Section 00010 - Solicitation Contract Form
SCOPE OF WORK
Scope of Work
Spill Control Dam – Catwalk Installation & Baffle Upgrade
VBDZ112016
PROJECT DESCRIPTION
The baffle and catwalk system is the first step of the Detection/Containment environmental project to contain the base storm water runoff during a spill event. Approximately 80% of the base storm water flow exits through the spill containment dam located along Range Road. Other additive portions of this project can be completed simultaneously, or at a later date, however the baffle improvement and accessibility is the first step necessary to contain a potential fuel spill into the base’s storm water system. The Contractor shall provide all material, labor, equipment, and supervision required to install a catwalk across the existing spill control dam and repair/upgrade existing baffle system. The current baffle needs reinforcement (the support has shifted off of the concrete wall and it is now structurally compromised) and debris to be cleaned away from the outlet. The catwalk allows access for work over the water body, and routine maintenance to occur. The catwalk will also help in maintaining the high levels of grass on the runway side of the dam, which will reduce bird nesting activity, and ultimately assist in reduction of Bird Airstrike Safety Hazard (BASH).
Construction drawings are available for existing system, but should be verified with onsite measurements.
Catwalk – The existing spill control dam is not accessible across the length of the baffle and/or weir. The baffle needs to be modified and maintained in order to be effective. (Necessary modifications are described below.) The Contractor shall design and construct a catwalk to allow for personnel access from the East side (road side) of the lagoon to the West side. Catwalk shall be constructed of a steel walkway with a minimum width of 48 inches. Designs shall be compliant with OSHA regulations 29 CFR 1910.23(c) and 1926.106. An additional center footing may be necessary to support the walkway. Stairs will be installed as needed.
Baffle – The existing baffle needs to be reconstructed with an improved support beam and added height. Baffle should be in a floating tray system that allows for movement upwards and downwards during freezing and thawing weather conditions. Baffle spans across lagoon area and is approximately 26 ft. in length. New baffle must be an additional 2’ lower in depth, than existing baffle. Current baffle total height is 3’ – new baffle should be a total of 5’ in height and should be installed with the floating tray stops approximately 2 feet lower than existing. Current height has been found to be above the surface of the water during dry weather conditions. Baffle should be constructed of pressure treated wooden boards, and aluminum or coated steel.
The Contractor will coordinate a work schedule with 109th Civil Engineering Department. The existing Spill Dam can be drained by the 109th Civil Engineering Department to facilitate installation. The draining must be at a minimum (and therefore installation time also minimized), since this dam offers the base’s primary spill protection. All measurements are approximate; it is the Contractor’s responsibility to verify accuracy of measurements. The Contractor will need to be escorted to and from the job site by 109th personnel which should be a planning factor. The Contractor will be responsible for the repair or replacement of any damages to Air Force property that they inflict. It is highly recommended that the Contractor attend a pre-arranged site visit prior to submitting a bid.
CONTRACTOR REQUIREMENTS
1. The Contractor is responsible for the proper disposal of all rubbish off-base.
2. The Contractor is responsible for quality control measures to verify adequate subbase compaction and slump test results. The Contractor will notify 109th Civil Engineering when quality control tests are going to occur so quality assurance inspections can be coordinated. All test results will be submitted to 109th Civil Engineering.
3. The Contractor is responsible for notifying Dig Safe for accurate marking of base utilities and will coordinate paperwork with 109th Civil Engineering.
4. The Contractor is required to follow all environmental regulations including providing 109th Civil Engineering with all applicable MSDS sheets.
5. The Contractor will submit all warrantee information against defects in material and workmanship upon completion of installation.
6. The Contractor is responsible for accuracy of all measurements and the implementation of appropriate building codes. The Contractor must get approval from Civil Engineering Production Control (344-2441) and/or Engineering (344-2568) before starting work and before any utility shutdowns.
7. The Contractor is responsible for site cleanliness.
8. The Contractor shall provide product submittals for materials prior to beginning work. The 109th Civil Engineering Squadron will review product submittals and return them to the Contractor. Only materials approved by the 109th Civil Engineering Squadron will be used for this project.
9. The Contractor will re-seed any grassy area that is disturbed due to the project.
10. The Contractor shall seek approval for use of cranes, booms, and high lift equipment in flight path.
PROPOSED PROJECT SCHEDULE
The project will begin 14 days following the Notice to Proceed. The project shall be completed within 30 calendar days following the start date.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Spill Dam: Catwalk and Baffle
FFP
Spill Dam: Catwalk and Baffle - Project #VBDZ112016
The contractor shall provide all material, labor, equipment, and supervision required to install a catwalk across the existing spill control dam and repair/upgrade existing baffle system per scope of work.
Wage Rate Determination applicable to this contract is attached.
The magnitude of the project is below $50,000 IAW FAR 36.204(b).
PERIOD OF PERFORMANCE: 14 CALENDAR DAYS AFTER ACKNOWLEDGEMENT OF NOTICE TO PROCEED.
FOB: Destination
NSN: Y291-00-000-0000
PURCHASE REQUEST NUMBER: F9S3S41187A001
SIGNAL CODE: A
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Origin |
| Contractor |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 15-SEP-2011 |
| 1 |
| F9S3S4 - 109 CES RPM-SRM |
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
518-344-2349
FOB: Destination F9S3S4
Section 00700 - Contract Clauses
WAGE RATE DETERMINATION
General Decision Number: NY100002 07/08/2011 NY2
Superseded General Decision Number: NY20080002
State: New York
Construction Types: Building, Heavy and Highway
Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington
Counties in New York.
BUILDING CONSTRUCTION PROJECTS (For all counties except
COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 03/12/2010
1 04/16/2010
2 04/30/2010
3 07/23/2010
4 09/24/2010
5 10/08/2010
6 10/15/2010
7 11/12/2010
8 11/19/2010
9 12/03/2010
10 01/28/2011
11 02/04/2011
12 02/25/2011
13 04/22/2011
14 05/06/2011
15 05/20/2011
16 06/03/2011
17 06/10/2011
18 06/17/2011
19 07/01/2011
20 07/08/2011
ASBE0040-002 05/01/2009
Rates Fringes
Asbestos/Insulator Worker
SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88
HAZARDOUS MATERIAL HANDLER
Duties limited to preparation wetting;
stripping; removal;
scrapping; vacuuming;
bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95
BOIL0197-002 10/20/2010
Rates Fringes
BOILERMAKER......................$ 30.00 17.23
BRNY0002-019 06/01/2010
Rates Fringes
BRICKLAYER
BRICKLAYERS, STONE MASONS,
CEMENT MASONS, PLASTERERS,
POINTERS, CAULKERS &
CLEANERS....................$ 26.91 15.78
HEAVY & HIGHWAY
CONSTRUCTION
CEMENT MASONS..............$ 27.87 15.04
MARBLE, TILE & TERRAZZO
FINISHERS...................$ 22.84 13.28
MARBLE, TILE & TERRAZZO
WORKERS.....................$ 28.78 15.78
CARP0019-002 07/01/2009
Rates Fringes
Carpenters:
HEAVY AND HIGHWAY
CONSTRUCTION (COLUMBIA AND
GREENE COUNTIES)
Carpenters, Millwrights, Pile Drivers...............$ 24.40 15.59
CARP0229-003 07/01/2009
Rates Fringes
Carpenters:
SARATOGA COUNTY
HEAVY & HIGHWAY
CONSTRUCTION:
Carpenters.................$ 27.54 13.80
WASHINGTON COUNTY
HEAVY & HIGHWAY
CONSTRUCTION:
Carpenters.................$ 27.04 13.80
PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.
CARP0370-001 06/01/2010
ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND
SCHOHARIE COUNTIES
Rates Fringes
Carpenters:
BUILDING CONSTRUCTION
Carpenters & Soft Floor
Layers.....................$ 27.20 15.81
Piledriver.................$ 27.70 15.81
HEAVY & HIGHWAY
CONSTRUCTION
Carpenters.................$ 26.39 14.95
CARP0370-003 07/01/2009
Rates Fringes
Carpenters:
CARPENTERS..................$ 26.39 14.95
DIVER TENDERS...............$ 25.49 14.95
DIVERS (Dry Day)............$ 25.49 14.95
DIVERS......................$ 60.00 14.95
PILEDRIVERS.................$ 24.49 14.95
ELEC0236-001 06/01/2009
ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);
MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;
WASHINGTON
Rates Fringes
ELECTRICIAN......................$ 30.50 17.09
ELEC0363-004 04/01/2011
GREENE COUNTY (Portion of)
Rates Fringes
ELECTRICIAN......................$ 37.00 23.12
ELEC1249-003 01/01/2011
Rates Fringes
LINE CONSTRUCTION: Lineman
(LIGHTING AND TRAFFIC SIGNAL
Including any and all Fiber
Optic Cable necessary for
Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)
Flagman.....................$ 23.28 15.00 + 6.5% +a
Groundman Truck Driver
(tractor trailer unit)......$ 32.98 15.00 + 6.5% +a
Groundman Truck Driver......$ 31.04 15.00 + 6.5% +a
Lineman & Technician........$ 38.80 15.00 + 6.5% +a
Mechanic....................$ 31.04 15.00 + 6.5% +a
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-004 01/01/2011
Rates Fringes
Line Construction:
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):
Flagman....................$ 24.79 15.00+6.5%+a
Groundman digging machine operator...................$ 37.19 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 35.12 15.00+6.5%+a
Groundman Truck driver.....$ 33.06 15.00+6.5%+a
Lineman and Technician.....$ 41.32 15.00+6.5%+a
Mechanic...................$ 33.06 15.00+6.5%+a
Overhead transmission line work (where other trades are or have been involved):
Flagman....................$ 26.29 15.00+6.5%+a
Groundman digging machine operator...................$ 39.44 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 37.25 15.00+6.5%+a
Groundman truck driver.....$ 35.06 15.00+6.5%+a
Lineman and Technician.....$ 43.82 15.00+6.5%+a
Mechanic...................$ 35.06 15.00+6.5%+a
Substation:
Cable Splicer..............$ 45.45 15.00+6.5%+a
Flagman....................$ 24.79 15.00+6.5%+a
Ground man truck driver....$ 33.06 15.00+6.5%+a
Groundman digging machine operator...................$ 37.19 15.00+6.5%+a
Groundman truck driver
(tractor trailer unit).....$ 35.12 15.00+6.5%+a
Lineman & Technician.......$ 41.32 15.00+6.5%+a
Mechanic...................$ 33.06 15.00+6.5%+a
Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation
Cable Splicer..............$ 46.87 15.00+6.5%+a
Flagman....................$ 25.57 15.00+6.5%+a
Groundman Digging Machine
Operator...................$ 38.35 15.00+6.5%+a
Groundman Truck Driver
(tractor-trailer unit).....$ 36.22 15.00+6.5%+a
Groundman Truck Driver.....$ 34.09 15.00+6.5%+a
Lineman & Technician.......$ 42.61 15.00+6.5%+a
Mechanic...................$ 34.09 15.00+6.5%+a
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer/Central
Office Person..............$ 27.44 4.43 + 3%
Groundman..................$ 13.81 4.43 + 3%
Installer Repairman-
Teledata
Lineman/Tecnician-
Equipment Operator.........$ 26.05 4.43 + 3%
TREE TRIMMER................$ 21.64 7.36+3%
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New
York State, provided the employee works two days before or two days after the holiday.
b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas
Day.
ELEC1249-007 05/04/2009
LINE CONSTRUCTION (LINEMAN) LIGHTING AND TRAFFIC SIGNAL
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE
TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD
WEATHER INFORMATION SYSTEMS
COLUMBIA COUNTY
Rates Fringes
LINE CONSTRUCTION: Lineman
Flagman.....................$ 23.00 13.50+6.5%+a
Groundman Digging Machine
Operator....................$ 34.51 13.50+6.5%+a
Groundman Truck Driver
(Tractor-trailer unit)......$ 32.59 13.50+6.5%+a
Groundman Truck Driver......$ 30.67 13.50+6.5%+a
Lineman and Technician......$ 38.34 13.50+6.5%+a
Mechanic....................$ 30.67 13.50+6.5%+a
PAID HOLIDAYS:
a. Memorial Day, New Year's Day, President's Day, Good
Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the
President of the United States and Election Day for the
Governor of New York State, provided the employee works two days before or two days after the holiday.
ELEV0035-001 01/01/2011
ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of
Durham, Greenville, New Baltimore, Coxcsackie and Athens);
MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND
WASHINGTON COUNTIES
Rates Fringes
Elevator Constructor.............$ 38.94 21.985
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, and the day after Thanksgiving Day, Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ELEV0138-004 01/01/2011
COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,
GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY
(THE TOWNS OF HUNTER AND CATSKILL)
Rates Fringes
ELEVATOR MECHANIC................$ 48.96 21.985+a+b
FOOTNOTES:
a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving
Day, the Friday after Thanksgiving Day and Christmas Day.
b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0106-001 07/01/2010
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.87 19.65+a
GROUP 2.....................$ 33.44 19.65+a
GROUP 3.....................$ 32.53 19.65+a
GROUP 4.....................$ 29.96 19.65+a
GROUP 5.....................$ 35.05 19.65+a
GROUP 6.....................$ 34.37 19.65+a
GROUP 7.....................$ 34.87 19.65+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over
5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane
GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine
Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom
Truck (5 tons and under), Cableway, Caisson Auger, Central
Mix Concrete Plant (Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly
Operated) (Gradall or similar), Fork Lift (Factory Rated 15
ft. and over), Front End Loader (4 c.y. and over), Head
Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland
Loader, Mine Hoist, Mucking Machine or Mole, Pavement
Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer
Mounted Log Chipper (Self-Feeder), Tug Operator (Except
Manned Rented Equipment), Tunnel Shovel
GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber
Tired), Bituminous Spreader and Mixer, Blacktop Plant
(Non-Automated), Blast or Rotary Drill (Truck or Tractor
Mounted), Boring Machine, Cage-Hoist, Central Mix Plant
(Non-Automated) and All Concrete Batching Plants, Cherry
Picker (5 Tons Capacity and Under), Compressors (4 or less)
Exceeding 2000 C.F.M. Combined Capacity, Concrete Paver
(over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power
Unit, Drill Rigs (Tractor Mounted), Front End Loader (under
4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist
(One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance
Engineer/Greaseman/ Welder, Mixer (For Stabilized Base
Self-Propelled), Monorail Machine, Plant Engineer, Profiler
(105 H.P. and under), Pug Mill, Pump Crete, Ready Mix
Concrete Plant, Refrigeration Equipment (For Soil
Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-Rock Drill, excluding
Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 4: A-Frame Winch Hoist on Truck, Ballast Regulator
(Ride- On), Compressors (4 not to exceed 2000 C.F.M.
Combined Capacity, or 3 or less with more than 1200 C.F.M.
but not to exceed 2000 C.F.M.), Directional Drill Machine
Locator Dust Collectors, Generators, Pumps, Welding
Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Drill
Core, Drill Well, Electric Pump Used In Conjunction with
Well Point System, Farm Tractor with Accessories, Fine
Grade Machine, Fork Lift (under 15 ft.), Grout Pump, Gunite
Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker
(Ride-On), Hydro-Blaster Water, Post Hole Digger and Post
Driver, Power Sweeper, Roller (Grade and Fill), Scarifier
(Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible Electric Pump (When Used In Lieu Of
Well Point System), Tamper (Ride-On), Tie Extractor
(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer
(Ride-On), Tire Repair, Track Liner, Tractor With Towed
Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With
Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust
Collectors, Generators, Pumps, Welding Machines, Light
Plants (3 or less of Any Type or Combination), Concrete or
Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or
Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor
GROUP 5: Master Mechanic
GROUP 6: Crane Premium with Boom Length and Jib 150 Ft.- 199
Ft.
GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over
Tower Crane Premium .50
Hazmat Work Premium 2.50
Hydrographic .50
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's
Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day
ENGI0106-002 07/01/2010
BUILDING
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.88 19.79+a
GROUP 2.....................$ 33.44 19.79+a
GROUP 3.....................$ 32.53 19.79+a
GROUP 4.....................$ 29.96 19.79+a
GROUP 5
1..........................$ 34.38 19.79+a
2..........................$ 34.88 19.79+a
GROUP 6.....................$ 34.38 19.79+a
GROUP 7.....................$ 35.43 19.79+a
GROUP 8.....................$ 37.93 19.79+a
Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.
FOOTNOTE:
a. Paid Holidays: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)
GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)
GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under)
GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model
CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller
GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack
(belcrete system), seeding, and mulching machines, pumps
GROUP 5: Crane Premiums:
1 over 150'
2 over 200'
GROUP 6: Tower Crane
GROUP 7: Master mechanic (other than nuclear work)
GROUP 8: Master mechanic on nuclear work
IRON0012-011 05/01/2011
ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY
(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);
RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON
COUNTIES:
Rates Fringes
Ironworkers:
Sheeter, Bucker-up..........$ 25.78 17.96
Sheeter.....................$ 27.90 19.24
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone
Derrickmen..................$ 27.65 19.24
IRON0440-007 05/01/2011
FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);
MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.
Johnsville):
Rates Fringes
Ironworkers:
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone
Derrickman..................$ 23.63 22.01
LABO0017-001 06/01/2010
COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
Rates Fringes
Laborers:
COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)
(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY
GROUP 1:...................$ 32.75 17.95+a
GROUP 2:...................$ 36.65 17.95+a
GREENE COUNTY (Township of
Catskill) HEAVY & HIGHWAY:
GROUP 1:...................$ 28.40 17.95+a
GROUP 2:...................$ 32.75 17.95+a
GROUP 3:...................$ 36.65 17.95+a
GROUP 4:...................$ 39.15 17.95+a
TUNNEL, SHAFT & CAISSON
WORK
GROUP 1....................$ 39.15 17.95+a
For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY
(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)
HEAVY & HIGHWAY CLASSIFICATIONS
GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required
GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required
For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY
(Township of Catskill)
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas
Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.
GROUP 1: Flagperson, gateperson
GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.
Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.
Ground man on milling machine
GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman
For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, President's Day, Memorial
Day, Independence Day, Labor Day, Election Day, Veterans
Day, Thanksgiving Day, Christmas Day
GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and
Powderman;
Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air
LABO0035-001 06/01/2010
FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);
MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND
ST. JOHNSVILLE)
Rates Fringes
Laborers Building Construction
Asbestos Removal............$ 21.50 13.44
Blasters, Form Setters, MotorBuggy Operator (Rider
Type)......................$ 20.50 13.44
Hazardous Waste Removal
Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 21.50 13.44
HEAVY & HIGHWAY:
GROUP 1:...................$ 24.30 16.54
GROUP 2:...................$ 24.50 16.54
GROUP 3:...................$ 24.70 16.54
GROUP 4:...................$ 24.90 16.54
Laborers....................$ 20.00 13.44
Pipelayers, Motor Mixers, Motor Buggy Operator
(Walk Behind) Power Lift
(Walk Behind)...............$ 20.15 13.44
Wagon Drill Operator........$ 20.40 13.44
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day.
GROUP 1: Common Laborers, Flagman, Outboard and Hand boats
GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw
Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman
GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters
LABO0157-001 07/01/2009
FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton
Park); SCHENECTADY and SCHOHARIE COUNTIES.
Rates Fringes
LABORER
BUILDING:
GROUP 1....................$ 22.88 13.65
GROUP 2....................$ 24.23 13.65
HEAVY & HIGHWAY:
GROUP 1:...................$ 24.34 14.40+a
GROUP 2:...................$ 24.54 14.40+a
GROUP 3:...................$ 24.74 14.40+a
GROUP 4:...................$ 24.94 14.40+a
GROUP 5:...................$ 26.34 14.40+a
LABORER CLASSIFICATIONS
Group 1: Common Laborers
Group 2: Asbestos and Toxic Materials
Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
LABORER CLASSIFICATIONS
GROUP 1: Common laborers, flagman, outboard & hand boats
GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers
GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
* LABO0190-001 07/01/2011
ALBANY; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY
(Townships of Stillwater, Halfmoon, Saratoga)
Rates Fringes
Laborers:
BUILDING:
GROUP 1....................$ 22.66 16.42
GROUP 2....................$ 24.01 16.42
LABORERS CLASSIFICATIONS
GROUP 1: Common Laborers
GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at
$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply
LABO0190-002 07/01/2011
ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).
GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO
COUNTY (Townships of Stillwater, Halfmoon Saratoga)
Rates Fringes
Laborers:
HEAVY & HIGHWAY:
GROUP 1:...................$ 25.39 16.95
GROUP 2:...................$ 25.39 16.95
GROUP 3:...................$ 25.59 16.95
GROUP 4:...................$ 25.79 16.95
GROUP 5:...................$ 25.99 16.95
FOOTNOTE:
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
LABORERS CLASSIFICATIONS
GROUP 1: Common laborers, flagmen, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers
GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman
GROUP 4: Blasterers, form setters, stone or granite curb setters
GROUP 5: Hazardous waste removal
LABO1000-005 05/01/2009
COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):
Rates Fringes
Laborers:
HEAVY & HIGHWAY
GROUP 1....................$ 24.20 18.75+a
GROUP 2....................$ 27.96 18.75+a
GROUP 3....................$ 28.96 18.75+a
LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;
tool rooms
GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;
Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;
wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker;
Asphalt Workers
GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);
Laser Beam Operator; Form Setter/Aligners; Blasters
FOOTNOTE:
a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and
Christmas Day
PAIN0009-005 05/01/2010
Rates Fringes
Painters:
Lead Abatement Workers, Structural Steel
Zone 1.....................$ 26.04 8.58
Zone 2.....................$ 24.79 9.83
Painters, Drywall
Finishers, Spray
Zone 1.....................$ 25.04 8.58
Zone 2.....................$ 23.79 9.83
Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA
ZONE #2 All of WASHINGTON County
PAIN0009-013 07/01/2010
Rates Fringes
GLAZIER..........................$ 23.10 14.59
PAIN0155-002 05/01/2010
COLUMBIA AND GREENE COUNTIES
Rates Fringes
Painters:
Drywall Finisher............$ 27.39 16.31
Lead Abatement Work.........$ 27.39 16.31
Painter/Paperhanger.........$ 27.39 16.31
Spray Rate..................$ 28.39 16.31
PAIN0806-002 10/01/2010
ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,
SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON
Rates Fringes
Painters:
Structural Steel and Bridge.$ 46.25 31.03
PLUM0007-001 05/01/2011
ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;
SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 33.46 20.95
PLUM0112-019 05/01/2011
Townships of Canajoharie and Minden
Rates Fringes
Plumber and Steamfitter
Northern Zone...............$ 29.90 19.49
PLUM0773-002 05/01/2011
SARATOGA (Remainder of County); WASHINGTON COUNTY:
Rates Fringes
PLUMBER/PIPEFITTER...............$ 30.25 20.53
ROOF0203-003 06/01/2007
SCHOHARIE COUNTY:
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 21.20 10.34
ROOF0241-001 06/01/2010
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 25.65 10.97
SFNY0669-001 04/01/2011
Rates Fringes
SPRINKLER FITTER.................$ 30.15 18.90
SHEE0083-001 06/01/2011
Rates Fringes
Sheet metal worker...............$ 29.78 20.21+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.
TEAM0294-002 05/01/2006
BUILDING CONSTRUCTION
Rates Fringes
Truck drivers:
GROUP 1.....................$ 22.27 9.84+a
GROUP 2.....................$ 22.57 9.84+a
FOOTNOTES:
a. One week vacation after 1 year; 2 weeks vacation after 5 years.
TRUCK DRIVERS BUILDING CLASSIFICATIONS
GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site
(including nozzle)
GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers
TEAM0294-003 07/01/2011
Rates Fringes
Truck drivers:
HEAVY & HIGHWAY
GROUP 1....................$ 26.67 15.65+a
GROUP 2....................$ 26.72 15.65+a
GROUP 3....................$ 26.77 15.65+a
GROUP 4....................$ 26.92 15.65+a
GROUP 5....................$ 27.07 15.65+a
TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)
GROUP 1: Pick-ups, panel trucks, flatboy material trucks
(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman
GROUP 2: Tandems, batch trucks, mechanics
GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck
GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit
GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
LIQUIDATED DAMAGES
STATEMENT OF LIQUIDATED DAMAGES
(Project: Spill Control Dam Catwalk Installation and Baffle Upgrade VBDZ112016)
In accordance with FAR 36.206, liquidated damages will be assessed for each calendar day required to complete the construction work on this project past the scheduled completion date. The contractor has complete control of the pace of work. Liquidated damages shall be in the amount as follows:
$420.00 Each day past scheduled completion date.
$300.00 One-time fixed cost.
Itemized Costs
CIVIL ENGINEER
| Engineer |
| 4.00 hrs/day @ $55.00/hr = |
| $220.00 per day |
| Project Engineer |
| 0.0 hrs/day @ $25.00/hr = |
| Inspector |
| 4.0 hrs/day @ $20.00/hr = |
| $80.00 per day |
Transportation
$0.00 per day
Total Civil Engineering Cost per day
$300.00 per day
PROCUREMENT
| Contracting Officer |
| 2.0 hrs/day @ $30.00/hr = |
| $60.00 per day |
| Contract Administrator |
| 2.0 hrs/day @ $30.00/hr = |
| $60.00 per day |
Total Procurement Cost per day
$120.00 per day
TOTAL COST PER DAY BEYOND COMPLETION DATE = $ 420.00 per day
PROBABLE ADDITIONAL LOSSES
Loss of living quarters by non-completion
Loss of use of runways/taxiways $ N/A
$ N/A
Loss of use of building
Loss of revenue from facilities providing services, $ N/A
$ N/A
FIXED COSTS
One time transportation cost – Engineer
One time transportation cost -- Procurement $ N/A
$ N/A
Preparation of Modification
Staff Judge Advocate Review $125.00
$175.00
TOTAL FIXED COST
$300.00
CHRISTOPHER E. TYMULA, SMSgt, NYANG
Base Contracting Officer
CLAUSES INCORPORATED BY REFERENCE
| 52.204-7 |
| Central Contractor Registration |
| APR 2008 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| JUN 2008 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| JUN 2010 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| JUN 2003 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| JUL 2005 |
| 52.222-12 |
| Contract Termination-Debarment |
| FEB 1988 |
| 52.222-13 |
| Compliance with Davis-Bacon and Related Act Regulations. |
| FEB 1988 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| OCT 2010 |
| 52.222-41 |
| Service Contract Act Of 1965 |
| NOV 2007 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| AUG 2003 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| SEP 2002 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| OCT 2008 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-26 |
| Preconstruction Conference |
| FEB 1995 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.243-4 |
| Changes |
| JUN 2007 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| MAR 2008 |
CLAUSES INCORPORATED BY FULL TEXT
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (APR 2011)
An offeror shall complete only paragraph (b) of this provision if the offeror has completed the annual representations and certifications electronically at http://orca.bpn.gov. If an offeror has not completed the annual representations and certifications electronically at the ORCA website, the offeror shall complete only paragraphs (c) through (o) of this provision.
(a) Definitions. As used in this provision --
“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
"Forced or indentured child labor" means all work or service-
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
Inverted domestic corporation means a foreign incorporated entity which is treated as an inverted domestic corporation under 6 U.S.C. 395(b), i.e., a corporation that used to be incorporated in the United States, or used to be a partnership in the United States, but now is incorporated in a foreign country, or is a subsidiary whose parent corporation is incorporated in a foreign country, that meets the criteria specified in 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
Manufactured end product means any end product in Federal Supply Classes (FSC) 1000-9999, except--
(1) FSC 5510, Lumber and Related Basic Wood Materials;
(2) Federal Supply Group (FSG) 87, Agricultural Supplies;
(3) FSG 88, Live Animals;
(4) FSG 89, Food and Related Consumables;
(5) FSC 9410, Crude Grades of Plant Materials;
(6) FSC 9430, Miscellaneous Crude Animal Products, Inedible;
(7) FSC 9440, Miscellaneous Crude Agricultural and Forestry Products;
(8) FSC 9610, Ores;
(9) FSC 9620, Minerals, Natural and Synthetic; and
(10) FSC 9630, Additive Metal Materials.
Place of manufacture means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate--
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such…