W912QR20R0038-0006.pdf

PDF 2 MB Posted

Attached to
Orangeburg, NY ARMY Reserve Center Renovations/New Construction
Solicitation number
W912QR20R0038
Issued by

About this file

This is a solicitation for a full facility restoration project of an Army Reserve Center located in Orangeburg, New York. The project involves renovations and new construction with an estimated cost between $10-25 million. It is a full and open procurement requiring a 10% price evaluation for HUBZone small businesses. The solicitation is issued by the Department of the Army Corps of Engineers Engineering District Louisville. Responses are due through the ProjNet system by the specified date. Funds have not been appropriated so no contract award will be made until funding is available. Technical inquiries must be submitted through Bidder Inquiry in ProjNet. Central Contractor Registration in SAM is required to comply with various CCR/ORCA and SAM requirements specified in the solicitation.

View the file

Other files

File Type Posted
W912QR20C0038-Orangeburg NY ARC.pdf PDF
W912QR20R0038-0007.pdf PDF
W912QR20R0038-0005.pdf PDF
W912QR20R0038-0004 .pdf PDF
W912QR20R0038_Sign_In-Roster-0004.jpg JPG image
W912QR20R0038Specs_Vol3-0003.pdf PDF
W912QR20R0038Specs_Vol2-0003.pdf PDF
W912QR20R0038Specs_Vol1-0003.pdf PDF
W912QR20R0038Plans-0003.pdf PDF
Native CAD Files.zip ZIP file
W912QR20R0038Specs-0002.pdf PDF
W912QR20R0038Specs-0001.pdf PDF
W912QR20R0038Plans-0001.pdf PDF
W912QR20R0038Specs-0000.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: STEPHEN D RAMSEY

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0038 for the Full Facility Restoration of an ARMY Reserve Center located in Orangeburg, NY is hereby amended as follow s:

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0038

X 9B. DATED (SEE ITEM 11)

24-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964860

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0038-0006

W912QR20R0038

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUMMARY OF CHANGES

The following have been modified:

SUMMARY OF CHANGES

ARMY Reserve Center Renovations Orangeburg, NY

W912QR20R0038

Amendment No. 0006

A. Wage Rates General Decision Number: NY20200020 have updated as of 07/03/2020 and are included with this amendment.

B. The following Specification Sections have been replaced in their entirety:

DIVISION 01 – GENERAL REQUIREMENTS

01 02 00.00 48 Part 1 - Design Objectives, and Functional and Area Requirements

01 02 00.00 48 Part 13 - Fire Protection Design

01 33 29.00 06 Sustainability Reporting

- END OF SUMMARY OF CHANGES -

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE RATES

"General Decision Number: NY20200020 07/03/2020

Superseded General Decision Number: NY20190020

State: New York

Construction Types: Building, Heavy, Highway and Residential

County: Rockland County in New York.

BUILDING; HEAVY; HIGHWAY; AND RESIDENTIAL CONSTRUCTION PROJECTS

(Includes single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 02/28/2020 3 04/03/2020 4 05/01/2020 5 06/12/2020 6 07/03/2020

ASBE0091-001 05/27/2019

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)..............$ 42.62 40.85 Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 42.62 40.85

BOIL0005-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 55.23 33%+24.12+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0005-005 06/01/2019

Rates Fringes

BRICKLAYER

BUILDING/RESIDENTIAL

CONSTRUCTION

Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.09 34.50

HEAVY & HIGHWAY

CONSTRUCTION

Bricklayers, Cement Masons, Plasterers, Stone Masons, Pointers, Caulkers & Cleaners........$ 41.96 33.38

CARP0279-004 07/01/2019

Carpenters :

Building and Heavy & Highway Construction........$ 45.30 30.55 Residential.................$ 36.23 24.47

* CARP0740-001 07/01/2020

Rates Fringes

MILLWRIGHT.......................$ 55.70 53.61

* CARP1556-006 07/01/2020

Rates Fringes

Dock Builder & Piledrivermen.....$ 55.93 51.79

* CARP1556-007 07/01/2020

Rates Fringes

Diver Tender.....................$ 50.34 51.79 Diver............................$ 70.80 51.79

CARP1556-010 07/01/2019

Rates Fringes

Pipe Bending Machine Operator....$ 54.63 50.98

ELEC0363-006 04/01/2020

Rates Fringes

Electricians:

BUILDING, HEAVY & HIGHWAY

CONSTRUCTION................$ 46.00 3%+32.36+a RESIDENTIAL CONSTRUCTION....$ 46.00 3%+32.36+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-002 05/06/2019

