Amendment_0003.pdf
PDF 87 KB Posted
- Solicitation number
- W912PP13R0028
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0002.pdf | ||
| PERSONNEL_RESUME_FORM.docx | DOCX document | |
| PPQ_FORM.docx | DOCX document | |
| CONTRACT_DESCRIPTION_FORM.docx | DOCX document | |
| Amendment_0001.pdf | ||
| A.2.11.3_RFPW912PP-13-R-0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912PP
PROJECT: Multiple Award Task Order Contract (MATOC), Environmental Consulting Services for the U.S. Army Corps of Engineers (USACE) South Pacific Division (SPD), Multiple Environmental Government Acquisition (MEGA)
1. This is Amendment No. 0003 to Solicitation No. W912PP-13-R-0028; 03 March 2014. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE
US ARMY ENGINEER DISTRICT, ALBUQUERQUE
ATTN: CONTRACTING DIVISION
4101 JEFFERSON PLAZA NE
ALBUQUERQUE, NM 87109-3435
ENVIRONMENTAL PROJECT MGMT SEC
4101 JEFFERSON PLAZA NE
ALBUQUERQUE, NM 87109-3435
W912PP-13-R-0028
1 2
03/20/2014
03/03/2014
W912PP-13-R-0028
Amendment 0003
2. SPECIFICATIONS: DELETE THE FOLLOWING LISTED PAGES AND SUBSTITUTE THE
PAGES ATTACHED HERETO. ON THE REVISED PAGES, FOR CONVENIENCE, CHANGES ARE
EMPHASIZED BY HIGHLIGHTS (additions) AND STRIKE THROUGH (deletions). ALL PORTIONS
OF THE REVISED (OR NEW) PAGES SHALL APPLY WHETHER OR NOT CHANGES HAVE
BEEN INDICATED.
Delete Pages Insert Pages
Page 24 of 123 Page 24 of 123
Page 25 of 123 Page 25 of 123
Page 105 of 123 Page 105 of 123
Page 106 of 123 Page 106 of 123
Page 122 of 123 Page 122 of 123
////////////////////////////////////////////////// LAST ITEM /////////////////////////////////////////////////////////////
5.3 Project Manager(s)
For each task order, the Contractor shall designate a Project Manager (PM). The Program Manager may act as the Project Manager, with approval of USACE, if execution is sufficiently limited. The Offeror shall identify the PM before issuance of the task order and the PM qualifications, experience and performance history shall be satisfactory to the Contracting Officer or COR. The Project Manager shall be the single point of contact for the task order, and shall be responsible for the management and execution of the task order in accordance with the approved performance work statement, approved work plans, and all Federal, State, and local laws and regulations. The Project Manager shall ensure coordination between the Safety and Health Manager (SHM) and the Site Safety and Health Officer (SSHO) to ensure that all site activities are performed in a safe manner. The Contractor shall also maintain close communication and coordination with USACE for the duration of the project, including weekly and/or monthly progress and detailed cost reporting.
• Individuals proposed as Project Managers shall have a college degree in engineering, geology, chemistry, or related field from an ABET accredited institution
• Individuals proposed as Project Managers shall have five (5) years experience in Project Management for other contracts/programs with a minimum of three (3) years working in ECS
• Individuals proposed as Project Managers shall report professional registration, in their respective field, where applicable or available
• As a minimum, one (1) project manager must be an employee of the Prime
5.4 Contractor Quality Control Supervisor (CQCS)
The Contractor shall designate, at a minimum, one (1) but no more than three (3), individual who is trained within its organization to be responsible for overall management of Contractor Quality Control (CQC) and have the authority to act in all CQC matters. The CQCS shall have appropriate education and experience in environmental consulting services. The CQCS is responsible to ensure compliance with the requirements identified in the Performance Work Statement and the Contractor Quality Control Plan. The need for an on-site QCS will be defined in the Performance Work Statement for the project specific task order, if required.
• The individual proposed as the CQCS shall have a minimum of three (3) years working experience in quality assurance and quality control (QA/QC) of environmental consulting services
• The individual proposed as the CQCS shall have demonstrable expertise in laboratory techniques.
• The individual proposed as the CQCS shall have formal education or training in field sampling related to environmental consulting services
• The CQCS must be an employee of the prime
5.5 Safety and Health Manager
In accordance with the USACE Safety and Health Requirements Manual (EM385-1-1, current version dated 15 September 2008), the contractor shall designate one (1) individual as a Safety and Health Manager (SHM) for any consulting work involving hazardous waste. The SHM shall be a Certified Industrial Hygienist (CIH), Certified Safety Professional (CSP) or Certified Health Physicist (CHP). If the project involves radioactive material incidental to the ECS work, then the contractor shall have a CHP assigned to the project, accessible to the field crew; but not necessarily required to be on-site. The SHM shall demonstrate the authority to shut down the site work if/when Health and Safety becomes an issue. The SHM shall enlist the support of safety and occupational health professionals with appropriate education and experience when working on sites with multiple hazards. The SHM shall be responsible for the following actions:
• Developing, maintaining, and overseeing implementation of the Site Safety and Health Plan (SSHP);
• Visiting the project as needed to audit the effectiveness of the SSHP;
• Remaining available for project emergencies;
• Developing modifications to the SSHP as needed;
• Evaluating occupational exposure monitoring/air sampling data and adjusting SSHP requirements as necessary;
• Serving as a QC staff member;
• Approving the SSHP by signature
5.6 Site Safety and Health Officer (SSHO)
The SSHO is required at cleanup operations. The SSHO shall demonstrate the authority to shut down the site work if/when health and safety becomes an issue. The SSHO shall have the authority and is responsible for the following actions:
• Being present anytime cleanup operations are being performed to implement the SSHP;
• Inspecting site activities to identify safety and occupational health deficiencies and correct them;
• Coordinating changes/modifications to the SSHP with the SHM, site superintendent, and contracting officer; and Conducting project specific training.
The SSHO shall have a minimum of three (3) years of experience implementing safety and occupational health procedures at environmental sites.
The SSHO shall have training and experience to conduct exposure monitoring/air sampling and select/adjust protective equipment use.
5.7 Senior Chemist
The Contractor shall utilize a Senior Chemist who shall ensure that all chemistry related goals of the program are attained. The Senior Chemist shall be available for consultation with the Contractor's personnel and Government personnel. The Senior Chemist should have general knowledge of remedial process chemistry, fate and transport of organics and inorganics, knowledge of chemical quality control, experience with validation software (ADR.NET or equivalent) and staged electronic data deliverables. The Senior Chemist shall be experienced in the sampling and analysis of toxic/hazardous chemicals and radiological contamination in environmental matrices. The Chemist will be required to have advanced expertise (senior level) in chemical data quality management of environmental analytical data and demonstrate an understanding and application of the UFP QAPP. The chemist must demonstrate knowledge and understanding of the DoD QSM and its application during validation to ensure defensible data are delivered meeting project specific requirements. Knowledge and understanding of data base systems, including ERPIMS, ERIS, EQuIS, is considered to be beneficial.
• The individual proposed at the Chemist shall have a college degree in chemistry, environmental, biological or physical sciences or engineering, with at least 30 semester hours in chemistry from an ABET accredited 4-year program
• The individual proposed as the Chemist shall have a minimum of five (5) years of specialized experience in ECS-related work
5.8 Civil Engineer
The Civil Engineer is responsible for assuring that all civil and general engineering support goals specified in the Task Order are attained.
• The individual proposed as the Civil Engineer shall have a college degree in civil engineering (soil mechanics, materials or related specialty), geological engineering, or related field from an Accreditation Board for Engineering and Technology (ABET) accredited college or university
• The individual proposed as the Civil Engineer shall demonstrate education and experience in geotechnical engineering
• The individual proposed as the Civil Engineer shall have five (5) years experience related to investigation, design, and construction of geotechnical features with a minimum of 3 years experience being related to ECS, and related feasibility studies
• The individual proposed as the Civil Engineer shall have at a minimum five (5) years of experience, specifically related to environment environmental compliance. Specific environmental compliance education may be substituted for up to two (2) years experience
• EXAMPLE: A candidate may demonstrate 3 years of compliance experience plus 2 years of general civil experience to be fully qualified with a total of 5 years.
• All experience may be inclusive. All required experience may be gained concurrently.
4.3 FACTOR 1
Technical Requirements: The technical requirements factor is divided into the following sub-factors:
4.3.1 FACTOR 1, SUB-FACTOR 1
Sub-factor 1: Summary of Previous Experience – Environmental Consulting Services
a. Using the Contract Description Form enclosed in Section J, provide at least two (2) but no more than five (5) examples of recent and relevant projects performed as the prime Contractor which demonstrates the Offeror's experience in performance of environmental consulting services similar to that described in Section C of this solicitation. Offerors should take into account the experience of its team members proposed for the contract, timeliness of performance, safety and health record, customer satisfaction and cost control. Project Experience from formal Teaming Partners will be evaluated. Award will only be made to the prime Contractor.
b. The projects selected should show diversity in the types of work accomplished by the firm, teaming arrangements, key personnel and their roles on the project, and regulatory information in addition to the basic cost information. Offerors may add lines to section (e) of the Contract Description Form, “Description of project” for additional project details provided the 30 page limitation is not exceeded.
c. Project experience submitted by the Offeror as a subcontractor will not be evaluated. Offerors can submit
Government and/or commercial contracts for the prime Offeror either currently in performance (must have demonstrated 6 months of execution) or completed within the past five (5) years from the closing date of this RFP which are relevant to the efforts required by this solicitation. Information provided on the Contract Description Forms will also be used to evaluate past performance. Offerors are invited but not required to submit photographs of successful projects in conjunction with this section. Project Experience from formal Teaming Partners will be evaluated. Award will only be made to the prime Contractor.
d. Where the word “project(s)” appears in this section, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101).
Examples of projects submitted by the prime Contractor may be projects performed for a Federal or State Government agency; or for a commercial or private sector customer.
e. Where the word “recent” appears it is understood to mean a project for which it is at least 75% complete
(measured by performance period days) as of the RFP closing date or a project that has been completed within 5 years of the RFP closing date. Projects completed more than 5 years before the RFP closing date will not be considered for evaluation purposes.
f. Relevant experience is one indicator of an Offeror’s ability to perform the contract successfully. Where the word “relevant” appears it is understood to mean that the project experience submitted is similar to the services described in this solicitation. Regarding relevant prime Contractor experience, the Government will consider the types of work features that are self-performed, on-site, by the prime Contractor’s own organization as well as that of a Joint Venture (JV), partnership, etc. Project Experience from formal Teaming Partners will be evaluated. Award will only be made to the prime Contractor.
g. If an Offeror has been required to take corrective action for any substandard performance, the Offeror should explain the circumstances and the corrective action(s) taken. If an Offeror has experienced other performance problems such as cost overruns, extended performance periods, and so on, the Offeror should explain.
4.3.2 FACTOR 1, SUB-FACTOR 2
Sub-factor 2: Resumes of Key Management Personnel for this Contract
The Offeror shall provide the resumes of the key personnel which it expects will execute the work that may be awarded under this contract. Specifically, the Offeror shall provide a resume for the key individuals listed below.
The resumes should clearly display proposed job title, current employer, education, special qualifications and record of experience showing title, specific duties, responsibilities and assignments within at least the last five years. The purpose of this submittal is to identify the level of expertise available for this contract. The resumes should include appropriate cross reference to the projects submitted under Factor 1, Sub-factor 1 (if applicable). A suggested resume template is included in Section J, Attachment 3.
Arrange the resumes in the proposal in the order listed in this solicitation. Resumes do not count against the overall page limitation. However, Personnel Resume Forms are limited to three (3) pages, per resume. Additional pages will not be evaluated. At the discretion of the Offeror, positions may be dual-hatted, with two exceptions:
the Site Safety and Health Officer and the Quality Control Supervisor.
NOTE: After contract award, the Contracting Officer shall approve replacement of any key management personnel after verifying that they meet or exceed the requirements of the contract, as detailed in the Performance Work Statement. If further key personnel are required to perform any work under this contract, the Offeror will be required to submit their resumes for approval by the Contracting Officer. The Offeror will provide information on the following key personnel that demonstrates their qualifications and experience:
NOTE: The Government will evaluate the proposed individuals for the following key positions (a-n a-k) based on previous project experience serving in the role and based on qualifications described in Part 5 of the Performance Work Statement of this solicitation.
a. Program Manager - The Offeror shall provide one (1) individual resume for an individual who is trained and experienced as a Program Manager
b. Project Managers - The Offeror shall provide a minimum of one (1) resume but no more than three (3) resumes for individual(s) who are trained and experienced as a Project Manager. (This allows the Government to ascertain the Offeror’s ability to provide, if necessary, multiple Project Managers for execution of concurrent Task Orders.)
c. Contractor Quality Control Supervisor (CQCS) - The Offeror shall provide a minimum of one (1) individual resume for an individual but no more than three (3) resumes for individual(s) who is trained within its organization and experienced to be responsible for overall management of Contractor Quality Control (CQC) and have the authority to act in all CQC matters. (This allows the Government to ascertain the Offeror’s ability to provide, if necessary, multiple Contractor Quality Control Supervisors for execution of concurrent Task Orders.)
d. Safety and Health Manager (SHM) - The Offeror shall provide one (1) individual resume for an individual who is trained and experienced as a SHM.
e. Site Safety and Health Officer (SSHO) - The Offeror shall provide one (1) individual resume for an individual who is trained and experienced as a SSHO.
f. Senior Chemist - The Offeror shall provide one (1) individual resume for an individual who is trained and experienced as a Chemist.
g. Civil/Project Engineer (C/PE) - The Offeror shall provide one (1) individual resume for an individual who is trained and experienced as a C/PE.
FACTOR 3: Corporate Technical Plans, Practices, and Procedures is divided into the following sub-factors:
a. Sub-factor 1: Quality Assurance/Quality Control (QA/QC) Program and Corporate Business Practices:
The Government will evaluate the QA/QC measures and business practices the Offeror has in place which demonstrates data management procedures used to increase and maintain quality and accuracy of output, best practices including those that are innovative, and procedures to ensure adherence to the QA/QC program. The Government will evaluate whether the Offeror has had any environmental reportable incident violations as well as whether members of the Offeror’s team has received any environmental Notice of Violations (NOVs) within the past 5 years. An Offeror with no reportable incidents of environmental violations and no NOVs in the past 5 years may be rated higher in the evaluation process. The Offeror’s proposal will be viewed as an example of the Offeror’s QA/QC and therefore the proposal may be rated lower for this sub-factor for major errors in grammar, spelling, and format.
The Government places a high value on innovative practices and programs which have resulted in demonstrated increases in the quality of outputs by the Offeror. Innovation in the field of environmental consulting restoration can take multiple forms. Innovative technologies are those that are new, inventive, creative in the application of conventional procedures and previously untried when first used. There is some risk in application of the new technology. However, this risk is balanced by the potential for improvements in quality, reduced project costs, or time savings. Later application of the same technology would not be considered innovative because when mature it can be applied routinely.
When including examples of environmental consulting restoration innovation in the proposal, the Offeror must consider the element of time, because as noted above, a technology or method is no longer considered innovative once it becomes routine.
b. Sub-factor 2: Safety and Health Plan:
The Government will evaluate the Offeror’s ongoing and successful execution of its Safety and Health Plan (SHP), evaluate items such as training, how many and the type of safety and health professionals it has on its team, as well as its guidance and procedures used in the preparation and implementation of an Accident Prevention Plan/Site Safety and Health plan for an ECS site. The Government will also evaluate the Offeror’s SHP for inclusion of materials identification along with handling and disposal. The Government will evaluate whether the Offeror has had any Occupational Safety and Health Administration (OSHA) violations and/or reported accidents in the past 5 years.
The Government places a high value on innovative practices or programs which have demonstrated a reduction in health and safety accidents on projects managed by the Offeror. As a result, an Offeror with no OSHA violations and/or reported accidents in the past 5 years may be rated higher in the evaluation process. The Government views a SHP that includes procedures and requirements for the variety of work proposed under this contract as advantageous.
FACTOR 4: Sample Project Scenario (hypothetical): The Government will evaluate the Offeror’s narrative describing their particular approach to the project scenario provided in Section J. The Government will assess the Offeror’s technical understanding of the project based upon the proposed approach, the disciplines used, the hours proposed and the technical feasibility of the proposed approach and solution to the problem presented.