This federal solicitation seeks full facility restoration services for an Army Reserve Center located in Orangeburg, New York. The project cost is estimated between $10 million and $25 million. Offerors must comply with System for Award Management registration requirements and submit bids via the ProjNet website no later than the response deadline. A HUBZone price evaluation preference applies under the terms of this full and open competitive procurement. The U.S. Army Corps of Engineers Engineering District Louisville is the contracting agency. Funds are presently unavailable, and no award will be made without appropriated monies. Technical questions must be submitted through Bidder Inquiry on ProjNet.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: STEPHEN D RAMSEY
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0038 for the Full Facility Restoration of an ARMY Reserve Center located in Orangeburg, NY is hereby amended as follow s:
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0038
X 9B. DATED (SEE ITEM 11)
24-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0038-0004
W912QR20R0038
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been modified:
SUMMARY OF CHANGES
The following have been modified:
SUMMARY OF CHANGES
ARMY Reserve Center Renovations Orangeburg, NY
W912QR20R0038
Amendment No. 0004
A. Site Visit sign in sheet dated 16 June 2020 is attached with this amendment.
B. The following Specification Sections have been replaced in their entirety:
DIVISION 01 – GENERAL REQUIREMENTS
01 02 00.13 48 Part 13 - Design - Fire Protection.
C. General Decision Number: NY20200020 has updated and has been included with this amendment.
- END OF SUMMARY OF CHANGES -
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: NY20200020 06/12/2020
Superseded General Decision Number: NY20190020
State: New York
Construction Types: Building, Heavy, Highway and Residential
County: Rockland County in New York.
BUILDING; HEAVY; HIGHWAY; AND RESIDENTIAL CONSTRUCTION PROJECTS
(Includes single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 02/28/2020 3 04/03/2020 4 05/01/2020 5 06/12/2020
ASBE0091-001 05/27/2019
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)..............$ 42.62 40.85 Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 42.62 40.85
BOIL0005-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 55.23 33%+24.12+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve
BRNY0005-005 06/01/2019
Rates Fringes
BRICKLAYER
BUILDING/RESIDENTIAL
CONSTRUCTION
Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.09 34.50
HEAVY & HIGHWAY
CONSTRUCTION
Bricklayers, Cement Masons, Plasterers, Stone Masons, Pointers, Caulkers & Cleaners........$ 41.96 33.38
CARP0279-004 07/01/2019
Rates Fringes
Carpenters :
Building and Heavy & Highway Construction........$ 45.30 30.55 Residential.................$ 36.23 24.47
CARP0740-001 07/01/2019
Rates Fringes
MILLWRIGHT.......................$ 54.20 53.06
* CARP1556-006 07/01/2019
Rates Fringes
Dock Builder & Piledrivermen.....$ 54.63 50.98
CARP1556-007 07/01/2019
Rates Fringes
Diver Tender.....................$ 49.14 50.98 Diver............................$ 69.22 50.98
CARP1556-010 07/01/2019
Rates Fringes
Pipe Bending Machine Operator....$ 54.63 50.98
ELEC0363-006 04/01/2020
Rates Fringes
Electricians:
BUILDING, HEAVY & HIGHWAY
CONSTRUCTION................$ 46.00 3%+32.36+a RESIDENTIAL CONSTRUCTION....$ 46.00 3%+32.36+a
FOOTNOTE:
a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day
ELEC1249-002 05/06/2019
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION-LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY
AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC
SIGNAL SYSTEMS, AND TRAFFIC
MONITORING SYSTEMS, ROAD
WEATHER INFORMATION SYSTEMS)
Flagman.....................$ 27.77 6.75%+24.15 Groundman (Digging Machine Operator)...................$ 41.65 6.75%+24.15 Groundman (Truck Driver)....$ 37.02 6.75%+24.15 Groundman Truck Driver (Tractor Trailer Unit)......$ 37.02 6.75%+24.15 Lineman and Technician......$ 46.28 6.75%+24.15 Mechanic....................$ 37.02 6.75%+24.15
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249-004 05/06/2019
Rates Fringes
ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :
Flagman....................$ 31.23 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Groundman Truck driver.....$ 41.64 6.75%+24.15 Lineman and Technician.....$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Substation:
Cable Splicer..............$ 57.26 6.75%+24.15 Flagman....................$ 31.23 6.75%+24.15 Ground man truck driver....$ 41.64 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15
Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Lineman & Technician.......$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 58.71 6.75%+24.15 Flagman....................$ 32.02 6.75%+24.15 Groundman Digging Machine Operator...................$ 48.03 6.75%+24.15 Groundman Truck Driver (tractor-trailer unit).....$ 42.70 6.75%+24.15 Groundman Truck Driver.....$ 42.70 6.75%+24.15 Lineman & Technician.......$ 53.37 6.75%+24.15 Mechanic...................$ 42.70 6.75%+24.15
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEC1249-008 01/01/2019
Rates Fringes
ELECTRICIAN (Line Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 32.78 3%+4.93 Groundman..................$ 16.49 3%+4.93
Installer Repairman- Teledata Lineman/Technician- Equipment Operator.........$ 31.12 3%+4.93 Tree Trimmer................$ 25.79 3%+9.98+a
a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.
