W912QR20B0001-0003.pdf
PDF 2 MB Posted
- Attached to
- WPAFB Fire/Crash Rescue Station
- Solicitation number
- W912QR20B0001
About this file
This is a submittal register for a solicitation to design and construct a Fire/Crash Rescue Station at Wright Patterson Air Force Base in Ohio, with an estimated construction cost between $5-10 million. Key specifications and submittal requirements include structural, HVAC, electrical, and fire protection systems. Bidders must provide shop drawings, product data, samples, design calculations, test reports, manufacturer instructions, and operation/maintenance documentation for building components and systems. A pre-bid meeting will be held, and the Army Corps of Engineers will administer the contract. The winning bidder must meet small business size standards, and HUBZone preferences apply. The response due date is not provided.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: MARCEL D HULL
600 DR M L KING JR PL RM 821
LOUISVILL KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20B0001 for the WPAFB Fire/Crash Rescue Station is hereby amended as follow s:
A. The follow ing SPECIFICATION SECTIONS have been replaced in their entirety:
1. PROJECT TABLE OF CONTENTS
2. SUBMITTAL REGISTER
3. 00 80 00.00 06 - SPECIAL PROVISIONS
4. 01 35 26.00 06 - GOVERNMENT SAFETY REQUIREMENTS
5. 01 45 04.10 06 - CONTRACTOR QUALITY CONTROL
B. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0001
X 9B. DATED (SEE ITEM 11)
27-Jan-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Mar-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0001-0003
460865 Fire/Crash Rescue Station F/34017
Wright-Patterson AFB, Ohio
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
Amdt. #0002
01 01 50 PROJECT GENERAL REQUIREMENTS (WPAFB)
Amdt. #0002
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 04 10 AIRFIELD PROJECT REQUIREMENTS (WPAFB)
01 14 00 WORK RESTRICTIONS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
Amdt. #0003
01 78 23 DELETED
Amdt. #0003
DIVISION 02 - EXISTING CONDITIONS
01 09 10 OZONE DEPLETING SUBSTANCE RECOVERY (WPAFB)
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
Amdt. #0002
07 14 00 DELETED
Amdt. #0002
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
Amdt. #0002
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
Amdt. #0002
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 36 13 SECTIONAL OVERHEAD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 11 - EQUIPMENT
11 31 13 SPECIALTY EQUIPMENT
11 44 00 FOOD COOKING EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
22 15 09.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING PROCEDURES
22 15 26.00 20 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL (DDC) FOR HVAC AND OTHER LOCAL
BUILDING SYSTEMS (WPAFB)
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 4
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 21 13 RADON MITIGATION (WPAFB)
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 05 23 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 86 PAGES
BEJV WPAFB Fire-Crash Rescue Station
00 80 00.00 06 SD-01 Preconstruction Submittals
1.28 GLabor, Equipment, and Material
Report
1.28 GDaily Equipment Report
SD-02 Shop Drawings
1.41 GMechanical/Electrical Room
Layout
SD-04 Samples
1.16 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
SF1413 Statement and
Acknowledgement
1.45Progress Photographs
SD-07 Certificates
1.16Warranty of Construction
1.15 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.32Insurance
1.30Sales and Use Tax
SD-11 Closeout Submittals
1.7.4 GPreliminary (Working) As-Built
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 86 PAGES
00 80 00.00 06 1.7.1 GFinal As-Built Drawings
1.7.1.2 GCAD Working As-Built Drawings
1.16 GWarranty Management Plan
01 01 50 SD-01 Preconstruction Submittals
1.8 GReduced Pressure Principle
Backflow Device
SD-11 Closeout Submittals
1.19 GFinal BUILDER Update Form
01 02 20 SD-01 Preconstruction Submittals
3.1 GContractor's Environmental
Coordinator
3.3 GApplication for Authorization -
Environmental Restoration Site
Disturbance
3.4.2 GErosion Control Plan
3.4.4 GSanitary or Wastewater Permit to
Install (PTI)
3.4.5 GDrinking Water Plans Approval
3.5.1Ohio EPA Notification of
Demolition and
Renovation/Abatement
3.5.2 GAsbestos Work Plan
3.5.9 GCertificate of Conformity
3.5.10Boiler Startup Information
3.8 GSite Specific Spill Plan (SSSP)
3.9.2HAZMAT Summary
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 86 PAGES
01 02 20 3.10.3 GWPAFB Form 1433 - Hazardous
Waste Storage Permit
3.11.3 GCertification of Recovered and
Biobased Products
3.12 GPermit Applications for UST work
SD-06 Test Reports
3.5.3Asbestos Abatement Clearance
Air Sampling Report
3.7 GRecycling and Solid Waste
Summary Report
SD-11 Closeout Submittals
3.11.3 GGreen Products Determination
Form (GPDF)
01 04 10 SD-01 Preconstruction Submittals
3.2Work Area Lighting And
Barricade Plan
G, 88 OSS/OSAM, 88 ABW/SEF
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4 GProject Schedule
SD-05 Design Data
3.5.2Narrative Report
3.5.4Schedule Reports
3.4.3 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
G ROSubmittal register
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 86 PAGES
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.1.1 GSustainability Action Plan
1.4 GLEED AP BD+C
GDesign Phase High Performance and Sustainable Building Checklist
1.5.1.4 GSustainability Progress Report
SD-11 Closeout Submittals
1.5.1.2 GFinal Sustainability eNotebook
1.5.1.2 GAmended Final Sustainability
eNotebook
1.5.1.2 GFinal High Performance and
Sustainable Building Checklist
1.7.1.2 GUSGBC GPA Certificates
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Lead Compliance Plan &
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 86 PAGES
01 35 26.00 06 1.7Asbestos Abatement Plan &
Specifications
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Crystalline Silica Assessment
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Excavation/Trenching Plan
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Confined Space Entry
Procedures
1.7Confined Space Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 86 PAGES
01 35 26.00 06 1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.3 G ROConstruction Quality Control Plan
01 46 00.00 06 SD-01 Preconstruction Submittals
1.3 G DOCommissioning Specialists
1.6.2 G DOProject Schedule
SD-05 Design Data
G DODesign Review Report
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 86 PAGES
01 46 00.00 06 3.1.2 G DOConstruction Phase
Commissioning Plan
1.4Issues Log
3.1.4.5Trend Log Report
3.3Trend Log Report
3.2 G DOCommissioning Report
SD-07 Certificates
1.5 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.5 G DOSystems Training
3.1.6 G ROTraining Plan
3.1.7 G DOSystems Manual
3.1.8 G DOMaintenance and Service Life
Plans
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
02 09 10 SD-01 Preconstruction Submittals
GWork Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 86 PAGES
02 09 10 SD-07 Certificates
1.1 GCertified Refrigerant Technician
1.1 GCertified Recovery of Recycling
Equipment
3.1 GForm 1471
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.10Existing Conditions
03 15 00.00 10 SD-02 Shop Drawings
2.4 GWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
2.4Waterstops
GSplicing Waterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 G AEReinforcement
SD-07 Certificates
2.3Reinforcing Steel
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 86 PAGES
03 30 00 1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 GJoint Sealants
2.4.4 GJoint Filler
2.3.1 GCementitious Materials
2.4.6 GVapor Retarder
2.4.1 GConcrete Curing Materials;
2.6 GReinforcement
2.4.3.1 GLiquid Chemical Floor Hardeners
and Sealers
2.3.4 GAdmixtures
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1 GFly Ash
1.6.4.1 GPozzolan
1.6.4.2 GSlag Cement
1.6.4.3 GAggregates
3.13.2.3 GCompressive Strength Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 86 PAGES
03 30 00 Chloride Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.4Safety Data Sheets
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
03 30 53 SD-02 Shop Drawings
1.4 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
2.2.9Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
2.3 GMix Design Data
2.4.2Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 86 PAGES
03 30 53 SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.2Aggregates
03 35 00.00 10 SD-04 Samples
1.3.1Field Test Panels
Sample Wall Panels
1.3.1.1Slab Panels
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 41 33 SD-02 Shop Drawings
2.1 GFabrication Drawings
2.1 GInstallation Drawings
SD-05 Design Data
2.1.1.1 GNormal-Weight Concrete
SD-06 Test Reports
2.1.1.1 GNormal-Weight Concrete
Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 86 PAGES
03 41 33 GUnit Weight
Anchorages
SD-07 Certificates
1.3.2Installers
1.3.1Manufacturer
2.1.1.1 GNormal-Weight Concrete
Aggregate
2.2.7Pretensioning
Welding Procedures
SD-08 Manufacturer’s Instructions
Installation Instructions
Welding Sequence and
Procedure
2.3.5Epoxy-Resin Grout
2.3.5Epoxy-Resin Adhesive
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 86 PAGES
05 30 00 SD-02 Shop Drawings
1.3.4 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.4Galvanizing Repair Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.3Welder Qualifications
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.6.2 GMetal Framing Calculations
05 50 13 SD-02 Shop Drawings
2.5 GBollards/Pipe Guards
2.8 GRoof Hatches
SD-03 Product Data
2.8 GRoof Hatches
2.6 GDownspout Terminations
05 51 33 SD-02 Shop Drawings
2.3Ladders
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 86 PAGES
05 51 33 SD-03 Product Data
2.3Ladders
Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
SD-03 Product Data
2.2.1 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
06 10 00 SD-02 Shop Drawings
2.1.1 GNailing Strips
SD-03 Product Data
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
2.2Oriented Strand Board
2.3.2Adhesives
SD-06 Test Reports
1.4.4Preservative-treated
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 86 PAGES
06 10 00 SD-07 Certificates
1.7Preservative Treatment
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.6 GHardware and Accessories
SD-04 Samples
1.4 GSamples
SD-07 Certificates
1.6.1.1 GCertificates of Grade
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.4.1Qualifications
2.3Fabrications
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter Tops
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 86 PAGES
07 05 23 2.2 GThermal Imaging Camera
SD-05 Design Data
GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 21 13 SD-03 Product Data
2.1 GBlock or Board Insulation
GVapor Retarder
SD-07 Certificates
2.1 GBlock or Board Insulation
GVapor Retarder
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.4.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.3Accessories
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 86 PAGES
07 21 16 3.3.1Insulation
07 27 10.00 10 SD-06 Test Reports
3.1.2 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
1.8.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
1.8.1 GQualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 86 PAGES
07 27 19.01 1.8.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 86 PAGES
07 27 26 3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
1.4.5 GGutter/Downspout Assembly
SD-03 Product Data
2.1 GRoof Panels
SRecycled Content for Aluminum
Roof Panels
2.1.1 SRecycled Content for Steel Roof
Panels
2.2.2 SEnergy Star Label for Metal
Roofing Product
SHeat Island Reduction
1.4.5 GFactory-Applied Color Finish
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 86 PAGES
07 41 13 2.4 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
GUnderlayments
2.7 GGaskets and Sealing/Insulating
Compounds
1.4.5 GCoil Stock
1.4.5 GAluminized Steel Repair Paint
1.4.5 GEnamel Repair Paint
1.4.5 GGalvanizing Repair Paint
SD-04 Samples
2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GGaskets and Sealant/Insulating
Compounds
SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SD-06 Test Reports
1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
GFire Rating Test Report
2.2 GFactory Finish and Color
Performance Requirements
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 86 PAGES
07 41 13 2.1 GRoof Panels
1.4.5 GCoil Stock Compatibility
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
2.6 GInsulation
1.4.5 GInstallation Manual
SD-09 Manufacturer’s Field
Reports
3.10.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.11 GInformation Card
07 42 13 SD-01 Preconstruction Submittals
1.6.3 GQualification of Manufacturer
1.6.4 GQualification of Installation
Contractor
1.9Warranty
SD-02 Shop Drawings
1.6.1.1 GInstallation Drawings
SD-03 Product Data
2.1Recycled Content;
2.2.1 GWall Panels
2.2.2Factory Color Finish
1.6.5Closure Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 86 PAGES
07 42 13 2.6.4.4Pressure Sensitive Tape
2.6.4.1Sealants and Caulking
1.6.3.1Galvanizing Repair Paint
1.6.3.1Enamel Repair Paint
Aluminized Steel Repair Paint
1.6.5Accessories
2.6Accessories
SD-04 Samples
2.2.1 GWall Panels
1.6.3.1 GFasteners
2.6.3 GMetal Closure Strips
2.2.2.5 GColor chart
SD-05 Design Data
1.6.1.2 GWind load design analysis
SD-06 Test Reports
3.8.2 GLeakage Tests
1.3.2 GWind Load Tests
1.4.2 GWind Load Tests
2.2.2.6 GCoating
2.2.2.6 GChalking
SD-07 Certificates
1.6.3.1 GCoil Stock
1.6.3.1 GFasteners
1.6.3.1 GGalvanizing Repair Paint
1.6.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 86 PAGES
07 42 13 3.3 GInstallation
SD-09 Manufacturer’s Field
Reports
3.9.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.9 GWarranty
1.6.6 GMaintenance Instructions
1.9.120 year 'No Dollar Limit' warranty for labor and material
07 60 00 SD-02 Shop Drawings
3.1.6 GFlashing at Roof Penetrations
and Equipment Supports
SD-08 Manufacturer’s Instructions
1.4.2 GInstructions for Installation
SD-10 Operation and Maintenance
Data
1.4.2 GCleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 86 PAGES
07 84 00 1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
SD-07 Certificates
GIndoor Air Quality
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.4 GFrames
2.2Accessories
2.6Weatherstripping
08 11 16 SD-02 Shop Drawings
1.5.1 GDoor and Frame Assembly
SD-03 Product Data
1.5.1 GDoor and Frame Assembly
2.2.3Recycled Content of Aluminum
Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 86 PAGES
08 11 16 SD-04 Samples
1.5.2 GFinish Samples
SD-05 Design Data
1.2.1 GCalculations
1.2.2 GAir Infiltration
1.2.3 GWater Penetration
1.2.4 GNFRC Project Label Certificates
for Fenestration
SD-08 Manufacturer’s Instructions
1.5.1 GDoor and Frame Assembly
1.5.5 GAdjustments, Cleaning, and
Maintenance
1.2.4 GNFRC Project Label Certificates
for Fenestration
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.1.2 GSound Transmission Class
Rating
SD-04 Samples
2.3.6.3 GDoor Finish Colors
SD-11 Closeout Submittals
1.4Warranty
08 31 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 86 PAGES
08 31 00 1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GAcoustical Ratings of Assemblies
08 36 13 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 GDoors
2.6 GElectric operators
SD-08 Manufacturer’s Instructions
2.2Doors
SD-10 Operation and Maintenance
Data
2.2 GDoors
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.9Fabrication Drawings
SD-03 Product Data
2.1 GWindows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 86 PAGES
08 51 13 Recycled Content of Aluminum
Windows
Energy Star Label For Residential
Aluminum Window Products
2.2.8.1 GHardware
2.2.3 GFasteners
1.10 GWindow Performance
2.3 GThermal-Barrier Windows
2.4 GMullions
2.2.10 GScreens
2.2.2 GWeatherstripping
2.2.8 GAccessories
1.10.5 GThermal Performance
SD-04 Samples
1.4.2.1Finish Sample
1.4.2.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.4.3 GDesign Analysis
SD-06 Test Reports
1.4.4Minimum Condensation
Resistance Factor
1.4.4Resistance to Forced Entry
1.10.2.2Standard Airblast Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 86 PAGES
08 51 13 SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.5 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
08 81 00 SD-03 Product Data
1.3Glazing Accessories
SD-04 Samples
2.3.1.1Sealant
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 86 PAGES
08 91 00 2.2Metal Wall Louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
2.1.5Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.10Accessories
2.1.1Gypsum Board
SD-07 Certificates
2.1 GAsbestos Free Materials
09 30 10 SD-02 Shop Drawings
3.2Detail Drawings
G architect
SD-03 Product Data
2.1.1Porcelain Tile
G architect
Setting-Bed
2.3Mortar, Grout, and Adhesive
Reinforcing Wire Fabric
SD-04 Samples
2.1Tile
G architect
2.3.3Grout
SD-07 Certificates
2.3 SIndoor Air Quality for Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 86 PAGES
09 30 10 2.3.4 SIndoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
GAcoustical Ceiling Systems
2.2.1.1Recycled Content for Type III
Ceiling Tiles
2.2.1.1Recycled Content for Type IV
Ceiling Tiles
2.3Recycled Content for Suspension
Systems
SD-04 Samples
2.2.1.1 GAcoustical Ceiling Tiles
SD-06 Test Reports
2.1.1 GCeiling Attenuation Class and
Test
SD-07 Certificates
2.2.1.1Indoor Air Quality for Type III
Ceiling Tiles
2.2.1.1Indoor Air Quality for Type IV
Ceiling Tiles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 86 PAGES
09 51 00 2.2.2.1Indoor Air Quality for Humidity
Resistant Ceiling Tiles
Indoor Air Quality for Sealants
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.4Adhesives
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 86 PAGES
09 68 00 2.1 GCarpet
2.1.1 SRecycled Content for Carpeting
2.4 GMoldings
2.3 SIndoor Air Quality for Aerosol
Adhesives
2.3 SIndoor Air Quality for Non-Aerosol
Adhesives
2.3 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1.1 SIndoor Air Quality for Carpet
2.1.2 SIndoor Air Quality for Carpet
SIndoor Air Quality for Fiber
Cushion
SIndoor Air Quality for Rubber
Cushion
SIndoor Air Quality for
Polyurethane-Foam Cushion
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 86 PAGES
09 68 00 SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
3.7.2Maintenance Service
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-02 Shop Drawings
3.8Piping identification
3.8stencil
SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
SD-04 Samples
1.8 GColor
SD-07 Certificates
1.3Applicator's qualifications
SD-08 Manufacturer’s Instructions
3.2.1Application instructions
3.5.2Mixing
1.6.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings:
10 14 00.20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 86 PAGES
10 14 00.20 1.4.1Detail Drawings
G, architect
SD-03 Product Data
3.1Installation
G, architect
1.6Warranty
SD-04 Samples
1.3 GSoftware
SD-10 Operation and Maintenance
Data
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
GInstallation Drawings
SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.7Colors And Finishes
2.2.1Anchoring Devices and Fasteners
2.2.3Hardware and Fittings
2.2.2Brackets
2.2.4Door Hardware
2.5Pilaster Shoes
2.2.3.2 G AEFinishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 86 PAGES
10 21 13 SRecycled content for plastic, solid polyethylene partitions and screens
SD-04 Samples
2.7 GColors and Finishes
2.2.3Hardware and Fittings
2.2.1Anchoring Devices and Fasteners
SD-07 Certificates
1.6Warranty
2.3Indoor air quality for solid phenolic, black core partitions and screens
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 GCorner Guards
SD-04 Samples
2.4 GFinish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .