RTA_FY25 WKS Service Bridge Paint_LOCKED_Signed.pdf

PDF 26 MB Posted

Attached to
W. Kerr Scott Lake and Dam Bridge Repainting
Solicitation number
W912PM26BA005
Issued by

About this file

This is a set of design and construction drawings for the Clean and Repaint of W. Kerr Scott Dam Service Bridge in Wilkesboro, North Carolina. The project, identified as Solicitation Number W912PM26BA005 and Contract Number W912PM-26-C00XX, is issued by the US Army Corps of Engineers Wilmington District with an issue date of December 2025 and marked as "Ready to Advertise."

The scope of work requires abrasive blasting and repainting of all exposed surfaces of the bridge steel superstructure and bearings in accordance with specification sections 01 57 19 and 09 97 02. Lead-based paint remediation is mandatory per specification section 02 83 00. The project involves cleaning and repainting of two steel plate girders (left and right), X-bracing, stiffener plates, bearings, and associated bridge components spanning approximately 248-254 feet across two spans. The contractor is responsible for providing work platforms, containment of blasted paint material, field verification of all dimensions prior to fabrication, protection of non-painted electrical and mechanical features, and a general sequence of work. Construction debris must be removed daily, and the site must be secured during and outside working hours. Reference drawings (S-17, S-18, S-19) are provided for context but represent the existing bridge structure; no new steel fabrication or repairs are required. Access is controlled through gated roads on the dam, which may be barricaded during contract work while maintaining one travel lane at all times.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

OLD HWY 268

RANGER RD.

YADKIN

RIVER

W. KERR SCOTT

DAM AND

RESERVOIR

DARK

MOUNTAIN

PARK

RA

NG

ER

R

D.

R

ES

EV

O

IR

R

D

R

ESEVO

IR

R

D

RANGER RD.

ISSUE DATE:

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

Approval Recommended: *

Approved: *

DEC 2025

DEC 2025

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION

CHIEF, ENGINEERING BRANCH

* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,

WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION

DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE

SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.

CHIEF, DESIGN and GENERAL ENGINEERING SECTION

AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET

G-000

C O

VE

R

S H

EE

T

PROJECT LOCATION, VICINITY MAP

N.T.S.

Wilmington DISTRICT

W912PM-26-C00XX

DECEMBER 2025

W912PM-26-BA005

CLEAN AND REPAINT

W. KERR SCOTT DAM SERVICE BRIDGE

WILKESBORO, NORTH CAROLINA

READY TO ADVERTISE SUBMITTAL

SHEET NO. TITLE

G-000 COVER SHEET

G-001 GENERAL CONSTRUCTION NOTES

C-101 SITE PLAN

S-101 GENERAL LAYOUT - PLAN AND ELEVATIONS

S-102 BOTTOM BRIDGE PLAN AND SECTION

S-201 LEFT GIRDER - ELEVATIONS & PLAN

S-202 RIGHT GIRDER - ELEVATIONS & PLAN

S-601 PHOTOS - CURRENT CONDITIONS

S-17 DAM AND OUTLET WORKS, ACCESS BRIDGE PLANS, SECTIONS & DETAILS.

S-18 DAM AND OUTLET WORKS, ACCESS BRIDGE DETAILS.

S-19 DAM AND OUTLET WORKS, ACCESS BRIDGE SECTIONS & DETAILS.

NOTICE TO CONTRACTOR: LEAD BASED PAINT REMEDIATION REQUIRED.

PROJECT AREA:

SERVICE BRIDGE

BROCKEL.MICHAEL.JOHN.1610786436

Digitally signed by

BROCKEL.MICHAEL.JOHN.1610786436

DN:

CN=BROCKEL.MICHAEL.JOHN.1610786436,

OU=USA, OU=PKI, OU=DoD, O=U.S.

Government, C=US Date: 2025.12.17 13:57:49-05'00'

Date: 2025.12.19 13:16:29 -05'00'

G-001

G

EN

ER

AL

C O

N

ST

R U

C

TI

O N

N O

TE

S of Engineers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

GENERAL NOTES

GENERAL

1. ALL EXPOSED SURFACES OF THE BRIDGE STEEL SUPERSTRUCTURE AND BEARINGS SHALL BE

ABRASIVE BLASTED AND REPAINTED IN ACCORDANCE WITH SPECIFICATION SECTIONS 01 57 19 AND

09 97 02. REMEDIATION OF LEAD PAINT IS REQUIRED AND SHALL BE IN ACCORDANCE WITH

SPECIFICATION SECTION 02 83 00. PROTECTION OF EXISTING FACILITY SHALL BE IN ACCORDANCE

WITH SPECIFICATION SECTION 01 10 00.10 38.

2. ALL ELEVATIONS AND DIMENSIONS SHALL BE VERIFIED IN THE FIELD BEFORE WORK BEGINS. THE

CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL DIMENSIONS PRIOR TO SHOP DRAWING

PREPARATIONS AND MATERIAL FABRICATION.

3. GOVERNMENT UTILITIES (INCLUDING WATER, FUEL, ETC.) AND EQUIPMENT WILL NOT BE MADE AVAILABLE TO THE CONTRACTOR. ELECTRIC UTILITIES WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

4. REFERENCE DRAWINGS ARE DRAWINGS OF RECORD, INCLUDED SOLELY FOR THE CONTRACTOR'S BENEFIT. NO REQUIRED WORK UNDER THIS CONTRACT IS SHOWN ON THE REFERENCE DRAWINGS.

THE REFERENCE DRAWINGS ARE NOT "AS-BUILTS" AND DO NOT NECESSARILY REPRESENT ACTUAL

FIELD CONDITIONS. REFERENCE DRAWINGS ARE NOT PRINTED TO SCALE.

5. CONTRACTOR SHALL INCLUDE A GENERAL SEQUENCE OF WORK WHICH INCLUDES, BUT IS NOT

LIMITED TO, ABRASIVE BLASTING AND PAINTING, AS WELL AS PROTECTION OF NON PAINTED

ELECTRICAL AND MECHANICAL FEATURES.

6. LAKE ELEVATIONS VARY. NORMAL POOL IS EL. 1030.0'. PER DATUM NAVD88. NOTE, ELEVATIONS IN

REFERENCE DRAWINGS ARE PER DATUM NGVD29. REFER TO RIVER-GAGES FOR HISTORIC RIVER

LEVELS.

7. LEAD BASE PAINT IS PRESENT ON THE EXISTING STEEL MEMBERS.

LIFE SAFETY

1. FIRE SAFETY - REMOVE CONSTRUCTION DEBRIS, WASTE MATERIALS, PACKAGING MATERIAL FROM

THE SITE DAILY. BURNING IS PROHIBITED ON THE GOVERNMENT PREMISES.

2. SECURITY - CONTRACTOR IS RESPONSIBLE FOR CLEANLINESS AND ORDERLINESS OF THE AREA

USED AND FOR THE SECURITY OF ANY MATERIAL OR EQUIPMENT STORED ONSITE. CONTRACTOR

IS RESPONSIBLE FOR SECURING THE SITE DURING AND OUTSIDE OF WORKING HOURS TO INCLUDE

THE APPLICATION OF THE EXISTING SECURITY FEATURES.

CONSTRUCTION:

1. ALL STEEL BRIDGE MEMBERS SHOWN ON THE SECTIONS AND ELEVATIONS ARE EXISTING. NO NEW

STEEL OR STEEL REPAIRS ARE REQUIRED UNDER THIS CONTRACT.

2. CONTRACTOR TO PROVIDE WORK PLATFORMS TO ACCESS SUPERSTRUCTURE IN ACCORDANCE

WITH SPECIFICATION SECTION 01 35 26.

3. CONTRACTOR TO PROVIDE CONTAINMENT OF BLASTED PAINT AND BLAST MATERIAL IN

ACCORDANCE WITH SPECIFICATION SECTION 09 97 02.

WKS-06

WKS-05

WKS-04

WKS-03

WKS-02

WKS-01

PC2

C-101

SI

TE

P

LA

N of Engineers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

SCALE: 1" = 200'-0"1 SITE PLAN

PROJECT AREA:

SERVICE BRIDGE

W. KERR SCOTT

RESERVOIR

GENERAL NOTES

1. ACCESS TO THE DAM AND SERVICE BRIDGE IS GATED. THE ROAD ON

TOP OF THE DAM AND SERVICE BRIDGE CAN BE BARRICADED AND

CLOSED TO THE PUBLIC WHILE CONTRACT WORK IS BEING

PERFORMED.

2. THE ASPHALT PAVED ROAD ON TOP OF THE DAM MAY ALSO BE USED

AS A STAGING AREA FOR CONTRACTOR EQUIPMENT AND TRAILER.

NOTE THAT ONE TRAVEL LANE ON THE ROAD SHALL BE MAINTAINED AT

ALL TIMES.

R

ES

EV

O

IR

R

D

W. KERR SCOTT DAM

DOWNSTREAM

LOCKING VEHICLE

BARRICADE

W. KERR SCOTT

SERVICE TOWER

GRAPHIC SCALE

1" = 200'

200'0 400'100'

W. KERR SCOTT DAM

UPSTREAM

LOCKING SECURITY

GATE

POTENTIAL STAGING

AREA

BENCHMARK SCHEDULE

DESCRIPTION NORTH EAST ELEVATION

PC2 874824.69 1342780.55 1106.86

WKS-01 874959.16 1342713.52 1106.38

WKS-02 874958.37 1342710.07 1106.37

WKS-03 874930.44 1342590.86 1104.33

WKS-04 874929.66 1342587.53 1104.26

WKS-05 874901.74 1342468.47 1102.07

WKS-06 874900.83 1342464.60 1102.00

248.32'

4" EXPANSION

JOINT

254.00'

'-0

2' -6

" 9' -0

4" EXPANSION

JOINT

X

X

X

X

X

X

128.08'

122.40'

254.00'

C

LE

AN

A

N D

R

EP

AI

N

T W

. K

ER

R S

C O

TT

D

AM

S

ER

VI

C E

BR

ID

G E

W

IL

KE

SB

O R

O , N

O R

TH

C

AR

O

LI

N

A

US Army Corps of Engineers

SI

ZE

"x

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

A.

E

U

BA

N K

S.

S

U R

R

AT

T

M . B

R O

C

KE

L

W

2P M

C

XX

N O

VE

M

BE

R

W

2P M

BA

R

TA

S U

BM

IT

TA

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

SCALE: 3/32" = 1'-0"1 ELEVATION A - RIGHT GIRDER

SCALE: 3/32" = 1'-0"2 PLAN

S-101

RAIL & CURB

SYSTEM (TYP)

CL RIGHT GIRDER SPAN 2

R O

AD

W

AY

CENTERLINE

ACCESS BRIDGE

FUEL TANK

FIXED BEARING

CONC.

ABUTMENT

SECURITY

GATE BEYOND

S-102

ST

R

U C

TU

R

AL

G

EN

ER

AL

L

AY

O

U T

- P

LA

N

E

LE

VA

TI

O N

S

3/32" = 1'-0"

30'5' 40'10' 20'

TOWER

SCUPPER (TYP)

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARING ROCKER

BEARING

RAIL & CURB

SYSTEM

BRIDGE LIGHT

(TYP)

X-BRACING (TYP)

- SEE SECTION

INTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

S-101

SCALE: 3/32" = 1'-0"3 ELEVATION B - LEFT GIRDER

RAIL & CURB

SYSTEM

FUEL TANK

CONCRETE

ABUTMENT

SECURITY

GATE BEYOND

BRIDGE LIGHT

(TYP)

SCUPPER (TYP)

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARINGROCKER

BEARING

RAIL & CURB

SYSTEM

X-BRACING (TYP)

- SEE SECTION

INTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

CL LEFT GIRDER SPAN 2

S-201

S-202

SCUPPER (TYP)

BRIDGE LIGHT

(TYP)

SCUPPER (TYP)CONSTRUCTION

JOINT (TYP)

CL RIGHT GIRDER

SPAN 1

CL LEFT GIRDER SPAN 1

BOTTOM FLANGE

PLATE

RIGHT GIRDER

SPAN 2

WF BRACING (TYP)

- SEE SECTION

BOTTOM FLANGE

PLATE

RIGHT

GIRDER

SPAN 1

BOTTOM FLANGE

PLATE

LEFT GIRDER

SPAN 2

WF BRACING (TYP)

- SEE SECTION

BOTTOM FLANGE

PLATE

LEFT

GIRDER

SPAN 1

TOWERROADWAY

TOWER ROADWAY

FIXED BEARING

S-101

JOINT

254.00'

'-0

2' -6

" 9' -0

4" EXPANSION

JOINT

X

X

X

X

X

X

128.08'

122.40'

AN

A

N D

R

EP

AI

N

T W

. K

ER

R S

C O

TT

D

AM

S

ER

VI

C E

BR

ID

G E

W

IL

KE

SB

O R

O , N

O R

TH

C

AR

O

LI

N

A

US Army Corps of Engineers

SI

ZE

"x

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

A.

E

U

BA

N K

S.

S

U R

R

AT

T

M . B

R O

C

KE

L

W

2P M

C

XX

N O

VE

M

BE

R

W

2P M

BA

R

TA

S U

BM

IT

TA

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

ST

R

U C

TU

R

AL

PL

AN

BO

TT

O M

B R

ID

G

E

LEFT EDGE OF

DECK

RIGHT EDGE

OF DECK

SCALE: 3/8" = 1'-0"2 SECTION - BRACING

RAIL & CURB

SYSTEM

LEFT GIRDER

ACCESS BRIDGE

DECK

RIGHT GIRDER

12WF27 BRACING

@ 12'-0" O.C. MAX

SCUPPER

CENTERLINE

ACCESS BRIDGE

GUSSET PLATE

@ X-BRACING

X-BRACING

@ 24'-0"

O.C. MAX.

INT. STIFFENER PLATE

EA. SIDE @ 6'-0" O.C.

MAX.

SCALE: 3/32" = 1'-0"1 PLAN - BOTTOM BRIDGE

S-202

CL RIGHT GIRDER

SPAN 2

R O

AD

W

AY

CENTERLINE

ACCESS BRIDGE

S-102

TOWER

S-201

CL LEFT GIRDER

SPAN 2

STIFFENER PLATE

(TYP)

WF BRACE (TYP)X-BRACE &

STIFFENER (TYP)

FUEL TANK

SCUPPER (TYP)

3/32" = 1'-0"

30'5' 40'10' 20'

0' 1' 5' 10' 3/8" = 1'-0"

12"

CL RIGHT GIRDER SPAN 1

CL LEFT GIRDER

SPAN 1

S-202

2S-201

ROCKER BEARINGSFIXED BEARINGS

ROCKER BEARINGSFIXED BEARINGS

S-102

254.00'

LEFT GIRDER SPAN 2 BOTTOM FLANGE PLATES

128.08'

LEFT GIRDER BOTTOM SPAN 1 FLANGE PLATES

125.58'

JOINT

AN

A

N D

R

EP

AI

N

T W

. K

ER

R S

C O

TT

D

AM

S

ER

VI

C E

BR

ID

G E

W

IL

KE

SB

O R

O , N

O R

TH

C

AR

O

LI

N

A

US Army Corps of Engineers

SI

ZE

"x

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

A.

E

U

BA

N K

S.

S

U R

R

AT

T

M . B

R O

C

KE

L

W

2P M

C

XX

N O

VE

M

BE

R

W

2P M

BA

R

TA

S U

BM

IT

TA

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

SCALE: 3/32" = 1'-0"1 ELEVATION INSIDE - LEFT GIRDER

FIXED BEARING

CONCRETE

ABUTMENT

3/32" = 1'-0"

30'5' 40'10' 20'

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARING ROCKER BEARINGINTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

S-201

ROADWAYTOWER

SCALE: 3/32" = 1'-0"2 ELEVATION OUTSIDE - LEFT GIRDER

FIXED BEARING

BOTTOM FLANGE

PLATE (TYP.)

LEFT GIRDER SPAN 2

CONCRETE

ABUTMENT

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARINGROCKER

BEARING

WF BRACING (TYP)

- SEE SECTION

X-BRACING (TYP)

- SEE SECTION

INTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

S-201

ROADWAY

TOWER

LEFT GIRDER

LEFT

GIRDER

SPAN 1

TOP FLANGE PLATE

(TYP.)

TOP FLANGE PLATE

(TYP.)

BOTTOM FLANGE

PLATE (TYP.)

SCALE: 3/32" = 1'-0"3 PLAN LEFT GIRDER - SPAN 1 & SPAN 2 BOTTOM PLATE

FIXED END EXPANSION

END

FIXED END

ROADWAYTOWER

10'-0" x 20" x 11 4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

EXPANSION

END

CONCRETE

ABUTMENT

8'-0" x 20" x 13 8"

FLANGE PLATE

38'-0" x 20" x 11 2"

FLANGE PLATE

10'-0" x 20" x 11

4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

10'-0" x 20" x 11 4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

38'-0" x 20" x 11 2"

FLANGE PLATE

10'-0" x 20" x 11

4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

ST

R

U C

TU

R

AL

LE

FT

G

IR

D

ER

EL

EV

AT

IO

N S

PL

AN

LEFT GIRDER SPAN 2 LEFT GIRDER SPAN 1

SEE GENERAL NOTES ON SHEET G-001.

S-201

248.32'

RIGHT GIRDER SPAN 2 BOTTOM FLANGE PLATES

122.40'

RIGHT GIRDER SPAN 1 BOTTOM FLANGE PLATES

125.58'

JOINT

AN

A

N D

R

EP

AI

N

T W

. K

ER

R S

C O

TT

D

AM

S

ER

VI

C E

BR

ID

G E

W

IL

KE

SB

O R

O , N

O R

TH

C

AR

O

LI

N

A

US Army Corps of Engineers

SI

ZE

"x

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

W

IL

M

IN

G

TO

N D

IS

TR

IC

T

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

, N O

R

TH

C

AR

O

LI

N A

A.

E

U

BA

N K

S.

S

U R

R

AT

T

M . B

R O

C

KE

L

W

2P M

C

XX

N O

VE

M

BE

R

W

2P M

BA

R

TA

S U

BM

IT

TA

L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

ST

R

U C

TU

R

AL

R

IG

H

T G

IR

D

ER

EL

EV

AT

IO

N S

PL

AN

SCALE: 3/32" = 1'-0"1 ELEVATION OUTSIDE - RIGHT GIRDER

FIXED END

SHOE

CONCRETE

ABUTMENT

3/32" = 1'-0"

30'5' 40'10' 20'

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARING ROCKER

BEARING

INTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

S-202

TOP FLANGE PLATE (TYP.)

ROADWAYTOWER

SCALE: 3/32" = 1'-0"2 ELEVATION INSIDE - RIGHT GIRDER

FIXED BEARING

BOTTOM FLANGE

PLATE (TYP.)

CONCRETE

ABUTMENT

CONCRETE

PIER

ROCKER

BEARING

CONCRETE

PIER

FIXED BEARINGFIXED BEARING

WF BRACING (TYP)

- SEE SECTION

X-BRACING (TYP)

- SEE SECTION

INTERMEDIATE.

STIFFENER PLATE

(TYP) SEE SECTION

S-202

ROADWAY TOWER

RIGHT GIRDER

TOP FLANGE PLATE

(TYP.)

BOTTOM FLANGE

PLATE (TYP.)

SCALE: 3/32" = 1'-0"3 PLAN RIGHT GIRDER - SPAN 1 & SPAN 2 BOTTOM PLATE

FIXED END EXPANSION

END

FIXED END

ROADWAYTOWER

10'-0" x 20" x 11 4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

EXPANSION

END

CONCRETE

ABUTMENT

8'-0" x 20" x 13 8"

FLANGE PLATE

38'-0" x 20" x 11 2"

FLANGE PLATE

10'-0" x 20" x 11

4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

10'-0" x 20" x 11 4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

38'-0" x 20" x 11 2"

FLANGE PLATE

10'-0" x 20" x 11

4"

FLANGE PLATE

CONTINUOUS TO END

OF PLATE GIRDER x 20" x 1" FLANGE PLATE

8'-0" x 20" x 13 8"

FLANGE PLATE

RIGHT GIRDER SPAN 2RIGHT

GIRDER

SPAN 1

RIGHT GIRDER SPAN 2 RIGHT GIRDER SPAN 1

SEE GENERAL NOTES ON SHEET G-001.

S-202

PH

O

TO

S

- C U

R R

EN

T

C O

N D

IT

IO

N S of Engineers

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SHEET ID

GENERAL CONSTRUCTION NOTES

1. THE PHOTOS ARE SHOWN FOR BIDDING PURPOSES ARE A VISUAL

REPRESENTATION OF THE CONDITION OF THE STEEL GIRDERS, BRACING,

AND BEARINGS TO BE CLEANED AND PAINTED. PHOTOS ARE

REPRESENTATIVE OF CONDITIONS OBSERVED DURING INSPECTIONS

BETWEEN 2021 AND 2024.

PHOTO 1: GENERAL VIEW OF BRIDGE, INTAKE

TOWER AND DAM. VIEW IS FACING NORTH.

PHOTO 2: APPROACH TO BRIDGE FROM ROAD ON TOP

OF DAM. VIEW IS FACING WEST. PHOTO 3: SOUTH GIRDER. VIEW IS FACING WEST.

PHOTO 4: BOTTOM OF SOUTH GIRDER AND STIFFENER. PHOTO 5: VIEW OF BRACING AND GIRDER STIFFENERS

BETWEEN THE TWO GIRDERS.

PHOTO 7: BEARINGS AT THE CENTER PIER. VIEW IS OF

THE NORTH SIDE OF THE BRIDGE.

PHOTO 6: BEARING ON SOUTHWEST CORNER OF

BRIDGE.

PHOTO 8: BEARING AT THE SOUTHEAST CORNER OF

BRIDGE.

PHOTO 9: GIRDER AT SOUTHWEST CORNER . VIEW IS

FACING SOUTH.

S-601

G-000 - COVER SHEET
G-001 - GENERAL CONSTRUCTION NOTES
C-101 - SITE PLAN
S-101 - STRUCTURAL GENERAL LAYOUT - PLAN & ELEVATIONS
S-102 - STRUCTURAL PLAN - BOTTOM BRIDGE
S-201 - STRUCTURAL LEFT GIRDER - ELEVATIONS & PLAN
S-202 - STRUCTURAL RIGHT GIRDER - ELEVATIONS & PLAN
S-601 - PHOTOS - CURRENT CONDITIONS
REFERENCE DRAWINGS_WKS SERVICE BRIDGE
S-17 - ACCESS BRIDGE PLANS - SECTIONS & DETAILS
S-18 - ACCESS BRIDGE DETAILS
S-19 - ACCESS BRIDGE SECTIONS AND DETAILS

File details come from the government source that posted it. Updated .