ELEV0001-002 03/17/2018
Rates Fringes
ELEVATOR MECHANIC
Elevator Constructor........$ 64.48 36.21+a+b Modernization and Repair....$ 50.49 40.399+a+b
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Good Friday, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;
an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.
ELEV0138-002 01/01/2020
THE TOWN OF STONY POINT
Rates Fringes
ELEVATOR MECHANIC................$ 60.49 34.765+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0825-012 01/01/2018
BUILDING HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 50.57 30.30
GROUP 2.....................$ 48.98 30.30
GROUP 3.....................$ 47.07 30.30
GROUP 4.....................$ 45.44 30.30
GROUP 5.....................$ 43.73 30.30
GROUP 6.....................$ 52.39 30.30
NOTES:
Hazmat Premium 20 percent Hydrographic Premium .50
FOOTNOTE:
a. New Years Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, Election Day, and Veterans Day provided the employee works one day during the calendar week in which the holiday occurs.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Autograde-Pavement-Profiler (CMI and Similar Types); Autograde Slipform Paver (CMI and Similar Types);
Backhoe; Central Power Plants (all types); Concrete Paving Machine (s-240 and Similar Types); Cranes (All Types, Including Overhead And Straddle Traveling Type); Cranes, Gantry; Derricks (Land, Floating or Chicago Boom Type) Drillmaster/Quarrymaster (Down the Hole Drill) Rotary Drill; Self-Propelled, Hydraulic Drill, Self-Powered Drill Draglines, Elevator Graders, Front End Loaders (5 yds. and over), Gradalls, Grader: Rago, Helicopters (Copilot), Helicopters, (Communication Engineer), Locomotive (large), Mucking Machines, Pavement and Concrete Breaker (Superhammer, Hoe Ram, Brokk 250 and Similar Types), Pile Driver (length of Boom Including Length of Leads Shall Determine Premium Rate Applicable), Pile Driver (length of boom including length of leads shall determine rate applicable), Roadway Surface Grinder Scooper (loader and shovel), Shovels, Tree Chopper with Boom, Trench Machines, Tunnel Boring Machines.
GROUP 2: ""A"" Frame; Backhoe (Combination); Boom Attachment on Loaders (Rate Based On Size Of Bucket) Not Applicable To Pipehook) Boring and Drilling Machines, Brush Chopper, Shredder and Tree Shredder Tree Shearer, Cableways, Carryalls, Concrete Pump, Concrete Pumping System, Pumpcrete and Similar Types, Conveyors, 125 ft and over;
Drill Doctor (duties include dust collector, maintenance), Front End Loader (22 yds. but less than 5 yds.), Graders (Finish); Groove Cutting Machine (ride on type), Heater
Planing; Hoists: (all type hoists, Shall Also Include Steam, Gas, Diesel, Electric, Air Hydraulic, Single and Double Drum, Concrete, Brick Shaft,Caisson, Snorkel Roof, and or any other similar type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type). Long Boom Rate to Be Applied if Hoist"") Hydraulic Cranes-10tons and Under;
Hydro-Axe; Hydro- Blaster; Jacket (Screw Air Hydraulic Power Operated Unit or Console Type: Not Hand Jack or Pile Load Test Type), Log Skidder; Pans, Pavers (all) Concrete;
Plate and Frame Filter Press; Pumpcrete Machines; Squeeze Crete and Concrete Pumping (regardless of size); Scrapers;
Sidebooms; ""straddle"" Carrier, Ross and Similar Types;
Vacum Truck; Whip Hammer; Winch Trucks(Hoisting).
GROUP 3: Asphalt Crubing Machine, Asphalt Plant Engineer, Asphalt Spreader;Autograde Tube Finisher & Texturing Machine (CMI and Similar types) Autograde Curecrete Machine (CMI and Similar Types); Bar Bending Machine (power), Batchers, Batching Plant and Crusher on Site; Belt Conveyor System; Boom Type Skimmer Machines; Bridge Deck Finisher;
Bulldozers (all); Car Dumpers (Railroad); Chief of Party;
Compressor and Blower Type Units (used) Independenty or Mounted On Dual Purpose Trucks, On Job Site or In Conduction with Job Site, In Loading and Unloading of Concrete, Cement, Fly Ash, Instantcrete, or Similar Type Materials); Compressor 92 or 3 in Battery); Concrete Finishing Machines; Concrete Saws and Cutters (ride on type); Concrete Spreaders, Hetzel, Rexomatic and Similar types; Concrete Vibrators; Conveyors, Under 125 ft), Crushing Machines, Ditching Machine, Small (ditchwitch, Vermeer or Similar type); Dope Dots (mechanical with or without pump), dumpsters; Elevator; Fireman; Forklifts (econombile, lull, and similar types of equipment); Front End Loaders (1 yd. and over but less than 2 yds.);
Generators (2 or 3 in Battery/ within 100 ft); Giraffe Grinders, Graders and Motor Patrols; Grout Pump; Gunnite Machines (excluding nozzle); Hammer Vibratory (in conjuction with generators); Hoists (Roof, Tuggeaerial Platform Hoist and House Cars), Hoppers, Hoppers Doors (power operated); Hydro-Blaster (where required); Ladders (Motorized); Laddervator; Locomotive, Dinky type;
Maintenance, Utility Man; Mechanics; Mixers (Excepting Paving Mixers); Motor Patrols and Graders; Pavement Breakers, Small, Self-Propelled ride on type (also Maintains Compressor or Hydraulic Unit); Pavement Breaker, Truck Mounted; Pipe Bending Machine (power); Pitch Pump;
Plaster Pump (regardless of size); Post Hold Digger (post pounder and auger); Rod Bending Machines (power); Roller, Black Top; Scales, (power); Seaman Pulverizing Mixer;
Shoulder Widener; Silos; Skimmer Machines (Boom Type);
Steel Cutting Machine, Services and Maintains; Tamrock Drill; Tractors; Tug Captain; Vibrating Plants (used in conjuction with unloading); welder and Repair Mechanics;
Concrete cleaning/decontamination machine operator;
Directional boring machine; Heavy equipment robotics operator; Master environmental maintenance operator, Ultra high pressure waterjet cuttting tool system operator;
Vacuum blasting machine operator
GROUP 4: Brooms and Sweepers; Chippers; Compressors (single);
Concrete Spreaders (small type); Conveyor Loaders (not including Elevator Graders); Engines, Large Diesel (1620 h.p.) and Staging Pump; Farm Tractors; Fertilizing Equipment (Operator and Maintenance of); Fine Grade Machine (small type); Form Line Graders (small type); Front End Loader (under 1 yd); Generator (single); Grease, Gas, Fuel and Oil Supply Trucks; Heaters (Nelson or Other Type Including Propane, Natural Gas or Flowtype Units); Lights, Portable Generating Light Plants; Mixers, Concrete Small;
Mulching Equipment (Operation and Maintenance of); Pumps (2 of Less Than 4 Inch Suction); Pumps 94 Inch Suction and Over Including Submersible Pumps); Pumps (Diesel Engine and Hydraulic); Immaterial of Power; Road Finishing Machines (Small Type); Rollers, Grade, Fill Or Stone Base; Seeding Equipment (Operation and maintence of); Sprinkler and Water Pump Trucks (Used on job Site or in conduction with Job Site); Steam Jennies and Boilers, Irrespective of Use;
Stone Spreader; Tamping Machines, Vibrating Ride On;
Temporary Heating Plant (welson or Other Type, Including Propane, Natural Gas or Flow Type Units); Water and Sprinkler Trucks (Used On Job Site In Conduction with Job Site); Welding Machines-Within 100 ft (Gas, and /or Electric Converters of Any type, single, two or three in a battery). welding system, multiple (rectifier transformer type) well point systems (including installation by bull gang and maintenance of); Off Road back dumps.
GROUP 5: Oiler, tire repair
GROUP 6: Helicopter pilots
ENGI0825-013 01/01/2018
Rates Fringes
Power equipment operators:
BUILDING CONSTRUCTION
STEEL ERECTION
GROUP 1....................$ 59.09 30.30
GROUP 2....................$ 57.43 30.30
GROUP 3....................$ 50.14 30.30
GROUP 4....................$ 47.48 30.30
GROUP 5....................$ 45.95 30.30
GROUP 6....................$ 44.19 30.30
GROUP 7....................$ 53.70 30.30
BUILDING CONSTRUCTION TANK
ERECTION
GROUP 1....................$ 58.81 30.30
GROUP 2....................$ 57.22 30.30
GROUP 3....................$ 53.70 30.30
GROUP 4....................$ 50.13 30.30
GROUP 5....................$ 44.92 30.30
OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES
GROUP 1....................$ 51.20 30.30
GROUP 2....................$ 49.55 30.30
GROUP 3....................$ 47.41 30.30
GROUP 4....................$ 45.91 30.30
GROUP 5....................$ 44.19 30.30
GROUP 6....................$ 53.13 30.30
RESIDENTIAL CONSTRUCTION
ALL JOB CLASSIFICATION.....$ 11.49 7.75
NOTES:
Hydrographic Premium .50 Hazmat Premium 20 percent Tunnel Premium .75
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day Thanksgiving Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day, Decoration Day provided the employee works one day in the calendar week during which the holiday occurs
POWER EQUIPMENT OPERATORS: STEEL ERECTION CLASSIFICATIONS
GROUP 1: Cranes (All Cranes, Land or Floating with Booms Including Jib 140 ft and over, Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms including Jib 140 ft and over above ground).
GROUP 2: Cranes (All Cranes, Land or Floating with Booms Including Jib Less Than 140 ft Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms Including Jib Less Than 140 ft above Ground).
GROUP 3: ""A"" Frame, Cherry Pickers 10 tons and under, Hoists Shall Also Include Steam, Gas, Desel, Electric, Air Hydraulic, Single and Double Drum Concrete, Brick Shaft Caisson, or Any Other Similar Type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type; Jacks:
Screw Air Hydraulic Power Operated unit or Console Type (not hand Jack or Pile Load Test Type); Side Booms.
GROUP 4: Aerial Platform used as Hoist; Compressor: 2 or 3 in Battery; Elevators or House Cars; Conveyors and Tugger Hosits; Chief of Party; Fireman; Forklift; Generators (2 or 3); Maintenance (Utility Man); Rod Bending Machine (power);
Welding Machines (Gas or Electric, 2 or 3 in Battery, Including Diesels); Captain: Power Boats: Tug Master: Power Boats.
GROUP 5: Compressor, Single; Welding Machine, Single, Gas, Diesel, and Electric Converters of any Type: Welding System Multple (Rectifier Transformer Type); Generator, Single.
GROUP 6: Oiler, staddle carrier
GROUP 7: Helicopter Pilot
For BUILDING CONSTRUCTION TANK ERECTION
NOTES:
Tunnel Premium .75 Hazmat Premium 20 % Hydrographic Premium .50
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day, Decoration Day provided the employee works one day in the calendar week during which the holiday occurs
POWER EQUIPMENT OPERATORS: TANK ERECTION CLASSIFICATIONS
GROUP 1: Operating Engineers on all Cranes, Derricks, etc with Booms Including Jib 140 ft or More Above Ground.
GROUP 2: Operating Engineer on all Equipment, Including Cranes, Derricks, etc with Booms Including Jib, Less Than 140 ft above the ground.
GROUP 3: Helicopter Pilot
GROUP 4: Air Compressors, Welding Machines and Generators are Covered and are Defined as Cover: Gas, Diesel, or Electric Driven Equipment and Sources of Power from a Permanent Plant: ie: Steam, Comgressed Air, Hydraulic or Other Power, For The Operating of any Machine or Automatic Tools, Used In The Erection, Alteration, Repair and Dismantling of Tanks and Any and All ""Dual Purpose"" Trucks Used On The Construction Job Site, or in the Loading and Unloading of Materials, at the Construction Job Site or in Conjuction with the Job Site.
GROUP 5: Oiler
For OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES NOTES:
Hydrographic Premium .50 Hazmat Premium 20% Tunnel Premium .75
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgivings Day, Christmas Day, Washington's Birthday, November Election Day, Veterans Day and Decoration Day provided the employee works one day in calendar week during which the holiday occurs.
OILSTATIC MAINLINES AND TRANSPORTATION PIPE LINES
CLASSIFICATIONS
GROUP 1: Backhoe; Cranes (all types); Draglines, Front End Loaders (5yds. and over), Gradalls, Helicopters (co-pilot), Helicopters (Communication Engineer); Scooper (Loader and Shovel) Koehring; Trench Machines.
GROUP 2: ""A"" Frame; Backhoe (Combination Hoe Loader); Boring and Drilling Machines; Ditching Machines, Small, Ditchwitch, Vermeer or Similar type; Forklifts; Front End Loaders 92 yds. and over but less than 5 yds.); Graders, Finish (fine); Hydraulic Cranes 10 tons and under (over 10 tons) Cranes Rate Applies); Side Booms: Winch Trucks (Hoisting).
GROUP 3: Backfiller; Brooms and Sweepers; Bulldozers;
Compressor (2 or 3 in battery); Chief of Party; Front End Loaders (under 2 yds); Generators; Giraffe Grinders;
Graders and Motor Patrols; Machanic; Pipe Bending Machine (power);Tractors; Water and Sprinkler Trucks used on Job Site or in Conduction with Job Site); Welder and Repair Mechanic; Captain (power boats); Tug Master (power boats).
GROUP 4: Compressor (single); Dope Pots (Mechanical with or without Pump); Dust Collectors; Pumps (4 inch suction and over); Pumps (2 of less than 4 inch suction); Pumps, Diesel Engine and Hydraulic (immaterial of power); Welding Machines, Gas or Electric Converters of any type- 2 or 3 in Battery Multple Welders; Well Point Systems (including installation and Maintenance); Farm Tractors.
GROUP 5: Oiler, grease, gas, fuel and oil supply trucks; Tire repair and maintenance
GROUP 6: Helicoter Pilot
IRON0417-001 07/01/2019
Rates Fringes
IRONWORKER.......................$ 39.58 45.20+a
a) Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, Day after Thanksgiving (unpaid), Christmas Day.
LABO0754-001 04/01/2018
Rates Fringes
LABORER
BUILDING & RESIDENTIAL
CONSTRUCTION
Hazardous Waste Handler.....$ 39.05 21.95+a
BUILDING & RESIDENTIAL
CONSTRUCTION
Air track operators, joy drill operators............$ 37.90 21.95+a All types of landscaping, pit men, dump men, building laborers (clean up), Flag Persons..........$ 33.80 21.95+a Blasters...................$ 37.05 21.95+a Bull float man, stud or riveting gunman, all scalers, power buggy operators (all types), mixer men, (by machine or hand), power saw (all types), brush king, jackhammer, jib rig operators, pavement breakers, vibrator men, powder men, ramset operators, torchmen, cement spray men, gunite nozzle men, sandblasting, all other machine or semi-skilled and asbestos and hazardous waste removal;...$ 37.05 21.95+a Form setter, liners, joint setters, top concrete men...............$ 37.35 21.95+a Hod carriers, scaffold and runway men, steel rod carrriers, rip rap and dry stone layers, concrete laborer, mason tenders, piplayers, (all types), signal men, rail and fence men (all types), core drillers, wrecking and demolition men;.......................$ 36.81 21.95+a
HEAVY & HIGHWAY
CONSTRUCTION
Hazardous Waste Handler Category A:................$ 41.50 23.30+a Category B:................$ 41.50 23.30+a Category C:................$ 41.50 23.30+a Category D:................$ 41.50 23.30+a
HEAVY & HIGHWAY
CONSTRUCTION
GROUP 1....................$ 45.00 23.30+a GROUP 2....................$ 41.50 23.30+a GROUP 3....................$ 39.75 23.30+a GROUP 4....................$ 36.20 23.30+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving day; Christmas Day, President's Election Day; Non-Presidental Election day; and Veterans Day, provided the employee works two days or reported to work two days in the work week and was unable to work.
For HEAVY & HIGHWAY CONSTRUCTION
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, Christmas Day, President's Birthday, Presidental Election Day, Veterans Day provided the employee works one day in the calendar week during which the holiday occurs.
LABORERS HEAVY/HIGHWAY CLASSIFICATIONS
GROUP 1: Blasters
GROUP 2: Track Operator; Joy Drill Operator
GROUP 3: Nipper, Power Buggy Operator; Plaster Tender; Mixer Man (by Machine or hand); Scaffold Runway Man; Power Saw;
Brush King; Steel Rod Carrier; Jack Hammer; Wagon Driller;
Jib Rig Operator; Pavement Breaker; Vibrator Man; Bit Grinder; Powder Man; Ramset Operator; Rip Rap and Dry Stone Layer; Cement Spray Man; Gunnite Nozzle Man; Spray and Nozzle Man on Mulching and Seeding Machine; Sand Blaster;
Concrete Saw; All other Machine or Semi-Skilled Men;
Asbestos and Hazardous Waste Removal; Concrete Laborer;
Building Laborer; Mason Tender; Carpenter Tender; Pipe Layer (all types); Signal Man; Gabion Basket Assembler;
Bull Float Man; Form Setter; Liner; Joint Setter; Sheeter;
Tip Concrete Man; Stud or Riveting Gun Man; All Scalers;
Asphalt Men (all types); Rail and Fence (all types); Core Driller; Wrecking and Demolition Man; Bar Man; Seeder;
Planter; Landscape Men (all types), Ax Man; Pit and Dump Men; Road Laborer
GROUP 4: Flag Person
PAIN0009-010 05/01/2019
Rates Fringes
GLAZIER..........................$ 46.05 43.37
PAIN0155-004 05/01/2018
Rates Fringes
Painters:
Drywall Finisher............$ 36.19 22.76 Lead Abatement Work.........$ 36.19 22.76 Painter/Paperhanger.........$ 36.19 22.76 Spray Rate..................$ 37.19 22.76
PAIN0806-001 10/01/2018
Rates Fringes
Painters:
Structural Steel and Bridge.$ 49.50 41.88
PLUM0373-001 05/01/2019
Rates Fringes
PLUMBER
PLUMBERS AND STEAMFITTERS...$ 46.92 39.72
REFRIGERATION...............$ 32.49 23.87
SINGLE FAMILY DWELLINGS.....$ 16.60 4.95
SFNY0669-002 01/02/2020
Rates Fringes
SPRINKLER FITTER.................$ 45.52 25.95
SHEE0038-001 07/01/2019
Rates Fringes
Sheet metal worker...............$ 44.74 42.51
TEAM0445-001 05/01/2019
Rates Fringes
Truck drivers:
GROUP 1.....................$ 33.25 35.55+a GROUP 1A....................$ 34.39 35.55+a GROUP 2.....................$ 32.69 35.55+a
GROUP 3.....................$ 32.47 35.55+a GROUP 4.....................$ 32.36 35.55+a GROUP 5.....................$ 32.24 35.55+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Labor Day, President's Day, Presidential Election Day, Veterans Day, Decoration Day, Independence Day, Thanksgiving Day and Christmas Day provided the employee works two days in any calendar week during which the holidays occurs.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Drivers on Letourneau tractors, double barrel euclids, Athey wagons and similar equipment (except when hooked to scrapers), I-beam and pole trailers, drivers of road oil distributors, tire trucks and tractors and trailers with 5 axles and over, Articulated Back Dumps and Articulated Water Trucks.
GROUP 1A: Drivers on detachable Gooseneck Low bed Trailers rated over 35 tons.
GROUP 2: Drivers on all equipment 25 yards and over, up to and including 30 yard bodies and cable dump trailers and powder and dynamite trucks.
GROUP 3: Drivers on all equipment up to and including 24 yard bodies, mixer trucks, dump crete trucks and similar types of equipment, fuel trucks, batch trucks and all other tractor trailers.
GROUP 4: Drivers on tri axles, ten-wheelers, grease trucks and tillermen.
GROUP 5: Drivers on pick-up trucks used for materials & parts, drivers on escort man over-the-road and drivers on straight trucks.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
*** SAFETY PAYS ***
Training Center Full Facility Revitalization P2# 464139 Orangeburg, NY CERTIFIED FINAL
01 02 00.00 48 Part 13 - 1 of 5
PART 13
FIRE PROTECTION DESIGN
13.1 DESIGN CRITERIA.
13.1.1 Design and install (labor, material, permits, licenses, etc.) the fire protection system. Fire protection system shall be designed, installed, and tested in accordance with Applicable Criteria listed in Part 2 and the latest edition of NFPA, and all associated local codes. All electrical work performed shall comply with the National Electrical Code (NFPA 70) for workmanship and installation requirements.
All life safety elements of the project shall be as required by the latest version of the Fire Protection/Life Safety Code Submittal and A/E Certification of Fire Protection and Life Safety Code Requirements.
13.2 FIRE PROTECTION SYSTEM DESIGN AND CALCULATIONS.
Amdt. #0004
13.2.1 The Training Center shall be protected in accordance with UFC 3-600-01, NFPA 13 and International Building Code. Provide a design narrative and calculations as indicated in the Army Reserve Design Process and Submittal Requirements. A registered fire protection engineer shall prepare preliminary calculations and provide the requirements for the fire protection system. The fire protection system shop drawings and hydraulic calculations shall be prepared by a NICET Level III or IV certified fire protection specialist or a Registered Fire Protection Engineer. Water velocity in the fire sprinkler system piping shall not exceed 20 feet per second. The Contractor shall be responsible for the installation, testing and field certifying of the entire system. The hazard classification requirements for this facility with regard to sprinkler protection are defined per the following:
13.2.1.1 Extra Hazard Group 1 Classified Areas. These areas include, but are not limited to, controlled waste and flammable storage areas.
13.2.1.3 Ordinary Hazard Classified Areas. These areas include, but are not limited to, kitchens, armorer’s rooms and arms vaults, mechanical rooms, electrical rooms, and small storage rooms where ceiling heights do not exceed 12 feet.
13.2.1.4 Light Hazard Group Classified Areas. All areas not classified as ordinary hazard or extra hazard areas including combustible attic space.
13.2.1.5 Storage Rooms/Areas: All storage areas (except small janitor closets, or small office supply closets) will be assumed to contain Class IV commodities unless a greater hazard is indicated. Storage of plastic storage cases shall be protected per UFC 3-600-01.
Part 13 - 2 of 5
13.2.1.5.1 Sprinkler protection must be based on the maximum potential height of storage. The maximum potential height of storage shall be based on the roof or ceiling height NOT the height of the shelving or cages.
13.2.1.5.2 Roof slope may not exceed a rise of 2 units per 12 units of run unless the protected space is provided with a flat ceiling.
13.2.1.5.3 The sprinkler design demand, minimum K-factor, and hose stream shall meet the more stringent of UFC 3-600-01 and NFPA requirements.
13.2.1.5.4 Cage areas may contain back to back shelf storage. Contractor shall review provided shelf type. Contractor shall provide vertical shelf backs meeting NFPA 13 criteria for all shelves that are arranged in a back to back configuration.
13.2.1.5.5 Provide placards in cage storage area stating: “No Storage Above Cages, per Fire Marshal”.
13.2.2 Preliminary flow test data is provided in Appendix B of this Statement of Work. This data shall be used by the Offeror to bid the fire suppression system including possible storage tank or fire pump.
13.2.3 The Contractor shall perform a water flow test in accordance with NFPA 291 at nearby hydrants to determine static and residual pressure and water flow. A fire protection engineer or an engineer experienced in water flow testing shall perform or witness the required flow testing.
13.2.4 If the contractors test data is different than the preliminary flow data provided in Appendix B, consult the Contracting Officer for determination of which test data to use for design.
13.2.5 Provide double check valve backflow preventer as required by the Local Authority Having Jurisdiction.
13.2.6 Provide a separate post indicator valve (PIV) monitored by the existing fire alarm control panel. Provide a new, Siamese fire department connection (FDC) for the building.
13.2.7 Unheated Storage Building: Not in the scope of this contract.
Amdt. #0004
13.2.8 Wet chemical fire protection system shall be provided for the kitchen hood and exhaust duct system within the Training Building in accordance with NFPA 17A and
NFPA 96.
Part 13 - 3 of 5
13.3 FIRE PROTECTION EQUIPMENT.
13.3.1 Recessed or concealed heads will be used in areas with ceilings. Upright or pendant heads will be used in exposed areas with no ceilings. Provide dry heads in areas subject to freezing.
13.3.2 Arms vault sprinkler heads shall be provided with head guards regardless of configuration (upright or pendant).
13.3.3 Sprinkler heads in telecommunications rooms shall have guards over them, sprinkler piping in telecommunications rooms shall have drainage troughs. Limit piping through these rooms to only that required for the room. Consider the use of side wall sprinklers, and location of telecommunications equipment and wiring trays etc.
13.3.4 A fire pump or fire pumps, if necessary, shall be provided in accordance with UFC 3-600-01. Provide an electric driven fire pump or pumps and controllers in accordance with NFPA 20.
13.3.5 Fire protection equipment shall be seismically restrained in accordance with UFC 3-600-01 and NFPA 13.
13.4 FIRE ALARM AND MASS NOTIFICATION SYSTEM.
13.4.1 Connect new fire alarm system and mass notification equipment to the existing fire alarm and mass notification system. The existing fire alarm control unit is the Edwards EST-3 panel and Silent Knight M5104B communicator. The Fire Alarm panel in the existing OMS building will be the “master” and the panel in the Training Center will be “secondary”.
13.4.2 Provide a complete UL listed addressable fire alarm and mass notification system with full control, supervisory, alarm, signal, display, and battery backup features in compliance with NFPA 72, UFC 3-600-01 and UFC 4-021-01.
13.4.3 Provide a Fire Alarm Remote Annunciator (FAA) Panel that indicates alarm conditions by device and with alarm silence control. Locate in the main entrance lobby, unless directed otherwise by the local fire department.
13.4.4 Provide Mass Notification System LOCs in accordance with UFC 4-021-01.
13.4.5 Provide addressable alarm initiating devices in compliance with NFPA 72 including:
13.4.5.1 Provide double action manual pull stations located at main exit, kitchen exit, exits adjoining assembly occupancies, and boiler room exit. Break-glass type pull stations are prohibited, including the break-glass rod types.
13.4.5.2 Provide photoelectric smoke detectors for fire-rated door hold-opens, fire shutter control, complete coverage of the TER.
Part 13 - 4 of 5
13.4.5.3 Provide photoelectric duct smoke detectors in all HVAC main supply ducts and in return ducts when system is greater than 15000 cfm. Provide duct smoke detectors to control fire/smoke dampers. An alternative to duct smoke detection is area smoke detection of associated smoke compartments. This may be included in the design when more economical than multiple duct smoke detectors.
13.4.5.4 Provide CO detection per UFC 3-600-01 and NFPA 72.
13.4.6 Notification Appliances. Provide audible and visual notification appliances in compliance with UFC 3-600-01, UFC 4-021-01 and NFPA 72 including:
13.4.6.1 Provide a weatherproof fire alarm bell or horn located on the outside of the building at the fire protection water service fire department connection in accordance with NFPA 13.
13.4.6.2 Provide audible notification appliances (speakers) throughout each building in accordance with the Americans with Disabilities Act – Accessibility Guidelines (ADA-AG). Provide audible notification appliances (speakers) on the exterior of buildings in accordance with UFC 4-021-01.
13.4.6.3 Provide visual notification appliances throughout each building in accordance with the ADA-AG and UFC 4-021-01. Provide clear strobes marked “ALERT” for fire alarm notification and mass notification.
13.4.6.4 Existing transmitter to remain.
13.4.7 Signal and Control.
13.4.7.1 Provide all initiation, notification, signal, and control wiring in conduit (EMT minimum).
13.4.7.2 Connect alarm initiating devices to Signal Line Circuits (SLC), Class B, in accordance with NFPA 72.
13.4.7.3 Connect alarm notification appliances to notification appliance circuits (NAC), Class B, in accordance with NFPA 72.
13.4.8 Provide magnetic door holders at selected locations.
13.4.9 System Testing.
13.4.9.1 Provide acceptance testing. Provide preliminary testing as required to complete system and submit the Certificate of Completion, in accordance with NFPA 72.
Provide final testing to complete and submit the Inspection and Testing Form, in accordance with NFPA 72.
13.4.10 Emergency Power
13.4.10.1 Provide battery backup for the fire alarm and mass notification system. If the fire. If the facility has an emergency generator providing standby power to the
Part 13 - 5 of 5 system, 4 hours backup is required. If no emergency generator exists, 72 hours is required. Provide 15 minutes of alarm operation. Battery calculations shall also show that batteries are capable of providing 60 minutes of mass notification alarm (without standby time).
| STANDARD FORM 30 |
| SUMMARY OF CHANGES |
| General Decision Number: NY20200020 |
| 01 02 00.00 48 - PART 13 - FIRE PROTECTION DESIGN |