Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
PROJECT: FY17 Hazardous Cargo Pad and Taxiway, Holloman Air Force Base, Otero County, NM
1. This is Amendment No. 0003 to Solicitation No. W912PP-17-R-0005. The following revisions shall be incorporated into the specifications.
The required response date/time has changed from “22-Feb-2017 02:00 PM” to “03-Mar-2017 02:00 PM”.
All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
See Item 6
J
W912PP-17-R-0005
1 2
02/14/2017
01/20/2017
W912PP-17-R-0005
Amendment No. 0003
2. SPECIFICATIONS: DELETE THE FOLLOWING LISTED PAGES AND SUBSTITUTE THE PAGES
ATTACHED HERETO. ON THE REVISED PAGES, FOR CONVENIENCE, CHANGES ARE EMPHASIZED
BY STRIKETHROUGH FOR DELETIONS AND UNDERLINE FOR ADDITIONS FROM THE PREVIOUS
ISSUE. ALL PORTIONS OF THE REVISED (OR NEW) PAGES SHALL APPLY WHETHER OR NOT
CHANGES HAVE BEEN INDICATED.
Delete Page Insert Page
Section 00100, Page 11 of 74 Section 00100, Page 11 of 74 01 74 19, Page 4 01 74 19, Page 4 33 05 23.13, Page 1 33 05 23.13, Page 1
3. DRAWING CHANGES: The following drawings shall be revised as stated below.
Bidders are requested to change their drawings for bidding purposes. Successful bidder drawings will be issued to the successful bidder.
a. G-002
b. C-101
c. C-102
d. C-113
e. C-124
f. C-125
g. C-503
h. S-502
i. S-503
4. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision: 2.2, 3.1, 4.1, 15.1, 27.2, 28.2, 38.1 63.1, 64.1
////////LAST ITEM////////
THE FOLLOWING ARE LOCAL PROVISIONS TO SECTION 00100:
USE OF THE WORDS “PROPOSER” AND “OFFEROR”
Whenever the word “Proposer” appears in the RFP it shall be construed to have the same meaning as the word
“Offeror.”
AVAILABILITY OF PLANS AND SPECIFICATIONS
This solicitation will be issued via Internet only. Notification of amendments shall be made via Internet only, as well. It is therefore the contractor’s responsibility to check the following address daily for any posted changes to this solicitation. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders must register with
FedBizOpps before accessing the system. Registration instructions can be found on the FedBizOpps website at www.fbo.gov by clicking on the “Register Now” hyperlink. Contractors registered with FedBizOpps may view and/or download this solicitation and all amendments from the Internet after solicitation issuance at this site.
BIDDER INQUIRY AND PROPOSAL INFORMATION
a. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org.
1. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab.
Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
2. From this page, you may view all bidder inquiries or add inquiry.
3. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
4. The Solicitation Number is:
The Bidder Inquiry Key is:
W912PP-17-R-0005
Q4QI76-QA3MQM
b. The Bidder Inquiry System will be unavailable for new inquires 13 22 February 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
c. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
d. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
e. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
CONTRACTING OFFICER AUTHORITY
The Contracting Officer who signs this contract will be the primary Contracting Officer for this contract. However, any Contracting Officer assigned to the Albuquerque District, contracting within his or her authority, may take formal action on this contract when a contract action needs to be taken and the primary Contracting Officer is unavailable.
NAICS CODE AND SMALL BUSINESS SIZE STANDARD
The North American Industry Classification System (NAICS) code for this acquisition is 237310. The small business size standard is: the average annual receipts of the concern and its affiliates for the preceding three fiscal years must not exceed $36.5 million.
The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
http://www.fbo.gov/ http://www.projnet.org/ l4ctemlk Line
01 74 19-4
Management Plan to each subcontractor, the Quality Control Manager, and the Contracting Officer.
1.7 RECORDS
Records shall be maintained to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. The records shall be made available to the Contracting Officer during construction, and a copy of the records shall be delivered to the Contracting Officer upon completion of the construction.
1.8 REPORTS
Provide quarterly reports and a final report to Contracting Officer at USACE office at CannonHolloman AFB. Quarterly and final reports shall include project name, information for waste generated this quarter, and cumulative totals for the project. Each report shall include supporting documentation to include manifests, weight tickets, receipts, and invoices specifically identifying the project and waste material. Include timber harvest and demolition information, if any.
1.9 COLLECTION
Separate, store, protect, and handle at the site identified recyclable and salvageable waste products in a manner that maximizes recyclability and salvagability of identified materials. Provide the necessary containers, bins and storage areas to facilitate effective waste management and clearly and appropriately identify them. Provide materials for barriers and enclosures around recyclable material storage areas which are nonhazardous and recyclable or reusable. Locate out of the way of construction traffic.
Provide adequate space for pick-up and delivery and convenience to subcontractors. Recycling and waste bin areas are to be kept neat and clean, and recyclable materials shall be handled to prevent contamination of materials from incompatible products and materials. Clean contaminated materials prior to placing in collection containers. Use cleaning materials that are nonhazardous and biodegradable. Handle hazardous waste and hazardous materials in accordance with applicable regulations and coordinate with Section 01 57 20 ENVIRONMENTAL PROTECTION. Separate materials by one of the following methods:
W912PP-17-R-0005
Amendment No. 0003
L4EC9JDG
Cross-Out
SECTION 33 05 23.13
UTILITY HORIZONTAL DIRECTIONAL DRILLING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 180 (2015) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.652 Safety and Health Regulations for Construction; Subpart P, Excavations;
Requirements for Protective Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Statement of Qualifications and Records; G
SD-03 Product Data
Polyethylene Pipe; G
Drilling Fluids; G
Additives; G
Mixtures; G
Safety Data Sheets
SD-05 Design Data
Secondary Containment Plan; G
SD-06 Test Reports
33 05 23.13 - 1
W912PP-17-R-0005
Amendment No. 0003
L4EC9JDG
Cross-Out
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A C
T
N O
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
E le c
S u b s ta ti o n
Old Fire Training Area
Abandon Skeet Range
Abandon Fire Training
Area
Playground
Court
Court
Court
Playground
Playground
C o u r t
Court Court
Tennis
Courts
Tennis
Courts
P o o l
P o o l
D e te n ti o n
P o n d
Bermed Area
Substation
Playg roun d
Playground
Playground
P la y g r o u n d
Playground
Substation
Landfill
Landfill
Landfill
Landfill
Pond
R u n n in g
Tr a c k
Sports
Field
Sports
Field
Sports
Field
Sports
Field
Sports
Field
Lagoon
Lagoon
Lagoon
Lagoon
Lagoon
Lagoon
Sports
Field
Sports
Field
Skeet Range
LOCALIZER
ANTENNA
934 935936
957956
44902
44903
44906
W.T.
21811
21810
21814
21815
21813
21812
21819
21818
21817
21816
95868
828917
G4 T5
G5
T4
T6
G6
75130
T7
G7
2253 2251 2249
22472245
75105J
2238 2240
28442846 2848285052
2854285628582860
2855 2853
27 28
274327492753 2751 4547
2748 2744
9 2721 2720
2725 27352731
24 262728
2760 2782
71 2
270927072705
2710 2702
G9
T2
T8 G8
T9
G2
G3
FP
S
R
AD
AR
TW
R
8 4
1 7
2214 2216
E
2424 2426
52077
1 751
05G
H E
LI
P
A D
75117
75111
75102
75114
RANGE
75-106
5D
9 2
43 244
8 245
05B
81104
6 7
7 2
7 255
2 254
4 46 254
3 253
1 2
4 2
5 2
75 105A
1 2
1 5
TH
E A
TE
R
2 2
9 2
75500
0 642
AN/FP
N 47
44301
LOX PLANT
75140
75141
R V
S
TO
R A G E
B
AK
G
LI
D E
S
LO
P E
S H E
LT
E R
B A K
GLIDE S
LOPE
ANTENNA
SHELTER
KING 1 AREA
TRAINING AREA
PRIME BEEF
93100
BAK-12
1099 1097
69100
M O
TO
R
P
O O L
84203
W.T.
13624
AF BEACON
BAK-12
93101
83301
12281229
12371236
12031200
75600
1225 1224
1242 1241
1233 1234
1246 1247 1248
B A S E
O P S
O F F
IC
E R 'S
C
LU
B
F A
M
IL
Y
C
A M P
PARK/PICNIC AREA
H O S P
IT
A L
R E A
ELEMENTARY
SCHOOL
E
LE
M E N
TA
R Y
S C
H O
O
JR
H
IG
H
S C
H O
O L
B X C
O M
M
IS
S A R
Y
C H
A P E L 7
H Q
B
LD
G
E
Y
R
D
N C
O
C
LU
B
M P F
POL
AREA
FIRE TRAINING FAC
CONTROL
TOWER
SP TRAINING
AREA
13850
LAUNCH
BALLOON
PAD
PRIMATE SCIENCE
LABORATORY (NMSU)
GOLF
C
ART
SHED
9GOLF COURSE
DRIVING
W E
G
V E
N U
E
S
D R
E
S A
C R
A M
E N
SANDOVAL
LOOP
SOCORRO LOOP
SAN JUAN
LOOP
A R
R
IB
D
IV
E
QUAY LOOP
HOLLOMAN AIR FORCE BASE
H A
IV
E
KELLY
ROAD
B E
P
T H
M O
R O
N I
D R
IV
E
F O
R
IN
E N
U E
CHOW HALL
TULAROSA R
OAD
K E L L Y
R
O A D
WAGNER STREET
MESQUITE ROAD
TRAVIS PLACE TRAVIS LOOP
DONA ANA PLACE DONA ANA LOOP
DONA ANA LOOPDE BACA PLACE
M E S
Q U
IT
A D
F E T C
H E T
L O
O P
H A R
M O
N
L O
O P
TORRANCE PLACE
SIERRA PLACESIERRA LOOP
SIERRA LOOP OTERO LOOP
OTERO LOOPLUNA LOOP
LUNA LOOP HIDALGO LOOP
HIDALGO LOOP
EG
LI
N
C T
M A R
TI
E
KI
RTL
AN
D
PLACE
N
ELL
IS
PLACE
G R
IF
FI
S
C O
U R T
K E E S L E R
COURT
C T
C T
L A N
G L E Y
COURT
B R
O O
K S
C O
U R T
C U
R
IR
C L E
S O
U
TH
CURRY C
IRCLE
NORTH
B E
R N
A L
IL
L O
C T
US
75-500
W.T.
BAK-12
R S U
P A D
N E
S
W
TA
X
IW
A Y
R
U N
W
C E S S
G E O R
G
IA
S
TR
E E T
E
IG
H T H
S T R E E T
D E
LA
W A
E N
U E
F
IF
T H
S T R E E T
D O
M
LL
E A
C O
N N E C
TI
C U T
A V E N
U E
S
IX
T H
S T R E E T
N
W
X
IC
E N
U E
ID
A
E N
U E
C O
M M
U N
IT
Y
C E N
TE
R
F O
U R T H
S T R E E T
ID
A
E N
U E
A R
IZ
O
E N
U E
ARN
O
LD
AVEN
U E
S E C
O N
D
S T R E E T
N
X
E
A R
IZ
O
E N
U E
T A B
O
E N
U E
M c K
IN
L E Y
L O
O P
S A N
TA
F
IV
E
F
IR
S T
S T R E E T
C O
LF
A X
L
A
M O S
P L
VALENCIA
DRIVE
V A
LE
N
IA
IV
E
GUADALUPE PL
SAN MIGUEL
CATRON L
OOP
TAOS LOOP
MORA LOOP
LOOP
EDDY LOOP
EDDY PLACE
S A
N
IV
E
X
.3
D E
LA
W A
E N
U E
C O
LO
R A D
O
ID
A
E
S A
B
A D
DOUGLAS ROAD
SABRE ROAD
DEZONIA ROAD
Y U
C
E N
U E
O C
O T
IL
E N
U E
TE
S T
S
TAN
D
TR
IN
IT
Y S
TR
E E T
W A
G N
R E
E T
B O
R
E E
T
M A
T A
D
N E
LOX
AREA
POL
P-8
P-9
P-10
LO
C
K H E
E N
U E
P A T R
K
E N
U E
A R
K A N S
E N
U E
C R E S
O
E N
U E
D R
M O
Y A R
D
R
EF
U
ELE
R
R
O
AD
P-13
P-14
P-16
P-
P-18
P-20
P-19
P-21
P-25
P-
P-
P-
M A
IN
G A
TE
U N P
A V E D
R
O A D
K E L L Y
R
O A D
U N
P A
V
A D
H O
L L
O M
R
B
S
E
W H
IT
N
IS
S
IL
N G
E
UNPAVED ROAD
UNPAVED ROAD
UNPAVED ROAD
D E
Z O
IA
A D
L E
T H
A D
U N
P A
V
A D
E L E V E N T H
S T R E E T
N
IN
T H
S T R E E T
F
IR
S T
S T R E E T
H O
L L
O M
R
S
E
H O
L L
O M
R
S
E
21808
CONSTRUCTION P
ROHIBIT
ED
A P
P R
O A
CLEAR ZONE
Z O
N E
CLEAR ZONE
C L E A R
Z
O N E
CONSTRUCTION PROHIBITED
C O
N S
T R
U C
T
IO
O H
IB
IT
E D
APPROACH
ZONE
ZONE
APPROACH
C O
N S T R
U C T
IO
N
P R
O H
IB
IT
E D
A P P
R O
A
N E
APP
R
ACH
ZO
E
CLEAR ZONE
C L E A R
Z
O N E
C L E A R
Z
O N E
C L E
N E
C L E
N E
ZO
N
EAP
PRO
ACH
P
R O
A
N E
C O
N S T R
U C T
IO
N
P
R O
H
IB
IT
E D
A P
P R
O A
N E
A P
P R
O A
N E
CLEAR ZONE
C L E A R
Z
O N E
AP
PROACH
ZONE
C O
N S
T R
U C
T
IO
O H
IB
IT
E D
ZONE
APPROACH
A P
P R
O A
N E
C L E
N E
C L E
N E
10511048
P-17
F A
IR
C H
IL
IV
E
P-2
BAK-12
TYPE MA-1A
BAK-15
BAK-12
BAK-9
BAK-15
PAVILION
MUNITIONS STORAGE AREA
SUSPECT VEHICLE
INSPECTION AREA
GUADALUPE PLACE
TO
W
HI
TE
S
ANDS
L
AS
C
RUCES
N.
M
U.
S.
HI
GHW
AY
FO
R
TY
N
IN
AVE
BAK-15
B A K
C E N
TE
R
LE
A R
N
IN
G
75754
HOLLOMAN AFB
CANNON AFB
Hobbs
Roswell
Clovis
Ft. Sumner
Carlsbad
Tucumcari
Alamogordo
Carrizozo
Los Cruces
Deming
Lordsburg
Silver City
Consequences
Truth or
Socorro
WHITE
SANDS
MISSILE
RANGE
Santa Fe
Los Vegas
Toas
Raton
Vaughn
Santa Rosa
Albuquerque
KIRTLAND
AFB
Espanola
Shiprock Farmington
Aztec
Trinidad
Walsenburg
Ft. Garland Cortez
Dorango
Gallup
Chama
Alamosa
Bernalillo
Clayton
FT. WINGATE
ARMY DEPOT
SAC PEAK
OBSERVATORY
Pecos
Alpine
Marfa
Presidi
Van Horn
El Paso
Ft. Stockton
FORT BLISS PYOTE AFB
M E X I C O
N E W M E X I C 0
C O L O R A D O
I
HOLLOMAN AIR FORCE BASE
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
C
V E
L A
S Q
U E
Z h a c -1
.a m
V
IC
IN
IT
Y M
A P
S
P R
O J E
C T L
O C
A T
IO
N A
N D
0' 500' 1000' 2000' 3000'
1"=1000'
PROJECT LOCATION MAP
SCALE: 1"=1000'
VICINITY MAP
SCALE: NOT TO SCALE
BENCHMARK DATA
CONTROL TOWER
FIRE DEPT.
POLICE
SECURITY
ENGINEER
BASE CIVIL
HOSPITAL
BASE
& INFORMATION
VISITOR CENTER
MAIN GATE
ACCESS GATE
CONTRACTOR
WEST GATE
E
E W
EVA
RENIN
YTROF
D E
LA
W A R E A
V E
SABRE RD
S A
B
DOUGLAS RD
RUNWAY 07
/25
R U
N W
A Y
/3
M O
R O
N I D
R
LOCATION
PROJECT
BM HAFB 2A
BM HAFB 07-08
ELEV. = 4047.13
E = 1,295,084.69
N = 11,923,832.31
BM HAFB 07-08
DATUM IS EGM96, US SURV. FT.
HORIZ. DATUM IS UTM ZONE 13N, WGS84, US SURV. FT. VERTICAL
ELEV. = 4060.13
E = 1,291,793.48
N = 11,929,656.29
BM HAFB 2A
K E
DR YLLEK
C-101
AREA
WASTE FILL
WASTE FILL AREA NOTES
GENERAL NOTES
WASTE FILL AREA
HAUL ROUTE TO
CONTRACTOR
WASTE FILL AREA
HAUL ROUTE TO
CONTRACTOR
ROUTE
ACCESS/HAUL
CONTRACTOR
ROUTE
ACCESS/HAUL
CONTRACTOR
R U
N W
A Y
4/
ENGINEER
COE RESIDENT
AREA, SHALL BE SEGRATED FROM CLEAN SOIL PLACED HERE.
CLEAN BASE COURSE MATERIAL, IF PLACED IN THE WASTE FILL
MATERIAL, ASPHALT RUBBLE, CONCRETE RUBBLE, TRASH, ETC.
SHALL BE CLEAN MATERIAL THAT IS FREE OF ORGANIC
HAFB WASTE FILL AREA. MATERIAL PLACED IN THIS AREA
THE PROJECT SITE MAY BE DISPOSED 0F IN THE DESIGNATED
1. EXCESS SOIL AND BASE COURSE MATERIAL REMOVED FROM
FOR SANITARY SEWAGE WASTE DISPOSAL REQUIREMENTS.
RESPONSIBILIITY. REFER TO SPECIFICATION SECTION 01 51 00
REMOVAL SHALL BE AT THE CONTRACTOR'S EXPENSE AND
WASTE FILL AREA. CONSTRUCTION WASTE AND DEBRIS
CLEAN WASTE SOIL, WHICH MAY BE DISPOSED OF AT THE BASE
WASTE MATERIAL OFF THE BASE WITH THE EXCEPTION OF
2. THE CONTRACTOR SHALL DISPOSE OF CONSTRUCTION
THE BASE AT HIS EXPENSE AND RESPONSIBILITY.
1. THE CONTRACTOR SHALL OBTAIN BORROW MATERIAL OFF
TAXIWAY G
T A
X
IW
A Y L
TAXIWAY R
K E
DOUGLAS RD
3.1
AM0003
D E
L E
T E
D B
E N
C H
M A
R K
A M
/1
/1
91 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
0+00B
12+00B
1+00B
2+00B
3+00B
4+00B
5+00B
6+00B
7+00B
8+00B
9+00B
10+00B
11+00B
27+50A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A 22+00A 23+00A 24+00A 25+00A 26+00A 27+00A
27+50A
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
C
0+00C
1+00C
C
C
4+
C
5+
C
6+
C
7+
C
8+
C
9+
C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
C 1 C 1 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
N
SCALE: 1"=200'
0'
1"=200'
100' 200' 400' 600'
NEW HAZARDOUS CARGO PAD (HCP)
T A X
IW
KELLY ROAD
K E
A D
K E
L L
Y R
O A
D
HALE D
RIVE
0'
0'
0'
0'
LEGEND
NOTES
CONTROL AND OPERATIONS NOTES AND DETAILS.
2.SEE SHEET C-501 FOR CONTRACTOR ACCESS
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
PHASING NOTES
CONSTRUCTION PHASING
PHASE 1
WHITE SANDS MISSILE RANGE
HOLLOMAN AIR FORCE BASE
(ALIGNMENT C)
NEW WATER LINE
ACCESS ROAD
EXIST. UNPAVED
(ALIGNMENT B)
NEW ACCESS ROAD
(ALIGNMENT A)
NEW HCP TAXIWAY
ACCESS ROAD
EXIST. UNPAVED
FOR PHASED CONSTRUCTION
RUNWAY CLEARANCE LINE
(ALIGNMENT C)
NEW WATER LINE
R U
N W
A Y O
V E
R R
U N
R U
N W
A Y O
V E R
R U
N
RUNWAY
EDGE OF EXIST.
CONSTRUCTION
LINE FOR PHASED
RUNWAY CLEARANCE
R U
N W
A Y
/2
325'
325'
T A
X
IW
A Y G
PHASE 1PHASE 1
PHASE 1
EXIST. PAVED ROAD
EXIST. PAVED ROAD
C-504
G
MARKINGS (THIS PROJECT)
DISPLACED THRESHOLD
TEMPORARILY
LOW PROFILE BARRICADES
PHASE 1 WORK AREA
NEW PAVEMENT OR SHOULDER
' 3
CENTERLINE STRIPE
EXIST. RUNWAY
BE 3' WIDE.
LINE (TYP OF 13). ARROWHEAD STRIPE SHALL
END OF RUNWAY AND TEMPORARY THRESHOLD
END OF EACH CENTERLINE STRIPE BETWEEN
PAINT TEMPORARY YELLOW ARROWHEAD AT
REQUIREMENTS.
"PHASING OF WORK" FOR ADDITIONAL WORK PHASING
9. REFER TO SPECIFICATION SECTION 01 01 50,
CONTRACTING OFFICER.
APPROVED BY THE AIRFIELD MANAGER AND
PROCEED UNTIL BARRICADE INSTALLATIONS ARE
OF THE CONTRACTING OFFICER. WORK SHALL NOT
THE AIRFIELD MANAGER AND TO THE SATISFACTION
BARRICADES SHALL BE INSTALLED AS REQUIRED BY
WORK AREAS IN THE VICINITY OF THE AIRFIELD.
BARRICADES ON THE AIRFIELD TO DELINEATE THE
AND RELOCATION AS REQUIRED OF LOW PROFILE
8. PHASE 1 SHALL INCLUDE INSTALLATION, REMOVAL,
MARKING OUT WITH BLACK PAINT.
COMPLETELY OBLITERING MARKINGS, NOT BY
TEMPORARY MARKINGS SHALL BE REMOVED BY
TEMPORATY MARKINGS ARE NO LONGER NEEDED,
COMPLETE. AT COMPLETION OF PHASE, WHEN
OFFICER, AND SHALL BE REMOVED WHEN WORK IS
AIRFIELD MANAGER THROUGH THE CONTRACTING
WORK IN THE PHASE, SHALL BE APPROVED BY THE
SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
RUNWAY 04 AS SHOWN ON THIS SHEET. MARKINGS
REMOVAL OF DISPLACED THRESHOLD MARKINGS ON
7. PHASE 1 SHALL INCLUDE INSTALLATION AND
FOOTPRINT REQUIRED TO ACCOMPLISH THE PHASE.
CONTRACTOR SHALL WORK WITHIN THE MINIMUM
REQURED TO ACCOMPLISH THE WORK. THE
AND, FOR CLARITY, ARE SHOWN LARGER THAN
6. THE BOUNDARIES OF PHASE 1 ARE APPROXIMATE
SPECIFICATIONS.
ACCOMPLISHED IN ACCORDANCE WITH THE
DISTRIBUTION SYSTEM. DISINFECTION SHALL BE
ITS CONNECTION TO THE EXISTING WATER
FILLED AND DISINFECTED AS A SINGLE UNIT PRIOR TO
THE ENTIRE COMPLETED NEW WATER LINE MAY BE
5. SEPARATE FROM THE WORK INCLUDED IN PHASE 1,
ADDITIONAL INFORMATION.
THE WATER LINE PLAN AND PROFILE SHEETS FOR
WATER LINE WILL NOT BE ACCEPTABLE. REFER TO
EXCAVATION FOR INSTALLATION OF THIS SECTION OF
INSTALLED BY TRENCHLESS METHOD. OPEN
STA 24+70C, INCLUDED IN PHASE 1, SHALL BE
4. THE NEW WATER LINE BETWEEN STA 16+80C AND
ACCOMPLISH THE TESTING.
OF WATER LINE SHALL BE CAPPED AT EACH END TO
IN THIS PHASE OF WORK, THE COMPLETED SECTION
THE COMPLETED LENGTH OF WATER LINE INCLUDED
THE SATISFACTION OF THE CONTRACTING OFFICER,
3. PHASE 1 SHALL INCLUDE PRESSURE TESTING, TO
SHOWN ON SHEET C-119.
WHICH INCLUDES PAVEMENT GRIDS 1 THROUGH 6 AS
TAXIWAY AND ASSOCIATED CONSTRUCTION BETWEEN
2. PHASE 1 CONSTRUCTION INCLUDES THE NEW
AREAS SHOWN ON THIS DRAWING.
ALL PROJECT WORK WITHIN THE PHASE 1 WORK
1. PHASE 1 INCLUDES SUBSTANTIAL COMPLETION OF
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
2 40
4.1
C
V E
L A
S Q
U E
Z h a c -1
.a m
C-102
C O
N S
T R
U C
T
IO
N P
H A
S
IN
G
AM0003
R E
V
IS
E D P
H A
S
IN
G N
O T
E
A M
/1
/1
0' 120'
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
GRADING PLAN E - ACCESS RD
S H
E E
T C -1
KEY PLAN
50.39
50.39 INV.
MATCH EXISTING GRADE
AT OUTLET
PROTECTION
ROCK EROSION
AT OUTLET
PROTECTION
ROCK EROSION
12'
' 10'
SWALE
TO DRAIN
CULVERT INLET. GRADE
EXTEND SWALE TOWARD
EA. END
CONC. HEADWALL
40 L.F. EA. WITH
2 x 12" CULVERT
STA 7+40.00B
EA. END
CONC. HEADWALL
50 L.F. EA. WITH
3 x 12" CULVERT
STA 0+82.00B
UNSURFACED ROAD (TYP)
CENTERLINE.
MIDPOINT OF CULVERTS SHALL BE LOCATED AT ROAD
PERPENDICULAR TO ROAD AT STATION INDICATED.
5. ROAD CULVERTS SHALL BE INSTALLED
4. SEE SHEET C-303 FOR THE ACCESS ROAD PROFILE.
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
13 40
15.1
C
V E
L A
S Q
U E
Z h a c -1
.a m
C-113
G R
A D
IN
G P
L A
N E A
C C
E S
S R
D
AM0003
A
M
R E
V
IS
E D L
E G
E N
D
/1
/1
FILTER FABRIC
THICK LAYER BEDDING MATERIAL OVER
1' THICK LAYER ROCK RIPRAP OVER 4"
NEW SPOT ELEVATION AT INVERT
NEW SPOT ELEVATION
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
SIGN
K E
L L
Y
R
D
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
B
B
B
B
M A
T C
H L
IN
4056 4056
40564056
4057 4057 4057 4057
405740574057
55.07 INV.
55.31 INV.
55.06INV.
INV.54.86
56.22
56.29
57.14
56.14
55.99
56.26
57.53
57.53
K E
L
A
D
C-502
C-502
A
B
C
DE
F
1"=40'
20' 40' 80'
S H
E E
T C -1
SCALE: 1"=4'V 1"=40'H
SCALE: 1"=40'H
0' 2' 4' 8' 12'
1"=4'
S H
E E
T C -1
KEY PLAN
NEW WATER LINE - ALIGNMENT C
LEGEND
NOTES
W
E 1,293,180.92
S H
E E
T C -1
S H
E E
T C -1
PROFILE - WATER LINE STA 9+50C TO 18+10C
PLAN
N 11,924,469.79
PI STA 16+77.08C
VICINITY OF NEW WATER LINE.
GROUNDING, AND CATHODIC PROTECTION WORK IN
RELOCATED ELECTRICAL, COMMUNICATION, LIGHTING,
SEE THE ELECTRICAL DRAWINGS FOR NEW AND/OR
NEW FINISHED CONTOUR
EXISTING CONTOUR
EXISTING BURIED ELEC LINE
NEW WATER LINE
COMMENCEMENT OF CONSTRUCTION OPERATIONS.
VERIFY ALL UTILITY LOCATIONS PRIOR TO
APPROXIMATE. THE CONTRACTOR SHALL FIELD
3. EXSISTING UTILITY INFORMATION SHOWN IS
ACCEPTABLE.
PIPE AT FIXED BURIAL DEPTH WILL NOT BE
TRAPS AT PIPELINE HIGH POINTS. INSTALLATION OF
VERTICAL ALIGNMENT REQUIRED TO PREVENT AIR
SHALL BE CONSTANT (STRAIGHT LINE). CONTROL OF
PROFILE. SLOPE OF PIPE BETWEEN CONTROL POINTS
CONTROLLED BY TOP OF PIPE ELEVATIONS GIVEN ON
2. VERTICAL ALIGNMENT OF WATERLINE SHALL BE
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
/0
/1
AM0003
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
25 40
27.2
C
V E
L A
S Q
U E
Z h a c -1
.a m
C-124
S T
A
C T
O
C
P L
A N P
R O
F
IL
E W
A T
E R L
IN
E A
M
R E
V
IS
E D P
R O
F
IL
E
2 2
A M
/1
/1
R E
V
IS
E D P
L A
N A
N D P
R O
F
IL
E
3 3
42604260
ELEC
ASPHALT ROAD
ROAD GRAVEL
ELECT. MH
ELECT. MH
M H
E
LE
C
E
LE
C
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
M A
T C
H L
IN
W-8"
M A
T C
H L
IN
C
C
C
C
C
C
C
C
C
GRAVEL ROAD
PAVED ROAD
M A
T C
H L
IN
ALIGNMENT CENTERLINE
EXISTING GRADE AT
S T
A
C B
E G
IN
R
E Q
U
IR
E D
T R
E N
C H
L E
S S I
N S
T A
L L
A T
IO
N
TRENCHLESS INSTALLATION REQUIRED
INSTALLATION REQUIRED
TRENCHLESS
M A
T C
H L
IN
8" WATER
10+00C 11+00C 12+00C 13+00C 14+00C 15+00C 16+00C 17+00C 18+00C
T O
P O
F P
IP
E
.7
T O
P O
F P
IP
E
.4
S T
A
C
S T
A
C
T O
P O
F P
IP
E
.4
S T
A
C
M
IN
E L E
C L
IN
E
E X
IS
T
B U
R
IE
D
FOR ADDITIONAL INFORMATION
SEE ELECTRICAL DRAWINGS
LOCATION APPROXIMATE,
SHALL BE FUSIBLE C-900 PVC PIPE
PIPE INSTALLED BY TRENCHLESS METHOD
T O
P O
F P
IP
E
.1
S T
A
C
T O
P O
F P
IP
E
.1
S T
A
C
T O
P O
F P
IP
E
.3
S T
A
C
1"=40'
20' 40' 80'
KEY PLAN
SCALE: 1"=4'V 1"=40'H
SCALE: 1"=40'H
0' 2' 4' 8' 12'
1"=4'
S H
E E
T C -1
NEW WATER LINE - ALIGNMENT C
NOTES
S H
E E
T C -1
S H
E E
T C -1
S H
E E
T C -1
PROFILE - WATER LINE STA 18+10C TO 27+10C
PLAN
E 1,292,658.42
N 11,925,101.77
PI STA 24+97.08C
REPLACEMENT DETAIL ON SHEET B-501
ACCORDANCE WITH HMAC PAVEMENT
PAVEMENT. REPAIR PAVEMENT CUT IN
CONSTRUCT NEW WATER LINE ACROSS
REMOVE PAVEMENT AS REQUIRED TO
VICINITY OF NEW WATER LINE.
GROUNDING, AND CATHODIC PROTECTION WORK IN
RELOCATED ELECTRICAL, COMMUNICATION, LIGHTING,
SEE THE ELECTRICAL DRAWINGS FOR NEW AND/OR
W
NEW FINISHED CONTOUR
EXISTING CONTOUR
EXISTING BURIED ELEC LINE
NEW WATER LINE
LEGEND
COMMENCEMENT OF CONSTRUCTION OPERATIONS.
VERIFY ALL UTILITY LOCATIONS PRIOR TO
APPROXIMATE. THE CONTRACTOR SHALL FIELD
3. EXSISTING UTILITY INFORMATION SHOWN IS
ACCEPTABLE.
PIPE AT FIXED BURIAL DEPTH WILL NOT BE
TRAPS AT PIPELINE HIGH POINTS. INSTALLATION OF
VERTICAL ALIGNMENT REQUIRED TO PREVENT AIR
SHALL BE CONSTANT (STRAIGHT LINE). CONTROL OF
PROFILE. SLOPE OF PIPE BETWEEN CONTROL POINTS
CONTROLLED BY TOP OF PIPE ELEVATIONS GIVEN ON
2. VERTICAL ALIGNMENT OF WATERLINE SHALL BE
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
26 40
28.2
C
V E
L A
S Q
U E
Z h a c -1
.a m
C-125
S T
A
C T
O
C
P L
A N P
R O
F
IL
E W
A T
E R L
IN
E
/0
/1
A
M
AM0003
R E
V
IS
E D P
R O
F
IL
E
/1
/1
A
M
R
E V
IS
E D P
L A
N A
N D P
R O
F
IL
E
42604260
ELEC
R U
N W
A Y S
IG
N
S Y S T E
M
A R
R E S T
IN
G C
A B L E
A S P
H A L T P
A D
A S P
H A L T R
O A
D
E L E C T . M
H
R U
N W
A Y S
IG
N
C O
N C P
A D S
ASPHALT SHOULDER
C O
N C P
A D S
C O
N C P
A D S
C O
N C P
A D S
E L E C T . M
H
S
IG
N
A S P
H A L T O
V E R
R U
N
E L E C T . M
H
M H
M H
ELEC
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
M A
T C
H L
IN
T C
H L
IN
C
C
C
C
C
C
C
C
C
C
RUNWAY OVERRUN
RUNWAY OVERRUN
PAVED ROAD
M A
T C
H L
IN
ALIGNMENT CENTERLINE
EXISTING GRADE AT
T R
E N
C H
L E
S S I
N S
T A
L L
A T
IO
N
S T
A
C B
E G
IN
R
E Q
U
IR
E D
TRENCHLESS INSTALLATION REQUIRED
M A
T C
H L
IN
18+00C 19+00C 20+00C 21+00C 22+00C 23+00C 24+00C 25+00C 26+00C 27+00C
8" WATER8" WATER
M
IN
SHALL BE FUSIBLE C-900 PVC PIPE
PIPE INSTALLED BY TRENCHLESS METHOD
SHALL BE FUSIBLE C-900 PVC PIPE
PIPE INSTALLED BY TRENCHLESS METHOD
T O
P O
F P
IP
E
.2
S T
A
C
T O
P O
F P
IP
E
.9
S T
A
C
STA 16+80C TO STA 24+70C PROVIDE CONSTANT SLOPE
TAXIWAY
0' 30'
1"=10'
5' 10' 20'
10.0% 2.0% 1.0%
10.0% 2.0%
1.0%
SHOULDER
2.07'2.09'
BOX CULVERT FLOOR SLAB
BOX CULVERT TOP SLAB
TAXIWAY CENTERLINE
TAXIWAY CENTERLINE
EQUAL (TYP AT EACH SHOULDER)
BOLTED SOLID COVER OR APPROVED
WITH NEENAH R-4990-HA TYPE D
NEENAH R-4993-HAB (TYPE T) FRAME
(TYP AT EACH END OF CULVERT)
GRATE COVER OR APPROVED EQUAL
WITH NEENAH R-4990-HA TYPE A BOLTED
NEENAH R-4993-HAB (TYPE T) FRAME
8' 24'
4'20'
111.5' 107.5'
PROTECTION
ROCK RIPRAP EROSION
C-503
C-5034
C-503
C-503
C-503
SCALE: 1"=10'
SECTION
C-503
2 SECTION
SCALE: 1"=2' C-503
3 SECTION
SCALE: 1"=2' C-503
4 SECTION
SCALE: 1"=2'
C-503
C-503
75' (TAXIWAY)
17.93'50'(SHOULDER)37.5'37.5'50'(SHOULDER)21.91'
0' 6'
1"=2'
1' 2' 4'
A
SCALE: 1"=10'
PLAN - TAXIWAY BOX CULVERT
C-104,109
INV. EL. 4050.18INV. EL. 4049.96 INV. EL. 4050.40
EL. 4053.53
0.20%0.20% 0.20%
SHOULDER
NOTES
(TYP AT EACH END OF CULVERT)
GRATE COVER OR APPROVED EQUAL
WITH NEENAH R-4990-HA TYPE A BOLTED
NEENAH R-4993-HAB (TYPE T) FRAME
EQUAL (TYP AT EACH SHOULDER)
BOLTED SOLID COVER OR APPROVED
WITH NEENAH R-4990-HA TYPE D
NEENAH R-4993-HAB (TYPE T) FRAME
CONC. BOX CULVERTCONC. BOX CULVERTCONC. BOX CULVERT
CONC. APRON (TYP)
ASPHALT SHOULDER (TYP)
2' 2'
2'
FILTER FABRIC
BEDDING MATERIAL
ROCK RIPRAP
AT STRUCTURE (TYP)
FILTER FABRIC TIE-BACK
AT RIPRAP PERIMETER (TYP)
FILTER FABRIC TIE-BACK
VARIES VARIES
VARIES
4' (TYP)
EL. 4052.15
EL. 4053.15 EL. 4053.15
EL. 4052.15
PAVEMENT THICKNESS AND DETAILS.
2. SEE THE GEOTECH DRAWINGS FOR ADJACENT
REQUIREMENTS.
CULVERT DIMENSIONS, DETAILS, AND ADDITIONAL
1. SEE THE STRUCTURAL DRAWINGS FOR BOX
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
36 40
38.1
C
V E
L A
S Q
U E
Z h a c -5
.a m
C-503
P L
A N A
N D S
E C
T
IO
N S
T A
X
IW
A Y B
O X C
U L
V E
R T
AM0003
A
M
R E
V
IS
E D S
E C
T
IO
N
/1
/1
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
1'-0"
KEYED NOTES
S-502
SECTION
SCALE: 1 1/2" - 1' - 0 "
P l o t
S c a l e
F i l e a m e
P l o t
D a t e
R E
V I E
W E
D
B
Y
S O
L C
O N
T R
A C
T
N
O
M a r k
D e s c r i p t i o n
Albuquerque District of Engineers
US Army Corps
A p p r
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
A L
B U
Q U
E R
Q U
E
N
X
I C
O
SEQUENCE NO.
OF
SHEET NO.
C H
I E
F
D A
T E e r o
T o l e r a n c e e r o
A c c i d e n t s
D E
S I G
N
B
Y
D R
A W
N
B
Y
D a t e
BID SET - NOT FOR CONSTRUCTION
W
P P
R
H O
L L
O M
R
S
E N
X
I C
O
F Y
Z
A R
D O
U
R
X
I W
W R
D
J A
N U
A R
Y
1. 3" CONC COVER FOR ALL REINF
2. ALL REINF HOOKS ARE 12xØ PER ACI 318-11, SECTION 12.2.2
3. CONCRETE INSTALLATION AS NOTED S-001 GENERAL
STRUCTURAL NOTE 14.
GENERAL NOTES
0' 2'
1 1/2" = 1'-0"
3" 6" 1'
S-502
PLAN
SCALE: 1 1/2" - 1' - 0 "
1. #5 12" OC, HORIZ BAR
2. #5 12" OC, VERT BAR, LOOP AROUND #8 HORIZ BAR
3. #5 BAR, 2 EA, EQ SPA
4. #6 @ 12" OC W/O HOOK
5. #8 CONT THROUGH GRATE SUPPORT, 1'-8" MIN PENETRATION
INTO ADJ SHEAR PIN TOP SLAB
6. CLOSED GRATE (DEFINED BY MFR) SEE CIVIL.
7. OPEN GRATE (DEFINED BY MFR) SEE CIVIL
8. CULVERT WALL, SEE S-503
9. BOTTOM SLAB, SEE S-503
10. 9 1/2" TALL SHEAR RAILS, 5/8" Ø STUDS SPACED 3 1/4" OC,
1 1/4" Ø SHEAR HEADS, RAILS ARE 12" OC.
11. SHEAR RAIL PLATES: 1/2" THICK, 1 3/4" WIDE WITH 7/16" FILLET
WELD ALL AROUND OR PER MANUFACTURER REQUIRED.
NOTE: NOT ALL REINF SHOWN FOR CLARITY
S-503
S T
R U
C T
U R
A L
C U
L V
E R
T
C
R O
C
T I O
N S
S-502
4 5
63.1
E
B
A N
K S
C
B
R O
W N
R
Z
A R
A G
O Z
A
H A
S
D
W G
M O
D I F
I E
D
K
E Y
T
E S
A
M
1 1
AM0003
W912PP-17-R-0005
Amendment No. 0003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
TRENCH TOP
EL: SEE CIVIL
V A
R I E
S
T
O
B A
S E
D
O
N
I N
V
E
L E
V
S E
E
C
I V
I L
TRENCH INV
EL: SEE CIVIL
2'-0"
4'-4"
1'-0"1'-0"
4'-4"1'-0" 1'-0"
C
P
2" TYP
E Q
E Q
E Q
TRENCH TOP
EL: SEE CIVIL
V A
R I E
S
T
B A
S E
D
O
N
I N
V
E
L E
V
S E
E
C
I V
I L
TRENCH INV
EL: SEE CIVIL
1'-0"1'-0"
4'-4"1'-0" 1'-0"
2'-0"
C
P
2" TYP
TRENCH TOP
EL: SEE CIVIL
TRENCH INV
EL: SEE CIVIL
V A
R I E
S
T
O
A
F T
B A
S E
D
O
N
I N
V
E
L E
V
S E
E
C
I V
I L
1'-0"1'-0"
4'-4"1'-0" 1'-0"
2'-0"
C
P
2" TYP
3'-1 1/4"
3/16" 2'-2"
2'-0"
3/16"
KEYED NOTES
S-503
S-503
SCALE: 1 1/2" - 1' - 0 "
S-503
SECTION
SCALE: 1 1/2" - 1' - 0 "
SECTION
SECTION
SCALE: 1 1/2" - 1' - 0 "
S T
R U
C T
U R
A L
C U
L V
E R
T
C
R O
C
T I O
N S
S-503
5 5
64.1
E
B
A N
K S
C
B
R O
W N
R
Z
A R
A G
O Z
A
H A
S
D
W G
M O
D I F
I E
D
D
E T
A I L
S
H E
U
D
A
M
P l o t
S c a l e
F i l e a m e
P l o t
D a t e
R E
V I E
W E
D
B
Y
S O
L C
O N
T R
A C
T
N
O
M a r k
D e s c r i p t i o n
Albuquerque District of Engineers
US Army Corps
A p p r
U S
A
R M
Y
E
N G
I N
E E
R
D
I S
T R
I C
T
C O
R P
S
O
F
E
N G
I N
E E
R S
A L
B U
Q U
E R
Q U
E
N
X
I C
O
SEQUENCE NO.
OF
SHEET NO.
C H
I E
F
D A
T E e r o
T o l e r a n c e e r o
A c c i d e n t s
D E
S I G
N
B
Y
D R
A W
N
B
Y
D a t e
BID SET - NOT FOR CONSTRUCTION
W
P P
R
H O
L L
O M
R
S
E N
X
I C
O
F Y
Z
A R
D O
U
R
X
I W
W R
D
J A
N U
A R
Y
GENERAL NOTES
0' 2'
1 1/2" = 1'-0"
3" 6" 1'
1. #5 BAR ENCLOSING ENTIRE SHEAR STUD SYSTEM, SEE PLAN
VIEW ON S-503
2. #5 @ 10" OC.
3. #5 @ 10" OC W/O HOOK.
4. #5 @ 12" OC.
5. #5 @ 12" OC W/O HOOK.
6. #6 @ 12" OC.
7. #6 @ 12" OC W/O HOOK.
8. #8 BAR CONT THROUGH GRATE SUPPORT.
9. #10 @ 11" OC.
10. 9 1/2" TALL SHEAR RAILS, 5/8" Ø STUDS SPACED 3 1/4" OC,
1 1/4" Ø SHEAR HEADS, RAILS ARE 12" OC (SEE 1/S-502).
11. CONT WATERSTOP, SEE TYP
12. OPTIONAL CONSTRUCTION JOINT.
13. OPTIONAL CONSTRUCTION JOINT, PROTECT RUBBER
WATERSTOP FROM ENVIRONMENT WHEN EXPOSED.
14. NEENA H-4993-HAB (TYPE T) FRAME W/ NEENAH R-4990-HA
TYPE D BOLTED SOLID COVER OR APPROVED EQUAL AT
SHOULDER.
15. NEENA H-4993-HAB (TYPE T) FRAME W/ NEENAH R-4990-HA
TYPE A BOLTED GRATE COVER OR APPROVED EQUAL BEYOND
SHOULDER.
16. BOLT HOLES
S-503
DETAIL
SCALE: NTS
GRATE
CONNECTION,
SEE CIVIL
1. 3" CONC COVER FOR ALL REINF
2. ALL REINF HOOKS ARE 12xØ PER ACI 318-11, SECTION 12.2.2
3. CONCRETE INSTALLATION AS NOTED S-001 GENERAL
STRUCTURAL NOTE 14.
C
S-001
S-503
GRATE
CONNECTION,
SEE CIVIL
S-503
AM0003
W912PP-17-R-0005
Amendment No. 0003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
| ha53 AM0003.pdf |
| ha53g-002 |
| ha53c-101 |
| ha53c-102 |
| ha53c-113 |
| ha53c-124 |
| ha53c-125 |
| ha53c-503 |
File details come from the government source that posted it. Updated .