ADDENDUM_1.pdf

PDF 152 KB Posted

Attached to
Renovation of Building 42 Gym
Solicitation number
W912PQ-15-R-0010
Issued by

View the file

Other files

File Type Posted
ADDENDUM_2.pdf PDF
Roll-up_door_spec.pdf PDF
YORK_Spec.pdf PDF
BLDG_42_GYM_HVAC-_Updated.pdf PDF
W912PQ-15-R-0010_P0001.pdf PDF
Site_visit_attendance.pdf PDF
BLDG_42_GYM_HVAC-_Drawings.pdf PDF
W912PQ-15-R-0010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW YORK AIR NATIONAL GUARD

TH

AIRLIFT WING

BASE CONTRACTING OFFICE

1 AIR NATIONAL GUARD ROAD

SCOTIA, NY 12302-9752

April 23, 2015

Addendum for Project “Renovate Bldg. 42 Gym” at Stratton ANGB, Scotia, NY

12302. Project Number VBDZ151003.

The proposal response date has not been extended.

The following is the listing of questions asked for the subject project, and the respective answers:

Can you provide a specification for the new HVAC unit?

Attached specifications for HVAC are the basis for design (or equivalent)

What is the spec for thickness/insulation on the new overhead door?

Attached specifications for the Door are the basis for design (or equivalent).

Can we remove and reinstall the anchors that bolt the mezzanine level to the uneven concrete and install longer ones?

The existing anchors are expanding and will likely damage the concrete when removed. The concrete would have to be repaired with epoxy before another bolt can be re-attached.

WANDA D. YARBOR, MSGT, NYANG

Contracting Officer

2015-04-24T14:03:53-0400
YARBOR.WANDA.DENISE.1023499823

File details come from the government source that posted it. Updated .