W912PP19R0022_Lauer_Dam_Amendment_0005.pdf
PDF 2 MB Posted
- Solicitation number
- W912PP19R0022
About this file
W912PP19R0022 AMENDMENT 0005
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
PROJECT: Lauer Dam Rehabilitation Project, Modoc County, CA
1. This is Amendment No. 0005 to Solicitation No. W912PP19R0022; 29 July 2019. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
J
W912PP19R0022
1 2
07/29/2019
06/21/2019
W912PP19R0022
AMENDMENT No. 0005
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
Proposal Schedule, Page 3b/151 Proposal Schedule, Page 3b/151 Proposal Schedule, Page 3d/151 Proposal Schedule, Page 3d/151 Section 03 48 00, Page 2 Section 03 48 00, Page 2
3. DRAWING CHANGES: The following drawings have been revised:
E-2, SHEET 44 of 45 E-3, SHEET 45 of 45
////////LAST ITEM////////
Solicitation No. W912PP19R0022 Page 3b of 151
PROPOSAL SCHEDULE (Cont’d)
Item Unit No. Description Quantity Unit Price Amount
0009 Subgrade Preparation, to include: Dental concrete applied to the foundation at the concrete core wall, concrete retaining walls, concrete outlet structures, and slush grout of exposed fractures.
2701,250 SY $_________ $
0010 Clay Blanket, to include:
Removal, hauling, processing, moisture conditioning, and compacting Clay Blanket Material to the lines and grades shown in the Drawings.
1,700 CY $_________ $
0011 Geotextile, to include:
Furnishing and installing geotextile as shown in the Drawings.
5,800 SY $_________ $
0012 Zone 1 and Zone 2 Rockfill, to include: Excavating, processing, hauling, placing, spreading, and compacting Zone 1 and Zone 2 rockfill materials obtained from the borrow area. For bidding purposes, the Contractor shall assume four (4) roller passes with the specified equipment is necessary to compact each rockfill lift.
Item also includes permanent dam access road construction and slope protection.
19,000 CY $_________ $
AMENDMENT 0005
Solicitation No. W912PP19R0022 Page 3d of 151
PROPOSAL SCHEDULE (Cont’d)
Item Unit No. Description Quantity Unit Price Amount
0019 First Fill and Dam Breach Implementation, to include:
Complete pumped filling of reservoir between new and existing dam, including required water level holds.
Excavate breach of existing dam. ExcludesIncludes riprap and removal of existing outlet works.
1 JOB *** $
0020 Removal and Disposal of Existing Structures, to include: Demolition, removal, and hauling of materials and structures offsite for disposal. Includes existing metal conduits, fencing and gates, and miscellaneous structures.
1 JOB *** $
0021 Leveling Slab and Mass Concrete, to include:
Furnishing and placing mass concrete for leveling slab under outlet works conduit encasement.
100 CY $_________ $
Bureau of Indian Affairs SECTION 03 48 00
03 48 00-2
Lauer Dam Rehabilitation May 2019 1510870 – Issued for Bid PRE-CAST CONCRETE SPECIALTIES
1. Placement drawings:
a. Identify location of structure.
2. Plan for transporting, placing, and installing.
3. Concrete curing methods.
E. Administrative:
1. Statement of Qualifications:
a. CONTRACTOR’s resident superintendent for structure placement.
2. Pre-installation conference minutes.
F. Quality Control:
1. Results of quality control tests from MANUFACTURER.
1.4 QUALITY ASSURANCE
A. Pre-installation conference:
1. Meeting attendees:
a. CONTRACTOR, including placing, finishing, and installing subcontractors.
(Attendance mandatory)
PART 2 PRODUCTS
2.1 PRE-CAST CONCRETE EARLY WARNING SYSTEM STRUCTURE
A. Monolithic pre-cast concrete structure implemented to house the EWS and its components.
2.2 PHYSICAL PROPERTIES
A. Monolithic structure.
B. Footing dimensions: 6’-9”W x 11’-9”L 12’ 4”W x 14’ 8”L
C. Design loads:
1. 110 mph wind load
2. 250 psf roof load 65 psf roof load
14'-8"
7"
8'-4" 6'-4"
3" (MIN)
STOP LOG
STORAGE
VENT PIPE
(TYP)
GRATING
INTAKE
STRUCTURE
RETAINING WALL
RETAINING WALL
T.O. SLAB
EL. 4990.4
FF EL. 4990.5
EWS EQUIPMENT
(BY OTHERS)
INSTALL PRECAST
CONC STRUCTURE
EARLY WARNING SYSTEM
PER SPECIFICATIONS
1" Ø PENETRATION
FOR EWS WIRING
(BY OTHERS)
6'-9"
1'-8"
SUPPORT
LEDGE
5"
FDN
(TYP)
6" SLAB
ON GRADE
INTAKE
STRUCTURE
SUPPORT
LEDGE
4'-8"
5" (TYP)
5" (TYP)
24"Ø
SUPPORT
SHAFT
U.S. Department of Interior
Bureau of Indian Affairs
Safety of Dams Program
Pacific Region
GEI Project 1510870
SHEET NO.
DWG. NO.
APPISSUE/REVISIONNO. DATE
Designed:
Checked:
Drawn:
If this scale bar does not measure
1" then drawing is not original scale.
Attention:
1"
4601 DTC Boulevard
Denver, Colorado 80237
303-662-0100
CMMBID SET0 5/31/19
May 31, 2019
Lauer Dam Rehabilitation
XL Ranch Reservation, CA
Approved By:
Approval Date:
P
L a u e r
D a m
C i v i l P r o d u c t i o n
D r a w i n g s W o r k i n g
D r a w i n g s
E
E a r l y
W a r n i n g
S y s t e m
P l a n s d w g
J u l s k l a w i t t e r
P. EGGERS
A. LOCKMAN
C. MASCHING
of 4544
E-2
EARLY WARNING SYSTEM
CONTROL HOUSE
PLANS
P. EGGERS
FLOOR PLAN
EWS CONTROL HOUSE
FOUNDATION PLAN
EWS CONTROL HOUSE
1/2" = 1'-0"
1/2" = 1'-0"
A
E-4
B
E-4
C
E-4
CMMREVISION 11 7/25/19
14'-8"
14'-2"
M
I N
5'-6"
L T
E
CONSTRUCTION JOINT
AT CONTRACTOR'S OPTION
INTAKE STRUCTURE
REINF NOT SHOWN
GATE OPERATOR
6" SITE PAD
W/ #4@12" OC, EW
3" (MIN)
3 - #4 EQ SP, T&B
#4@12" T&B
#4@18" OC
GREASE SLAB END
" PREFORMED JOINT
FILLER OVER FULL DEPTH, TYP
GRATING
3" (MIN)
PRECAST EWS BUILDING
CONNECTION TO BE
PROVIDED BY MFG
OPENING FOR
ENTRY DOOR
12'-4"
11'-10"
SUPPORT LEDGE
5"
1'-8"
STOP LOG
STORAGE
VENT PIPE, TYP
M
I N
FINISH GRADE
EL. 4990.5
RETAINING WALL
REINF NOT SHOWN
#6 @ 12"
2 - #6
" PREFORMED JOINT
FILLER OVER FULL DEPTH, TYP
PRECAST EWS BUILDING
CONNECTION TO BE
PROVIDED BY MFG
3'-0" 4'-4" RO 5'-0"
11'-9"
RETAINING
WALL
3 - #4 EQ SPC, T&B
#4@12" T&B
24"Ø SUPPORT
SHAFT
8 - #6 EQ SPC
#4 TIE @ 18" OC
5 - #4 TIES @ 3" OC
REINF NOT SHOWN
REINF NOT SHOWN
FDN FOOTING
6" SLAB
(BEYOND)
EWS FDN
SUPPORT
CORBEL
PRECAST EWS BUILDING
CONNECTION TO BE
PROVIDED BY MFG
DRILL & GROUT
#6 REBAR INTO
COMPETENT ROCK
(NOTE 1)
M
I N
LIMIT OF EXCAVATION
RETAINING
WALL FOOTING
U.S. Department of Interior
Bureau of Indian Affairs
Safety of Dams Program
Pacific Region
GEI Project 1510870
SHEET NO.
DWG. NO.
APPISSUE/REVISIONNO. DATE
Designed:
Checked:
Drawn:
If this scale bar does not measure
1" then drawing is not original scale.
Attention:
1"
4601 DTC Boulevard
Denver, Colorado 80237
303-662-0100
CMMBID SET0 5/31/19
May 31, 2019
Lauer Dam Rehabilitation
XL Ranch Reservation, CA
Approved By:
Approval Date:
P
L a u e r
D a m
C i v i l P r o d u c t i o n
D r a w i n g s W o r k i n g
D r a w i n g s
E
E a r l y
W a r n i n g
S y s t e m
S e c t i o n s d w g
J u l s k l a w i t t e r
P. EGGERS
A. LOCKMAN
C. MASCHING
of 4545
E-3
EARLY WARNING SYSTEM
CONTROL HOUSE
SECTIONS AND DETAILS
P. EGGERS
1/2" = 1'-0"
1/2" = 1'-0"
±SECTION
EWS HOUSE
A
E-2
SECTION
EWS HOUSE
B
E-2
SECTION
EWS HOUSE
C
E-2
ROCKFILL
ZONE 2
1/2" = 1'-0"
NOTES:
1. DRILL AND CLEAN 2" MINIMUM DIAMETER HOLE AND GROUT WITH CELROC P NON-SHRINK GROUT BY MINOVA PER
MANUFACTURER SPECIFICATIONS. CENTRALIZE REBAR IN HOLE.
CMMREVISION 11 7/25/19
| SECTION 03 48 00 - Pre-Cast Concrete Specialties.pdf |
| PART 1 GENERAL |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.1 SUMMARY |
| A. The work described in this specification includes the following general items of work: |
| A. The work described in this specification includes the following general items of work: |
| 1. Prefabricated Early warning system structure (EWS) design and installation. |
| 1. Prefabricated Early warning system structure (EWS) design and installation. |
| 2. EWS equipment and accessories. |
| 2. EWS equipment and accessories. |
| 1.2 REFERENCES |
| 1.2 REFERENCES |
| A. The following is a list of standards that may be referenced in this Section: |
| A. The following is a list of standards that may be referenced in this Section: |
| 1. American Concrete Institute (ACI): |
| 1. American Concrete Institute (ACI): |
| a. ACI 301 ( Specifications for Structural Concrete |
| a. ACI 301 ( Specifications for Structural Concrete |
| b. ACI 318/318R ( Building Code Requirements for Structural Concrete and Commentary |
| b. ACI 318/318R ( Building Code Requirements for Structural Concrete and Commentary |
| c. ACI 350 – Code Requirements for Environmental Engineering Concrete Structures and Commentary |
| c. ACI 350 – Code Requirements for Environmental Engineering Concrete Structures and Commentary |
| 2. ASTM International (ASTM): |
| 2. ASTM International (ASTM): |
| a. ASTM E329 ( Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction |
| a. ASTM E329 ( Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction |
| 3. CBC – California Building Code |
| 3. CBC – California Building Code |
| 4. IBC – International Building Code |
| 4. IBC – International Building Code |
| 5. Where these Specifications differ from the requirements of ACI or ASTM, the more stringent requirements shall apply. |
| 5. Where these Specifications differ from the requirements of ACI or ASTM, the more stringent requirements shall apply. |
| 1.3 SUBMITTALS |
| 1.3 SUBMITTALS |
| A. MANUFACTURER’s certification as having met applicable ASTM standards |
| A. MANUFACTURER’s certification as having met applicable ASTM standards |
| B. MANUFACTURER’s product literature. |
| B. MANUFACTURER’s product literature. |
| C. Warranty: Provide certified copies of MANUFACTURER’s product warranties. |
| C. Warranty: Provide certified copies of MANUFACTURER’s product warranties. |
| D. Shop drawings of specified product from MANUFACTURER and implementation into design. |
| D. Shop drawings of specified product from MANUFACTURER and implementation into design. |
| 1. Placement drawings: |
| a. Identify location of structure. |
| 1. Placement drawings: |
| 1. Placement drawings: |
| a. Identify location of structure. |
| 2. Plan for transporting, placing, and installing. |
| 2. Plan for transporting, placing, and installing. |
| 3. Concrete curing methods. |
| 3. Concrete curing methods. |
| E. Administrative: |
| E. Administrative: |
| 1. Statement of Qualifications: |
| 1. Statement of Qualifications: |
| a. CONTRACTOR’s resident superintendent for structure placement. |
| a. CONTRACTOR’s resident superintendent for structure placement. |
| 2. Pre-installation conference minutes. |
| 2. Pre-installation conference minutes. |
| F. Quality Control: |
| F. Quality Control: |
| 1. Results of quality control tests from MANUFACTURER. |
| 1. Results of quality control tests from MANUFACTURER. |
| 1.4 QUALITY ASSURANCE |
| 1.4 QUALITY ASSURANCE |
| A. Pre-installation conference: |
| A. Pre-installation conference: |
| 1. Meeting attendees: |
| 1. Meeting attendees: |
| a. CONTRACTOR, including placing, finishing, and installing subcontractors. (Attendance mandatory) |
| a. CONTRACTOR, including placing, finishing, and installing subcontractors. (Attendance mandatory) |
| PART 2 PRODUCTS |
| PART 2 PRODUCTS |
| 2.1 pre-cast concrete early warning system structure |
| 2.1 pre-cast concrete early warning system structure |
| A. Monolithic pre-cast concrete structure implemented to house the EWS and its components. |
| A. Monolithic pre-cast concrete structure implemented to house the EWS and its components. |
| 2.2 Physical properties |
| 2.2 Physical properties |
| A. Monolithic structure. |
| A. Monolithic structure. |
| B. Footing dimensions: 6’-9”W x 11’-9”L 12’ 4”W x 14’ 8”L |
| B. Footing dimensions: 6’-9”W x 11’-9”L 12’ 4”W x 14’ 8”L |
| C. Design loads: |
| C. Design loads: |
| 1. 110 mph wind load |
| 1. 110 mph wind load |
| 2. 250 psf roof load 65 psf roof load |
| 2. 250 psf roof load 65 psf roof load |
| 3. 250 psf floor load |
| 4. 50% G seismic rating |
| D. Bullet proof steel door of at least 36” x 84” with rust/corrosion resistant paint. |
| 3. 250 psf floor load |
| 3. 250 psf floor load |
| 4. 50% G seismic rating |
| D. Bullet proof steel door of at least 36” x 84” with rust/corrosion resistant paint. |
| E. Ventilation per state laws and code. |
| E. Ventilation per state laws and code. |
| PART 3 EXECUTION |
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.1 GENERAL |
| A. Acceptance of Site Verification of Conditions: The CONTRACTOR shall inspect, accept, and verify in writing the following items prior to installation of monolithic structure. |
| A. Acceptance of Site Verification of Conditions: The CONTRACTOR shall inspect, accept, and verify in writing the following items prior to installation of monolithic structure. |
| 1. Verify the base materials, thickness, compacted density, surface tolerances, and elevations conform to specified requirements. |
| 1. Verify the base materials, thickness, compacted density, surface tolerances, and elevations conform to specified requirements. |
| 2. Verify location, type, and elevations of edge restraints and utility structures. |
| 2. Verify location, type, and elevations of edge restraints and utility structures. |
| B. Notify CO or COR a minimum of 24 hours prior to commencement of structure placement or installation. |
| B. Notify CO or COR a minimum of 24 hours prior to commencement of structure placement or installation. |
| 3.2 PREPARATION |
| 3.2 PREPARATION |
| A. Prepare site for delivery with all required equipment and personnel. |
| A. Prepare site for delivery with all required equipment and personnel. |
| B. Clean and prepare structure foundation prior to placement. |
| B. Clean and prepare structure foundation prior to placement. |
| C. Offloading and installation to be completed following MANUFACTURER’s guidelines. |
| C. Offloading and installation to be completed following MANUFACTURER’s guidelines. |
| 3.3 PLACING Monolithic structure |
| 3.3 PLACING Monolithic structure |
| A. Place structure as indicated on the Drawings. |
| A. Place structure as indicated on the Drawings. |
| B. Use MANUFACTURER’s guidelines for offloading and placing of the structure. |
| B. Use MANUFACTURER’s guidelines for offloading and placing of the structure. |
| 3.4 COLD WEATHER PLACEMENT |
| 3.4 COLD WEATHER PLACEMENT |
| A. Follow MANUFACTURER’s guidelines for cold weather placement. |
| A. Follow MANUFACTURER’s guidelines for cold weather placement. |
| B. Do not place structure against frozen earth or ice, or against forms or reinforcement with frost or ice present. |
| B. Do not place structure against frozen earth or ice, or against forms or reinforcement with frost or ice present. |
| 3.5 HOT WEATHER PLACEMENT |
| A. Follow MANUFACTURER’s guidelines for hot weather placement. |
| 3.6 QUALITY CONTROL |
| A. Responsibility: |
| 3.5 HOT WEATHER PLACEMENT |
| 3.5 HOT WEATHER PLACEMENT |
| A. Follow MANUFACTURER’s guidelines for hot weather placement. |
| 3.6 QUALITY CONTROL |
| A. Responsibility: |
| 1. CONTRACTOR will perform all field quality control testing, obtain all field quality control samples, and perform all laboratory testing of field quality control samples for all cast-in-place concrete as required. |
| 1. CONTRACTOR will perform all field quality control testing, obtain all field quality control samples, and perform all laboratory testing of field quality control samples for all cast-in-place concrete as required. |
| 2. MANUFACTURER will provide quality control documentation from location of fabrication. |
| 2. MANUFACTURER will provide quality control documentation from location of fabrication. |
| a. Pre-pour inspections of the reinforcement, clearances, layouts, and dimensions of structure. |
| a. Pre-pour inspections of the reinforcement, clearances, layouts, and dimensions of structure. |
| b. Post-pour inspections to check the concrete finishes for damage, inconsistencies, and to ensure dimensions are correct. |
| b. Post-pour inspections to check the concrete finishes for damage, inconsistencies, and to ensure dimensions are correct. |
| c. Final inspections prior to shipping to ensure finish quality and all requested accessories are included. |
| c. Final inspections prior to shipping to ensure finish quality and all requested accessories are included. |
| 3. CONTRACTOR shall provide necessary materials and adequate access to BIA’s personnel for quality assurance testing. |
| 3. CONTRACTOR shall provide necessary materials and adequate access to BIA’s personnel for quality assurance testing. |
| 4. CONTRACTOR will verbally advise the CO or COR of results of field quality control test results upon completion of respective tests. Copies of CONTRACTOR’s field quality control test results will be provided to the CO or COR within 24 hours after t... |
| 4. CONTRACTOR will verbally advise the CO or COR of results of field quality control test results upon completion of respective tests. Copies of CONTRACTOR’s field quality control test results will be provided to the CO or COR within 24 hours after t... |
| B. General: |
| B. General: |
| 1. Quality control test results will be evaluated in accordance with ACI 301 and these Specifications. |
| 1. Quality control test results will be evaluated in accordance with ACI 301 and these Specifications. |
| 2. Sampling and preparation of freshly mixed concrete shall be in accordance with ASTM C172 and ASTM C617. |
| 2. Sampling and preparation of freshly mixed concrete shall be in accordance with ASTM C172 and ASTM C617. |
| 3. Quality control laboratory shall meet the requirements of ASTM C1077. |
| 3. Quality control laboratory shall meet the requirements of ASTM C1077. |
| 4. Refer to Section 03 05 00: Basic Concrete Materials, for concrete quality requirements. |
| 4. Refer to Section 03 05 00: Basic Concrete Materials, for concrete quality requirements. |
| C. Compressive Strength: |
| C. Compressive Strength: |
| 1. Cylinder Preparation: ASTM C31. |
| 1. Cylinder Preparation: ASTM C31. |
| 2. Each set shall consist of five cylinders. |
| 3. Laboratory Test Procedure: ASTM C39. |
| 4. For each set: |
| 2. Each set shall consist of five cylinders. |
| 2. Each set shall consist of five cylinders. |
| 3. Laboratory Test Procedure: ASTM C39. |
| 4. For each set: |
| a. 2 cylinders will be tested at 7 days. |
| a. 2 cylinders will be tested at 7 days. |
| b. 2 cylinders will be tested at 28 days. |
| b. 2 cylinders will be tested at 28 days. |
| c. 1 cylinder will be reserved and tested at 56 days if 28-day strength is not met. |
| c. 1 cylinder will be reserved and tested at 56 days if 28-day strength is not met. |
| D. Unit Weight: |
| D. Unit Weight: |
| 1. Test Procedure: ASTM C138. |
| 1. Test Procedure: ASTM C138. |
| E. Slump |
| E. Slump |
| 1. Test Procedure: ASTM C1611. |
| 1. Test Procedure: ASTM C1611. |
| F. Air Content: |
| F. Air Content: |
| 1. Test Procedure: ASTM C231. |
| 1. Test Procedure: ASTM C231. |
| G. Temperature: |
| G. Temperature: |
| 1. Test Procedure: ASTM C1064 |
| 1. Test Procedure: ASTM C1064 |
| 2. Measure temperature immediately prior to placement. |
| 2. Measure temperature immediately prior to placement. |
| H. Tolerances: |
| H. Tolerances: |
| 1. Variation of all hardened concrete structures or elements of structures will be measured as necessary to verify compliance with Specification requirements. |
| 1. Variation of all hardened concrete structures or elements of structures will be measured as necessary to verify compliance with Specification requirements. |
File details come from the government source that posted it.