The purpose of this amendment is to notify the potential vendors of the following changes 1. Add additional CLINS 2. Clarification to the instruction to offers and evaluation criteria
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QM-17-R-0004-0001_Conformed_Copy.pdf | ||
| W912QM-17-R-0004_Ground_Works.pdf | ||
| Technical_Exhibits.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to: Modify CLINs 0001 and 0002 Extended Descrption, add CLINs 0003 and 0004, and include clarifications into Instructions to Offerors and Evaluation Criteria.
This modification w as executed to add the follow ing changes:
a. Changes to CLIN 0001 Description and Extended description (See Summary of Changes).
b. CLIN 0002 (DBA) w as renumbered to CLIN 0004.
c. CLINs 0003 and 0004 w ere added to the solicitation (See Summary of Changes).
d. Changes w ere added to Instructions for Proposals and Evaluation Criteria
e. Clause 52.211-12 Liquidated Damages--Construction w as deleted
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QM-17-R-0004
X 9B. DATED (SEE ITEM 11)
11-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Nov-2016
CODE
RCO SOTO CANO
UNIT 5714
APO AA 34042
W912QM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QM-17-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0001
The CLIN description has changed from BDF Ground Work to Site Survey and Design.
The CLIN extended description has changed from:
The Contractor shall perform all Ground Work specified IAW the SOW
To:
The Contractor shall conduct a topographical site survey of the motor pool, laydown and living support area to include elevations, slopes and drainage prior to the start of any ground work. The Contractor shall develop a drainage and slope plan for all sites IAW SOW Paragraph 2.1.1..
CLIN 0002
This CLIN has been renumbered to CLIN 0004.
The CLIN extended description has changed from:
The contractor shall provide workers' compensation insurance or security asrequired by the Defense Base Act (DBA) and maintain it until performance iscompleted, in accordance with FAR Clause 52.228-3
To:
The contractor shall provide workers' compensation insurance or security as required by the Defense Base Act (DBA) and maintain it until performance iscompleted, in accordance with FAR Clause 52.228-3.
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job Laydown Yard/ Motor Pool Area
FFP
The Contractor shall set up a laydown yard and motor pool area to be used for parking lots, containers and equipment IAW SOW Paragraph's 2.2 and 2.3 FOB: Destination
NET AMT
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job Living and Support Area (LSA)
FFP
The Contractor shall set up a bed down area to be used for set up of tents for sleeping and living IAW SOW Paragraph 2.4.
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item has been added to CLIN 0003:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
POP 10-JAN-2017 TO
10-MAR-2017
N/A BTH BELIZE 17
OFFICER IN CHARGE
BELIZE DEFENSE FORCE BASE CAMP,
PRICE BARRACK
LADYVILLE, BELIZE
W81Y57
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following have been modified:
STATEMENT OF WORK
United States Army South (ARSOUTH) Beyond the Horizons, Belize 2017 (BTH 17 BLZ)
Statement of Work (SOW) Renovations at Belize Defense Force Base Camp (BDF)
Price Barracks, Ladyville, Belize
1. GENERAL
1.1 Scope of Work. Contractor shall provide all labor, transportation, equipment, materials, supervision, and any other necessary items to perform Ground Work Laydown to improve the following areas: Forward Operating Base (FOB) and Forward Operating Site (FOS) locations at the Belize Defense Force, Price barracks, Ladyville, Belize. This facility will be used for the BTH17 Belize Forward Operation Site (FOS) Barracks, Price barracks, Ladyville, Belize.
1.2 Required Performance Period. The contractor shall complete all work for Laydown yard, motor pool and living support area (LSA) no later than 10 March 2017.
1.3. The Contracting Officer (KO) shall appoint a Contracting Officer Representative (COR) in writing. After award of contract, coordination of progress and submission of all reports shall be submitted through the COR. There shall be inspections conducted by the COR or designated representative prior to completion of, and during closeout of the project. Contractor and COR shall coordinate to schedule these inspections.
1.3.1. Contracting Officer Representative (COR):
The COR will be identified by separate letter.
The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract.
Perform inspections necessary in connection with contract performance.
Maintain written and oral communications with the Contractor concerning technical aspects of the contract.
Issue written interpretations of technical requirements, including Government drawings, designs, and specifications.
