McEntire JNGB has several items are due for repainting.
Project Overview
1 Dec 16 Attachment 9
All work to be completed on McEntire JNGB and the contractor will furnish all necessary equipment, labor, MSDS’s, materials, tools, and transportation needed to accomplish the project. All information and quantities need to be verified by the contractor and shall be in accordance with applicable Unified Facility Criteria, ANG and Air Force Engineering Technical Letters, and all other regulator and code requirements.
Project consists of Base Bid and two options.
BASE BID
The parking apron redline markings repainting, and the paint removal in some areas.
ECP’s and new Restricted Area markings to be painted on apron. Guidelines can be found in UFC 3-260-04 6-5.10 Restricted Area and Restricted Area Entry Control Points (ECP).
BASE BID
BASE BID
The airfield taxiways are due for repainting and will need to aligned with the runway edge lines that were recently completed in a different project.
Option 1
Front Gate Roadways repainted and corrected to meet DOT standards.
Option 1
Curbs
Option 2
Propane Tanks need to be cleaned and repainted
Eight (28 ft long) swing gates around base that need repainted.
There are 384 bollards located on base that need to be repainted. The bollards average about 4 feet tall and between 20 – 30 inches wide.