This document is an Amendment (Number 0004) to Solicitation Number W912PP25R0003 for the Missile Assembly Support Facility at White Sands Missile Range in New Mexico. The amendment modifies several technical specification sections and drawing sheets, including updates to Quality Control, Roof and Deck Insulation, Spray Foam Air Barriers, Wall Panels, Acoustical Ceilings, Paints and Coatings, Toilet Compartments, and Electronic Security Systems sections.
The amendment changes multiple drawing sheets across various disciplines including civil, architectural, mechanical, electrical, and structural drawings, with specific modifications to demolition plans, utility plans, sanitary sewer details, floor plans, roof plans, building elevations, building sections, wall sections, roof details, and site details. The amendment changes the Block 13A date to 20 Mar 2025, with time remaining unchanged. Contractors are required to acknowledge receipt of this amendment prior to the specified hour and date, with potential rejection of their offer if acknowledgment is not received as specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912PP
Design Bid Build, Missile Assembly Support Building at White Sands Missile Range, New Mexico.
1.This is Amendment No. 0004 to Solicitation No. W912PP25R0003. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
2.Block 13A of the SF1442 is hereby changed to 20 Mar 2025. Time remains unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
See Item 6
J
W912PP25R0003
1 2
03/10/2025
01/21/2025
W912PP25R0003
AMENDMENT No. 0004
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
01 45 00.00 10 QUALITY CONTROL, Page
01 45 00.00 10 QUALITY CONTROL, Page
07 22 00 – ROOF AND DECK INSULATION,
Entirety
07 22 00 – ROOF AND DECK INSULATION,
Entirety
07 27 36 - SPRAY FOAM AIR BARRIERS,
Entirety
07 27 36 - SPRAY FOAM AIR BARRIERS,
Replaced in its Entirety
07 42 40 - RIGID CELLULAR
POLYURETHANE WALL CLADDING
07 42 63 - FABRICATED WALL PANEL
ASSEMBLIES, Entirety
07 42 63 - FABRICATED WALL PANEL
ASSEMBLIES, Entirety
09 51 00 - ACOUSTICAL CEILINGS, Page
09 51 00 - ACOUSTICAL CEILINGS, Page
09 90 00 - PAINTS AND COATINGS,
Entirety
09 90 00 - PAINTS AND COATINGS,
Entirety
10 21 13 - TOILET COMPARTMENTS,
Entirety
28 10 05 - ELECTRONIC SECURITY
SYSTEMS (ESS), Pages 9, 28, 39 & 40
28 10 05 - ELECTRONIC SECURITY
SYSTEMS (ESS), Pages 9, 28, 39 & 40
3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:
Delete Page Insert Page
G-002.1 - SHEET INDEX G-002.2 - SHEET INDEX
AMENDMENT No. 0003
Page 2a of 2
CD101 - DEMOLITION PLAN CD101.1 - DEMOLITION PLAN
CU101 - OVERALL UTILITY PLAN CU101.1 - OVERALL UTILITY PLAN
CU102 - ENLARGED UTILITY PLAN CU102.1 - ENLARGED UTILITY PLAN
CU201 - SANITARY SEWER P&P CU201.1 - SANITARY SEWER P&P
C-501 - SITE DETAILS C-501.1 - SITE DETAILS
C504 - SANITARY SEWER DETAILS I C504.1 - SANITARY SEWER DETAILS I
C505 - SANITARY SEWER DETAILS II C505.1 - SANITARY SEWER DETAILS II
A-101.1 - FIRST FLOOR PLAN A-101.2 - FIRST FLOOR PLAN
A-103 - ROOF PLAN A-103.1 - ROOF PLAN
A-201.1 - BUILDING ELEVATIONS A-201.2 - BUILDING ELEVATIONS
A-202.1 - BUILDING ELEVATIONS A-202.2 - BUILDING ELEVATIONS
A-301 - BUILDING SECTIONS A-301.1 - BUILDING SECTIONS
A-306.1 - WALL SECTIONS A-306.2 - WALL SECTIONS
A-502.1 - ROOF DETAILS A-502.2 - ROOF DETAILS
AMENDMENT No. 0004
Page 2b of 2
A-503 - CEILING AND MISCELLANEOUS
DETAILS
A-503.1 - CEILING AND MISCELLANEOUS
DETAILS
ES501 - SITE DETAILS I ES501.1 - SITE DETAILS I
////////LAST ITEM////////
WSMR Missile Assembly Support Facility Solicitation No. W912PP25R0003 White Sands Missile Range, NM Solicitation Specifications personnel to ensure safety and Contract compliance. The Safety and Health Manager reports directly to a senior project (or corporate) official independent from the CQC System Manager. The Safety and Health Manager will also serve as a member of the CQC Staff Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff maintains a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization is responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
Identify as CQC System Manager an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor. The CQC System Manager is required to be a professional engineer or a licensed architect and a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract. This CQC System Manager is on the site at all times during construction and is employed by the prime Contractor. The CQC System Manager is assigned no other duties .
Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.
3.4.3 CQC Personnel
In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: electrical, mechanical, civil, structural, environmental, architectural, submittals clerk, Cx Agent/LEED Specialist. These individuals or specialized technical companies are directly employed by the prime Contractor and can not be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel's areas of responsibility; have the necessary education or experience in accordance with the experience matrix listed herein. These individuals have no other duties other than quality control.
SECTION 01 45 00.00 10 Page 4
SECTION 07 22 00
ROOF AND DECK INSULATION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C208 (2012; R 2017; E 2017; E 2019) Standard Specification for Cellulosic Fiber Insulating Board
ASTM C552 (2022) Standard Specification for Cellular Glass Thermal Insulation
ASTM C728 (2017; R 2022) Standard Specification for Perlite Thermal Insulation Board
ASTM C1289 (2022a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials
FM GLOBAL (FM)
FM 4450 (1989) Approval Standard for Class 1 Insulated Steel Deck Roofs
FM 4470 (2022) Single-Ply, Polymer-Modified Bitumen Sheet, Built-up Roof (BUR), and Liquid Applied Roof Assemblies for Use in Class 1 and Noncombustible Roof Deck Construction
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2021) International Building Code
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
UNDERWRITERS LABORATORIES (UL)
UL 1256 (2002; Reprint Jul 2013) Fire Test of Roof
SECTION 07 22 00 Page 1
Deck Constructions
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Insulation Board Layout and Attachment; G, DO
Verification of Existing Conditions ; G
SD-03 Product Data
Insulation ; G
Cover Board ; G
Fasteners ; G, DO
Moisture Control ; G, DO
Recycled Content For Insulation ; S
SD-06 Test Reports
Flame Spread Rating ; G
SD-07 Certificates
Installer Qualifications ; G, DO
Certificates Of Compliance For Felt Materials ; G
Indoor Air Quality For Insulation ; S
SD-08 Manufacturer's Instructions
Nails and Fasteners ; G
Roof Insulation ; G
1.3 SHOP DRAWINGS
Submit insulation board layout and attachment indicating methods of attachment and spacing, transitions, tapered components, thicknesses of materials, and closure and termination conditions. Show locations of ridges, valleys, crickets, interface with, and slope to, roof drains.
Base shop drawings on verified field measurements and include verification of existing conditions .
SECTION 07 22 00 Page 2
1.4 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for cover board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.5 MANUFACTURER'S INSTRUCTIONS
Include field of roof and perimeter attachment requirements.
Provide a complete description of installation sequencing for each phase of the roofing system. Include weatherproofing procedures.
1.6 QUALITY CONTROL
Provide certification of installer qualifications from the insulation manufacturer confirming the specific installer has the required qualifications for installing the specific roof insulation system(s) indicated.
Provide certificates of compliance for felt materials .
1.7 FIRE PERFORMANCE REQUIREMENTS
1.7.1 Insulation in Roof Systems
Comply with the requirements of ICC IBC . Roof insulation to have a flame spread rating of 75 or less when tested in accordance with ASTM E84.
Additional documentation of compliance with flame spread rating is not required when insulation of the type used for this project as part of the specific roof assembly is listed and labeled as FM Class 1 approved. Only roof assemblies that pass FM 4450 may be used.
1.7.2 Thermal Barrier Requirements
Separate polyurethane insulation from a steel deck with a thermal barrier of glass mat gypsum roof board or other approved barrier material in accordance with the requirements of the ICC IBC or FM 4450 or FM 4470 or UL 1256 . Only roof assemblies that pass FM 4450 may be used.
1.7.3 Fire Resistance Ratings for Roofs
Provide in accordance with ICC IBC Chapter 7 and Table 721.1(3) Min Fire and Smoke Protection For Floor and Roof Systems.
1.8 CERTIFICATIONS
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.9 DELIVERY, STORAGE, AND HANDLING
1.9.1 Delivery
Deliver materials to the project site in manufacturer's unopened and
SECTION 07 22 00 Page 3 undamaged standard commercial containers bearing the following legible information:
a. Name of manufacturer
b. Brand designation
c. Specification number, type, and class, as applicable, where materials are covered by a referenced specification
Deliver materials in sufficient quantity to allow continuity of the work.
1.9.2 Storage and Handling
Store and handle materials in accordance with manufacturer's printed instructions. Protect from damage, exposure to open flame or other ignition sources, wetting, condensation, and moisture absorption. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Store in an enclosed building or trailer that provides a dry, adequately ventilated environment. Replace damaged material with new material.
1.10 ENVIRONMENTAL CONDITIONS
Do not install roof insulation during inclement weather or when air temperature is below 40 degrees F and interior humidity is 45 percent or greater, or when there is visible ice, frost, or moisture on the roof deck.
1.11 PROTECTION
1.11.1 Flame Heated Equipment
1.11.1.1 Fire Protection
Locate melt kettles no closer than 25 feet from buildings or combustible materials. Provide and maintain two approved 4-A:40-B:C fire extinguishers within 25 feet of each operating kettle. Fire extinguishers, operations and locations must comply with NFPA 1 Section Tar Kettles. Equip asphalt (tar) kettles with tight fitting lids.
1.11.1.2 Operational Requirements
Equip kettles with automatic thermostatic control capable of maintaining asphalt temperature. Calibrate and maintain controls in working order for the duration of the work. Equip kettles with means of agitation and ensure they are operating as necessary to produce a controlled uniform temperature throughout kettle contents to prevent spot heating. Do not heat contents above flash point. Do not place flame heated equipment on the roof.
1.11.1 Special Protection
Provide special protection as approved by the insulation manufacturer.
1.11.2 Drippage of Bitumen
Seal joints in and at edges of deck as necessary to prevent drippage of asphalt into the building or onto adjacent surfaces.
SECTION 07 22 00 Page 4
1.11.2 Completed Work
Cover completed work with cover board for the duration of construction.
Avoid traffic on completed work particularly when ambient temperature is above 80 degrees F . Replace crushed or damaged insulation prior to roof surface installation.
PART 2 PRODUCTS
2.1 INSULATION
2.1.1 Insulation Types
Provide one, or an assembly of a maximum of three, of the following roof insulation materials. Provide roof insulation that is compatible with attachment methods for the specified insulation and roof membrane.
a. Expanded Perlite Board: Provide in accordance with ASTM C728. Minimum
3/4 inch thick when both top and bottom surfaces must be in contact with asphalt.
b. Polyisocyanurate Board: Provide in accordance with ASTM C1289 REV A Type I, foil faced both sides or Type II, fibrous felt or glass mat membrane both sides, except minimum compressive strength of 20 pounds per square inch (psi) .
c. Composite Boards: Provide in accordance with ASTM C1289 REV A, Type III, perlite insulation board faced on one side with fibrous felt or glass fiber mat membrane on opposite side.
d. Cellular Glass Boards: ASTM C552, Type IV.
f. Wood Fiberboard: In accordance with ASTM C208, high density, except 4 by 4 feet maximum board size.
ASTM C208 Type II, Grade 1 or 2, roof insulating board, treated with sizing, wax or bituminous impregnation. Limit bituminous impregnation to 4 percent by weight when used over steel decks. Maximum board size: 4 feet by 4 feet .
2.1.2 Mineral Fiber Insulation Board
Provide in accordance with ASTM C726.
2.1.2 Recycled Materials
Provide thermal insulation materials containing recycled content. Unless specified otherwise, the minimum required recycled content for listed materials are:
Perlite Composition Board: 75 percent postconsumer paper
Polyisocyanurate/polyurethane: 9 percent recovered material
Wood Fiberboard: 100 percent recovered material
SECTION 07 22 00 Page 5
Cellular Glass Insulation: 75 percent recovered content
Structural Fiberboard: 100 percent recovered content
Fiberglass Insulation: 25 percent recovered content
Fiber (felt) or Fiber composite: 75 percent recovered content
Rubber: 90 percent recovered content
Plastic or Plastic/Rubber composite: 90 percent recovered content
Wood/Plastic Composite: 90 percent total recovered content
Provide data identifying percentage of recycled content for insulation .
2.1.3 Indoor Air Quality
Provide certification of indoor air quality for insulation .
2.1.4 Insulation Thickness
As necessary to provide the thermal resistance (R-value) indicated. Base calculation on the R-value for aged insulation. For insulation over steel decks, satisfy both specified R-value and minimum thickness for width of rib opening recommended in insulation manufacturer's published literature.
2.1.5 Cants and Tapered Edge Strips
Provide preformed cants and tapered edge strips of the same material as the roof insulation. When unavailable, provide pressure-preservative treated wood, wood fiberboard, or rigid perlite board cants and edge strips as recommended by the roofing manufacturer for the specific application, unless otherwise indicated. Face of cant strips to incline at 45 degrees with a minimum vertical height of 4 inches . Taper edge strips at a rate of one to 1 1/2 inch per foot down to approximately 1/8 inch thick.
2.2 MOISTURE CONTROL
2.2.1 Vapor Retarder
2.2.1.1 Asphalt Saturated Felt Base Sheet for Single Layer Application
Provide in accordance with ASTM D4601/D4601M , weighing not less than 35 pounds per 100 square feet .
2.2.2 Organic Roofing
Provide in accordance with ASTM D226/D226M, Type I.
2.2 FASTENERS
Provide flush-driven fasteners through flat round or hexagonal steel or plastic plates. Provide zinc-coated steel plates, flat round not less than 1 3/8 inch diameter, hexagonal not less than 28 gage . Provide high-density plastic plates, molded thermoplastic with smooth top surface, SECTION 07 22 00 Page 6 reinforcing ribs and not less than 3 inches in diameter. Fully recess fastener head into plastic plate after it is driven. Form plates to prevent dishing. Do not use bell or cup shaped plates. Provide fasteners in accordance with insulation manufacturer's recommendations for holding power when driven, or a minimum of 120 pounds each in steel deck, whichever is the higher minimum. Provide fasteners for steel or concrete decks in accordance with FM APP GUIDE ( http://www.approvalguide.com/ ) for Class I roof deck construction, and spaced to withstand uplift pressure of 90 pounds per square foot .
2.2.1 Roofing Nails for Wood Decks
Barbed 11 gage , zinc-coated nails with 7/16 to 5/8 inch diameter heads or annular ring shank, square head, one piece composite nails. Provide nails long enough to penetrate wood deck at least 5/8 inch without protruding through underside of decking.
2.2.2 Fasteners for Plywood Decks
Annular ring shank, square head, one piece composite nails long enough to penetrate into plywood decks approximately 1/2 inch without protruding through underside of decking.
2.2.1 Fasteners for Steel Decks
Approved hardened penetrating fasteners or screws in accordance with FM 4450 and listed in FM APP GUIDE for Class I roof deck construction.
Quantity and placement to withstand a minimum uplift pressure of 90 psf in accordance with FM APP GUIDE.
2.2.2 Fasteners for Poured Concrete Decks
Approved hardened fasteners or screws to penetrate deck at least 1 inch but not more than 1 1/2 inches , in accordance with FM 4470 , and listed in FM APP GUIDE for Class I roof deck construction. Quantity and placement to withstand an uplift pressure of 90 psf in accordance with FM APP GUIDE.
2.3 WOOD NAILERS
Pressure-preservative treated as specified in Section 06 10 00 ROUGH
CARPENTRY.
PART 3 EXECUTION
3.1 EXAMINATION AND PREPARATION
3.1.1 Surface Inspection
Ensure surfaces are clean, smooth, and dry prior to application. Ensure surfaces receiving vapor retarder are free of projections that might puncture the vapor retarder. Check roof deck surfaces, including surfaces sloped to roof drains and outlets, for defects before starting work.
The Contractor must inspect and approve the surfaces immediately before starting installation. Prior to installing insulation, perform the following:
b. Examine steel decks to ensure that panels are properly secured to structural members and to each other and that surfaces of top flanges
SECTION 07 22 00 Page 7 are flat or slightly convex.
3.1.2 Surface Preparation
Correct defects and inaccuracies in roof deck surface to eliminate poor drainage from hollow or low spots, perform the following:
a. Provide wood nailers of the same thickness as the insulation at eaves, edges, curbs, walls, and roof openings for securing of cant strips, gravel stops, gutters, and flashing flanges.
d. Cover steel decks with a layer of insulation board of sufficient width to span the width of a deck rib opening, and in accordance with fire safety requirements. Secure with piercing or self-drilling, self-tapping fasteners of quantity and placement in accordance with FM APP GUIDE. Locate insulation joints parallel to ribs of deck on solid bearing surfaces only, not over open ribs.
3.2 INSTALLATION OF VAPOR RETARDER
Install vapor retarder in direct contact with insulation. Unless otherwise specified, vapor retarder to consist of two plies of No. 15 asphalt-saturated felt, two plies of asphalt-coated glass felt . Lay vapor retarder at right angles to direction of slope. Install first ply of felt as specified herein for the specific deck. Apply second ply of 2-ply vapor retarder system using asphalt at rate of 20 to 35 lbs per 100 square feet , applied within plus or minus 25 degrees F of EVT. Do not heat asphalt above asphalt's FBT or 525 degrees F , whichever is less. Use thermometers to check temperatures during heating and application.
Completely seal side and end laps. Asphalt must be visible beyond all edges of each ply as it is being installed. Lay plies free of wrinkles, buckles, creases or fishmouths. Do not walk on mopped surfaces while asphalt is sticky. Press out air bubbles to obtain complete adhesion between surfaces. At walls, eaves, rakes, and other vertical surfaces, extend vapor retarder organic felts or separate plies 9 inches , with not less than 9 inches on the substrate, and the extended portion turned back and mopped in over the top of the insulation. At roof penetrations other than walls, eaves and rakes, and vertical surfaces, extend vapor retarder or separate plies 9 inches to form a lap folded back over the edge of the insulation. Provide asphalt roof cement under the vapor retarder for at least 9 inches from walls, eaves, rakes and other penetrations.
3.2.1 Vapor Retarder on Steel Decks
Even mop the mechanically secured insulation surface with asphalt before installing vapor retarder. For a two-ply vapor retarder, install each sheet lapping 19 inches over the preceding sheet. Lap ends not less than 4 inches . Stagger the laps a minimum of 12 inches . Cement felts together with solid mopping of asphalt. Apply asphalt moppings at rate of 20 to 35 lbs per 100 square feet .
3.2.2 Over Gypsum Insulating Concrete or Lightweight Insulating Concrete
Lay one ply of venting inorganic base sheet, without mopping, at a right angle to the slope with 4 inch side laps and 6 inch end laps. Bond laps with hot asphalt. Stagger end laps. . Apply 2-ply vapor retarder over the base sheet as specified above.
SECTION 07 22 00 Page 8
3.2.3 Over Concrete Decks and First Layer of Insulation on Steel Decks
Apply 2-ply vapor retarder as specified above except delete the venting inorganic base sheet.
3.2.4 Over Structural Concrete on Non-Venting Support
Lay one ply of venting inorganic base sheet with mopping holes at a right angle to the slope with 4 inch side laps and 6 inch end laps then apply the vapor retarder as specified.
3.2 INSULATION INSTALLATION
Apply insulation in two layers with staggered joints when total required thickness of insulation exceeds 1/2 inch . Lay insulation so that continuous longitudinal joints are perpendicular to direction of roofing, as specified in Section , and end joints of each course are staggered with those of adjoining courses. When using multiple layers of insulation, provide joints of each succeeding layer that are parallel and offset in both directions with respect to the layer below. Keep insulation 1/2 inch clear of vertical surfaces penetrating and projecting from roof surface.
Verify required slopes to each roof drain.
3.2.1 Special Precautions for Installation of Foam Insulation
3.2.1.1 Polyisocyanurate Insulation
Where polyisocyanurate foam board insulation is provided, install 1/2 inch thick wood fiberboard, glass mat gypsum roof board, or 3/4 inch thick expanded perlite board insulation over top surface of foam board insulation. Stagger joints of insulation with respect to foam board insulation below.
3.2.2 Cant Strips
Where indicated, provide cant strips at intersections of roof with walls, parapets, and curbs extending above roof. Wood cant strips must bear on and be anchored to wood blocking. Fit cant strips flush to vertical surfaces. Where possible, nail cant strips to adjoining surfaces. Where cant strips are installed against non-nailable materials, install in an approved adhesive.
3.2.3 Tapered Edge Strips
Where indicated, provide edge strips in the right angle formed by the juncture of roof and wood nailing strips that extend above the level of the roof. Install edge strips flush to vertical surfaces of wood nailing strips. Where possible, nail edge strips to adjoining surfaces. Where installed against non-nailable materials, install in an approved adhesive.
3.3 PROTECTION
3.3.1 Protection of Applied Insulation
Completely cover each day's installation of insulation with finished roofing specified in on same day. Phased construction is not permitted.
Protect open spaces between insulation and parapets or other walls and spaces at curbs, scuttles, and expansion joints, until permanent roofing and flashing are applied. Storing, walking, wheeling, or trucking
SECTION 07 22 00 Page 9 directly on insulation or on roofed surfaces is not permitted. Provide smooth, clean board or plank walkways, runways, and platforms near supports, as necessary, to distribute weight in accordance with indicated live load limits of roof construction . Protect exposed edges of insulation with cutoffs at the end of each work day or whenever precipitation is imminent. Cutoffs must be two layers of bituminous-saturated felt set in plastic bituminous cement set in roof cement. Fill all profile voids in cutoffs to prevent trapping moisture below the membrane. Remove cutoffs when work resumes.
3.3.2 Damaged Work and Materials
Restore work and materials that become damaged during construction to original condition or replace with new materials.
3.4 INSPECTION
Establish and maintain inspection procedures to assure compliance of the installed roof insulation with contract requirements. Remove, replace, correct in an approved manner, any work found not in compliance. Quality control must include, but is not limited to, the following:
a. Observation of environmental conditions; number and skill level of insulation workers; start and end time of work.
b. Verification of certification, listing or label compliance with FM Data Sheets. ( https://www.fmglobal.com/fmglobalregistration/Downloads.aspx )
c. Verification of proper storage and handling of insulation and vapor retarder materials before, during, and after installation .
d. Inspection of vapor retarder application, including edge envelopes and mechanical fastening.
e. Inspection of mechanical fasteners; type, number, length, and spacing.
f. Coordination with other materials, cants, sleepers, and nailing strips.
g. Inspection of insulation joint orientation and laps between layers, joint width and bearing of edges of insulation on deck.
h. Installation of cutoffs and proper joining of work on subsequent days.
i. Continuation of complete roofing system installation to cover insulation installed same day.
j. Verification of required slope to each roof drain.
-- End of Section --
SECTION 07 22 00 Page 10
SECTION 07 27 36
SPRAY FOAM AIR BARRIERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems
ASSP Z88.2 (2015) American National Standard Practices for Respiratory Protection
ASTM INTERNATIONAL (ASTM)
ASTM C518 (2021) Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM C1029 (2020) Standard Specification for Spray-Applied Rigid Cellular Polyurethane Thermal Insulation
ASTM C1303/C1303M (2022) Standard Test Method for Predicting Long-Term Thermal Resistance of Closed-Cell Foam Insulation
ASTM C1338 (2019) Standard Test Method for Determining Fungi Resistance of Insulation Materials and Facings
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D1622 (2020) Apparent Density of Rigid Cellular Plastics
ASTM D1623 (2017) Standard Test Method for Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics
ASTM D2126 (2020) Response of Rigid Cellular Plastics to Thermal and Humid Aging
SECTION 07 27 36 Page 1
ASTM D2842 (2019) Water Absorption of Rigid Cellular Plastics
ASTM D4541 (2022) Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers
ASTM D6226 (2021) Standard Test Method for Open Cell Content of Rigid Cellular Plastics
ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2024) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials
ASTM E283/E283M (2019) Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Skylights, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E2178 (2021a) Standard Test Method for Determining Air Leakage Rate and Calculation of Air Permeance of Building Materials
ASTM E2357 (2018) Standard Test Method for Determining Air Leakage Rate of Air Barrier Assemblies
INTERNATIONAL CODE COUNCIL (ICC)
ICC 1100 (2019) Standard for Spray-applied Polyurethane Foam Plastic Insulation
ICC IBC (2024) International Building Code
ICC IECC (2021) International Energy Conservation Code
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2022; ERTA 1 2021) Standard for Portable Fire Extinguishers
NFPA 268 (2022) Standard Test Method for Determining Ignitability of Exterior Wall Assemblies Using a Radiant Heat Energy Source
SECTION 07 27 36 Page 2
NFPA 285 (2023) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Wall Assemblies Containing Combustible Components
SPRAY POLYURETHANE FOAM ALLIANCE (SPFA)
SPFA TechDocs (2015) SPFA Technical Documents Library, four categories: General, Insulation, Roofing, Specialty
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-600-01 (2016; with Change 6, 2021) Fire Protection Engineering for Facilities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.132 Personal Protective Equipment
29 CFR 1910.133 Eye and Face Protection
29 CFR 1910.134 Respiratory Protection
UL SOLUTIONS (UL)
UL 723 (2020) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials
1.2 RELATED REQUIREMENTS
Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM, Section 01 91 00.15 TOTAL BUILDING COMMISSIONING and other building envelope sections to provide a complete air barrier system.
Submit all materials, components, and assemblies of the air barrier system together as one complete submittal package.
1.3 DEFINITIONS
1.3.1 Long Term Thermal Resistance (LTTR)
The thermal resistance value of a closed cell foam insulation product measured using accelerated aging ASTM C1303/C1303M equivalent to the time-weighted average thermal resistance value over 15 years. Loss in thermal resistance is attributable to changes in cell gas composition caused by diffusion of air into and blowing agent out of the foam cells.
1.3.2 SPFA TechDocs
Reformatted documents, named SPFA TechDocs ( https://www.sprayfoam.org/SPFA_techdocs ), is a repository of technical information containing common definitions used in this Section. The site is organized in four categories for easy reference and identification:
Roofing, Insulation, Specialty and General.
Spray Polyurethane Foam: Thermal and air barrier system consisting of sprayed polyurethane foam (SPF).
SECTION 07 27 36 Page 3
1.4 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualification of Manufacturer; G , Qualification of Installer; G , Quality Control Plan; G , Safety Plan; G , Fire Prevention Plan; G , Respiratory Protection Plan; G , SD-02 Shop Drawings
Spray Foam Air Barrier System Shop Drawings
SD-03 Product Data
Blowing Agents; G , Closed Cell SPF; G , Transition Membrane; G , Primers, Adhesives, and Mastics; G , Sealants; G , Safety Data Sheets; G , Accessories; G , SD-06 Test Reports
Air Barrier Test; G , Flame Spread and Smoke Developed Index Ratings of SPF Products; G , Flame Propagation of Wall Assemblies; G , Site Inspections Reports; G , SD-07 Certificates
Indoor Air Quality for Spray Foam Air Barrier; S
SD-08 Manufacturer's Instructions
SECTION 07 27 36 Page 4
SPF Handling, Storage, and Spray Procedures; G , Substrate Preparation; G , Ignition Barrier; G , Transition Membrane Manufacturer's Installation Instructions; G , Manufacturer's Printed Installation Instructions for Primers, Adhesives, and Mastics; G , SD-09 Manufacturer's Field Reports
Daily Work Record; G ,
1.5 MISCELLANEOUS REQUIREMENTS
For the spray foam air barrier system provide the following:
1.5.1 Shop Drawings
Submit spray foam air barrier system shop drawings showing locations, detailing, and extent of spray foam air barrier assemblies. Provide details of all typical conditions, intersections with other envelope assemblies and materials, membrane counter-flashings. Show details for bridging of gaps in construction, treatment of inside and outside corners, expansion joints, methods of attachment of materials covering the SPF without compromising the barrier. Indicate how miscellaneous penetrations such as conduit, pipes, electric boxes, brick ties, and similar items will be sealed.
1.5.2 Product Data
Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products. Submit literature including material description, physical properties, fire-ratings, and manufacturer's printed installation instructions. Also include manufacturer's printed installation instructions for primers, adhesives, and mastics.
1.5.3 Mockup
Provide a spray foam air barrier mockup of each foam system specified.
Apply foam in an area designated by the Contracting Officer. Apply an area of not less than 50 square feet. Include all components specified for the finished assembly including primers, support components, expansion and contraction joints, and other accessories as representative of the complete system. Isolate the area and protect workers as required by 29 CFR 1910.132 , 29 CFR 1910.133 and 29 CFR 1910.134 . Notify the Contracting Officer a minimum of 48 hours prior to the test application.
Select a test area representative of conditions to be sprayed including window or door openings, wall to ceiling transitions, flashings, and penetrations, as applicable.
SECTION 07 27 36 Page 5
1.5.4 Test Reports
Submit test reports indicating that mockup peel adhesion tests on all materials have been performed and the changes made, if required, in order to achieve successful and lasting adhesion. Submit test reports for flame spread and smoke developed index ratings of SPF products tested in accordance with ASTM E84 or UL 723 . Submit test reports for flame propagation of wall assemblies tested in accordance with NFPA 285 .
1.6 DELIVERY, STORAGE, AND HANDLING
1.6.1 Delivery
Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage; unload and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage. Submit SPF Handling, Storage, and Spray Procedures in accordance with submittal procedures.
1.6.2 Storage
Store materials in clean, dry areas, away from excessive heat, sparks, and open flame. Maintain temperatures in the storage area below the materials' flash point(s) and within limits recommended by the manufacturer's printed instructions. Provide ventilation in accordance with ASSP Z9.2 to prevent build-up of flammable gases. Store all chemicals in locations that limit the risk of contact with water, acids, caustics (such as lye), alcohols, and strong oxidizing and reducing agents.
1.6.3 Handling
Handle materials and containers safely and in accordance with manufacturer's recommendations. Store liquids in airtight containers and keep containers closed except when removing materials. Do not use equipment or containers containing remains of dissimilar materials. Do not expose foam component containers to direct sunlight. Containers exposed to long periods of cold may also exhibit separation and poor performance. Do not use materials from containers with content temperatures exceeding limits specified in the manufacturers installation instructions.
Mark and remove from job site all chemicals which have been contaminated with moisture, that exceed shelf life limits, or that have been exposed to temperature extremes.
1.6.3.1 Venting and Handling of Material Containers
Partially unscrew material container and drum caps to gradually vent the containers prior to opening. Do not inhale vapors. Follow drum decontamination and disposal procedures recommended by the manufacturer or the American Chemistry Council's Center for the Polyurethanes Industry.
1.7 MOCKUP PEEL ADHESION TEST
Perform a field peel adhesion test on the construction mockup. Test the SPF for adhesion in accordance with ASTM D4541 Method B using a Type II
SECTION 07 27 36 Page 6 pull tester except use a disk that is 2.25 inches in diameter and cut through the foam to separate the material attached to the disk from the surrounding material. Perform test after curing period in accordance with manufacturer's written recommendations. Record mode of failure and area which failed in accordance with ASTM D4541. Compare adhesion values with the manufacturer's established minimum values for the particular combination of material and substrate. Indicate on the inspection report whether the manufacturer's requirement has been met. Where the manufacturer has not declared a minimum adhesion value for their product and substrate combination, the inspector must record actual values.
1.8 AIR BARRIER TESTING
Perform air barrier testing in accordance with Section 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM.
1.9 SAFETY PROVISIONS
1.9.1 Fire Prevention
Provide a written fire prevention plan for the SPF application. Address specific fire hazards such as spontaneous combustion from exothermic heat build-up of SPF components during curing. Provide a continuous fire watch during mixing and spraying of SPF and for a minimum of two hours after completion of work at the end of each day. Maintain fire watch for additional time as required to ensure no potential ignition conditions exist.
1.9.1.1 Fire Extinguishers
Provide two fire extinguishers of minimum 15 pounds capacity each, in accordance with NFPA 10 , in the immediate vicinity of the work. CAUTION:
Do not discharge high pressure carbon dioxide extinguishers where explosive vapors exist since the discharge can cause a spark which will ignite the vapors.
1.9.2 Respiratory Protection Plan
Provide a written respiratory protection plan in accordance with OSHA regulation 29 CFR 1910.134 that protects installers during application and addresses separation of the area to prevent other workers from entering the work area during spraying.
1.9.3 Isolation
Isolate the work area as recommended by spray foam manufacturer's written requirements. Prevent workers without respiratory, skin, and eye Personal Protective Equipment (PPE) or training from entering the work area or otherwise being exposed to airborne chemicals from off-gassing of the insulation in excess of permissible exposure limits. Display appropriate warning signage at all work area entry points. Provide negative pressure ventilation of the spray area to minimize chemical exposure for all workers.
1.9.4 Respirators and Eye Protection
Respiratory protective devices (respirators) must meet the requirements of ASSP Z88.2 . Eye and face protective equipment must meet the requirements of ANSI/ISEA Z87.1 . Additionally, sprayers and workers in the immediate
SECTION 07 27 36 Page 7 vicinity of the spray during indoor installation of high-pressure SPF must wear NIOSH-approved, full-face, supplied air respirators (SAR) or hoods operated in positive pressure or continuous flow mode. Workers not in the immediate vicinity of the sprayer must wear air purifying respirators (APR) with an organic gas / P100 particulate cartridge. During outdoor installation of high-pressure SPF, sprayers and workers in the immediate vicinity of the spray must wear air purifying respirators (APR) with an organic gas / P100 particulate cartridge.
Instruct personnel in the use of personal protective equipment. Maintain such equipment and inspect regularly. All workers using respirators are required to have undergone pulmonary function testing and fit testing and must provide certification that they have done so. Change APR cartridges in accordance with manufacturer's written recommendations.
1.9.5 Clothing and Gloves
Sprayers and workers must wear protective clothing and gloves in accordance with OSHA requirements during materials application.
Disposable, chemically-resistant coveralls must be worn and must cover all exposed skin. Sprayers and workers must wear fabric gloves coated with nitrile, neoprene, butyl or PVC.
1.9.6 Additional Requirements
Require personnel to review the Health, Safety and Environmental Aspects of Spray Polyurethane Foam and Coverings published by the Spray Polyurethane Foam Alliance (SPFA) ( https://www.sprayfoam.org/ ) and the American Chemistry Council Center for the Polyurethanes Industry. Verify compliance prior to allowing personnel on site for installation work.
1.10 QUALITY CONTROL
1.10.1 Qualification of Manufacturer
Submit documentation verifying that the manufacturer of the SPF is currently accredited by the Air Barrier Association of America ( ABAA Accreditation https://www.airbarrier.org/ ) or by the Spray Polyurethane Foam Alliance (SPFA) Professional Certification Program (PCP).
1.10.2 Qualification of Installer
Submit documentation verifying that installers of the spray foam air barrier are currently certified to properly install SPF materials.
Acceptable certifications include those provided by the approved product manufacturer, by ABAA/BPQI (Building Performance Quality Institute) or by the Spray Polyurethane Foam Alliance (SPFA) Professional Certification Program (PCP). Installers must provide photo identification certification cards for inspection upon request.
1.10.3 General Quality Requirements
Provide all products and installation in accordance with the approved product manufacturer's installation instructions. SPFA TechDocs requirements (https://www.sprayfoam.org/SPFA_techdocs) may be used if manufacturers installation instructions do not address specific applications and documented best practices.
SECTION 07 27 36 Page 8
1.11 PRECONSTRUCTION MEETING
Conduct a preconstruction meeting after approval of submittals and a minimum of two weeks prior to commencing work specified in this Section.
Attendance is required by the Contracting Officer's designated personnel, Contractor, and representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the air/vapor/thermal barrier system. Agenda must include, at a minimum, the following items:
a. Drawings, specifications and submittals related to the SPF work;
b. Sequence of construction;
c. Coordination with substrate preparation work and responsibility of repairing defects in substrates. Determine method of ensuring SPF work does not begin until substrates have been inspected and accepted;
d. Ensure that all penetrations of the substrate by other trades are completed prior to SPF air barrier installation where possible;
responsibility of sealing penetrations after SPF air barrier installation should be addressed.
e. Compatibility of materials;
f. Construction and testing of construction mockup;
g. Application of self-adhering air barrier transition strips and primer as required for sealing the spray foam air barrier system at openings including but not limited to windows, doors and louvers;
h. Spray foam air barrier system installation; including methods to be used to provide a continuous barrier at thru-wall flashing, penetrations, and covering of embed items;
i. Quality control plan including methods of applying the product so that a consistent thickness across the face of the substrate is achieved.
j. Procedures for SPF manufacturer's technical representative's onsite inspection and acceptance of substrates, contact info for the representative, frequency of visits, and distribution of copies of inspection reports. Determine where core samples will be taken and review procedures for daily documentation of SPF application.
k. Property protection measures, including isolation of the work, and prevention of overspray and clean-up should overspray occur.
l. Safety requirements, including review of PPE, fire prevention, safety plan, respirator plan, ventilation and separation of the work area, fall protection, and posting of warning signs. Provide a complete schedule and a detailed, written fire protection plan including temporary isolation of the product and the work area until permanent isolation or thermal barrier is in place.
1.12 PROJECT/SITE CONDITIONS
1.12.1 Temperature and Weather
Install SPF within the range of ambient and substrate surface temperatures
SECTION 07 27 36 Page 9 in accordance with manufacturer's written instructions. Do not apply SPF to damp or wet substrates. Do not apply SPF during inclement weather or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent. Do not apply SPF to exterior building surfaces when wind speeds exceed 25 miles per hour. Use moisture measuring methods and equipment to verify that the moisture conditions of substrate surfaces are in accordance with SPF manufacturer requirements prior to application. Substrate temperatures must be within limits recommended by the manufacturer's printed instructions.
1.12.2 Conditions for Primers
Follow manufacturer's printed application and curing instructions regarding ambient temperature minimum limits.
1.12.3 Conditions for Ignition…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .