About this file

This document provides an amendment to a solicitation for a Blanket Purchase Agreement for geotechnical and construction services. The amendment clarifies language regarding laboratory requirements and the pricing schedule spreadsheet. The BPA holders will provide field and laboratory testing services including direct push soil sampling, auger drilling, cone penetrometer testing, dynamic cone penetrometer testing, rotary coring of rock, test pits, geophysics, and laboratory testing. Laboratory testing will cover index testing, strength properties, consolidation properties, permeability, strength properties for rock and aggregate, corrosivity, water, and hazardous materials sampling. Construction phase services will include investigation and reporting, technician hours, concrete, masonry, structural steel, earthwork, and pavement testing. Pricing is to be provided using the attached spreadsheet with unit prices for each service. The amendment does not change any other terms of the solicitation.

View the file

Other files

File Type Posted
W912PP23Q0045.pdf PDF
RFQ Attachment 1_CLIN Schedule.xlsx XLSX spreadsheet
W912PP23Q0045.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This is Amendment 0001 to Solicitation W912PP23Q0045. The purpose of this amendment is clarify language as it pertains to laboratory requirements and requirements for submission of the pricing schedule spreadsheet. All other provisions shall remain unchanged. Changes are indicated in red for additions and green for deletions.

///////////////////////////////////////Last Item///////////////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PP23Q0045

X 9B. DATED (SEE ITEM 11)

17-Aug-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2023

CODE

US ARMY ENGINEER DISTRICT, ALBUQUERQUE

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

W912PP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PP23Q0045

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

TERMS AND CONDITIONS

TERMS AND CONDITIONS

BLANKET PURCHASE AGREEMENT

(BPA) TERMS AND CONDITIONS

DESCRIPTION OF AGREEMENT: This BPA is for Geotechnical Services for the Albuquerque District, U.S. Army Corps of Engineers. Work is typically, but not always, requested to be performed within the Albuquerque District area of responsibility which includes Southern Colorado, New Mexico, and West Texas. BPA holders shall furnish services described herein, if requested by a Contracting Officer for calls up to $250,000.00.

EXTENT OF OBLIGATION: The Government is obligated only to the extent of authorized Calls placed against this BPA. This agreement may be terminated upon 30 days written notice by either party.

PERIOD OF PERFORMANCE: This agreement shall remain in effect for a period of five (5) years. Each call placed under the BPA will have a specified period of performance. No call’s period of performance shall exceed the period of performance of the BPA.

PURCHASE LIMITATION: Each BPA Call has no minimum and a maximum of $250,000.

INDIVIDUALS AUTHORIZED TO PURCHASE UNDER THE BPA: Contracting Officers of the Albuquerque District Contracting Division are authorized to purchase under the BPA. Dollar limitation is $250k per BPA call by Contracting Officers.

MODIFICATION: This BPA may be modified only under its terms or conditions or by mutual agreement of the parties.

INVOICES: An itemized invoice shall be submitted per BPA Call upon acceptance and full completion of the call.

Monthly progress payments may be invoiced for services completed for call’s with periods of performance exceeding 90 days.

BPA call invoicing shall include all information as required herein, including necessary supporting documentation and shall be submitted to both:

Original Invoice without additional information or supporting documentation

Finance Center Attn: CEFC-FP 5722 Integrity Drive Millington, TN 38054-5005 CEFC-Payments@usace.army.mil And

1. One copy of the invoice with all required information including any necessary supporting documentation shall be emailed to the Technical POC and/or Contracting Officer’s Representative (COR) as identified in each Call.

The COR or Technical POC will review and agree to the completion of services before invoices are submitted for payment.

CANCELLATIONS/TERMINATIONS: This Agreement may be cancelled/terminated in its entirety at no cost to either party. The party desiring to cancel/terminate this Agreement shall serve to the other party a written notice of such intent at least thirty (30) calendar days prior to the effective date of the cancellation/termination. The parties agree that the cancellation shall have no effect on any calls not completed by the effective date of the cancellation/termination. The Contractor shall complete such calls under the terms and conditions of this Agreement.

APPLICABILITY: The terms and conditions of this Agreement shall be applicable to all BPA calls issued citing this document.

BINDING CONTRACT: Upon issuance of a BPA Call by a Contracting Officer, a binding contract shall be established between the Contractor and the Contracting Activity/Government. All vendors are cautioned that they are not to accept BPA Calls against the BPA from any individual that is not a Contracting Officer with the US Army Corps of Engineers, Albuquerque District.

PRICING: The BPA Holder shall offer a price for every service, as practicable, listed in the Price Schedule. This established price may include subcontracted sampling and testing to account for tests that the BPA Holder does not self-perform and/or is not validated to perform. BPA Holders will only need to perform (and/or subcontract) for the full suite of the tests required per each individual BPA Order. See Pricing Schedule below.

Pricelists shall be valid for the total duration of the agreement. A negotiated annual escalation rate decided upon during the establishment of the BPA will be applied annually at the start of the calendar year.

NON-PAYMENT FOR PROPOSALS: The Government shall not be liable for reimbursement of any Contractor proposal preparation costs for this BPA.

BPA CALL ORDER PROCESS: Upon identification of a requirement within the scope of this BPA, the Contracting Activity shall send a call order to each BPA holder(s). The call will include Technical Specifications which will detail what is required, and when and where it is to be delivered. The BPA Holder (s) will respond to that call order. The basis for award will be included in each call. Calls may be evaluated on price only or price and other factors in order to obtain the best value for the Government.

PERFORMANCE WORK STATEMENT

GENERAL DESCRIPTION

The Blanket Purchase Agreement (BPA) Holder(s) shall provide and/or procure all necessary and qualified personnel, facilities, equipment, transportation and materials required to provide Quality Assurance Laboratory and Field Testing Services to the U.S. Army Corps of Engineers, Albuquerque District (USACE/Government).

TYPE OF SERVICES

This agreement covers requirements for BPA Holder(s) geotechnical investigations, geophysics investigations, soil and rock sampling, field and laboratory testing of soil, rock, and concrete in strict compliance to the investigation and test methods specified in the Price Schedule. The contractor shall provide and/or procure all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to perform the field and laboratory test methods and to report as defined in this Performance Work Statement.

Call orders shall specify whether samples will be provided by the Government or obtained by contractor. the BPA Pricing shall include all required sampling and testing required of the specified test method except as specifically stated in the Price Schedule.

The contractor shall be responsible for obtaining required permits and performing work in accordance with local, state, and federal law. The time required for obtaining permits may be accounted for as standby hours within the pricing schedule of a call order.

PRODUCTS

The BPA Holder(s) shall sample, test, and report results of material testing in strict compliance with the referenced standard test method.

PLACE OF PERFORMANCE

The location of services will vary with most call’s placed within the Albuquerque District Area of Responsibility (AOR) including Southern Colorado, New Mexico, and West Texas.

LABORATORY REQUIREMENTS

All laboratories, utilized by the BPA Holder(s), performing tests shall be or become validated by the USACE, Materials Testing Center (MTC), for the required test methods called for in each BPA call order Costs to obtain and maintain validation are the responsibility of the testing laboratory(s), and are not a reimbursable expense under this agreement or resulting orders. Structural Steel field testing and inspection services are not currently validated by the MTC; however, laboratory personnel performing these tests shall have current International Code Council (ICC) certification. Laboratories shall maintain these certifications and validations for the life of the agreement to remain eligible for award of a BPA Call Order. If the laboratory is not currently validated with USACE MTC, they shall acquire validation for any applicable testing methods within 30 days of the award of any call order. Further information on USACE validation includingLab Validation Request Forms and the current list of USACE (MTC) Validated labs can be accessed by copying and pasting the following site into a web browser:

http://www.erdc.usace.army.mil/Media/FactSheets/FactSheetArticleView/tabid/9254/Article/476661/mater ialstesting-center.aspx

HOURS OF OPERATION

The contractor is responsible for conducting business between the hours of 7:00am to 5:00pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

RECOGNIZED HOLIDAYS

The following holidays are recognized as Federal holidays and Government offices will not be open. It is not required for the Contractor to perform services on these holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

Juneteenth

CONFLICT OF INTEREST

The BPA holder shall not be the construction project contractor’s quality control testing laboratory for the same project for which a call order is placed against. The BPA holder shall notify the COR if a conflict of interest exists for a specific call order.

Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

QUALITY CONTROL

The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which they assure themselves that work complies with the requirement of the contract.

QUALITY ASSURANCE

The Government shall evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds. A QASP will be included on a per-call basis for more complex requirements where a COR would need to be appointed. Majority of work on this BPA will likely not require a QASP.

SECURITY REQUIREMENTS

General security requirements are listed below. Additional requirements, if applicable, shall be as specified in each call order. Training and personal requirements will vary by installation and location of service and may be accounted for as standby time hours within the pricing schedule of a call order. Security requirements can be a combination of any/all of the following:

AT/OPSEC

1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations.

Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures.

The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2. Antiterrorism (AT) Level I training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

4. Contract personnel requiring a common access card (CAC): Contract personnel will be issued a common access card (CAC) only if duties involve one of the following: (1) both physical access to a DoD facility and access to DoD information systems or networks; (2) remote access to a DoD information system or network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. Before CAC issuance, contract personnel must have, at a minimum, a favorably adjudicated Tier 1 investigation or an equivalent or higher investigation in accordance with applicable Army regulations and Homeland Security Presidential Directive-12 (HSPD-12). At the discretion of the RA, an initial CAC may be issued based on a favorable review of a fingerprint check and a successfully scheduled Tier 1 investigation with the National Background Investigations Bureau. The RA provides contract personnel with additional information and forms to initiate the CAC issuance process, and/or to initiate background investigations, when required. Contract personnel shall complete these processes within established timelines to avoid delays.

5. Security requirements for contract performance outside the US: For contract performance requirements that involve services or delivery in a foreign country, the Contractor shall comply with the requirements of DFARS clause 252.225-7043, as applicable. For performance requirements that involve contract personnel accompanying or supporting US Armed Forces deployed outside the US, the Contractor shall comply with the requirements of DFARS clause 252.225-7040, as applicable. Contract personnel accessing DoD or other federal facilities outside the US shall comply with applicable Status of Forces Agreements and Geographic Combatant Command requirements.

Prior to contract personnel traveling outside the US, the Contractor shall provide documentation of AT, OPSEC, and other required training to the COR, or other RA representative. Additionally, contract personnel shall comply with travel requirements specified in the DoD Foreign Clearance Guide, including country and theater clearance processes.

6. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

8. Threat Awareness Reporting Program: All contract personnel who maintain an active security clearance shall receive initial and annual refresher training on the Threat Awareness and Reporting Program (commonly referred to as “TARP”), provided by a Counterintelligence Agent. As determined by the servicing Counterintelligence Agent for the RA, contract personnel may complete web-based TARP training.

9. Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

10. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

DATA RIGHTS

The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

SAFETY REQUIREMENTS

The contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the contract award. EM 385-1-1 and its changes are available at http://publications.usace.army.mil/publications by selecting Engineer Manuals, EM 385-1-1 “Safety and Occupational Health”. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.

GOVERNMENT FURNISHED ITEMS AND SERVICES

The contractor shall assume that the Government will not provide any materials or equipment for any activities unless otherwise specified in each individual call order.

Pricing Schedule The Contractor shall provide a cost breakdown for as many items as practiable on the Excel Spreadsheet provided.

Please note, while it is not required to submit pricing on all elements, it is recommended to submit pricing for as many item numbers as possible due to the likelihood that calls will include muliple item numbers from different item groupings. Completion of the entire spreadsheet will enhance the possiblibility of receiving a Master Agreement and/or calls.

Item No. Schedule of Supplies/Service Unit of Measure

Unit Price

1. General

1-01 2-day shipping Per pound

1-02 Asphalt Coring and Cold Patch Each

1-03 Asphalt Coring and Hot Patch Each

1-04 Bulk Sample Collection Each

1-05 Concrete Pavement Coring and Patch Each

1-06 Disposal of soil, rock, etc. Cu yd

1-07 Equipment Decontamination

ASTM D 5088

Each

1-08 Field Logging Hour

1-09 Health and Safety Plan Each

1-10 Investigation Results Report Each

1-11 Piezometer/Open Standpipe Installation

Linear Foot

1-12 Pothole for Utility Locates Hour

1-13 Priority overnight shipping Per pound

1-14 Standby Time Hour

Unit Price

1-15 Traffic Control (with flaggers) Day

1-16 Traffic Control (without flaggers) Day

1-17 Traffic Control Plan Each

1-18 Transport of Samples Hour

1-19 Utility Potholing Hour

1-20 Work Plan Each

2. Direct Push Soil Sampling

2-01 Direct Push Soil Sampling- dual tube ASTM D6282 (0-30 feet below ground surface)

Linear Foot

2-02

Direct Push Soil Sampling- dual tube

ASTM D6282

(greater than 30 feet below ground surface)

Linear Foot

2-03 Dual Tube - Field Pneumatic Slug Test

ASTM D7242

Each

2-04 Dual Tube - groundwater sample collection ASTM D6001

Each

2-05 Dual Tube- Drive Sampling (SPT)

ASTM D1586

Each

2-06 Dual Tube- soil sample collection Each

2-07 Field Logging on ENG Form 1836

EM 1110-1-1804

Hour

2-08 Mobilization and Demobilization Direct Push1 Hour

2-09 Mobilization and Demobilization Direct Push2

Each

Unit Price

3. Auger Drilling

3-01 Auger Drilling

ASTM D1452

(0-30 feet below ground surface)

Linear Foot

3-02

Auger Drilling

ASTM D1452

(greater than 30 feet below ground surface)

Linear Foot

3-03 Drive Sampling (SPT)

ASTM D1586

Each

3-04 Energy Calibration for Automatic Hammer

Each

3-05 Field Logging on ENG Form 1836

EM 1110-1-1804

Hour

3-06 Mobilization and Demobilization Auger Drilling2

Each

3-07 Mobilization and Demobilization Auger Drilling1

Hour

4. Cone Penetrometer

4-01 Cone Penetrometer Testing (CPT)

ASTM D5778

(0-30 feet below ground surface)

Linear Foot

4-02

Cone Penetrometer Testing (CPT)

ASTM D5778

(Greater than 30 feet below ground surface)

Linear Foot

4-03 Mobilization and Demobilization

CPT3

Each

4-04 Mobilization and Demobilization

CPT2

Hour

5. Dynamic Cone Penetrometer Testing

5-01 Dynamic Cone Penetrometer (DCP) Testing

ASTM D6951

Each

5-02 Mobilization and Demobilization

DCP3

Unit Price

5-03 Mobilization and Demobilization

DCP2

Hour

6. Rotary Coring of Rock

6-01 Core Boxes (Waxed Cardboard) Each

6-02 Mobilization & Demobilization Rotary Coring of Rock2

Each

6-03 Mobilization & Demobilization Rotary Coring of Rock1 Hour

6-04 Rotary Coring of Rock

ASTM D2113

(0-30 feet below ground surface)

Linear Foot

6-05

Rotary Coring of Rock

ASTM D2113

(Greater than 30 feet below ground surface)

Linear Foot

7. Test Pit

7-01 Mobilization & Demobilization Test Pit1 Hour

7-02 Mobilization & Demobilization Test Pit2

Each

7-03 Test Pit Hour

8. Geophysics

8-01 Acoustic Borehole Logging

ASTM D6274

Linear Foot

8-02 Electromagnetic Induction Testing

(EM)

ASTM D6639 & ASTM E566

Hour

8-03 Full Wave Form Sonic Borehole Logging

ASTM 5753

Linear Foor

8-04 Gamma Ray/Neutron/Caliper Borehole Logging ASTM D5753 and ASTM D6274

Linear Foot

Unit Price

8-05 Ground Penetrating Radar (GPR)

ASTM D6432

Hour

8-06 Mobilization & Demobilization Geophysics1

Hour

8-07 Mobilization & Demobilization Geophysics2

Each

8-08 Multichannel Analysis of Surface Waves (MASW)

Hour

8-09 Optical Borehole Logging ASTM D6274 Linear Foot

8-10

Polyprobe Borehole Logging (Temperature, Fluid Resistivity, Gamma Ray, Resistivity

(SP,8,16,32,64,SPR))

ASTM 5753

Linear Foot

8-11 Refraction Microtremor (ReMi) Each

8-12 Seismic Refraction

ASTM D5777-18

Hour

9. Laboratory Testing

Index Testing

9-01 AASHTO Soil Classification ASTM D3282 Each

9-02 Atterberg Limits

ASTM D4318

Each

9-03 Moisture Content

ASTM D2216

Each

9-04 Particle Size Analysis

ASTM D422

Each

9-05 Particle Size Analysis, Hydrometer

ASTM D1140

Each

9-06 Specific Gravity of Soils by Air Pycnometer

ASTM D5550

Unit Price

9-07 Specific Gravity of Soils by Water Pycnometer

ASTM D854

Each

9-08 U.S.C.S. Soil Classification ASTM D2487 Each

Compaction

9-09 Modified Proctor

ASTM D1557

Each

9-10 Standard Proctor

ASTM D698

Each

Strength Properties (Soil)

9-11 California Bearing Ratio

ASTM D1883

Each

9-12 Consolidated Undrained Compressive Strength

ASTM D4767

Each

9-13 Direct Shear Test

ASTM D3080

Each

9-14 Laboratory Miniature Vane Shear Test

ASTM D4648

Each

9-15 Resilient Modulus AASHTO 294 Each

9-16 Resistance R-Value and Expansion Pressure of Compacted Soils

ASTM D2844

Each

9-17 Unconfined Compressive Strength

ASTM D2166

Each

9-18 Unconsolidated Undrained Compressive Strength

ASTM D2850

Each

Consolidation, Swelling, Collapse Properties

9-19 Collapse Potential of Soils

ASTM D5333

Each

9-20 One Dimensional Consolidation ASTM D2435 Each

Unit Price

9-21 One Dimensional Consolidation Using Controlled Strain Loading

ASTM D4186

Each

9-22 One Dimensional Swell or Settlement Potential

ASTM D4546

Each

Permeability Test

9-23

Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter

ASTM D5084

Each

9-24 Permeability of Granular Soils (Constant Head)

ASTM D2434

Each

Strength Properties (Rock)

9-25 Direct Shear Strength

ASTM D5607

Each

9-26 Durability

ASTM D4644

Each

9-27 Point Load Strength

ASTM D5731

Each

9-28 Soundness

ASTM D5240

Each

9-29 Specific Gravity and Absorption

ASTM D6473

Each

9-30 Strength Deformation (Elastic Moduli of Intact Rock)

ASTM D3148

Each

9-31 Unconfined Compressive Strength

ASTM D7012

Each

9-32 Unit Weight

ASTM D2937

Each

Aggregate Testing

9-33

Density, Relative Density (Specific Gravity, and Absorption for Coarse Aggregates

ASTM C127

Unit Price

9-34 Friable Particles Clay Lumps and Friable Particles

ASTM C142

Each

9-35 LA Abrasion ASTM C535 Each

9-36 Petrographic Examination

ASTM C295

Each

9-37 Potential Alkali Reactivity of Aggregates

ASTM C1260

Each

9-38 Resistance to Freezing and Thawing ASTM D5312 and COE CRD-C 144 Each

9-39 Resistance to Wetting and Drying

ASTM D5313

Each

9-40 Soundness of Aggregates by use of Sodium Sulfate or Magnesium Sulfate

ASTM C88

Each

9-41

Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Fine Aggregate

ASTM C128

Each

Corrosivity

9-42 Chloride Content

ASTM D512

Each

9-43 pH for peat

ASTM D2976

Each

9-44 pH for soils

ASTM D4972

Each

9-45 pH of soil for use in corrosion testing

AASHTO 289

Each

9-46 Resistivity

ASTM D1125

Each

9-47 Sulfate Content

ASTM D4230

Water Testing - EPA 600 Series for Water and Wastewater and Drinking Water 4

Unit Price

9-48 1 - 4 metals by ICP/MS (includes prep)

EPA 200.8

9-49 5 - 8 metals by ICP/MS (includes prep)

9-50 9 - 12 metals by ICP/MS (includes prep)

9-51 Alkalinity

EPA 310/SM 2320B

Each

9-52 Anions (each anion) by Ion Chromatography EPA 300.00 Each

9-53 Biochemical Oxygen Demand, BOD, 5-day, 20°C

EPA 405.1

Each

9-54 Chemical Oxygen Demand (COD)

EPA 410

Each

9-55 Chloride EPA 325 Each

9-56 Chlorinated Pesticides

EPA 615

9-57 Conductivity, Specific Conductance

EPA 335/ SM 4500-CN G

Each

9-58 Cyanide, Free

EPA 335.4

Each

9-59 Cyanide, Total

EPA 335.4/ SM 4500 CN I

Each

9-60 Ferrus Iron

SM 3500-FE D

Each

9-61 Hardness, EDTA Total as CaCO3 EPA 130/ SN 2340 B or C Each

9-62 Hexavalent Chromium by Ion Chromatography (low level)

EPA 218.6

Each

9-63 Mercury, Low Level

CFR 136A/1631E

9-64 Methyl mercury

EPA 1630

Unit Price

9-65 Nitrate

EPA 353

Each

9-66 Nitrate + Nitrite

EPA 353/ SM 4500 NO3

Each

9-67 Nitrate-Nitrite

EPA 353

Each

9-68 Nitrogen, Ammonia

EPA 350 SM 4500 NH3 C, D

Each

9-69 Organic Carbon, Total (TOC) or Dissolved (DOC)

EPA 415.1 / SM5310

Each

9-70 Organochlorine Pesticides / PCBs

EPA 608

9-71 Organophosphorous Pesticides

EPA 614

9-72 PCB Congeners (WHO list or USACE Inland Testing Manual list of 22 Congeners) SW8082

9-73 Phosphorous, Ortho (as P)

EPA 365

Each

9-74 Phosphorous, Total

EPA 365

9-75 Polynuclear Aromatic Hydrocarbons

(PAH)

EPA 610

9-76 PPL Metals (13) ICP/MS and CVAA, includes prep

Each

9-77 Semivolatile Organic Compounds

EPA 625

9-78 Sulfate, Turbidimetric

EPA 375/ SM 4500-SO4

9-79 Sulfide

EPA 376

9-80 Total Suspended Solids- Residue, Non- Filterable, Gravimetric, Dried at 103-

105°C. EPA 160.2

9-81 Volatile Organic Compounds EPA 624 Each

Unit Price

SW846 Methodologies, RCRA Programs, RFI Corrective Actions

9-82 RCRA Metals, Total (ICP and CVAA, includes prep) SW846 6010 / 7000

Each

9-83 Toxicity Characteristic Leaching Procedure SW846 1311

9-84 Volatile Organic Compounds SW846 8260B

9-85 Semivolatile Organic Compounds

SW846 8270C

9-86 Polynuclear Aromatic Hydrocarbons

SW846 8270C

9-87

BTEX

SW846 8021B

9-88 Gasoline Range Organics (GRO) SW846 8015B Mod

9-89 Diesel Range Organics (DRO) SW846 8015B Mod

9-90 Polychlorinated Biphenyls (PCBs)

SW846 8082

9-91 Chlorinated Herbicides

SW846 8151A

9-92 Organophosphate Pesticides SW846

9-93 1 - 4 metals by ICP/MS (includes prep)

SW846 6020

9-94 5 - 8 metals by ICP/MS (includes prep)

9-95 9 - 12 metals by ICP/MS (includes prep)

9-96 Organic Carbon, TOC Walkley Black

9-97 Hexavalent Chromium Chelation/Extraction (low level)

SW846 7197

Unit Price

9-98 Soil/Sediment Digestion SW-846 Test Method 3051A

10. Asbestos, Lead-Based Paint (LBP), and other Hazardous Material Sampling

10-1 Asbestos Sampling 40 CFR 763 Subpart E and 29 CFR

1926.1101 (Asbestos)

Each

10-2

LBP Sampling

29 CFR 1910, 40 CFR 261, 29 CFR 1926,

40 CFR 261, 40 CFR 262 and 40 CFR 268, and HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing

Each

10-3 Lead in Soil Sampling

24 CFR 745

Each

10-4 Lead Dust Sampling 40 CFR Part 745 Each

10-5 Mercury Discovery 40 CFR Part 713

Each

10-6 Polychlorinated Biphenyls (PCBs) Discovery

40 CFR 761

Each

10-7 Lighting Ballast and Lamps Containing PCBs Discovery

40 CFR 761

Each

11. Construction Phase Services

11-1 Investigation and Results Report Each

11-2 Technician Hours3 Hour

Concrete Testing

11-3 Air Content ASTM C173 or ASTM C231

Each

11-4 Compressive Strength Testing ASTM C31 and ASTM C39, ACI 318 (with temperature test for each)

Unit Price

11-5 NQ Confined Core Drilling Linear Foot

11-6 PQ Confined Core Drilling Linear Foot

11-7 Slump Testing

ASTM C143

Each

11-8 Unit Weight of Concrete ASTM C567 and ASTM C138

Each

Masonry

11-9 Mortar Aggregate Ratio

ASTM C780 A4

Each

11-10 Mortar Compressive Strength

ASTM C780 A6

Each

11-11

Sampling and Testing Grout for Masonry ASTM C1019 (with temperature test for each)

Each

Structural Steel

11-12 Nondestructive Testing of Welds

AWS D1.1

Each

11-13 Test Bolt, Nut, and Washer Assembly

AISC 360

Each

11-14 Visual Inspection of Welds AWS D1.1 Each

Earthwork

11-15 In-Place Field Density (Rubber Balloon)

ASTM D2167

Each

11-16 In-Place Field Density (Sand Cone)

ASTM D1556

Each

11-17 In-Place Field Density and Moisture Content (Nuclear)

ASTM D6938

Unit Price

11-18 Sieve Analysis of Fine & Coarse Aggregates

ASTM C136

Each

Pavement

11-19 Flexural Strength of Concrete

ASTM C78

Each

11-20 Gradation Testing for Material Finer than No. 200

ASTM C117

Each

11-21 In-Place Field Density for HMAC (Nuclear)

ASTM D2950

11-22 Annual Escalation Rate %

1 Mobilization and de-mobilization costs shall include all associated costs for performing work outside of the standard 30 mile radius of the contractors point of origin as defined in note 3. Costs shall be on a per hour basis inclusive of any additional mobilization and de-mobilization transportation and labor costs. Hours shall be rounded to the nearest quarter hour.

2 Mobilization and de-mobilization costs shall include all associated costs for performing work within a 30 mile radius of the contractors point of origin. Work outside of this radius shall be paid out on a per mile basis as described in note 2.

3 Technician hours for construction phase services shall include all costs for travel to and from the home office to a worksite. Costs associated with field hours performing individual testing as specified in the call order shall be included in each test line item as applicable.

4 Testing laboratory shall be DoD Environmental Laboratory Accreditation Program (ELAP) accredited.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .