About this file

This solicitation is for a new Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Design/Build construction projects within the Great Lakes and Ohio River Division boundaries. The scope includes new building construction, renovation, repairs, site work and civil works projects. Incidental services include demolition, utilities work, equipment upgrades and abatement. Designs shall be performed by registered professionals.

The MATOC will consist of up to seven firm-fixed-price IDIQ contracts with a three year base and two year option period, not to exceed $45 million total. This procurement is 100% set aside for HUBZone small businesses. The selection process will have two phases, evaluating past performance, technical approach and pro formas in Phase I to select up to ten companies for Phase II. The solicitation will be posted on SAM.gov and amendments issued there. Offerors must register on SAM.gov. The contract will be awarded by the Department of the Army Corps of Engineers Engineering District Louisville.

View the file

Other files

File Type Posted
4x6.pdf PDF
Hydrograph.pdf PDF
ERDC_ITL TR-19-7 _A_E_C Computer-Aided Design (CAD) _ Release 6.1_.pdf PDF
1LINE001 cables.pdf PDF
1LINE001 devices.pdf PDF
W912QR20R0014-0008.pdf PDF
W912QR20R0014-0007.pdf PDF
W912QR20R0014-0005.pdf PDF
W912QR20R0014-0004.pdf PDF
W912QR20R0014-0002.pdf PDF
W912QR20R0014-0001.pdf PDF
W912QR20R0014-0000.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Louisville District Operations HUBZONE Multiple Award Task Order Contracts U.S. Army Corps of Engineers Great Lakes and Ohio River Division Mission Boundaries

Specifications - PHASE II

Volume 2 of 2

11 March 2020

W912QR20R0014

09 November 2020

W912QR20R0014-0009

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR20R0014-0009

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0014 for the aw ard of up to seven (7) firm-fixed-price Indefinite Delivery Indefinite Quantity (IDIQ) Contracts to form a Design/Build Multiple Aw ard Task Order Contract (MATOC) to provide Construction Services for Operations and Maintenance (O&M) for Civil and Military Projects primarily w ithin the Great Lakes and Ohio River Division Mission Boundaries is hereby amended as follow s:

****SEE CONTINUATION PAGE AMDT 0009****

1. CONTRACT ID CODE PAGE OF PAGES

1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0014

X 9B. DATED (SEE ITEM 11)

11-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Nov-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

CONTINUATION PAGE AMDT 0009

SUMMARY OF CHANGES – AMENDMENT 0009

General Information:

1. The due date and time for Phase II proposal submission is hereby extended to 1300 HRS ET on Thursday, 19 November 2020.

2. As a reminder, there is not an Amendment 0003 or Amendment 0006 to this solicitation.

Section 00 22 16:

1. The Section 00 22 18 – Procedures for Submittal and Evaluation of Offers for Phase II is hereby revised under Section 00 22 16. Changes are annotated with “Amendment 0009******” markers and in bold text.

Section 00 73 00:

GENERAL DECISION OH20200082

1. General Decision Number OH20200082, Modification 6, dated 11/06/2020, is hereby added in its entirety and is only applicable to the Sample Project.

SAMPLE PROJECT PROVISIONS AND CLAUSES

2. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) is hereby revised to replace “180” with “210”.

Section 01 20 00.00 06:

1. Paragraph 3.4.1.4, EXISTING SITE UTILITIES, is hereby revised.

2. Paragraph 3.4.1.6, UTILITY OUTAGES, is hereby revised.

3. Task Order - Scope of Work – Appendix I – Motor Control Center Replacement and List of Attachments, is hereby revised.

All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 16-Nov-2020 01:00 PM to 19-Nov-2020 01:00 PM.

SECTION 00 22 16 - SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

The following have been modified:

SECTION 00 22 18 – PROCEDURES

PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE II

1. Overview

1.1 The intent of this solicitation is to select up to seven (7) contractors for a firm-fixed-price Multiple Award

Task Order Contract (MATOC) for primarily Design/Bid/Build (D/B/B) and Design/Build (D/B) Construction Activities for the Great Lakes and Ohio River Division Mission Boundaries.

1.2 This is a two-phase procurement. Following completion of the evaluation of Phase I, up to a maximum of ten (10) most highly qualified offerors will be selected to participate in Phase II. The selected offerors for Phase II will be invited to submit the information described in this Section 00 22 18, Procedures for Submittal and Evaluation of Offers for Phase II, for review and evaluation by the Government.

AMENDMENT 0009******

1.3 This sample project is for the Replacement of the Motor Control Center (MCC) Project at West Fork Lake, Hamilton County, Cincinnati, Ohio. The cost range is between $50,000 and $100,000.

AMENDMENT 0009******

1.4 The basis of award is the Best Value Trade-Off process. Following completion of the Phase II evaluation, the Contracting Officer will award a maximum of seven (7) firm-fixed-price Indefinite Delivery Indefinite (IDIQ) contracts to the responsible offerors whom the Source Selection Authority (SSA) determines conform to the solicitation, are fair and reasonable, and offer the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offers or to reject all offers. For Phase II submittals, requirements stated in this RFP are minimums.

NOTE: The rating information from Phase I will not be considered in Phase II or in the final selection.

2. Submittal of Offers

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror’s technical information, and management capabilities necessary for successful completion of the project. For the Phase II submittals, requirements stated in this RFP are minimums. Innovative, creative or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 Offerors shall submit their proposals in accordance with the ELECTONIC PROPOSAL

SUBMISSION INSTRUCTIONS no later than the time and date specified in Section 00 10 00 of Standard Form 30.

2.3 The Government is using a two-phase procurement approach for this design/build Indefinite Delivery

Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC). For Phase II, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted in accordance with the ELECTONIC PROPOSAL SUBMISSION INSTRUCTIONS. Phase II proposal sections should parallel the submission requirements identified herein.

2.4 Volume I for Phase II shall be submitted in accordance with the ELECTONIC PROPOSAL SUBMISSION INSTRUCTIONS and include the following information:

Volume I – Factor I: Design / Technical o Sub-factor 1 – Design Drawings o Sub-factor 2 – Design Narrative

Volume I – Factor II: Management Approach o Sub-factor 1 – Schedule Narrative o Sub-factor 2 – Management Plan

NOTE: Volume I shall be submitted in accordance with the “File Naming Convention” and “File Organization” paragraphs of the ELECTONIC PROPOSAL SUBMISSION INSTRUCTIONS. Failure to place the required submission information under the appropriate tab (factor or sub-factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted which exceeds the specified limit will not be evaluated.

2.5 Volume II for Phase II shall be submitted in accordance with the ELECTONIC PROPOSAL

SUBMISSION INSTRUCTIONS and include the following information:

AMENDMENT 0009******

Volume II – Tab A: A signed SF1442 acknowledging all amendments and Price Breakout Schedules (Sample Project and Binding Rates)

NOTE: Volume II, with the Price Breakout Schedule for the Sample Project and the Price Breakout Schedule for the Binding Rates, shall be submitted in accordance with the “File Naming Convention” and “File Organization” paragraphs of the ELECTONIC PROPOSAL SUBMISSION INSTRUCTIONS.

Failure to place the required submission information under the appropriate tab (factor or sub-factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.

3. Proposal Evaluation Process

3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the U.S. Army Corps of

Engineers will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical/quality proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors will not be revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Trade-Off Process, as stated in paragraph 1.4 above.

3.2 The evaluation process for Phase II essentially consists of four parts: proposal compliance review, technical evaluation, price evaluation, and cost/technical trade-off analysis.

3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and price proposal were received.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the proposals against the Phase II RFP requirements. The factors will be rated using an adjectival-based system.

3.2.3 Price Evaluation: The SSEB and SSA will evaluate price proposals independent of the technical evaluation.

The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Cost/Technical Trade-off Analysis: After all above evaluations and reviews are complete, the SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The SSA will then consider all factors to select the proposals offering the best value to the Government.

4. Phase II Proposal Information and Related Evaluation Factors

4.1 Phase II proposals will be evaluated in accordance with the factors and sub-factors below, listed in relative order of importance. All technical evaluation factors and sub-factors, other than cost or price, when combined, are approximately equal to cost or price. Offerors are reminded to include their best technical approach in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.

4.2 Volume I – Factor I: Design / Technical 1st

Sub-factor 1 – Design Drawings equal to Sub-factor 2 Sub-factor 2 – Design Narrative equal to Sub-factor 1

4.3 Volume I – Factor II: Management Approach 2nd

Sub-factor 1 – Schedule Narrative 1st Sub-factor 2 – Management Plan 2nd

4.4 Volume II – Price and Pro Forma Information

AMENDMENT 0009******

Tab A Standard Form 1442 and Price Breakout Schedules Not Rated

AMENDMENT 0009******

4.5 Ratings:

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Technical Assessment Ratings Adjectival Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is un-awardable.

4.6 Definitions:

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.

5. Volume I – Factor I: Design / Technical

5.1 Submission Requirements:

5.1.1 Sub-factor 1 – Design Drawings

Submit ANSI D half size scalable to fit 11” x 17” sheets. The proposed design drawings shall provide the information as follows:

MOTOR CONTROL CENTER FUNCTION

Include the following:

-Cabinet layout and dimensions -Proposed components and subfeatures -Component specifcations -Short circuit analysis -One line diagram

NOTE: There is a limit of 15 drawings for the Design Drawings sub-factor using 11” x 17” sheets. All information must be clearly legible. Any information that is not clearly legible may result in a lower rating if the evaluators cannot readily find the appropriate information.

5.1.2 Sub-factor 2 – Design Narrative

Provide a clear and concise narrative describing the project, while specifically addressing the following Motor Control Center Features:

-Cabinet and components -Site work/Utility connections and routing -Structural including any modification necessary to the existing base.

-Antiterrorism/Force Protection (AT/FP) features.

-Proposed components and subfeatures -One line diagram

NOTE: There is a limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Design Narrative sub-factor.

*Proposals SHALL address each bullet point for Sub-Factor 1 – Design Drawings and Sub-Factor 2 – Design Narrative or the proposal will be considered deficient and rated Unacceptable.

5.2 Evaluation Criteria:

5.2.1 Sub-factor 1 – Design Drawings

Design Drawings will be reviewed for thoroughness, functionality, quality of materials, and an understanding of the project requirements. Drawings that exceed the minimum requirements may receive additional consideration.

5.2.2 Sub-factor 2 – Design Narrative:

The Design Narrative will be evaluated for completeness and thoroughness, by including the building features of the RFP as outlined in the Statement of Work. Proposals that demonstrate a complete understanding of the project requirements in the Statement of Work, may receive additional consideration.

6. Volume I – Factor II: Management Approach

6.1 Submission Requirements:

6.1.1 Sub-factor 1 – Schedule Narrative

Based on the project budget and scope, provide a schedule narrative describing the construction sequence / process for successful completion of each phase of the project (Design, Construction, Commissioning and Close-Out) within the duration shown in Section 00 70 00, FAR Clause 52.211-10. Offerors may propose a shorter duration for completion, but Government review times shall not be shortened. The Schedule Narrative shall address the major construction milestones and tasks indicated below:

Design Phase / Packages Fast Tracking (if utilized) Pre-Construction Submittals and Review Long Lead Items Red Zone Meeting Quality Control and Testing As-Builts Work in occupied buildings/Phasing

NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Schedule Narrative sub-factor.

6.1.2 Sub-factor 2 – Management Plan

Provide a management plan narrative for the project that describes how your labor, resources, designers, subcontractors and material suppliers will be managed, supervised, coordinated and used to ensure successful completion of the project. Additionally, the Management Plan shall address the following information:

Identify significant areas of risk and provide your plan for mitigating risk during contract performance.

Describe your process for managing, coordinating and tracking changes that arise during the design and construction phases.

Provide an organizational chart for this project showing home office support, on-site management and the responsible chain of command. Joint venture offerors must show the respective areas of responsibility for each partner. Clearly delineate on-site from off-site personnel on the organizational chart.

NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for the Management Plan sub-factor.

*Proposals SHALL address each bullet point for Sub-Factor 1 – Schedule Narrative and Sub-Factor 2 – Management Plan or the proposal will be considered deficient and rated unacceptable.

6.2 Evaluation Criteria:

6.2.1 Sub-factor 1 – Schedule Narrative

The narrative will be evaluated based on the understanding of events identified in paragraph 6.1.1 above and the offeror’s capability to complete the schedule within the contract duration. Narratives that demonstrate a clear understanding of the schedule impacts of the major milestones and tasks and provide a thorough approach for successfully completing the contract within the contract duration may be rated more favorably by the SSEB.

NOTE: The SSEB will evaluate the offeror’s schedule narrative using calendar days, not dates.

6.2.2 Sub-factor 2 – Management Plan

Plans will be evaluated based on the level of understanding of the work and the involvement the contractor will have in the management, oversight, control, and coordination of the work performed during construction of the project. Plans will also be evaluated based on the level of understanding of project risks and the approach for minimizing these risks. The offeror’s organizational chart will be evaluated based on the clarity, adequacy, capabilities and strengths for managing a successful project. Plans that demonstrate a clear understanding of the project requirements and provide a thorough approach for successfully managing the project may be rated more favorably by the SSEB.

7. Volume II – Price and Proforma Information (Submit in a separate electronic file).

7.1 Tab A – Standard Form 1442 and Proposal Price Breakout Schedule.

7.1.1 Submission Requirements:

The offeror shall complete and submit Standard Form 1442 and the Proposal Price Breakout Schedules (Sample Project and Binding Rates). Both of the Price Breakout Schedules are included in Section 00 10 00 of this solicitation.

7.1.2 Evaluation Criteria:

The Total Evaluated Price to be used for evaluation purposes will be determined by adding the Total Estimated MATOC Price (Base plus Option) and the Total Proposal Price of the Sample Project. Offerors must complete all of the Price Breakout information for the purpose of evaluation. The price for the Sample Project, as well as the binding rates that make up the Total Estimated MATOC Price, will be reviewed by the SSEB and Contracting Officer/SSA for fairness and reasonableness through the use of price analysis. Price will also be checked for unbalancing of line items. Offerors are cautioned to distribute costs appropriately. The SSEB and Contracting Officer/ SSA will also confirm that the proposed binding rates are used for the Sample Project. Proposed prices that do not utilize the proposed binding rates will be considered Unacceptable.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

GENERAL DECISION OH20200082

General Decision Number: OH20200082 11/06/2020 Superseded General Decision Number: OH20190082 State: Ohio Construction Type: Building County: Hamilton County in Ohio.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 05/01/2020 3 06/12/2020 4 07/10/2020 5 09/25/2020 6 11/06/2020

* ASBE0008-010 03/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 30.07 18.75

BROH0018-008 06/01/2019

Rates Fringes

BRICKLAYER.......................$ 28.66 14.66

TILE FINISHER....................$ 24.20 14.01

TILE SETTER......................$ 28.74 14.06

CARP0002-008 05/01/2017

Rates Fringes

CARPENTER (Accoustical Ceiling Installation Only).......$ 24.04 15.29

CARP0002-014 05/01/2017

Rates Fringes

CARPENTER (Including Drywall Hanging, Metal Stud Installation and Form Work;

Excludes Acoustical Ceiling Installation)....................$ 30.42 16.99

* ELEC0212-010 06/03/2020

Rates Fringes

ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 31.30 19.07

ELEV0011-002 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 47.23 34.765+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ENGI0018-036 05/01/2019

Rates Fringes

POWER EQUIPMENT OPERATOR

Backhoe/Excavator/Trackhoe;

Bulldozer; Crane............$ 37.14 15.20

ENGI0018-037 05/01/2018

Rates Fringes

POWER EQUIPMENT OPERATOR

Bobcat/Skid Steer/Skid Loader......................$ 35.89 15.09

ENGI0066-045 06/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

Forklift....................$ 28.87 19.66 Grader/Blade................$ 32.42 19.66 Mechanic....................$ 32.92 19.66

IRON0044-003 06/01/2020

Rates Fringes

IRONWORKER, REINFORCING..........$ 30.27 21.40

IRON0044-019 06/01/2020

Rates Fringes

IRONWORKER (Ornamental and Structural)......................$ 30.47 21.20

LABO0265-017 06/01/2018

Rates Fringes

LABORER

Common or General...........$ 22.45 16.20

LABO0265-019 06/01/2018

Rates Fringes

LABORER

Mason Tender - Brick........$ 21.95 16.20

PAIN0123-001 05/01/2019

Rates Fringes

PAINTER (Brush and Roller).......$ 25.30 10.20

PAIN0387-002 11/01/2017

GLAZIER..........................$ 26.00 14.15

PLAS0132-018 06/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.40 14.95

PLAS0132-019 06/22/2018

Rates Fringes

PLASTERER........................$ 24.25 14.65

PLUM0392-005 06/01/2020

Rates Fringes

PIPEFITTER (Includes HVAC Pipe Installation)...............$ 33.91 22.29 PLUMBER (Excludes HVAC Pipe Installation)....................$ 33.91 22.29

ROOF0042-007 08/01/2020

Rates Fringes

ROOFER...........................$ 28.45 17.05

SFOH0669-009 01/02/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 37.88 23.96

SHEE0024-029 06/01/2020

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation Only).....$ 31.51 21.03

* UAVG-OH-0021 01/01/2019

Rates Fringes

OPERATOR: Oiler.................$ 27.56 16.37

SUOH2012-084 08/29/2014

ELECTRICIAN (Low Voltage Wiring Only).....................$ 22.28 8.63

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 26.19 8.99

LABORER: Landscape & Irrigation.......................$ 23.60 0.87

LABORER: Mason Tender - Cement/Concrete..................$ 23.87 9.80

LABORER: Pipelayer..............$ 23.18 8.95

OPERATOR: Loader................$ 29.66 12.61

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29

OPERATOR: Roller................$ 29.85 12.00

PAINTER: Spray..................$ 22.78 12.40

TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SAMPLE PROJECT PROVISIONS/CLAU

SAMPLE PROJECT CLAUSES

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $350 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

11.0% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is the State of Ohio, county of Hamilton, and city of Cincinnati.

(End of provision)

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by NONE.

(b) Weather conditions: The Contractor shall make their own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being:

(c) Transportation facilities: Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.

(d) Historical data for all areas may be obtained from:

U. S. Department of Commerce National Climatic Center Federal Building Asheville, N. C. 28801

52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings.

(End of Summary of Changes)

TABLE OF CONTENTS

SECTION 01 20 00.00 06

Task Order SCOPE OF WORK

Design/Build 02/13

SECTION 01 20 00.00 06 Page 1 - 2

1.0 PROJECT INFORMATION 1

1.1 GENERAL 1

1.2 SCOPE OF WORK 1

1.3 SITE LOCATION 1

1.4 EXISTING SITE UTILITIES 2

1.5 BID OPTIONS. Not Used. 2

1.6 ATTACHMENTS 2

1.7 PERMITS 2

1.8 ENVIRONMENTAL REQUIREMENTS 2

1.9 NOT USED 3

1.10 NOT USED 3

1.11 NOT USED 3

1.12 NOT USED. 3

1.13 PERSONNEL REQUIREMENTS AND QUALIFICATIONS 3

2.0 DESIGN REQUIREMENTS 4

2.1 GENERAL 4

2.2 DESIGN 5

2.3 REQUEST FOR PROPOSAL (RFP) INTENT 5

2.4 COORDINATION BETWEEN THE VARIOUS DISCIPLINES 5

2.5 QUALITY OF WORK 5

2.6 RFP DESIGN AND TECHNICAL CRITERIA 6

2.7 APPLICABLE BUILDING CODES AND STANDARDS 7

2.8 ACCESSIBILITY REQUIREMENTS. NOT USED. 8

2.9 FORCE PROTECTION & ANTI‐TERRORISM CONSIDERATIONS 8

2.10 UNITS OF MEASUREMENT 8

2.11 REQUIRED DESIGN PROFESSIONALS 8

2.12 DESIGN SUBMITTAL DISTRIBUTION MATRIX 8

3.0 GENERAL CONSTRUCTION REQUIREMENTS 9

3.1 SUMMARY 9

3.2 GENERAL INFORMATION 9

3.3 DOCUMENTATION 10

TABLE OF CONTENTS

SECTION 01 20 00.00 06 Page 2 - 2

3.4 CONSTRUCTION CONSIDERATIONS 10

3.6 CONTRACTOR DAMAGED FINISHES 16

4.0 Electrical 16

‐‐End of Section ‐‐ 16

SECTION 01 20 00.00 06 Page 1 - 16

1.0 PROJECT INFORMATION

1.1 GENERAL

Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Motor Control Center (MCC) Project at West Fork Lake, Hamilton County, Cincinnati, Ohio to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.

1.2 SCOPE OF WORK

Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes removal and disposal of existing motor control center equipment; and providing a new MCC in the control tower at West Fork Lake.

Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable and sustainable space.

The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget.

The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.

All demolition required to construct the project is included as part of the work of this Contract.

1.3 SITE LOCATION

This project is located at West Fork Lake, 10558 McKelvey Road Cincinnati, OH 45240-3930, Hamilton County.

SECTION 01 20 00.00 06 Page 2 - 16

1.4 EXISTING SITE UTILITIES

1.4.1 The contractor shall verify the capacity of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project. The contractor shall provide their own generator for electrical power requirements for their own equipment while the motor control center is being replaced.

Amendment 0009******

1.5 BID OPTIONS. Not Used.

1.6 ATTACHMENTS

Amendment 0009******

Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.

a. APPENDIX I: APPENDIX I Includes narrative of electrical scope of work, project site photos of affected equipment, one line diagram of existing motor control center, an elevation of existing MCC, one-line electrical diagrams, a hydrograph, and a CAD file (AEC-borders). Amendment 0009******

1.7 PERMITS

The Contractor shall investigate and submit any permits necessary for the construction of this project. All permit applications shall be completed by the Contractor and provided to the Contracting Officer for submittal to the appropriate agency. Contractor shall pay all permit fees. Copies of all permits shall be provided to the USACE.

1.8 ENVIRONMENTAL REQUIREMENTS

1.8.1 Environmental Compliance: The contractor shall comply with the National Environmental Protection Act.

1.8.2 Dust Control: Contractor shall maintain all work areas free from excess dust to such reasonable degree as to avoid causing a hazard to base personnel or surrounding facilities. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.

1.8.3 Asbestos: No asbestos containing material shall be used.

1.8.4 SDS Sheets: A Safety Data Sheet (SDS) is required for all building materials except for wood, glass, or steel. The SDS will be submitted to the Contracting Officer within seven (7) calendar days after the NOTICE TO PROCEED.

1.8.5 Hazardous Materials Management: Contractor will provide the Contracting Officer (KO) the Safety Data Sheets (SDS) for chemical materials to be used during the project prior to the contract award in accordance with FAR Clause 52.223-3. The Contractor will provide SDSs’ to the Contracting Officer for review prior to the contractor bringing products on the installation. The

Amendment 0009******

SECTION 01 20 00.00 06 Page 3 - 16 contractor must inventory all chemical materials, including but not limited to:

solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils, brought on base. A chemical material inventory must be maintained when used containing the nomenclature, manufacturer, part number, quantity, storage location, and the process in which the material is used. All chemical materials will be managed in accordance with federal, state, local, and Installation regulations.

1.8.6 Paint: All paints must meet Green Seal Certification and be low VOC.

See the table below for additional guidance. Paint containing lead will not be used during any painting process. An SDS will be submitted for all paint products used.

For this kind of product:

VOCs (in g/L) shall not exceed:

Flat Topcoat 50

Non-Flat Topcoat 100

Primer or Undercoat 100

Floor Paint 100

Anti Corrosive Coating 250

Reflective Wall Coating 50

Reflective Roof Coating 100

1.8.7 Not Used.

1.8.8 Not Used.

1.8.9 Waste Water: Absolutely no chemical products will be allowed to be dumped in any drainage system, storm drain, wash rack, septic system or sanitary sewer. All remaining and residual chemicals will be taken away by the contractor.

1.8.10 NOT USED

1.8.11 Not Used.

1.9 NOT USED

1.10 NOT USED

1.11 NOT USED

1.12 NOT USED.

1.13 PERSONNEL REQUIREMENTS AND QUALIFICATIONS

1.13.1 In addition to the superintendent, CQC staff and safety staff required by this section and Section 01 45 04.10 06 and 01 35 26.00 06, the contractor shall provide a full time Construction Project Manager for the entire life of

SECTION 01 20 00.00 06 Page 4 - 16 this contract including both the design and construction phases. The Construction Project Manager shall have a degree in Construction Management or Engineering and shall have 10 years of relative experience in construction management. The superintendent shall not assume other duties.

1.13.2 The SSHO shall be assigned as SSHO, but may have duties as the CQC System Manager and shall NOT be…