FY17_HCP_and_Taxiway_Bid_Set_Drawings_11x17_(W912PP-17-R-0005).pdf
PDF 20 MB Posted
- Solicitation number
- W912PP-17-R-0005
About this file
W912PP-17-R-0005 DRAWINGS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PP-17-R-0005_AMEND_0004.pdf | ||
| W912PP-17-R-0005_AMEND_0003.pdf | ||
| W912PP-17-R-0005_AMEND_0002.pdf | ||
| Site_Visit_Attendance_Sheet.pdf | ||
| W912PP-17-R-0005_AMEND_0001.pdf | ||
| W912PP-17-R-0005_ISSUE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Army Corps of Engineers
Albuquerque District
...Serving the Nation
...Serving the Army ero Accidents ero Tolerance
OTERO COUNTY, NEW MEXICO
HOLLOMAN AIR FORCE BASE
PLANS FOR
W912PP-17-R-0005
KWRD043006
DATED :
PROJECT NO.:
SOLICITATION NO. :
TEAM MEMBER SIGNATURE FUNCTION
APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND
SUBMITTED:
CHIEF, DESIGN BRANCH
APPROVED:
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
CIVIL
STANDARDS OF QUALITY AND PROFESSIONALISM.
ALBUQUERQUE DISTRICT DESIGN TEAM. THIS DOCUMENT MEETS OUR HIGH
SET OF DRAWINGS WERE ASSEMBLED AND REVIEWED BY THE FOLLOWING
THE DESIGN, ASSOCIATED DETAILS, AND PRESENTATION CONCEPTS IN THIS
COST ENGINEERING
SPECIFICATIONS
PROJECT MANAGEMENT
BY ER 1110-1-8152.
DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED
DESIGNATIONS OF GOVERNMENT INDIVIDUALS APPEAR ON THESE PROJECT
ALBUQUERQUE DISTRICT. THE INITIALS OR SIGNATURES AND REGISTRATION
THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS
GEOTECHNICAL
ENGINEERING TECHNICIAN
PROJECT MANAGER
COST ENGINEER
SHELLEY D. RAMOS, P.E.
HUFF HORTON, P.E. CIVIL ENGINEER
CHRIS A. VELASQUEZ, P.E. CHIEF, GENERAL ENGINEERING
CHIEF, GEOTECHNICAL
MICHAEL R. PRUDHOMME, CCE CHIEF, COST ENGINEERING
ENGINEERING TECHNICIANBARRY EASTER
BRIAN SANCHEZ, CET
GEOTECHNICAL ENGINEER
ELECTRICAL
ELECTRICAL ENGINEERJAMES GEAR, P.E.
MATTHEW BONNER, P.E.
TAXIWAY (KWRD043006)
FY17 HAZARDOUS CARGO PAD AND
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y , H
O L L
O M
A N A
IR
F
O R
C E B
A S
E , O
T E
R O
Y C
O U
N T
Y , N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E
O T
E R
O Y C
O U
N T
Y
N E
W M
E X
IC
O
ENGINEERING TECHNICIAN
STRUCTURAL
CHIEF, FACILITIES DESIGNGEORGE SIMS, P.E.
ERIC BANKS
CHRIS R. BROWN
STRUCTURAL ENGINEER
DAVID ABBOTT
JOHN STAGES, P.E.
JANUARY 2017
BID SET - NOT FOR CONSTRUCTION
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N h a g -0
.d g n
C .O .E
C .O .E
C .O .E
G-002
IN
D
E X O
F D
R A
W
IN
G S
GENERAL
COVER SHEET1 G-001
G-002
CIVIL
C-1013
C-105
C-107
C-102
C-103
PROJECT LOCATION AND VICINITY MAPS
C-104
10 C-108
GEOTECHNICAL
B-101
B-103
8 C-106
INDEX OF DRAWINGS2
C-501
44 B-102
47 B-105
48 B-106
NOTES AND DETAILS
CONTRACTOR ACCESS CONTROL AND OPERATIONS
INDEX OF DRAWINGS
TITLESHEET TITLESHEET TITLESHEET TITLESEQ. SHEETSEQ. SEQ. SEQ.
65 E-001
67 ES101
ELECTRICAL
B-104
SUBSURFACE INVESTIGATION PLAN
C-503
C-502
SITE PLAN A - HCP TAXIWAY
SITE PLAN B - HCP TAXIWAY
SITE PLAN C - HCP TAXIWAY
SITE PLAN E - ACCESS ROAD
C-109
C-110
C-111
GRADING PLAN A - HCP TAXIWAY
GRADING PLAN B - HCP TAXIWAY
GRADING PLAN C - HCP TAXIWAY
C-112
15 C-113
GRADING PLAN E - ACCESS ROAD
16 C-114
18 C-115
19 C-116
20 C-117
21 C-118
SHEET LAYOUT - UTILITY PLAN
22 C-119
23 C-120
STRUCTURAL
MASTER SITE PLAN
B-110
B-111
B-108
B-109
54 B-301
49 B-107
B-501
B-502
B-701
B-702
JOINT LAYOUT PLAN A
JOINT LAYOUT PLAN B
JOINT LAYOUT PLAN C
JOINT LAYOUT PLAN D
PAVEMENT SITE PLAN A
PAVEMENT SITE PLAN B
PAVEMENT SITE PLAN C
PAVEMENT SITE PLAN D
PAVEMENT SITE PLAN E
PAVEMENT SECTIONS I
PAVEMENT DETAILS II
PAVEMENT DETAILS I
SITE PLAN D - HCP AND TAXIWAY
GRADING PLAN D - HCP AND TAXIWAY
PAVEMENT JOINT ELEVATIONS I
PAVEMENT JOINT ELEVATIONS II
PAVEMENT MARKING AND SIGNAGE PLAN A
PAVEMENT MARKING PLAN B
PAVEMENT MARKING PLAN C
PAVEMENT MARKING PLAN D
24 C-121
25 C-122
26 C-123
27 C-124
SHEET LAYOUT - PAVEMENT JOINT ELEVATIONS
28 C-125
PAVEMENT JOINT ELEVATIONS III
29 C-126
30 C-127
31 C-128
32 C-301
33 C-302
34 C-303 PROFILE - ACCESS ROAD (ALIGN. B)
TAXIWAY BOX CULVERT PLAN AND SECTIONS
C-50439
C-50540
35 C-401 ENLARGED PLAN - HCP
ELECTRICAL LEGEND AND SITE NOTES
90 EA102
89 EA101
91 EA103
92 EA104
98 EA501
93 EA105
99 EA502
EA504
EA503
EA505
AIRFIELD LIGHTING PLAN - AREA "A"
AIRFIELD LIGHTING PLAN - AREA "B"
AIRFIELD LIGHTING PLAN - AREA "C"
AIRFIELD LIGHTING PLAN - AREA "D"
AIRFIELD LIGHTING PLAN - AREA "E"
AIRFIELD ELECTRICAL DETAILS
AIRFIELD ELECTRICAL DETAILS
AIRFIELD ELECTRICAL DETAILS
AIRFIELD ELECTRICAL DETAILS
AIRFIELD ELECTRICAL DETAILS
S-001
S-002
S-501
C-50641
ED101 AIRFIELD DEMOLITION PLAN - AREA "F"
EG101
S-502
79 EG102 AIRFIELD GROUNDING PLAN - AREA "B"
80 EG103 AIRFIELD GROUNDING PLAN - AREA "C"
81 EG104 AIRFIELD GROUNDING PLAN - AREA "D"
87 EG501 AIRFIELD STATIC GROUND AND TIEDOWN DETAIL
82 EG105 AIRFIELD GROUNDING PLAN - AREA "E"
68 ES102
TAXIWAY, HCP, AND ACCESS ROAD SECTION GRADES
PAVEMENT MARKING AND AIRCRAFT TIEDOWN DETAILS
WATER LINE DETAILS
STRUCTURAL GENERAL STRUCTURAL NOTES
STRUCTURAL QA PROGRAM AND CONCRETE NOTES
STRUCTURAL PLAN AND PROFILE
STRUCTURAL CULVERT CROSS SECTIONS
S-503 STRUCTURAL CULVERT CROSS SECTIONS
69 ES103
74 ES501 CATHODIC PROTECTION DETAILS
EL101 CONTROL TOWER LIGHTING LAYOUT ADDITION
