W912QR-43534997_Specs-0000.pdf
PDF 2 MB Posted
- Attached to
- Cannelton Fixed Weir Repair
- Solicitation number
- W912QR-43534997
About this file
This is a solicitation letter and specifications document for a construction project to repair the fixed weir at Cannelton Locks & Dam in Hancock County, Kentucky. The solicitation is restricted to holders of MATOC contracts W91237-23-D0003 through W91237-23-D-0009 for Design-Build Land Based Construction Projects.
The U.S. Army Corps of Engineers Louisville District is seeking proposals for construction services only, with an estimated cost between $250,000-$500,000. The work includes repair of concrete cap of sheet pile cell 2, with a bid option for additional concrete demolition and new concrete for cracked/delaminated areas. Proposals are due by February 19, 2025 at 12:00 PM Eastern Time to Joel Huberman. A site visit is scheduled for February 12, 2025 at 10:00 AM at the Cannelton Lock & Dam Visitors Center. The period of performance is 270 calendar days after Notice to Proceed. Payment and performance bonds are required. The contract will be awarded based on lowest evaluated price, and proposals must be valid for 60 days. The Davis-Bacon Act wage determination IN20240006 dated 12/20/2024 applies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR-43534997-0006.pdf | ||
| W912QR-43534997_Specs-0005.pdf | ||
| W912QR-43534997-0004.pdf | ||
| W912QR-43534997-0003.pdf | ||
| W912QR-43534997-0002.pdf | ||
| W912QR-43534997-0001_.pdf | ||
| W912QR-43534997_Plans-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Cannelton Fixed Weir Repair, Cannelton Locks & Dam, Hancock County, KY
P2: 128624
Design-Build Specifications - Vol. 2 Certified Final Design
24 January 2025
W912QR-43534997
MATOC
W9123723D0003-23D0009 All requirements of the base MATOC Volume 1 of 2 shall apply to this Task Order unless noted otherwise.
ARIMS: 1200 Disposition: Permanent
W912QR-43534997_Specs-0000
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
CELRL-CT 24 January 2025
Massillon Construction & Supply LLC Mi-De-Con, Inc.
Aleut Flood Management, LLC Brannon Construction & Maintenance Services, LLC
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W91237-23-D0003 through W91237-23-D-0009, to provide Design Bid Build Land Based Construction Projects assigned to the Rivers Districts (LRH, LRL, LRN & LRP) of the Great Lakes and Ohio River Division.
We request you submit a price proposal for Cannelton Fixed Weir Repair located at Cannelton Locks & Dam, Cannelton, Indiana, detailed in the scope of work and specifications enclosed in this letter. All vendors must be registered in the SAM database prior to submitting a proposal.
The cost range is Between $250,000.00 and $500,000 per FAR 36.204 Disclosure of the magnitude of construction projects.
PLEASE NOTE: THIS IS FOR CONSTRUCTION SERVICES ONLY: the effective DBA Wage Rate for this requirement is IN20240006 dated 12/20/2024.
Please note, as stated in the Base Contract, the following clauses have been updated to reflect the specific Task Order requirements:
FAR 52.211-10 Commencement, Prosecution, and Completion of Work.
FAR 52.211-12 Liquidated Damages-Construction.
FAR 52.211-13 Time Extensions.
DFARS 252.236-7001 Contract Drawings and Specifications.
FAR 52.236-4 Physical Data.
FAR 52.236-1 Performance of Work by the Contractor.
FAR 52.246-21 Warranty of Construction.
FAR 52.228-5 Insurance-Work on a Government Installation.
FAR 52.228-7 Insurance-Liability to Third Persons.
FAR 52.236-27 Site Visit Construction Alt. I DFARS 252.236-7002 Obstruction of Navigable Waterways.
The basis for award of this task order is lowest evaluated price. Please complete the price breakout schedule and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.
Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due.
Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.
Proposals are due no later than 12:00 PM Eastern Time on Wednesday, 19 February 2025. Please submit your proposal by email to Joel Huberman at Joel.Huberman@usace.army.mil.
Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Joel Huberman.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (8ERW4M-286KIK).
Government responses will be limited to:
(a) Notice that an amendment will be issued;
(b)Reference to an existing requirement contained in the solicitation; or
(c) Notice that a response is not necessary.
