W912PP21R0022 Amendment 0001.pdf

PDF 498 KB Posted

Attached to
FY20 MILL AND OVERLAY RWY 13-31 ALL ASPHALT & REPAIR SHOULDERS, CANNON AIR FORCE BASE, CURRY COUNTY, NM
Solicitation number
W912PP21R0022
Issued by

About this file

This document is an amendment to solicitation number W912PP21R0022 for FY20 MILL AND OVERLAY RWY 13-31 ALL ASPHALT & REPAIR SHOULDERS, CANNON AIR FORCE BASE, CURRY COUNTY, NM. The amendment revises pages in the solicitation related to instructions to offerors and content requirements. Offerors must acknowledge receipt of the amendment by the specified date and time to have their proposals considered. The opportunity involves milling and overlaying runways and shoulders at Cannon Air Force Base in Curry County, New Mexico. Relevant experience includes asphalt and concrete airfield paving projects over $25 million on active military airfields. Proposals are due by April 2, 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

W912PP21R0022

AMENDMENT No. 0001

2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.

Delete Page Insert Page

00 20 00 - INSTRUCTIONS FOR

PROCUREMENT, PAGE 7 of 125 (Page 14 of SPECIFICATIONS PACKAGE)

00 20 00 - INSTRUCTIONS FOR

PROCUREMENT, PAGE 7 of 125

00 22 16 - SUPPLEMENTARY INSTRUCTIONS

TO PROPOSERS, PAGES 21 and 22 of 125 (Pages 30 and 31 of SPECIFICATIONS

PACKAGE)

00 22 16 - SUPPLEMENTARY INSTRUCTIONS

TO PROPOSERS, PAGES 21 and 22 of 125

3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:

N/A

////////LAST ITEM////////

W9 l 2PP2 l R0022

THE FOLLOWING ARE INSTRUCTIONS TO OFFERORS TO SECTION 00 20 00:

USE OF THE WORDS "PROPOSER" AND "OFFEROR"

Whenever the word "Proposer" appears in the RFP it shall be construed to have the same meaning as the word "Offeror."

AVAILABILITY OF PLANS AND SPECIFICATIONS

This solicitation will be issued via Internet only. Notification of amendments shall be made via Internet only, as well. It is therefore the contractor's responsibility to check the following address daily for any posted changes to this solicitation. For security reasons, all technical and engineering data related to this solicitation will be distributed using beta.SAM.gov, formerly Federal Business Opportunities (tho.gov). Beta.SAM.gov is a consolidation often legacy sites into a single database. In order to save searches, follow contract opportunities, request secure documents or sign up for an Interested Vendor List, you will need a login.gov account in beta.SAM.gov. To create a login.gov account or link an existing login.gov account with beta.SAM.gov follow the instructions on the beta.SAM.gov website. Contractors registered with beta.SAM.gov may view and/or download this solicitation and all amendments from the Internet after solicitation issuance at this site.

IMPLEMENTATION OF OPORD 2013-74: INTEGRATING ANTITERRORISM AND OPERATIONS

SECURITY (OPSEC) INTO THE USACE ACQUISITION

The successful Offeror will be required to conduct a background check on all on-site personnel. The results of the background check shall be made available to the COR upon request.

BIDDER INQUIRY AND PROPOSAL INFORMATION

a. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org.

1. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab.

Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page, you may view all bidder inquiries or add inquiry.

3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

4. The Solicitation Number is:

The Bidder Inquiry Key is:

W912PP21R0022

C3DXDM-P5F2ZA

b. The Bidder Inquiry System will be unavailable for new inquires on 2 April 2021 at 2:00PM Mountain time, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

c. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

5 working days prior to proposal due date

W912PP21R0022

3.2.2 Content Requirement. All information shall be confined to the appropriate file.

The offerer shall confine submissions to essential matters sufficient to define the proposal in a concise manner to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

3.2.3 Where the word "project" appears, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101 ). Examples of projects submitted by the Prime Contractor may be projects performed for a State or Federal Government Agency, or for a commercial or private sector customer.

B. FACTORS AND EVALUATION APPROACH

VOLUME I, Tabs A-D - Technical. The volume shall be organized in accordance with the 2. PROPOSAL SUBMISSION REQUIREMENTS and include the following:

1. Factor 1: Relevant Contractor Experience

1.1 The offerer shall submit examples of recent construction projects which best illustrate the experience of the construction contractor on relevant projects of similar scope, type, complexity, and magnitude as defined below. A minimum of three (3) projects but not more than five (5) are to be submitted for the Prime Contractor. Limit the information to Factor 1 to twenty (20) pages or less.

1.2 Where the word "recent" appears it is understood to mean construction type project for which construction is at least 70% complete (measured by performance period days) as of the RFP closing date, or a construction type project that has been completed within 7 years of the RFP closing date. Projects completed more than 7 years before the RFP closing date will not be considered for evaluation purposes.

1.3 Where the word "relevant" appears, it is understood to mean that project experience submitted is similar to the context of the solicitation in terms of scope, type, magnitude of effort and complexity as described and required in this RFP. For this RFP, "relevant" projects are defined as projects that are similar in terms of:

Scope: Airfield Shoulder and Runway construction greater than 50,000 square feet.

Type: Military Airfield Asphaltic and Concrete Paving and associated Lighting.

Complexity: Working on an active Military airfield with security requirements.

Magnitude: $25 Million or above.

1.4 As this is a Best Value trade-off, the more bullets that are met for each submitted project under this Factor, the higher the possibility of a higher technical rating.

1.5 Information is to be compiled on the Contract Description Forms provided at the end of Section 00 22 16 and will be used to evaluate relevant contractor experience.

Greater than $10 Million

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0001
Code[0]: W912PP
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: FY-20 MILL AND OVERLAY OF RUNWAY 13-31 SHOULDERS, Cannon Air Force Base, Curry County, New Mexico

1.This is Amendment No. 0001 to Solicitation No. W912PP21R0022. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE

CORPS OF ENGINEERS

4101 JEFFERSON PLAZA, N.E.

ALBUQUERQUE, NEW MEXICO 87109-3435

NameandAddress[0]:
AdministeredBy[0]: See Item 6
ContractIDCode[0]: J
ReqNumber[0]:
AmendmentNo[1]: W912PP21R0022
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 05/27/2021
Dated9B[0]: 05/17/2021
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .