ADDENDUM_1.pdf
PDF 152 KB Posted
- Attached to
- Renovation of Building 42 Gym
- Solicitation number
- W912PQ-15-R-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM_2.pdf | ||
| Roll-up_door_spec.pdf | ||
| YORK_Spec.pdf | ||
| BLDG_42_GYM_HVAC-_Updated.pdf | ||
| W912PQ-15-R-0010_P0001.pdf | ||
| Site_visit_attendance.pdf | ||
| BLDG_42_GYM_HVAC-_Drawings.pdf | ||
| W912PQ-15-R-0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW YORK AIR NATIONAL GUARD
TH
AIRLIFT WING
BASE CONTRACTING OFFICE
1 AIR NATIONAL GUARD ROAD
SCOTIA, NY 12302-9752
April 23, 2015
Addendum for Project “Renovate Bldg. 42 Gym” at Stratton ANGB, Scotia, NY
12302. Project Number VBDZ151003.
The proposal response date has not been extended.
The following is the listing of questions asked for the subject project, and the respective answers:
Can you provide a specification for the new HVAC unit?
Attached specifications for HVAC are the basis for design (or equivalent)
What is the spec for thickness/insulation on the new overhead door?
Attached specifications for the Door are the basis for design (or equivalent).
Can we remove and reinstall the anchors that bolt the mezzanine level to the uneven concrete and install longer ones?
The existing anchors are expanding and will likely damage the concrete when removed. The concrete would have to be repaired with epoxy before another bolt can be re-attached.
WANDA D. YARBOR, MSGT, NYANG
Contracting Officer
| 2015-04-24T14:03:53-0400 | |
| YARBOR.WANDA.DENISE.1023499823 |
File details come from the government source that posted it. Updated .