The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the proposal due date. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the proposal due date stated in this letter.
If you have contractual questions, please contact Joel Huberman at the email address provided above. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, Matthew P. Judd Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
PLEASE NOTE THAT THE FOLLOWING PAGE NUMBERING MAY NOT BE ACCURATE
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Project Number is: W912QR-43534997 The Bidder Inquiry Key is: 8ERW4M-286KIK
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret
Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S.
Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
00 10 00
PRICE BREAKOUT SCHEDULE
Project: Cannelton Fixed Weir Repair
Location: Cannelton Locks & Dam, Cannelton, IN
Base Bid Items
Item No. Description Qty. Unit Unit Price Total Price
1 Repair of Concrete Cap of Sheet Pile Cell 2 1 Job N/A $
Total Base Bid Price $
Bid Options
Item No. Description Qty. Unit Unit Price Total Price
Additional Concrete Demolition and New Concrete for Cracked/Delaminated Area of Sheet Pile Cell 2
31 Cubic Yards N/A $
Option Total Price $
Base Plus All Options Total Price $
GENERAL:
* Please refer to the specifications for full item descriptions for any particular item.
** Proposals will be evaluated based on the total base price/proposal plus all options.
*** Bid Options may be exercised at any time during the Period Of Performance (POP).
ITEM NOTES:
Item No. 1: This item includes all costs associated with completion of the project base work as described in the plans and specifications.
BID OPTION NOTES:
Bid Option Item No. 2: Includes all costs associated with completion of the optional work as described in the plans and specifications.
Section 00 75 00 Clauses
52.211-10 Commencement, Prosecution, and Completion of Work.
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days after Notice to Proceed is issued. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages-Construction.
LIQUIDATED DAMAGES-CONSTRUCTION (SEPT 2000)
(a)If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $885.00 for each calendar day of delay until the work is completed or accepted.
(b)If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause
52.211-13 Time Extensions (Sept 2000)
TIME EXTENSIONS (Sept 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
252.236-7001 Contract Drawings and Specifications.
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general—
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
See Drawing Sheet Number GI001
52.236-4 Physical Data.
Physical Data (Apr 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Concrete Cores. Cores and soil samples from results of site investigations are available for inspection at various locations in the Louisville area, subject to prior arrangement at the Office of the District Engineer, Engineering Division, Steven Hite, 600 Dr. Martin Luther King, Jr. Place, Louisville, Kentucky 40201,
(502) 315-6450.
(b) Weather conditions NATIONAL WEATHER SERVICE - CENTRAL REGION. The Contractor shall make his own investigations as to weather conditions at the site. Data may be obtained from various National Weather Service (NWS) offices located generally at airports of principal cities, the nearest to this project being:
Owensboro, KY.
(c) Transportation facilities: Roads and railroads in the general area are shown on the drawings. Access ways shall be investigated by the Contractor to satisfy himself as to their existence and allowable use.
(d) Hydrographs are included in drawings.
Historical data for all areas may be obtained from:
U. S. Department of Commerce National Climatic Center Federal Building Asheville, N. C. 28801
52.236-1 Performance of Work by the Contractor.
Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.228-5 Insurance-Work on a Government Installation.
Insurance-Work on a Government Installation (Jan 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective-
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
52.228-7 Insurance-Liability to Third Persons.
Insurance-Liability to Third Persons (Mar 1996)
a) (1) Except as provided in paragraph (a)(2) of this clause, the Contractor shall provide and maintain workers’ compensation, employer’s liability, comprehensive general liability (bodily injury), comprehensive automobile liability (bodily injury and property damage) insurance, and such other insurance as the Contracting Officer may require under this contract.
(2) The Contractor may, with the approval of the Contracting Officer, maintain a self-insurance program, provided that, with respect to workers’ compensation, the Contractor is qualified pursuant to statutory authority.
(3) All insurance required by this paragraph shall be in a form and amount and for those periods as the Contracting Officer may require or approve and with insurers approved by the Contracting Officer.
(b) The Contractor agrees to submit for the Contracting Officer’s approval, to the extent and in the manner required by the Contracting Officer, any other insurance that is maintained by the Contractor in connection with the performance of this contract and for which the Contractor seeks reimbursement.
(c) The Contractor shall be reimbursed-
(1) For that portion-
(i) Of the reasonable cost of insurance allocable to this contract; and
(ii) Required or approved under this clause; and
(2) For certain liabilities (and expenses incidental to such liabilities) to third persons not compensated by insurance or otherwise without regard to and as an exception to the limitation of cost or the limitation of funds clause of this contract. These liabilities must arise out of the performance of this contract, whether or not caused by the negligence of the Contractor or of the Contractor’s agents, servants, or employees, and must be represented by final judgments or settlements approved in writing by the Government. These liabilities are for-
(i) Loss of or damage to property (other than property owned, occupied, or used by the Contractor, rented to the Contractor, or in the care, custody, or control of the Contractor); or
(ii) Death or bodily injury.
(d) The Government’s liability under paragraph (c) of this clause is subject to the availability of appropriated funds at the time a contingency occurs. Nothing in this contract shall be construed as implying that the Congress will, at a later date, appropriate funds sufficient to meet deficiencies.
(e) The Contractor shall not be reimbursed for liabilities (and expenses incidental to such liabilities)-
(1) For which the Contractor is otherwise responsible under the express terms of any clause specified in the Schedule or elsewhere in the contract;
(2) For which the Contractor has failed to insure or to maintain insurance as required by the Contracting Officer; or
(3) That result from willful misconduct or lack of good faith on the part of any of the Contractor’s directors, officers, managers, superintendents, or other representatives who have supervision or direction of-
(i) All or substantially all of the Contractor’s business;
(ii) All or substantially all of the Contractor’s operations at any one plant or separate location in which this contract is being performed; or
(iii) A separate and complete major industrial operation in connection with the performance of this contract.
(f) The provisions of paragraph (e) of this clause shall not restrict the right of the Contractor to be reimbursed for the cost of insurance maintained by the Contractor in connection with the performance of this contract, other than insurance required in accordance with this clause; provided, that such cost is allowable under the Allowable Cost and Payment clause of this contract.
(g) If any suit or action is filed or any claim is made against the Contractor, the cost and expense of which may be reimbursable to the Contractor under this contract, and the risk of which is then uninsured or is insured for less than the amount claimed, the Contractor shall-
(1) Immediately notify the Contracting Officer and promptly furnish copies of all pertinent papers received;
(2) Authorize Government representatives to collaborate with counsel for the insurance carrier in settling or defending the claim when the amount of the liability claimed exceeds the amount of coverage; and
(3) Authorize Government representatives to settle or defend the claim and to represent the Contractor in or to take charge of any litigation, if required by the Government, when the liability is not insured or covered by bond. The Contractor may, at its own expense, be associated with the Government representatives in any such claim or litigation.
52.246-21 Warranty of Construction.
Warranty of Construction (Mar 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph
(i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
(1) The Contractor’s failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
52.236-27 Site Visit (Construction).
Alternate I (Feb 1995).
If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision:
a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-
Wednesday 12 February 2025
1000: Meet at Visitors Center 1015: Walk Site Location 1100: Leave
(c) Participants will meet at-
All attendees are required to meet at Cannelton Lock & Dam Visitors Center at 1000 hrs.
Cannelton Lock & Dam U.S. Army Corps of Engineers 5281 E. State Road 66 Cannelton, IN 47520
No inquiries will be allowed during the site visit. All inquiries must be submitted via the ProjNet Bidder Inquiry site. A Bidder Key is provided with the solicitation information. Please RSVP the following information:
1. Name of Attendee(s)
2. Company
3. Phone Number and Email Address
Please remember to bring a Current State Issued ID in order to attend the site visit.
The following Personal Protective Equipment (PPE) is required: Steel Toe Boots, Hard Hat, and a Reflective Vest.
Send RSVP to nicholas.j.bibelhauser@usace.army.mil , USACE must receive the email by Noon hours EST. on 10 February 2025. No additional attendees will be registered after this date or time.
252.236-7002 Obstruction of Navigable Waterways.
OBSTRUCTION OF NAVIGABLE WATERWAYS (DEC 1991)
(a) The Contractor shall—
(1) Promptly recover and remove any material, plant, machinery, or appliance which the contractor loses, dumps, throws overboard, sinks, or misplaces, and which, in the opinion of the Contracting Officer, may be dangerous to or obstruct navigation;
(2) Give immediate notice, with description and locations of any such obstructions, to the Contracting Officer; and
(3) When required by the Contracting Officer, mark or buoy such obstructions until the same are removed.
(b) The Contracting Officer may—
(1) Remove the obstructions by contract or otherwise should the Contractor refuse, neglect, or delay compliance with paragraph (a) of this clause; and
(2) Deduct the cost of removal from any monies due or to become due to the Contractor; or
(3) Recover the cost of removal under the Contractor's bond.
(c) The Contractor's liability for the removal of a vessel wrecked or sunk without fault or negligence is limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 410 et. seq.).
Wage Determination
"General Decision Number: IN20240006 12/20/2024
Superseded General Decision Number: IN20230006
State: Indiana
Construction Types: Heavy and Highway
Counties: Adams, Allen, Bartholomew, Benton, Blackford, Boone, Brown, Carroll, Cass, Clark, Clay, Clinton, Crawford, Daviess, Dearborn, Decatur, DeKalb, Delaware, Dubois, Elkhart, Fayette, Floyd, Fountain, Franklin, Fulton, Gibson, Grant, Greene, Hamilton, Hancock, Harrison, Hendricks, Henry, Howard, Huntington, Jackson, Jasper, Jay, Jefferson, Jennings, Johnson, Knox, Kosciusko, Lagrange, Lawrence, Madison, Marion, Marshall, Martin, Miami, Monroe, Montgomery, Morgan, Newton, Noble, Ohio, Orange, Owen, Parke, Perry, Pike, Posey, Pulaski, Putnam, Randolph, Ripley, Rush, Scott, Shelby, Spencer, Starke, Steuben, Sullivan, Switzerland, Tippecanoe, Tipton, Union, Vanderburgh, Vermillion, Vigo, Wabash, Warren, Warrick, Washington, Wayne, Wells, White and Whitley Counties in Indiana.
* EXCEPT LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 02/16/2024 3 03/01/2024 4 03/22/2024 5 03/29/2024 6 04/05/2024 7 04/19/2024 8 05/03/2024 9 05/17/2024 10 05/31/2024 11 06/14/2024 12 07/05/2024 13 07/12/2024 14 07/19/2024 15 07/26/2024 16 08/09/2024 17 08/16/2024 18 08/23/2024 19 08/30/2024 20 09/06/2024 21 09/13/2024 22 09/20/2024 23 10/04/2024 24 10/18/2024 25 11/01/2024 26 11/15/2024 27 11/22/2024 28 11/29/2024 29 12/06/2024 30 12/20/2024
ASBE0008-004 03/01/2024
DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES
Rates Fringes
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 34.23 21.94
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wettings, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 25.00 13.70
ASBE0017-008 06/01/2024
NEWTON COUNTY:
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 55.02 35.75
HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION,
WETTING, STRIPPING REMOVAL
SCRAPPING, VACUUMING, BAGGING
AND DISPOSAL OF ALL
INSULATION MATERIALS, WHETHER
THEY CONTAIN ASBESTOS OR NOT,
FROM MECHAINCAL SYSTEMS).........$ 44.02 32.76
ASBE0018-005 06/01/2024
BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON, KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, PUTNAM, RUSH, SHELBY, STARKE, TIPPECANOE, TIPTON, VERMILLION, VIGO, WARREN and WHITE Counties
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 38.55 23.53
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40
ASBE0037-004 04/02/2024
DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PIKE, POSEY, SPENCER, SULLIVAN, VANDERBURGH AND
WARRICK COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials protective coverings, coatings an finishes to all types of mechanical systems. Also the application of firestopping, material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement.)...$ 27.19 22.06
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 33.44 21.84
ASBE0041-002 07/01/2024
ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN,
WABASH, WELLS AND WHITLEY COUNTIES:
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 35.10 19.39
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings, stripping, removal, scrapping, vaccuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 35.10 19.39
ASBE0051-003 03/01/2024
CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, ORANGE, PERRY, SCOTT, and WASHINGTON Counties
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 29.31 18.47
HAZARDOUS MATERIAL HANDLER
(includes preparation, wettings, stripping, removal, scrapping, vaccuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 19.80 13.30
* ASBE0079-002 07/01/2024
RANDOLPH AND WAYNE COUNTIES
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems)..............$ 38.56 18.70
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)).............$ 38.56 18.70
BRIN0003-001 06/01/2023
INDIANAPOLIS
BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN and SHELBY COUNTIES
Rates Fringes
Bricklayer, Stone Mason, Pointer, Caulking................$ 36.24 17.39
TERRAZZO FINISHER................$ 23.38 13.15
TERRAZZO WORKER/SETTER...........$ 36.38 17.24
Tile & Marble Finisher...........$ 24.33 13.16 Tile, Marble Setter..............$ 35.63 17.23
BRIN0004-004 06/01/2024
FORT WAYNE
ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:
Rates Fringes
BRICKLAYER (STONE MASON,
MARBLE MASONS, POINTER,
CLEANER, AND CAULKER)............$ 35.00 21.60
Terrazzo Grinder Finisher........$ 31.00 17.89 Terrazzo Worker Mechanic.........$ 36.30 22.04 Tile Setter & Marble Mason Mechanic.........................$ 31.55 19.08 Tile, Marble & Terrazzo Finisher.........................$ 31.55 19.08
BRIN0004-005 06/01/2024
CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, and WARRICK Counties
Rates Fringes
BRICKLAYER.......................$ 35.34 21.72
TILE FINISHER....................$ 29.08 17.32
TILE SETTER......................$ 29.08 17.32
BRIN0004-009 06/01/2024
BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY and
SWITZERLAND COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 35.21 18.19
TERRAZZO FINISHER................$ 25.33 14.19
TERRAZZO WORKER/SETTER...........$ 37.97 18.06
Tile & Marble Finisher...........$ 25.33 14.19 Tile, Marble Setter..............$ 37.22 18.05
BRIN0004-010 06/01/2024
CLARK, FLOYD, and HARRISON Counties
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONEMASONS
AND CEMENT MASONS...........$ 33.70 16.57
BRIN0004-015 06/01/2024
TERRE HAUTE
CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION and VIGO COUNTIES
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS
and POINTER/
CLEANER/CAULKER.............$ 38.16 18.22
CEMENT MASON (Greene and Sullivan Counties)..........$ 27.78 11.02
CEMENT MASON (REMAINING
COUNTIES)...................$ 37.16 18.22
TERRAZO FINISHER............$ 25.33 14.19
TERRAZZO WORKER.............$ 37.97 18.06
TILE LAYER, MARBLE MASON,
MOSAIC WORKER...............$ 38.16 18.22
BRIN0004-016 06/01/2024
MUNCIE
BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH,
RUSH, TIPTON, UNION and WAYNE COUNTIES
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 35.83 20.89
TERRAZZO FINISHER................$ 25.33 14.19
TERRAZZO WORKER/SETTER...........$ 37.97 18.06
Tile & Marble Finisher...........$ 25.33 14.19 Tile & Marble Setter; Mosaic Worker...........................$ 35.83 20.89
BRIN0006-001 06/01/2023
JASPER, NEWTON & STARKE COUNTIES
Rates Fringes
BRICKLAYER (Including Stonemason, and Pointer, Caulker & Cleaner)...............$ 42.05 28.22 Tile, Marble & Terrazzo Worker...$ 42.05 28.22
BRIN0011-001 06/01/2023
LAFAYETTE
BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN and WHITE COUNTIES
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 33.75 20.12
TERRAZZO FINISHER................$ 23.38 13.15
TERRAZZO WORKER/SETTER...........$ 36.38 17.24
Tile & Marble Finisher...........$ 24.33 13.16
Tile & Marble Setter; Mosaic Worker...........................$ 35.63 17.23
BRIN0018-002 06/01/2023
CASS, ELKHART, FULTON, GRANT, HOWARD, KOSCUISKO, LAGRANGE, MARSHALL, MIAMI, PULASKI, WABASH
Rates Fringes
Bricklayer, Caulker, Cleaner, Pointer..........................$ 34.00 19.71
CARP0002-023 04/01/2024
DEARBORN, JACKSON, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES
Rates Fringes
CARPENTER........................$ 29.28 27.90
CARP0133-001 04/01/2024
BOONE, CLAY, FOUNTAIN, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, VERMILLION AND
VIGO COUNTIES
Rates Fringes
CARPENTER........................$ 32.93 24.91
CARP0133-003 04/01/2024
HAMILTON, HANCOCK, HENDRICKS, JOHNSON (Townships of Clark, Camp Atterbury north of Hospital Road, Pleasant, White River), and MARION Counties
Rates Fringes
CARPENTER........................$ 34.04 24.91
CARP0175-004 04/01/2024
CLARK, FLOYD, HARRISON, JEFFERSON,SCOTT AND WASHINGTON COUNTIES
Rates Fringes
CARPENTER........................$ 28.71 28.47
CARP0215-002 04/01/2024
BENTON, CARROLL, CLINTON, PULASKI, TIPPECANOE, WARREN AND WHITE COUNTIES
Rates Fringes
CARPENTER........................$ 33.43 24.37
CARP0224-011 04/01/2024
CRAWFORD, DUBOIS, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK COUNTIES:
Rates Fringes
CARPENTER........................$ 28.78 28.40
CARP0224-012 04/01/2024
DAVIESS, GIBSON, GREENE, KNOX, LAWRENCE, MARTIN, ORANGE AND SULLIVAN COUNTIES:
CARPENTER........................$ 29.13 28.45
CARP0232-003 04/01/2024
ALLEN, DEKALB, LAGRANGE, NOBLE, STEUBEN and WHITLEY COUNTIES
Rates Fringes
CARPENTER........................$ 32.10 25.04
CARP0301-001 04/01/2024
BARTHOLOMEW, BROWN,(Camp Atterbury south of Hospital Road), DECATUR, FRANKLIN, JOHNSON (Townships of Blue River, Franklin, Hensley, Needham, Nineveh, Union), RUSH AND SHELBY
COUNTIES
Rates Fringes
CARPENTER........................$ 32.49 24.91
CARP0413-003 04/01/2024
ADAMS, CASS, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, MARSHALL, MIAMI, TIPTON, WABASH AND WELLS COUNTIES:
Rates Fringes
CARPENTER........................$ 32.42 24.87
CARP0999-001 06/01/2024
JASPER, NEWTON, AND STARKE COUNTIES
Rates Fringes
CARPENTER........................$ 43.58 34.68
CARP1016-001 04/01/2024
BLACKFORD, DELAWARE, FAYETTE, HENRY, JAY, MADISON, RANDOLPH, UNION AND WAYNE COUNTIES
Rates Fringes
CARPENTER........................$ 32.69 24.91
CARP1076-004 04/01/2016
HAMILTON and MARION Counties, and the following Townships in JOHNSON County: Camp Atterbury (North of Hospital Rd.), Clark, Pleasant, and White River
Rates Fringes
MILLWRIGHT.......................$ 26.81 19.28
CARP1076-005 06/01/2017
JASPER, NEWTON, PULASKI, and STARKE Counties
MILLWRIGHT.......................$ 37.66 26.42
CARP1076-006 06/01/2018
BARTHOLOMEW, BLACKFORD, BOONE, BROWN, CLAY, DECATUR, DELAWARE, FAYETTE, FOUNTAIN, FRANKLIN, HAMILTON, HANCOCK, HENDRICKS, HENRY, JAY, JOHNSON, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, RANDOLPH, RUSH, SHELBY, UNION, VERMILLION, VIGO, AND WAYNE COUNTIES
Rates Fringes
MILLWRIGHT.......................$ 28.18 22.39
CARP1080-001 04/01/2021
GIBSON, GREENE, POSEY, SULLIVAN, VANDERBURGH and WARRICK COUNTIES
Rates Fringes
MILLWRIGHT
ZONE 1
POSEY, VANDERBURGH and
WARRICK COUNTIES...........$ 30.92 24.83
ZONE 2
GIBSON, GREENE AND
SULLIVAN COUNTIES..........$ 29.64 25.77
ELEC0016-003 04/01/2023
CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE, PERRY, PIKE, POSEY,
SPENCER, VANDERBURGH, WARRICK
Rates Fringes
ELECTRICIAN......................$ 41.04 18.94
ELEC0016-006 08/31/2024
CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE, PERRY, PIKE, POSEY,
SPENCER, VANDERBURGH, WARRICK
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 33.98 18.04
ELEC0071-006 01/02/2024
DEARBORN, OHIO, and SWTIZERLAND COUNTIES
Rates Fringes
Line Construction:
Equipment Operator..........$ 39.11 4%+15.57 Groundman...................$ 25.90 4%+12.93 Lineman & Cable Splicers....$ 44.52 4%+16.65
ELEC0153-003 06/01/2023
ELKHART, KOSCIUSKO and MARSHALL COUNTIES
Rates Fringes
Communication Technician.........$ 26.50 18.33
ELECTRICIAN......................$ 38.00 26.47
Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to , sound and voice transmission/transference systems, communication systems that transmit or receive information and /or control systems, television and video systems, micre-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.
ELEC0212-002 11/30/2023
DEARBORN, OHIO, and SWITZERLAND COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 27.20 14.54
ELEC0212-009 06/07/2024
DEARBORN, OHIO, and SWITZERLAND COUNTIES
Rates Fringes
ELECTRICIAN......................$ 35.43 22.05
ELEC0305-003 12/01/2023
ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WELLS, and WHITLEY
COUNTIES
Rates Fringes
ELECTRICIAN......................$ 38.31 27.43%+10.66
ELEC0305-004 08/31/2023
ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN, WELLS, and WHITLEY
COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 34.50 18.74
ELEC0369-005 05/29/2024
CLARK, FLOYD, HARRISON, JACKSON, JEFFERSON, SCOTT, and WASHINGTON Counties
Rates Fringes
ELECTRICIAN......................$ 37.88 21.38
ELEC0481-003 03/31/2024
BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS, JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM, RIPLEY, RUSH AND SHELBY COUNTIES
Rates Fringes
ELECTRICIAN......................$ 42.15 26.88
ELEC0481-004 01/01/2023
BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS, JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM, RIPLEY, RUSH AND SHELBY COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 35.76 18.96
ELEC0531-002 05/31/2023
JASPER, PULASKI, and STARKE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 43.50 30.64
ELEC0531-003 05/28/2018
JASPER, PULASKI, and STARKE COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 27.64 13.23
ELEC0538-005 06/01/2023
FOUNTAIN, VERMILLION, and WARREN Counties
Rates Fringes
ELECTRICIAN......................$ 39.09 24.37
ELEC0538-009 09/01/2024
FOUNTAIN, VERMILLION, and WARREN Counties
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 38.88 19.02
ELEC0668-001 06/01/2023
BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHITE COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 33.02 16.10
ELEC0668-002 06/01/2024
BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHITE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 39.33 23.05
FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, July 4th, Labor Day, Veterans Day Thanksgiving Day and Christmas Day
ELEC0697-003 08/31/2024
NEWTON COUNTY
ELECTRICIAN (Communication Technician Only).................$ 39.50 29.87
ELEC0697-006 06/01/2024
NEWTON COUNTY
Rates Fringes
ELECTRICIAN......................$ 48.10 31.28
ELEC0702-003 01/02/2024
DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH COUNTIES
Rates Fringes
Line Construction:
GROUNDMAN, Class A..........$ 32.81 30% + 8.60
GROUNDMAN-EQUIPMENT
OPERATOR (All other equipment)..................$ 41.73 30% + 8.60
HEAVY-EQUIPMENT OPERATOR
(All crawler type equipment D-4 and larger)...$ 47.63 30% + 8.60
LINEMAN.....................$ 58.12 30% + 8.60
ELEC0725-007 06/01/2022
BROWN, CLAY, GREENE, KNOX, MONROE, OWEN, PARKE, SULLIVAN AND
VIGO COUNTIES
Rates Fringes
Communication Technician.........$ 30.00 18.07
Includes the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound and vision production and reproduction apparatus, equipment and appliances used for domestic, commercial, education, entertainment and private telephone systems.
ELEC0725-014 10/01/2024
BROWN, CLAY, GREENE, KNOX, MONROW, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES
Rates Fringes
ELECTRICIAN......................$ 43.30 25.32
ELEC0855-002 06/01/2024
BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH, UNION and WAYNE Counties
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 36.94 17.52
ELEC0855-004 06/01/2024
BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH,
UNION and WAYNE Counties
ELECTRICIAN......................$ 38.53 21.42
ELEC0873-001 06/01/2021
CLINTON, GRANT, HOWARD, MIAMI, TIPTON, AND WABASH COUNTIES
Rates Fringes
ELECTRICIAN (Communication Technician Only).................$ 30.08 17.23
ELEC0873-002 03/01/2022
CLINTON, GRANT, HOWARD, MIAMI, TIPTON AND WABASH COUNTIES:
Rates Fringes
ELECTRICIAN......................$ 36.59 20.12
ELEC1393-001 12/02/2024
REMAINING COUNTIES
Rates Fringes
Line Construction:
EQUIPMENT OPERATOR 1:
Diggers, 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks......................$ 36.86 28%+7.64
EQUIPMENT OPERATOR 3
(Backhoes over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% J.L. rate.....$ 45.53 28%+7.64
GROUNDMAN TRUCK DRIVER......$ 27.57 29%+6.75
GROUNDMAN...................$ 25.04 29%+6.75
LINEMAN.....................$ 48.35 28%+7.64
ENGI0103-003 04/01/2023
INCLUDING UNDERGROUND AND UTILITY CONSTRUCTION
ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON, DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY, HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI, RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION, WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 40.55 21.80
GROUP 2.....................$ 38.83 21.80
GROUP 3.....................$ 37.91 21.80
GROUP 4.....................$ 36.41 21.80
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Air compressors in manifold with throttle valve;
Asphalt plant engineer; Auto grade or similar type machine;
Auto patrol; Backhoe or farm-type tractor, 45 hp and over;
Ballast regulator (RR); Bituminous mixer; Bituminous paver;
Bituminous plant engineer; Bulldozer; Caisson drilling machine; Cherry picker, 15 ton or over; Chip spreader;
Concrete mixer 21 cu. ft. or over; Core drilling machine;
Crane or derrick with any attachment (including clamshell, dragline, shovel, backhoe, etc.); Dredge engineer; Dredge operator; Drilling machine on which the drill is an integral part; Earth mover, rubber-tired (paddle wheel, 616, 631, TS-24 or similar type); Earth mover, rubber-tired, tandem ($0.50 per hour additional for each bowl); Elevating grader; Fork lift, 10 ton or over; P.C.C. formless paver post driver; Highlift shovel, 1 1/2 cu. yd. or over; Hoist, 2 drums and over; Helicopter, crew; Hydraulic boom truck;
keystone, skimmer scoop; Loader, self-propelled (belt, chain, wheel); Locomotive operator; Mechanic; Mucking machine; Panel board concrete plant, central mix type;
Paver, Hetherington; Pile driver, skid or crawler; Road paving mixer; Rock breaking plant; Rock crushing plant, portable; Roller (asphalt, waterbound macadam, bituminous macadam, brick surface); Roller with dozer blade; Root rake, tractor-mounted; Self-propelled widener; Stump remover, tractor-mounted; Surface heater and planer; Tandem push tractor ($0.50 per hour additional); Tractor, boom;
Winch or hoe head; Tractor, push; Tractor with scoop;
Tractor-mounted spreader; Tree mover; Trench machine, over 24""; Tug boat operator; Well drilling machine; Winch truck with A-frame
GROUP 2: Air compressor with throttle valve or clever brooks-type combination; Backfiller; Backhoe on farm-type tractor, under 45 hp; Bull float; Cherry picker under 15 ton; Chip spreader, self-propelled; Concrete pump; Concrete mesh depressor, independently operated; Concrete spreader, power-driven; End loader under 1 1/2 cu. yd.; Excavating loader, portable; Finishing machine and bull float; Gunite machine; Head greaser; Mesh or steel placer; Multiple tamping machine (RR); P.C.C. concrete belt placer; Pull grader, power control; Refrigerating machine, freezing operation; Ross carrier; Sheepfoot roller (self-propelled); Tamper (multiple vibrating, asphalt, waterbound macadam, bituminous macadam, brick surface);
Trench machine, 24"" and under; Tube float; Welder
GROUP 3: Assistant plant engineer; Base paver (Jersey or similar type machine); Concrete finishing machine; Concrete mixer, less than 21 cu. ft.; Curb machine; Farm tractor, including farm tractor with all attachments except backhoe and including high lift end loaders of 1 cu. yd.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .