Specifications - W912PM23B0008.pdf
PDF 8 MB Posted
- Attached to
- W. Kerr Scott Erosion Control Federal contract opportunity
- Solicitation number
- W912PM23B0008
About this file
This document is a solicitation for the W. Kerr Scott Erosion Control project issued by the Department of the Army Corps of Engineers Engineering District Wilmington. The project involves installing rip rap revetment structures along the shoreline at the spillway and south abutment, including excavation, grading, monitoring, clearing and grubbing, installation of geotextiles, pre-condition surveys, conditional surveys, post construction surveys, and other incidental related work. The magnitude of construction is between $1,000,000 and $5,000,000, and the project is a 100% small business set-aside. The solicitation number is W912PM23B0008, and bids are due by a specific date and time. An organized site visit is scheduled for April 22, 2024. The solicitation includes a list of drawings and supplementary data such as boring logs and hydrograph data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B18 - Bid Opening Sign in Sheet_14 MAY 2024.pdf | ||
| B1 - Bid Abstract.pdf | ||
| A21 - W912PM23B0008-0002.pdf | ||
| A21 - W912PM23B0008_Conformed Copy.pdf | ||
| A21 - W912PM23B0008-0001.pdf | ||
| Locked - Plans - W912PM23B0008 .pdf | ||
| Unlocked - Plans - W912PM23B0008.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Locked - Plans and Specifications - W912PM23B0008 - WKS Erosion Control - RTA.pdf | ||
| Unlocked - Plans and Specifications - W912PM23B0008 - WKS Erosion Control - RTA.pdf | ||
| A21 - W912PM23B0008.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912PM23B0008 Contract No. W912PM23XXXXX
W KERR SCOTT DAM &
RESERVOIR EROSION CONTROL
PROJECT
WILKESBORO, NORTH CAROLINA
READY TO ADVERTISE - RTA
SPECIFICATIONS
13-MARCH-2024
W. Ker r Scot t Er osi on Cont r ol WKSEROSI ONCONTR
W912PM23B0008 RTA
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES
01 32 01. 00 10 08/ 23 PROJECT SCHEDULE
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 35 26 11/ 20, CHG 4: 08/ 23 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 08/ 23 QUALI TY CONTROL
01 45 00. 15 10 11/ 23 RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE ( RMS CM)
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 21 00 09/ 22 CONSTRUCTI ON SURVEYS
DI VI SI ON 31 - EARTHWORK
31 00 00 08/ 08, CHG 2: 02/ 21 EARTHWORK
31 05 19. 13 02/ 21 GEOTEXTI LES FOR EARTHWORK
31 11 00 11/ 18 CLEARI NG AND GRUBBI NG
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 31 19 01/ 08, CHG 1: 11/ 14 STONE, CHANNEL, SHORELI NE/ COASTAL
PROTECTI ON FOR STRUCTURES
- - End of Pr oj ect Tabl e of Cont ent s - -
DOCUMENT PROJECT Page 1
SECTI ON TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
1. 2 CONTRACT DRAWI NGS
1. 3 SUPPLEMENTARY DATA
1. 3. 1 Bor i ng Logs
1. 3. 2 Hydr ogr aph Dat a
ATTACHMENTS:
At t achment 1 - W. Ker r Scot t Dam Shor e Pr ot ect i on Pr oj ect Auger Logs and Lab Dat a
- - End of Sect i on Tabl e of Cont ent s - -
DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e t i t l ed " W. Ker r Scot t Dam & Reser voi r Er osi on Cont r ol Pr oj ect " and i ncl ude al l dr awi ng sheet s i ncl uded on t he " I ndex of Dr awi ngs" .
1. 3 SUPPLEMENTARY DATA
Suppl ement ar y dat a may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i onal pur poses.
1. 3. 1 Bor i ng Logs
The Gover nment does not guar ant ee t hat bor i ngs i ndi cat e act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made. See At t achment 1 - W. Ker r Scot t Dam Shor e Pr ot ect i on Pr oj ect Auger Logs and Lab Dat a f or det ai l s.
1. 3. 2 Hydr ogr aph Dat a
Reser voi r hydr ogr aph dat a has been obt ai ned by t he Gover nment f or W. Ker r Scot t Reser voi r at Dam NR Wi l kesbor o, NC - 02111391. The Gover nment does not guar ant ee t hat t he hydr ogr aph dat a i ndi cat es act ual condi t i ons, except f or t he exact l ocat i ons and t he t i me t hat t hey wer e made. Cont r act or shal l f i nd t he most r ecent dat a at t he f ol l owi ng l i nk:
ht t ps: / / wat er dat a. usgs. gov/ moni t or i ng- l ocat i on/ 02111391/ #par amet er Code=62614&per i od=P365D
- - End of Document - -
DOCUMENT 00 01 15 Page 2
1028.0
Lab = (SP-SM) Poorly Graded Silty Sand with a trace of gravel
N 874485 E 1342320
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
1.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/9/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/9/23
1 0
N/A
N/A
Date Drafted: 5/10/2023
1.0'
WKS-23-GS-03
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
Reviewed By: Jay Locke Date Checked: 01/04/2023 VERSION: Final
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-GS-03
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-GS-03
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Soil Test Hand Auger
1031' NAVD88
GRAB SAMPLE 1.0 ft DEEP
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
SP-SM (0 to 1 ft): POORLY GRADED SAND WITH SILT: Brown, fine to medium-grained, silty sand, few coarse sand, trace fine gravel, trace mica, very loose, Grab Sample.
S-1
1.0
0.0
0.0010.010.1110100
27.3
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-GS-03
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-GS-03
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Yellowish Brown, Poorly Graded Silty Sand (SP-SM), with a trace of gravel.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18697
Other tests, when reported, were conducted in general accordance with
ASTM's D422, D854, D2216, D2487 & D4318.
1036.0
Lab = (ML) M.C. = 23.2% Inorganic Silt with some sand
M.C. = 20.2%;
Lab = (ML) M.C. = 20.1%; Inorganic Silt with some sand
M.C. = 20.0%
Lab = (ML); LL = 46; PL = 38; PI = 8 M.C. = 20.3% Inorganic Silt with some sand
Lab = (ML) M.C. = 20.6%
Lab = (ML) M.C. = 23.4% Inorganic Silt with some sand
M.C. = 22.8%
N 874459 E 1342379
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
8.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/8/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/8/23
8 0
N/A
N/A
Date Drafted: 5/10/2023
8.0'
WKS-23-HA-01
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Reviewed By: Jay Locke Date Checked: 01/04/2024 VERSION: Final
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-HA-01
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
2.0
4.0
6.0
8.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-HA-01
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Humbolt Dynamic Cone Penetrometer (DCP) H-4202 used;
15-lb steel mass falling 20-inches.
DCP coorelations to SPT may be made by referencing Sowers and Hedges (1966).
Soil Test Hand Auger
1050' NAVD88
ML (0 to 8 ft), INORGANIC SILT: Light brown to brownish red, fine-grained, low plasticity, clayey silt, trace fine sand, trace clay, no, medium stiff, (inorganic silt: residual soil). Contains roots and vegetative material. DCP = 3-3-5.
(1 ft), Light brown to reddish brown, stiff, contains trace mica, little roots and vegetative material. DCP = 5-5-8.
(2 ft), hard, DCP = 8-12-20.
(3 ft), Light reddish brown mottled with orange, hard, DCP = 8-16-19.
(4 ft), Light brown to tan, hard, DCP = 12-18-20.
(5 ft), Light brown to reddish brown, no fine sand, trace clay, trace mica, hard, occasional weathered rock fragments or fine gravel.
(6 ft), Light orangish brown mottled with black, no weathered rock, no gravel, no roots or vegetative material, (residual soil).
(7 ft), little clay, trace mica, no weathered rock, no gravel, no roots or vegetative material, (residual soil).
BOTTOM OF BOREHOLE AT 8.0 ft
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
S-1
S-2
S-3
1.0
2.0
3.0
S-4
4.0
S-5
5.0
S-6
6.0
S-7
7.0
S-8
8.0
0.0010.010.1110100
23.2
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-01
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-01
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Red, (Visual) Inorganic Silt (ML), with a little sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18675
0.0010.010.1110100
20.1
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-01
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-3
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-01
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
2.0 to 3.0
Red, (Visual) Inorganic Silt (ML), with some sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18677
0.0010.010.1110100
20.3
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-01
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-5
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-01
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
4.0 to 5.0
Light Red, Inorganic Silt (ML), with some sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18679
0.0010.010.1110100
23.4
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-01
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-7
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-01
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
6.0 to 7.0
Light Red, (Visual) Inorganic Silt (ML), with some sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18681
1031.0
Lab = (CH); LL = 50; PL = 28; PI = 22 M.C. = 25.0% Fat Clay with a little sand
Lab = (ML); LL = 45; PL = 30; PI = 15 M.C. = 25.3% Inorganic Silt with sand
Lab = (ML); LL = 38; PL = 32; PI = 6 M.C. = 24.5% Inorganic Silt with sand
Lab = (ML); LL = 39; PL = 33; PI = 6 M.C. = 26.9% Inorganic Silt with sand
Lab = (ML) M.C. = 27.35% Inorganic Silt with sand
Lab = (ML); LL = 38; PL = 29; PI = 9 M.C. = 25.9%
Lab = (ML) M.C. = 23.8% Inorganic Silt with sand
M.C. = 28.0%
N 874465 E 1342365
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
8.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/8/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/8/23
8 0
N/A
N/A
Date Drafted: 5/10/2023
8.0'
WKS-23-HA-02
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Reviewed By: Jay Locke Date Checked: 01/04/2024 VERSION: Final
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-HA-02
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
2.0
4.0
6.0
8.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-HA-02
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Humbolt Dynamic Cone Penetrometer (DCP) H-4202 used;
15-lb steel mass falling 20-inches.
DCP coorelations to SPT may be made by referencing Sowers and Hedges (1966).
Soil Test Hand Auger
1044' NAVD88
ML (0 to 8 ft), INORGANIC SILT: Light brown to orangish brown, fine-grained, low plasticity, silt, trace fine sand, trace clay, little mica, stiff, contains roots and vegetative material, (residual soil), DCP = 6-5-5.
(1 ft), Light brown to tan, no fine sand, little clay, little mica, stiff, some roots, some vegetative material, (residual soil), DCP = 4-4-4.
(2 ft), Light tan, little fine sand, little clay, little mica, very stiff, contains roots, (residual soil), DCP = 6-10-13.
(3 ft), no fine sand, trace clay, trace mica, hard, trace roots, (residual soil), DCP = 16-17-19.
(4 ft), Light tan mottled with black, trace fine sand, trace clay, trace mica, hard, (residual soil), DCP = 10-16-20., no roots.
(5 ft), little fine sand, trace clay, no mica, (residual soil).
(6 ft), Tan to light yellowish white, trace fine sand, trace clay, (residual soil).
(7 ft), Light tan mottled with light brown, trace mica, contains occasional black oxidation streaks,(residual soil).
BOTTOM OF BOREHOLE AT 8.0 ft
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
S-1
S-2
S-3
S-4
1.0
2.0
3.0
4.0
S-5
5.0
S-6
6.0
S-7
7.0
S-8
8.0
0.0010.010.1110100
25.0
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-02
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-02
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Light Reddish Brown, Fat Clay (CH), with a little sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18683
0.0010.010.1110100
24.5
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-02
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-3
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-02
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
2.0 to 3.0
Pink, Inorganic Silt (ML), with some sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18685
0.0010.010.1110100
27.4
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-02
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
NP
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-5
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-02
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
NP
7/13/23
4.0 to 5.0
Pink, Inorganic Silt (ML), with some sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
NP
0.5
K7/18687
0.0010.010.1110100
23.8
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-02
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-7
500 50 5
REQUISITION: W81LJ831573125
PL
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-02
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
6.0 to 7.0
Pink, (Visual) Inorganic Silt (ML), with sand.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18689
N 875406 E 1341694
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
1029.0
1028.0
Lab = (ML) M.C. = 37.0% Sandy Inorganic Silt with trace of gravel
Lab = (ML); LL = 45; PL = 41; PI = 4 M.C. = 34.7% Inorganic Silt with sand
Lab = (SM); LL = NP; PL = NP; PI = NP M.C. = 34.8% Silty Sand
Lab = (SM); LL = NP; PL = NP; PI = NP M.C. = 36.2% Silty Sand
(4-) Encountered groundwater at 4-ft.
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
1033' NAVD88
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
5.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/9/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/9/23
4 0
N/A
N/A
Date Drafted:5/10/2023
5.0'
WKS-23-HA-04
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-HA-04
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
2.0
4.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-HA-04
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Humbolt Dynamic Cone Penetrometer (DCP) H-4202 used; 15-lb steel mass falling 20-inches. DCP coorelations to SPT may be made by referencing Sowers and Hedges (1966).
Soil Test Hand Auger
Reviewed By: Jay Locke Date Checked: 01/04/2024 VERSION: Final
ML (0 to 4 ft), CLAYEY SILT: Dark reddish brown, fine-grained, low plasticity, clayey silt, trace fine sand, little clay, trace mica, contains roots and vegetative material (residual soil)., trace rock fragments.
(1 ft), Brown, fine-grained, no roots or vegetative material (residual soil)., little rock fragments.
(2 ft), trace clay, (weathered and decayed rock fragments), no roots or vegetative material (residual soil)., few rock fragments.
(3 ft), fine-grained, nonplastic, sandy lean silt, little fine sand, trace clay, no mica, (residual soil)., no rock fragments.
BOTTOM OF BOREHOLE AT 5.0 ft
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
S-2
1.0
4.0
0.0
S-1
2.0
S-3
3.0
S-4
Terminated Hand Auger Boring Upon Encountering Groundwater and Hole Collapse
0.0010.010.1110100
37.0
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-04
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-04
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Brown, (Visual) Sandy Inorganic Silt (ML), with a trace of gravel.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18691
0.0010.010.1110100
34.8
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-04
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
NP
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-3
500 50 5
REQUISITION: W81LJ831573125
PL
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-04
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
NP
7/13/23
2.0 to 3.0
Strong Brown, Silty Sand (SM), with a trace of gravel.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
NP
0.5
K7/18693
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-HA-05
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-HA-05
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
1033.0
M.C. = 22.2%
N 875458 E 1341799
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
1034' NAVD88
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
1.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/9/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/9/23
1 0
N/A
N/A
Date Drafted:5/10/2023
1.0'
WKS-23-HA-05
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Soil Test Hand Auger
Reviewed By: Jay Locke Date Checked: 01/0/2024 VERSION: Final
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
ML (0 to 1 ft), SANDY SILT WITH GRAVEL: Brown, fine-grained, nonplastic, sandy lean silt, with fine gravel, little fine sand, few rock fragments, (residual soil), trace roots.
Hand Auger Terminated at 1.0' upon Encountering Refusal on Bedrock.
BOTTOM OF BOREHOLE AT 1.0 ft
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
1.0
S-1
0.0010.010.1110100
22.2
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-05
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-05
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Yellowish Brown, Silty Sand (SM), with a little gravel.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18695
1034.0
Lab = (ML) M.C. = 29.2%; Sandy Inorganic Silt with a trace of gravel
N 875572 E 1341937
11. MANUFACTURER'S DESIGNATION OF DRILL
10. SIZE AND TYPE OF BIT
1. PROJECT
NAD83W. KERR SCOTT DAM SHORE PROTECTION PROJECT
6. THICKNESS OF OVERBURDEN
7. DEPTH DRILLED INTO ROCK
8. TOTAL DEPTH OF BORING
STARTED
South Atlantic Division
USACE, Wilmington District
OF
INSTALLATION
15. DATE BORING
9. COORDINATE SYSTEM
17. TOTAL CORE RECOVERY FOR BORING
DISTURBED12. TOTAL SAMPLES
DEG FROM
VERTICAL
DIVISION
NC State Plane - North Carolina
1035' NAVD88
Joseph Locke
COMPLETED
Kelley Kaltenbach, P.G., Geologist
VERTICAL
1.0'
VERTICAL
UNDISTURBED
5. DIRECTION OF BORING
5/9/23
SHEETS
4. NAME OF DRILLER
SHEET
INCLINED
HORIZONTAL
N/A
3. DRILLING AGENCY
NAVD88
LOCATION COORDINATES
16. ELEVATION TOP OF BORING
14. ELEVATION GROUND WATER
DRILLING LOG
5/9/23
1 0
N/A
N/A
Date Drafted:5/10/2023
1.0'
WKS-23-HA-06
Drafted By: Kelley Kaltenbach, P.G.
Hand Auger
BEARING
2. HOLE NUMBER
13. TOTAL NUMBER CORE BOXES
Wilmington District
18. CORE LOGGER
Boring Designation WKS-23-HA-06
SHEET 1 of 1
ELEV
(feet) a
JAN 2018
SAW FORM 1836-A (LAND-BASED SOIL BORING)
LEGEND
c
Wilmington District Geotechnical Section
DEPTH
(feet) b
0.0
[H.P.] /
% CORE
REC
e
Boring Designation WKS-23-HA-06
REMARKS
(Drilling time, water loss, depth of weathering, etc., if significant) g
Elevation established from USACE Topo-Survey, May 2023. Vdatum is
NAVD88.
Soil Test Hand Auger
Reviewed By: Jay Locke Date Checked: 01/04/2024 VERSION: Final
ML (0 to 1 ft), INORGANIC SILT: Reddish brown, fine-grained, low plasticity, clayey silt, trace fine sand, little clay, trace mica, contains few roots, (residual soil)., trace fine to medium gravel.
Hand Auger Terminated at 1.0' upon Encountering Refusal on Bedrock.
BOTTOM OF BOREHOLE AT 1.0 ft
SOILS ARE FIELD VISUALLY CLASSIFIED IN
ACCORDANCE WITH THE UNIFIED SOIL
CLASSIFICATION SYSTEM
CLASSIFICATION OF MATERIALS
(Description) d
BOX OR
SAMPLE #
f
0.0
1.0
S-1
0.0010.010.1110100
29.2
HYDROMETER
GRAIN SIZE IN MILLIMETERS
WKS-23-HA-06
COBBLES
FINE
100 140 200
Depth (ft) Classification
DEPARTMENT OF THE ARMY, SAVANNAH DISTRICT, ENVIRONMENTAL AND MATERIALS UNIT
U.S. STANDARD SIEVE NUMBERS
WORK ORDER: 77B752
W. Kerr Scott Dam Shore Project
ASTM D2487
3/8 3 4
0.05 0.005
U.S. STANDARD SIEVE OPENING IN INCHES
MEDIUM
SAND
COARSE
6 14
Hole No.
Soil Testing North Carolina
GRAVEL
S-1
500 50 5
REQUISITION: W81LJ831573125
PL
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRADATION CURVES
CORPS OF ENGINEERS, 200 N. COBB PARKWAY, BLDG 400 SUITE 404, MARIETTA, GA. 30062
WKS-23-HA-06
PE
R
C E
N T
F
IN
E R
B Y
W E
IG
H
T
Sample No.
Date
FINE COARSE
SILT OR CLAY
7/13/23
0.0 to 1.0
Dark Yellowish Brown, (Visual) Sandy Inorganic Silt (ML), with a trace of gravel.
Nat w%
40 50 703 2 1.5 1 3/4 1/2
PI
Project
LL
Lab No.
0.5
K7/18696
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 2 Locat i on
1. 3 OCCUPANCY OF PREMI SES
1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES
1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes i nst al l i ng r i p r ap r evet ment st r uct ur es al ong t he shor el i ne at t he spi l l way and sout h abut ment . Thi s i s t o i ncl udes, but not l i mi t ed t o, excavat i on, gr adi ng, moni t or i ng, c l ear i ng and gr ubbi ng, i nst al l at i on of geot ext i l es, pr e- condi t i on sur veys, condi t i onal sur veys, post const r uct i on sur veys, and ot her i nci dent al r el at ed wor k.
1. 2. 2 Locat i on
The wor k i s l ocat ed at t he W. Ker r Scot t Reser voi r & Dam i n Wi l kesbor o, Nor t h Car ol i na, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3 OCCUPANCY OF PREMI SES
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , pr oposed haul r out es and use of appr oaches.
1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s, i f r equi r ed, pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es. Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 5 busi ness days pr i or t o st ar t i ng excavat i on wor k.
SECTI ON 01 11 00 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 3
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 CONTRACT COST BREAKDOWN
1. 4 SI NGLE JOB PAYMENT I TEMS
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on
1. 4. 1. 1 Payment
1. 4. 1. 2 Uni t of Measur e
1. 4. 2 Spi l l way Pr oposed Revet ment
1. 4. 2. 1 Payment
1. 4. 2. 2 Uni t of Measur e
1. 4. 3 Sout h Abut ment - Pr oposed Revet ment & Sl ope St abi l i zat i on - St a.
0+00 t o St a. 1+60
1. 4. 3. 1 Payment
1. 4. 3. 2 Uni t of Measur e
1. 4. 4 Cl ear i ng and Gr ubbi ng
1. 4. 4. 1 Payment
1. 4. 4. 2 Uni t of Measur e
1. 4. 5 Er osi on and Sedi ment Cont r ol
1. 4. 5. 1 Payment
1. 4. 5. 2 Uni t of Measur e
1. 4. 6 Sout h Abut ment - Pr oposed Revet ment & Sl ope St abi l i zat i on -
St a. 1+60 t o End
1. 4. 6. 1 Payment
1. 4. 6. 2 Uni t of Measur e
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 20 00 Page 1
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A615/ A615M ( 2022) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Rei nf or cement
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Wei ght Cer t i f i cat es
1. 3 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
1. 4 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and
SECTI ON 01 20 00 Page 2 equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on
1. 4. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Speci al Cont r act Cl auseRequi r ement PAYMENT
FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON.
1. 4. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
1. 4. 2 Spi l l way Pr oposed Revet ment
1. 4. 2. 1 Payment
Payment wi l l be made f or al l l abor , mat er i al s, equi pment , envi r onment al pr ot ect i ons, and cost s associ at ed f or t he const r uct i on of t he Spi l l way Revet ment i n t he l ocat i on shown on t he pl ans.
1. 4. 2. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
1. 4. 3 Sout h Abut ment - Pr oposed Revet ment & Sl ope St abi l i zat i on - St a. 0+00 t o St a. 1+60
1. 4. 3. 1 Payment
Payment wi l l be made f or al l l abor , mat er i al s, equi pment , envi r onment al pr ot ect i ons, excavat i on, and cost s associ at ed f or t he const r uct i on of t he Sout h Abut ment & Sl ope St abi l i zat i on i n t he l ocat i on shown on t he pl ans f r om st at i on 0+00 t o appr oxi mat el y st at i on 1+60.
1. 4. 3. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
1. 4. 4 Cl ear i ng and Gr ubbi ng
1. 4. 4. 1 Payment
Payment wi l l be made f or al l l abor , mat er i al s, equi pment , envi r onment al pr ot ect ect i ons, cost s, and r el at ed appur t enances associ at ed f or c l ear i ng and gr ubbi ng t he sout h abut ment at t he l ocat i on and l i mi t s show on t he pl ans.
SECTI ON 01 20 00 Page 3
1. 4. 4. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
1. 4. 5 Er osi on and Sedi ment Cont r ol
1. 4. 5. 1 Payment
Payment wi l l be made f or al l l abor , mat er i al s, equi pment , cost s, and ot her r el at ed appur t enances f or envi r onment al pr ot ect i on and per mi t t i ng c l ose out f or t he W. Ker r Scot t Er osi on Cont r ol Pr oj ect .
1. 4. 5. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
1. 4. 6 Sout h Abut ment - Pr oposed Revet ment & Sl ope St abi l i zat i on - St a.
1+60 t o End
1. 4. 6. 1 Payment
Payment wi l l be made f or al l l abor , mat er i al s, equi pment , envi r onment al pr ot ect i ons, excavat i on, and cost s associ at ed f or t he const r uct i on of t he Sout h Abut ment & Sl ope St abi l i zat i on i n t he l ocat i on shown on t he pl ans f r om appr oxi mat el y st at i on 1+60 t o t he end of st at i oni ng.
1. 4. 6. 2 Uni t of Measur e
Uni t of measur e: j ob.
Quant i t y: One
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
SECTI ON 01 20 00 Page 4
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
08/ 23
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
PART 2 PRODUCTS
2. 1 SOFTWARE
2. 1. 1 Gover nment Def aul t Sof t war e
2. 1. 2 Cont r act or Sof t war e
2. 1. 2. 1 Pr i maver a
2. 1. 2. 2 Ot her Than Pr i maver a
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 1. 1 Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO)
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
3. 2. 1 Act i v i t y Cost Loadi ng
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
3. 3. 2 Act i v i t y Dur at i ons
3. 3. 3 Pr ocur ement Act i v i t i es
3. 3. 4 Mandat or y Act i v i t i es
3. 3. 5 Gover nment Act i v i t i es
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)
3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)
3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)
3. 3. 7 Cont r act Mi l est ones and Const r ai nt s
3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
3. 3. 7. 3. 1 St ar t Phase
3. 3. 7. 3. 2 End Phase
3. 3. 8 Adver se Weat her
3. 3. 9 Cal endar s
3. 3. 10 Open Ended Logi c
3. 3. 11 Def aul t Pr ogr ess Dat a Di sal l owed
SECTI ON 01 32 01. 00 10 Page 1
3. 3. 12 Out - of - Sequence Pr ogr ess
3. 3. 13 Added and Del et ed Act i v i t i es
3. 3. 14 Or i gi nal Dur at i ons
3. 3. 15 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
3. 3. 16 Ret ai ned Logi c
3. 3. 17 Per cent Compl et e
3. 3. 18 Remai ni ng Dur at i on
3. 3. 19 Cost Loadi ng of Cl oseout Act i v i t i es
3. 3. 19. 1 As- Bui l t Dr awi ngs
3. 3. 19. 2 O & M Manual s
3. 3. 20 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
3. 4 PROJECT SCHEDULE SUBMI SSI ONS
3. 4. 1 Pr el i mi nar y Pr oj ect Schedul e Submi ssi on
3. 4. 2 I ni t i al Pr oj ect Schedul e Submi ssi on
3. 4. 3 Per i odi c Schedul e Updat es
3. 5 SUBMI SSI ON REQUI REMENTS
3. 5. 1 El ect r oni c Schedul i ng Dat a
3. 5. 2 Nar r at i ve Repor t
3. 5. 3 Schedul e Repor t s
3. 5. 3. 1 Act i v i t y Repor t
3. 5. 3. 2 Logi c Repor t
3. 5. 3. 3 Tot al Fl oat Repor t
3. 5. 3. 4 Ear ni ngs Repor t by CLI N
3. 5. 3. 5 Schedul i ng and Level i ng Repor t
3. 5. 4 Net wor k Di agr am
3. 5. 4. 1 Cont i nuous Fl ow
3. 5. 4. 2 Pr oj ect Mi l est one Dat es
3. 5. 4. 3 Cr i t i cal Pat h
3. 5. 4. 4 Gr oupi ng and Sor t i ng
3. 5. 4. 5 Cash Fl ow / Schedul e Var i ance Cont r ol ( SVC) Di agr am
3. 6 PERI ODI C SCHEDULE UPDATE
3. 6. 1 Per i odi c Schedul e Updat e Meet i ngs
3. 6. 2 Updat e Submi ssi on Fol l owi ng Pr ogr ess Meet i ng
3. 7 WEEKLY PROGRESS MEETI NGS
3. 8 REQUESTS FOR TI ME EXTENSI ONS
3. 8. 1 Just i f i cat i on of Del ay
3. 8. 2 Changes That Do Not Cause Del ay
3. 8. 3 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)
3. 8. 4 For ensi c Schedul e Anal ysi s ( Ret r ospect i ve Anal ysi s)
3. 8. 5 Fr agment ar y Net wor k ( Fr agnet )
3. 8. 6 Ti me Ext ensi on
3. 8. 7 I mpact t o Ear l y Compl et i on Schedul e
3. 9 FAI LURE TO ACHI EVE PROGRESS
3. 9. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess
3. 9. 2 Fai l ur e t o Per f or m
3. 9. 3 Recover y Schedul e
3. 10 OWNERSHI P OF FLOAT
3. 11 TRANSFER OF SCHEDULE DATA I NTO RESI DENT MANAGEMENT SYSTEM
3. 12 PRI MAVERA P6 MANDATORY REQUI REMENTS
SECTI ON 01 32 01. 00 10 Page 2
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
08/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
AACE 84R- 13 ( 2015) Pl anni ng and Account i ng f or Adver se Weat her
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 67- 17 ( 2017) Schedul e Del ay Anal ysi s
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 2017) Admi ni st r at i on - - Pr oj ect Schedul es
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G
Pr el i mi nar y Pr oj ect Schedul e; G
I ni t i al Pr oj ect Schedul e; G
Per i odi c Schedul e Updat e; G
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The Desi gnat ed Pr oj ect Schedul er must have pr epar ed and mai nt ai ned at l east t hr ee pr evi ous const r uct i on schedul es f or pr oj ect s of s i mi l ar s i ze and compl exi t y t o t hi s cont r act , usi ng Pr i maver a P6. .
SECTI ON 01 32 01. 00 10 Page 3
Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s speci f i cat i on.
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment uses Pr i maver a P6. Ensur e expor t ed schedul e f i l es ar e compat i bl e wi t h t he ver si on of P6 used by t he Gover nment .
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Pr i maver a
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em. Ver i f y at t he SEKO meet i ng whi ch ver si on of P6 i s i n use by t he Gover nment . Expor t t he schedul e i n a ver si on of P6 no newer t han t hat used by t he Gover nment .
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he Cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect compl et i on.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s, and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .
3. 1. 1 Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO)
I n conj unct i on wi t h t he post awar d conf er ence or pr e const r uct i on
SECTI ON 01 32 01. 00 10 Page 4 conf er ence t he Gover nment and t he Cont r act or wi l l hol d a separ at e and di st i nct Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO) . The i nt ent of t hi s meet i ng i s f or t he Gover nment t o r evi ew wi t h t he cont r act or t he r equi r ement s of t he schedul i ng speci f i cat i on, communi cat e t he Gover nment ’ s expect at i ons r egar di ng schedul e devel opment and management , and answer any quest i ons t he Cont r act or may have r egar di ng t he schedul e r equi r ement s.
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N. Mat ch t he pr ogr ess payment " Pay Per i od Thr u" dat e i n RMS t o t he schedul e dat a dat e.
3. 2. 1 Act i v i t y Cost Loadi ng
Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.
Act i v i t i es wi t h a negat i ve cost l oadi ng i s not al l owed. Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he di sappr oval of t he pr el i mi nar y, i ni t i al , or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i ncl uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
3. 3. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Non- pr ocur ement act i v i t i es Or i gi nal Dur at i ons ( OD) ar e not t o exceed 20 wor kdays or 30 cal endar days.
3. 3. 3 Pr ocur ement Act i v i t i es
I ncl ude i n t he schedul e act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
SECTI ON 01 32 01. 00 10 Page 5
3. 3. 4 Mandat or y Act i v i t i es
I ncl ude t he f ol l owi ng act i v i t i es i n t he i ni t i al pr oj ect schedul e and al l updat es.
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r i ng desi gn compl et i on
c. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.
d. Submi ssi on and appr oval of O & M manual s.
e. Submi ssi on and appr oval of as- bui l t dr awi ngs.
f . Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.
g. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .
h. Submi ssi on of TAB speci al i st desi gn r evi ew r epor t .
i . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i st .
j . Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, Cont r ol s t est i ng pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he cont r act commi ssi oni ng r equi r ement s.
This is the start of the file's text. The full file is on GovTribe.