Q&A.pdf

PDF 33 KB Posted

Attached to
Base Fence & Gate Repairs
Solicitation number
W912PQ19Q6002
Issued by

View the file

Other files

File Type Posted
W912PQ19Q60020001.pdf PDF
W912PQ19Q6002.pdf PDF
Access_to_Plans_and_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q. For the main gate entrance non‐motorized sliding gate that will be converted to a motorized sliding gate, where will power be pulled from?

A. There is a panel that can be used to pull power from in the guard shack adjacent to the gate we are adding the motor to. We verified there is room for the additional circuit in the existing panel. The entire area is on backup power so no additional tie‐ins are required to provide emergency power.

Additionally there is a conduit that can be used to run the electric that comes out right next to the column where the motor would be placed. It is single phase 220 V power.

File details come from the government source that posted it.