ET101 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "A"
ET102 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "B"
ET103 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "C"
ET104 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "D"
ET105 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "E"
ET106 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "F"
ET107
17 C-114A PAVEMENT MARKING AND SIGNAGE PLAN F
66 ES100 AIRFIELD ELECTRICAL OVERALL KEY PLAN
70 ES104
77 EG100 AIRFIELD GROUNDING OVERALL KEYPLAN
AIRFIELD GROUNDING PLAN - AREA "A"
83 EG106 AIRFIELD GROUNDING PLAN - AREA "F"
84 EG107 AIRFIELD GROUNDING PLAN - AREA "G"
85 EG108 AIRFIELD GROUNDING PLAN - AREA "N"
86 EG109
88 EA100 AIRFIELD LIGHTING OVERALL KEYPLAN
94 EA106
95 EA107
96 EA108
97 EA109
AIRFIELD LIGHTING PLAN - AREA "F"
AIRFIELD LIGHTING PLAN - AREA "G"
AIRFIELD LIGHTING PLAN - AREA "N"
ET100 AIRFIELD TELECOMMUNICATIONS OVERALL KEYPLAN
ET108 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "H"
ET109 AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "I"
ET110
AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "G"
AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREA "L"
AIRFIELD LIGHTING PLAN - AREAS "H"-"M"
AIRFIELD GROUNDING PLAN - AREAS "H"-"M"
CATHODIC PROTECTION PLAN - AREAS "A" THRU "F"
CATHODIC PROTECTION PLAN - AREAS "G", "J", "K", & "M"
ET111
ET501
"N", "J", "K", & "M"
AIRFIELD TELECOMMUNICATIONS SITE PLAN - AREAS
TELECOMMUNICATION DETAILS
55 B-302 PAVEMENT SECTIONS II
DRILLING LOGS I
DRILLING LOGS II
MARKING/SIGNAGE
SHEET LAYOUT - SITE, GRADING, AND PAVEMENT
CONSTRUCTION PHASING EXISTING COMMUNICATIONS DEMOLITION PLAN - AREAS "E" & "F"
71 ES105 NEW COMMUNICATIONS CONSTRUCTION PLAN - AREAS "E" & "F"
PLAN & PROFILE 1 - WATER LINE STA 0+00C TO 9+50C
PLAN & PROFILE 2 - WATER LINE STA 9+50C TO 18+10C
PLAN & PROFILE 3 - WATER LINE STA 18+10C TO 27+10C
PLAN & PROFILE 4 - WATER LINE STA 27+10C TO 35+80C
PLAN & PROFILE 5 - WATER LINE STA 35+80C TO 44+90C
PLAN & PROFILE 6 - WATER LINE STA 44+90C TO 54+00C
PROFILE - TAXIWAY (ALIGN. A) STA 0+00A TO 18+40A
PROFILE - TAXIWAY (ALIGN. A) STA 18+40A TO 27+00A
C-50742 ROAD CLOSURE GATE DETAILS
AIR RELEASE VALVE AND CULVERT HEADWALL DETAILS
75 ES502 COMMUNICATIONS DUCTBANK AND ROUTING DETAILS
72 ES106
73 ES107
TEMPORARY DISPLACED THRESHOLD PLAN - AREA "O"
ROUTING - AREA "P"
ENLARGED VIEW TEMPORARY END LIGHT JUMPER
EXISTING COMMUNICATIONS SITE PLAN - AREA "A"
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A C
T
N O
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
E le c
S u b s ta ti o n
Old Fire Training Area
Abandon Skeet Range
Abandon Fire Training
Area
Playground
Court
Court
Court
Playground
Playground
C o u r t
Court Court
Tennis
Courts
Tennis
Courts
P o o l
P o o l
D e te n ti o n
P o n d
Bermed Area
Substation
Playg roun d
Playground
Playground
P la y g r o u n d
Playground
Substation
Landfill
Landfill
Landfill
Landfill
Pond
R u n n in g
Tr a c k
Sports
Field
Sports
Field
Sports
Field
Sports
Field
Sports
Field
Lagoon
Lagoon
Lagoon
Lagoon
Lagoon
Lagoon
Sports
Field
Sports
Field
Skeet Range
LOCALIZER
ANTENNA
934 935936
957956
44902
44903
44906
W.T.
21811
21810
21814
21815
21813
21812
21819
21818
21817
21816
95868
828917
G4 T5
G5
T4
T6
G6
75130
T7
G7
2253 2251 2249
22472245
75105J
2238 2240
28442846 2848285052
2854285628582860
2855 2853
27 28
274327492753 2751 4547
2748 2744
9 2721 2720
2725 27352731
24 262728
2760 2782
71 2
270927072705
2710 2702
G9
T2
T8 G8
T9
G2
G3
FP
S
R
AD
AR
TW
R
8 4
1 7
2214 2216
E
2424 2426
52077
1 751
05G
H E
LI
P
A D
75117
75111
75102
75114
RANGE
75-106
5D
9 2
43 244
8 245
05B
81104
6 7
7 2
7 255
2 254
4 46 254
3 253
1 2
4 2
5 2
75 105A
1 2
1 5
TH
E A
TE
R
2 2
9 2
75500
0 642
AN/FP
N 47
44301
LOX PLANT
75140
75141
R V
S
TO
R A G E
B
AK
G
LI
D E
S
LO
P E
S H E
LT
E R
B A K
GLIDE S
LOPE
ANTENNA
SHELTER
KING 1 AREA
TRAINING AREA
PRIME BEEF
93100
BAK-12
1099 1097
69100
M O
TO
R
P
O O L
84203
W.T.
13624
AF BEACON
BAK-12
93101
83301
12281229
12371236
12031200
75600
1225 1224
1242 1241
1233 1234
1246 1247 1248
B A S E
O P S
O F F
IC
E R 'S
C
LU
B
F A
M
IL
Y
C
A M P
PARK/PICNIC AREA
H O S P
IT
A L
R E A
ELEMENTARY
SCHOOL
E
LE
M E N
TA
R Y
S C
H O
O
JR
H
IG
H
S C
H O
O L
B X C
O M
M
IS
S A R
Y
C H
A P E L 7
H Q
B
LD
G
Y
R
D
N C
O
C
LU
B
M P F
POL
AREA
FIRE TRAINING FAC
CONTROL
TOWER
SP TRAINING
AREA
13850
LAUNCH
BALLOON
PAD
PRIMATE SCIENCE
LABORATORY (NMSU)
GOLF
C
ART
SHED
9GOLF COURSE
DRIVING
W E
V E
N U
E
S
D R
E
S A
C R
A M
E N
SANDOVAL
LOOP
SOCORRO LOOP
SAN JUAN
LOOP
A R
R
IB
D
IV
E
QUAY LOOP
HOLLOMAN AIR FORCE BASE
H A
IV
E
KELLY
ROAD
B E
P
T H
M O
R O
N I
D R
IV
E
F O
R
IN
E N
U E
CHOW HALL
TULAROSA R
OAD
K E L L Y
R
O A D
WAGNER STREET
MESQUITE ROAD
TRAVIS PLACE TRAVIS LOOP
DONA ANA PLACE DONA ANA LOOP
DONA ANA LOOPDE BACA PLACE
M E S
Q U
IT
A D
F E T C
H E T
L O
O P
H A R
M O
N
L O
O P
TORRANCE PLACE
SIERRA PLACESIERRA LOOP
SIERRA LOOP OTERO LOOP
OTERO LOOPLUNA LOOP
LUNA LOOP HIDALGO LOOP
HIDALGO LOOP
EG
LI
N
C T
M A R
TI
E
KI
RTL
AN
D
PLACE
N
ELL
IS
PLACE
G R
IF
FI
S
C O
U R T
K E E S L E R
COURT
C T
C T
L A N
G L E Y
COURT
B R
O O
K S
C O
U R T
C U
R
IR
C L E
S O
U
TH
CURRY C
IRCLE
NORTH
B E
R N
A L
IL
L O
C T
US
75-500
W.T.
BAK-12
R S U
P A D
N E
S
W
TA
X
IW
A Y
R
U N
W
C E S S
G E O R
G
IA
S
TR
E E T
E
IG
H T H
S T R E E T
D E
LA
W A
E N
U E
F
IF
T H
S T R E E T
D O
M
LL
E A
C O
N N E C
TI
C U T
A V E N
U E
S
IX
T H
S T R E E T
N
W
X
IC
E N
U E
ID
A
E N
U E
C O
M M
U N
IT
Y
C E N
TE
R
F O
U R T H
S T R E E T
ID
A
E N
U E
A R
IZ
O
E N
U E
ARN
O
LD
AVEN
U E
S E C
O N
D
S T R E E T
N
W
X
E
A R
IZ
O
E N
U E
T A B
O
E N
U E
M c K
IN
L E Y
L O
O P
S A N
TA
F
IV
E
F
IR
S T
S T R E E T
C O
LF
A X
L
A
M O S
P L
VALENCIA
DRIVE
V A
LE
N
IA
IV
E
GUADALUPE PL
SAN MIGUEL
CATRON L
OOP
TAOS LOOP
MORA LOOP
LOOP
EDDY LOOP
EDDY PLACE
S A
N
IV
E
X
.3
D E
LA
W A
E N
U E
C O
LO
R A D
O
ID
A
E
S A
B
A D
DOUGLAS ROAD
SABRE ROAD
DEZONIA ROAD
Y U
C
E N
U E
O C
O T
IL
E N
U E
TE
S T
S
TAN
D
TR
IN
IT
Y S
TR
E E T
W A
G N
R E
E T
B O
R
E E
T
M A
T A
D
N E
LOX
AREA
POL
P-8
P-9
P-10
LO
C
K H E
E N
U E
P A T R
K
E N
U E
A R
K A N S
E N
U E
C R E S
O
E N
U E
D R
M O
Y A R
D
R
EF
U
ELE
R
R
O
AD
P-13
P-14
P-16
P-
P-18
P-20
P-19
P-21
P-25
P-
P-
P-
M A
IN
G A
TE
U N P
A V E D
R
O A D
K E L L Y
R
O A D
U N
P A
V
A D
H O
L L
O M
R
B
S
E
W H
N
IS
S
IL
N G
E
UNPAVED ROAD
UNPAVED ROAD
UNPAVED ROAD
D E
Z O
IA
A D
L E
T H
A D
U N
P A
V
A D
E L E V E N T H
S T R E E T
N
IN
T H
S T R E E T
F
IR
S T
S T R E E T
H O
L L
O M
R
S
E
H O
L L
O M
R
S
E
21808
CONSTRUCTION P
ROHIBIT
ED
A P
P R
O A
CLEAR ZONE
Z O
N E
CLEAR ZONE
C L E A R
Z
O N E
CONSTRUCTION PROHIBITED
C O
N S
T R
U C
T
IO
O H
IB
IT
E D
APPROACH
ZONE
ZONE
APPROACH
C O
N S T R
U C T
IO
N
P R
O H
IB
IT
E D
A P P
R O
A
N E
APP
R
ACH
ZO
E
CLEAR ZONE
C L E A R
Z
O N E
C L E A R
Z
O N E
C L E
N E
C L E
N E
ZO
N
EAP
PRO
ACH
P
R O
A
N E
C O
N S T R
U C T
IO
N
P
R O
H
IB
IT
E D
A P
P R
O A
N E
A P
P R
O A
N E
CLEAR ZONE
C L E A R
Z
O N E
AP
PROACH
ZONE
C O
N S
T R
U C
T
IO
O H
IB
IT
E D
ZONE
APPROACH
A P
P R
O A
N E
C L E
N E
C L E
N E
10511048
P-17
F A
IR
C H
IV
E
P-2
BAK-12
TYPE MA-1A
BAK-15
BAK-12
BAK-9
BAK-15
PAVILION
MUNITIONS STORAGE AREA
SUSPECT VEHICLE
INSPECTION AREA
GUADALUPE PLACE
TO
W
HI
TE
S
ANDS
L
AS
C
RUCES
N.
M
U.
S.
HI
GHW
AY
FO
R
TY
N
IN
AVE
BAK-15
B A K
C E N
TE
R
LE
A R
N
IN
G
75754
HOLLOMAN AFB
CANNON AFB
Hobbs
Roswell
Clovis
Ft. Sumner
Carlsbad
Tucumcari
Alamogordo
Carrizozo
Los Cruces
Deming
Lordsburg
Silver City
Consequences
Truth or
Socorro
WHITE
SANDS
MISSILE
RANGE
Santa Fe
Los Vegas
Toas
Raton
Vaughn
Santa Rosa
Albuquerque
KIRTLAND
AFB
Espanola
Shiprock Farmington
Aztec
Trinidad
Walsenburg
Ft. Garland Cortez
Dorango
Gallup
Chama
Alamosa
Bernalillo
Clayton
FT. WINGATE
ARMY DEPOT
SAC PEAK
OBSERVATORY
Pecos
Alpine
Marfa
Presidi
Van Horn
El Paso
Ft. Stockton
FORT BLISS PYOTE AFB
M E X I C O
N E W M E X I C 0
C O L O R A D O
I
HOLLOMAN AIR FORCE BASE
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
C
V E
L A
S Q
U E
Z h a c -1
.d g n
V
IC
IN
IT
Y M
A P
S
P R
O J E
C T L
O C
A T
IO
N A
N D
0' 500' 1000' 2000' 3000'
1"=1000'
PROJECT LOCATION MAP
SCALE: 1"=1000'
VICINITY MAP
SCALE: NOT TO SCALE
BENCHMARK DATA
CONTROL TOWER
FIRE DEPT.
POLICE
SECURITY
ENGINEER
BASE CIVIL
HOSPITAL
BASE
& INFORMATION
VISITOR CENTER
MAIN GATE
ACCESS GATE
CONTRACTOR
WEST GATE
E
E W
EVA
RENIN
YTROF
D E
LA
W A R E A
V E
SABRE RD
S A
B
DOUGLAS RD
RUNWAY 07
/25
R U
N W
A Y
/3
M O
R O
N I D
R
LOCATION
PROJECT
BM HAFB 2A
BM HAFB 07-08
ELEV. = 4047.13
E = 1,295,084.69
N = 11,923,832.31
BM HAFB 07-08
ELEV. = 4043.55
E = 1,298,896.55
N = 11,921,131.54
BM HAFB 07-06
DATUM IS EGM96, US SURV. FT.
HORIZ. DATUM IS UTM ZONE 13N, WGS84, US SURV. FT. VERTICAL
ELEV. = 4060.13
E = 1,291,793.48
N = 11,929,656.29
BM HAFB 2A
K E
DR YLLEK
C-101
AREA
WASTE FILL
WASTE FILL AREA NOTES
GENERAL NOTES
WASTE FILL AREA
HAUL ROUTE TO
CONTRACTOR
WASTE FILL AREA
HAUL ROUTE TO
CONTRACTOR
ROUTE
ACCESS/HAUL
CONTRACTOR
ROUTE
ACCESS/HAUL
CONTRACTOR
R U
N W
A Y
4/
ENGINEER
COE RESIDENT
AREA, SHALL BE SEGRATED FROM CLEAN SOIL PLACED HERE.
CLEAN BASE COURSE MATERIAL, IF PLACED IN THE WASTE FILL
MATERIAL, ASPHALT RUBBLE, CONCRETE RUBBLE, TRASH, ETC.
SHALL BE CLEAN MATERIAL THAT IS FREE OF ORGANIC
HAFB WASTE FILL AREA. MATERIAL PLACED IN THIS AREA
THE PROJECT SITE MAY BE DISPOSED 0F IN THE DESIGNATED
1. EXCESS SOIL AND BASE COURSE MATERIAL REMOVED FROM
FOR SANITARY SEWAGE WASTE DISPOSAL REQUIREMENTS.
RESPONSIBILIITY. REFER TO SPECIFICATION SECTION 01 51 00
REMOVAL SHALL BE AT THE CONTRACTOR'S EXPENSE AND
WASTE FILL AREA. CONSTRUCTION WASTE AND DEBRIS
CLEAN WASTE SOIL, WHICH MAY BE DISPOSED OF AT THE BASE
WASTE MATERIAL OFF THE BASE WITH THE EXCEPTION OF
2. THE CONTRACTOR SHALL DISPOSE OF CONSTRUCTION
THE BASE AT HIS EXPENSE AND RESPONSIBILITY.
1. THE CONTRACTOR SHALL OBTAIN BORROW MATERIAL OFF
TAXIWAY G
T A
X
IW
A Y L
TAXIWAY R
K E
DOUGLAS RD
91 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
0+00B
12+00B
1+00B
2+00B
3+00B
4+00B
5+00B
6+00B
7+00B
8+00B
9+00B
10+00B
11+00B
27+50A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A 22+00A 23+00A 24+00A 25+00A 26+00A 27+00A
27+50A
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
C
0+00C
1+00C
C
C
4+
C
5+
C
6+
C
7+
C
8+
C
9+
C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
C 1 C 1 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
N
SCALE: 1"=200'
0'
1"=200'
100' 200' 400' 600'
NEW HAZARDOUS CARGO PAD (HCP)
T A X
IW
KELLY ROAD
K E
A D
K E
L L
Y R
O A
D
HALE D
RIVE
0'
0'
0'
0'
LEGEND
NOTES
CONTROL AND OPERATIONS NOTES AND DETAILS.
2.SEE SHEET C-501 FOR CONTRACTOR ACCESS
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
PHASING NOTES
CONSTRUCTION PHASING
PHASE 1
WHITE SANDS MISSILE RANGE
HOLLOMAN AIR FORCE BASE
(ALIGNMENT C)
NEW WATER LINE
ACCESS ROAD
EXIST. UNPAVED
(ALIGNMENT B)
NEW ACCESS ROAD
(ALIGNMENT A)
NEW HCP TAXIWAY
ACCESS ROAD
EXIST. UNPAVED
FOR PHASED CONSTRUCTION
RUNWAY CLEARANCE LINE
(ALIGNMENT C)
NEW WATER LINE
R U
N W
A Y O
V E
R R
U N
R U
N W
A Y O
V E R
R U
N
RUNWAY
EDGE OF EXIST.
CONSTRUCTION
LINE FOR PHASED
RUNWAY CLEARANCE
R U
N W
A Y
/2
325'
325'
T A
X
IW
A Y G
PHASE 1PHASE 1
PHASE 1
EXIST. PAVED ROAD
EXIST. PAVED ROAD
C-504
G
MARKINGS (THIS PROJECT)
DISPLACED THRESHOLD
TEMPORARILY
LOW PROFILE BARRICADES
PHASE 1 WORK AREA
NEW PAVEMENT OR SHOULDER
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
2 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-102
C O
N S
T R
U C
T
IO
N P
H A
S
IN
G
' 3
CENTERLINE STRIPE
EXIST. RUNWAY
BE 3' WIDE.
LINE (TYP OF 13). ARROWHEAD STRIPE SHALL
END OF RUNWAY AND TEMPORARY THRESHOLD
END OF EACH CENTERLINE STRIPE BETWEEN
PAINT TEMPORARY YELLOW ARROWHEAD AT
REQUIREMENTS.
"PHASING OF WORK" FOR ADDITIONAL WORK PHASING
9. REFER TO SPECIFICATION SECTION 01 01 50,
CONTRACTING OFFICER.
APPROVED BY THE AIRFIELD MANAGER AND
PROCEED UNTIL BARRICADE INSTALLATIONS ARE
OF THE CONTRACTING OFFICER. WORK SHALL NOT
THE AIRFIELD MANAGER AND TO THE SATISFACTION
BARRICADES SHALL BE INSTALLED AS REQUIRED BY
WORK AREAS IN THE VICINITY OF THE AIRFIELD.
BARRICADES ON THE AIRFIELD TO DELINEATE THE
AND RELOCATION AS REQUIRED OF LOW PROFILE
8. PHASE 1 SHALL INCLUDE INSTALLATION, REMOVAL,
MARKING OUT WITH BLACK PAINT.
COMPLETELY OBLITERING MARKINGS, NOT BY
TEMPORARY MARKINGS SHALL BE REMOVED BY
TEMPORATY MARKINGS ARE NO LONGER NEEDED,
COMPLETE. AT COMPLETION OF PHASE, WHEN
OFFICER, AND SHALL BE REMOVED WHEN WORK IS
AIRFIELD MANAGER THROUGH THE CONTRACTING
WORK IN THE PHASE, SHALL BE APPROVED BY THE
SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
RUNWAY 04 AS SHOWN ON THIS SHEET. MARKINGS
REMOVAL OF DISPLACED THRESHOLD MARKINGS ON
7. PHASE 1 SHALL INCLUDE INSTALLATION AND
FOOTPRINT REQUIRED TO ACCOMPLISH THE PHASE.
CONTRACTOR SHALL WORK WITHIN THE MINIMUM
REQURED TO ACCOMPLISH THE WORK. THE
AND, FOR CLARITY, ARE SHOWN LARGER THAN
6. THE BOUNDARIES OF PHASE 1 ARE APPROXIMATE
SPECIFICATIONS.
ACCOMPLISHED IN ACCORDANCE WITH THE
DISTRIBUTION SYSTEM. DISINFECTION SHALL BE
ITS CONNECTION TO THE EXISTING WATER
FILLED AND DISINFECTED AS A SINGLE UNIT PRIOR TO
THE ENTIRE COMPLETED NEW WATER LINE MAY BE
5. SEPARATE FROM THE WORK INCLUDED IN PHASE 1,
ADDITIONAL INFORMATION.
THE WATER LINE PLAN AND PROFILE SHEETS FOR
WATER LINE WILL NOT BE ACCEPTABLE. REFER TO
EXCAVATION FOR INSTALLATION OF THIS SECTION OF
INSTALLED BY TRENCHLESS METHOD. OPEN
STA 14+70C, INCLUDED IN PHASE 1, SHALL BE
4. THE NEW WATER LINE BETWEEN STA 16+80C AND
ACCOMPLISH THE TESTING.
OF WATER LINE SHALL BE CAPPED AT EACH END TO
IN THIS PHASE OF WORK, THE COMPLETED SECTION
THE COMPLETED LENGTH OF WATER LINE INCLUDED
THE SATISFACTION OF THE CONTRACTING OFFICER,
3. PHASE 1 SHALL INCLUDE PRESSURE TESTING, TO
SHOWN ON SHEET C-119.
WHICH INCLUDES PAVEMENT GRIDS 1 THROUGH 6 AS
TAXIWAY AND ASSOCIATED CONSTRUCTION BETWEEN
2. PHASE 1 CONSTRUCTION INCLUDES THE NEW
AREAS SHOWN ON THIS DRAWING.
ALL PROJECT WORK WITHIN THE PHASE 1 WORK
1. PHASE 1 INCLUDES SUBSTANTIAL COMPLETION OF
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
A
B
C
DE
B
B
B
B
B
B
B
B
B
B
B
B
B
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
A
0+
A 1+
A
2+
A 3+
A
4+00A
5+00A
6+00A
7+00A
8+00A
9+00A
10+00A
11+00A
12+00A
13+00A
14+00A
15+00A
16+00A
17+00A
18+00A
19+00A
20+00A
21+00A
A
A
A
A
A
A
A
F
N
LEGEND
NOTES
SCALE: 1"=200'
0'
1"=200'
100' 200' 400' 600'
NEW HAZARDOUS CARGO PAD (HCP)
T A
X
IW
A Y R
(ALIGNMENT B)
NEW ACCESS ROAD
(ALIGNMENT A)
NEW HCP TAXIWAY
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
SHEET BOUNDARY
R U
N W
A Y
4/
SHEET LAYOUT - SITE, GRADING, AND PAVEMENT MARKING/SIGNAGE
E 1,293,099.51
E 1,292,467.42
N 11,925,705.29
PI - STA 3+12.70A
E 1,291,641.73
RUNWAY
EDGE OF EXIST.
ACCESS ROAD
EXIST. UNPAVED
ACCESS ROAD
EXIST. UNPAVED
E 1,292,841.32
ACCESS ROAD
EXIST. UNPAVED
E 1,292,674.96
K E L L Y R
O A
D
K E
L L
Y
R
O A
D
TAXIWAY G T
A
X
IW
A Y L
07/25
RUNWAY
H O
L L
O M
R
S
E
W H
N
S
N
G E
N 11,925,471.40
STA 0+00A
ALIGNMENT POB
N 11,927,904.67
STA 27+50A
ALIGNMENT POE
N 11,927,771.59
STA 0+00B
ALIGNMENT POB N 11,927,739.97
STA 12+00B
ALIGNMENT POE
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
3 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-103
A N
D P
A V
E M
E N
T M
A R
K
IN
G /S
IG
N A
G E
S H
E E
T L
A Y
O U
T S
IT
E
G R
A D
IN
G
S T A . 2
.1 A E
N D T
A X
IW
A Y
- B
E G
IN
H
C P
E 1,292,511.24
N 11,927,382.68
PI - STA 19+83.15A
SHEET C-107,C-112,C-117
SHEET C-105,C-110,C-115
SHEET C-106,C-111,C-116
SHEET C-108,C-113
SHEET C-104,C-109,C-114
SHEET C-114A
0' 120'
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
SITE PLAN A - HCP TAXIWAY
NEW ASPHALT PAVED SHOULDER
NEW CONC. AIRFIELD PAVEMENT
KEY PLAN
SHEET C-105
50' 75' 50'
R
R
C-503
A
BOX CULVERT
SPACING OF THE CONCRETE PAVEMENT JOINTS.
3. SEE THE JOINT LAYOUT PLAN (SHEET B-108) FOR
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
E 1,292,674.96
3.
N 11,925,747.48
E 1,292,647.24
N 11,925,778.99
E 1,292,669.41
N 11,925,758.77
E 1,292,663.96
E 1,292,519.82
N 11,925,646.25
PC - STA 2+33.75A
E 1,292,469.48
N 11,925,784.21
PT - STA 3+84.13A
'5
N 11,925,471.40
STA 0+00A
ALIGNMENT POB
R
CABLE RELOCATIONS
FOR UNDERGROUND
SEE ELEC. DRAWINGS
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
4 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-104
S
IT
E P
L A
N A H
C P T
A X
IW
A Y
ASPHALT PAD
A S P H
A
LT
R
O A D
AIR FIELD LIGHTINGCONC PADS
CABLE MARKER
UNDERGROUND
AIRFIELD LIGHTING
CONC PADS
ELECT. MH
CONCRETE
ASPHALT OVERRUN
M H
M H
R U
N W
A Y
-2
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
0+
A
1+
A
2+
A
3+
A
4+00A
5+00A
6+00A
MATCH LINE -
C-502
MATCH LINE -
A
B
C
DE
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
NEW ASPHALT PAVED SHOULDER
NEW CONC. AIRFIELD PAVEMENT
SITE PLAN B - HCP TAXIWAY
KEY PLAN
SHEET C-104
SHEET C-106
50' 75' 50'
SPACING OF THE CONCRETE PAVEMENT JOINTS.
3. SEE THE JOINT LAYOUT PLAN (SHEET B-110) FOR
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
5 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-105
S
IT
E P
L A
N B H
C P T
A X
IW
A Y
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
7+00A
8+00A
9+00A
10+00A
11+00A
12+00A
13+00A
MATCH LINE -
MATCH LINE -
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
SITE PLAN C - HCP TAXIWAY
NEW ASPHALT PAVED SHOULDER
NEW CONC. AIRFIELD PAVEMENT
KEY PLAN
SHEET C-105
SHEET C-107
50' 75' 50'
400'
R
N 11,927,198.70
E 1,292,906.57
SPACING OF THE CONCRETE PAVEMENT JOINTS.
3. SEE THE JOINT LAYOUT PLAN (SHEET B-103) FOR
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
E 1,292,506.70
N 11,927,209.15
PC - STA 18+09.55A
PROJECT GRADING LIMITS
EXIST. DITCH - REMOVE WITHIN
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
6 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-106
S
IT
E P
L A
N C H
C P T
A X
IW
A Y
DITCH
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
13+00A
14+00A
15+00A
16+00A
17+00A
18+00A
19+00A
20+00A
MATCH LINE -
MATCH LINE -
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
SHEET C-106
SITE PLAN D - HCP AND TAXIWAY
S H
E E
T C -1
NEW AIRCRAFT TIEDOWN
NEW UNPAVED ROAD SHOULDER
OR ROAD
NEW ASPHALT PAVED SHOULDER
NEW CONC. AIRFIELD PAVEMENT
E 1,293,099.51
50'
75'
50'
140'
R
R
R
50'
R
E 1,292,820.35
E 1,292,841.32
N 11,927,630.67
E 1,292,523.27
.5
N 11,927,740.53
STA 11+79.03B
OF AIRCRAFT TIEDOWNS (TYP)
SEE SHEET C-401 FOR LOCATION
PROJECT GRADING LIMITS
EXIST. ROAD - REMOVE WITHIN
N 11,927,904.67
STA 27+50A
ALIGNMENT POE
N 11,927,739.97
STA 12+00B
ALIGNMENT POE
STA 24+32.24A
N 11,927,622.33
E 1,292,663.03
N 11,927,749.47
E 1,292,670.62
N 11,927,840.08
E 1,292,932.55
N 11,927,765.28
E 1,292,998.92
.6
.6
R 400'
N 11,927,198.70
E 1,292,906.57
45°
SEE SHEET C-128
HYDRANT OUTLET.
WATER LINE FLUSHING
PROTECTION FOR
ROCK EROSION
EA. END
CONC. HEADWALL
40 L.F. EA. WITH
2 x 12" CULVERT
STA 7+40.00B
CENTERLINE.
MIDPOINT OF CULVERTS SHALL BE LOCATED AT ROAD
PERPENDICULAR TO ROAD AT STATION INDICATED.
4. ROAD CULVERTS SHALL BE INSTALLED
SPACING OF THE CONCRETE PAVEMENT JOINTS.
3. SEE THE JOINT LAYOUT PLAN (SHEET B-111) FOR
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
7 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-107
S
IT
E P
L A
N D H
C P A
N D T
A X
IW
A Y
S T A . 2
.1 A E
N D T
A X
IW
A Y
- B
E G
IN
H
C P
E 1,292,641.08
N 11,927,497.90
PT - STA 21+37.12A
N 11,927,525.95
E 1,292,616.19
N 11,927,469.85
E 1,292,665.97
DIRT ROADS
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
A
20+00A
21+00A
A
A
A
A
A
A
A
MATCH LINE -
M A
T C
H L
IN
2C -5
C-502
A
B
C
1"=40'
20' 40' 80'
LEGEND
NOTES
KEY PLAN
SCALE: 1"=40'
SITE PLAN E - ACCESS RD
S H
E E
T C -1
UNPAVED ROAD SHOULDER
OR ROAD
NEW ASPHALT PAVED SHOULDER
NEW CONC. AIRFIELD PAVEMENT
E 1,291,641.73
R
30'
R
R
R
3'
.9
.0
UNSURFACED ROAD (TYP)
SAWCUT AT REMOVAL LIMITS.
NEW ROAD INTERSECTION.
EXIST. ASPHALT ROADWAY AT
REMOVE 3' WIDE STRIP OF
SEE DETAIL ON SHEET C-507
SWING, STEEL PIPE GATE
INSTALL 30' WIDE, DOUBLE
STA. 1+10B
UNPAVED SHOULDER
NEW STOP SIGN
12'
SWALE
SCALE: NOT TO SCALE
TRAFFIC SIGN MOUNTING DETAILS
" DIA. HOLES8
MOUNT SIGN SECURELY
TO POST
" O.D. STEEL2
SIGN POST
PROVIDE BREAK-AWAY
CONNECTION
6" MAX.
FINISHED GRADE
CONCRETE
(A L L S
IG
N S
GUTTER
CURB AND
" I.D. PIPE2
1'-0"
3'-0"
SHALL BE SET 7'-0" FROM EDGE OF PAVEMENT.
WHEN CURB AND GUTTER IS NOT PRESENT, C OF POSTL
TRAFFIC CONTROL DEVICES (DEPT. OF TRANSPORTATION).
ALL SIGNS SHALL CONFORM TO THE MANUAL ON UNIFORM
BROWN IN CONFORMANCE WITH BASE STANDARD.
SIGN POSTS SHALL HAVE BAKED ENAMEL FINISH, COLOR
CONCRETE STRENGTH SHALL BE 3000 PSI MIN.
NOTES:
1.
2.
3.
4.
5.
FOR STEEL SIGN POST.
BREAK-AWAY CONNECTION SHALL BE FHWA APPROVED
PROJECT GRADING LIMITS
EXIST. SWALE - REMOVE WITHIN
PROJECT GRADING LIMITS
EXIST. ROAD - REMOVE WITHIN
N 11,927,771.59
STA 0+00B
ALIGNMENT POB
EA. END
CONC. HEADWALL
50 L.F. EA. WITH
3 x 12" CULVERT
STA 0+82.00B
EA. END
CONC. HEADWALL
40 L.F. EA. WITH
2 x 12" CULVERT
STA 7+40.00B
CENTERLINE.
MIDPOINT OF CULVERTS SHALL BE LOCATED AT ROAD
PERPENDICULAR TO ROAD AT STATION INDICATED.
3. ROAD CULVERTS SHALL BE INSTALLED
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
8 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-108
S
IT
E P
L A
N E A
C C
E S
S R
D
SIGN
K E
L L
Y
R
D
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
B
B
B
B
M A
T C
H L
IN
K E
L
A
D
C-502
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
GRADING PLAN A - HCP TAXIWAY
KEY PLAN
SHEET C-110
MATCH EXIST. GRADE
50.39
50.39 INV.
PROFILE.
5. SEE SHEETS C-301 AND C-302 FOR THE TAXIWAY
CONCRETE PAVEMENT JOINT ELEVATIONS.
4. SEE SHEETS C-118, C-119, C-120, AND C-121 FOR
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
BOX CULVERT
C-503
A
ENLARGED PLAN FOR LIMITS
AT INLET - SEE BOX CULVERT
ROCK EROSION PROTECTION
ENLARGED PLAN FOR LIMITS
AT OUTLET - SEE BOX CULVERT
ROCK EROSION PROTECTION
NEW SPOT ELEVATION AT INVERT
NEW SPOT ELEVATION
ON CONC. AIRFIELD PAVEMENT ONLY)
NEW FINISHED 0.10' CONTOUR (SHOWN
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
CABLE RELOCATIONS
FOR UNDERGROUND
SEE ELEC. DRAWINGS
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
9 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-109
G R
A D
IN
G P
L A
N A H
C P T
A X
IW
A Y
ASPHALT PAD
A S P H
A
LT
R
O A D
AIR FIELD LIGHTINGCONC PADS
CABLE MARKER
UNDERGROUND
AIRFIELD LIGHTING
CONC PADS
ELECT. MH
CONCRETE
ASPHALT OVERRUN
M H
M H
R U
N W
A Y
-2
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
0+
A
1+
A
2+
A
3+
A
4+00A
5+00A
6+00A
MATCH LINE -
50.40 INV.
49.96INV.
52.15
52.42
52.39 53.60
53.50
52.42
51.35
52.56
C-502
52.15
53.15
53.53
53.15
52.79
MATCH LINE -
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
GRADING PLAN B - HCP TAXIWAY
KEY PLAN
SHEET C-109
SHEET C-111
PROFILE.
5. SEE SHEETS C-301 AND C-302 FOR THE TAXIWAY
CONCRETE PAVEMENT JOINT ELEVATIONS.
4. SEE SHEETS C-118, C-119, C-120, AND C-121 FOR
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
ON CONC. AIRFIELD PAVEMENT ONLY)
NEW FINISHED 0.10' CONTOUR (SHOWN
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
10 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-110
G R
A D
IN
G P
L A
N B H
C P T
A X
IW
A Y
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
7+00A
8+00A
9+00A
10+00A
11+00A
12+00A
13+00A
MATCH LINE -
MATCH LINE -
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
GRADING PLAN C - HCP TAXIWAY
SHEET C-110
SHEET C-112
KEY PLAN
PROFILE.
5. SEE SHEETS C-301 AND C-302 FOR THE TAXIWAY
CONCRETE PAVEMENT JOINT ELEVATIONS.
4. SEE SHEETS C-118, C-119, C-120, AND C-121 FOR
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
ON CONC. AIRFIELD PAVEMENT ONLY)
NEW FINISHED 0.10' CONTOUR (SHOWN
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
11 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-111
G R
A D
IN
G P
L A
N C H
C P T
A X
IW
A Y
DITCH
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
13+00A
14+00A
15+00A
16+00A
17+00A
18+00A
19+00A
20+00A
MATCH LINE -
MATCH LINE -
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
S H
E E
T C -1
SHEET C-111
KEY PLAN
GRADING PLAN D - HCP AND TAXIWAY
50.39
50.39 INV.
NEW AIRCRAFT TIEDOWN
NEW SPOT ELEVATION AT INVERT
NEW SPOT ELEVATION
ON CONC. AIRFIELD PAVEMENT ONLY)
NEW FINISHED 0.10' CONTOUR (SHOWN
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
SEE SHEET C-128
HYDRANT OUTLET.
WATER LINE FLUSHING
PROTECTION FOR
ROCK EROSION
AT OUTLET
PROTECTION
ROCK EROSION
EA. END
CONC. HEADWALL
40 L.F. EA. WITH
2 x 12" CULVERT
STA 7+40.00B
CENTERLINE.
MIDPOINT OF CULVERTS SHALL BE LOCATED AT ROAD
PERPENDICULAR TO ROAD AT STATION INDICATED.
6. ROAD CULVERTS SHALL BE INSTALLED
PROFILE.
PROFILE. SEE SHEET C-303 FOR ACCESS ROAD
5. SEE SHEETS C-301 AND C-302 FOR THE TAXIWAY
CONCRETE PAVEMENT JOINT ELEVATIONS.
4. SEE SHEETS C-118, C-119, C-120, AND C-121 FOR
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
12 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-112
G R
A D
IN
G P
L A
N D H
C P A
N D T
A X
IW
A
YS
T A . 2
.1 A E
N D T
A X
IW
A Y
- B
E G
IN
H
C P
DIRT ROADS
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
A
20+00A
21+00A
A
A
A
A
A
A
A
MATCH LINE -
M A
T C
H L
IN
40564056
55.06INV.
INV.54.86
56.22
56.29
57.32
57.57
57.14
56.99
57.28
55.80
55.80
56.14
55.99
56.44
56.26
56.99
2C -5
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
GRADING PLAN E - ACCESS RD
S H
E E
T C -1
KEY PLAN
NEW SPOT ELEVATION AT INVERT
NEW SPOT ELEVATION
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW PAVEMENT
50.39
50.39 INV.
MATCH EXISTING GRADE
AT OUTLET
PROTECTION
ROCK EROSION
AT OUTLET
PROTECTION
ROCK EROSION
12'
' 10'
SWALE
TO DRAIN
CULVERT INLET. GRADE
EXTEND SWALE TOWARD
EA. END
CONC. HEADWALL
40 L.F. EA. WITH
2 x 12" CULVERT
STA 7+40.00B
EA. END
CONC. HEADWALL
50 L.F. EA. WITH
3 x 12" CULVERT
STA 0+82.00B
UNSURFACED ROAD (TYP)
CENTERLINE.
MIDPOINT OF CULVERTS SHALL BE LOCATED AT ROAD
PERPENDICULAR TO ROAD AT STATION INDICATED.
5. ROAD CULVERTS SHALL BE INSTALLED
4. SEE SHEET C-303 FOR THE ACCESS ROAD PROFILE.
ABOVE SEA LEVEL.
3. ADD 4000' TO SPOT ELEVATIONS FOR ELEVATION
ALIGNMENTS.
2. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
13 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-113
G R
A D
IN
G P
L A
N E A
C C
E S
S R
D
SIGN
K E
L L
Y
R
D
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
B
B
B
B
M A
T C
H L
IN
4056 4056
40564056
4057 4057 4057 4057
405740574057
55.07 INV.
55.31 INV.
55.06INV.
INV.54.86
56.22
56.29
57.14
56.14
55.99
56.26
57.53
57.53
K E
L
A
D
C-502
C-502
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
SHEET C-115
PAVEMENT MARKING AND SIGNAGE PLAN A
C-504
D
C-504
A
C-504
B
C-504
E
POSITION MARKING
RUNWAY HOLD
R
0'
0'
C-504
A
C-504
D
.7 5'
CENTERLINE
RUNWAY
.5
C-504
A
37.5'
SHEET C-114A
NEW RUNWAY SAFETY AREA/OFZ SIGN
NEW RUNWAY HOLD SIGN
NEW TAXIWAY DIRECTION SIGNS
NEW TAXIWAY LOCATION SIGN
NEW PAVEMENT
0'
.2
R
OF DOUBLE EDGE LINE
DIMENSION TO CENTER
INFORMATION.
ELECTRICAL DRAWINGS FOR ADDITIONAL
150/5345-44K AND AC 150-5340-18F. SEE THE
SIGNS SHALL BE IN ACCORDANCE WITH FAA AC
BE FAA AC 150/5345-44K, SIZE 3 SIGNS. HEIGHT OF
3. TAXIWAY LOCATION AND DIRECTION SIGNS SHALL
DETAILS.
2. SEE SHEET C-504 FOR PAVEMENT MARKING
ALIGNMENTS.
1. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
(TYP)
(TYP)
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
14 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-114
S
IG
N A
G E P
L A
N A
P A
V E
M E
N T M
A R
K
IN
G A
N D
SHEET C-102 FOR ADDITIONAL INFORMATION.
MARKING INDICATED ON SHEET C-102. SEE
OF RUNWAY AND TEMPORARY THRESHOLD
RUNWAY CENTERLINE STRIPE BETWEEN END
(TYP OF 13) AT END OF EACH EXISTING
PROVIDE TEMPORARY ARROWHEAD STRIPE
EDGE STRIPE
EXIST. RUNWAY
CENTERLINE STRIPE (TYP)
EXIST. RUNWAY
EDGE STRIPE
EXIST. RUNWAY
TAXILINE
EXIST.
ASPHALT PAD
A S P H
A
LT
R
O A D
AIR FIELD LIGHTINGCONC PADS
CABLE MARKER
UNDERGROUND
AIRFIELD LIGHTING
CONC PADS
ELECT. MH
CONCRETE
ASPHALT OVERRUN
M H
M H
R U
N W
A Y
-2
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
0+
A
1+
A
2+
A
3+
A
4+00A
5+00A
6+00A
MATCH LINE -
MATCH LINE -
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
PAVEMENT MARKING AND SIGNAGE PLAN F
DETAILS.
2. SEE SHEET C-504 FOR PAVEMENT MARKING
ALIGNMENTS.
1. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
SHEET C-114
NEW TAXIWAY DIRECTION SIGN
NEW TAXIWAY LOCATION SIGN
CONC. TAXIWAY
EDGE OF
R U
N W
A Y /2
T O C
E N T E R L
IN
E
NEW AIRFIELD SIGN
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
15 40
C
V E
L A
S Q
U E
Z h a c -1
A .d g n
C-114A
S
IG
N A
G E P
L A
N F
P A
V E
M E
N T M
A R
K
IN
G A
N D
TYP.
AIR FIELD LIGHTING
RUNWAY SIGN
SYSTEM
ARRESTING CABLE
ASPHALT PAD
AIR FIELD LIGHTING
ASPHALT ROAD
ELECT. MH
RUNWAY SIGN
CONC PADS
A S P
H A L T S
H O
U L D E R
CONC PADS
CONC PADS
T A
X
IW
A Y R
ASPHALT OVERRUN
M H
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
MATCH LINE -
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
SHEET C-114
SHEET C-116
PAVEMENT MARKING PLAN B
NEW PAVEMENT
DETAILS.
2. SEE SHEET C-504 FOR PAVEMENT MARKING
ALIGNMENTS.
1. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
C-504
B
C-504
A
C-504
D
37.5'
(TYP)
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
16 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-115
P A
V E
M E
N T M
A R
K
IN
G P
L A
N B
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
7+00A
8+00A
9+00A
10+00A
11+00A
12+00A
13+00A
MATCH LINE -
MATCH LINE -
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
SHEET C-117
PAVEMENT MARKING PLAN C
NEW PAVEMENT
DETAILS.
2. SEE SHEET C-504 FOR PAVEMENT MARKING
ALIGNMENTS.
1. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
C-504
D
C-504
A
C-504
B
37.5'
(TYP)
SHEET C-115
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
17 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-116
P A
V E
M E
N T M
A R
K
IN
G P
L A
N C
DITCH
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
13+00A
14+00A
15+00A
16+00A
17+00A
18+00A
19+00A
20+00A
MATCH LINE -
MATCH LINE -
A
B
C
1"=40'
20' 40' 80'
SCALE: 1"=40'
LEGEND
NOTES
KEY PLAN
SHEET C-116
PAVEMENT MARKING PLAN D
S H
E E
T C -1
NEW AIRCRAFT TIEDOWN
NEW PAVEMENT
DETAILS.
2. SEE SHEET C-504 FOR PAVEMENT MARKING
ALIGNMENTS.
1. SEE SHEET C-103 FOR HORIZONTAL CONTROL OF
C-504
B
ADDITIONAL INFORMATION
SEE SHEET C-401 FOR
C-504
D
C-504
A
37.5'
37.5'
C-504
B
C-504
A
C-504
D
(TYP)
(TYP)
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
18 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-117
P A
V E
M E
N T M
A R
K
IN
G P
L A
N D
S T A . 2
.1 A E
N D T
A X
IW
A Y
- B
E G
IN
H
C P
DIRT ROADS
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
B
B
B
B
B
B
B
A
20+00A
21+00A
A
A
A
A
A
A
A
MATCH LINE -
M A
T C
H L
IN
C
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
II
III
I
N
LEGEND
NOTES
SCALE: 1"=200'
0'
1"=200'
100' 200' 400' 600'
NEW HAZARDOUS CARGO PAD (HCP)
T A
X
IW
A Y R
(ALIGNMENT B)
NEW ACCESS ROAD
(ALIGNMENT A)
NEW HCP TAXIWAY
SHEET LAYOUT - PAVEMENT JOINT ELEVATIONS
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
SHEET BOUNDARY
R U
N W
A Y
4/
K E L L Y R
O A
D
K E
L L
Y
R
O A
D
TAXIWAY G T
A
X
IW
A Y L
07/25
RUNWAY
H O
L L
O M
R
S
E
W H
N
S
N
G E
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
19 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-118
J O
IN
T E
L E
V A
T
IO
N S
S H
E E
T L
A Y
O U
T P
A V
E M
E N
T
SHEET C-119
SHEET C-120
SHEET C-121
LEGEND
NOTES
KEY PLAN
PAVEMENT JOINT ELEVATIONS I
0' 90'
1"=30'
15' 30' 60'
SCALE: 1"=30'
4.
A1
B1
C1
D1
E1
F1
G1
H1
S H
E E
T C -1
OF THE CONCRETE PAVEMENT JOINTS.
3. SEE SHEETS B-108 THROUGH B-111 FOR SPACING
ABOVE SEA LEVEL.
2. ADD 4000' TO JOINT ELEVATIONS FOR ELEVATION
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
20 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-119
P A
V E
M E
N T J
O
IN
T E
L E
V A
T
IO
N S I
SLAB IDENTIFIER GRID NUMBER
SLAB IDENTIFIER GRID LETTER
NEW PAVEMENT JOINT ELEVATION
NEW CONC. AIRFIELD PAVEMENT
A-S
1-124
M H
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
M A
T C
H L
IN
.6
.8
.0
.7
.9
.1
.5
.4
.6
.8
.6
.4
.4
.6
.8
.6
.3
.2
.3
53.60
53.48
53.34
53.10
52.94
52.74
52.68
52.52
52.42
2.3
52.45
52.54
52.71
52.77
52.97
53.13
.2
3.
4.
5.
II
III
I
G
F
E
D
C
B
A1
13 14 15 16 17 19 18 20 21 22 23 24 25 26 27 28 29 30 31 32 23 34 35
A
B
C
D
A
B
NOTES
KEY PLAN
PAVEMENT JOINT ELEVATIONS II
0' 90'
1"=30'
15' 30' 60'
SCALE: 1"=30'
LEGEND
4.
S H
E E
T C -1
1T
H
IS
S
H E
E T
S H
E E
T C -1
T H
IS
S
H E
E T
OF THE CONCRETE PAVEMENT JOINTS.
3. SEE SHEETS B-108 THROUGH B-111 FOR SPACING
ABOVE SEA LEVEL.
2. ADD 4000' TO JOINT ELEVATIONS FOR ELEVATION
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
21 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-120
P A
V E
M E
N T J
O
IN
T E
L E
V A
T
IO
N S I I
SLAB IDENTIFIER GRID NUMBER
SLAB IDENTIFIER GRID LETTER
NEW PAVEMENT JOINT ELEVATION
NEW CONC. AIRFIELD PAVEMENT
A-S
1-124
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
M A
T C
H L
IN
T C
H L
IN
6.
II
III
I
71706934 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
A
B
D
C
D
C
B
A A
B
C
D
M A
T C
H L
IN
T C
H L
IN
7.
6.6
6.8
7.0
6.8
6.6
6.7
6.8
7.0
6.8
6.7
.74
.93
.11
.93
.74
.77
.96
.14
.96
.77
.80
.99
.18
.99
.80
56.8
57.0
57.2
56.87
8988878685848382818079787776757473727170 D
C
B
A
D
C
NOTES
KEY PLAN
0' 90'
1"=30'
15' 30' 60'
LEGEND
PAVEMENT JOINT ELEVATIONS III
SCALE: 1"=30'
4.
S H
E E
T C -1
OF THE CONCRETE PAVEMENT JOINTS.
3. SEE SHEETS B-108 THROUGH B-111 FOR SPACING
ABOVE SEA LEVEL.
2. ADD 4000' TO JOINT ELEVATIONS FOR ELEVATION
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
22 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-121
P A
V E
M E
N T J
O
IN
T E
L E
V A
T
IO
N S I
II
SLAB IDENTIFIER GRID NUMBER
SLAB IDENTIFIER GRID LETTER
NEW PAVEMENT JOINT ELEVATION
NEW CONC. AIRFIELD PAVEMENT
A-S
1-124
1 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
M A
T C
H L
IN
.5
.7
.5
.7
.9
.6
.8
.9
.8
.6
.8
.0
.8
7.3
8.
.08
57.54
57.04 57.12
.39
57.31 57.29
57.27
57.23
57.20
57.17
57.14
57.10 57.08
57.35
12412312212112011911811711611511411311211111010910810710610510410310210110099
II
III
I
S
D
C
B
A
J
K
L
M
N
P
Q
R
D
C
B
A D
C
91 2 3 4 5
1 2 3 4 5
B
A
C
D D
C
B
A
P lo t S c a le
F il e N a m e
P lo t
D a te
R E
V
IE
W E
D B
Y
S O
L C
O N
T R
A
M a rk
D e s c ri p ti o n
Albuquerque District of Engineers
US Army Corps
A p p r.
A L
B U
Q U
E R
Q U
E
N E
W M
E X
IC
O
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
SEQUENCE NO.
OF
SHEET NO.
C H
IE
F
D A
T E e ro T o le ra n c e e ro A c c id e n ts
D E
S
IG
N B
Y
D R
A W
N B
Y
D a te
W
P P
R
H O
L L
O M
A N A
IR
F
O R
C E B
A S
E N
E W M
E X
IC
O
F Y H
A Z
A R
D O
U S C
A R
G O P
A D A
N D T
A X
IW
A Y
K W
R D
J A
N U
A R
Y
BID SET - NOT FOR CONSTRUCTION
4 5 6
C
0+00C
1+00C
C
C
4+
C
5+
C
6+
C
7+
C
8+
C
9+
C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
+0
0C
C 1 C 1 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C 2 C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
4 4 5 5
5 5 6 6
6 6 7 7
7 7 8 8
8 8 9 9
9 9 0 0
0 0
1 1
1 1 2 2
2 2 3 3
3 3 4 4
N
LEGEND
NOTES
SCALE: 1"=200'
0'
1"=200'
100' 200' 400' 600'
NEW HAZARDOUS CARGO PAD (HCP)
NEW ACCESS ROAD
NEW HCP TAXIWAY
R U
N W
A Y
/2
T A X
IW
KELLY ROAD
K E
A D
K E
L L
Y R
O A
D
NEW WATER LINE - ALIGNMENT C
NEW WATER LINE - ALIGNMENT C
SHEET BOUNDARY
HALE D
RIVE
SHEET LAYOUT - UTILITY PLAN
PHASING NOTES
E 1,294,510.03
E 1,294,395.50
E 1,294,313.25
E 1,293,180.92
N 11,923,606.77
PI STA 1+20.00C
N 11,923,869.84
PI STA 3+95.63C
N 11,924,469.79
PI STA 16+77.08C
E 1,292,658.42
N 11,925,101.77
PI STA 24+97.08C
E 1,292,392.66
PHASING REQUIREMENTS.
1. REFER TO SHEET C-102 FOR PROJECT WORK
WHITE SANDS MISSILE RANGE
HOLLOMAN AIR FORCE BASE
N 11,923,642.58
STA 0+00C
ALIGNMENT POB
N 11,927,879.09
STA 54+00C
ALIGNMENT POE
E 1,292,329.79
N 11,925,472.13
PI STA 29+92.22C
H
H O
R T
O N
H
H O
R T
O N
G E
N E
R A
L E
N G
IN
E E
R
IN
G S
E C
T
IO
N
23 40
C
V E
L A
S Q
U E
Z h a c -1
.d g n
C-122
S H
E E
T L
A Y
O U
T U
T
IL
IT
Y P
L A
N
COMMENCEMENT OF CONSTRUCTION OPERATIONS.
VERIFY ALL UTILITY LOCATIONS PRIOR TO
APPROXIMATE. THE CONTRACTOR SHALL FIELD
5. EXSISTING UTILITY INFORMATION SHOWN IS
WORK IN PROJECT.
LIGHTING, GROUNDING, AND CATHODIC PROTECTION
RELOCATED ELECTRICAL, COMMUNICATION,
4. SEE THE ELECTRICAL DRAWINGS FOR NEW AND/OR
WILL NOT BE ACCEPTABLE.
FOR INSTALLATION OF THIS SECTION OF WATER LINE
TRENCHLESS METHOD. OPEN TRENCH EXCAVATION
16+80C AND 14+70C SHALL BE INSTALLED BY
THE SECTION OF NEW WATER LINE BETWEEN STA
3. TO MINIMIZE DISRUPTION TO AIRFIELD OPERATIONS
LOW PROFILE BARRICADES.
2. SEE SHEET C-102 FOR LOCATION OF REQUIRED
CONTROL OF CONSTRUCTION.
BE UTILIZED FOR HORIZONTAL AND VERTICAL
1. SEE SHEET C-101 FOR BENCHMARK LOCATIONS TO
R U
N W
A Y
/2
S H E E T
C -1
SHEET C-1
26 SHEET C-127
S H
E E
T C -1
S H
E E
T C -1
SHEET C-128
1"=40'
20' 40' 80'
S H
E E
T C -1
SCALE: 1"=4'V 1"=40'H
SCALE: 1"=40'H
0' 2' 4' 8' 12'
1"=4'
KEY PLAN
NEW WATER LINE - ALIGNMENT C
W
W
LEGEND
NOTES
NEW FINISHED CONTOUR
EXISTING CONTOUR
NEW VALVE
EXIS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .