RFQ_W912QM-19-Q-0072.doc

DOC document 135 KB Posted

Attached to
Window frames, Doors, Lintels and Steel Plates
Solicitation number
W912QM-19-Q-0072
Issued by

About this file

Combined Synopsis Solicitation to provide Window frames, Doors, Lintels in support of BTH GTM19.

View the file

Other files

File Type Posted
TE_1_Doors-Windows-Lintels-Plates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ/SOLICITATION NUMBER: W912QM-19-Q-0072

Window frames, Doors, Lintels and Steel Plates – BTH GTM19

Date: 29 Mar 2019

ORDER IS SUBJECT TO "AVAILABILITY OF FUNDS"

FAR CLAUSE 52.232-18 (APR 1984).

STREAMLINED SOLICITATION:

i. This is a combined synopsis/solicitation for commercial items prepared in accordance with (IAW) the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

ii. The solicitation number is W912QM-19-Q-0072 and is issued as a Request for Quote (RFQ).

iii. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2019-01, effective date 20 December 2018.

iv. The associated North American Industrial Classification System (NAICS) code for this procurement is 238350 Finish Carpentry Contractors with a small business size standard of $ 15.0 millions. This requirement is not being set aside for Small Businesses.

v. CLIN Structure:

ITEM
SUPPLIES/SERVICES.
QTY
UNIT ISSUE
UNIT PRICE
TOTAL

CLIN

Tojocaz Clinic Supplies delivery

1
EA
$
$

CLIN

Aldea Euc. School Supplies delivery
1
EA
$
$

CLIN

Inst. Nac. Educ. Supplies delivery

1
EA
$
$

CLIN

Las Lagunas School Supplies delivery

1
EA
$
$

GRAN TOTAL

$
$

vi. Description of the Requirement:

The 410th CSB, Regional Contracting Office requires Window frames, Doors, Lintels and Steel Plates in support of Army South (ARSOUTH), Beyond the Horizon Guatemala 2019 (BTH GTM 19) Exercise. See Statement of Work (SOW) below for more details.

vii. Place of Delivery and Acceptance:

Delivery Site:

a) Location 1: Tojocaz Clinic (VIC 15PXS6279890530) 15.28603, -91.48382

b) Location 2: Aldea Eucalipto Zona 7 school (VIC 15PXS6553094233) 15.319322, -91.458137

c) Location 3: Inst. Nac. Educ Div Los Olivos school (VIC 15PXS6258695728) 15.33302, -91.48546

d) Location 4: Las Laguanas School (VIC 15PXS5894993340) 15.31166, -91.51948

Acceptance:

BTH GTM19

Forward Operating Site (FOS)

5ta Brigada Huehuetenango, Guatemala, Central America Applicable Provisions:

viii. 52.212-1, Instructions to Quoters —Commercial Items Addendum NOTE: This addendum replaces FAR 52.212-1 in its entirety. It can be revised as needed to reflect the specific requirement, such as paragraph c) Period for Acceptance of Quotations, (e) Multiple quotations, (h)Multiple purchase orders, etc.

This addendum replaces provision FAR 52.212-1 in its entirety.

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits a quotation in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of quotations. Submit signed and dated quotations to the office specified in this solicitation via email to maria.n.reyesromero.fn@mail.mil with courtesy copy to missy.l.mcneill.mil@mail.mil at or before the exact time specified in this solicitation. Quotations may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, quotations must show—

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of quotations;

(3) The name, address, telephone number and email address of the quoter;

(4) A technical description of the items being quoted in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) “Remit to” address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the quoter shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the quotation is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Quotations that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of quotations. The quoter agrees to hold the prices in its quotation firm for 30 calendar days from the date specified for receipt of quotations.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of quotations. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during pre-award testing.

(e) Multiple quotations. Quoters are encouraged to submit multiple quotations presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each quotation submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of quotations.

(1) Quoters are responsible for submitting quotations, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that quotations or revisions are due.

(2) Any quotation, modification, revision, or withdrawal of a quotation received at the Government office designated in the solicitation after the exact time specified for receipt of quotations is “late” and will not be considered unless it is received before award is made, and the Contracting Officer determines that accepting the late quotation would not unduly delay the acquisition.

(g) Issuance of Purchase Order. The Government intends to evaluate quotations in accordance with FAR 13.106. The Government will not use the formal source selection procedures described in FAR Part 15. The Government may issue a purchase order to other than the quoter with the lowest priced quotation. After the evaluation of quotations, the Government may negotiate final terms with one or more quoters of the Government’s choice before issuing any purchase order.

(h) Multiple Purchase Orders. Unless otherwise provided in the Schedule, quotations may not be submitted for quantities less than those specified. The Government reserves the right to issue a purchase order on any item for a quantity less than the quantity quoted, at the unit prices quoted, unless the quoter specifies otherwise.

(i) Contractor and Government Entity (CAGE) Code or NATO Contractor Government Entity (NCAGE) Code. The quoter shall enter its CAGE or NCAGE code in the block with its name and address on the cover page of its quotation, in accordance with FAR 52.204-16.

(j) Data Universal Numbering System (DUNS) Number. The quoter shall enter, in the block with its name and address on the cover page of its quotation, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the quoter’s name and address. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the quoter to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR Subpart 32.11) for the same concern. If the quoter does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one. A quoter within the United States may contact Dun and Bradstreet by calling 1-866-705-5711 or via the internet at http://fedgov.dnb.com/webform. A quoter located outside the United States must contact the local Dun and Bradstreet office for a DUNS number. The quoter should indicate that it is a quoter for a Government contract when contacting the local Dun and Bradstreet office.

(k) System for Award Management. Unless exempted by the Contracting Officer, the quoter shall be registered in the SAM database prior to issuance of purchase order, during performance and through final payment. If the quoter does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered quoter. Quoters may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.

(l) Requests for Information: The Contracting Officer will not notify unsuccessful quoters. Quoters may request information on purchase order(s) resulting from this solicitation.

(End of provision)

ix. FAR 52.212-2 Evaluation of Quotes—Commercial Items ADDENDUM This addendum replaces provision FAR 52.212-2 in its entirety.

(a) The Government will issue a purchase order resulting from this solicitation to the responsible quoter whose quotation conforming to the solicitation will be most advantageous to the Government, price and other factors considered, in accordance with FAR 13.106. The following factor(s) shall be used to evaluate offers:

NOTE: Per FAR 13.106-1(a)(2), “When soliciting quotations or offers, the contracting officer shall notify potential quoters or offerors of the basis on which award will be made (price alone or price and other factors, e.g., past performance and quality). Contracting officers are encouraged to use best value. Solicitations are not required to state the relative importance assigned to each evaluation factor and subfactor, nor are they required to include subfactors”.

Lowest Price Technically Acceptable (LPTA)

(b) Options. The Government will evaluate quotations by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quotation is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

NOTE: Delete paragraph (b) if no Options will be included

(c) Notification. For acquisitions for which automatic notification is not provided through an electronic commerce method that employs widespread electronic public notice, notification to unsuccessful quoters shall be given only if requested or required by FAR 5.301.

(End of provision)

x. Quoters shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications—Commercial Items (Oct 2018) Alternate I, with its offer.

xi. 52.212-4, Contract Terms and Conditions—Commercial Items (Oct 2018) applies to this acquisition, no addenda has been done.

xii. 52.212-5, Contract Terms and Conditions Required to Implement Statues or Executive Orders—Commercial Items (DEVIATION 2013-O0019) (Jan 2019) applies to this acquisition.

xiii. The following clauses also apply to this acquisition:

52.252-2 -- Clauses Incorporated by Reference (Feb 1998)

This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil AMC Level Protest --

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the contracting officer) to:

Headquarters U.S. Army Materiel Command

Office of Command Counsel

4400 Martin Road

Rm: A6SE040.001

Redstone Arsenal, AL 35898-5000

Fax: (256)450-8840

Clauses Incorporated by reference:

52.202-1, Definitions (Nov 2013);

52.204-7, System for Award Management (Oct 2018);

52.222-3 Convict Labor (June 2003) 52.222-19 Child Labor – Cooperation with Authorities and Remedies (Jan 2018) 52.222-21 Prohibition of Segregated (Apr 2015) 52.222-50 Combatting Trafficking in Persons (Jan 2019) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) 52.225-14, Inconsistency Between English Version and Translation of Contract (Feb 2000);

52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran – Representation and Certification (Aug 2018)

52.229-6, Taxes -- Foreign Fixed-Price Contracts (Feb 2013);

252.203-7000, Requirements Relating to Compensation of Former DOD Officials (Sep 2011);

252.203-7002, Requirement to Inform Employees of Whistleblower Rights (Sept 2013);

252.203-7005, Representation relating to compensation of former DOD officials (Nov 2011);

252.209-7004, Subcontracting With Firms That Are Owned or Controlled By the Government of A Terrorist Country (Oct 2015);

252.225-7041, Correspondence in English (Jun 1997);

252.229-7000, Invoices Exclusive Of Taxes or Duties (Jun 1997);

252.232-7003, Electronic Submission of payment requests and receiving Reports (Dec 2018) 252.232-7006, Wide area workflow payment instructions (Dec 2018) 252.232-7008, Assignment of Claims (Overseas) (Jun 1997);

252.232-7010, Levies on Contract Payments (Dec 2006);

252.233-7001, Choice of Law (Overseas) (Jun 1997) 252.243-7001, Pricing of Contract Modifications (Dec 1991)

xiv. The Defense Priorities and Allocation System (DPAS) is not applicable to this requirement.

xv. Solicitation Date: 29 March 2019 Close Response Date/Time/Location: No later than 8 April 2019 at 3:00PM local time at the 410th CSB Regional Contracting Office, Soto Cano Air Base, Comayagua, Honduras or thru email at the below email address(es).

xvi. Points of Contact: Noema Reyes Romero, Contract Specialist phone: (504) 2713-5123 Ext. 449-4572 e-mail: maria.n.reyesromero.fn@mail.mil; CPT Missy L. McNeill, Contracting Officer, phone (504) 2713-5123 Ext 449-4304, email missy.l.mcneill.mil@mail.mil United States Army South (ARSOUTH)

Beyond the Horizon 2019 Guatemala (BTH-19 GTM)

Statement of Work (SOW)

Window Frames, Doors, Lintels, and Steel Plates

1. General: This is a contract to provide and deliver windows, doors, lintels, and steel plates for the United States Army South (ARSOUTH, also referred to herein as “the Government”). The Government shall not exercise any supervision or control over the contract delivery providers performing herein. Such contract providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Scope of work: The Contractor shall certify the designs and fabricate, package, and load pre-fabricated windows, doors, lintels, and steel plates for seven (7) Concrete Masonry Unit (CMU) block buildings in accordance with the Statement of Work.

1.2 Delivery: The windows, doors, lintels, and steel plates are to be completed and delivered by 10 MAY 2019. Final acceptance will be conducted by the Government contracting officer representative (COR) at the place of delivery. The contractor will be responsible for delivery of all doors, windows and lintels to 5th Infantry Brigade Military Base (VIC 15PXS5847893063) 15.30919 -91.52389. The contractor will be responsible for providing its own means of transportation for delivery.

1.3 Building Projects:

1. Tojocaz Medium Size Clinic (VIC 15PXS6279890530) 15.28603, -91.48382. One building.

2. Aldea Eucalipto Zona 7 four rooms school (VIC 15PXS6553094233) 15.319322, -91.458137. One building.

3. Aldea Eucalipto Zona 7 four stall pit latrine (VIC 15PXS6553094233) 15.319322, -91.458137. One building.

4. Inst. Nac. Educ Div Los Olivos open room school (VIC 15PXS6258695728) 15.33302, -91.48546. One building.

5. Las Lagunas three room school (VIC 15PXS5894993340) 15.31166, -91.51948. One building.

6. Las Lagunas four stall latrines (VIC 15PXS5894993340) 15.31166, -91.51948. Two buildings.

1.4 Technical Exhibits:

· Technical Exhibit #1 shows the Window and door Design for the schools Latrine and clinics

· Technical Exhibit #2 shows the BOM list for Windows & Doors

1.5 Design Review and Certification: The Contractor shall review the designs and accompanying BOM list, and make adjustments as necessary to ensure that they will fit securely as a kit on the 8-inch CMU block buildings to be constructed by the U.S. Military in Guatemala. The revised designs and BOM lists shall be discussed with the Contracting Officer’s Representative (COR) before starting fabrication.

1.6 Inspections: The Government will schedule times to make inspections of the work completed. The Government also requests to conduct in-progress work inspections periodically throughout the fabrication process. The COR will coordinate with the contractor to schedule in-progress work inspections.

2.0 Specifications:

2.1. Steel frame windows. The Contractor shall fabricate and provide steel window frames to fit and wrap around the 8-inch CMU block building walls for the 7 new construction projects. Refer to Technical Exhibit #2 for total quantities. Refer to Technical Exhibits #1-2 for additional specifications on dimensions. Contractor shall weld at all bar to bar connections and bar to frame connections. Bars shall be equally spaced horizontally and vertically. Window frame shall be of 12-gauge thickness steel plate. Contractor shall pre-drill 4 holes (1/4 inch diameter, 2 holes each side). The Contractor shall weld a 12-gauge 5/8 inch X 5/8 inch corner piece in all 4 corners.

2.1.1 The Contractor shall apply one coat of anticorrosive primer to all window frames and bar surfaces (inside and outside) and two coats of anticorrosive metal paint to the outside surface and bars. Horizontal ½ inch square bar shall sit 1 inch back from the front of the window. Window frame tolerances are +1/16 inch and – 0 inch. Rough openings of the steel window frames are provided for each building type in Technical Exhibits #1-2. All windows and window frames shall be painted with Sherwin Williams, All Surface Enamel Oil Base SW 6868, Real Red or similar quality.

2.2. Hollow metal doors. The Contractor shall provide 1 and ¾ inch hollow metal doors, weather strips, door sweeps, door flashing, backer-rod, anchoring bolts, stopper with hook, and door sills. Refer to Technical Exhibit #1 for total quantities. Refer to Technical Exhibits #1-2 for additional specifications on dimensions.

2.2.1 Exterior doors for all buildings and pit latrine doors shall be 16-gauge, while interior doors shall be 18-gauge. All door frames shall be 16-gauge. Frame shall be fastened to the wall using 5/16 inch diameter 6 inches long flathead expansion anchor bolts for all doors and project sites. Contractor shall provide 3 bolts per side (total of 6 bolts).

2.2.2 The Contractor shall apply one coat of anticorrosive primer to all doors and frames surfaces and two coats of anticorrosive metal paint. Door and frame tolerances are + 1/16 inch and – 0 inch. All doors and door frames shall be painted with Sherwin Williams, All Surface Enamel Oil Base SW 6868, Real Red or similar.

2.2.3 The Contractor shall provide commercial grade door locks, handles, knobs, and latches for all doors in a Satin Chrome color finish; turn/push-button locking; pushing and turning button locks outside knob, requiring use of key until button is manually unlocked; push-button locking; pushing button locks outside knob until unlocked by key or by turning inside knob; hatch 1" x 2 1/4" square corner faceplate; 7/8" housing diameter; 1/2" throw; strike 1 1/8" x 2 3/4", square corner, T-strike, box; cylinder 6-pin solid brass; keyed 6-pin, C123 Keyway; door range 1 3/8" - 1 7/8.” For each new door, contractor shall provide master keys for exterior and interior doors.

2.2.3.1 The Contractor shall provide submittal of the proposed door locks, handles, knobs, and latches for approval prior to final delivery. Master key is a key to open all exterior or interior doors. Contractor shall provide 4 master key copies for each building.

2.3. Steel lintels. The Contractor shall provide steel lintels. Refer to Technical Exhibit 1 for total quantities. Refer to Technical Exhibits #1-2 for additional specifications on dimensions. Each steel lintel shall have a standard width to match the 8-inch CMU block. Lintel length depends on the rough window and door opening dimensions marked on the designs at Technical Exhibits #1-2, which includes building design for additional specification and details, and shall extend 7 and ¾ inches on each side of the opening.

2.4. Steel plates. The Contractor shall provide steel plates that will be cut onsite. Refer to Technical Exhibit 1-2 for total quantities. Refer to Technical Exhibit #2 for additional specifications on dimensions. Steel plates shall be 1/4 inch steel plate. Drill 5/8" holes on perimeter with 1/2 inch anchor bolts to hold steel in place during concrete placement. Pit Latrine design also specifies that the following steel plates are needed for the underground black water container: one (1) 6ft-1in x 7ft, two (2) 3ft-10in x 7ft, and one (1) 5ft-6in x 7ft.

2.5 Rolling Service Door Pre-Assembled Industrial Door (PAID), push-up operation that comes with brackets and tensioner pre-assembled. Reduced drive chain hoist operation is delivered with brackets, tension, gears and chain drive pre-assembled. 10'0" wide x 8'0" high; pull rope (hand operation).

3.0 OPSEC/ATFP: If the contractor, or a sub-contractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance under this contract.

3.1 The Contractor personnel shall not sketch or take photos of Government facilities or activities, unless related to service to be provided. Contractor personnel shall not post or discuss Government facility activities on any unauthorized public access media. All Government paper products and removable digital storage material that is received, generated, or stored during the contract, shall be destroyed completely when no longer needed to preclude recognition of information.

4. JOBSITE MAINTANENCE AND SAFETY:

4.1. The Contractor shall maintain the work site in a neat, orderly, and safe condition at all times. The Contractor shall remove debris on a daily basis and dispose of to the closest authorized dumping area in accordance with local laws. Under no circumstances should material be burned at the work site. The Contractor shall remove all tools, supplies, equipment, and debris upon completion of the contract.

4.2. The Contractor shall repair any damage done to the existing grounds, facilities, or property during the course of construction at no additional cost. The surrounding terrain shall be delivered in the same condition as it was received before the work took place (with grass, gravel, sidewalks, or whatever applies to each case).

4.3. The work zone shall be marked with construction zone signs with temporary construction fences installed as protection measurements. Signs, tags, and labels shall be provided to give warning and caution of hazards. They are provided to instruct and direct workers and the public. All warning systems such as signs, tags, and labels shall be visible at all times when the hazard or problem exists, and shall be removed or covered when the hazard or problem no longer exists. All employees shall be informed as to the meaning of the various signs, tags, and labels used throughout the workplace and any special precautions that may be required.

4.4. The Contractor’s personnel working on roofs shall wear fall protection equipment.

Personal fall protection equipment and systems shall be used when a person is working at heights and exposed to a fall hazard. Personal Fall Arrest System (PFAS): Consists of body support (full body harness), connecting means, and an anchorage system. Be rigged such that workers can neither free fall more than 6 ft (1.8 m) nor contact any lower level or other physical hazard in the path of the fall.

4.5. No person shall be required or instructed to work in surroundings or under conditions that are unsafe or dangerous to his or her health. The employer is responsible for initiating and maintaining safety and health procedures that comply with the Government of Guatemala safety and health requirements.

4.5.1 Each employee is responsible for complying with applicable safety and occupational health requirements, wearing prescribed safety and health equipment, reporting unsafe conditions/activities, preventing avoidable accidents, and working in a safe manner.

4.5.2 The contractor shall be responsible for damages and/or injuries to personnel, visitors, property, and equipment safety at the work site as a result of the Contractors fault or negligence. The contractor shall enforce safety and health precautions to protect property, workers, and the public. The Contractor shall ensure all workers are wearing safety gear at all times, and ensure that all applicable safety regulations are followed.

4.6. The Contractor shall immediately correct all safety deficiencies upon notification by the KO or COR.

5. CONTRACTOR COMPLIANCE: The Contractor shall be responsible for complying with all Government of Guatemala laws, construction codes, ordinances, and regulations applicable to the performance of the work. In the event of a conflict between the contract and such laws, regulations, and ordinances, the Contractor shall propose a course of action for resolution to the KO for approval.

5.1. Labor, Health, and Safety Codes. The Contractor shall comply with all local, municipal, and national labor, health, and safety laws of Guatemala.

5.2. Permits and Licenses. Prior to start of construction, the Contractor shall, at no additional cost to the U.S. Government, obtain all necessary construction, excavation, utilities, and work permits as applicable.

5.3. Environmental Compliance and Permits. During execution of the work, the Contractor shall comply with local, municipal, and national environmental laws and regulations of Guatemala. Disposal of hazardous waste, containers or components thereof, shall be disposed of in an approved hazardous waste disposal site only. No other location shall be utilized for such disposal.

5.3.1. The Contractor shall not pollute storm lines, sewer lines, or swales with fuels, oils, bitumen, paint, acid, construction waste, or other harmful materials.

6. Utilities Excavation and Connection. The U.S. Government will not provide any utility connections. The Contractor is responsible for providing any needed generators to operate any equipment at own expense. The Contractor is responsible for providing potable water and portable latrines for contractor’s employees’ daily consumption and use at own expense.

7. Subcontractors. If applicable, the Contractor shall give written assurance to the KO that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits. The Contractor shall submit proper documentation and evidence within 24 hours of hiring subcontractors to the KO demonstrating compliance with this clause when directed. The Contractor, and not the subcontractor, is still responsible for the construction of the project.

8. Government (U.S. Army) Furnished Items or Services. None

9. Contractor Requirements for Performance of Work: The Contractor shall have (if applicable) a current license and certification for construction work in Guatemala. If required, this documentation shall be submitted to KO prior to any work being started on project site.

Technical Exhibit Attachments

*See attached documents for the following Technical Exhibits

1) TE-1 Windows Doors and Lintels Designs

2) TE-2 Windows Doors and Lintels Quantities TE-2 Windows Doors and Lintels Quantities

Doors, Windows, Lintels, and Steel Plates BTH19 Guatemala

Item
Description (see

SOW for more detailed specs)

Unit
Tojocaz Clinic
Aldea Eucalipto 4 Room School
Aldea Eucalipto 4 Stall Latrine
Instituto Nacional Educacion Los Olivos Mod 3 Room

School

Las Lagunas 3 Room School
Las Lagunas 4 Stall Latrine (two latrines)
Total Quantity

Clin 0001 - Windows

1
Windows #1 (Large for Schools), made of bent steel plate (12 gauge). Clean and primed light gray on all surfaces after fabrication. Paint. (6'X3'-4'') (0'7-

5/8" width)

ea
5
8
0
2
6
0
21
3
Windows #2 (Large for Clinic), made of bent steel plate (12 gauge). Clean and primed light gray on all surfaces after fabrication. Paint. (2'X3'-4") (0'7-5/8"

width)

ea
4
1
0
0
0
0
5

Clin 0002 - Doors

4
Exterior Doors (includes hollow metal 16-gauge door, 16-gauge frame, weather strips, door sweeps, door fashing, backer-rod, anchoring bolts, stopper with hook, door sills, locks, handles, keys) Without Frame 3' X 6'-8"

X 1 3/4"

ea
5 RH
5 RH
4 RH
2 RH
3 RH
4 RH
23 RH
5
Exterior Doors (includes hollow metal 16-gauge door, 16-gauge frame, weather strips, door sweeps, door fashing, backer-rod, anchoring bolts, stopper with hook, door sills, locks, handles, keys) Without frame 5' X 6'-8" X 1 3/4" (Double Door)
ea
0
0
0
2 RUD
0
0
2 RUD
6
Interior Doors (includes hollow metal 16 gauge door, 16-gauge frame, weather strips, door sweeps, door fashing, backer-rod, anchoring bolts, stopper with hook, door sills, locks, handles, keys) 3' X 6'-8" X 1 3/4"
ea
2 RH

2 LH

0
2 RH

2 LH

1 LH
2 RH

2 LH

0
6 RH 6

LH

7
Interior Doors (includes hollow metal 16 gauge door, 16-gauge frame, weather strips, door sweeps, door fashing, backer-rod, anchoring bolts, stopper with hook, door sills, locks, handles, keys) 2'-8" X 6'-8" X 1 3/4"
ea
0
0
0
1 DD
0
0
1 DD

Clin 0003 - Lintels

8
Steel Lintels for all Windows and Doors - lintel should extend 7-3/4" on each side of opening - check designs for window/door opening dimensions
ea
6 Windows

9 Doors 9 Windows

9 Doors 0 Windows

4 Doors 2 Windows

5 Doors

2 Roll Up Doors 6 Windows

7 Doors 0 Windows

8 Doors 23 Windows

42 Doors 2 Roll up Doors

Clin 0004 - Steel plate

9
Steel Plates (1/4 inch steel plate) to cover. One 6ft-1in x 7ft, two 3ft-10in x

7ft, and one 5ft-6in x 7ft).

ea
0
0
4
0
0
8
12

Clin 0005 - Design Review & Certification

10
Design Review & Certification
ea
1
1
1
1
1
1
6

Clin 0006 - Packaging

11
Packaging
ea
1
1
1
1
1
1
6

*RH- Right Hand Door

*LH- Left Hand Door

File details come from the government source that posted it.