING BETWEEN

PR-1, THE STARTER, CAP BANK, AND THE NEW CHILLER.

4. REMOVE TEMPORARY STARTERS AND PROVIDE FUSED DISCONNECT SWITCHES FOR

THE PUMPS P-2 AND P-5.PROVIDE POWER FEEDS BETWEEN THE MCC'S, ISOLATION

TRANSFORMERS, VFD'S, SWITCHES AND PUMPS.

5. REPEAT FOR CHILLER 3, PUMPS P-3 AND P-6.

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CORRECTED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W

PA

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

US Army Corps of Engineers

7/17/2020

G-003

P R

O

JE

C T

P H

A S

IN

G

E . L

A R

U E

K . F

IE

LD

S

G . L

E

IT

C H G

-0

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

SHEET KEYNOTES:

1. CONTRACTOR LAYDOWN AREA. PROVIDE 6 FT TALL CHAIN-LINK FENCE WITH PRIVACY FABRIC

AROUND THE ENTIRE PERIMETER OF THE EQUIPMENT AREA.

2. REMOVABLE CONCRETE HATCH PANELS TO ACCESS BASEMENT CHILLER ROOM.

3. CONTRACTOR DUMPSTER LOCATION. COORDINATE EXACT LOCATION WITH CONTRACTING

AUTHORITY.

4. SUGGESTED CRANE LOCATION. REFERENCE CRANE SPECIFICATIONS IN THE BID

SPECIFICATIONS.

CHEMICAL

TREATMENT

BUILDING (618)

COOLING

TOWERS

APPROXIMATE LOCATION

OF BASEMENT CHILLER

ROOM

NTSA3 OVERALL SITE PLAN

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CORRECTED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W

PA

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

NORTH

US Army Corps of Engineers

7/17/2020

G-101

O V

E R

A

LL

S

IT

E P

LA

N

G E

N E

R A

L

E . L

A R

U E

K . F

IE

LD

S

G . L

E

IT

C H G

-1

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

NTSA1 AREA B BASE MAP

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CORRECTED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W

PA

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

US Army Corps of Engineers

7/17/2020

G-102

A R

E A

B B

A S

E M

A P

G E

N E

R A

L

E . L

A R

U E

K . F

IE

LD

S

G . L

E

IT

C H G

-1

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

SHEET KEYNOTES:

1. EXISTING FURNITURE SHALL BE REMOVED AND DISPOSED OR SALVAGED BY CONTRACTOR.

COORDINATE WITH GOVERNMENT FOR ITEMS TO BE SALVAGED.

2. LAB DESK COUNTER TOP HAS BEEN IDENTIFIED AS ASBESTOS-CONTAINING MATERIAL.

ASBESTOS-CONTAINING FURNITURE SHALL BE REMOVED IN ACCORDANCE WITH WPAFB

SPECIFICATION SECTION 02 08 10.

3. NEW CONCRETE PAD. REFER TO ARCHITECTURAL SHEETS.

GENERAL SHEET NOTES:

1. REFER TO OTHER PLAN SHEETS FOR DETAILED EQUIPMENT INFORMATION.

2. THE FOLLOWING SURFACES IN THE CHEMICAL TREATMENT BUILDING TESTED POSITIVE FOR

LEAD CONTENT IN EXCESS OF THE EPA REGULATORY THRESHOLD OF 1.0 MG/CM2: YELLOW

CONCRETE CURBS. CONTRACTOR SHALL PERFORM LEAD CONTAINING PAINT CONTROL

MEASURES IN ACCORDANCE WITH WPAFB SPECIFICATION 02 09 00.

WH-1

ES-1

SUMP PUMP

SK-1

FC-1

PALLET

BRINE TANK

RESIN TANK

RESIN TANK

SPILL CONTAINMENT KIT

NON-OXIDIZING CHEMICAL

STORAGE TANK

OXYDIZING BIOCIDE CHEMICAL

STORAGE TANK

CHEMICAL STORAGE TANK AND

CONTAINMENT BASIN

ACC-1

PALLET

PIPE STAND (TYP)

FLOOR DRAIN (TYP)

CONCRETE BOLLARD (TYP.4)

01/2"=1'-0" 1' 2' 4'A2 CHEMICAL TREATMENT BUILDING LAYOUT

S O

LI

C

IT

A

TI

O

N N

O

O P

TI

O

N A

L

FI

E

LD

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

TI

O

N

1 3 5

C

7 9

A

M A

R K

IS

S

U E

D A

TE

P

N O

S

IZ

E

S U

B M

IT

TE

D B

Y

C O

N

TR

A C

T N

O

SHEET ID

D A

TE

CORRECTED FINAL

D S

N Z

H

TV

R

E P

A

IR

C H

IL

LE

D W

A

TE

R S

Y S

TE

M

, F A

C

IL

IT

Y

W

R

IG

H T

P A

TT

E

R S

O N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

E

E R

IN

G

G R

O U

P

W

R

IG

H T

A V

E . W

P A

FB

O

H

W P A

FB

W

R

IG

H T-

P A

TT

E

R S

O N

A

IR

F O

R C

E B

A S

E W

2Q

R

R

A N

S I D

A E

C

NORTH

US Army Corps of Engineers

7/17/2020

G-111

C H

E M

IC

A

L

TR

E A

TM

E

N T

B U

IL

D

IN

G

G E

N E

R A

L

LA

Y O

U T

E . L

A R

U E

K . F

IE

LD

S

G . L

E

IT

C H G

-1

.D W

G

CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction

W

2Q R

R

-0

GOVERNING DESIGN SPECIFICATION

LIVE LOADS

STRUCTURAL DESIGN DATA

2015 INTERNATIONAL BUILDING CODE, AS

MODIFIED BY UFC 1-200-01 & UFC 3-301-01

FLOOR GRATING LOAD 60 PSF

(CHEMICAL BUILDING):

1. THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS IN STRICT ACCORDANCE WITH

THE SAFETY REQUIREMENTS IMPOSED BY THE CONTRACTING OFFICER AND EM 385-1-1.

IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE

SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. THE CONTRACTOR SHALL

REMOVE ALL DEBRIS FROM THE OWNER'S PROPERTY AND DISCARD ACCORDING TO

LOCAL REGULATIONS.

2. THIS STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER IT IS

FULLY COMPLETED. HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO DETERMINE

THE ERECTION PROCEDURES AND SEQUENCES REQUIRED TO ENSURE STABILITY

OF THE STRUCTURE AND ITS COMPONENT PARTS DURING CONSTRUCTION.

ANY TEMPORARY BRACING, CONNECTIONS, GUYS, OR TIE-DOWNS THAT MAY BE

NECESSARY DURING ERECTION ARE NOT SHOWN ON STRUCTURAL DRAWINGS. IF

APPLIED THEY SHALL BE REMOVED AS CONDITIONS PERMIT, AND SHALL REMAIN

THE PROPERTY OF THE CONTRACTOR. THIS CONSTRUCTION STABILITY REQUIREMENT

APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS.

3. THE PROJECT SPECIFICATIONS SHALL BE USED IN CONJUNCTION WITH THE STRUCTURAL

DRAWINGS TO DETERMINE THE COMPLETE PROJECT REQUIREMENTS. ANY DISCREPANCIES

OR CONFLICTS FOUND BETWEEN THE PROJECT SPECIFICATIONS AND THE STRUCTURAL

DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR IMMEDIATELY. THE

STRICTEST PROVISION SHALL GOVERN UNLESS THE COR DETERMINES OTHERWISE

5. DIMENSIONS PERTAINING TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE

CONTRACTORS PRIOR TO SHOP DRAWING SUBMISSION, ANY FABRICATION, CONSTRUCTION,

OR ERECTION

7. EXISTING UTILITIES AND ALL OTHER OBSTRUCTIONS TO WORK SHALL BE TEMPORARILY

REMOVED AND RE-INSTALLED (INCLUDING NECESSARY MODIFICATIONS) BY THE CONTRACTOR

AFTER COMPLETION OF NEW WORK.

8. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS, ETC. ARE SHOWN FOR GENERAL INFORMATION ONLY. REFER TO RELATED DRAWINGS (ARCH., MECH., ELECT, ETC.) FOR OTHER

POSSIBLE EQUIPMENT SUPPORTS; WALL, FLOOR AND ROOF OPENINGS, SLEEVES, AND OTHER

EMBEDDED ITEMS NOT SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS. COORDINATE

ALL REQUIRED DIMENSIONS WITH APPLICABLE TRADE CONTRACTORS PRIOR TO ANY STEEL

FABRICATION OR CONCRETE PLACEMENT.

9. ALL FRAMING MEMBERS PROVIDED FOR MECHANICAL TRADES, LINTELS, ROOF OPENINGS, ETC.

ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR SHALL SUBMIT MANUFACTURER'S

DESIGN DATA FOR THE PROPOSED EQUIPMENT PRIOR TO STEEL SHOP DRAWING SUBMITTAL,

TO ACCOMMODATE THE ACTUAL CONDITION.

GENERAL NOTES

4. SHOP DRAWINGS REQUIRED BY THE PROJECT SPECIFICATIONS AND PREPARED BY

SUPPLIERS AND/OR SUBCONTRACTORS SHALL BE REVIEWED AND STAMPED BY THE

CONTRACTOR PRIOR TO SUBMISSION TO THE GOVERNMENT. ALL DEVIATIONS

FROM THE ENGINEERING DRAWINGS SHALL BE CIRCLED AND NOTED ON THE SHOP

DRAWINGS BY THE CONTRACTOR. NO SHOP WORK IS PERMITTED TO COMMENCE UNTIL

THE RETURN OF A STAMPED, APPROVED COPY OF THE SHOP DRAWINGS TO THE

CONTRACTOR.

6. ALL DETAILS, SECTIONS, AND NOTES PROVIDED ON STRUCTURAL DRAWINGS ARE INTENDED

TO BE TYPICAL FOR SIMILAR SITUATIONS ELSEWHERE, UNLESS SPECIFICALLY NOTED

OTHERWISE. FOR ANY DETAILS AND DIMENSIONS NOT PROVIDED, REFER TO ARCHITECTURAL,

MECHANICAL, ANY EXISTING DRAWINGS, AND BY FIELD OBSERVATION. ALL DIMENSIONS AND

ELEVATIONS SHOWN ON STRUCTURAL DRAWINGS WERE INTENDED TO CONFORM WITH THE

INFORMATION PROVIDED ON ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL REPORT

ANY DISCREPANCIES TO THE COR FOR RESOLUTION BEFORE PROCEEDING WITH ANY

ADDITIONAL WORK.

FOUNDATIONS

1. ANY EXCAVATION WORK SHALL PROCEED WITH CAUTION TO AVOID DAMAGE TO

UNKNOWN UNDERGROUND UTILITIES AND EXISTING FOUNDATIONS, AS DETERMINED

BY CONTRACTOR.

2. CONTRACTOR SHALL OBTAIN A PERMIT FOR EXCAVATIONS AS SPECIFIED IN SPECIFICATION

01 01 50 (PARAGRAPH 1.4J).

THE FABRICATIONS AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT, BUILDING CODE ADOPTED, AISC "SPECIFICATION FOR THE DESIGN, FABRICATION

AND ERECTION OF STRUCTURAL STEEL BUILDINGS", AND "CODE OF STANDARD PRACTICE FOR

STEEL BUILDINGS AND BRIDGES", WITH THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:

1. WIDE FLANGE ROLLED STEEL SHAPES SHALL CONFORM TO ASTM A992, Fy=50 KSI, WHILE ALL PLATES, BARS, CHANNELS, AND ANGLES SHALL CONFORM TO ASTM A36, Fy=36 KSI.

HOLLOW STRUCTURAL SECTIONS (HSS) SHALL CONFORM TO ASTM A500 GRADE B, WITH

A MINIMUM YIELD STRESS (Fy) OF 46 KSI FOR SQUARE AND RECTANGULAR SHAPES, AND A MINIMUM YIELD STRESS (Fy) OF 42 KSI FOR ROUND SHAPES.

2. SPLICING OF STRUCTURAL STEEL IS PROHIBITED EXCEPT AS DETAILED.

6. WELDS SHALL BE MADE ONLY BY CERTIFIED WELDERS AND WELDING OPERATORS WHO HAVE

BEEN PREVIOUSLY QUALIFIED BY TESTS AS PRESCRIBED IN THE CURRENT AWS D1.1 "STRUCTURAL

WELDING CODE-STEEL".

5. WELDING SHALL CONFORM TO THE CURRENT AWS D1.1 "STRUCTURAL WELDING CODE-STEEL", AND WELDING ELECTRODES SHALL BE E70XX.

3. STRUCTURAL STEEL SHALL BE NEW UNLESS NOTED OTHERWISE, AND SHALL BE MADE FREE OF RUST, SCALE, ETC., AND SHIPPED WITH ONE COAT OF GRAY OXIDE PRIMER. AFTER ERECTION, EXPOSED STEEL SHALL BE PAINTED PER PROJECT SPECIFICATIONS. ALL STEEL EXPOSED TO

WEATHER OR USED AS LINTELS SHALL BE HOT-DIPPED GALVANIZED

STRUCTURAL STEEL

4. ALL BOLTS SHALL CONFORM TO ASTM A325X AND SHALL BE 3/4" DIAMETER MINIMUM, UNLESS

NOTED OTHERWISE. BOLTS SHALL BE INSTALLED WITH VISUAL TENSION INDICATORS,

ASTM A563 NUTS, AND SHALL HAVE AN ASTM F436 HARDENED STEEL WASHER UNDER THE

TURNED ELEMENT.

8. ALL REINFORCING STEEL SHALL BE DEFORMED AND CONFORM TO ASTM A615. ALL

WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064.

6. MAXIMUM SLUMP SHALL BE 4" +/- 1", AS DETERMINED IN ACCORDANCE WITH ASTM C143

(BEFORE ADDITION OF PLASTICIZERS)

10. ALL HOOK BARS SHALL CONTAIN 90 DEGREE ACI STANDARD HOOKS UNLESS NOTED

OTHERWISE. HOOKS MAY BE ROTATED TO MAINTAIN CLEARANCES. ALL BAR SPLICES

AND LAPS, WHEN NOT SPECIFICALLY DIMENSIONED ON DRAWINGS, SHALL BE AS PER

ACI STANDARD REQUIREMENTS. CLASS B LAPS SHALL BE USED UNLESS NOTED

OTHERWISE. CLOSED STIRRUPS MAY BE CONSTRUCTED IN TWO PIECES, 135 DEGREE

HOOKS SHALL BE USED.

9. CONCRETE COVER ON REINFORCING STEEL SHALL BE PER ACI 318, UNLESS NOTED

OTHERWISE.

7. AIR ENTRAIN ALL CONCRETE EXPOSED TO WEATHER 6% +/- 1.0%

11. THE PLACEMENT OF CONDUITS IN CONCRETE SHALL ADHERE TO THE FOLLOWING:

A. OUTSIDE DIAMETER OF CONDUITS SHALL BE 1" OR LESS WHERE EMBEDDED IN SLABS,

AND 1 1/2" OR LESS WHERE EMBEDDED IN WALLS.

B. BUNCHING OF CONDUITS IS NOT PERMITTED. CONDUITS SHALL BE SPACED

3 DIAMETERS OR GREATER ON CENTER. NO CROSSOVERS ARE PERMITTED IN SLABS.

C. MINIMUM CONCRETE COVER ON CONDUITS SHALL BE 1 1/2".

D. ALUMINIUM CONDUITS, PIPES, OR SLEEVES ARE NOT PERMITTED.

SUPPORTING NON-STRUCTURAL COMPONENTS FROM THE STRUCTURE

1. COMPONENT LOADS SHALL BE DISTRIBUTED TO THE STRUCTURE SO THAT THE COLLATERAL

LOAD ALLOWANCES PROVIDED WITH THE STRUCTURAL DESIGN DATA IS NEVER EXCEEDED.

SUPPORT ANCHORS SHALL HAVE AN ULTIMATE SAFETY FACTOR OF AT LEAST 4.0.

2. LOADS SUPPORTED FROM WIDE FLANGE BEAMS SHALL BE APPLIED IN A MANNER WHICH DOES NOT

CAUSE TORSION ABOUT THE LONGITUDINAL AXIS OF THE BEAM.

3. COORDINATE AND VERIFY EXACT SIZE AND LOCATION OF MECHANICAL UNITS AND ALL FRAMED

OPENINGS IN FLOORS & ROOFS WITH MECHANICAL DRAWINGS AND EQUIPMENT SUPPLIER. HVAC

CONTRACTOR SHALL PROVIDE ACCURATE DIMENSIONAL INFORMATION TO STEEL FABRICATOR

PRIOR TO FABRICATION OF ALL SUPPORT FRAMES.

4. DO NOT HANG OR OTHERWISE SUPPORT ANY ITEMS DIRECTLY FROM ROOF PANELS. EQUIPMENT

MUST BEAR DIRECTLY ON STEEL FRAMING SUPPORTS.

ABV

ACI

ACM

ALTERNATE

WT

HORIZONTAL

ABOVE

AFF ABOVE FINISHED FLOOR

ALT

APPROX

ASTM

APPROXIMATE

BUILDING LINE

BUILDING

BASEMENT

BETWEEN

BOTTOM

BL

BLDG

BOT

BSMT

BTWN

CONC

CONN

CONTR CONTRACT(OR)

CONNECTION

CONCRETE

DEMOLISHDEMO

DR DRAIN

EA

EL

ENTR

EQ

EQUIP

EXIST

EQUIPMENT

EXISTING

EQUAL

ENTRANCE

ELEVATION

EACH

FOUNDATION

FLOOR

FACE OF CONCRETE

FOOTINGFTG

FOC

FLR

FND

WEIGHT

W/O

W/ WITH

WITHOUT

VERTICALVERT

UNO UNLESS NOTED OTHERWISE

THICK(NESS)

TYPICALTYP

THK

STL

SYS

STEEL

SYSTEM

REINFORCE(MENT)

REQUIREDREQD

REINF

POUNDS PER SQUARE FOOTPSF

OPNG OPENING

NOT TO SCALENTS

MTL

MISC

MIN

MECH

MAX MAXIMUM

MECHANIC(AL)

MINIMUM

METAL

MISCELLANEOUS

HORIZ

GOVT

GD GRADE, GRADING

GOVERNMENT

COL COLUMN

MANUF MANUFACTURER

AMERICAN CONCRETE

INSTITUTE

ASBESTOS CONTAINING

MATERIAL

AMERICAN SOCIETY FOR

TESTING AND MATERIALS

BRG BEARING

VIF VERIFY IN FIELD

SS STAINLESS STEEL

ABBREVIATIONS

1. ALL CONCRETE SHALL BE NORMAL WEIGHT, WITH AGGREGATES CONFORMING TO ASTM C33

ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT, BUILDING

CODE ADOPTED, ACI 301,"SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS", WITH

THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:

CAST-IN-PLACE CONCRETE

5. CHLORIDE BASED ADMIXTURES ARE PROHIBITED IN ALL REINFORCED CONCRETE. OTHER

ADMIXTURES SHALL CONFORM TO ASTM C494.

3. PROVIDE 3/4" CHAMFERS AT TOP EDGES AND CORNERS OF EXPOSED WALLS, JOINTS,

UNLESS NOTED OTHERWISE.

2. CONCRETE SHALL DEVELOP THE FOLLOWING 28-DAY COMPRESSIVE STRENGTH (F'c):

A. CONCRETE USED FOR NEW SUMP PIT PIERS 5,000 PSI

B. CONCRETE USED FOR EXTERIOR SLAB ON GRADE/ 4,500 PSI

AREA WELL CURB

4. JOINTS NOT INDICATED ON STRUCTURAL DRAWINGS ARE NOT PERMITTED WITHOUT

APPROVAL FROM THE STRUCTURAL ENGINEER.