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION-LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, AND TRAFFIC

MONITORING SYSTEMS, ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 27.77 6.75%+24.15 Groundman (Digging Machine Operator)...................$ 41.65 6.75%+24.15 Groundman (Truck Driver)....$ 37.02 6.75%+24.15 Groundman Truck Driver (Tractor Trailer Unit)......$ 37.02 6.75%+24.15 Lineman and Technician......$ 46.28 6.75%+24.15 Mechanic....................$ 37.02 6.75%+24.15

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-004 05/06/2019

Rates Fringes

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Groundman Truck driver.....$ 41.64 6.75%+24.15 Lineman and Technician.....$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Substation:

Cable Splicer..............$ 57.26 6.75%+24.15 Flagman....................$ 31.23 6.75%+24.15 Ground man truck driver....$ 41.64 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Lineman & Technician.......$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 58.71 6.75%+24.15 Flagman....................$ 32.02 6.75%+24.15 Groundman Digging Machine Operator...................$ 48.03 6.75%+24.15 Groundman Truck Driver (tractor-trailer unit).....$ 42.70 6.75%+24.15 Groundman Truck Driver.....$ 42.70 6.75%+24.15 Lineman & Technician.......$ 53.37 6.75%+24.15 Mechanic...................$ 42.70 6.75%+24.15

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-008 01/01/2019

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93

Groundman..................$ 16.49 3%+4.93 Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 31.12 3%+4.93 Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0001-002 03/17/2018

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 64.48 36.21+a+b Modernization and Repair....$ 50.49 40.399+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ELEV0138-002 01/01/2020

THE TOWN OF STONY POINT

Rates Fringes

ELEVATOR MECHANIC................$ 60.49 34.765+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0825-012 01/01/2018

BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION

Power equipment operators:

GROUP 1.....................$ 50.57 30.30

GROUP 2.....................$ 48.98 30.30

GROUP 3.....................$ 47.07 30.30

GROUP 4.....................$ 45.44 30.30

GROUP 5.....................$ 43.73 30.30

GROUP 6.....................$ 52.39 30.30

NOTES:

Hazmat Premium 20 percent Hydrographic Premium .50

FOOTNOTE:

a. New Years Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, Election Day, and Veterans Day provided the employee works one day during the calendar week in which the holiday occurs.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Autograde-Pavement-Profiler (CMI and Similar Types); Autograde Slipform Paver (CMI and Similar Types);

Backhoe; Central Power Plants (all types); Concrete Paving Machine (s-240 and Similar Types); Cranes (All Types, Including Overhead And Straddle Traveling Type); Cranes, Gantry; Derricks (Land, Floating or Chicago Boom Type) Drillmaster/Quarrymaster (Down the Hole Drill) Rotary Drill; Self-Propelled, Hydraulic Drill, Self-Powered Drill Draglines, Elevator Graders, Front End Loaders (5 yds. and over), Gradalls, Grader: Rago, Helicopters (Copilot), Helicopters, (Communication Engineer), Locomotive (large), Mucking Machines, Pavement and Concrete Breaker (Superhammer, Hoe Ram, Brokk 250 and Similar Types), Pile Driver (length of Boom Including Length of Leads Shall Determine Premium Rate Applicable), Pile Driver (length of boom including length of leads shall determine rate applicable), Roadway Surface Grinder Scooper (loader and shovel), Shovels, Tree Chopper with Boom, Trench Machines, Tunnel Boring Machines.

GROUP 2: ""A"" Frame; Backhoe (Combination); Boom Attachment on Loaders (Rate Based On Size Of Bucket) Not Applicable To Pipehook) Boring and Drilling Machines, Brush Chopper, Shredder and Tree Shredder Tree Shearer, Cableways, Carryalls, Concrete Pump, Concrete Pumping System, Pumpcrete and Similar Types, Conveyors, 125 ft and over;

Drill Doctor (duties include dust collector, maintenance), Front End Loader (22 yds. but less than 5 yds.), Graders

(Finish); Groove Cutting Machine (ride on type), Heater Planing; Hoists: (all type hoists, Shall Also Include Steam, Gas, Diesel, Electric, Air Hydraulic, Single and Double Drum, Concrete, Brick Shaft,Caisson, Snorkel Roof, and or any other similar type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type). Long Boom Rate to Be Applied if Hoist"") Hydraulic Cranes-10tons and Under;

Hydro-Axe; Hydro- Blaster; Jacket (Screw Air Hydraulic Power Operated Unit or Console Type: Not Hand Jack or Pile Load Test Type), Log Skidder; Pans, Pavers (all) Concrete;

Plate and Frame Filter Press; Pumpcrete Machines; Squeeze Crete and Concrete Pumping (regardless of size); Scrapers;

Sidebooms; ""straddle"" Carrier, Ross and Similar Types;

Vacum Truck; Whip Hammer; Winch Trucks(Hoisting).

GROUP 3: Asphalt Crubing Machine, Asphalt Plant Engineer, Asphalt Spreader;Autograde Tube Finisher & Texturing Machine (CMI and Similar types) Autograde Curecrete Machine (CMI and Similar Types); Bar Bending Machine (power), Batchers, Batching Plant and Crusher on Site; Belt Conveyor System; Boom Type Skimmer Machines; Bridge Deck Finisher;

Bulldozers (all); Car Dumpers (Railroad); Chief of Party;

Compressor and Blower Type Units (used) Independenty or Mounted On Dual Purpose Trucks, On Job Site or In Conduction with Job Site, In Loading and Unloading of Concrete, Cement, Fly Ash, Instantcrete, or Similar Type Materials); Compressor 92 or 3 in Battery); Concrete Finishing Machines; Concrete Saws and Cutters (ride on type); Concrete Spreaders, Hetzel, Rexomatic and Similar types; Concrete Vibrators; Conveyors, Under 125 ft), Crushing Machines, Ditching Machine, Small (ditchwitch, Vermeer or Similar type); Dope Dots (mechanical with or without pump), dumpsters; Elevator; Fireman; Forklifts (econombile, lull, and similar types of equipment); Front End Loaders (1 yd. and over but less than 2 yds.);

Generators (2 or 3 in Battery/ within 100 ft); Giraffe Grinders, Graders and Motor Patrols; Grout Pump; Gunnite Machines (excluding nozzle); Hammer Vibratory (in conjuction with generators); Hoists (Roof, Tuggeaerial Platform Hoist and House Cars), Hoppers, Hoppers Doors (power operated); Hydro-Blaster (where required); Ladders (Motorized); Laddervator; Locomotive, Dinky type;

Maintenance, Utility Man; Mechanics; Mixers (Excepting Paving Mixers); Motor Patrols and Graders; Pavement Breakers, Small, Self-Propelled ride on type (also Maintains Compressor or Hydraulic Unit); Pavement Breaker, Truck Mounted; Pipe Bending Machine (power); Pitch Pump;

Plaster Pump (regardless of size); Post Hold Digger (post pounder and auger); Rod Bending Machines (power); Roller, Black Top; Scales, (power); Seaman Pulverizing Mixer;

Shoulder Widener; Silos; Skimmer Machines (Boom Type);

Steel Cutting Machine, Services and Maintains; Tamrock Drill; Tractors; Tug Captain; Vibrating Plants (used in conjuction with unloading); welder and Repair Mechanics;

Concrete cleaning/decontamination machine operator;

Directional boring machine; Heavy equipment robotics operator; Master environmental maintenance operator, Ultra high pressure waterjet cuttting tool system operator;

Vacuum blasting machine operator

GROUP 4: Brooms and Sweepers; Chippers; Compressors (single);

Concrete Spreaders (small type); Conveyor Loaders (not including Elevator Graders); Engines, Large Diesel (1620 h.p.) and Staging Pump; Farm Tractors; Fertilizing Equipment (Operator and Maintenance of); Fine Grade Machine (small type); Form Line Graders (small type); Front End Loader (under 1 yd); Generator (single); Grease, Gas, Fuel and Oil Supply Trucks; Heaters (Nelson or Other Type Including Propane, Natural Gas or Flowtype Units); Lights, Portable Generating Light Plants; Mixers, Concrete Small;

Mulching Equipment (Operation and Maintenance of); Pumps (2 of Less Than 4 Inch Suction); Pumps 94 Inch Suction and Over Including Submersible Pumps); Pumps (Diesel Engine and Hydraulic); Immaterial of Power; Road Finishing Machines (Small Type); Rollers, Grade, Fill Or Stone Base; Seeding Equipment (Operation and maintence of); Sprinkler and Water Pump Trucks (Used on job Site or in conduction with Job Site); Steam Jennies and Boilers, Irrespective of Use;

Stone Spreader; Tamping Machines, Vibrating Ride On;

Temporary Heating Plant (welson or Other Type, Including Propane, Natural Gas or Flow Type Units); Water and Sprinkler Trucks (Used On Job Site In Conduction with Job Site); Welding Machines-Within 100 ft (Gas, and /or Electric Converters of Any type, single, two or three in a battery). welding system, multiple (rectifier transformer type) well point systems (including installation by bull gang and maintenance of); Off Road back dumps.

GROUP 5: Oiler, tire repair

GROUP 6: Helicopter pilots

ENGI0825-013 01/01/2018

Rates Fringes

Power equipment operators:

BUILDING CONSTRUCTION

STEEL ERECTION

GROUP 1....................$ 59.09 30.30

GROUP 2....................$ 57.43 30.30

GROUP 3....................$ 50.14 30.30

GROUP 4....................$ 47.48 30.30

GROUP 5....................$ 45.95 30.30

GROUP 6....................$ 44.19 30.30

GROUP 7....................$ 53.70 30.30

BUILDING CONSTRUCTION TANK

ERECTION

GROUP 1....................$ 58.81 30.30

GROUP 2....................$ 57.22 30.30

GROUP 3....................$ 53.70 30.30

GROUP 4....................$ 50.13 30.30

GROUP 5....................$ 44.92 30.30

OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES

GROUP 1....................$ 51.20 30.30

GROUP 2....................$ 49.55 30.30

GROUP 3....................$ 47.41 30.30

GROUP 4....................$ 45.91 30.30

GROUP 5....................$ 44.19 30.30

GROUP 6....................$ 53.13 30.30

RESIDENTIAL CONSTRUCTION

ALL JOB CLASSIFICATION.....$ 11.49 7.75

NOTES:

Hydrographic Premium .50 Hazmat Premium 20 percent Tunnel Premium .75

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day Thanksgiving Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day, Decoration Day provided the employee works one day in the calendar week during which the holiday occurs

POWER EQUIPMENT OPERATORS: STEEL ERECTION CLASSIFICATIONS

GROUP 1: Cranes (All Cranes, Land or Floating with Booms Including Jib 140 ft and over, Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms including Jib 140 ft and over above ground).

GROUP 2: Cranes (All Cranes, Land or Floating with Booms Including Jib Less Than 140 ft Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms Including Jib Less Than 140 ft above Ground).

GROUP 3: ""A"" Frame, Cherry Pickers 10 tons and under, Hoists Shall Also Include Steam, Gas, Desel, Electric, Air Hydraulic, Single and Double Drum Concrete, Brick Shaft Caisson, or Any Other Similar Type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type; Jacks:

Screw Air Hydraulic Power Operated unit or Console Type (not hand Jack or Pile Load Test Type); Side Booms.

GROUP 4: Aerial Platform used as Hoist; Compressor: 2 or 3 in Battery; Elevators or House Cars; Conveyors and Tugger Hosits; Chief of Party; Fireman; Forklift; Generators (2 or 3); Maintenance (Utility Man); Rod Bending Machine (power);

Welding Machines (Gas or Electric, 2 or 3 in Battery, Including Diesels); Captain: Power Boats: Tug Master: Power

Boats.

GROUP 5: Compressor, Single; Welding Machine, Single, Gas, Diesel, and Electric Converters of any Type: Welding System Multple (Rectifier Transformer Type); Generator, Single.

GROUP 6: Oiler, staddle carrier

GROUP 7: Helicopter Pilot

For BUILDING CONSTRUCTION TANK ERECTION

NOTES:

Tunnel Premium .75 Hazmat Premium 20 % Hydrographic Premium .50

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day, Decoration Day provided the employee works one day in the calendar week during which the holiday occurs

POWER EQUIPMENT OPERATORS: TANK ERECTION CLASSIFICATIONS

GROUP 1: Operating Engineers on all Cranes, Derricks, etc with Booms Including Jib 140 ft or More Above Ground.

GROUP 2: Operating Engineer on all Equipment, Including Cranes, Derricks, etc with Booms Including Jib, Less Than 140 ft above the ground.

GROUP 3: Helicopter Pilot

GROUP 4: Air Compressors, Welding Machines and Generators are Covered and are Defined as Cover: Gas, Diesel, or Electric Driven Equipment and Sources of Power from a Permanent Plant: ie: Steam, Comgressed Air, Hydraulic or Other Power, For The Operating of any Machine or Automatic Tools, Used In The Erection, Alteration, Repair and Dismantling of Tanks and Any and All ""Dual Purpose"" Trucks Used On The Construction Job Site, or in the Loading and Unloading of Materials, at the Construction Job Site or in Conjuction with the Job Site.

GROUP 5: Oiler

For OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES NOTES:

Hydrographic Premium .50 Hazmat Premium 20% Tunnel Premium .75

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgivings Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day and Decoration Day provided the employee works one day in calendar week during which the holiday occurs.

OILSTATIC MAINLINES AND TRANSPORTATION PIPE LINES

CLASSIFICATIONS

GROUP 1: Backhoe; Cranes (all types); Draglines, Front End Loaders (5yds. and over), Gradalls, Helicopters (co-pilot), Helicopters (Communication Engineer); Scooper (Loader and Shovel) Koehring; Trench Machines.

GROUP 2: ""A"" Frame; Backhoe (Combination Hoe Loader); Boring and Drilling Machines; Ditching Machines, Small, Ditchwitch, Vermeer or Similar type; Forklifts; Front End Loaders 92 yds. and over but less than 5 yds.); Graders, Finish (fine); Hydraulic Cranes 10 tons and under (over 10 tons) Cranes Rate Applies); Side Booms: Winch Trucks (Hoisting).

GROUP 3: Backfiller; Brooms and Sweepers; Bulldozers;

Compressor (2 or 3 in battery); Chief of Party; Front End Loaders (under 2 yds); Generators; Giraffe Grinders;

Graders and Motor Patrols; Machanic; Pipe Bending Machine (power);Tractors; Water and Sprinkler Trucks used on Job Site or in Conduction with Job Site); Welder and Repair Mechanic; Captain (power boats); Tug Master (power boats).

GROUP 4: Compressor (single); Dope Pots (Mechanical with or without Pump); Dust Collectors; Pumps (4 inch suction and over); Pumps (2 of less than 4 inch suction); Pumps, Diesel Engine and Hydraulic (immaterial of power); Welding Machines, Gas or Electric Converters of any type- 2 or 3 in Battery Multple Welders; Well Point Systems (including installation and Maintenance); Farm Tractors.

GROUP 5: Oiler, grease, gas, fuel and oil supply trucks; Tire repair and maintenance

GROUP 6: Helicoter Pilot

IRON0417-001 07/01/2019

Rates Fringes

IRONWORKER.......................$ 39.58 45.20+a

a) Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving

(unpaid), Christmas Day.

LABO0754-001 04/01/2018

Rates Fringes

LABORER

BUILDING & RESIDENTIAL

CONSTRUCTION

Hazardous Waste Handler.....$ 39.05 21.95+a

BUILDING & RESIDENTIAL

CONSTRUCTION

Air track operators, joy drill operators............$ 37.90 21.95+a All types of landscaping, pit men, dump men, building laborers (clean up), Flag Persons..........$ 33.80 21.95+a Blasters...................$ 37.05 21.95+a Bull float man, stud or riveting gunman, all scalers, power buggy operators (all types), mixer men, (by machine or hand), power saw (all types), brush king, jackhammer, jib rig operators, pavement breakers, vibrator men, powder men, ramset operators, torchmen, cement spray men, gunite nozzle men, sandblasting, all other machine or semi-skilled and asbestos and hazardous waste removal;...$ 37.05 21.95+a Form setter, liners, joint setters, top concrete men...............$ 37.35 21.95+a Hod carriers, scaffold and runway men, steel rod carrriers, rip rap and dry stone layers, concrete laborer, mason tenders, piplayers, (all types), signal men, rail and fence men (all types), core drillers, wrecking and demolition men;.......................$ 36.81 21.95+a

HEAVY & HIGHWAY

CONSTRUCTION

Hazardous Waste Handler Category A:................$ 41.50 23.30+a Category B:................$ 41.50 23.30+a Category C:................$ 41.50 23.30+a Category D:................$ 41.50 23.30+a

HEAVY & HIGHWAY

CONSTRUCTION

GROUP 1....................$ 45.00 23.30+a GROUP 2....................$ 41.50 23.30+a GROUP 3....................$ 39.75 23.30+a GROUP 4....................$ 36.20 23.30+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving day; Christmas Day, President's Election Day; Non-Presidental Election day; and Veterans Day, provided the employee works two days or reported to work two days in the work week and was unable to work.

For HEAVY & HIGHWAY CONSTRUCTION

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, Christmas Day, President's Birthday, Presidental Election Day, Veterans Day provided the employee works one day in the calendar week during which the holiday occurs.

LABORERS HEAVY/HIGHWAY CLASSIFICATIONS

GROUP 1: Blasters

GROUP 2: Track Operator; Joy Drill Operator

GROUP 3: Nipper, Power Buggy Operator; Plaster Tender; Mixer Man (by Machine or hand); Scaffold Runway Man; Power Saw;

Brush King; Steel Rod Carrier; Jack Hammer; Wagon Driller;

Jib Rig Operator; Pavement Breaker; Vibrator Man; Bit Grinder; Powder Man; Ramset Operator; Rip Rap and Dry Stone Layer; Cement Spray Man; Gunnite Nozzle Man; Spray and Nozzle Man on Mulching and Seeding Machine; Sand Blaster;

Concrete Saw; All other Machine or Semi-Skilled Men;

Asbestos and Hazardous Waste Removal; Concrete Laborer;

Building Laborer; Mason Tender; Carpenter Tender; Pipe Layer (all types); Signal Man; Gabion Basket Assembler;

Bull Float Man; Form Setter; Liner; Joint Setter; Sheeter;

Tip Concrete Man; Stud or Riveting Gun Man; All Scalers;

Asphalt Men (all types); Rail and Fence (all types); Core Driller; Wrecking and Demolition Man; Bar Man; Seeder;

Planter; Landscape Men (all types), Ax Man; Pit and Dump Men; Road Laborer

GROUP 4: Flag Person

PAIN0009-010 05/01/2019

Rates Fringes

GLAZIER..........................$ 46.05 43.37

PAIN0155-004 05/01/2018

Rates Fringes

Painters:

Drywall Finisher............$ 36.19 22.76 Lead Abatement Work.........$ 36.19 22.76 Painter/Paperhanger.........$ 36.19 22.76 Spray Rate..................$ 37.19 22.76

PAIN0806-001 10/01/2018

Rates Fringes

Painters:

Structural Steel and Bridge.$ 49.50 41.88

PLUM0373-001 05/01/2019

Rates Fringes

PLUMBER

PLUMBERS AND STEAMFITTERS...$ 46.92 39.72

REFRIGERATION...............$ 32.49 23.87

SINGLE FAMILY DWELLINGS.....$ 16.60 4.95

SFNY0669-002 01/02/2020

Rates Fringes

SPRINKLER FITTER.................$ 45.52 25.95

SHEE0038-001 07/01/2019

Rates Fringes

Sheet metal worker...............$ 44.74 42.51

TEAM0445-001 05/01/2019

Rates Fringes

Truck drivers:

GROUP 1.....................$ 33.25 35.55+a GROUP 1A....................$ 34.39 35.55+a

GROUP 2.....................$ 32.69 35.55+a GROUP 3.....................$ 32.47 35.55+a GROUP 4.....................$ 32.36 35.55+a GROUP 5.....................$ 32.24 35.55+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Labor Day, President's Day, Presidential Election Day, Veterans Day, Decoration Day, Independence Day, Thanksgiving Day and Christmas Day provided the employee works two days in any calendar week during which the holidays occurs.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Drivers on Letourneau tractors, double barrel euclids, Athey wagons and similar equipment (except when hooked to scrapers), I-beam and pole trailers, drivers of road oil distributors, tire trucks and tractors and trailers with 5 axles and over, Articulated Back Dumps and Articulated Water Trucks.

GROUP 1A: Drivers on detachable Gooseneck Low bed Trailers rated over 35 tons.

GROUP 2: Drivers on all equipment 25 yards and over, up to and including 30 yard bodies and cable dump trailers and powder and dynamite trucks.

GROUP 3: Drivers on all equipment up to and including 24 yard bodies, mixer trucks, dump crete trucks and similar types of equipment, fuel trucks, batch trucks and all other tractor trailers.

GROUP 4: Drivers on tri axles, ten-wheelers, grease trucks and tillermen.

GROUP 5: Drivers on pick-up trucks used for materials & parts, drivers on escort man over-the-road and drivers on straight trucks.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

*** SAFETY PAYS ***

Training Center Full Facility Revitalization P2# 464139 Orangeburg, NY CERTIFIED FINAL

September 2009 version 01 02 00.00 48 Part 1 - 1 of 13

PART 1

DESIGN OBJECTIVES, AND FUNCTIONAL AND AREA REQUIREMENTS

1.1 SCOPE OF WORK. The objective of this solicitation is to obtain a facility in which the Using Units are able to effectively implement their Army Reserve support and training missions. These activities require sufficient space with up-to-date furnishings and equipment to support the Units’ full-time and Army Reserve personnel. The facility will consist of the renovation of one building with construction of two building additions, optional construction of another addition to this building, and associated site improvements, complete and adequate for assignment as an Army Reserve Training Center.

1.1.1 Requirements stated in this RFP are minimums; design and construction shall meet or exceed the requirements. The design and technical criteria contained and cited in this RFP establish minimum standards for design and construction quality. This project has been determined to be a Best Value (BV) project: innovative, creative, and life cycle cost effective solutions which meet or exceed these requirements are encouraged.

1.1.2 This project shall consist of the design and renovation of the existing Army Reserve Center on Government-owned land at Orangeburg New York, the construction of two or three additions to the building for use as the Training Center. This project includes modifications to required utilities, storm drainage, communications, electrical, HVAC, fire protection/alarm systems, paving, walks, curbs, parking, access roads, exterior lighting, site improvements, grading and landscaping. All building and room signage shall be new.

1.1.2.1 This project consists of interior renovations to the existing building complemented by the construction of new additions. Varying levels of renovation or new work are as described below and as indicated at associated plans and Room by Room Supplemental Instructions. Contractor shall renovate and construct this facility according to UFC 4-171-05 and referenced guidance documents.

1.1.2.2 Some lightly renovated areas of the building may require utility distribution for other areas through these spaces.

1.1.2.3 Fully automatic fire suppression sprinkler system shall be provided.

1.1.2.4 Light to Medium Renovation includes maintaining existing partitions, replacing existing ceilings including lighting, and providing all wall and floor finishes.

Existing door frames shall remain, painted. Replace existing doors and hardware.

Provide all new wire fabric cages at Unit Storage areas. Some upgrade of communications and fire alarm devices and distribution may be required.

1.1.2.5 Full Renovation includes removal of all existing partitions, ceilings, doors and finishes. Renovations include replacement of ceilings including lighting, construction of

Part 1 - 2 of 13 new partitions including doors and frames, and all wall and floor finishes. Renovation scope includes reconfiguration of electrical, communications, and HVAC systems and devices and extension of automatic fire suppression system to all spaces. Full renovation of public toilets includes replacement of all plumbing fixtures, toilet partitions and finishes. Full renovation of kitchen and associated areas includes replacement of all food service equipment and renovation of all finishes and utilities associated with equipment as needed.

1.1.2.6 Full Renovation includes the construction of a cast-in-place concrete arms vault entirely within the existing Unit Storage wing. The Contractor shall design and construct the vault to avoid interference with existing building foundations. The layout plan indicates the vault located within several structural bays, with columns and associated foundations close to vault walls. Vault construction shall be independent of existing building structure, but the existing foundations may be used as required. It is possible that excavation for the vault may require underpinning and rebuilding of existing foundations to avoid conflict. Vault shall include wire fence caging partitions and gates as indicated, and all cast-in-place floor anchors as needed to anchor government-provided weapons racks.

1.1.2.7 Full Renovation includes location of building main entry to extend and align with existing main corridor. This work shall include partial demolition of existing building exterior wall and reconstruction of this section as entry, to include aluminum and glass storefront system at exterior wall and vestibule. New glazing at exterior storefronts and doors shall meet all current AT/FP requirements.

1.1.2.8 West Addition is comprised of a building infill addition at the location of the existing angular entry at the building front. Interior partitions, ceilings, finishes, doors and frames and all needed utilities shall be provided to integrate with adjacent renovated interior spaces. Exterior finish and system construction at this addition shall be fully integrated with the existing building. Existing building exterior walls at addition location shall be removed to allow fully integrated spaces. Building parapets as may occur are to be removed to allow fully integrated roof surfaces. Structural system for addition is expected to be steel frame similar to the existing system. Building addition exterior shell shall meet all current AT/FP requirements.

1.1.2.9 North Addition is comprised of a building addition outside of the existing exterior wall at the north side of current Unit Storage. Similar description to West Addition above.

1.1.2.10 Remove and replace existing exterior hollow metal doors and frames and associated hardware at mechanical, electrical and other utility rooms with similar doors, frames and hardware. Glazing in new exterior doors shall meet all current AT/FP requirements.

1.1.2.11 Provide site demolition and construction work as indicated. This work includes minor grading and parking lot restriping.

1.1.2.12 Provide additional pavement, new sidewalks, loading ramp and fencing as indicated.

Part 1 - 3 of 13

1.1.2.13 Refer to Section 1.7 for further description of site-related scope items.

1.1.3 Provide design for furniture and some equipment to be purchased and installed by the Government. See Section 1.3.3.1. See Louisville Army Reserve Customer Website https://www.lrl.usace.army.mil/Missions/Engineering/Design- Guide/Military-Programs/Army-Reserve-Customers/Furniture/

1.1.4 The following items are to be removed and set aside by the GC for reuse by the Government: Interior LED fixtures, LED heads in the parking area, new Roof top Unit and Heating boiler. Items may be temporarily stored on site, with no haulage required by GC.

1.1.5 Refer to Section 1.9 for additional proposal options.

1.2 DESIGN OBJECTIVES.

1.2.1 Applicable Criteria. Applicable design and construction criteria references are listed in this Statement of Work at 01 02 00 00 48 Part02 and in the Outline Technical Specifications. Criteria shall be taken from the most current references as of the date of issue of the RFP, unless noted otherwise. Referenced codes and standards are minimum acceptable criteria.

1.2.1.1 This RFP and its referenced documents define the necessary criteria to plan and design the Orangeburg Training Center Full Facility Revitalization. Functional space requirements, including general lighting, communications, power, tempered air requirements and finishes, are contained in the Design Guide for US Army Reserve (UFC 4-171-05), which also provides general criteria and guidance for the design of Army Reserve facilities. Typical functional space furniture layouts are provided in the RFP drawings; Contractor’s designers shall adapt these to the final floor plans.

1.2.1.2 Where manufacturer or vendor names are called out, the intention is generally to provide guidance on desired quality and features for the system or material.

Unless the manufacturer or vendor is identified as “sole-source,” or with similar language, the Contractor may provide the equivalent or better system or material of another vendor or manufacturer.

1.2.1.3 The project shall be designed and constructed using English (inch-pound) units of measurement.

1.2.2 Primary Consideration. The primary consideration of this solicitation is to obtain the renovation to an existing Army Reserve Training Center within funds available, and to maximize design quality. Offerors are encouraged to review the RFP to familiarize themselves with all RFP requirements.

1.2.3 Design Quality. Design quality is achieved through the optimization of interior planning, integration of the building[s] with the site, sustainability, selection of building materials and systems for low-cost maintenance and operation, and an overall balance of esthetics and functionality.

W912QR20R0038-0006

https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/Military-Programs/Army-Reserve-Customers/Furniture/ https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/Military-Programs/Army-Reserve-Customers/Furniture/

Part 1 - 4 of 13

1.2.4 Design Freedom. Requirements stated in this RFP are minimums.

Innovative, creative, or cost-saving proposals, which meet or exceed these requirements are encouraged, and will be considered more favorably.

1.2.4.1 The project conceptual design was developed by the Army Reserve, the Corps of Engineers, and an A/E design team; this conceptual design is accepted by the Government.

1.2.4.2 The Conceptual Design Drawings, this Statement of Work, and the Outline Technical Specifications, along with the other information and requirements in this RFP, serve as requirements for Contractor building design and construction completion, along with other code, regulatory and professional practice requirements. The extent of development of these RFP documents in no way relieves the successful offeror from responsibility for completing the design, construction documentation, and construction of the facility in conformance with Applicable Criteria and codes.

1.2.4.3 The conceptual design illustrates desired general arrangements, orientation, and adjacencies which are acceptable to the Government – it is not intended to dictate the final layout and image for the project. The Contractor’s designers shall develop and refine the conceptual site and building design in their completion of the design and construction documents. Such development shall be consistent with the criteria and acceptable to the Government.

1.2.4.3.1 Conceptual exterior images - not used

1.2.4.4 The Contractor shall accommodate minor site and building plan changes by the Government in the early stages of the design process, as a normal part of the design development process. The Contractor may adjust spaces, within the overall and specific functional area guidelines, as required to accommodate structural layout, and as necessary to provide adequate space for mechanical, electrical and communication spaces. The mechanical and electrical rooms must provide adequate space to safely and efficiently accommodate equipment operation and maintenance. The spatial relationships and adjacencies in the RFP drawings, however, must be maintained, unless the Contractor recommends changes to the Government, and the Government accepts such changes.

1.2.4.6 The Contractor’s architect or interior designer shall select the final palette of colors and materials for building interior and exterior to produce a pleasing appearance, coordinated throughout. Coordinate with the requirements of paragraph 6.5 of Part 6 – Interior Design.

1.2.5 Installation Design Guidance.

1.2.5.1 Installation Real Property Master Plan – not used.

1.2.5.2 Installation Design Guide – not used

Part 1 - 5 of 13

1.2.6 Energy and Resources Conserving Features. Public Laws 102-486 and 109-58, Executive Order 13423, and Federal Regulations 10 CFR 435, require federal buildings to be designed and constructed to reduce energy consumption in a life-cycle, cost-effective manner using renewable energy sources when economical.

This is the start of the file's text. The full file is on GovTribe.