F8K7CE9126AW01

Construction Contract for Project # RVKQ182588 Repair Wind Damaged Doors Building 912 at the 107th Attack Wing, Niagara Falls Air Reserve Station, Niagara Falls, New York. The description of w ork is as follow s: provide all labor, materials, plant, equipment and supervision necessary to repair by replacement tw o (2) door assemblies. Doors require replacement as the original materials w ere insuff icient to resist w ind damage and have become damaged beyond the point of reasonable repair w ithout prediction of future damage; along w ith other associated w ork w ith in the statement of w ork (SOW). This action is being solicited as a total small business set-aside. The North American Industry Classif ication (NAICS) Code is 238350 and the Size Standard for Small Business is $15M average annual revenue for the past three years. Project magnitude is Less than $25,000.00. A single aw ard is contemplated. A bid bond is NOT required w ith quote. If considering submitting a quote you should attend the site visit. Solicitation and all information, notices, amendments for this solicitation w ill be posted at http://w w w .fbo.gov. Site Visit Wednesday, 5 June 2019, 9:00 a.m. EST at the 107th Attack Wing Operations Building 912, at the Niagara Falls Air Reserve Station, Niagara Falls, New York 14304.

JASON M. FRONDEN 716-236-2493

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Jul-2019

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________122 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

W912PQ19P5004

7. ISSUED BY CODE

W912PQ- 107TH AW/MSC

9910 BLEWETT AVE

NIAGARA FALLS NY 14304-6001

W912PQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

716-236-3043FAX:TEL: 716-236-2493 TEL: FAX:

W912PQ19Q5001 44

See Item 7

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE

7Z4J5

FACILITY CODE

7Z4J5

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

$34,400.00 See Schedule

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified) 1

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE F8770027. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

DFAS DEAMS-F87700

ACCTG DISB STA NR 387700

DFAS DEAMS

27 ARKANSAS RD

LIMESTONE ME 04751-6216

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR

ALLIED ENVIRONMENTAL SERVICES OF NY LLC

LINDA GRIMMER

19 RANSIER DR STE C

WEST SENECA NY 14224-2259

15. TELEPHONE NO. (Include area code)

(716) 803-9823

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

X 29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF: W912PQ19Q5001

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print) JASON M. FRONDEN / CONTRACTING OFFICER

TEL: 716-236-2493 EMAIL: jason.m.fronden.mil@mail.mil

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY 10-Jul-2019

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912PQ19P5004

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job $33,900.00 $33,900.00 RVKQ18-2588 Repair Doors B912

FFP

Replace two exterior door sets and restore adjacent surfaces and finishes along with other work associated within the Statement of Work (SOW).

FOB: Destination

MILSTRIP: F8K7CE9126AW0100

MFR PART NR: Null

PURCHASE REQUEST NUMBER: F8K7CE9126AW01

SIGNAL CODE: A

PSC CD: Z2AA

NET AMT $33,900.00

ACRN AA

CIN: 00000000000004531188

$33,900.00

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job $500.00 $500.00 Contractor Manpower Reporting

FFP

The result of this requirement will require you to report this information if you are awarded the contract. To access the CMRA system and submit the appropriate data, please go to: http://www.ecmra.mil/

FOB: Destination

MILSTRIP: F8K7CE9126AW0101

MFR PART NR: Null

PURCHASE REQUEST NUMBER: F8K7CE9126AW01

SIGNAL CODE: A

PSC CD: Z2AA

NET AMT $500.00

ACRN AA

CIN: 00000000000004531189

$500.00

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 122 dys. ADC 1 F8K7CE- 107 AW/CE