LOADS ASSOCIATED REFER TO AS-BUILT DRAWINGS

WITH EXISTING BUILDING:

12. PROVIDE CRYSTALLINE WATERPROOFING ADDITIVE AND COATING TO ALL NEW CONCRETE

MIX DESIGNS AND ALL SURFACES OF EXISTING CONCRETE (TO REMAIN). REFER TO

SPECIFICATION SECTION 07 16 16.

AREA WELL LOAD 20 PSF

(SURFACE):

DIAG. DIAGONAL

DIMENSIONSDIMS.

DWGS DRAWINGS

EXPANSIONEXP

EXT EXTERIOR

JOINTJT

LG LONG

MATERIALMATL

PERIM PERIMETER

COR CONTRACTING OFFICER'S

REPRESENTATIVE

S-001

G

EN

ER

AL

N O

TE

S

ST

R

U C

TU

R

AL

S.

R

IC

C

I

S.

R

IC

C

I

S.

S

AP

SF

O R

D

S-

1.

D

W G

SO

LI

C

IT

AT

IO

N N

O

O

PT

IO

N

AL

F

IE

LD

D W

N B

Y:

C

KD

B Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

1 3 5

C

7 9

A

M

AR

K

IS

SU

E D

AT

E:

P2 N

O

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

CORRECTED FINAL

D

SN

Z H

TV

R

EP

AI

R

C H

IL

LE

D W

AT

ER

S

YS

TE

M

, F

AC

IL

IT

Y

W R

IG

H

T

PA

TT

ER

SO

N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

EE

R

IN

G G

R O

U P

W R

IG

H

T

AV

E.

W

PA

FB

O H

W P A

FB

W

R

IG

H T-

PA

TT

ER

SO

N A

IR

F

O R

C E

BA

SE

W

2Q R

R

AN

SI

D

AE

C

NORTH

US Army Corps of Engineers

CERTIFIED FINAL

25 26 27 28

FC

FB

FA

CG1

CG

CF

22'-5"± (V.I.F.) 22'-6"± (V.I.F.)17'-11"± (V.I.F.)

'-1

(V

.I.

F.

'-6

(V .I.

F.

'-6

(V

.I.

F.

'-2

(V .I.

F.

'-6

(V

.I.

F.

'-7

12'-0"± (V.I.F.)

NEW PIPING RUN,

(18"Ø & 20"Ø).

SEE NOTE 1

NEW W12x22 (@

UNDERSIDE OF

ELEVATED FLOOR

SLAB). SEE DETAIL

C8/S-101 FOR CONN.

INTO EXIST CONC.

NEW PIPE SUPPORT

@ EXIST. CONC. COL.

SEE D5/S-101 FOR DETAIL

EXIST. CONC. COL.

(14"x14" ALONG LINE

CG1). CONTRACTOR

SHALL FIELD VERIFY

DIMS.

EXIST. CONC. COL.

(16"x16" ALONG LINE 26 AND 18"x18"

ALONG LINE 27).

CONTRACTOR SHALL

FIELD VERIFY DIMS.

NEW PIPE SUPPORT

@ EXIST. CONC. COL.

SEE D5/S-101 FOR DETAIL

AREA WELL

OPENING

EXTENTS

EXIST. BEAMS

BELOW ROOF

SLAB (TO BE

DEMO'ED)

NEW W12x22

BETWEEN

EXIST. CONC.

BEAMS

NEW W8x13

BEAM, (2)

SIDES OF NEW

PENETRATION

NEW 18" DIA. PIPE

PENETRATION THRU

EXIST. CONC. ROOF.

SEE DETAIL B5/S-101

FOR FRAMING AROUND

PENETRATION & LOCATION

EXIST. PIPE

PENETRATIONS

(TO REMAIN)

EXIST. CONC.

BEAM (TYP)

EXIST. CONC.

BEAM (TYP)

EXIST. CEILING

HUNG PIPING.

SEE NOTE 1

5'-6"

T/MC8x BEAMS

EL. 108'-9" +/-

5' -6

1'

-0

1' -8

1'

-8

6"

1' -0

1' -8

3/16

KICKER TO

WT WEB

3/16

KICKER

TO PL3/8"

1/ 2"

G

AP

3/16 L3x3 TO

WEB

EQ. EQ.

HSS TO

TOP

FLANGE2-12

8"

FACE OF

EXIST. COL.

NEW PIPING. SEE

MECH DWGS FOR

SIZE & ELEVATIONS.

PIPE ROLLER

(BELOW EA. PIPE)

SEE MECH. DWGS.

EXIST. CONC. COL

ALONG LINE 26

NEW (2) MC8x8.5

HORIZ. SUPPORT,

EA. SIDE OF WT

WEB, w/ PL3/8" @

END OF SUPPORT

NEW WT7x24x7'-6" LG

ALONG FACE OF EXIST.

COL. CENTER ON WIDTH

FASTEN NEW WT7 TO EXIST.

COLS. w/ 5/8"Ø EPOXY ANCHORS, EMBED 5 5/8" INTO EXIST. COL.

(5 ANCHORS EA. SIDE OF WT

WEB - 5" GAGE FOR ANCHORS).

CARE SHOULD BE TAKEN TO LOCATE

ALL REINF. IN COLS. & WT SHALL

BE LOCATED TO AVOID ANCHOR/

REINF. INTERFERENCE.

NEW 2L4x4x3/8 DIAG.

KICKER BETWEEN

WT7x & END PL3/8"

TOP OF MECH. ROOM

SLAB ON GRADE.

EL. = 100'-0"

TOP EDGE

OF WT7

BOT. OF DIAG.

KICKER

W12 BEAM w/ L3x3x3/8x6"

LG. CONN., EA. SIDE OF

WEB. PROVIDE (2) 5/8"Ø

EPOXY ANCHORS IN L3x3

LEG BETWEEN EXIST. CONC.

EMBED ANCHOR 5 5/8" INTO

EXIST. CONC. (TYP.)

BOT. OF EXIST.

ELEV. SLAB

EXIST. CONC.

BEAM (TO REMAIN)

NEW 18"Ø PIPE

PENETRATION THRU

ELEVATED CONC.

SLAB

EXIST. CHANNEL

TO BE REMOVED.

SEE ARCH DWG.

A-301 FOR ITEMS

TO BE REMOVED

EXIST. BENT PL

@ CONC. SHELF

(TO REMAIN)

NEW W12 BEAM,

CENTER ON HORIZ.

SECTION OF EXIST.

CONC. HAUNCH. SEE

PLAN FOR SIZE & BEAM

SPAN. REFER TO DETAIL

C8/S-101 FOR CONN.

@ EA. END INTO EXIST.

CONC.

CL OF NEW PIPE

EXIST. 10" ELEVATED

CONC. SLAB (TO REMAIN)

NEW HSS4x3x3/16 ALONG TOP

OF NEW W8 BEAM. CONTRACTOR

SHALL FIELD VERIFY HEIGHT

(BASED ON DISTANCE BETWEEN

TOP OF BEAM & BOT. OF CONC.)

AND LENGTH (BETWEEN INSIDE

FACE OF WALL AND SLOPED

PORTION OF CONC.) OF TUBE

PRIOR TO FABRICATION

NEW W8 BEAM w/ L3x3x3/8x6"

LG. CLIP ANGLE EA. END. SEE

PLAN FOR SIZE & SPA OF BEAM.

AT CONN. TO CONC. WALL,

PROVIDE (2) 5/8"Ø EPOXY

ANCHORS INTO EXIST. CONC.

WALL. EMBED. 4" (MIN.). AT

CONN. TO W12, PROVIDE (2) 3/4"

DIA. A325 BOLT IN EA. ANGLE LEG.

EXIST. 12" CONC.

WALL (TO REMAIN)

1' -8

1' -2

/4

DIMS. TAKEN TO

CL OF ANCHORS

1/4

MC8 TO

WT7

(COORD w/ PIPE EL.)

3/16

PL3/8" TO

MC8's. CONT

WELD 1 1/2"

ALONG VERT.

OF PL

8" (END OF MC8

TO PL3/8" CL)

3/16

NOTES:

1. REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF NEW PIPING

AND FOR PENETRATION THRU EXISTING CONCRETE AT AREA WELL.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO

FABRICATION OF ANY NEW SUPPORT STEEL.

SCALE: 3/4" = 1' - 0" 0 1'1' 6"D5 PIPE HANGAR SUPPORT DETAIL - TYP

SCALE: 3/4" = 1' - 0" 0 1'1' 6"B5 FRAMING AROUND PIPE PENETRATION

SCALE: 1/8" = 1' - 0" 0 8'8' 4'A1 PARTIAL BASEMENT PLAN - STRUCTURAL

SCALE: 3/4" = 1' - 0" 0 1'1' 6"C8 W12x22 CONN. TO EXIST. CONC.

PA

R

TI

AL

B

AS

EM

EN

T

PL

AN

PI

PE

S U

PP

O

R T

D

ET

AI

LS

ST

R

U C

TU

R

AL

S.

R

IC

C

I

S.

R

IC

C

I

S.

S

AP

SF

O R

D

S-

1.

D

W G

S-101

SO

LI

C

IT

AT

IO

N N

O

O

PT

IO

N

AL

F

IE

LD

D W

N B

Y:

C

KD

B Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

1 3 5

C

7 9

A

M

AR

K

IS

SU

E D

AT

E:

P2 N

O

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

CORRECTED FINAL

D

SN

Z H

TV

R

EP

AI

R

C H

IL

LE

D W

AT

ER

S

YS

TE

M

, F

AC

IL

IT

Y

W R

IG

H

T

PA

TT

ER

SO

N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

EE

R

IN

G G

R O

U P

W R

IG

H

T

AV

E.

W

PA

FB

O H

W P A

FB

W

R

IG

H T-

PA

TT

ER

SO

N A

IR

F

O R

C E

BA

SE

W

2Q R

R

AN

SI

D

AE

C

NORTH

US Army Corps of Engineers

SCALE:

KEY PLAN

NTS

PHASE II

OFFICE

COMPLEX

PHASE I PHASE III

NORTHEAST

LAB

TOWER WING

SOUTHWEST

LAB

SOUTHEAST

LAB

SUPPORT

WING

CLEAN

ROOM WING

INDOOR RANGE

OUTDOOR

RANGE

VEHICLE

SHELTER

26'-8 1/2"± (INSIDE FACE TO INSIDE FACE OF SUMP)

EXIST. CHEMICAL

TREATMENT BLDG.,

SEE E5/S-111 FOR

NEW TANK LOCATION

& NEW FRAMING

MEMBERS

4" THICKNESS OF SHOTCRETE

ALONG INSIDE FACE OF EXIST.

CONC. WALL. (TYP. ALONG EAST

WALL, BETWEEN CONC. PIERS)

NEW CONC. PIER @

COOLING TOWER SUMP

PIT #3, (1) LOCATION IN

SUMP PIT #3. SEE NOTE 1

FOR NEW PIER AND NOTE

2 FOR DEMO. OF EXIST.

EXIST. CONC. PIERS

@ COOLING TOWER

SUMP PIT (TYP. EA.

SUMP PIT BAY - TO

REMAIN, U.N.O.)

EXIST. W12x BEAMS

FOR EQUIP. SUPPORT

(TYP. EA. SUMP PIT

BAY - TO REMAIN)

EXIST. CONC. WALL

BETWEEN COOLING

TOWER SUMP PITS

(TYP., TO REMAIN)

NEW CONC. PIERS @

COOLING TOWER SUMP

PIT #2, (2) LOCATIONS IN

SUMP PIT #2. SEE NOTE 1

FOR NEW PIER AND NOTE

2 FOR DEMO. OF EXIST.

EXIST. STEEL BEAM

ADJACENT TO EXIST.

CONC. WALL (TYP.

FULL LENGTH ALONG

EAST EL. OF SUMP

PITS - TO REMAIN).

SEE NOTE 3 FOR

CORROSION REPAIR.

NEW CONC. PIER @

COOLING TOWER SUMP

PIT #1, (1) LOCATION IN

SUMP PIT #1. SEE NOTE 1

FOR NEW PIER AND NOTE

2 FOR DEMO. OF EXIST.

EXIST. CONC. WALLS

@ PERIMETER OF

COOLING TOWER

SUMP PITS.

OUTLINE OF NEW

MECH. EQUIP. SEE

NOTE 6

EXIST. ACCESS

HATCH ENTRANCE

TO SUMP (TYP. EA.

SUMP PIT)

OUTLINE OF NEW

MECH. EQUIP. SEE

NOTE 6

OUTLINE OF NEW

MECH. EQUIP. SEE

NOTE 6

EXIST. CONC. WALLS

@ PERIMETER OF

COOLING TOWER

SUMPS.

'-9

(E

XI

ST

. S

U M

P #3

'-2

(E

XI

ST

. S U

M P

#2

'-9

(E

XI

ST

. S

U M

P #1

TY

P.

S-501

A6

10'-0" (V.I.F., INSIDE FACE TO

INSIDE FACE OF CONC.

WALL AROUND OPNG.)

EX

TE

N

TS

O F

EX

IS

T

FL

R

G R

AT

IN

G (S

EE

N

O

TE

EXTENTS OF EXIST. FLR.

GRATING (SEE NOTE 4)

EXIST. L4x4x1/4xCONT.

AROUND PERIMETER

OF OPNG. T/ANGLE

EL. = 99'-11" (TYP, TO

REMAIN)

6"

2' -6

3'-3" 4'-6"

PERIMETER STRUC.

OF EXIST. CHEM.

BLDG. (TO REMAIN)

EXIST. CONC. SLAB

ON GRADE. T/SLAB

EL. = 100'-0" (TO REMAIN).

NEW MECH. TANK.

SEE NOTE 2

EXIST. STEEL

MEMBERS.

SEE NOTE 1

EXIST. 1" METAL

FLOOR GRATING

(TO REMAIN)

NEW MECH. TANKS.

SEE NOTE 3

NEW MC6x12 BEAMS

BELOW NEW MECH.

TANKS.

INSIDE FACE

OF EXIST.

CONC. WALL

CL OF NEW

MECH. TANKS

S-501

F6

NOTES:

1. NEW 2'-0"x8"x7'-6"+/- CONCRETE PIERS AT EXISTING PIER LOCATIONS, (4 LOCATIONS TOTAL SHALL BE VERIFIED IN FIELD. 2 LOCATIONS

FIELD VERIFIED IN SUMP PIT #2 AND 1 LOCATION IN EACH OF SUMP

PIT #1 AND #3). SEE PHOTOS C7/S-111 AND A7/S-111 FOR CONCRETE

DETERIORATION IN SUMPS #1 AND #3. CONTRACTOR SHALL FIELD

VERIFY ALL EXISTING CONCRETE CONDITIONS IN SUMPS AND

NOTIFY COR IF ANY FURTHER CONCRETE DETERIORATION IS

OCCURRING.

2. CONTRACTOR SHALL DEMOLISH EXISTING PIERS PRIOR TO

CONSTRUCTION OF NEW PIERS (NEW PIERS TO BE PLACED AT SAME

LOCATION AS THE EXISTING PIERS BEING REMOVED). CONTRACTOR

SHALL FIELD VERIFY ANY DOWEL CONNECTION BETWEEN

PIERS/PERIMETER WALL AND NOTIFY COR OF THE EXISTING

CONNECTION CONDITIONS. SEE DETAIL A6/S-501 FOR EXISTING

REINF. STEEL WITHIN WALL AND PIER (PER EXISTING DRAWINGS)

3. EXISTING STEEL BEAMS WITH CORROSION AND RUST PRESENT.

CONTRACTOR SHALL CLEAN AND REMOVE ALL EXISTING

CORROSION/RUST AND APPLY A COLD GALVANIZING REPAIR PAINT

AT THESE LOCATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING

STEEL IN ALL SUMPS AND NOTIFY COR IF LOSS OF STEEL SECTION IS

OCCURRING.

4. CONTRACTOR SHALL PROVIDE SHORING TO EXISTING SUMP PIT AND

STEEL STRUCTURE PRIOR TO/DURING DEMOLITION OF CONCRETE

PIERS.

5. PROVIDE INTEGRAL WATERPROOFING ADMIXTURE TO CONCRETE

MIX DESIGN FOR ALL NEW CONCRETE APPLICATIONS

6. INDICATES EXTENTS OF NEW MECHANICAL EQUIPMENT. REFER

TO MECHANICAL DRAWINGS FOR LOCATION OF NEW EQUIPMENT,

INCLUDING PENETRATIONS THROUGH SUMP WALLS & FLOOR

PLATES. NEW EQUIPMENT PLACEMENT AND RAIL SYSTEM SHALL

BE SIMILAR TO EXISTING AND BE CENTERED ON STEEL BEAMS

(BELOW).

7. PROVIDE CRYSTALLINE WATERPROOFING APPLICATION TO ALL

EXISTING CONCRETE SURFACES INTERNAL TO SUMP. SEE

SPECIFICATION SECTION 07 16 16 FOR INFORMATION ON

APPLICATION PROCESS FOR WATERPROOFING.

8. SEE SPEC SECTION 03 37 13 FOR SHOTCRETE APPLICATION AND

EXISTING CONCRETE SURFACE PREPARATION.

9. SEE DETAIL A1/S-501 FOR EXISTING CONCRETE REPAIR

PROCEDURES AT REMAINING LOCATIONS THROUGHOUT SUMP

EXTENTS (DOES NOT INCLUDE REPAIRS AT PIERS TO BE REPLACED

AND WALL TO RECEIVE SHOTCRETE APPLICATION).

NOTES:

1. EXISTING C6 STEEL CHANNELS BELOW EXISTING FLOOR GRATING, SPANNING BETWEEN L4x4 ANGLES AT PERIMETER OF BASIN OPENING. (TYP. U.N.O.). CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS OF

GRATING/STEEL SUPPORT SYSTEM PRIOR TO ANY NEW WORK.

2. NEW BRINE TANK (ASSUMED MAX. WEIGHT OF 4950 LBS) TO BE PLACED ATOP EXISTING CONCRETE SLAB ON

GRADE. REFER TO MECHANICAL DRAWINGS FOR TANK INFORMATION AND PLACEMENT LOCATION.

3. NEW RESIN TANKS (QUANTITY 2, EACH WITH MAX. WEIGHT OF 3850 LBS) TO BE PLACED ATOP THE EXISTING FLOOR GRATING/NEW STEEL BEAM SYSTEM. REFER TO MECHANICAL DRAWINGS FOR TANK INFORMATION.

NOTIFY CONTRACTING AUTHORITY IF PLACEMENT CHANGES FROM WHAT IS SHOWN ON PLAN.

4. EXISTING STEEL GRATING SHALL REMAIN AT EXTENTS OF OPENING. REINSTALL GRATING AFTER NEW STEEL

HAS BEEN INSTALLED (BELOW).

SCALE: 3/16" = 1' - 0" 0 5'5'A1 COOLING TOWER PLAN - STRUCTURAL

SCALE: 1/4" = 1' - 0" 0 4'4' 2'E5 CHEMICAL TREATMENT BLDG. PLAN - STRUCTURAL

SCALE: N.T.S.C7 TOWER 1 SUMP - DETERIORATED CONCRETE @ PIER

SCALE: N.T.S.A7 TOWER 3 SUMP - DETERIORATED CONCRETE @ PIER

C O

O

LI

N G

T O

W

ER

C

H

EM

IC

AL

B U

IL

D

IN

G

P

LA

N

ST

R U

C

TU

R

AL

S.

R

IC

C

I

S.

R

IC

C

I

S.

S

AP

SF

O R

D

S-

1.

D

W G

S-111

SO

LI

C

IT

AT

IO

N N

O

O

PT

IO

N

AL

F

IE

LD

D W

N B

Y:

C

KD

B Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

1 3 5

C

7 9

A

M

AR

K

IS

SU

E D

AT

E:

P2 N

O

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

CORRECTED FINAL

D

SN

Z H

TV

R

EP

AI

R

C H

IL

LE

D W

AT

ER

S

YS

TE

M

, F

AC

IL

IT

Y

W R

IG

H

T

PA

TT

ER

SO

N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

EE

R

IN

G G

R O

U P

W R

IG

H

T

AV

E.

W

PA

FB

O H

W P A

FB

W

R

IG

H T-

PA

TT

ER

SO

N A

IR

F

O R

C E

BA

SE

W

2Q R

R

AN

SI

D

AE

C

NORTH

US Army Corps of Engineers

SCALE:

KEY PLAN

NTS

PHASE II

OFFICE

COMPLEX

PHASE I PHASE III

NORTHEAST

LAB

TOWER WING

SOUTHWEST

LAB

SOUTHEAST

LAB

SUPPORT

WING

CLEAN

ROOM WING

INDOOR RANGE

OUTDOOR

RANGE

VEHICLE

'-9

(E

XT

EN

TS

O F

N

EW

C O

N C

. S

LA

B)

'-5

(E

XT

EN

TS

O F

N

EW

C O

N C

. S

LA

B)

1/2" EXP.

JOINT MAT'L

1/ 2"

E

XP

JO

IN

T

M

AT

'L

8' -1

0"

EX

TE

N

TS

O

F N

EW

C

O N

C . S

LA

B)

19'-11"+/- (EXTENTS OF NEW CONC. SLAB)

3' -4

(E

XT

EN

TS

O F

N

EW

C O

N C

. S

LA

B)

6'-1" (DEMO EXIST.

CURB & SLAB ON

GRADE TO ALLOW

FOR NEW CONC. RAMP

33'-0"+/- (EXTENTS OF NEW CONC. SLAB)

1/2" EXP.

JO

INT M

AT'L

1/2" EXP.

JO

IN

T M

AT'L

SL

O

PE

1/2" EXP.

JOINT MAT'L

1/2" EXP.

JOINT MAT'L

1/ 2"

E

XP

JO

IN

T

M

AT

'L

11'-5"+/- (NEW SLAB EDGE TO

EDGE OF EXIST. CONC FND.)

'-1

1"

N

EW

S

LA

B

ED

G

E

TO

E D

G E

O F

EX

IS

T.

C

O N

C . F

N D

EXT. FACE OF

EXIST. CONC.

(@ MAINTENANCE

SHELTER)

CONTROL JOINT,

SEE DETAIL A5/S-112

EXIST. DOWNSPOUT

TO BE ADJUSTED TO

DRAIN INTO GRASSY

AREA

EXT. FACE OF

EXIST. CONC

EXIST. CONC. FND.

WALL (TO REMAIN)

CONTROL JOINT,

SEE DETAIL A5/S-112

EXT. FACE OF

EXIST. CONC

NEW PIPE BOLLARD

(4) LOCATIONS. SEE

DETAIL A3/S-112 FOR

SIZE & CONN. INTO

CONC. SLAB. EXIST. CONC. CURB

(TO REMAIN, U.N.O.)

EXIST. CONC. SLAB

ON GRADE (TO REMAIN)

NEW CONC. RAMP,

SEE NOTE 2

EXIST. PAVEMENT

(TO REMAIN)

EXIST. CONC. CURB

(TO REMAIN, U.N.O.)

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

A1 S-112

A1 S-112

6' -0

(L

EN

G

TH

O F

N

EW

C O

N C

. R

AM

P

- V

ER

IF

Y

IN

FI

EL

D B

AS

ED

O N

S

LO

PE

A1

S-112

4' -1

1"

TO

ST

AR

T O

F R

AM

P)

2'-1" +/-

(WIDTH OF

RAMP AT

TOP)

1'-7" +/- (EDGE

OF EXIST.

CONC TO

NEW RAMP)

1'-0"

8"

5"

T/S.O.G.

1/4

4' -0

ISOLATION JOINT

w/ BONDBREAKER

ALONG WALL

EXIST. FND. WALL

MAX CJ SPACE FOR

T/SLAB = 3T (FT). JOINT

SPACING IN ANY DIRECTION

SHALL NOT EXCEED 1.5

TIMES SPACING IN

PERPENDICULAR DIRECTION

EL. MATCH EXIST.

NOTES:

1. 5" THK. CONCRETE SLAB ON GRADE w/ #5 TOP, EA. WAY, @ 18"oc ON 4" COMPACTED GRANULAR BASE.

T/NEW S.O.G. EL. TO VARY BASED ON SLOPE. MATCH ELEVATION OF SLAB ON GRADE AT ENTRANCE TO

BUILDING.

2. NEW CONCRETE RAMP BETWEEN EXISTING PAVEMENT AND EXIST. SLAB ON GRADE. MIMUMUM RAMP

SLOPE TO BE 1" PER 1'-0". PROVIDE SMOOTH TRANSITION AT PAVEMENT INTERFACE.

3. NEW MECHANICAL EQUIPMENT AND HOUSEKEEPING PAD. REFER TO SHEET M-111 FOR LOCATION, SIZE, AND WEIGHT OF EQUIPMENT/PAD.

SCALE: 1/2" = 1' - 0" 0 2'2' 1'A1 DETAIL

SCALE: 1/2" = 1' - 0" 0 2'2' 1'A3 BOLLARD DETAIL

SCALE: 1/2" = 1' - 0" 0 2'2' 1'A5 TYP. SLAB ON GRADE JOINT PATTERN

SCALE: 3/8" = 1' - 0" 4'0 2'C1 CHEMICAL TREATMENT BLDG. PLAN - EXTERIOR SLAB

C H

EM

IC

AL

B

U

IL

D

IN

G

EX

TE

R

IO

R S

LA

B

PL

AN

ST

R

U C

TU

R

AL

S.

R

IC

C

I

S.

R

IC

C

I

S.

S

AP

SF

O R

D

S-

2.

D

W G

S-112

SO

LI

C

IT

AT

IO

N N

O

O

PT

IO

N

AL

F

IE

LD

D W

N B

Y:

C

KD

B Y:

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

1 3 5

C

7 9

A

M

AR

K

IS

SU

E D

AT

E:

P2 N

O

SI

ZE

SU

BM

IT

TE

D B

Y:

C O

N

TR

AC

T

N O

SHEET ID

D

AT

E

CORRECTED FINAL

D

SN

Z H

TV

R

EP

AI

R

C H

IL

LE

D W

AT

ER

S

YS

TE

M

, F

AC

IL

IT

Y

W R

IG

H

T

PA

TT

ER

SO

N

A

FB

B

D

E

F

G

2 4 6 8 10

W

2Q R

-1 8-

D -0

JU

LY

TH

C

IV

IL

E

N G

IN

EE

R

IN

G G

R O

U P

W R

IG

H

T

AV

E.

W

PA

FB

O H

W P A

FB

W

R

IG

H T-

PA

TT

ER

SO

N A

IR

F

O R

C E

BA

SE

W

2Q R

R

AN

SI

D

AE

C

NORTH

US Army Corps of Engineers

SCALE:

KEY PLAN

NTS

PHASE II

OFFICE

COMPLEX

PHASE I PHASE III

NORTHEAST

LAB

TOWER WING

SOUTHWEST

LAB

SOUTHEAST

LAB

SUPPORT

WING

CLEAN

ROOM WING

INDOOR RANGE

OUTDOOR

RANGE

VEHICLE

7"+/-LOCATION TO MATCH EXIST.

3"

3/16 L4x4 TO

MC6

EXIST. 1" METAL

GRATING TO BE

RE-INSTALLED AFTER

NEW STEEL BEAMS

INSTALLED.

EXIST. SLAB ON

GRADE. SEE PLAN

FOR EL.

EXIST. EXT.

BLDG WALL

EXIST. L4x4 (w/ ANCHORS

INTO WALL) @ TOP OF

CONC. WALL (TO REMAIN -

TYP. AROUND PERIMETER)

EXIST. CONC. WALL

@ BASIN (TYP

AROUND PERIMETER)

L6x6x3/4x6" LG., w/ (2)

5/8" DIA. EPOXY ANCHORS.

EMBED. 4" INTO CONC.

WALL. CENTER L6x6 ON

NEW MC6 BEAM (TYP. EA.

END OF NEW MC6)

NEW MC6 CHANNEL

BELOW EXIST. GRATING.

SEE PLAN FOR SIZE &

LOCATION.

NEW L4x4x1/4 BETWEEN

NEW MC6 & EXIST. STEEL

BEAMS (TO REMAIN).

LOCATION SHALL BE

SIMILAR TO MEMBER

BEING REMOVED.

EXIST. CONC. WALL

@ BASIN (TYP AROUND

PERIMETER)

1'-0"+/- (THICKNESS

OF EXIST PERIMETER

SUMP WALL)

T/EXIST. BASE

EL. 100'-0"

EL. 107'-6"+/- (V.I.F.

MATCH EXIST.)

T/NEW CONC. PIER

1 1/2"

CLR

4" (THICKNESS OF NEW

SHOTCRETE LAYER

BETWEEN CONC.

PIERS, SHOWN BEYOND)

EL. 108'-10" +/- (V.I.F.)

T/EXIST. WALL

1'-0"± (THICKNESS

OF EXIST PERIMETER

SUMP WALL

4" (THICKNESS OF NEW

SHOTCRETE LAYER

BETWEEN CONC. PIERS)

1/

2" C

LR

(T

YP

INSIDE FACE OF

EXIST. CONC.

SUMP WALL

EXIST. W12 BEAM

TO REMAIN. SEE

NOTE 4 ON S-111 FOR

SHORING DURING

EXIST. PIER REMOVAL

& NOTE 3 FOR CLEANING

OF ANY CORROSION

NEW CONC. PIER. SEE

A1/S-111 FOR LOCATION

OF NEW PIERS & NOTE

1 FOR DIMS.

#5 x 18" LG. DOWEL

@ NEW STIRRUP

LOCATIONS. EMBED.

& EPOXY 6" INTO

EXIST. CONC. WALL

PROVIDE #3 BARS

@ 12"oc, EA. WAY, CENTER IN NEW

SHOTCRETE LAYER

(BEYOND). EXTEND

HORIZ. THRU NEW

PIER.

PROVIDE #4

STIRRUPS @

12"oc (MAX) ALONG

HEIGHT OF PIER

NEW (6) #6 VERT. BARS

IN NEW CONC. PIER

EXIST. 10" CONC.

BASE SLAB (REINF.

NOT SHOWN FOR

CLARITY)

NEW GROUT PAD

BELOW EXIST.

BEAM

EXIST. SUMP WALL

@ PERIMETER w/

EXIST. REINF

(PER AS-BUILTS)

EXIST. DOWELS BETWEEN

SLAB & PIER (QUANTITY 6).

DOWELS TO REMAIN PER

EXIST. CONDITION.

CONTRACTOR SHALL

VERIFY QUANTITY &

CONDITION. NOTIFY

COR IF DOWEL REQUIRES

REPAIR

INSIDE FACE OF

EXIST. CONC.

SUMP WALL

PROVIDE #3 BARS

@ 12"oc, EA. WAY, CENTER IN NEW

SHOTCRETE LAYER

(BEYOND). EXTEND

HORIZ. THRU NEW

PIER.

#4 STIRRUPS @

12"oc ALONG

HEIGHT OF PIER

NEW CONC. PIER.

EXIST. SUMP WALL

@ PERIMETER (EXIST

REINF. NOT SHOWN

FOR CLARITY)

#5 x 18" LG. DOWEL

@ NEW STIRRUP

LOCATIONS. EMBED.

& EPOXY 6" INTO

EXIST. CONC. WALL

NEW (6) #6 VERT.

BARS IN NEW

CONC. PIER

B9

S-501

2"2"2"

8"

PROVIDE (3) #4

STIRRUPS @

TOP OF PIER

CRACK (INJECTION)

REPAIR PROCEDURE:

REPAIR PROCEDURE:

1. ROUTE OR SAWCUT EXIST. CRACK

(TO SIZE) TO ALLOW FOR INJECTION

OF CRACK REPAIR MATERIAL (PER

MANUF. INSTRUCTIONS).

2. CLEAN CRACK OF ANY LOOSE OR

FOREIGN MATTER BY BRUSHING OR

CHIPPING METHODS.

3. PROVIDE APPROPRIATE INJECTION

COMPOUND:

A. EPOXY INJECTION FOR CRACKING

w/ NO MOISTURE EVIDENT AT CRACK.

B. CEMENTITIOUS (POLYMERIZED)

MORTAR INJECTION FOR CRACKING

w/ MOISTURE EVIDENT AT CRACK

C. SEE SPEC SECTION 03 01 00 FOR ADD'L

PRODUCT INFORMATION

4. CLEAN SURFACE OF EXCESS COMPOUND

& SEAL CRACK AS NECESSARY.

1. CONTRACTOR SHALL DETERMINE EXTENTS OF

SOUND CONCRETE AROUND SPALL SURFACE.

2. PROVIDE 3/4" (MAX.) DEEP SAWCUT (SAWCUT

SHALL NOT CUT THROUGH ANY EXISTING

REINFORCING BARS). EXTENTS OF SAWCUT

SHALL BE 2" BEYOND EXTENTS OF SPALL AREA.

(SAWCUT SHALL…

This is the start of the file's text. The full file is on GovTribe.