Monitor Contractor's performance and notifies both the Contracting Officer and
Contractor of any deficiencies.
Coordinate availability of government furnished property, and provide site entry of
Contractor personnel.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions of the resulting order.
Only the Contracting Officer has authority to make changes to any contract.
1.2.2. The Contractor shall develop a work schedule that has been coordinated and approved by Belize Defense Force Commander and Public Works Department. The schedule shall list the days and work hours that work shall be performed on the FOS. The approved schedule shall be provided to the COR prior to the start of any construction.
1.2.3. Only the (KO) has the authority to make changes to any contract resulting from the solicitation of this project, including but not limited to increase or decrease in prices, time extensions, and changes.
2. SPECIFICATIONS: The Contractor shall complete all specified improvements for ground work included within this statement of work. The Contractor is responsible for verifying exact dimensions, current conditions on site, and other information presented in this scope of work before submitting their proposal.
All materials shall be new and of commercial grade. All work shall be done according to specifications set forth in this section, the Technical Exhibits (TE), commercial and industrial codes, and design and construction standards of Belize. If the Government of Belize does not have industry standards, or codes in place, the contractor shall use U.S. industry standards.
2.1 FOB and FOS Improvements:
2.1.1 Site Survey and design:
The Contractor shall conduct a topographical site survey of the motor pool, laydown and living support areas to include elevations, slopes and drainage prior to the start of any ground work.
The Contractor shall develop a drainage and slope plan for all sites (motor pool, laydown and LSA) and submit to the COR and ARSOUTH Engineer Directorate for approval.
The Contractor shall provide a PDF and AutoCAD versions to the COR and ARSOUTH Engineer directorate prior to approval.
2.1.2 Laydown yard:
The Contractor shall set up a laydown yard to be used for parking lots of containers and equipment.
The Contractor shall clear and grub an area of 6,000 square meters (See TE, figure
#2) The Contractor shall level an area of 6,000 square meters (See TE, figure #2) The Contractor shall implement drainage and slope plan developed from site survey data.
The Contractor shall deliver, distribute and compact 1,000 cubic meters of gravel in the designated area with a 6” layer.
Aggregate material shall be clean and free of deleterious material including organics.
Material shall be crushed “Crusher Run” Aggregate ranging from 1 to 4 inches with no more than 30% gravel dust fines.
2.3 Motor pool area:
The Contractor shall set up a motor pool to be used for parking lots of vehicles and equipment.
The Contractor shall clear and grub an area of 6,000 square meters (see TE, figure #2).
The Contractor shall level an area of 6,000 square meters (See TE, figure #2).
The Contractor shall implement drainage and slope plan developed from site survey data.
The Contractor shall deliver, distribute and compact 1,000 cubic meters of gravel in the designated area with a 6” layer.
Aggregate material shall be clean and free of deleterious material including organics.
Material shall be crushed “Crusher Run” Aggregate ranging from 1 to 4 inches with no more than 30% gravel dust fines.
2.4 Living and Support Area (LSA):
The Contractor shall set up a Bed down area to be used for set up of tents for sleeping and living.
The Contractor shall clear and grub and area that is 14,000 square meters (see TE figure #3).
The Contractor shall level an area that is 14,000 square meters. (See TE, figure #3) The Contractor shall implement drainage and slope plan developed from site survey data.
The Contractor shall deliver, distribute and compact 2,000 cubic meters of gravel in the designated area with a 6” layer.
Aggregate material shall be clean and free of deleterious material including organics.
Material shall be crushed “Crusher Run” Aggregate ranging from 1 to 4 inches with no more than 30% gravel dust fines.
The Contractor shall create an access road around the perimeter of the FOB site (See TE, figure # 3 and 4 for more details).
Each access road shall be 5 meters wide and 10 meters long with a 6” layer of compacted gravel.
2.5 Final Inspection Notification:
The Contractor shall notify the KO and the COR in writing at least five (5) calendar days in advance of the desired final inspection date.
2.6 Acceptance:
Final acceptance shall not occur until all work, including clean-up, has been accomplished and no discrepancies remain.
Final acceptance of work shall be contingent upon the approval of the COR.
3. Submittals.
3.1. Submittal during Contract Performance:
3.1.1. Contractor Reports and Photographs. The Contractor shall provide a weekly progress report of completed work to the COR and KO every Tuesday. Report shall have at a minimum the following information: contract number, project title, any problems with the project to include getting materials, labor, or weather delays, and the progress report photographs of each stage of the construction progress. Photographs shall be sent via e-mail to the KO and the COR.
3.1.2. Safety Mishap Report. Contractor shall submit a safety mishap report in the event of an accident on the jobsite. The report shall include actions taken to prevent the mishap from reoccurrence and forwarded to the COR within 24 hours after the mishap.
4. Supervision and Site Access. The contractor shall provide all necessary supervision, management, labor, materials, and equipment to plan and perform the work as described above in Section 2.
4.1. Anytime work is in progress, the Contractor shall maintain a designated supervisor on site, and provide that supervisor’s name to the KO and COR. The supervisor’s name shall be given to the KO and COR prior to the start of any work. The supervisor shall be responsible for directing the onsite work, acquiring materials, resolving construction issues, and providing information about work progress to the U.S. Government’s COR. The supervisor shall be able to communicate in English.
4.2. Prior to start of work, the Contractor shall send a list of workers (Personnel), vehicles, and equipment that will be accessing Belize Defense Force installation to the KO and COR and the installation POC. The Contractor shall be responsible for the transportation of personnel and materials to the work site. The Contractor shall only use established entrances and roadways. All personnel shall access the Belize Defense Force installation by procedures set forth by Belize Defense Force installation officials. If security badges are required, the Supervisor shall collect all employee badges at completion of the work day and reissue at the start of the next work period.
4.3. Storage Areas. The Contractor shall confine all operations (including storage of materials) to areas authorized or approved by the Contracting Officer and the Belize Defense Force installation POC. Material storage shall be coordinated with the Belize Defense Force installation. The Contractor shall store materials at designated areas only. The Contractor is responsible and liable for the security and condition of the stored materials and equipment.
4.4. The Contractor shall work on the constructions and renovations without interfering with normal Belize Defense Force activities and operations which shall continue during renovation.
The Contractor shall proceed by sections whenever possible to minimize interruption of the Belize Defense Force installation activities. All contractor personnel shall wear visible identification while on the construction site indicating the prime contractors name and name of individual.
5. Job Site Maintenance and Safety.
5.1. The Contractor shall maintain the work site in a neat, orderly, and safe condition at all times.
The Contractor shall remove debris on a daily basis and dispose of to the closest authorized dumping area in accordance with local laws. Under no circumstances should material be burned at the work site. The Contractor shall remove all tools, supplies, equipment, and debris upon completion of the contract.
5.2. The Contractor shall repair any damage done to the existing grounds, facilities, or property during the course of construction at no additional cost. The surrounding terrain shall be delivered in the same condition as it was received before the work took place (with grass, gravel, sidewalks, or whatever applies to each case).
5.3. The work zone shall be marked with construction zone signs with temporary construction fences installed as protection measurements. Signs, tags, and labels shall be provided to give warning and caution of hazards. They are provided to instruct and direct workers and the public.
All warning systems such as signs, tags, and labels shall be visible at all times when the hazard or problem exists, and shall be removed or covered when the hazard or problem no longer exists.
All employees shall be informed as to the meaning of the various signs, tags, and labels used throughout the workplace and any special precautions that may be required.
5.4. The Contractor’s personnel working on roofs shall wear fall protection equipment.
Personal fall protection equipment and systems shall be used when a person is working at heights and exposed to a fall hazard. Personal Fall Arrest System (PFAS): Consists of body support (full body harness), connecting means, and an anchorage system. Be rigged such that workers can neither free fall more than 6 ft. (1.8 m) nor contact any lower level or other physical hazard in the path of the fall.
5.5. No person shall be required or instructed to work in surroundings or under conditions that are unsafe or dangerous to his or her health. The employer is responsible for initiating and maintaining safety and health procedures that comply with the Government of Belize safety and health requirements.
5.5.1 Each employee is responsible for complying with applicable safety and occupational health requirements, wearing prescribed safety and health equipment, reporting unsafe conditions/activities, preventing avoidable accidents, and working in a safe manner.
5.5.2 The contractor shall be responsible for damages and/or injuries to personnel, visitors, property, and equipment safety at the work site as a result of the Contractors fault or negligence.
The contractor shall enforce safety and health precautions to protect property, workers, and the public. The Contractor shall ensure all workers are wearing safety gear at all times, and ensure that all applicable safety regulations are followed.
5.6. The Contractor shall immediately correct all safety deficiencies upon notification by the KO or COR.
6. Contractor Compliance. The Contractor shall be responsible for complying with all Government of Belize laws, construction codes, ordinances, and regulations applicable to the performance of the work. In the event of a conflict between the contract and such laws, regulations, and ordinances, the Contractor shall propose a course of action for resolution to the KO for approval.
6.1. Labor, Health, and Safety Codes. The Contractor shall comply with all local, municipal, and national labor, health, and safety laws of Belize.
6.2. Permits and Licenses. Prior to start of construction, the Contractor shall, at no additional cost to the U.S. Government, obtain all necessary construction, excavation, utilities, and work permits as applicable.
6.3. Environmental Compliance and Permits. During execution of the work, the Contractor shall comply with local, municipal, and national environmental laws and regulations of Belize.
Disposal of hazardous waste, containers or components thereof, shall be disposed of in an approved hazardous waste disposal site only. No other location shall be utilized for such disposal.
6.3.1. The Contractor shall not pollute storm lines, sewer lines, or swales with fuels, oils, bitumen, paint, acid, construction waste, or other harmful materials.
7. Utilities Excavation and Connection. The U.S. Government will not provide any utility connections. The Contractor is responsible for providing any needed generators to operate any equipment at own expense. The Contractor is responsible for providing potable water and portable latrines for contractor’s employees’ daily consumption and use at own expense.
8. Subcontractors. If applicable, the Contractor shall give written assurance to the KO that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits. The Contractor shall submit proper documentation and evidence within 24 hours of hiring subcontractors to the KO demonstrating compliance with this clause when directed. The Contractor, and not the subcontractor, is still responsible for the construction of the project.
9. Government (U.S. Army) Furnished Items or Services. None
10. Contractor Requirements for Performance of Work: The Contractor shall have (if applicable) a current license and certification for construction work in Belize. If required, this documentation shall be submitted to KO prior to any work being started on project site.
Technical Exhibit: Figure #1
GPS: 17 32.7737N, 88 18.4506W
Area: 116940.58 Sq. Ft. (2.6846 Acres) Perimeter: 1377.42 ft.
Technical Exhibit: Figure #2
Technical Exhibit: Figure #3
Technical Exhibit: Figure #4
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been modified:
EVALUATION CRTIERIA
1. BASIS OF AWARD. The award will be evaluated on a Lowest Priced, Technically Acceptable (LPTA) basis, considering past performance. Subject to the provisions contained herein, the Government intends to award a single contract resulting from the solicitation to the Offeror whose response conforms to the Statement of Work; is technically acceptable; and provides the lowest total price for the actual contract line items awarded.
GPS: 17 32.8983N, 88
Area: 146344.47 Sq. Ft. (3.3596 Acres) Perimeter: 1623.00 ft.
Motor pool and laydown area
Living and support area
The Government reserves the right to award without discussions. Therefore, offerors are encouraged to provide their best Proposal with the technical and past performance information requested for evaluation.
2. EVALUATION APPROACH. The evaluation process consists of three parts; 1) Price, 2) Technical, and 3) Past Performance evaluation. All three parts will be evaluated separately. The proposals will be evaluated as follows:
a. The Government will conduct a price reasonableness analysis by adding the price offered by each Offeror on CLINs 0001 through 0003 and evaluate to determine if the Offeror’s proposed price is fair and reasonable, DBA (CLIN 0004) will be exclude from the analysis.
b. All proposals shall be ranked from lowest proposed price to highest proposed price.
c. The Government will select the three (3) lowest priced offers representing price reasonableness and submit those three (3) complete offers, without pricing, to the technical evaluator(s). The technical (non-pricing) volume(s) of each of the three (3) offers will be provided to the technical evaluator(s) for review, without identification of the prices or any rank order of prices. The Technical Evaluation Team will review the three (3) offers for technical acceptability. If any Offerors are determined to be technically acceptable from this group, the Offeror with the lowest price technically acceptable offer will be awarded the contract. If, on the other hand, no offers are found to be technically acceptable within the first group of three (3) offers, then the process described above will be conducted again, as many times as necessary, until such time as the Government identifies a technically acceptable offer with acceptable past performance and a contract award made to a responsible Offeror.
d. All Factors/Sub-factors will be evaluated based on how well the proposal addresses an Offeror’s processes, methodologies, approaches, and concepts to fulfill the solicitation requirements.
3. PRICE EVALUATION PROCESS. The low offeror and the items to be awarded shall be determined as follows:
a. The offer which provides the lowest overall price, excluding DBA Insurance.
b. The price should be broken down into the following major categories that align with the CLIN Structure of the solicitation
1. CLIN 0001 Site Survey and Design
2. CLIN 0002 Laydown Yard and Motor Pool Area
3. CLIN 0003 Living and Support Area (LSA)
c. Price analysis will be performed IAW FAR15.404-1(b)(2) to make a fair and reasonable price determination.
d. Price reasonableness is a judgment of the proposed price as compared to competitive prices received, current market conditions, Independent Government Cost Estimate (IGCE) historical prices, information other than certified cost or pricing data, or other relevant measures. The Government may utilize any one or a combination of these techniques to determine that prices are fair and reasonable.
4. TECHNICAL EVALUATION PROCESS. The technical evaluation portion will be conducted based on the following factors:
1. Primary Component Material List: (Attachment – Price Breakdown Worksheet – Material List).
Description of products and materials to be used for the project to determine if it is in compliance with the materials identified within the Statement of Work.
2. Project Schedule: The project schedule will be in sufficient detail to clearly illustrate the major construction phases (i.e. Site survey and design, Laydown Yard, Motor Pool area, Living and Support area, Site cleanup and disposal,) and expected completion dates and execution times of each work phase. Sufficient float time shall be incorporated in the schedule to account for down days due to inclement weather.
3. Quality Control Plan: Shall be in sufficient details to clearly illustrate the contractor’s surveillance and quality control methods to cover the major project phases.
5. TECHNICAL MERIT ADJECTIVAL RATING. Technical Acceptability will include an evaluation of all three (3) factors. Those ratings will then be rolled into one overall technical rating. To be rated Technically Acceptable, sub-factors 1 and 3 must be rated acceptable. The following is the Technical Merit Adjectival Rating Scheme for evaluation of the Technical proposal:
TECHNICAL ACCEPTABLE / UNACCEPTABLE RATINGS
RATING DESCRIPTION
Acceptable Proposal clearly meets the minimum requirements of the solicitation Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation
6. PAST PERFORMANCE EVALUATION PROCESS - The Government will evaluate the submitted contracts or construction projects in order to evaluate both past performance and experience. Past performance relates to how well a contractor has performed on previous contracts. Experience pertains to the types of work and volume of work previously or currently being performed by the contractor that are comparable to the types of work envisioned by this requirement in terms of size, scope and complexity. The Government may contact references to verify experience and past performance. In order to be considered for award, the offeror’s past performance rating must be evaluated as acceptable. Offeror shall present evidence of the offeror’s and/or their sub-contractors past performance on at least two (2) similar projects. In the event an Offeror has no relevant past experience, Offeror’s may submit past performance information for key personnel proposed. If an Offeror, or the proposed employees for the Offeror, do not have a past performance history relating to this solicitation, the Offeror will not be evaluated favorably or unfavorably on this factor (unknown). For purposes of this evaluation, a relevant project is further defined as any work relating to site preparation that involve excavating and grading, earth moving and land clearing for all types of sites.
TECHNICAL ACCEPTABLE / UNACCEPTABLE RATINGS
RATING DESCRIPTION
Acceptable Based on the offeror’s performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Unknown In the case of an Offeror with a record of relevant past performance or whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown past performance and shall be considered “acceptable.”
PAST PERFORMANCE RELEVANCY RATING DEFINITIONS
Relevant Present/Past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/Past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/Past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
INSTRUCTIONS FOR PROPOSALS
*Contractor shall register in the NSPA portal and obtain their CAGE Code prior to proposal submission.
Site for registration: https://eportal.nspa.nato.int/public/eportal.aspx
1. This procurement will be awarded as a Lowest Price, Technically Acceptable (LPTA) contract, considering past performance. The Government intends to evaluate all proposals and award a single contract without discussions.
Therefore, the initial offer should contain the Offeror’s best terms from a price and technical standpoint. Do not assume you will be afforded the opportunity to clarify, discuss, or revise your response. However, the Government reserves the right to make clarification or request revised responses if later determined by the Contracting Officer to be necessary. The government may reject any or all response if such action is in the public interest and/or waive informalities and minor irregularities in the submitted offers. The Government reserves the right to cancel this RFP and make no award. By responding to this RFP and submitting a proposal in response to the RFP, the Contractor understands that the Government shall not be liable for any costs incurred by the Contractor in response to this RFP.
2. PROPOSAL DELIVERY: All responses shall be in English, legible and prepared in the following general format to be properly evaluated. Responses must be complete, self-sufficient, and respond directly to the requirements of this RFP.
a. Electronic Submission. The Offeror shall provide a copy of their proposal as an electronic file. The proposal shall be e-mailed to Michael Floore II , Contract Specialist at michael.d.floore..mil@mail.mil and Ambrosio Alvarez, Contracting Officer at ambrosio.c.alvarezestero.mil@mail.mil before 3:00 pm Central Standard Time, on Sunday, 11 December 2016. The subject line of the email shall contain the solicitation number.
b. Solicitation Questions. Questions regarding this solicitation shall be submitted in writing to the Contract Specialist by email to michael.d.floore..mil@mail.mil and ambrosio.c.alvarezestero.mil@mail.mil.
The Government will answer all questions provided that the questions are received by 11:00 a.m. Central Standard Time on Friday, 18 November 2016. The Government reserves the right not to respond to any questions received concerning this solicitation after the question receipt date and time above.
Accordingly, Offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal cycle.
c. Amendments prior to date set for receipt of proposals. The Government reserves the right to revise or amend the specifications, drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such revisions, if any, will be announced by an amendment or amendments to this Request for Proposal (RFP). All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be sent out via email to all those interested parties contacted via email by the Government.
d. Exceptions. If the Offeror takes exception to any of the requirements specified in this solicitation, the Offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements and supporting rationale shall be included in an addendum to the quote and clearly labeled "Exceptions". An addendum is only required if the Offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an Offeror takes no exceptions to any solicitation requirement if the Offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an Offeror's quote unacceptable and ineligible for award.
e.
3. QUALIFICATION OF OFFEROR.
Offerors must be technically qualified and financially responsible to perform the work described in this solicitation.
As a minimum, each Offeror shall meet the following requirements:
a. Be able to demonstrate prior relevant experience with suitable references
b. Have the necessary personnel, equipment and financial resources available or ability to obtain them to perform the work.
c. Have all licenses and permits required by local law. The Offeror shall determine whether performance requires registration with Belizean authorities or authorization to do business in Belize and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Offeror also shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Belize.
d. Meet all local insurance requirements.
e. Have no adverse criminal record.
f. Have no political or business affiliation which could be considered contrary to the interest of the United
States.
g. Be able to read, speak, and understand English.
h. The Oferror has been duly authorized to operate and do business in Belize.
i. In order to be eligible for award, all offerors shall have a NCAGE Code. to register for a NCAGE Code, go to: https://eportal.nspa.nato.int/ac135public/
4. SUMMARY OF INSTRUCTIONS.
Title Executed Standard Form 1442 Priced Line Item 0001 thru 0004, Page 3 of the RFP Technical/Past Performance/Price Proposal Any deviations, exceptions, or conditional assumptions taken with respect to any of the instructions or requirements of this solicitation shall be identified and explained/justified in the offer (Refer to paragraph 2d, PROPOSAL DELIVERY Exceptions).
5. PROPOSAL CONTENTS: Each Offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration at the government’s discretion.
Proposal Sections shall be labeled by section (i.e., Section I - Price, Section II-Technical and Section III-Past Performance). If the proposal is not broken down in sections as described, the proposal may be removed from further consideration as non-compliant.
Section I - Price/Cost Information and required documents Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project. The Government is not, and does not intend on, requesting certified cost or pricing data. Offeror’s may be required during the evaluation process to provide sufficient price/cost information that will enable the Government to perform a meaningful evaluation.
A complete response shall consist of a price breakdown worksheet and a cover sheet. The Offeror shall provide its response with a cover sheet that contains the company’s name, address and telephone number, name and title of the person authorized to sign and negotiate the contract and appropriate dollar threshold, offer validation period of 30 days.
Offer - Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442 contract line item on page 3.
An official having the authority to contractually bind your company must sign the SF 1442 IAW FAR 4.102.
One copy of the SF 1442 is required to have an original signature. The Offeror shall add price/cost amounts from the price breakdown worksheet and insert in the SF 1442 contract line items.
The Offeror shall submit with its proposal the following documents (accurate and complete), as listed below:
a. Standard Form 1442 - Complete blocks 14 through 20c; and price all line items on pages 3.
b. Amendment(s) – Acknowledge by signing any amendments issued out during this solicitation Amendments may also be acknowledged in block 19 of the SF 1442.
IF ALL THE DOCUMENTS LISTED ABOVE ARE NOT SUBMITTED WITH YOUR PROPOSAL,
OFFEROR’S PROPOSAL MAY BE CONSIDERED NON-COMPLIANT.
Section II - Technical Response: Each item listed below shall be limited to no more than six (6) single-sided or three (3) double-sided pages.
Provide the following:
a. A description of all equipment to include the item name, age of the item, its intended usage, and a transportation plan. Materials to include the item name, cost and unit of measure, procurement plan, and quantity. Products to be used for the project. Offeror’s technical response shall ensure a complete understanding of the work to be performed and its ability to comply with the Statement of Work requirements.
b. Project Schedule: Project schedule shall be submitted using any of the following project schedules: Critical Path Method (CPM), Program Evaluation & Review Technique (PERT), or Gantt chart. The project schedule will be in sufficient detail to clearly illustrate the following major project phases: (Site survey and design, Laydown yard for containers and equipment, Motor Pool area for parking lots of vehicles, Living and Support area, Site Clean up and disposal) and expected completion dates and execution times of each work phase. Sufficient float time shall be incorporated in the schedule to account for down days due to inclement weather.
c. Quality Control Plan: Quality Control Plan shall be in sufficient detail to clearly illustrate the contractor’s
d. surveillance and quality control methods for the following major project phases:
1. Site Survey and Design
2. Laydown yard for parking lot of containers and equipment
3. Motor Pool area for parking lots of vehicles
4. Living and Support area
5. Site Cleanup and Disposal
Section III - Past Performance Information:
Provide any information currently available (letters, customer surveys) which demonstrate customer satisfaction relating to overall job performance and quality of completed services on three (3) relevant contracts of the same or similar type of work in size, nature and complexity specified in this Statement of Work . Recent contracts must be work that has been completed within the past three years. All past performance materials must be submitted in English.
Explain corrective actions taken in past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, customer complaints, or personnel problems/issues.
References - The past performance information from three relevant contracts, as specified in the paragraph above, must clearly demonstrate Offeror’s prior experience in similar construction projects that were:
a. Physically completed within the past three years
b. Similar in magnitude (US $ amount)
c. Similar in building renovation construction features
Provide the following information for each contact or project and describe:
Customer's name, address, and telephone numbers of customer's lead contract and technical personnel:
a. Contract value, number and type
b. Date of the contract award place(s) of performance, and completion dates
c. Brief description of the work, including responsibilities
d. Comparability to the work under this solicitation
e. Brief discussion of any major technical problems and their resolution
f. Method of acquisition (fully competitive, partially competitive, or noncompetitive), and the basis for award
(cost/price, technical merit, etc.) and
g. Any terminations (partial or complete) and the reason (convenience or default)
If more than three projects are submitted, only the three most recent will be evaluated. The projects may be contracts for the U.S. Government or other clients.
Past Performance Page Limitation: No more than one (1) double-sided or two (2) single pages of written material shall be submitted for each project. Photographs may be included, but photos and written material combined shall not exceed the page limit requirements.
6. METHOD OF PAYMENTS: For this requirement the following method of payments will be available and will be coordinated between the Offer or and Contracting Officer before contract award is made:
a. Cashier Checks
b. Electronic Funds Transfer (EFT)
c. Government Purchase Card (GPC)
SECTION 00700 - CONTRACT CLAUSES
The following have been deleted:
52.211-12 Liquidated Damages--Construction SEP 2000
(End of Summary of Changes)