This document provides details on a federal contract opportunity for chiller repairs at Wright-Patterson Air Force Base. The U.S. Army Corps of Engineers Louisville District is seeking proposals to replace three chillers, chilled water pumps, condenser water pumps, and related electrical systems at Building 620. Additional work includes installing variable speed drives, a refrigerant monitoring system, chilled water control panels, suction and discharge headers, balancing valves, centrifugal water separators, an exhaust fan, water softening system, HVAC unit, make-up water piping, and an emergency eye wash station. The project also requires replacing three cooling towers, sluice gates, and isolation valves and repairing concrete basins and piers in the cooling tower area. The contract value is estimated between $5-10 million, and the period of performance is 420 calendar days from notice to proceed. Proposals are due in response to Solicitation Number W912QR20R0065 and will be evaluated using best value tradeoff procedures.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOUISVILLE DISTRICT
US Army Corps of Engineers ®
WRIGHT PATTERSON AIR FORCE BASE
REPAIR CHILLED WATER SYSTEM,
FACILITY 20620
CONTRACT NO.:
ISSUE DATE.:
W912QR-18-D0026
JULY 2020
PROJECT #ZHTV 130071
A DVANCED
E NGINEERING
C ONSULTANTS
Mechanical | Electrical | Plumbing | Fire Protection 1405 Dublin Road Tel: (614) 486-4778 Columbus, Ohio 43215 Fax: (614) 486-4082
P2 #486296
DRAWING INDEX:
G-001 TITLE SHEET
G-002 GENERAL PROJECT NOTES
G-003 PROJECT PHASING
G-101 OVERALL SITE PLAN
G-102 AREA B BASE MAP
G-111 CHEMICAL TREATMENT BUILDING LAYOUT
S-001 GENERAL INFORMATION - STRUCTURAL
S-101 PARTIAL BASEMENT PLAN - STRUCTURAL
S-111 COOLING TOWER YARD PLAN - STRUCTURAL
S-112 CHEMICAL BUILDING - EXTERIOR SLAB PLAN - STRUCTURAL
S-501 DETAILS - STRUCTURAL
A-101 EXISTING AREA WELL - DEMOLITION AND NEW WORK - ARCHITECTURAL
A-301 AREA WELL SECTION AND DETAILS - ARCHITECTURAL
P-001 GENERAL INFORMATION - PLUMBING
P-111 CHEMICAL TREATMENT BUILDING - PLUMBING
P-501 DETAILS AND ISOMETRICS - PLUMBING
M-001 GENERAL INFORMATION - MECHANICAL
MD101 PARTIAL BASEMENT PLAN - MECHANICAL - DEMOLITION
MD111 COOLING TOWER YARD PLAN - MECHANICAL - DEMOLITION
MD801 SCHEMATICS - MECHANICAL - DEMOLITION
M-101 PARTIAL BASEMENT PLAN - MECHANICAL
M-102 PARTIAL BASEMENT PLANS - MECHANICAL
M-103 PARTIAL BASEMENT PLANS - MECHANICAL
M-104 MECHANICAL ROOM INGRESS PLAN - MECHANICAL
M-111 COOLING TOWER YARD PLAN - MECHANICAL
M-121 PARTIAL SECOND FLOOR PLAN - MECHANICAL
M-301 SECTIONS - MECHANICAL
M-501 DETAILS - MECHANICAL
M-502 DETAILS - MECHANICAL
M-601 SCHEDULES - MECHANICAL
M-701 CONTROL TERMS, ABBREVIATIONS AND GENERAL INFORMATION - MECHANICAL
M-702 CHILLED WATER SYSTEM CONTROLS - MECHANICAL
M-703 CHILLED WATER SYSTEM CONTROLS - MECHANICAL
M-704 CHILLED WATER SYSTEM CONTROLS - MECHANICAL
M-705 CHILLED WATER SYSTEM CONTROLS - MECHANICAL
M-706 CHILLED WATER SYSTEM CONTROLS - MECHANICAL
M-801 SCHEMATICS - MECHANICAL
E-001 GENERAL INFORMATION - ELECTRICAL
ED101 PARTIAL BASEMENT PLAN - ELECTRICAL - DEMOLITION
ED111 COOLING TOWER YARD PLAN - ELECTRICAL - DEMOLITION
ED112 PIPE TUNNEL PLAN - ELECTRICAL - DEMOLITION
ED121 PARTIAL SECOND FLOOR PLAN - ELECTRICAL - DEMOLITION
ED601 SCHEDULES - ELECTRICAL - DEMOLITION
ED701 PARTIAL ELECTRICAL ONE-LINES - DEMOLITION
ED702 PARTIAL ELECTRICAL ONE-LINES - DEMOLITION
E-101A PARTIAL BASEMENT PLAN - LIGHTING
E-101B PARTIAL BASEMENT PLAN - POWER AND SYSTEMS
E-103 PARTIAL BASEMENT PLANS - ELECTRICAL
E-111A COOLING TOWER YARD PLAN - LIGHTING
E-111B COOLING TOWER YARD PLAN - POWER AND SYSTEMS
E-112 PIPE TUNNEL PLAN - ELECTRICAL
E-501 DETAILS - ELECTRICAL
E-601 SCHEDULES - ELECTRICAL
E-602 SCHEDULES - ELECTRICAL
E-701 PARTIAL ELECTRICAL ONE-LINES
E-702 PARTIAL ELECTRICAL ONE-LINES
W912QR20R0065SOLICITATION NO.:
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CERTIFIED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W
PA
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
US Army Corps of Engineers
7/17/2020
G-001
C O
V E
R S
H E
E T
E .L
A R
U E
K .F
IE
LD
S
G .L
E
IT
C H G
-0
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
021 July 2020
W912QR20R0065
PROJECT GENERAL NOTES:
1. COORDINATE ALL WORK THROUGH THE GOVERNMENT CONTRACTING OFFICER.
2. ANY NEW TYPES OF HAZARDOUS MATERIALS TO BE USED, AND THE WASTES THAT MAY BE
GENERATED AS A RESULT OF THAT USE NEED TO BE CONSIDERED IN THE DESIGN. IF
APPROPRIATE, DEDICATED SPACE FOR STORAGE OF HAZARDOUS MATERIALS AND WASTE
NEED TO BE PROVIDED. IN ADDITION PROPER COORDINATION IS NEEDED WITH 88 CEG/CEIEC.
QUESTIONS CONCERNING THE REQUIREMENTS FOR STORAGE AND DISPOSAL OF ANY
HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88 CEG/CEIEC HAZARDOUS MATERIALS
PM, MIKE VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) OR 88 CEG/CEIEC
HAZARDOUS WASTE PM, GARY SELBY (937-257-3349 OR GARY.SELBY@US.AF.MIL).
3. BECAUSE IT IS NOT POSSIBLE TO DEFINITELY KNOW THE LOCATION OF ALL POTENTIAL
ASBESTOS CONTAINING MATERIALS (ACM) WITHIN A FACILITY, FOR INSTANCE ACM FIRE WALLS
OR ACM FLOOR TILE, THE CONTRACTOR PERFORMING THIS WORK SHALL COMPLY WITH ALL
RELEVANT PARTS OF 29 CFR 1910.1001 AND/OR 29 CFR 1926.1101 AS MAY BE APPLICABLE. A
LIMITED ASBESTOS AND LEAD-BASED PAINT SURVEY WAS PERFORMED ON 12 JUN 2017. THIS
REPORT CAN BE FOUND IN THE PROJECT SPECIFICATIONS. IDENTIFIED AREAS ARE NOTED ON
THE DRAWINGS. IF ADDITIONAL SUSPECT ASBESTOS-CONTAINING MATERIAL IS FOUND THE
CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE HIS OWN TELEPHONE AND COMPUTER
CONNECTIONS FOR HIS CONSTRUCTION TRAILER ON SITE.
5. BUILDING WILL REMAIN OCCUPIED. CONTRACTOR SHALL COORDINATE ALL ACTIVITIES
REQUIRED IN BASE OCCUPIED AREAS WITH THE GOVERNMENT PROJECT MANAGER,
CONTRACTING OFFICER, AND BUILDING SECURITY OPERATIONS OFFICER.
6. CONTRACTOR SHALL REQUEST AND RECEIVE PERMISSION PRIOR TO ANY UTILITY OUTAGE A
MINIMUM OF 2 WEEKS PRIOR TO OUTAGE.
7. CONTRACTOR SHALL KEEP CONSTRUCTION SITE CLEAN AT ALL TIMES.
8. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE
OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO DISTURBANCE. FOR PROJECTS
THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED BY THE
OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. THE CONSTRUCTION CONTRACTOR
SHALL PREPARE AND SUBMIT THE SWPPP AND DRAFT NOI TO THE CONTRACTING OFFICER'S
REPRESENTATIVE TO BE FORWARDED TO ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA, FOR
REVIEW. ONCE THE SWPPP AND DRAFT NOI HAVE BEEN APPROVED BY THE COR AND
ENVIRONMENTAL MANAGEMENT, THE CONTRACTOR SHALL PREPARE AND FORWARD THE FINAL
NOI TO THE OHIO EPA. PLEASE CONTACT AND 88 CEG/CEIEA WATER PM, KAREN BEASON, BY
EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT (937) 257-5899 FOR ADDITIONAL
INFORMATION.
9. ANY FIRE SUPPRESSION EQUIPMENT CONTAINING IONIZING RADIOACTIVE MATERIAL (SMOKE
DETECTORS) AND ANY EMERGENCY EXIT SIGNS CONTAINING IONIZING RADIOACTIVE MATERIAL
SHALL BE TURNED INTO 88 CEG/CEIEC. COORDINATE THIS TURN-IN WITH WPAFB 88 CEG/CEIEC
RADIATION SAFETY BRANCH AT 937-257-7320.
10. THE WPAFB RECYCLING CENTER IS AVALLABLE FOR CONTRACTOR USE TO REDUCE WASTE
DISPOSAL. ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING
CENTER. ALL RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH THE WPAFB
SPECIFICATION SECTION 01 02 20. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT
937-257-5060 TO CONFIRM WHAT MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN.
THE CONTRACTOR SHALL SUBMIT A QUARTERLY SUMMARY REPORT TO THE GOVERNMENT
CONTRACT REPRESENTATIVE IAW WPAFB SPECIFICATION SECTION 01 02 20 STATING (1) THE
COST TO RECYCLE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS
RECYCLED, (2) THE COST TO DIVERT/REUSE THE TONNAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS DIVERTED/REUSED, (3) THE COST TO MULCH AND THE TONNAGE AND
COST OF CONSTRUCTION AND DEMOLITION MATERIALS MULCHED, (4) THE COST FOR
WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS
CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO INCINERATE AND
THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED, AND (7)
EXPLANATION OF THE DIVERSION RATE APRIL 7, JULY 7, OCTOBER 7, JANUARY 7 COVERING THE
THREE MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB
DIVERSION FORM. FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, DAVE
DALTON, AT (937) 257-5060 OR DAVID.DALTON.2@US.AF.MIL.
11. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE
IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 02 20 FOR RECYCLING.
12. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 02 08 34.
13. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 02 08 33.
14. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH
WPAFB SPECIFICATION SECTION 02 08 10.
15. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE
WITH WPAFB SPECIFICATION 02 09 00.
16. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 02 09 10.
17. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
18. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING
ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
19. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED
DUST SUPPRESSION METHODS SUCH AS WATER SPRAYS ON AREAS OF HIGH DUST
GENERATION. FOR ADDITIONAL INFORMATION PLEASE CONTACT 88 CEG/CEIE AIR PM CHRIS
TUMBUSCH (937-257-2455 OR CHRISTOPHER.TUMBUSCH@US.AF.MIL).
20. 30 DAYS PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE
SAMPLE OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY
INTO THE SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH
OF THE FOLLOWING: CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY,
MOLYBDENUM, NICKEL, SILVER, ZINC AND SULFIDE. THE LAB PERFORMING THE ANALYSIS
MUST BE CERTIFIED BY OHIO EPA TO ANALYZE FOR THESE PARAMETERS. PROVIDE A COPY OF
THE LAB'S REPORT TO THE CONTRACTING OFFICER, WHO WILL IN TURN FORWARD IT TO 88
CEG/CEIEA FOR A DETERMINATION ON THE WASTEWATER DISPOSAL METHOD.
21. ALL CONTRACT WORK SHALL BE COMPLETED UNDER SUPERVISION OF A FACILITY ESCORT.
22. THERE WILL BE NO WORK ACCOMPLISHED ON ALL FEDERAL HOLIDAYS. (NEW YEAR'S DAY, MLK
DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING, AND CHRISTMAS DAY).
23. DEMOLITION OF LOAD-BEARING WALLS OR STRUCTURAL COMPONENTS REQUIRE NOTIFICATION
OF DEMOLITION AND RENOVATION TO THE REGIONAL AIR POLLUTION AND CONTROL AGENCY
(RAPCA) A MINIMUM OF 10 WORK DAYS PRIOR TO BEGINNING CONSTRUCTION.
24. ALL METAL AND WIRING NEEDS TO BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER.
CONTACT DAVE DALTON AT 937-257-5060 OR DAVID.DALTON.2@WPAFB.AF.MIL FOR ADDITIONAL
INFORMATION.
25. IF ANY DRINKING WATER MAINS ARE BEING EXTENDED, UPSIZED, OR NEW MAINS ARE BEING
INSTALLED, A PLANS APPROVAL MAY BE REQUIRED FROM THE OHIO EPA PRIOR TO BEGINNING
MAIN INSTALLATION. THE CONSTRUCTION CONTRACTOR SHALL PREPARE AND SUBMIT A
DRAFT PLANS APPROVAL PACKAGE TO THE CONTRACTING OFFICER'S REPRESENTATIVE,
INCLUDING A CHECK FOR ANY APPLICABLE OHIO EPA FEES, FOR REVIEW AND PROCESSING BY
ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA. ENVIRONMENTAL MANAGEMENT SHALL
ENDORSE THE PACKAGE AS THE UTILITY OWNER AND SHALL SUBMIT IT TO OHIO EPA. PLEASE
CONTACT THE 88 CEG/CEIEA WATER PM, KAREN BEASON, BY EMAIL AT
KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL INFORMATION.
26. IF ANY SANITARY SEWER MAINS ARE BEING EXTENDED, UPSIZED OR NEW MAINS ARE BEING
INSTALLED A PERMIT TO INSTALL (PTI) MAY BE REQUIRED FROM THE OHIO EPA PRIOR TO
BEGINNING MAIN INSTALLATION. THE CONSTRUCTION CONTRACTOR SHALL PREPARE AND
SUBMIT A DRAFT PTI PACKAGE TO THE CONTRACTING OFFICER'S REPRESENTATIVE, INCLUDING
A CHECK FOR ANY APPLICABLE OHIO EPA FEES, FOR REVIEW AND PROCESSING BY
ENVIRONMENTAL MANAGEMENT, 88 CEG/CEIEA. ENVIRONMENTAL MANAGEMENT SHALL
ENDORSE THE PACKAGE AS THE UTILITY OWNER AND SHALL SUBMIT IT TO OHIO EPA. PLEASE
CONTACT THE 88 CEG/CEIEA WATER PM, KAREN BEASON, BY EMAIL AT
KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR ADDITIONAL INFORMATION.
27. IF ANY REFRIGERANT-CONTAINING EQUIPMENT SCHEDULED FOR NEW INSTALLATION,
INCLUDING WATER COOLERS, THEY MUST UTILIZE AN HFC REFRIGERANT. CFC AND HCFC
REFRIGERANTS ARE NOT AUTHORIZED FOR NEW EQUIPMENT INSTALLATIONS. FOR
ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH.
CHRIS CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT
CHRISTOPHER.TUMBUSCH@US.AF.MIL.
28. IF AN EMERGENCY GENERATOR OR BOILER WILL BE INSTALLED, AN AIR SOURCE PERMIT MAY
BE REQUIRED FOR THE GENERATOR AND POSSIBLY THE FUEL TANK. FOR ADDITIONAL
INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH. CHRIS CAN BE
REACHED AT 937-257-2455 OR BY EMAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL.
29. ANY TRANSFORMERS, SWITCH GEAR, OR ELECTRICAL PANELS CONTAINING OIL SCHEDULED
FOR REMOVAL MUST HAVE THE EQUIPMENT OIL VERIFIED TO BE NON PCB-CONTAINING PRIOR
TO TURN-IN. 88 CEG/CEIE MAINTAINS A BASE-WIDE PCB DATA-BASE FOR OIL CONTAINING
EQUIPMENT. IF THE EQUIPMENT CANNOT BE LOCATED IN THE DATA-BASE THE OIL FROM EACH
INDIVIDUAL PIECE OF EQUIPMENT MUST BE SAMPLED FOR PCB. PLEASE CONTACT THE 88
CEG/CEIEC USED OIL TECHNICIAN BOB JARUSIEWIC BY EMAIL AT
ROBERT.JARUSIEWIC@US.AF.MIL OR BY PHONE AT 937-257-2889 FOR ADDITIONAL
INFORMATION.
30. STORM WATER INNOVATIVE DESIGN MEASURES MUST BE INCORPORATED INTO THE DESIGN
IAW SECTION 438 OF THE ENERGY INDEPENDENCE AND SECURITY ACT (EISA) IF THE PROJECT HAS A FOOTPRINT THAT EXCEEDS 5000 SQ FT. PLEASE CONTACT THE 88 CEG/CEIEA WATER PM
KAREN BEASON BY EMAIL AT KAREN.BEASON@US.AF.MIL OR BY PHONE AT 937-257-5899 FOR
ADDITIONAL INFORMATION.
31. ALL FACILITY PROJECTS REGARDLESS OF FUNDING SOURCE THAT RESULT IN DOD REAL
PROPERTY ASSETS MUST COMPLY WITH UFC 1-200-02, HIGH PERFORMANCE AND SUSTAINABLE
BUILDING REQUIREMENTS. PLEASE ENSURE THESE REQUIREMENTS ARE INCORPORATED INTO
THE DESIGN AS APPROPRIATE.
32. COORDINATION OF THIS PROJECT WITH SHPO MAY BE REQUIRED IF WORK IS DONE TO A
BUILDING OR AREA LISTED AS HISTORIC. PLEASE CONTACT THE 88 CEG/CEIE CULTURAL
RESOURCES PM PAUL WOODRUFF. CONTACT PAUL BY EMAIL AT PAUL.WOODRUFF@US.AF.MIL
OR BY PHONE AT 937-257- 1374 FOR ADDITIONAL INFORMATION.
33. A CRANE PLAN SUBMITTAL IS REQUIRED FOR GOVERNMENT APPROVAL. THE CRANE PLAN
SHALL INCLUDE THE CRANE LOCATION, HEIGHT, DATES OF USE AND POINT OF CONTACT.
PLEASE NOTE THAT AN FAA FORM 7460-1 WILL BE REQUIRED IF CRANE IS OVER 200FT AND
THESE DOCUMENTS MAY TAKE 60 DAYS OR MORE TO PROCESS.
34. CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE GOVERNMENT'S MINIMUM
REQUIREMENTS AND NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS. UNLESS
INDICATED OTHERWISE ON THE PLANS OR SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED
MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN PRODUCTS,
OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD OF QUALITY AND
CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR EXCEED THE STANDARD
OF QUALITY AND CHARACTERISTICS OF THE BASIS OF DESIGN.
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CORRECTED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W
PA
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
US Army Corps of Engineers
7/17/2020
G-002
G E
N E
R A
L P
R O
JE
C
T N
O
TE
S
E . L
A R
U E
K . F
IE
LD
S
G . L
E
IT
C H G
-0
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
CHILLER/PUMP CONSTRUCTION SEQUENCE:
* TWO CHILLER SYSTEMS SHALL ALWAYS BE OPERATIONAL DURING CONSTRUCTION.
1. ISOLATE AND DECOMMISSION CHILLER FROM ALL HYDRONIC SYSTEMS. EVACUATE
REFRIGERANT. REMOVE ASSOCIATED HYDRONIC PIPING TO THE NEAREST ISOLATION
VALVES.
2. ISOLATE, DECOMMISSION AND DRAIN COOLING TOWER. DEMOLISH COOLING TOWER
AND PERFORM CONCRETE SUMP REPAIR CONCURRENT WITH CHILLER WORK.
DEMOLISH BOLTED PLATE, WHICH COVERS OPENING BETWEEN CT SUMPS AND
PROVIDE A SLUICE GATE OVER THAT OPENING. REFER TO MD111 AND M-111 FOR MORE
INFORMATION. INSTALL COOLING TOWER. REFER TO MD111 AND M-111 FOR MORE
INFORMATION.
3. REMOVE CHILLED WATER PUMP AND ALL ASSOCIATED PIPING CONNECTIONS TO
BRANCH TEE CONNECTION ON EXISTING 18"Ø HEADER. REFER TO MD801. **THIS WILL
REQUIRE A CHILLED WATER PLANT DRAIN AND SHUTDOWN. UTILIZE CHILLED WATER
BRANCH ISOLATION VALVES SHOWN ON THIS SHEET.**
4. CUT IN NEW 12"Ø ISOLATION VALVES (CODED NOTE 6) ON PUMPS SUCTION PIPING NEAR
TEE CONNECTION. THIS VALVE WILL BE USED IN FUTURE PHASING AND PREVENT
ADDITIONAL PLANT SHUTDOWN AND DRAINAGE.
5. DEMOLISH CHILLER. UTILIZE HATCH OPENING.
6. REMOVE CONDENSER WATER PUMP, CENTRIFUGAL SEPARATOR AND ALL ASSOCIATED
PIPING CONNECTIONS TO THE NEAREST ISOLATION VALVES. REFER TO MD801. **THIS
WILL REQUIRE A CONDENSER WATER PLANT DRAIN AND SHUTDOWN. UTILIZE
CONDENSER WATER BRANCH ISOLATION VALVE SHOWN ON THIS SHEET.**
7. REMOVE REHEAT PIPING TO NEAREST VALVE CONNECTION.
8. INSTALL CHILLER RETURN HEADERS SUPPORT STEEL. REFER TO STRUCTURAL PLANS
FOR MORE INFORMATION.
9. INGRESS THROUGH HATCH AND INSTALL CONDENSER WATER PUMP, AND ASSOCIATED
VALVES AND PIPING. INSTALL CENTRIFUGAL SEPARATOR. REFER TO M-801.
10. INGRESS THROUGH HATCH AND INSTALL CHILLER, AND ASSOCIATED VALES AND
PIPING. REFER TO M-801.
11. INGRESS THROUGH HATCH AND INSTALL CHILLED WATER PUMP. REFER TO M-801.
12. INSTALL 18X18X18 TEE CONNECTION INTO EXISTING 18"Ø HEADER. INSTALL CHILLED
WATER RETURN HEADERS WITH VALVED BRANCH CONNECTIONS. REFER TO M-101 AND
M-801.
13. REPLACE REDUCED PRESSURE ZONE VALVE (RPZ-1) ON THE DOMESTIC WATER
MAKEUP WATER LINE. REFER TO M-111 FOR MORE INFORMATION.
14. DEMO AND INSTALL NEW CONDENSER WATER MAKEUP WATER PIPING. REFER TO M-111
FOR MORE INFORMATION.
15. **FILL CHILLED WATER SYSTEM, CONDENSER WATER SYSTEM AND COOLING TOWER
SUMP. CHILLED WATER AND CONDENSER WATER SYSTEM OUTAGE COMPLETE**
16. INSTALL NEW COOLING TOWER.
17. INSTALL WATER SOFTENING SYSTEM. REFER TO M-111 FOR MORE INFORMATION.
18. CONNECT CHILLED WATER PUMP SUCTION AND DISCHARGE TO HEADER PIPING.
19. CONNECT CHILLER TO HEADER PIPING.
20. TEST, COMMISSION AND GOVERNMENT SHALL ACCEPT CHILLER, COOLING TOWER,
CHILLED WATER PUMP, CONDENSER WATER PUMP, AND RELATED COMPONENTS FOR
OPERATION PRIOR TO WORKING ON THE NEXT CHILLER SYSTEM. THIS IS TO ENSURE
CHILLER PERFORMANCE AND MAINTAIN CHILLER PLANT CAPACITY BEFORE
SUBSEQUENT SYSTEMS ARE DEMOLISHED.
· REPEAT STEPS ABOVE WITH RESPECTS TO THE NEXT CHILLER AND COOLING TOWER.
CHILLED WATER AND CONDENSER WATER OUTAGE SHOULD NOT BE NECESSARY. AT
THIS POINT, NEW HEADER PIPING IS INSTALLED. CHILLER INGRESS (DISASSEMBLED)
MUST PASS BELOW PIPING NEW HEADER PIPING. REFER TO M-301.
· WHEN COOLING TOWER'S SUMP IS DRAINED, DEMOLISH TWO BOLTED PLATES WHICH
COVER OPENINGS AT EACH DEMISING SUMP WALL AND PROVIDE A SLUICE GATE OVER
THE OPENING.
· REPEAT STEPS ABOVE WITH RESPECTS TO THE FINAL CHILLER AND COOLING TOWER.
CHILLED WATER AND CONDENSER WATER OUTAGE SHOULD NOT BE NECESSARY.
WHEN COOLING TOWER'S SUMP IS DRAINED, DEMOLISH BOLTED PLATE WHICH COVERS
THE OPENING.
· **IMPORTANT** PRIOR TO REMOVING THE REHEAT PIPING FROM CHILLER, INSTALL
FULL SIZE BRIDGE PIPING ON THE REHEAT RETURN PIPING AS DESCRIBED ON THE
MD101 AND M-101. FAILURE TO BRIDGE THE REHEAT RETURN PIPING WILL DEADHEAD
THE BUILDING REHEAT PUMPS. THIS WILL REQUIRE A BUILDING HEAT PLANT ISOLATION
AND SHUT DOWN TO REMOVE AND INSTALL BRIDGE PIPING. COORDINATE THIS WORK
DURING ANNUAL STEAM PLANT SHUTDOWN, TYPICALLY IN JUNE.
ELECTRICAL CONSTRUCTION SEQUENCE:
A. PRIOR TO ANY SHUTDOWN
1. INSTALL CONDUITS BETWEEN SWITCHGEAR PR1 AND THE CHILLER STARTERS. LEAVE
SUFFICIENT PULLING ELBOWS. PROVIDE POWER FEEDS BETWEEN THE MCC'S 4A AND
4B AND PUMPS P-1 THROUGH P-6.
2. REMOVE COMMS EQUIPMENT IN THE ALCOVE NEAR PR1. PROVIDE VARIABLE
FREQUENCY DRIVES, ISOLATION TRANSFORMERS, LOAD REACTORS IN THIS ALCOVE.
3. PROVIDE TEMPORARY STARTERS IN THE VICINITY OF PUMPS P-2, P-3, P-5 AND P-6.
B.TOTAL CHILLER SYSTEM SHUTDOWN
1. TRIP SWITCHGEAR PR1 MAIN AND BRANCH BREAKERS. PROVIDE NEW OVERHEAD
POWER FEED, CAP BANK AND ELECTRONIC SOFT STARTER FOR CHILLER 1.
2. RE-FEED EXISTING CHILLERS 2, 3 STARTERS WITH OVERHEAD CONDUIT AND CABLE
FROM PR1. PROVIDE PULLING ELBOWS, SLACK CABLE FOR STARTER CHANGE OUT.
3. CLOSE SWITCHGEAR PR1 MAIN AND BRANCH BREAKERS. CONFIGURE NEW STARTER
FOR CHILLER 1.
4. DE - ENERGIZE MCC 4B. REMOVE STARTER BUCKETS FOR CONDENSER WATER PUMPS
1, 2 AND 3. PROVIDE NEW BREAKER BUCKETS, BLANK DOORS IN THE MCC.
5. DE-ENERGIZE MCC 4A. REMOVE STARTER BUCKETS FOR CHILLED WATER PUPS P-4, P-5
AND P-6. PROVIDE NEW BREAKER BUCKETS AND BLANK DOORS IN THE MCC.
6. PROVIDE TEMPORARY STARTERS FOR THE CONDENSER AND CHILLED WATER PUMPS.
PROVIDE POWER FEEDS BETWEEN THE MCC'S, THE STARTERS AND THE PUMPS.
C.CHILLERS 2, 3 UPGRADE
1. OPEN MCC 4A BREAKER 1 AND MCC 4B BREAKER 1. REMOVE TEMPORARY STARTERS
AND INSTALL FUSED DISCONNECT SWITCHES FOR PUMPS P-1, P-4. PROVIDE POWER
FEEDS BETWEEN THE MCC'S, ISOLATION TRANSFORMERS, VFD'S, SWITCHES AND
PUMPS.
2. TRIP SWITCHGEAR BRANCH BREAKER FOR CHILLER 2 AND 3. OPEN MCC BREAKERS
FOR PUMPS P-2 AND P-5
3. PROVIDE NEW CHILLER 2 SOFT STARTER AND CAP BANK. PROVIDE WIRING BETWEEN
PR-1, THE STARTER, CAP BANK, AND THE NEW CHILLER.
4. REMOVE TEMPORARY STARTERS AND PROVIDE FUSED DISCONNECT SWITCHES FOR
THE PUMPS P-2 AND P-5.PROVIDE POWER FEEDS BETWEEN THE MCC'S, ISOLATION
TRANSFORMERS, VFD'S, SWITCHES AND PUMPS.
5. REPEAT FOR CHILLER 3, PUMPS P-3 AND P-6.
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CORRECTED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W
PA
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
US Army Corps of Engineers
7/17/2020
G-003
P R
O
JE
C T
P H
A S
IN
G
E . L
A R
U E
K . F
IE
LD
S
G . L
E
IT
C H G
-0
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
SHEET KEYNOTES:
1. CONTRACTOR LAYDOWN AREA. PROVIDE 6 FT TALL CHAIN-LINK FENCE WITH PRIVACY FABRIC
AROUND THE ENTIRE PERIMETER OF THE EQUIPMENT AREA.
2. REMOVABLE CONCRETE HATCH PANELS TO ACCESS BASEMENT CHILLER ROOM.
3. CONTRACTOR DUMPSTER LOCATION. COORDINATE EXACT LOCATION WITH CONTRACTING
AUTHORITY.
4. SUGGESTED CRANE LOCATION. REFERENCE CRANE SPECIFICATIONS IN THE BID
SPECIFICATIONS.
CHEMICAL
TREATMENT
BUILDING (618)
COOLING
TOWERS
APPROXIMATE LOCATION
OF BASEMENT CHILLER
ROOM
NTSA3 OVERALL SITE PLAN
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CORRECTED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W
PA
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
NORTH
US Army Corps of Engineers
7/17/2020
G-101
O V
E R
A
LL
S
IT
E P
LA
N
G E
N E
R A
L
E . L
A R
U E
K . F
IE
LD
S
G . L
E
IT
C H G
-1
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
NTSA1 AREA B BASE MAP
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CORRECTED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W
PA
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
US Army Corps of Engineers
7/17/2020
G-102
A R
E A
B B
A S
E M
A P
G E
N E
R A
L
E . L
A R
U E
K . F
IE
LD
S
G . L
E
IT
C H G
-1
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
SHEET KEYNOTES:
1. EXISTING FURNITURE SHALL BE REMOVED AND DISPOSED OR SALVAGED BY CONTRACTOR.
COORDINATE WITH GOVERNMENT FOR ITEMS TO BE SALVAGED.
2. LAB DESK COUNTER TOP HAS BEEN IDENTIFIED AS ASBESTOS-CONTAINING MATERIAL.
ASBESTOS-CONTAINING FURNITURE SHALL BE REMOVED IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 02 08 10.
3. NEW CONCRETE PAD. REFER TO ARCHITECTURAL SHEETS.
GENERAL SHEET NOTES:
1. REFER TO OTHER PLAN SHEETS FOR DETAILED EQUIPMENT INFORMATION.
2. THE FOLLOWING SURFACES IN THE CHEMICAL TREATMENT BUILDING TESTED POSITIVE FOR
LEAD CONTENT IN EXCESS OF THE EPA REGULATORY THRESHOLD OF 1.0 MG/CM2: YELLOW
CONCRETE CURBS. CONTRACTOR SHALL PERFORM LEAD CONTAINING PAINT CONTROL
MEASURES IN ACCORDANCE WITH WPAFB SPECIFICATION 02 09 00.
WH-1
ES-1
SUMP PUMP
SK-1
FC-1
PALLET
BRINE TANK
RESIN TANK
RESIN TANK
SPILL CONTAINMENT KIT
NON-OXIDIZING CHEMICAL
STORAGE TANK
OXYDIZING BIOCIDE CHEMICAL
STORAGE TANK
CHEMICAL STORAGE TANK AND
CONTAINMENT BASIN
ACC-1
PALLET
PIPE STAND (TYP)
FLOOR DRAIN (TYP)
CONCRETE BOLLARD (TYP.4)
01/2"=1'-0" 1' 2' 4'A2 CHEMICAL TREATMENT BUILDING LAYOUT
S O
LI
C
IT
A
TI
O
N N
O
O P
TI
O
N A
L
FI
E
LD
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
TI
O
N
1 3 5
C
7 9
A
M A
R K
IS
S
U E
D A
TE
P
N O
S
IZ
E
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
SHEET ID
D A
TE
CORRECTED FINAL
D S
N Z
H
TV
R
E P
A
IR
C H
IL
LE
D W
A
TE
R S
Y S
TE
M
, F A
C
IL
IT
Y
W
R
IG
H T
P A
TT
E
R S
O N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
E
E R
IN
G
G R
O U
P
W
R
IG
H T
A V
E . W
P A
FB
O
H
W P A
FB
W
R
IG
H T-
P A
TT
E
R S
O N
A
IR
F O
R C
E B
A S
E W
2Q
R
R
A N
S I D
A E
C
NORTH
US Army Corps of Engineers
7/17/2020
G-111
C H
E M
IC
A
L
TR
E A
TM
E
N T
B U
IL
D
IN
G
G E
N E
R A
L
LA
Y O
U T
E . L
A R
U E
K . F
IE
LD
S
G . L
E
IT
C H G
-1
.D W
G
CERTIFIED FINALARIMS: 200A Disposition: Maintain for 15yrs after construction
W
2Q R
R
-0
GOVERNING DESIGN SPECIFICATION
LIVE LOADS
STRUCTURAL DESIGN DATA
2015 INTERNATIONAL BUILDING CODE, AS
MODIFIED BY UFC 1-200-01 & UFC 3-301-01
FLOOR GRATING LOAD 60 PSF
(CHEMICAL BUILDING):
1. THE CONTRACTOR SHALL CONDUCT ALL OPERATIONS IN STRICT ACCORDANCE WITH
THE SAFETY REQUIREMENTS IMPOSED BY THE CONTRACTING OFFICER AND EM 385-1-1.
IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE
SAFETY CODES AND REGULATIONS GOVERNING THIS WORK. THE CONTRACTOR SHALL
REMOVE ALL DEBRIS FROM THE OWNER'S PROPERTY AND DISCARD ACCORDING TO
LOCAL REGULATIONS.
2. THIS STRUCTURE IS DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER IT IS
FULLY COMPLETED. HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO DETERMINE
THE ERECTION PROCEDURES AND SEQUENCES REQUIRED TO ENSURE STABILITY
OF THE STRUCTURE AND ITS COMPONENT PARTS DURING CONSTRUCTION.
ANY TEMPORARY BRACING, CONNECTIONS, GUYS, OR TIE-DOWNS THAT MAY BE
NECESSARY DURING ERECTION ARE NOT SHOWN ON STRUCTURAL DRAWINGS. IF
APPLIED THEY SHALL BE REMOVED AS CONDITIONS PERMIT, AND SHALL REMAIN
THE PROPERTY OF THE CONTRACTOR. THIS CONSTRUCTION STABILITY REQUIREMENT
APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS.
3. THE PROJECT SPECIFICATIONS SHALL BE USED IN CONJUNCTION WITH THE STRUCTURAL
DRAWINGS TO DETERMINE THE COMPLETE PROJECT REQUIREMENTS. ANY DISCREPANCIES
OR CONFLICTS FOUND BETWEEN THE PROJECT SPECIFICATIONS AND THE STRUCTURAL
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE COR IMMEDIATELY. THE
STRICTEST PROVISION SHALL GOVERN UNLESS THE COR DETERMINES OTHERWISE
5. DIMENSIONS PERTAINING TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE
CONTRACTORS PRIOR TO SHOP DRAWING SUBMISSION, ANY FABRICATION, CONSTRUCTION,
OR ERECTION
7. EXISTING UTILITIES AND ALL OTHER OBSTRUCTIONS TO WORK SHALL BE TEMPORARILY
REMOVED AND RE-INSTALLED (INCLUDING NECESSARY MODIFICATIONS) BY THE CONTRACTOR
AFTER COMPLETION OF NEW WORK.
8. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS, ETC. ARE SHOWN FOR GENERAL INFORMATION ONLY. REFER TO RELATED DRAWINGS (ARCH., MECH., ELECT, ETC.) FOR OTHER
POSSIBLE EQUIPMENT SUPPORTS; WALL, FLOOR AND ROOF OPENINGS, SLEEVES, AND OTHER
EMBEDDED ITEMS NOT SPECIFICALLY INDICATED ON STRUCTURAL DRAWINGS. COORDINATE
ALL REQUIRED DIMENSIONS WITH APPLICABLE TRADE CONTRACTORS PRIOR TO ANY STEEL
FABRICATION OR CONCRETE PLACEMENT.
9. ALL FRAMING MEMBERS PROVIDED FOR MECHANICAL TRADES, LINTELS, ROOF OPENINGS, ETC.
ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR SHALL SUBMIT MANUFACTURER'S
DESIGN DATA FOR THE PROPOSED EQUIPMENT PRIOR TO STEEL SHOP DRAWING SUBMITTAL,
TO ACCOMMODATE THE ACTUAL CONDITION.
GENERAL NOTES
4. SHOP DRAWINGS REQUIRED BY THE PROJECT SPECIFICATIONS AND PREPARED BY
SUPPLIERS AND/OR SUBCONTRACTORS SHALL BE REVIEWED AND STAMPED BY THE
CONTRACTOR PRIOR TO SUBMISSION TO THE GOVERNMENT. ALL DEVIATIONS
FROM THE ENGINEERING DRAWINGS SHALL BE CIRCLED AND NOTED ON THE SHOP
DRAWINGS BY THE CONTRACTOR. NO SHOP WORK IS PERMITTED TO COMMENCE UNTIL
THE RETURN OF A STAMPED, APPROVED COPY OF THE SHOP DRAWINGS TO THE
CONTRACTOR.
6. ALL DETAILS, SECTIONS, AND NOTES PROVIDED ON STRUCTURAL DRAWINGS ARE INTENDED
TO BE TYPICAL FOR SIMILAR SITUATIONS ELSEWHERE, UNLESS SPECIFICALLY NOTED
OTHERWISE. FOR ANY DETAILS AND DIMENSIONS NOT PROVIDED, REFER TO ARCHITECTURAL,
MECHANICAL, ANY EXISTING DRAWINGS, AND BY FIELD OBSERVATION. ALL DIMENSIONS AND
ELEVATIONS SHOWN ON STRUCTURAL DRAWINGS WERE INTENDED TO CONFORM WITH THE
INFORMATION PROVIDED ON ARCHITECTURAL DRAWINGS. THE CONTRACTOR SHALL REPORT
ANY DISCREPANCIES TO THE COR FOR RESOLUTION BEFORE PROCEEDING WITH ANY
ADDITIONAL WORK.
FOUNDATIONS
1. ANY EXCAVATION WORK SHALL PROCEED WITH CAUTION TO AVOID DAMAGE TO
UNKNOWN UNDERGROUND UTILITIES AND EXISTING FOUNDATIONS, AS DETERMINED
BY CONTRACTOR.
2. CONTRACTOR SHALL OBTAIN A PERMIT FOR EXCAVATIONS AS SPECIFIED IN SPECIFICATION
01 01 50 (PARAGRAPH 1.4J).
THE FABRICATIONS AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT, BUILDING CODE ADOPTED, AISC "SPECIFICATION FOR THE DESIGN, FABRICATION
AND ERECTION OF STRUCTURAL STEEL BUILDINGS", AND "CODE OF STANDARD PRACTICE FOR
STEEL BUILDINGS AND BRIDGES", WITH THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:
1. WIDE FLANGE ROLLED STEEL SHAPES SHALL CONFORM TO ASTM A992, Fy=50 KSI, WHILE ALL PLATES, BARS, CHANNELS, AND ANGLES SHALL CONFORM TO ASTM A36, Fy=36 KSI.
HOLLOW STRUCTURAL SECTIONS (HSS) SHALL CONFORM TO ASTM A500 GRADE B, WITH
A MINIMUM YIELD STRESS (Fy) OF 46 KSI FOR SQUARE AND RECTANGULAR SHAPES, AND A MINIMUM YIELD STRESS (Fy) OF 42 KSI FOR ROUND SHAPES.
2. SPLICING OF STRUCTURAL STEEL IS PROHIBITED EXCEPT AS DETAILED.
6. WELDS SHALL BE MADE ONLY BY CERTIFIED WELDERS AND WELDING OPERATORS WHO HAVE
BEEN PREVIOUSLY QUALIFIED BY TESTS AS PRESCRIBED IN THE CURRENT AWS D1.1 "STRUCTURAL
WELDING CODE-STEEL".
5. WELDING SHALL CONFORM TO THE CURRENT AWS D1.1 "STRUCTURAL WELDING CODE-STEEL", AND WELDING ELECTRODES SHALL BE E70XX.
3. STRUCTURAL STEEL SHALL BE NEW UNLESS NOTED OTHERWISE, AND SHALL BE MADE FREE OF RUST, SCALE, ETC., AND SHIPPED WITH ONE COAT OF GRAY OXIDE PRIMER. AFTER ERECTION, EXPOSED STEEL SHALL BE PAINTED PER PROJECT SPECIFICATIONS. ALL STEEL EXPOSED TO
WEATHER OR USED AS LINTELS SHALL BE HOT-DIPPED GALVANIZED
STRUCTURAL STEEL
4. ALL BOLTS SHALL CONFORM TO ASTM A325X AND SHALL BE 3/4" DIAMETER MINIMUM, UNLESS
NOTED OTHERWISE. BOLTS SHALL BE INSTALLED WITH VISUAL TENSION INDICATORS,
ASTM A563 NUTS, AND SHALL HAVE AN ASTM F436 HARDENED STEEL WASHER UNDER THE
TURNED ELEMENT.
8. ALL REINFORCING STEEL SHALL BE DEFORMED AND CONFORM TO ASTM A615. ALL
WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064.
6. MAXIMUM SLUMP SHALL BE 4" +/- 1", AS DETERMINED IN ACCORDANCE WITH ASTM C143
(BEFORE ADDITION OF PLASTICIZERS)
10. ALL HOOK BARS SHALL CONTAIN 90 DEGREE ACI STANDARD HOOKS UNLESS NOTED
OTHERWISE. HOOKS MAY BE ROTATED TO MAINTAIN CLEARANCES. ALL BAR SPLICES
AND LAPS, WHEN NOT SPECIFICALLY DIMENSIONED ON DRAWINGS, SHALL BE AS PER
ACI STANDARD REQUIREMENTS. CLASS B LAPS SHALL BE USED UNLESS NOTED
OTHERWISE. CLOSED STIRRUPS MAY BE CONSTRUCTED IN TWO PIECES, 135 DEGREE
HOOKS SHALL BE USED.
9. CONCRETE COVER ON REINFORCING STEEL SHALL BE PER ACI 318, UNLESS NOTED
OTHERWISE.
7. AIR ENTRAIN ALL CONCRETE EXPOSED TO WEATHER 6% +/- 1.0%
11. THE PLACEMENT OF CONDUITS IN CONCRETE SHALL ADHERE TO THE FOLLOWING:
A. OUTSIDE DIAMETER OF CONDUITS SHALL BE 1" OR LESS WHERE EMBEDDED IN SLABS,
AND 1 1/2" OR LESS WHERE EMBEDDED IN WALLS.
B. BUNCHING OF CONDUITS IS NOT PERMITTED. CONDUITS SHALL BE SPACED
3 DIAMETERS OR GREATER ON CENTER. NO CROSSOVERS ARE PERMITTED IN SLABS.
C. MINIMUM CONCRETE COVER ON CONDUITS SHALL BE 1 1/2".
D. ALUMINIUM CONDUITS, PIPES, OR SLEEVES ARE NOT PERMITTED.
SUPPORTING NON-STRUCTURAL COMPONENTS FROM THE STRUCTURE
1. COMPONENT LOADS SHALL BE DISTRIBUTED TO THE STRUCTURE SO THAT THE COLLATERAL
LOAD ALLOWANCES PROVIDED WITH THE STRUCTURAL DESIGN DATA IS NEVER EXCEEDED.
SUPPORT ANCHORS SHALL HAVE AN ULTIMATE SAFETY FACTOR OF AT LEAST 4.0.
2. LOADS SUPPORTED FROM WIDE FLANGE BEAMS SHALL BE APPLIED IN A MANNER WHICH DOES NOT
CAUSE TORSION ABOUT THE LONGITUDINAL AXIS OF THE BEAM.
3. COORDINATE AND VERIFY EXACT SIZE AND LOCATION OF MECHANICAL UNITS AND ALL FRAMED
OPENINGS IN FLOORS & ROOFS WITH MECHANICAL DRAWINGS AND EQUIPMENT SUPPLIER. HVAC
CONTRACTOR SHALL PROVIDE ACCURATE DIMENSIONAL INFORMATION TO STEEL FABRICATOR
PRIOR TO FABRICATION OF ALL SUPPORT FRAMES.
4. DO NOT HANG OR OTHERWISE SUPPORT ANY ITEMS DIRECTLY FROM ROOF PANELS. EQUIPMENT
MUST BEAR DIRECTLY ON STEEL FRAMING SUPPORTS.
ABV
ACI
ACM
ALTERNATE
WT
HORIZONTAL
ABOVE
AFF ABOVE FINISHED FLOOR
ALT
APPROX
ASTM
APPROXIMATE
BUILDING LINE
BUILDING
BASEMENT
BETWEEN
BOTTOM
BL
BLDG
BOT
BSMT
BTWN
CONC
CONN
CONTR CONTRACT(OR)
CONNECTION
CONCRETE
DEMOLISHDEMO
DR DRAIN
EA
EL
ENTR
EQ
EQUIP
EXIST
EQUIPMENT
EXISTING
EQUAL
ENTRANCE
ELEVATION
EACH
FOUNDATION
FLOOR
FACE OF CONCRETE
FOOTINGFTG
FOC
FLR
FND
WEIGHT
W/O
W/ WITH
WITHOUT
VERTICALVERT
UNO UNLESS NOTED OTHERWISE
THICK(NESS)
TYPICALTYP
THK
STL
SYS
STEEL
SYSTEM
REINFORCE(MENT)
REQUIREDREQD
REINF
POUNDS PER SQUARE FOOTPSF
OPNG OPENING
NOT TO SCALENTS
MTL
MISC
MIN
MECH
MAX MAXIMUM
MECHANIC(AL)
MINIMUM
METAL
MISCELLANEOUS
HORIZ
GOVT
GD GRADE, GRADING
GOVERNMENT
COL COLUMN
MANUF MANUFACTURER
AMERICAN CONCRETE
INSTITUTE
ASBESTOS CONTAINING
MATERIAL
AMERICAN SOCIETY FOR
TESTING AND MATERIALS
BRG BEARING
VIF VERIFY IN FIELD
SS STAINLESS STEEL
ABBREVIATIONS
1. ALL CONCRETE SHALL BE NORMAL WEIGHT, WITH AGGREGATES CONFORMING TO ASTM C33
ALL CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF THE CURRENT, BUILDING
CODE ADOPTED, ACI 301,"SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS", WITH
THE FOLLOWING SUPPLEMENTAL REQUIREMENTS:
CAST-IN-PLACE CONCRETE
5. CHLORIDE BASED ADMIXTURES ARE PROHIBITED IN ALL REINFORCED CONCRETE. OTHER
ADMIXTURES SHALL CONFORM TO ASTM C494.
3. PROVIDE 3/4" CHAMFERS AT TOP EDGES AND CORNERS OF EXPOSED WALLS, JOINTS,
UNLESS NOTED OTHERWISE.
2. CONCRETE SHALL DEVELOP THE FOLLOWING 28-DAY COMPRESSIVE STRENGTH (F'c):
A. CONCRETE USED FOR NEW SUMP PIT PIERS 5,000 PSI
B. CONCRETE USED FOR EXTERIOR SLAB ON GRADE/ 4,500 PSI
AREA WELL CURB
4. JOINTS NOT INDICATED ON STRUCTURAL DRAWINGS ARE NOT PERMITTED WITHOUT
APPROVAL FROM THE STRUCTURAL ENGINEER.
LOADS ASSOCIATED REFER TO AS-BUILT DRAWINGS
WITH EXISTING BUILDING:
12. PROVIDE CRYSTALLINE WATERPROOFING ADDITIVE AND COATING TO ALL NEW CONCRETE
MIX DESIGNS AND ALL SURFACES OF EXISTING CONCRETE (TO REMAIN). REFER TO
SPECIFICATION SECTION 07 16 16.
AREA WELL LOAD 20 PSF
(SURFACE):
DIAG. DIAGONAL
DIMENSIONSDIMS.
DWGS DRAWINGS
EXPANSIONEXP
EXT EXTERIOR
JOINTJT
LG LONG
MATERIALMATL
PERIM PERIMETER
COR CONTRACTING OFFICER'S
REPRESENTATIVE
S-001
G
EN
ER
AL
N O
TE
S
ST
R
U C
TU
R
AL
S.
R
IC
C
I
S.
R
IC
C
I
S.
S
AP
SF
O R
D
S-
1.
D
W G
SO
LI
C
IT
AT
IO
N N
O
O
PT
IO
N
AL
F
IE
LD
D W
N B
Y:
C
KD
B Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
1 3 5
C
7 9
A
M
AR
K
IS
SU
E D
AT
E:
P2 N
O
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
D
AT
E
CORRECTED FINAL
D
SN
Z H
TV
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, F
AC
IL
IT
Y
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
EE
R
IN
G G
R O
U P
W R
IG
H
T
AV
E.
W
PA
FB
O H
W P A
FB
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
W
2Q R
R
AN
SI
D
AE
C
NORTH
US Army Corps of Engineers
CERTIFIED FINAL
25 26 27 28
FC
FB
FA
CG1
CG
CF
22'-5"± (V.I.F.) 22'-6"± (V.I.F.)17'-11"± (V.I.F.)
'-1
(V
.I.
F.
'-6
(V .I.
F.
'-6
(V
.I.
F.
'-2
(V .I.
F.
'-6
(V
.I.
F.
'-7
12'-0"± (V.I.F.)
NEW PIPING RUN,
(18"Ø & 20"Ø).
SEE NOTE 1
NEW W12x22 (@
UNDERSIDE OF
ELEVATED FLOOR
SLAB). SEE DETAIL
C8/S-101 FOR CONN.
INTO EXIST CONC.
NEW PIPE SUPPORT
@ EXIST. CONC. COL.
SEE D5/S-101 FOR DETAIL
EXIST. CONC. COL.
(14"x14" ALONG LINE
CG1). CONTRACTOR
SHALL FIELD VERIFY
DIMS.
EXIST. CONC. COL.
(16"x16" ALONG LINE 26 AND 18"x18"
ALONG LINE 27).
CONTRACTOR SHALL
FIELD VERIFY DIMS.
NEW PIPE SUPPORT
@ EXIST. CONC. COL.
SEE D5/S-101 FOR DETAIL
AREA WELL
OPENING
EXTENTS
EXIST. BEAMS
BELOW ROOF
SLAB (TO BE
DEMO'ED)
NEW W12x22
BETWEEN
EXIST. CONC.
BEAMS
NEW W8x13
BEAM, (2)
SIDES OF NEW
PENETRATION
NEW 18" DIA. PIPE
PENETRATION THRU
EXIST. CONC. ROOF.
SEE DETAIL B5/S-101
FOR FRAMING AROUND
PENETRATION & LOCATION
EXIST. PIPE
PENETRATIONS
(TO REMAIN)
EXIST. CONC.
BEAM (TYP)
EXIST. CONC.
BEAM (TYP)
EXIST. CEILING
HUNG PIPING.
SEE NOTE 1
5'-6"
T/MC8x BEAMS
EL. 108'-9" +/-
5' -6
1'
-0
1' -8
1'
-8
6"
1' -0
1' -8
3/16
KICKER TO
WT WEB
3/16
KICKER
TO PL3/8"
1/ 2"
G
AP
3/16 L3x3 TO
WEB
EQ. EQ.
HSS TO
TOP
FLANGE2-12
8"
FACE OF
EXIST. COL.
NEW PIPING. SEE
MECH DWGS FOR
SIZE & ELEVATIONS.
PIPE ROLLER
(BELOW EA. PIPE)
SEE MECH. DWGS.
EXIST. CONC. COL
ALONG LINE 26
NEW (2) MC8x8.5
HORIZ. SUPPORT,
EA. SIDE OF WT
WEB, w/ PL3/8" @
END OF SUPPORT
NEW WT7x24x7'-6" LG
ALONG FACE OF EXIST.
COL. CENTER ON WIDTH
FASTEN NEW WT7 TO EXIST.
COLS. w/ 5/8"Ø EPOXY ANCHORS, EMBED 5 5/8" INTO EXIST. COL.
(5 ANCHORS EA. SIDE OF WT
WEB - 5" GAGE FOR ANCHORS).
CARE SHOULD BE TAKEN TO LOCATE
ALL REINF. IN COLS. & WT SHALL
BE LOCATED TO AVOID ANCHOR/
REINF. INTERFERENCE.
NEW 2L4x4x3/8 DIAG.
KICKER BETWEEN
WT7x & END PL3/8"
TOP OF MECH. ROOM
SLAB ON GRADE.
EL. = 100'-0"
TOP EDGE
OF WT7
BOT. OF DIAG.
KICKER
W12 BEAM w/ L3x3x3/8x6"
LG. CONN., EA. SIDE OF
WEB. PROVIDE (2) 5/8"Ø
EPOXY ANCHORS IN L3x3
LEG BETWEEN EXIST. CONC.
EMBED ANCHOR 5 5/8" INTO
EXIST. CONC. (TYP.)
BOT. OF EXIST.
ELEV. SLAB
EXIST. CONC.
BEAM (TO REMAIN)
NEW 18"Ø PIPE
PENETRATION THRU
ELEVATED CONC.
SLAB
EXIST. CHANNEL
TO BE REMOVED.
SEE ARCH DWG.
A-301 FOR ITEMS
TO BE REMOVED
EXIST. BENT PL
@ CONC. SHELF
(TO REMAIN)
NEW W12 BEAM,
CENTER ON HORIZ.
SECTION OF EXIST.
CONC. HAUNCH. SEE
PLAN FOR SIZE & BEAM
SPAN. REFER TO DETAIL
C8/S-101 FOR CONN.
@ EA. END INTO EXIST.
CONC.
CL OF NEW PIPE
EXIST. 10" ELEVATED
CONC. SLAB (TO REMAIN)
NEW HSS4x3x3/16 ALONG TOP
OF NEW W8 BEAM. CONTRACTOR
SHALL FIELD VERIFY HEIGHT
(BASED ON DISTANCE BETWEEN
TOP OF BEAM & BOT. OF CONC.)
AND LENGTH (BETWEEN INSIDE
FACE OF WALL AND SLOPED
PORTION OF CONC.) OF TUBE
PRIOR TO FABRICATION
NEW W8 BEAM w/ L3x3x3/8x6"
LG. CLIP ANGLE EA. END. SEE
PLAN FOR SIZE & SPA OF BEAM.
AT CONN. TO CONC. WALL,
PROVIDE (2) 5/8"Ø EPOXY
ANCHORS INTO EXIST. CONC.
WALL. EMBED. 4" (MIN.). AT
CONN. TO W12, PROVIDE (2) 3/4"
DIA. A325 BOLT IN EA. ANGLE LEG.
EXIST. 12" CONC.
WALL (TO REMAIN)
1' -8
1' -2
/4
DIMS. TAKEN TO
CL OF ANCHORS
1/4
MC8 TO
WT7
(COORD w/ PIPE EL.)
3/16
PL3/8" TO
MC8's. CONT
WELD 1 1/2"
ALONG VERT.
OF PL
8" (END OF MC8
TO PL3/8" CL)
3/16
NOTES:
1. REFER TO MECHANICAL DRAWINGS FOR SIZE AND LOCATION OF NEW PIPING
AND FOR PENETRATION THRU EXISTING CONCRETE AT AREA WELL.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
FABRICATION OF ANY NEW SUPPORT STEEL.
SCALE: 3/4" = 1' - 0" 0 1'1' 6"D5 PIPE HANGAR SUPPORT DETAIL - TYP
SCALE: 3/4" = 1' - 0" 0 1'1' 6"B5 FRAMING AROUND PIPE PENETRATION
SCALE: 1/8" = 1' - 0" 0 8'8' 4'A1 PARTIAL BASEMENT PLAN - STRUCTURAL
SCALE: 3/4" = 1' - 0" 0 1'1' 6"C8 W12x22 CONN. TO EXIST. CONC.
PA
R
TI
AL
B
AS
EM
EN
T
PL
AN
PI
PE
S U
PP
O
R T
D
ET
AI
LS
ST
R
U C
TU
R
AL
S.
R
IC
C
I
S.
R
IC
C
I
S.
S
AP
SF
O R
D
S-
1.
D
W G
S-101
SO
LI
C
IT
AT
IO
N N
O
O
PT
IO
N
AL
F
IE
LD
D W
N B
Y:
C
KD
B Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
1 3 5
C
7 9
A
M
AR
K
IS
SU
E D
AT
E:
P2 N
O
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
D
AT
E
CORRECTED FINAL
D
SN
Z H
TV
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, F
AC
IL
IT
Y
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
EE
R
IN
G G
R O
U P
W R
IG
H
T
AV
E.
W
PA
FB
O H
W P A
FB
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
W
2Q R
R
AN
SI
D
AE
C
NORTH
US Army Corps of Engineers
SCALE:
KEY PLAN
NTS
PHASE II
OFFICE
COMPLEX
PHASE I PHASE III
NORTHEAST
LAB
TOWER WING
SOUTHWEST
LAB
SOUTHEAST
LAB
SUPPORT
WING
CLEAN
ROOM WING
INDOOR RANGE
OUTDOOR
RANGE
VEHICLE
SHELTER
26'-8 1/2"± (INSIDE FACE TO INSIDE FACE OF SUMP)
EXIST. CHEMICAL
TREATMENT BLDG.,
SEE E5/S-111 FOR
NEW TANK LOCATION
& NEW FRAMING
MEMBERS
4" THICKNESS OF SHOTCRETE
ALONG INSIDE FACE OF EXIST.
CONC. WALL. (TYP. ALONG EAST
WALL, BETWEEN CONC. PIERS)
NEW CONC. PIER @
COOLING TOWER SUMP
PIT #3, (1) LOCATION IN
SUMP PIT #3. SEE NOTE 1
FOR NEW PIER AND NOTE
2 FOR DEMO. OF EXIST.
EXIST. CONC. PIERS
@ COOLING TOWER
SUMP PIT (TYP. EA.
SUMP PIT BAY - TO
REMAIN, U.N.O.)
EXIST. W12x BEAMS
FOR EQUIP. SUPPORT
(TYP. EA. SUMP PIT
BAY - TO REMAIN)
EXIST. CONC. WALL
BETWEEN COOLING
TOWER SUMP PITS
(TYP., TO REMAIN)
NEW CONC. PIERS @
COOLING TOWER SUMP
PIT #2, (2) LOCATIONS IN
SUMP PIT #2. SEE NOTE 1
FOR NEW PIER AND NOTE
2 FOR DEMO. OF EXIST.
EXIST. STEEL BEAM
ADJACENT TO EXIST.
CONC. WALL (TYP.
FULL LENGTH ALONG
EAST EL. OF SUMP
PITS - TO REMAIN).
SEE NOTE 3 FOR
CORROSION REPAIR.
NEW CONC. PIER @
COOLING TOWER SUMP
PIT #1, (1) LOCATION IN
SUMP PIT #1. SEE NOTE 1
FOR NEW PIER AND NOTE
2 FOR DEMO. OF EXIST.
EXIST. CONC. WALLS
@ PERIMETER OF
COOLING TOWER
SUMP PITS.
OUTLINE OF NEW
MECH. EQUIP. SEE
NOTE 6
EXIST. ACCESS
HATCH ENTRANCE
TO SUMP (TYP. EA.
SUMP PIT)
OUTLINE OF NEW
MECH. EQUIP. SEE
NOTE 6
OUTLINE OF NEW
MECH. EQUIP. SEE
NOTE 6
EXIST. CONC. WALLS
@ PERIMETER OF
COOLING TOWER
SUMPS.
'-9
(E
XI
ST
. S
U M
P #3
'-2
(E
XI
ST
. S U
M P
#2
'-9
(E
XI
ST
. S
U M
P #1
TY
P.
S-501
A6
10'-0" (V.I.F., INSIDE FACE TO
INSIDE FACE OF CONC.
WALL AROUND OPNG.)
EX
TE
N
TS
O F
EX
IS
T
FL
R
G R
AT
IN
G (S
EE
N
O
TE
EXTENTS OF EXIST. FLR.
GRATING (SEE NOTE 4)
EXIST. L4x4x1/4xCONT.
AROUND PERIMETER
OF OPNG. T/ANGLE
EL. = 99'-11" (TYP, TO
REMAIN)
6"
2' -6
3'-3" 4'-6"
PERIMETER STRUC.
OF EXIST. CHEM.
BLDG. (TO REMAIN)
EXIST. CONC. SLAB
ON GRADE. T/SLAB
EL. = 100'-0" (TO REMAIN).
NEW MECH. TANK.
SEE NOTE 2
EXIST. STEEL
MEMBERS.
SEE NOTE 1
EXIST. 1" METAL
FLOOR GRATING
(TO REMAIN)
NEW MECH. TANKS.
SEE NOTE 3
NEW MC6x12 BEAMS
BELOW NEW MECH.
TANKS.
INSIDE FACE
OF EXIST.
CONC. WALL
CL OF NEW
MECH. TANKS
S-501
F6
NOTES:
1. NEW 2'-0"x8"x7'-6"+/- CONCRETE PIERS AT EXISTING PIER LOCATIONS, (4 LOCATIONS TOTAL SHALL BE VERIFIED IN FIELD. 2 LOCATIONS
FIELD VERIFIED IN SUMP PIT #2 AND 1 LOCATION IN EACH OF SUMP
PIT #1 AND #3). SEE PHOTOS C7/S-111 AND A7/S-111 FOR CONCRETE
DETERIORATION IN SUMPS #1 AND #3. CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING CONCRETE CONDITIONS IN SUMPS AND
NOTIFY COR IF ANY FURTHER CONCRETE DETERIORATION IS
OCCURRING.
2. CONTRACTOR SHALL DEMOLISH EXISTING PIERS PRIOR TO
CONSTRUCTION OF NEW PIERS (NEW PIERS TO BE PLACED AT SAME
LOCATION AS THE EXISTING PIERS BEING REMOVED). CONTRACTOR
SHALL FIELD VERIFY ANY DOWEL CONNECTION BETWEEN
PIERS/PERIMETER WALL AND NOTIFY COR OF THE EXISTING
CONNECTION CONDITIONS. SEE DETAIL A6/S-501 FOR EXISTING
REINF. STEEL WITHIN WALL AND PIER (PER EXISTING DRAWINGS)
3. EXISTING STEEL BEAMS WITH CORROSION AND RUST PRESENT.
CONTRACTOR SHALL CLEAN AND REMOVE ALL EXISTING
CORROSION/RUST AND APPLY A COLD GALVANIZING REPAIR PAINT
AT THESE LOCATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
STEEL IN ALL SUMPS AND NOTIFY COR IF LOSS OF STEEL SECTION IS
OCCURRING.
4. CONTRACTOR SHALL PROVIDE SHORING TO EXISTING SUMP PIT AND
STEEL STRUCTURE PRIOR TO/DURING DEMOLITION OF CONCRETE
PIERS.
5. PROVIDE INTEGRAL WATERPROOFING ADMIXTURE TO CONCRETE
MIX DESIGN FOR ALL NEW CONCRETE APPLICATIONS
6. INDICATES EXTENTS OF NEW MECHANICAL EQUIPMENT. REFER
TO MECHANICAL DRAWINGS FOR LOCATION OF NEW EQUIPMENT,
INCLUDING PENETRATIONS THROUGH SUMP WALLS & FLOOR
PLATES. NEW EQUIPMENT PLACEMENT AND RAIL SYSTEM SHALL
BE SIMILAR TO EXISTING AND BE CENTERED ON STEEL BEAMS
(BELOW).
7. PROVIDE CRYSTALLINE WATERPROOFING APPLICATION TO ALL
EXISTING CONCRETE SURFACES INTERNAL TO SUMP. SEE
SPECIFICATION SECTION 07 16 16 FOR INFORMATION ON
APPLICATION PROCESS FOR WATERPROOFING.
8. SEE SPEC SECTION 03 37 13 FOR SHOTCRETE APPLICATION AND
EXISTING CONCRETE SURFACE PREPARATION.
9. SEE DETAIL A1/S-501 FOR EXISTING CONCRETE REPAIR
PROCEDURES AT REMAINING LOCATIONS THROUGHOUT SUMP
EXTENTS (DOES NOT INCLUDE REPAIRS AT PIERS TO BE REPLACED
AND WALL TO RECEIVE SHOTCRETE APPLICATION).
NOTES:
1. EXISTING C6 STEEL CHANNELS BELOW EXISTING FLOOR GRATING, SPANNING BETWEEN L4x4 ANGLES AT PERIMETER OF BASIN OPENING. (TYP. U.N.O.). CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS OF
GRATING/STEEL SUPPORT SYSTEM PRIOR TO ANY NEW WORK.
2. NEW BRINE TANK (ASSUMED MAX. WEIGHT OF 4950 LBS) TO BE PLACED ATOP EXISTING CONCRETE SLAB ON
GRADE. REFER TO MECHANICAL DRAWINGS FOR TANK INFORMATION AND PLACEMENT LOCATION.
3. NEW RESIN TANKS (QUANTITY 2, EACH WITH MAX. WEIGHT OF 3850 LBS) TO BE PLACED ATOP THE EXISTING FLOOR GRATING/NEW STEEL BEAM SYSTEM. REFER TO MECHANICAL DRAWINGS FOR TANK INFORMATION.
NOTIFY CONTRACTING AUTHORITY IF PLACEMENT CHANGES FROM WHAT IS SHOWN ON PLAN.
4. EXISTING STEEL GRATING SHALL REMAIN AT EXTENTS OF OPENING. REINSTALL GRATING AFTER NEW STEEL
HAS BEEN INSTALLED (BELOW).
SCALE: 3/16" = 1' - 0" 0 5'5'A1 COOLING TOWER PLAN - STRUCTURAL
SCALE: 1/4" = 1' - 0" 0 4'4' 2'E5 CHEMICAL TREATMENT BLDG. PLAN - STRUCTURAL
SCALE: N.T.S.C7 TOWER 1 SUMP - DETERIORATED CONCRETE @ PIER
SCALE: N.T.S.A7 TOWER 3 SUMP - DETERIORATED CONCRETE @ PIER
C O
O
LI
N G
T O
W
ER
C
H
EM
IC
AL
B U
IL
D
IN
G
P
LA
N
ST
R U
C
TU
R
AL
S.
R
IC
C
I
S.
R
IC
C
I
S.
S
AP
SF
O R
D
S-
1.
D
W G
S-111
SO
LI
C
IT
AT
IO
N N
O
O
PT
IO
N
AL
F
IE
LD
D W
N B
Y:
C
KD
B Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
1 3 5
C
7 9
A
M
AR
K
IS
SU
E D
AT
E:
P2 N
O
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
D
AT
E
CORRECTED FINAL
D
SN
Z H
TV
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, F
AC
IL
IT
Y
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
EE
R
IN
G G
R O
U P
W R
IG
H
T
AV
E.
W
PA
FB
O H
W P A
FB
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
W
2Q R
R
AN
SI
D
AE
C
NORTH
US Army Corps of Engineers
SCALE:
KEY PLAN
NTS
PHASE II
OFFICE
COMPLEX
PHASE I PHASE III
NORTHEAST
LAB
TOWER WING
SOUTHWEST
LAB
SOUTHEAST
LAB
SUPPORT
WING
CLEAN
ROOM WING
INDOOR RANGE
OUTDOOR
RANGE
VEHICLE
'-9
(E
XT
EN
TS
O F
N
EW
C O
N C
. S
LA
B)
'-5
(E
XT
EN
TS
O F
N
EW
C O
N C
. S
LA
B)
1/2" EXP.
JOINT MAT'L
1/ 2"
E
XP
JO
IN
T
M
AT
'L
8' -1
0"
EX
TE
N
TS
O
F N
EW
C
O N
C . S
LA
B)
19'-11"+/- (EXTENTS OF NEW CONC. SLAB)
3' -4
(E
XT
EN
TS
O F
N
EW
C O
N C
. S
LA
B)
6'-1" (DEMO EXIST.
CURB & SLAB ON
GRADE TO ALLOW
FOR NEW CONC. RAMP
33'-0"+/- (EXTENTS OF NEW CONC. SLAB)
1/2" EXP.
JO
INT M
AT'L
1/2" EXP.
JO
IN
T M
AT'L
SL
O
PE
1/2" EXP.
JOINT MAT'L
1/2" EXP.
JOINT MAT'L
1/ 2"
E
XP
JO
IN
T
M
AT
'L
11'-5"+/- (NEW SLAB EDGE TO
EDGE OF EXIST. CONC FND.)
'-1
1"
N
EW
S
LA
B
ED
G
E
TO
E D
G E
O F
EX
IS
T.
C
O N
C . F
N D
EXT. FACE OF
EXIST. CONC.
(@ MAINTENANCE
SHELTER)
CONTROL JOINT,
SEE DETAIL A5/S-112
EXIST. DOWNSPOUT
TO BE ADJUSTED TO
DRAIN INTO GRASSY
AREA
EXT. FACE OF
EXIST. CONC
EXIST. CONC. FND.
WALL (TO REMAIN)
CONTROL JOINT,
SEE DETAIL A5/S-112
EXT. FACE OF
EXIST. CONC
NEW PIPE BOLLARD
(4) LOCATIONS. SEE
DETAIL A3/S-112 FOR
SIZE & CONN. INTO
CONC. SLAB. EXIST. CONC. CURB
(TO REMAIN, U.N.O.)
EXIST. CONC. SLAB
ON GRADE (TO REMAIN)
NEW CONC. RAMP,
SEE NOTE 2
EXIST. PAVEMENT
(TO REMAIN)
EXIST. CONC. CURB
(TO REMAIN, U.N.O.)
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
A1 S-112
A1 S-112
6' -0
(L
EN
G
TH
O F
N
EW
C O
N C
. R
AM
P
- V
ER
IF
Y
IN
FI
EL
D B
AS
ED
O N
S
LO
PE
A1
S-112
4' -1
1"
TO
ST
AR
T O
F R
AM
P)
2'-1" +/-
(WIDTH OF
RAMP AT
TOP)
1'-7" +/- (EDGE
OF EXIST.
CONC TO
NEW RAMP)
1'-0"
8"
5"
T/S.O.G.
1/4
4' -0
ISOLATION JOINT
w/ BONDBREAKER
ALONG WALL
EXIST. FND. WALL
MAX CJ SPACE FOR
T/SLAB = 3T (FT). JOINT
SPACING IN ANY DIRECTION
SHALL NOT EXCEED 1.5
TIMES SPACING IN
PERPENDICULAR DIRECTION
EL. MATCH EXIST.
NOTES:
1. 5" THK. CONCRETE SLAB ON GRADE w/ #5 TOP, EA. WAY, @ 18"oc ON 4" COMPACTED GRANULAR BASE.
T/NEW S.O.G. EL. TO VARY BASED ON SLOPE. MATCH ELEVATION OF SLAB ON GRADE AT ENTRANCE TO
BUILDING.
2. NEW CONCRETE RAMP BETWEEN EXISTING PAVEMENT AND EXIST. SLAB ON GRADE. MIMUMUM RAMP
SLOPE TO BE 1" PER 1'-0". PROVIDE SMOOTH TRANSITION AT PAVEMENT INTERFACE.
3. NEW MECHANICAL EQUIPMENT AND HOUSEKEEPING PAD. REFER TO SHEET M-111 FOR LOCATION, SIZE, AND WEIGHT OF EQUIPMENT/PAD.
SCALE: 1/2" = 1' - 0" 0 2'2' 1'A1 DETAIL
SCALE: 1/2" = 1' - 0" 0 2'2' 1'A3 BOLLARD DETAIL
SCALE: 1/2" = 1' - 0" 0 2'2' 1'A5 TYP. SLAB ON GRADE JOINT PATTERN
SCALE: 3/8" = 1' - 0" 4'0 2'C1 CHEMICAL TREATMENT BLDG. PLAN - EXTERIOR SLAB
C H
EM
IC
AL
B
U
IL
D
IN
G
EX
TE
R
IO
R S
LA
B
PL
AN
ST
R
U C
TU
R
AL
S.
R
IC
C
I
S.
R
IC
C
I
S.
S
AP
SF
O R
D
S-
2.
D
W G
S-112
SO
LI
C
IT
AT
IO
N N
O
O
PT
IO
N
AL
F
IE
LD
D W
N B
Y:
C
KD
B Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
1 3 5
C
7 9
A
M
AR
K
IS
SU
E D
AT
E:
P2 N
O
SI
ZE
SU
BM
IT
TE
D B
Y:
C O
N
TR
AC
T
N O
SHEET ID
D
AT
E
CORRECTED FINAL
D
SN
Z H
TV
R
EP
AI
R
C H
IL
LE
D W
AT
ER
S
YS
TE
M
, F
AC
IL
IT
Y
W R
IG
H
T
PA
TT
ER
SO
N
A
FB
B
D
E
F
G
2 4 6 8 10
W
2Q R
-1 8-
D -0
JU
LY
TH
C
IV
IL
E
N G
IN
EE
R
IN
G G
R O
U P
W R
IG
H
T
AV
E.
W
PA
FB
O H
W P A
FB
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
W
2Q R
R
AN
SI
D
AE
C
NORTH
US Army Corps of Engineers
SCALE:
KEY PLAN
NTS
PHASE II
OFFICE
COMPLEX
PHASE I PHASE III
NORTHEAST
LAB
TOWER WING
SOUTHWEST
LAB
SOUTHEAST
LAB
SUPPORT
WING
CLEAN
ROOM WING
INDOOR RANGE
OUTDOOR
RANGE
VEHICLE
7"+/-LOCATION TO MATCH EXIST.
3"
3/16 L4x4 TO
MC6
EXIST. 1" METAL
GRATING TO BE
RE-INSTALLED AFTER
NEW STEEL BEAMS
INSTALLED.
EXIST. SLAB ON
GRADE. SEE PLAN
FOR EL.
EXIST. EXT.
BLDG WALL
EXIST. L4x4 (w/ ANCHORS
INTO WALL) @ TOP OF
CONC. WALL (TO REMAIN -
TYP. AROUND PERIMETER)
EXIST. CONC. WALL
@ BASIN (TYP
AROUND PERIMETER)
L6x6x3/4x6" LG., w/ (2)
5/8" DIA. EPOXY ANCHORS.
EMBED. 4" INTO CONC.
WALL. CENTER L6x6 ON
NEW MC6 BEAM (TYP. EA.
END OF NEW MC6)
NEW MC6 CHANNEL
BELOW EXIST. GRATING.
SEE PLAN FOR SIZE &
LOCATION.
NEW L4x4x1/4 BETWEEN
NEW MC6 & EXIST. STEEL
BEAMS (TO REMAIN).
LOCATION SHALL BE
SIMILAR TO MEMBER
BEING REMOVED.
EXIST. CONC. WALL
@ BASIN (TYP AROUND
PERIMETER)
1'-0"+/- (THICKNESS
OF EXIST PERIMETER
SUMP WALL)
T/EXIST. BASE
EL. 100'-0"
EL. 107'-6"+/- (V.I.F.
MATCH EXIST.)
T/NEW CONC. PIER
1 1/2"
CLR
4" (THICKNESS OF NEW
SHOTCRETE LAYER
BETWEEN CONC.
PIERS, SHOWN BEYOND)
EL. 108'-10" +/- (V.I.F.)
T/EXIST. WALL
1'-0"± (THICKNESS
OF EXIST PERIMETER
SUMP WALL
4" (THICKNESS OF NEW
SHOTCRETE LAYER
BETWEEN CONC. PIERS)
1/
2" C
LR
(T
YP
INSIDE FACE OF
EXIST. CONC.
SUMP WALL
EXIST. W12 BEAM
TO REMAIN. SEE
NOTE 4 ON S-111 FOR
SHORING DURING
EXIST. PIER REMOVAL
& NOTE 3 FOR CLEANING
OF ANY CORROSION
NEW CONC. PIER. SEE
A1/S-111 FOR LOCATION
OF NEW PIERS & NOTE
1 FOR DIMS.
#5 x 18" LG. DOWEL
@ NEW STIRRUP
LOCATIONS. EMBED.
& EPOXY 6" INTO
EXIST. CONC. WALL
PROVIDE #3 BARS
@ 12"oc, EA. WAY, CENTER IN NEW
SHOTCRETE LAYER
(BEYOND). EXTEND
HORIZ. THRU NEW
PIER.
PROVIDE #4
STIRRUPS @
12"oc (MAX) ALONG
HEIGHT OF PIER
NEW (6) #6 VERT. BARS
IN NEW CONC. PIER
EXIST. 10" CONC.
BASE SLAB (REINF.
NOT SHOWN FOR
CLARITY)
NEW GROUT PAD
BELOW EXIST.
BEAM
EXIST. SUMP WALL
@ PERIMETER w/
EXIST. REINF
(PER AS-BUILTS)
EXIST. DOWELS BETWEEN
SLAB & PIER (QUANTITY 6).
DOWELS TO REMAIN PER
EXIST. CONDITION.
CONTRACTOR SHALL
VERIFY QUANTITY &
CONDITION. NOTIFY
COR IF DOWEL REQUIRES
REPAIR
INSIDE FACE OF
EXIST. CONC.
SUMP WALL
PROVIDE #3 BARS
@ 12"oc, EA. WAY, CENTER IN NEW
SHOTCRETE LAYER
(BEYOND). EXTEND
HORIZ. THRU NEW
PIER.
#4 STIRRUPS @
12"oc ALONG
HEIGHT OF PIER
NEW CONC. PIER.
EXIST. SUMP WALL
@ PERIMETER (EXIST
REINF. NOT SHOWN
FOR CLARITY)
#5 x 18" LG. DOWEL
@ NEW STIRRUP
LOCATIONS. EMBED.
& EPOXY 6" INTO
EXIST. CONC. WALL
NEW (6) #6 VERT.
BARS IN NEW
CONC. PIER
B9
S-501
2"2"2"
8"
PROVIDE (3) #4
STIRRUPS @
TOP OF PIER
CRACK (INJECTION)
REPAIR PROCEDURE:
REPAIR PROCEDURE:
1. ROUTE OR SAWCUT EXIST. CRACK
(TO SIZE) TO ALLOW FOR INJECTION
OF CRACK REPAIR MATERIAL (PER
MANUF. INSTRUCTIONS).
2. CLEAN CRACK OF ANY LOOSE OR
FOREIGN MATTER BY BRUSHING OR
CHIPPING METHODS.
3. PROVIDE APPROPRIATE INJECTION
COMPOUND:
A. EPOXY INJECTION FOR CRACKING
w/ NO MOISTURE EVIDENT AT CRACK.
B. CEMENTITIOUS (POLYMERIZED)
MORTAR INJECTION FOR CRACKING
w/ MOISTURE EVIDENT AT CRACK
C. SEE SPEC SECTION 03 01 00 FOR ADD'L
PRODUCT INFORMATION
4. CLEAN SURFACE OF EXCESS COMPOUND
& SEAL CRACK AS NECESSARY.
1. CONTRACTOR SHALL DETERMINE EXTENTS OF
SOUND CONCRETE AROUND SPALL SURFACE.
2. PROVIDE 3/4" (MAX.) DEEP SAWCUT (SAWCUT
SHALL NOT CUT THROUGH ANY EXISTING
REINFORCING BARS). EXTENTS OF SAWCUT
SHALL BE 2" BEYOND EXTENTS OF SPALL AREA.
(SAWCUT SHALL…