W912QR20R0044_Specs-0003.pdf
PDF 935 KB Posted
- Solicitation number
- W912QR20R0044
About this file
This solicitation is for the construction of an Aeromedical Evacuation Squadron Training/Administration Building at Joint Base Andrews, MD. The project involves construction of a 17,567 square foot masonry and steel facility for administrative functions, training rooms, classrooms, and support spaces. Site work will include utilities, paving, lighting, and landscaping. An existing 16,706 square foot building will be demolished.
The single award firm-fixed-price design-bid-build contract has an estimated value between $10-25 million. Proposals are due on August 25, 2020 and will be evaluated using a best value tradeoff process. Technical factors are approximately equal to cost. The contract duration is 540 calendar days from notice to proceed. The North American Industry Classification System code is 236220. The solicitation will be full and open with no set-aside. The point of contact is Stephen Ramsey at the U.S. Army Corps of Engineers Louisville District.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: STEPHEN D RAMSEY
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0044 for the Construction of Administrative Facility located at Joint Base Andrew s, MD is hereby amended as follow s:
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0044
X 9B. DATED (SEE ITEM 11)
23-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0044_Specs-0003
W912QR20R0044
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been modified:
SUMMARY OF CHANGES
SUMMARY OF CHANGES
Construction of Administrative Facility Joint Base Andrews, MD
W912QR20R0044
Amendment No. 0003
A. The due date for proposals is hereby extended from 3:00 PM ET 18 August 2020 to 2:00 PM ET 25 August 2020.
B. General Decision Number: MD20200044 dated 08/07/2020 have been updated and are hereby incorporated.
C. The FF&E package for this project has been added in its entirety.
D. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
09 51 00
E. The following PLAN SHEETS have been revised and replaced in their entirety:
CD101 DEMOLITION PLAN
CU501 UTILITY DETAILS
A-613 DOOR DETAILS
A-310 WALL SECTIONS – BUILDING ENVELOPE
IF111 FIRST FLOOR FURNITURE PLAN - AREA -A-
IF112 FIRST FLOOR FURNITURE PLAN - AREA -B-
S-531 FRAMING SECTIONS
F. The following PLAN SHEETS have been added new:
FOR REFERERNCE ONLY AS-BUILTS PDF FOR EXISTING BUILDING #3744
G. FAR Clause 52.204-24 and 52.204-25 have been removed in their entirety and replaced with FAR 52.204-26.
- END OF SUMMARY OF CHANGES -
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 18-Aug-2020 03:00 PM to 25-Aug-2020 02:00 PM.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by full text:
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (DEC
2019)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representation. The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(End of provision)
The following have been deleted:
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
DEC 2019
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: MD20200044 08/07/2020
Superseded General Decision Number: MD20190044
State: Maryland
Construction Type: Building
County: Prince George's County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 02/14/2020 4 02/28/2020 5 03/13/2020 6 04/17/2020 7 05/15/2020
8 05/29/2020 9 06/26/2020 10 07/10/2020 11 08/07/2020
ASBE0024-007 04/01/2020
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 38.01 17.37+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-010 04/01/2020
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 24.46 7.69+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BRMD0001-006 05/03/2020
Rates Fringes
TILE SETTER......................$ 30.12 12.46
BRMD0001-011 05/03/2020
Rates Fringes
BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 33.00 12.09
BRMD0001-012 05/03/2020
Rates Fringes
MASON - STONE....................$ 39.76 18.88
BRMD0001-013 05/03/2020
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 30.12 12.46
CARP0197-001 05/01/2019
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 29.00 12.71
CARP0219-001 05/01/2019
Rates Fringes
MILLWRIGHT.......................$ 35.99 11.23
ELEC0026-021 09/02/2019
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 28.55 11.28
ELEC0026-022 11/04/2019
Rates Fringes
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 46.85 19.45+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.
ELEV0010-001 01/01/2020
ELEVATOR MECHANIC................$ 47.02 34.765+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0077-017 05/01/2020
Rates Fringes
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 32.83 10.05+a Bulldozer...................$ 32.83 10.05+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.
IRON0005-005 06/01/2019
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 32.50 22.385
IRON0005-014 05/01/2019
Rates Fringes
IRONWORKER, REINFORCING..........$ 28.95 21.08
LABO0011-016 06/15/2020
Rates Fringes
LABORER (Common or General)......$ 17.77 8.63 LABORER: Mason Tender - Cement/Concrete..................$ 25.88 8.63 LABORER: Pipelayer..............$ 25.88 8.63
PAIN0051-014 06/01/2020
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 27.97 12.55 Glazing Contracts over $2 million.....................$ 32.21 12.55
PAIN0051-019 06/01/2018
PAINTER
Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.06 9.76 Industrial..................$ 31.10 11.48
PLAS0891-005 07/01/2018
Rates Fringes
PLASTERER........................$ 29.53 6.80
PLAS0891-006 02/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
PLAS0891-008 08/01/2016
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
* PLUM0005-010 08/01/2020
Rates Fringes
PLUMBER..........................$ 44.92 19.91+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-011 08/01/2019
Rates Fringes
PIPEFITTER (Including HVAC Pipe and System Installation)....$ 43.14 21.87+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 07/01/2019
Rates Fringes
ROOFER...........................$ 30.25 13.24
SFMD0669-001 04/01/2020
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 35.70 23.60
SHEE0100-015 07/01/2019
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 40.77 21.35+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
SUMD2010-092 08/04/2010
Rates Fringes
LABORER
Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 0.00 Mason Tender - Brick........$ 13.28 2.95 Mason Tender - Stone........$ 14.03 0.00 Mason Tender for Pointing, Caulking and Cleaning.......$ 14.15 0.00 Mortar Mixer................$ 16.61 9.08
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.14
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29
Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 0.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 5.18 Loader......................$ 24.00 5.40 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88
TILE FINISHER....................$ 17.87 7.32
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
P2 481544 Aeromedical Evacuation Squadron Training Facility JB Andrews, MD
SECTION TABLE OF CONTENTS
DIVISION 09 - FINISHES
SECTION 09 51 00
ACOUSTICAL CEILINGS
08/17
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Ceiling Tiles
1.4 DELIVERY, STORAGE. AND HANDLING
1.5 ENVIRONMENTAL REQUIREMENTS
1.6 SCHEDULING
1.7 WARRANTY
1.8 EXTRA MATERIALS
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Ceiling Attenuation Class and Test
2.1.2 Ceiling Sound Absorption
2.1.3 Light Reflectance
2.2 ACOUSTICAL UNITS
2.2.1 Units for Exposed-Grid System
2.2.1.1 Type
2.2.1.2 Flame Spread
2.2.1.3 Pattern
2.2.1.4 Minimum NRC
2.2.1.5 Minimum Light Reflectance Coefficient
2.2.1.6 Nominal Size
2.2.1.7 Edge Detail
2.2.1.8 Finish
2.2.1.9 Minimum CAC
2.2.2 Impact/Abrasion Resistant, Humidity Resistant, and Scrubbable
Units
2.2.2.1 Type
2.2.2.2 Flame Spread
2.2.2.3 Pattern
2.2.2.4 Minimum NRC
2.2.2.5 Minimum Light Reflectance Coefficient
2.2.2.6 Nominal Size
2.2.2.7 Edge Detail
2.2.2.8 Joint Detail
2.3 SUSPENSION SYSTEM
2.4 HANGERS
2.4.1 Wires
2.4.2 Straps
2.4.3 Rods
2.4.4 Eyebolts
SECTION 09 51 00 Page 1
CERTIFIED FINAL AMDT0003
2.4.5 Masonry Anchorage Devices
2.5 ACCESS PANELS
2.6 FINISHES
2.7 COLORS AND PATTERNS
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Suspension System
3.1.1.1 Plumb Hangers
3.1.1.2 Splayed Hangers
3.1.2 Wall Molding
3.1.3 Caulking
3.2 CEILING ACCESS PANELS
3.3 CLEANING
3.4 RECLAMATION PROCEDURES
-- End of Section Table of Contents --
SECTION 09 51 00 Page 2
SECTION 09 51 00
ACOUSTICAL CEILINGS
08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A489 (2018; E 2018) Standard Specification for Carbon Steel Eyebolts
ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B633 (2015) Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel
ASTM C635/C635M (2017) Standard Specification for Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings
ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels
ASTM E1264 (2014) Acoustical Ceiling Products
ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling Plenum
ASTM E1477 (1998a; R 2017; E 2018) Standard Test Method for Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers
SECTION 09 51 00 Page 3
ASTM E795 (2016) Standard Practices for Mounting Test Specimens During Sound Absorption Tests
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Approved Detail Drawings; G, RO
SD-03 Product Data
Acoustical Ceiling Systems; G Recycled Content for Type III Ceiling Tiles; S Recycled Content for Suspension Systems; S
SD-04 Samples
Acoustical Ceiling Tiles; G
SD-07 Certificates
Indoor Air Quality for Type III Ceiling Tiles; S Indoor Air Quality for Impact/Abrasion Resistant, Humidity Resistant, Scrubbable Ceiling Tiles; S
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Ceiling Tiles
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.4 DELIVERY, STORAGE. AND HANDLING
Deliver materials to the site in the manufacturer's original unopened containers with brand name and type clearly marked. Carefully handle and
SECTION 09 51 00 Page 4 store materials in dry, watertight enclosures. Immediately before installation, store acoustical units for not less than 24 hours at the same temperature and relative humidity as the space where they will be installed in order to assure proper temperature and moisture acclimation.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain a uniform temperature of not less than 60 degrees F nor more than 85 degrees F and a relative humidity of not more than 70 percent for 24 hours before, during, and 24 hours after installation of acoustical units.
1.6 SCHEDULING
Complete and dry interior finish work such as plastering, concrete and terrazzo work before ceiling installation. Complete mechanical, electrical, and other work above the ceiling line; install and start operating heating, ventilating, and air conditioning systems in order to maintain temperature and humidity requirements.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period. Include an agreement to repair or replace acoustical panels that fail within the warranty period in the standard performance guarantee or warranty. Failures include, but are not limited to, sagging and warping of panels; rusting and manufacturers defects of grid system.
1.8 EXTRA MATERIALS
Furnish spare tiles, from the same lot as those installed, of each color at the rate of 5 tiles for each 1000 tiles installed.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Provide sound controlling units mechanically mounted on a ceiling suspension system for acoustical treatment. The unit size, texture, finish, and color must be as specified. The Contractor has the option to substitute inch-pound (I-P) Recessed Light Fixtures (RLF) for metric RLF.
If the Contractor opts to furnish I-P RLF, other ceiling elements like acoustical ceiling tiles, air diffusers, air registers and grills, must also be I-P products. Coordinate the whole ceiling system with other details, like the location of access panels and ceiling penetrations, etc., shown on the drawings. The Contractor is responsible for all associated labor and materials and for the final assembly and performance of the specified work and products if I-P products are used. The location and extent of acoustical treatment must be as shown on the approved detail drawings. Submit drawings showing suspension system, method of anchoring and fastening, details, and reflected ceiling plan. Coordinate with paragraph RECLAMATION PROCEDURES for reclamation of mineral fiber acoustical ceiling panels to be removed from the job site.
AMDT0003**************************************************************
2.1.1 Ceiling Attenuation Class and Test
Provide a ceiling system with an attenuation class (CAC) of 35 when
SECTION 09 51 00 Page 5 determined in accordance with ASTM E1414/E1414M . Provide fixture attenuators over light fixtures and other ceiling penetrations, and provide acoustical blanket insulation adjacent to partitions, as required to achieve the specified CAC. Provide test ceiling continuous at the partition and assembled in the suspension system in the same manner that the ceiling will be installed on the project.
**************************************************************AMDT0003
2.1.2 Ceiling Sound Absorption
Determine the Noise Reduction Coefficient (NRC) in accordance with ASTM C423 Test Method.
2.1.3 Light Reflectance
Determine light reflectance factor in accordance with ASTM E1477 Test Method.
2.2 ACOUSTICAL UNITS
Submit two samples of each type of acoustical unit and each type of suspension grid tee section showing texture, finish, and color. Conform acoustical units to ASTM E1264, Class A, and the following requirements:
2.2.1 Units for Exposed-Grid System
2.2.1.1 Type
III (non-asbestos mineral fiber with painted finish). Provide Type III Acoustical Ceiling Tiles containing a minimum of 30 percent recycled content. Provide data identifying percentage of recycled content for Type III ceiling tiles. Provide certification of indoor air quality for Type III Ceiling Tiles.
2.2.1.2 Flame Spread
Class A, 25 or less
2.2.1.3 Pattern
E
AMDT0003***************************************************************
2.2.1.4 Minimum NRC
0.70 in open office areas; 0.70 in team rooms, Learning Center, phone booth, Commander (CDR) offices, classrooms, and other rooms as designated;
0.50 in all other rooms and areas when tested on mounting Type E-400 of
ASTM E795.
***************************************************************AMDT0003
2.2.1.5 Minimum Light Reflectance Coefficient
LR-1, 0.75 or greater
2.2.1.6 Nominal Size
24 by 24 inch
2.2.1.7 Edge Detail
Beveled
SECTION 09 51 00 Page 6
2.2.1.8 Finish
Factory-applied standard white finish.
2.2.1.9 Minimum CAC
2.2.2 Impact/Abrasion Resistant, Humidity Resistant, and Scrubbable Units
2.2.2.1 Type
Non-asbestos mineral or glass fibers bonded with ceramic, moisture resistant thermo-setting resin, or other moisture resistant material and having a factory applied white paint finish. Provide panels that do not sag or warp under conditions of heat, high humidity or chemical fumes, and resistant to impact and abrasion. Panels shall be scrubbable. Provide certification of indoor air quality for Impact/Abrasion Resistant Ceiling Tiles. Product shall be provided at Kitchen 116.
2.2.2.2 Flame Spread
Class A, 25 or less
2.2.2.3 Pattern
E
2.2.2.4 Minimum NRC
0.65 when tested on Mounting Type E-400 of ASTM E795.
2.2.2.5 Minimum Light Reflectance Coefficient
LR-1, 0.75 or greater
2.2.2.6 Nominal Size
24 by 24 inch
2.2.2.7 Edge Detail
Beveled
2.2.2.8 Joint Detail
Trimmed and butted
2.3 SUSPENSION SYSTEM
Provide standard, exposed-grid, standard width flange suspension system conforming to ASTM C635/C635M for intermediate-duty systems. Provide surfaces exposed to view of aluminum or steel with a factory-applied white baked-enamel finish. Provide wall molding having a flange of not less than 15/16 inch . Provide mitered corners. Suspended ceiling framing system must have the capability to support the finished ceiling, light fixtures, air diffusers, and accessories, as shown. Provide a suspension system with a maximum deflection of 1/360 of the span length. Conform seismic details
SECTION 09 51 00 Page 7 to contract drawings.
Provide Suspension System containing a minimum of 15 percent recycled content. Provide data identifying percentage of recycled content for suspension systems.
2.4 HANGERS
Provide hangers and attachment capable of supporting a minimum 300 pound ultimate vertical load without failure of supporting material or attachment.
2.4.1 Wires
Conform wires to ASTM A641/A641M , Class 1, 0.08 inch (12 gauge) in diameter.
2.4.2 Straps
Provide straps of 1 by 3/16 inch galvanized steel conforming to ASTM A653/A653M , with a light commercial zinc coating or ASTM A1008/A1008M with an electrodeposited zinc coating conforming to ASTM B633, Type RS.
2.4.3 Rods
Provide 3/16 inch diameter threaded steel rods, zinc or cadmium coated.
2.4.4 Eyebolts
Provide eyebolts of weldless, forged-carbon-steel, with a straight-shank in accordance with ASTM A489. Eyebolt size must be a minimum 1/4 inch, zinc coated.
2.4.5 Masonry Anchorage Devices
Comply with ASTM C636/C636M for anchorage devices for eyebolts.
2.5 ACCESS PANELS
Provide access panels that match adjacent acoustical units, designed and equipped with suitable framing and fastenings for removal and replacement without damage. Size panel to be not less than 12 by 12 inch or more than 12 by 24 inch.
a. Attach an identification plate of 0.032 inch thick aluminum, 3/4 inch in diameter, stamped with the letters "AP" and finished the same as the unit, near one corner on the face of each access panel.
b. Identify ceiling access panel by a number utilizing white identification plates or plastic buttons with contrasting numerals.
Provide plates or buttons of minimum 1 inch diameter and securely attached to one corner of each access unit. Provide a typewritten card framed under glass listing the code identification numbers and corresponding system descriptions listed above. Mount the framed card where directed and furnish a duplicate card to the Contracting Officer. Code identification system is as follows:
1 Fire detection/alarm system 2 Air conditioning controls 3 Plumbing system
SECTION 09 51 00 Page 8
4 Heating and steam systems 5 Air conditioning duct system 6 Sprinkler system 7 Intercommunication system 8 Telephone junction boxes
2.6 FINISHES
Use manufacturer's standard textures, patterns and finishes as specified for acoustical units and suspension system members. Treat ceiling suspension system components to inhibit corrosion.
2.7 COLORS AND PATTERNS
Use colors and patterns for acoustical units and suspension system components as indicated on the drawings.
PART 3 EXECUTION
3.1 INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
Examine surfaces to receive directly attached acoustical units for unevenness, irregularities, and dampness that would affect quality and execution of the work. Rid areas, where acoustical units will be cemented, of oils, form residue, or other materials that reduce bonding capabilities of the adhesive. Complete and dry interior finish work such as plastering, concrete, and terrazzo work before installation. Complete and approve mechanical, electrical, and other work above the ceiling line prior to the start of acoustical ceiling installation. Provide acoustical work complete with necessary fastenings, clips, and other accessories required for a complete installation. Do not expose mechanical fastenings in the finished work. Lay out hangers for each individual room or space. Provide hangers to support framing around beams, ducts, columns, grilles, and other penetrations through ceilings. Keep main runners and carrying channels clear of abutting walls and partitions. Provide at least two main runners for each ceiling span. Wherever required to bypass an object with the hanger wires, install a subsuspension system so that all hanger wires will be plumb.
3.1.1 Suspension System
Install suspension system in accordance with ASTM C636/C636M and as specified herein. Do not suspend hanger wires or other loads from underside of steel decking.
3.1.1.1 Plumb Hangers
Install hangers plumb and not pressing against insulation covering ducts and pipes. Where lighting fixtures are supported from the suspended ceiling system, provide hangers at a minimum of four hangers per fixture and located not more than 6 inch from each corner of each fixture.
3.1.1.2 Splayed Hangers
Where hangers must be splayed (sloped or slanted) around obstructions, offset the resulting horizontal force by bracing, countersplaying, or other
SECTION 09 51 00 Page 9 acceptable means.
3.1.2 Wall Molding
Provide wall molding where ceilings abut vertical surfaces. Miter corners where wall moldings intersect or install corner caps. Secure wall molding not more than 3 inch from ends of each length and not more than 16 inch on centers between end fastenings. Provide wall molding springs at each acoustical unit in semi-exposed or concealed systems.
3.1.3 Caulking
Seal all joints around pipes, ducts or electrical outlets penetrating the ceiling. Apply a continuous ribbon of acoustical sealant on vertical web of wall or edge moldings.
3.2 CEILING ACCESS PANELS
Locate ceiling access panels directly under the items which require access.
3.3 CLEANING
Following installation, clean dirty or discolored surfaces of acoustical units and leave them free from defects. Remove units that are damaged or improperly installed and provide new units as directed.
3.4 RECLAMATION PROCEDURES
Neatly stack ceiling tile, designated for recycling by the Contracting Officer, on 4 by 4 foot pallets not higher than 4 foot. Panels must be completely dry. Shrink wrap and symmetrically stack pallets on top of each other without falling over.
-- End of Section --
SECTION 09 51 00 Page 10
| SF30 |
| SUMMARY OF CHANGES |
| 00 70 00 |
| 00 73 00 |
| General Decision Number: MD20200044 08/07/2020 |
| 09 51 00 |
File details come from the government source that posted it. Updated .