9905 BLEWETT AVE

NIAGARA FALLS NY 14304

716-236-2459 FOB: Destination

F8K7CE

0002 122 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

FOB: Destination

F8K7CE

Section 00100 - Bidding Schedule/Instructions to Bidders

SOW

107th Attack Wing

New York Air National Guard

Niagara Falls ARS

Niagara Falls, New York 14304

04 April 2019

STATEMENT OF WORK

RVKQ182588

Repair Wind Damaged Doors Building 912

FOR

107TH ATTACK WING CONTRACTING OFFICE

NEW YORK AIR NATIONAL GUARD

NIAGARA FALLS, NEW YORK

SECTION 1: Introduction

SECTION 2: General SECTION 3: Safety

SECTION 4: CMRA

SECTION 5: Drawing / Specifications

SECTION 01010

SUMMARY OF WORK

1 INTRODUCTION

1.1 INTRODUCTION/BACKGROUND

The project site is located in building 912, 107th Attack Wing, Operations Flight, New York Air National Guard (NYANG), at the western portion of the Niagara Falls Air Reserve Station (NFARS), Niagara Falls, New York. The description of work is as follows: provide all labor, materials, plant, equipment and supervision necessary to repair by replacement two (2) door assemblies. Doors require replacement as the original materials were insufficient to resist wind damage and have become damaged beyond the point of reasonable repair without prediction of future damage.

1.2 SCOPE OF WORK

The description of work is as follows: provide all labor, materials, plant, equipment and supervision necessary to replace door assemblies in two locations.

Door Assembly Remove and replace existing door assemblies. Provide and install door assemblies to replace the existing door sets. Materials should be consistent with a maximum duty constructed door or level 4 as defined by the SDI (Steel Door Institute). Doors will be similar in dimensions to existing doors. Door and frame material will be steel. Finishes will be consistent with existing building style and factory applied. Color samples must be submitted and approved. Doors will be full glass similar to existing. Door assembly construction and operation must be consistent with the following standards, of the latest revision, on the date of award:

UFC 4-010-01 DoD Minimum Antiterrorism Standards For Buildings UFGS 08 11 13 Steel Doors and Frames ABA Architectural Barriers Act ANSI A250.13-2014 American National Standards Institute SDI/DOOR A250.3 Steel Door Institute

Door Hardware and Accessories Door lockset must accept the BEST® key core system, matching core commonly in use at the 107th. New lockset finish will be consistent with existing and of commercial quality. Panic exit device is required. All doors will adhere to NFPA 101 considering locks and thresholds. Latches, Locks, and Exit Devices: Not more than 15 lbs. to release the latch. Locks shall not require the use of a key, tool, or special knowledge for operation. Thresholds: Not more than 1/2 inch high. Provide exit devices with hex key dogging device to hold the pushbar and latch in a retracted position. Hinge will be full length if available and no other stronger mounting method is available. Hinge pin will be non-removable type. Mullion will be removable. Mullion to be keyed if option available.

Door closer to be maximum duty and sufficient to prevent damage to door in wind that can be expected considering the location adjacent to an airfield and the location’s geography.

North Door Specific Requirements Mullion must be removable. Door widths to be same as existing. Panic exit device will be on both doors. This door is required for fire egress and therefore must meet all standard egress requirements.

West Door Specific Requirements The intent of this door is to have the maximum allowable opening potential width and height. This door is required for fire egress and therefore must have a 36 inch wide door and fulfill all other standard egress requirements. In addition to the door an inactive leaf is installed with a removable mullion. Similar construction is required for replacement door.

Adjacent Finishes and Materials All finishes adjacent to door being replaced will be adjusted as required by door replacement to allow for a finished look comparable to current existing conditions. Work may include but not limited to: drywall and paint, ceilings, flooring, thresholds, siding, trim, etc. New finishes will be comparable to existing and samples must be submitted and approved.

Gutter Downspout Replacement Replace gutter downspout and associated attachment hardware located due east of the north door. Gutter was previously damaged by door and in need of replacement. Match existing materials and construction type.

Additional requirements Contractor will verify all dimensions before starting work to ensure trouble free instillation. Contractor shall provide warranty on all materials and workmanship for a period of five years from date of acceptance. Contractor shall provide warranty of 10 years for locks and latches. Contractor shall provide warranty of 25 years for manual door closers. Contractor will provide manufacturers warranties and install materials in accordance with manufacturer’s instructions.

1.3 LOCATION AND DESCRIPTION OF WORK

The project site is located in building 912, 107th Operations Building, New York Air National Guard (NYANG), at the western portion of the Niagara Falls Air Reserve Station (NFARS), Niagara Falls, New York.

1.4 TECHNICAL SPECIFICATIONS

Work shall be completed in a professional manner according to standard industry practices. The contractor shall provide personnel and equipment necessary to accomplish work. Services include but are not limited to pre-planning, providing required equipment to complete the job, supervision, loading/unloading, assemble, move, and install.

Changes requested by the government representative shall be approved by the contracting officer in writing prior to acceptance by the contractor.

2 GENERAL

2.1 POINT OF CONTACT

The POC for this project is TSgt David Loder, (716)-236-2403 David.M.Loder.mil@mail.mil.

2.2 WORK RESTRICTIONS

The Contractor shall not work Federal Holidays.

2.3 NORMAL DUTY HOURS

Normal duty hours shall be from 7:00 am to 4:00 pm. Requests for work during non-normal hours require written approval from the Contracting Officer 7 days in advance.

2.4 NOTICE TO COMMENCE WORK

The Contractor shall give the Contracting Officer at least a 48 hour notice of Contractor’s intent to commence work.

2.5 PERFORMANCE PERIOD

Performance period is 122 days, after notice to proceed. Work on site is to be limited in time to minimize disruption to operations. Materials with long lead times are expected. On site work schedule is to be submitted as part of the bid process.

2.6 OCCUPANCY OF PREMISES BY THE GOVERNMENT

The facility will be occupied during this period. Contractor will limit their movement within the facility to not interfere with ongoing operations. Coordination with the Contractor and the Contracting Officer’s Technical Representative (COTR) will be required to facilitate this. Approval and adherence to an onsite work schedule is required.

Any changes to the schedule must be made in writing in advance and approved by the

COTR.

2.7 OCCUPANCY OF PREMISES BY THE CONTRACTOR

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches and roadway access with a corresponding timeline of events.

2.8 ACCESS

The contractor shall allow government personnel access to work areas, provide support and not interfere with military, state, federal, and other designated personnel in performance of their official duties.

2.9 PASS AND IDENTIFICATION ITEMS

The contractor shall obtain pass and identification items required for contract performance for employees and non-government owned vehicles IAW clauses of this contract. The contractor will retrieve all identification media, including vehicle passes, from employees upon termination of on-site employment and turn said media into the

CO.

2.10 TRAFFIC LAWS:

The contractor shall comply with all Niagara Falls Air Reserve Stations traffic regulations while on the installation.

2.11 SECURITY

The CO may direct the contractor to remove, and the contractor shall remove an employee from any assignment under this contract for reasons of security or misconduct.

All contractor personnel are subject to security forces jurisdiction and the authority of the Installation Commander (CC) while on USAF installations

2.12 CHANGES

Any changes or alterations requesting additional items to be moved or additional services must be approved by the Contracting Officer prior to adding the items or services.

2.13 CONTRACTOR SUBMITTALS

The following items shall be submitted for approval:

Door system product specifications to include elevation detail drawings

Material finish samples for doors

Material finish samples for siding

Door hardware to include lockset and

Lock Type

On site work schedule

NGB Contract Progress Report

AF3064 Contract Progress Schedule or approved equivalent

Warranties and Operating Instructions

To the greatest extent possible, all submittals shall be accomplished electronically through e-mail. Samples are to be submitted to the project engineer by the Contractor for approval using AF Form 3000. The Contractor is responsible for all submittals on this listing and any others as required by the specifications and/or as requested by the Contracting Officer.

Approval must be obtained from the Contracting Officer prior to the commencement of any Work requiring submittals as specified.

All submittals except warranties and operating instructions as noted shall be made no later than ten (10) days after the receipt of the notice to proceed or as specified by the Contracting Officer. If submittals cannot be made within ten (10) working days after the notice to proceed, or as specified by the Contracting Officer, the Contracting Officer shall be advised of the difficulty and an extension of time requested.

The Contracting Officer shall return the submittals approved or disapproved within 10 working days after receipt, by AF Form 3000. Approval of submittals does not relieve the Contractor from performance in strict accordance with the Contract Specifications and drawings, nor does such approval constitute ‘acceptance’ under the provisions of this Contract.

2.14 MATERIALS

All materials procured shall be new and unused and in accordance with specifications.

2.15 DAILY SIGN-IN

Prior to starting work each day, the Contractor and/or Subcontractor must fill out the Sign-In Sheet located at Base Civil Engineer Office, Building 202.

2.16 HOURS OF WORK

Work shall be accomplished during normal business hours (0700 – 1600). Work performed outside of normal business hours, shall be approved and coordinated with the Contracting Officer prior to the work being performed. Work will not be conducted on Federal Holidays.

2.17 VERIFICATION OF DIMENSIONS

Contractor shall determine exact dimensions prior to constructions. Contractor is solely responsible for verifying dimensions of all materials prior to purchase.

2.18 REMOVAL OF WASTE MATERIAL

During the progress and the completion of work, all refuse and waste materials shall be removed from Government property and disposed of according to Federal, State and local environmental requirements. If waste material is not removed daily, the Contractor shall provide a covered waste container at their expense. Recycling of refuse shall be considered for all demolished materials.

3 SAFETY

3.1 As a contractor, you are required to comply with the Occupational Safety and Health Act of 1970 (OSHA) and OSHA Standards 29 CFR 1910, Occupational Safety and Health Standards, and 29 CFR 1926, Safety and Health Regulations for Construction. The detailed provisions of the Act for accident prevention are directly applicable to your operations Each contractor and subcontractor is responsible for managing their own Health and Safety Program. A copy of the program must be available for inspection either on site or retrievable within a reasonable time (8 hours). The program should address the following areas:

a. Hazard Communication

b. Personal Protective Equipment

c. Personnel Training / Certification

d. Fall Protection (if applicable)

e. Confined Space Entry (if applicable)

3.2 The contractor will keep records of any accidents involving property damage or injury occurring on the job and will report such incidents immediately to the Contracting Officer who is responsible for notifying the Safety Office. When the Contracting Officer becomes aware of noncompliance with safety standards that may cause injury to Air Force personnel or damage to Air Force property or equipment, they will inform the contractor. The contractor will take immediate steps to correct the situation.

3.3 In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

3.4 Some common contractor violations on Air Force installations include: Failure to properly ground electrical equipment (GFCI), failure to fence off excavations, parking vehicles improperly, unauthorized crossing of runways, violating smoking regulations, improper scaffolding, inadequate shoring/sloping of excavation and trenches, and depositing Foreign Object Damage (FOD) debris on base roads.

4 Contractor Manpower Reporting Application (CMRA):

Section 2330a of title 10, United States Code (10 USC 2330a), requires the Secretary of Defense to submit to Congress an annual Inventory of Contracts for Services (ICS) performed during the prior fiscal year for or on behalf of the Department of Defense (DoD). The inventory must include the number of contractor employees using direct labor hours and associated cost data collected from contractors. CMRA is the system utilized by the Air Force to collect and provide the Air Force's annual Inventory of Contracts for Services (ICS) to Congress. The result of this requirement will require you to report this information if you are awarded the contract. To access the AF CMRA system, please go to: http://www.ecmra.mil and look for the link for the Air Force CMRA system.

If you have questions or issues accessing the Air Force CMRA system, please contact the Air Force CMRA Help Desk at: (855) 723-2672 or CMRA@pentagon.af.mil

5 Drawings / Specifications

Fig 5.1 North Door

Fig 5.2 West Door

END OF SECTION 01010

WAGE DETERMINATION

"General Decision Number: NY20190019 06/21/2019

Superseded General Decision Number: NY20180019

State: New York

Construction Type: Building

County: Niagara County in New York.

BUILDING CONSTRUCTION PROJECTS (except single family homes and apartments up to and including 4 stories), Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 01/18/2019 2 03/01/2019 3 04/05/2019 4 06/21/2019

ASBE0004-001 05/01/2018

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (include application of all materials, protective coverings, coatings, and finishings to all types of mechanical systems).........................$ 33.25 23.04

HAZARDOUS MATERIAL HANDLER.......$ 33.25 23.04

BRNY0045-002 07/01/2018

Rates Fringes

Bricklayer, Stonemason...........$ 31.32 25.58 Marble mason.....................$ 31.45 23.70 Pointer, cleaner and caulker.....$ 31.32 25.58 Tile & Terrazzo Worker...........$ 31.57 24.83 Tile, Marble & Terrazzo Finisher.........................$ 29.13 15.12

CARP0276-016 07/01/2017

Rates Fringes

Carpenters (Including Drywall Hanging & Acoustical Ceiling Installation) Carpenters and Soft Floor Layers......................$ 31.53 24.61 Millwrights.................$ 31.53 24.61

ELEC0237-001 05/28/2018

Rates Fringes

Electricians:

Cable Splicers..............$ 37.40 27.44 Electricians................$ 34.78 27.98

ELEV0014-001 01/01/2019

Rates Fringes

ELEVATOR MECHANIC................$ 49.81 33.705+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0463-004 07/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

Backhoe Operators Group A1...................$ 36.37 27.10 Bulldozer Group A1...................$ 36.37 27.10 Forklift Operator/Lull Group A1...................$ 36.37 27.10 Loader Group A1...................$ 36.37 27.10 Roller Group A1...................$ 36.37 27.10

IRON0009-003 07/01/2018

Rates Fringes

Ironworkers:

IRONWORKER..................$ 30.50 26.50

SHEETER.....................$ 30.50 26.50

LABO0091-001 07/01/2017

Rates Fringes

Laborers:

GROUP 1....................$ 26.00 35.96+a GROUP 2....................$ 28.60 35.96+a GROUP 3....................$ 27.00 35.96+a GROUP 4....................$ 26.85 35.96+a GROUP 5....................$ 26.60 35.96+a GROUP 6....................$ 26.30 35.96+a GROUP 7....................$ 26.30 35.96+a GROUP 8.....................$ 28.00 35.96+a GROUP 9.....................$ 31.00 35.96+a

LABORER CLASSIFICATIONS

GROUP 1: Common Laborers, Decontamination of all machines;

Horizontal Directional Drill/Locator; All terrain vehicles with attachments/All wheel or track types

GROUP 2: Blasters, Grade Checker; 10% of Base Rate

GROUP 3: Wagon Drill-Airtrack, Self-Contained Drill

GROUP 4: Laser Beam Operator

GROUP 5: Road Finisher, Form Setter, Gunnite Nozzleman, Sandblasters, Burning Torch, Concrete Saw Operators, Grout Machine and Grout Pumps Operator

GROUP 6: Video Machine Operator in inspection of Pipe

GROUP 7: Potman, Pipelayers, Pavement Breakers or Busters, jackhammer operators; barco rammers; chain saw; powder monkey; black top rakers; scalers; drill tenders; mortar mixers; Concrete polishing machine; Operation & maintenance of all Robotic Remote Systems in hazardous environment;

Peration C men working from swinging scaffold bosum chair;

suspended cage or bucket; work in caissons below 8 feet;

concrete motor buggy; all other operators of mechanical tools, including vibrators egardless of type of power.

GROUP 8: The handling, loading, unloading, stacking, distribution, erection and dismantling of any and all types of scaffolding and/or work platforms used in the removal of insulating material regardless of the composition of said material. The removal of all insulation materials whether they contain asbestos or not from mechanical systems, (pipes, boilers,ducts, flues, breechings, etc.) on all mechanical systems (pipes, boilers, ducts, flues, breeching, etc.) that are going to be scrapped. The removal of all insulating materials whether they contain asbestos or not. The removal of all asbestos containing materials from walls, ceilings, floors, columns and all other non-mechanical structures and surfaces, etc;

GROUP 9: Use of supplied air respirators

FOOTNOTE:

a. PAID HOLIDAYS: Memorial Day, Labor Day, Thanksgiving Day

PAIN0004-009 05/01/2018

TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE,

PENDLETON, ROYALTON, SOMERSET and the eastern halves of CAMBRIA and WILSON

Painters:

BRUSH & ROLLER..............$ 25.95 24.44

DRYWALL/TAPING..............$ 26.45 24.44

PAIN0004-010 05/01/2017

TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD and the western halves of CAMBRIA and WILSON

Painters:

Painters....................$ 25.95 23.69 Tapers/Dry Wall.............$ 26.45 23.69

PAIN0004-012 05/01/2018

GLAZIER..........................$ 26.75 21.42

PLAS0111-003 04/01/2019

Rates Fringes

CEMENT FINISHER..................$ 30.00 33.17

PLASTERER........................$ 30.15 20.49

PLUM0022-005 04/30/2018

Rates Fringes

Plumber and Steamfitter

ZONE 1......................$ 35.40 25.20

* ROOF0074-002 06/01/2019

Rates Fringes

Roofers:

Composition.................$ 29.00 22.39 Slate & Tile................$ 29.15 22.39

SHEE0071-002 05/28/2018

Rates Fringes

Sheet metal worker...............$ 34.38 24.39

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

ADDENDUM 1 TO SOW

107th Attack Wing

New York Air National Guard

Niagara Falls ARS

Niagara Falls, New York 14304

6 June 2019

ADDENDUM 1

To

STATEMENT OF WORK

RVKQ182588

Repair Wind Damaged Doors Building 912

FOR

107TH ATTACK WING CONTRACTING OFFICE

NEW YORK AIR NATIONAL GUARD

NIAGARA FALLS, NEW YORK

SECTION 1: Images of damage to doors

SECTION 001

IMAGES OF DAMAGED DOORS

Fig 1.1 North Door – Damage

Fig 1.2 West Door – Damage

END OF SECTION 001

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.211-18 Variation in Estimated Quantity APR 1984 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2019-O0003).

JAN 2019

52.219-14 Limitations On Subcontracting JAN 2017 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-34 Project Labor Agreement MAY 2010 52.222-50 Combating Trafficking in Persons JAN 2019 52.223-16 Alt I Acquisition of EPEAT - Registered Personal Computer

Products - Alternate I

JUN 2014

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.226-5 Restrictions on Subcontracting Outisde Disaster or

Emergency Area

NOV 2007

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.233-3 Protest After Award AUG 1996 52.236-2 Differing Site Conditions APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items JAN 2019 52.245-1 Government Property JAN 2017 52.246-21 Warranty of Construction MAR 1994 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.233-7001 Choice of Law (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7006 Cost Limitation JAN 1997 252.239-7001 Information Assurance Contractor Training and Certification JAN 2008 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)

(a) Definitions. As used in this clause-- Internal confidentiality agreement or statement means a confidentiality agreement or any other written statement that the contractor requires any of its employees or subcontractors to sign regarding nondisclosure of contractor information, except that it does not include confidentiality agreements arising out of civil litigation or confidentiality agreements that contractor employees or subcontractors sign at the behest of a Federal agency.

Subcontract means any contract as defined in subpart 2.1 entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract. It includes but is not limited to purchase orders, and changes and modifications to purchase orders.

Subcontractor means any supplier, distributor, vendor, or firm (including a consultant) that furnishes supplies or services to or for a prime contractor or another subcontractor.

(b) The Contractor shall not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).

(c) The Contractor shall notify current employees and subcontractors that prohibitions and restrictions of any preexisting internal confidentiality agreements or statements covered by this clause, to the extent that such prohibitions and restrictions are inconsistent with the prohibitions of this clause, are no longer in effect.

(d) The prohibition in paragraph (b) of this clause does not contravene requirements applicable to Standard Form 312 (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(e) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015, (Pub. L. 113-235), and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions) use of funds appropriated (or otherwise made available) is prohibited, if the Government determines that the Contractor is not in compliance with the provisions of this clause.

(f) The Contractor shall include the substance of this clause, including this paragraph (f), in subcontracts under such contracts.

(End of clause)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

(a) The Government recognizes that the line items established in this solicitation may not conform to the Offeror's practices. Failure to correct these issues can result in difficulties in acceptance of deliverables and processing payments. Therefore, the Offeror is invited to propose alternative line items for which bids, proposals, or quotes are requested in this solicitation to ensure that the resulting contract is economically and administratively advantageous to the Government and the Offeror.

(b) The Offeror may submit one or more additional proposals with alternative line items, provided that alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation. However, acceptance of an alternative proposal is a unilateral decision made solely at the discretion of the Government. Offers that do not comply with the line items specified in this solicitation may be determined to be nonresponsive or unacceptable.

(End of provision)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)

(a) Definitions. As used in this clause--

Covered article means any hardware, software, or service that--

(1) Is developed or provided by a covered entity;

(2) Includes any hardware, software, or service developed or provided in whole or in part by a covered entity; or

(3) Contains components using any hardware or software developed in whole or in part by a covered entity.

Covered entity means--

(1) Kaspersky Lab;

(2) Any successor entity to Kaspersky Lab;

(3) Any entity that controls, is controlled by, or is under common control with Kaspersky Lab; or

(4) Any entity of which Kaspersky Lab has a majority ownership.

(b) Prohibition. Section 1634 of Division A of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L.

115-91) prohibits Government use of any covered article. The Contractor is prohibited from--

(1) Providing any covered article that the Government will use on or after October 1, 2018; and

(2) Using any covered article on or after October 1, 2018, in the development of data or deliverables first produced in the performance of the contract.

(c) Reporting requirement.

(1) In the event the Contractor identifies a covered article provided to the Government during contract performance, or the Contractor is notified of such by a subcontractor at any tier or any other source, the Contractor shall report, in writing, to the Contracting Officer or, in the case of the Department of Defense, to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (c)(1) of this clause:

(i) Within 1 business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (Original Equipment Manufacturer (OEM) number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the report pursuant to paragraph (c)(1) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered article, any reasons that led to the use or submission of the covered article, and any additional efforts that will be incorporated to prevent future use or submission of covered articles.

(d) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts, including subcontracts for the acquisition of commercial items.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 122 calendar days after the date the contractor receives the notice to proceed The time stated for completion shall include final cleanup of the premises.

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL

ITEMS) (JAN 2019).

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iii) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

(iv) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(v) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

(vi) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(vii) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(viii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78 (19 U.S.C. 3805 note).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013).

(vii) 52.233-1, Disputes (MAY 2014).

(viii) 52.244-6, Subcontracts for Commercial Items (JAN 2019).

(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (MAR 2016) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).

(ii) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126). (Applies to contracts for supplies exceeding the micro-purchase threshold).

(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).

(iv) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212) (applies to contracts of $150,000 or more).

(v) 52.222-36, Equal Employment for Workers with Disabilities (JUL 2014) (29 U.S.C. 793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.