Unlocked - Plans and Specifications - W912PM23B0008 - WKS Erosion Control - RTA.pdf
PDF 30 MB Posted
- Attached to
- W. Kerr Scott Erosion Control Federal contract opportunity
- Solicitation number
- W912PM23B0008
About this file
This document appears to be a set of plans and specifications for the W. Kerr Scott Erosion Control project under Solicitation Number W912PM23B0008. The project is a 100% small business set-aside with an estimated construction value between $1,000,000 and $5,000,000. The project requires an organized site visit on April 22, 2024 at 10 AM at the Visitor Assistance Center in Wilkesboro, NC. Bid submissions can be hand-delivered to the specified location in Wilmington, NC prior to the bid opening, or accessed via teleconference. Solicitation and technical inquiries should be submitted through the ProjNet system in Section K. The document does not contain a Performance Work Statement or Statement of Objectives, but rather appears to be plans and specifications detailing the required erosion control work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1 - Bid Abstract.pdf | ||
| B18 - Bid Opening Sign in Sheet_14 MAY 2024.pdf | ||
| A21 - W912PM23B0008-0002.pdf | ||
| A21 - W912PM23B0008_Conformed Copy.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| A21 - W912PM23B0008-0001.pdf | ||
| Locked - Plans - W912PM23B0008 .pdf | ||
| Unlocked - Plans - W912PM23B0008.pdf | ||
| Specifications - W912PM23B0008.pdf | ||
| A21 - W912PM23B0008.pdf | ||
| Locked - Plans and Specifications - W912PM23B0008 - WKS Erosion Control - RTA.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRINCE
EDWARD
PROJECT LOCATION
PHILPOTT
LAKE
FALLS
LAKE
HALIFAX
ONSLOW
DUPLIN
JONES
PENDER
PAMLICO
HA
NO
VE
R
NE
W
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
CUMBERLAND
SAMPSON
WAYNE
LENOIR
GREENE
PITT
CRAVEN
BEAUFORT HYDE
TYRREL
WASHINGTON
DARE
BERTIE C
H
O W
AN
PERQUIMANS
PASQUOTANK
CAMDEN
CURRITUCK
GATES
HERTFORD
NORTHAMPTON
HALIFAX
NASH
WILSON
JOHNSTON
WAKE
FRANKLIN
VANCE
G R
AN
VI
LL
E
WARREN
GREENSVILLE
BRUNSWICKMECKLENBURG
LUNENBURG
CARTERET
FRANKLIN
HENRYPATRICK
FLOYD
CARROLL
PITTSYLVANIA
MONTG
OMERY ROANOKE
BOTETOURT
BEDFORD
CAMPELL
APPOMATTOX
CHARLOTTE
STOKES ROCKINGHAM CASWELL PERSON
ORANGE
AL
AM
AN
C
E
DURHAM
CHATHAM
MOORE
MONTGOMERY
RANDOLPH
DAVIDSON
FORSYTH
SURRY
ALLEGHANY
ASHE
WATAUGA WILKES
CALDWELL
AVERY
MITCHELL
YANCY
BURKE
CATAWBA
ALEXANDER
IREDELL
LINCOLN
GASTON
M
EC
KL
EN
BU
R
G
CABARRUS
STANLY
UNION
ANSON
RICHMOND
RUTHERFORD
McDOWELL
MADISON
BUNCOMBE
HENDERSON
TRANSYLVANIA
HAYWOOD
JACKSON
SWAIN
GRAHAM
CHEROKEE
CLAY
MACON
YADKIN
ROWAN
CLEVELANDPOLK
Georgia
Tennessee
South Carolina
FEAR
C
APE
RIVER
N E
U S
E
RIVER
R O
A N
O K
E
RIVER
Virginia North Carolina
PAMLIC
O S
OUND
ATLA
N
TIC
O
C
EAN
SMITH MOUNTAIN
LAKE
WM. O. HUSKE
LOCK & DAM
SC
OTL
AN
D
EDGECOMBE
MARTIN
DAVIE
GUILFORD
Cape Hatteras
Cape Lookout
Cape Fear
HARNETT
LEE
605040302010020
SCALE IN MILES
W. KERR
SCOTT DAM
& RESERVOIR
JOHN H. KERR DAM & RESERVOIR
B. EVERETT
JORDAN DAM
& LAKE
LOCK & DAM
NO. 2
LOCK & DAM
NO. 1
Raleigh
PLAN
NORTH
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
RESERVOIR RD.
NC HIGHWAY 268
RANGER RD.
OLD NC HIGHTWAY 268
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
WILIMINGTON DISTRICT
W. KERR SCOTT DAM & RESERVOIR
EROSION CONTROL PROJECT
WILKESBORO, NORTH CAROLINA
W912PM23B0008
TBD
MARCH 2024
SF
-0
5-
G
1_ C
O
VE
R -S
H
EE
T.
D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C O
VE
R
S H
EE
T
G001
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
US Army Corps of Engineers ®
Approval Recommended: *
Approved: *
DATE
DATE
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
CHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET G001.
PROJECT LOCATION
VICINITY MAP
N.T.S
SPILLWAY REVETMENT
SOUTH ABUTMENT RIP RAP
SLOPE STABILIZATION
PLAN
NORTH
SHEET LIST
Sheet Number Sheet Title
G001 COVER SHEET
V101 EXISTING CONDITIONS
B101 GEOTECHNICAL HAND AUGER LOCATION MAP
CD101 DEMOLITION SHEET - CLEARING & GRUBBING LIMITS
CG101 PROPOSED SPILLWAY REVETMENT
CG102 SOUTH ABUTMENT PROPOSED RIP RAP GRADING & STABILIZATION
CG103 SOUTH ABUTMENT RIP RAP REVETMENT OPTION
CG104 EROSION & SEDIMENT CONTROL PLAN SPILLWAY
CG105 EROSION & SEDIMENT CONTROL PLAN SOUTH ABUTMENT
CG301 SOUTH ABUTMENT RIP RAP CROSS SECTIONS STA. 0+00 TO STA. 2+25
CG302 SOUTH ABUTMENT RIP RAP CROSS SECTIONS STA. 2+50 TO STA. 3+25
CG303 SOUTH ABUTMENT RIP RAP CROSS SECTIONS STA. 3+50 TO 5+50
CG501 SPILLWAY & SOUTH ABUTMENT CONSTRUCTION DETAILS
CG502 EROSION & SEDIMENT CONTROL DETAILS AND NOTES
CG503 EROSION & SEDIMENT CONTROL DETAILS
CG504 EROSION & SEDIMENT CONTROL DETAILS (CONTINUED)
CG505 EROSION & SEDIMENT CONTROL DETAILS (CONTINUED)
RTA SET
Approval Recommended: *
Approved: *
DATE
DATE
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
CHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET G001.
HARRIS.PATRICK.KEVIN.1410079573
Date: 2024.03.27 14:23:53-04'00'
Digitally signed by
MURPHY.TAMARA.C.1386322240
Date: 2024.03.27 15:10:33-04'00'
3/26/24
3/26/24
GENERAL SHEET NOTES:
1. Dates of Survey:
Ground Survey: 17-18 April Hydrographic Survey: 18-19 April UAS Survey: 19 April
2. Methods of Survey:
The ground survey was conducted along the bank of the emergency spillway, from the waterline to 50 ft upland, and along the right abutment, from the dam to the first upstream cove and from the parking lot to the waterline. Additionally, the centerline and two tops of the dam were collected.
The hydrographic survey was conducted from the toe of the dam to the first cove on each side of the dam.
The UAS survey was conducted in two flights. One flight was along the dam and the other was along the emergency spillway.
3. Surface construction:
The surface was created by combining data from all three survey methodologies, placing an emphasis on data collected during the ground survey.
The hydrographic data was converted to a 25 ft grid prior to integration.
The density of the point cloud produced by the UAS survey was reduced using the thinning process available in Global Mapper. It was then further reduced by removing the points associated with buildings, guardrails, lampposts, and other features to create a bare earth surface.
4. The Global Navigation Satellite System (GNSS) was used to perform a portion of this survey and the following information was used:
(1)Class of Survey: Class A (6) Pub/Fixed Control Used: VRS (2)Positional Accuracy: 0.04' (7) Geoid Model: 2018 (3)Dates of Survey: 04/17/2023 - 04/19/2023 (8) Combined Grid Factor: 1.0000545 (4)GPS Field Procedure: RTK (9)Units: US Survey Feet (5)Datum/Epoch: NAD83(2011)
5. There is a boat ramp located below the visitor center. The next closest boat ramp is located at the Skyline Marina, but Contractor will need to contact the owner for access. Any agreement between Contractor and the Marina will be at no additional expense to the Government.
1058.52
ECM
1106.81
ECM
1090.44
ECM
1107.09
ECM
1107.18
ECM
95 10
W. KERR SCOTT RESERVOIR
NORMAL WATER SURFACE
ELEVATION: 1030'
W. KERR SCOTT RESERVOIR
NORMAL WATER SURFACE
ELEVATION: 1030'
SIGN
NATURE
TRAIL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
V1
_E
XI
ST
IN
G _C
O N
D
IT
IO
N
S.
D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
TO
PO
G
R
AP
H
IC
S U
R
VE
Y
V101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
LEGEND
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
NOTHING FOUND OR SET
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
TIE LINE
PROPERTY LINE (NOT SURVEYED)
(R)
PROPERTY LINE (SURVEYED)
EDGE OF ROAD
SCALE: 1"=150'
EXISTING MAJOR CONTOUR
EDGE OF WATER
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
Feet 0 150 300
WKS-23
-H
A-04
WKS-23
-H
A-05
WKS-23
-H
A-06
WKS-23
-G
S-03
WKS-23
-H
A-01
WKS-23
-H
A-02
HAND AUGER LOCATION
POINT NO.
ELEVATION
1031.00
1050.00
1044.00
1033.00
1034.00
1035.00
NORTHING
874,485.00
874,459.00
874,465.00
875,406.00
875,458.00
875,572.00
EASTING
1,342,320.00
1,342,379.00
1,342,365.00
1,341,694.00
1,341,799.00
1,341,937.00
DESCRIPTIONS
WKS-23-GS-03
WKS-23-HA-01
WKS-23-HA-02
WKS-23-HA-04
WKS-23-HA-05
WKS-23-HA-06
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
B1
_H
AN
D -A
U G
ER
_I
N
FO
.D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
LO
C
AT
IO
N M
AP
G
EO
TE
C H
N
IC
AL
H
AN
D
A U
G
ER
B101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES
1. HAND AUGER LOCATIONS ARE APPROXIMATE AS THEY
WERE LOCATED BY HANDHELD GPS.
2. DURING HAND AUGER OPERATIONS IT WAS NOTED THAT
ROCK WAS ENCOUNTERED WITHIN 1FT OF THE EXISTING
SURFACE IN SOME LOCATIONS. PLEASE REFER TO THE
ATTACHMENTS IN SPECIFICATION 00 01 15 FOR BORE
LOG DATA AND LAB RESULTS FOR ADDITIONAL
INFORMATION.
Feet 0 50 100
1090.44
ECM
1000 10
95 10
N: 874,566.92 E: 1,342,392.57
N: 874,545.96 E: 1,342,423.11
N: 874,499.83 E: 1,342,409.15
N: 874,480.49 E: 1,342,396.99
N: 874,462.72 E: 1,342,393.43
N: 874,437.10 E: 1,342,403.86
N: 874,377.32 E: 1,342,433.49
N: 874,355.63 E: 1,342,438.38
N: 874,276.26 E: 1,342,368.48
N: 874,232.05 E: 1,342,332.89
N: 874,198.12 E: 1,342,328.29
N: 874,158.28 E: 1,342,316.60
N: 874,100.35 E: 1,342,249.36
N: 874,099.77 E: 1,342,280.48
N: 874,325.25 E: 1,342,428.89
PROPOSED DESIGN
GRADING LIMIT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C D
1_
D
EM
O
LI
TI
O
N .D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C
LE
AR
IN
G
G R
U
BI
N G
L
IM
IT
S
D
EM
O
LI
TI
O
N S
H
EE
ET
CD101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. CLEARING AND GRUBBING IS LIMITED TO THE ENVIRONMENTAL WINDOW OF 16 OCTOBER THRU
31 MARCH. SEE 01 57 19 - TEMPORARY ENVIRONMENTAL CONTROLS FOR MORE INFORMATION
REGARDING THE WINDOW.
2. CLEARING AND GRUBBING SHALL BE IN ACCORDANCE WITH SECTION 31 11 00 - CLEARING AND
GRUBBING OF THE SPECIFICATIONS.
LEGEND
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
NOTHING FOUND OR SET
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
TIE LINE
PROPERTY LINE (NOT SURVEYED)
(R)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NORTH ARROW
SCALE: 1" = 50'
Feet 0 50 100
CLEARING & GRUBBINING HATCH PATTERN
TROUT BUFFER HATCH PATTERN
PROPOSED DESIGN GRADING LIMIT
CG501A1A
0+00
1+00
2+00
3+00
4+00
5+
6+00
7+
8+00
9+
+0
10+45.82
CG501
A1B
PROPOSED TURBIDITY CURTAIN
N: 875,540.47 E: 1,341,516.84
N: 875,487.45 E: 1,341,557.34
N: 875,460.34 E: 1,341,568.41
N: 875,431.66 E: 1,341,575.95
N: 875,381.32 E: 1,341,580.84
N: 875,344.99 E: 1,341,579.36
N: 875,325.07 E: 1,341,582.12
N: 875,325.43 E: 1,341,598.34
N: 875,335.21 E: 1,341,598.08
N: 875,366.59 E: 1,341,632.66
N: 875,397.16 E: 1,341,685.99
N: 875,404.70 E: 1,341,702.75
N: 875,753.27 E: 1,342,141.72
N: 875,739.63 E: 1,342,116.00
N: 875,736.49 E: 1,342,113.14
N: 875,705.08 E: 1,342,098.28
N: 875,676.80 E: 1,342,088.66
N: 875,659.75 E: 1,342,074.41
N: 875,651.51 E: 1,342,048.83
N: 875,633.01 E: 1,342,029.11
N: 875,631.44 E: 1,342,019.31
N: 875,626.84 E: 1,342,011.59
N: 875,621.45 E: 1,342,008.13
N: 875,621.10 E: 1,342,002.12
N: 875,403.16 E: 1,341,740.40
N: 875,411.19 E: 1,341,761.38
N: 875,423.79 E: 1,341,762.14
N: 875,446.88 E: 1,341,794.33
N: 875,525.30 E: 1,341,870.81
N: 875,548.68 E: 1,341,924.37
N: 875,588.68 E: 1,341,961.01
N: 875,603.12 E: 1,341,965.83
N: 875,613.85 E: 1,341,990.99
W. KERR SCOTT RESERVOIR
NORMAL WATER SURFACE ELEVATION: 1030'
CENTERLINE OFFSET
LW
L
LW
L
LW
L
LW
L
LWL
LWL
LWL
LWL
LWL
LWL
LWL
LWL
CONSTRUCTION LIMITS
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
BASELINE POINT TABLE
No.
NORTHING
875,532
875,517
875,517
875,519
875,519
875,518
875,509
875,500
875,484
875,473
875,461
875,438
875,428
875,424
875,410
875,399
875,384
875,369
875,357
875,344
EASTING
1,341,509
1,341,515
1,341,520
1,341,521
1,341,521
1,341,522
1,341,533
1,341,538
1,341,548
1,341,551
1,341,559
1,341,563
1,341,564
1,341,562
1,341,566
1,341,566
1,341,572
1,341,568
1,341,567
1,341,569
BASELINE POINT TABLE
No.
NORTHING
875,338
875,332
875,329
875,324
875,319
875,318
875,318
875,316
875,311
875,311
875,313
875,313
875,317
875,319
875,319
875,324
875,333
875,336
875,345
875,350
EASTING
1,341,574
1,341,574
1,341,574
1,341,572
1,341,572
1,341,572
1,341,570
1,341,571
1,341,576
1,341,577
1,341,583
1,341,590
1,341,605
1,341,607
1,341,607
1,341,610
1,341,606
1,341,607
1,341,614
1,341,620
BASELINE POINT TABLE
No.
NORTHING
875,353
875,355
875,357
875,358
875,358
875,366
875,367
875,367
875,371
875,372
875,387
875,388
875,396
875,394
875,397
875,397
875,393
875,392
875,393
875,397
EASTING
1,341,626
1,341,632
1,341,634
1,341,638
1,341,642
1,341,651
1,341,653
1,341,655
1,341,668
1,341,669
1,341,691
1,341,691
1,341,696
1,341,703
1,341,707
1,341,722
1,341,740
1,341,741
1,341,750
1,341,754
BASELINE POINT TABLE
No.
NORTHING
875,405
875,405
875,407
875,414
875,420
875,423
875,436
875,444
875,445
875,447
875,457
875,458
875,463
875,475
875,477
875,478
875,481
875,481
875,478
875,485
EASTING
1,341,767
1,341,767
1,341,773
1,341,768
1,341,772
1,341,774
1,341,798
1,341,805
1,341,806
1,341,811
1,341,819
1,341,824
1,341,824
1,341,837
1,341,836
1,341,837
1,341,842
1,341,842
1,341,849
1,341,849
BASELINE POINT TABLE
No.
NORTHING
875,494
875,507
875,510
875,518
875,519
875,519
875,520
875,532
875,533
875,535
875,542
875,549
875,550
875,562
875,564
875,581
875,598
875,601
875,606
875,614
EASTING
1,341,857
1,341,873
1,341,875
1,341,877
1,341,882
1,341,895
1,341,902
1,341,913
1,341,921
1,341,924
1,341,930
1,341,938
1,341,948
1,341,958
1,341,966
1,341,967
1,341,970
1,341,975
1,341,995
1,342,004
BASELINE POINT TABLE
No.
NORTHING
875,615
875,614
875,612
875,612
875,621
875,622
875,626
875,631
875,632
875,633
875,644
875,649
875,650
875,650
875,651
875,670
875,693
875,693
875,708
875,715
EASTING
1,342,005
1,342,008
1,342,009
1,342,014
1,342,020
1,342,028
1,342,038
1,342,041
1,342,041
1,342,042
1,342,055
1,342,074
1,342,077
1,342,078
1,342,081
1,342,097
1,342,104
1,342,104
1,342,113
1,342,115
BASELINE POINT TABLE
No.
NORTHING
875,725
875,732
875,734
875,735
875,749
875,750
EASTING
1,342,115
1,342,120
1,342,123
1,342,125
1,342,145
1,342,145
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
1_
SP
IL
LW
AY
_R
IP
R
AP
.D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
R
IP
R
AP
R
EV
ET
M
EN
T
PR
O
PO
SE
D S
PI
LL
W
AY
CG101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE
MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY (NCDEQ) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SEE
SHEETS CG103 & CG104 FOR EROSION AND SEDIMENT CONTROL PLAN.
4. GOVERNMENT HAS OBTAINED NECESSARY PERMITS NEEDED TO PERFORM THE WORK, BUT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT
CLOSE OUT.
5. SEE CG103 FOR VISUAL REPRESENTATION & CG501 - DETAIL A1A & A1B FOR RIP RAP
REVETMENT TYPICAL SECTION.
6. CONTRACTOR SHALL FIELD VERIFY ELEVATIONS AND LOCATIONS PRIOR TO EARTH MOVING
ACTIVITIES.
7. CONSTRUCTION BASELINE IS BASED ON THE EDGE OF WATER OF THE SURVEY DATES 17-18
APRIL 2023, 18-19 APRIL 2023, & 19 APRIL 2023.
LEGEND
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
NOTHING FOUND OR SET
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
TIE LINE
PROPERTY LINE
(R)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NORTH ARROW
SCALE: 1" = 50'
Feet 0 50 100
TROUT BUFFER (25FT)
TURBIDITY CURTAIN
CONSTRUCTION LIMITS
LWL LWL
SILT FENCE
SF SF
5+
.3
0+
1+
2+
3+
4+
5+00
5 10
00 10 05 10
50 10
55 1060
1065 10
90 10
PROPOSED TURBIDITY CURTAIN
W. KERR SCOTT RESERVOIR
NORMAL WATER SURFACE ELEVATION: 1030' A2
CG50
N: 874,587.20 E: 1,342,377.37 N: 874,589.65
E: 1,342,399.55 N: 874,584.15 E: 1,342,408.36
N: 874,564.81 E: 1,342,412.03
N: 874,547.52 E: 1,342,395.06
N: 874,506.02 E: 1,342,389.76
N: 874,497.22 E: 1,342,374.67
BA
SE
C
LI
N
O
PT
IO
N
AL
C
LI
N
SF
SF
BASELINE OFFSET
LW
L
LW
L
LWL
N: 874,488.70 E: 1,342,349.31
CONSTRUCTION LIMITS
LW
L
LW
L
LW
L
LW
L
LWL
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LWL
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LWL
CL
6.00'
3.00'
FLOW@ MIN. 2.00%
SURFACE COURSE
TRAILBED
BASE CLIN BASELINE
POINT TABLE
No.
NORTHING
874,587.20
874,585.28
874,581.42
874,573.10
874,550.03
874,533.94
874,527.20
874,514.86
874,489.11
874,488.13
874,487.19
874,475.53
EASTING
1,342,377.37
1,342,375.14
1,342,372.77
1,342,369.55
1,342,362.40
1,342,344.70
1,342,332.23
1,342,326.16
1,342,325.56
1,342,325.70
1,342,326.05
1,342,334.14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
2_
SO
U
TH
_A
BU
TM
EN
T.
D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
PL
AN
V
IE
W
BA
SE
B
ID
PR
O
PO
SE
D R
IP
R
AP
G
R
AD
IN
G
S
TA
BI
LI
ZA
TI
O
N
SO
U
TH
A
BU
TM
EN
T
CG102
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT THE CONTRACTOR
SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT CLOSE OUT.
5. SEE SHEET CG104 FOR EROSION & SEDIMENT CONTROL PLAN AS WELL AS A VISUAL REPRESENTATION, CG301 &
CG302 FOR CROSS SECTIONS, AND CG501 FOR DETAILS.
6. EXISTING WALKING TRAIL LOCATION IS BASED ON GIS SHAPEFILE. CONTRACTOR SHALL FIELD VERIFY TRAIL LOCATION PRIOR TO ANY GRADING OR EXCAVATION WORK. IF THE WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND HIS/HER REPRESENTATIVE.
7. IF WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING AREA OR IS ALTERED DUE TO CONSTRUCTION CONTRACTOR SHALL REPLACE THE WALKING TRAIL TO THE SAME OR BETTER CONDITION. SEE DETAIL ON THIS
PAGE FOR FURTHER INFORMATION.
8. NO CONSTRUCTION WORK OR EQUIPMENT IS TO OCCUR ON THE FACE OF THE DAM. THE DEMARCATION FOR
THIS NO WORK ZONE WILL BE DENOTED BY THE GROIN OF THE DAM.
Feet 0 50 100
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
(R)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
LEGEND
NOTHING FOUND OR SET
TIE LINE
PROPERTY LINE
NORTH ARROW
SCALE: 1"=50'
EXISTING MINOR CONTOUR
EXISTING NATURE TRAIL
TYPICAL WALKING TRAIL DETAIL
N.T.S
SF SF
PROPOSED SILT FENCE
CONSTRUCTION LIMIT
LWL LWL LWL
5+
.3
0+
1+
2+
3+
4+
5+00
5 10
00 10 05 10
50 10
55 1060
1065 10
90 10
PROPOSED TURBIDITY CURTAIN
W. KERR SCOTT RESERVOIR
NORMAL WATER SURFACE ELEVATION: 1030'
A2 C
G
N: 874,587.20 E: 1,342,377.37 N: 874,589.65
E: 1,342,399.55 N: 874,584.15 E: 1,342,408.36
N: 874,564.81 E: 1,342,412.03
N: 874,547.52 E: 1,342,395.06
N: 874,506.02 E: 1,342,389.76
N: 874,497.28 E: 1,342,374.66
N: 874,489.10 E: 1,342,378.48
N: 874,475.29 E: 1,342,370.32
N: 874,474.78 E: 1,342,365.37
N: 874,453.98 E: 1,342,368.47 N: 874,437.16 E: 1,342,367.08
N: 874,422.39 E: 1,342,389.72
N: 874,369.01 E: 1,342,411.42
N: 874,334.76 E: 1,342,410.17
N: 874,314.94 E: 1,342,381.11
N: 874,303.65 E: 1,342,365.74
N: 874,292.42 E: 1,342,341.59
N: 874,273.71 E: 1,342,328.03
N: 874,246.38 E: 1,342,294.33 N: 874,237.15 E: 1,342,286.20
N: 874,211.39 E: 1,342,286.85
N: 874,191.63 E: 1,342,305.55
N: 874,172.74 E: 1,342,292.02 N: 874,168.41 E: 1,342,293.17
N: 874,159.23 E: 1,342,287.49N: 874,127.72
E: 1,342,265.28 N: 874,120.05 E: 1,342,265.29
N: 874,359.67 E: 1,342,409.64
BA
SE
C
LI
N
O
PT
IO
N
AL
C
LI
N
SF
SF
BASELINE OFFSET
LW
L
LW
L
LW
L
LW
L
LWL
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LWL
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LW
L
LWL
CL
6.00'
3.00'
FLOW@ MIN. 2.00%
SURFACE COURSE
TRAILBED
BASE CLIN
BASELINE POINT TABLE
No.
NORTHING
874,587.20
874,585.28
874,581.42
874,573.10
874,550.03
874,533.94
874,527.20
874,514.86
874,489.11
874,488.13
874,487.19
874,475.53
EASTING
1,342,377.37
1,342,375.14
1,342,372.77
1,342,369.55
1,342,362.40
1,342,344.70
1,342,332.23
1,342,326.16
1,342,325.56
1,342,325.70
1,342,326.05
1,342,334.14
OPTIONAL CLIN
BASELINE POINT TABLE
No.
NORTHING
874,445.81
874,431.33
874,430.84
874,418.99
874,415.16
874,400.27
874,390.92
874,387.74
874,375.51
874,368.15
874,359.97
874,359.98
874,353.62
874,349.22
874,345.73
874,333.86
874,326.88
874,325.88
874,317.75
874,305.95
EASTING
1,342,330.21
1,342,331.15
1,342,331.10
1,342,328.68
1,342,325.54
1,342,321.84
1,342,318.16
1,342,317.50
1,342,304.98
1,342,301.66
1,342,294.72
1,342,293.10
1,342,289.64
1,342,283.43
1,342,272.00
1,342,267.24
1,342,266.94
1,342,267.02
1,342,269.50
1,342,262.25
OPTIONAL CLIN
BASELINE POINT TABLE
No.
NORTHING
874,294.09
874,290.36
874,257.07
874,249.26
874,240.63
874,233.78
874,226.51
874,219.96
874,205.43
874,212.63
874,191.29
874,189.79
874,185.16
874,163.41
874,151.11
874,146.55
874,131.00
EASTING
1,342,263.70
1,342,263.58
1,342,252.09
1,342,251.97
1,342,249.31
1,342,250.39
1,342,248.67
1,342,243.04
1,342,241.67
1,342,239.74
1,342,235.87
1,342,235.99
1,342,225.23
1,342,231.50
1,342,232.55
1,342,233.47
1,342,233.90
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
3_
O
PT
S O
U
TH
A
BU
TM
EN
T.
D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
R
IP
R
AP
R
EV
ET
M
EN
T
- O
PT
IO
N
SO
U
TH
A
BU
TM
EN
T
CG103
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
Feet 0 50 100
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
(R)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
LEGEND
NOTHING FOUND OR SET
TIE LINE
PROPERTY LINE
NORTH ARROW
SCALE: 1"=50'
EXISTING MINOR CONTOUR
EXISTING NATURE TRAIL
SF SF
PROPOSED SILT FENCE
CONSTRUCTION LIMIT
LWL LWL LWL
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT THE CONTRACTOR
SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT CLOSE OUT.
5. SEE SHEET CG104 FOR EROSION & SEDIMENT CONTROL PLAN AS WELL AS A VISUAL REPRESENTATION, CG301 &
CG302 FOR CROSS SECTIONS, AND CG501 FOR DETAILS.
6. EXISTING WALKING TRAIL LOCATION IS BASED ON GIS SHAPEFILE. CONTRACTOR SHALL FIELD VERIFY TRAIL LOCATION PRIOR TO ANY GRADING OR EXCAVATION WORK. IF THE WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND HIS/HER REPRESENTATIVE.
7. IF WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING AREA OR IS ALTERED DUE TO CONSTRUCTION CONTRACTOR SHALL REPLACE THE WALKING TRAIL TO THE SAME OR BETTER CONDITION. SEE DETAIL ON THIS
PAGE FOR FURTHER INFORMATION.
8. NO CONSTRUCTION WORK OR EQUIPMENT IS TO OCCUR ON THE FACE OF THE DAM. THE DEMARCATION FOR
THIS NO WORK ZONE WILL BE DENOTED BY THE GROIN OF THE DAM.
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT THE CONTRACTOR
SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT CLOSE OUT.
5. SEE SHEET CG104 FOR EROSION & SEDIMENT CONTROL PLAN AS WELL AS A VISUAL REPRESENTATION, CG301 &
CG302 FOR CROSS SECTIONS, AND CG501 FOR DETAILS.
6. EXISTING WALKING TRAIL LOCATION IS BASED ON GIS SHAPEFILE. CONTRACTOR SHALL FIELD VERIFY TRAIL LOCATION PRIOR TO ANY GRADING OR EXCAVATION WORK. IF THE WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER AND HIS/HER REPRESENTATIVE.
7. IF WALKING TRAIL FALLS WITHIN THE PROPOSED GRADING AREA OR IS ALTERED DUE TO CONSTRUCTION CONTRACTOR SHALL REPLACE THE WALKING TRAIL TO THE SAME OR BETTER CONDITION. SEE DETAIL ON THIS
PAGE FOR FURTHER INFORMATION.
8. NO CONSTRUCTION WORK OR EQUIPMENT IS TO OCCUR ON THE FACE OF THE DAM. THE DEMARCATION FOR
THIS NO WORK ZONE WILL BE DENOTED BY THE GROIN OF THE DAM.
TYPICAL WALKING TRAIL DETAIL
N.T.S
CG501A1
0+00
1+
2+
3+
4+00
5+
6+00
7+
8+
9+
+0
+0
11+30.44
RR
M
TS
PS
M
TS
PS
M
TS
PS
M
TS
PS
RR
RR
CESC
PROPOSED HAUL ROUTE
PROPOSED TURBIDITY CURTAIN
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
M
TS
PS
M
TS
PS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
3_
ES
C
_S
PI
LL
W
AY
.D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
SP
IL
LW
AY
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
PL
AN
CG104
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE
MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY (NCDEQ) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SEE
SHEETS CG502 - CG505 FOR EROSION AND SEDIMENT CONTROL NOTES.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT
CLOSE OUT.
5. SEE CG501 - DETAIL A1A & A1B FOR RIP RAP REVETMENT TYPICAL SECTIONS.
6. CONTRACTOR SHALL WORK WITH CONTRACTING OFFICER OR HIS/HER REPRESENTATIVE TO
DETERMINE LAYDOWN AREAS AND HAUL ROUTES.
LEGEND
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
NOTHING FOUND OR SET
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
TIE LINE
PROPERTY LINE
(R)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NORTH ARROW
SCALE: 1" = 50'
Feet 0 50 100
KEY NOTES:
SILT FENCE
RIP RAP - CLASS I
TEMPORARY SEEDING
PERMANENT SEEDING
MULCHING
CONSTRUCTION ENTRANCE
STREAM CROSSING
M
PS
TS
RR CE
RIP RAP HATCH PATTERN
LAYDOWN AREA HATCH PATTERN
SC
EROSION & SEDIMENT CONTROL NOTES:
1. OWNER: UNITED STATES OF AMERICA. PARCEL ID/PIN: 1101130 / 3837-83-0047
2. SHEET AREA DISTURBANCE: 1 ACRE.
3. PRE-DEVELOPMENT RUNOFF: Q2= ±0.19 Q10= ±0.30
POST DEVELOPMENT RUNOFF: Q2= ±0.57 Q10= ±0.80
4. ALL BANK REPAIRS, STABILIZATION, GRADING, OR ANY OTHER DISTURBANCES WITHIN THE
25-FOOT BUFFER ZONE SHALL BE COMPLETED BY THE END OF EACH DAY. WORK SHALL BE
SCHEDULED SO THAT AT THE END OF EACH DAY BARE GROUND IS NOT EXPOSED AND ALL
DISTURBED AREAS INCLUDING BANKS SHALL HAVE AN ADEQUATE TEMPORARY OR
PERMANENT GROUND COVER IN PLACE.
5. CONTRACTOR SHALL INSTALL & MAINTAIN EROSION CONTROL DEVICES SUFFICIENT TO
CONTAIN SEDIMENT AROUND ANY ERODIBLE MATERIAL STOCKPILE AREAS AS DIRECTED. NO
EARTHEN-MATERIAL STOCKPILE OR STAGING AREA SHALL BE LOCATED WITH-IN 25-FOOT
BUFFER ZONE OF ANY SURFACE WATER CLASSIFIED AS TROUT WATERS BY
ENVIRONMENTAL MANAGEMENT COMMISSION.
TROUT BUFFER HATCH PATTERN
SF
SILT FENCE
SF SF
PROPOSED HAUL ROUTE
PROPOSED TURBIDITY CURTAIN
0+
1+
2+
3+
4+
5+00
5+
.3
LW
L
LW
L
LW
L
LW
L
LW
L
LWL
LW
L
LW
L
LW
L
LWL
SF
SF
RR
M
TS
RR
RR
PS
TS
CE
RECP
PS
M
TS
MPS
RECP
RECP
SF
SF
SF
SF
OFFSET BASELINE
PROPOSED DESIGN
GRADING LIMIT
CONSTRUCTION LIMITS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
4_
ES
C
_S O
U
TH
_A
BU
TM
EN
T.
D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
SO
U
TH
A
BU
TM
EN
T
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
PL
AN
CG105
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE MOST
RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
(NCDEQ) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SEE SHEETS
CG502 - CG505 FOR EROSION AND SEDIMENT CONTROL NOTES.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT THE
CONTRACTOR SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT CLOSE OUT.
5. SEE CG501 - DETAIL A2 FOR RIP RAP SLOPE STABILIZATION TYPICAL SECTION.
6. CONTRACTOR SHALL WORK WITH CONTRACTING OFFICER OR HIS/HER REPRESENTATIVE TO
DETERMINE LAYDOWN AREAS AND HAUL ROUTES.
LEGEND
USACE CONTROL POINT
FOUND 2" ALUMINUM CAP MONUMENT
NOTHING FOUND OR SET
RECORD FROM "PLAT OF FAMILY HOUSING
PARCEL - D" DATED MARCH 28, 2008. RECORD
DISTANCES ARE IN U.S. SURVEY FEET.
CONSTRUCTION FENCE
TIE LINE
PROPERTY LINE (NOT SURVEYED)
(R)
PROPERTY LINE (SURVEYED)
EDGE OF ROAD
EXISTING MAJOR CONTOUR
EDGE OF WATER
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
NORTH ARROW
SCALE: 1" = 50'
Feet 0 50 100
KEY NOTES:
SILT FENCE
RIP RAP - CLASS I
TEMPORARY SEEDING
PERMANENT SEEDING
MULCHING
CONSTRUCTION ENTRANCE
STREAM CROSSING
ROLLED EROSION CONTROL PRODUCT
M
PS
TS
RR CE
RIP RAP HATCH PATTERN
LAYDOWN AREA HATCH PATTERN
SC
EROSION & SEDIMENT CONTROL NOTES:
1. OWNER: UNITED STATES OF AMERICA. PARCEL ID/PIN: 1101130 / 3837-83-0047
2. SHEET AREA DISTURBANCE: ±1.0 ACRE.
3. PRE-DEVELOPMENT RUNOFF: Q2 = ±0.7575 CFS Q10= ±1 CFS
POST DEVELOPMENT RUNOFF: Q2= ±2.783 CFS Q10= ±3.7 CFS
4. ANY DISTURBED AREAS SHALL BE SEEDED AND MULCHED. ONCE CONSTRUCTION IS COMPLETED
DISTURBED AREAS ARE TO BE PERMANENTLY SEEDED.
RECP
RECP AREA HATCH PATTERN
TROUT BUFFER HATCH PATTERN
SF
PROPOSED SILT FENCE
SF SF
CONSTRUCTION LIMITS
LWL LWL
WALKING TRAIL
0+25
0 200-20-40
0+75
0 200-20-40
1+25
0 200-20-40-60
1+75
0 200-20-40
2+25
0 200-20-40
0+00
0 200-20-40
0+50
0 200-20-40
1+00
0 200-20-40-60
1+50
0 200-20-40-60
2+00
0 200-20-40
EXISTING
GROUND
PROPOSED
GROUND
PROPOSED
CUT
PROPOSED GROUND
PROPOSED FILL
EXISTING
GROUND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
1_
C R
O
SS
_S
EC
TI
O
N S.
D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C R
O
SS
S
EC
TI
O
N S
- S
TA
. 0 +0
TO
S
TA
. 2 +2
R
IP
R
AP
S
LO
PE
S
TA
BI
LI
ZA
TI
O N
SO
U
TH
A
BU
TM
EN
T
CG301
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
LEGEND
EXISTING GROUND
PROPOSED GROUND
WATER SURFACE_____
FILL HATCH PATTERN
CUT HATCH PATTERN
Feet 0 20 40
SCALE: 1" = 20'
NOTES:
1. RIP RAP NOT SHOWN FOR CLARITY. SEE GG501 FOR DETAILS AND LIMITS.
2+75
0 200-20-40-60-80-100
3+25
0 200-20-40-60-80
3+75
0 200-20-40-60
4+25
0 200-20-40
2+50
0 200-20-40-60-80-100
3+00
0 200-20-40-60-80-100
3+50
0 20 400-20-40-60-80
4+00
0 200-20-40-60
4+50
0 200-20-40
EXISTING GROUND
PROPOSED CUT
PROPOSED GROUND
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
1_
C R
O
SS
_S
EC
TI
O
N S.
D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C R
O
SS
S
EC
TI
O
N S
- S
TA
. 2 +5
TO
S
TA
. 3 +2
R
IP
R
AP
S
LO
PE
S
TA
BI
LI
ZA
TI
O N
SO
U
TH
A
BU
TM
EN
T
CG302
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
LEGEND
EXISTING GROUND
PROPOSED GROUND
WATER SURFACE_____
FILL HATCH PATTERN
CUT HATCH PATTERN
Feet 0 20 40
SCALE: 1" = 20'
4+75
0 200-20-40-60
5+25
0 200-20-40-60
5+00
0 200-20-40-60
5+50
0 200-20-40
EXISTING GROUND
PROPOSED GROUND
PROPOSED CUT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
1_
C R
O
SS
_S
EC
TI
O
N S.
D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C R
O
SS
S
EC
TI
O
N S
- S
TA
. 3 +5
TO
S
TA
. 5 +5
R
IP
R
AP
S
LO
PE
S
TA
BI
LZ
IA
TI
O N
SO
U
TH
A
BU
TM
EN
T
CG303
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
LEGEND
EXISTING GROUND
PROPOSED GROUND
WATER SURFACE_____
FILL HATCH PATTERN
CUT HATCH PATTERN
Feet 0 20 40
SCALE: 1" = 20'
SCALE: 1"= 50'
TYPICAL SECTION DETAIL- RIPRAP REVETMENT.
STA. 0+00 TO 6+00
CG101
A-1A
SCALE: 1"=50'
TYPICAL SECTION DETAIL - RIPRAP
SLOPE STABILIZATION
CG102
A-2
NCDOT CLASS I RIP RAP
(2 LAYERS)
MIN. 24"
BEDDING STONE - NCDOT CLASS A RIP RAP
MIN. 12"
NON-WOVEN GEOTEXTILE FABRIC
EXISTING GROUND
2NORMAL LAKE LEVEL
ELEV. =1030'
TOP OF SLOPE
APPROX. ELEV. = 1035'
SCALE: 1"= 50'
TYPICAL SECTION DETAIL- RIPRAP REVETMENT.
STA. 6+00 TO 11+30
CG101
A-1B
2'
MIN.
2'
10'
TIE INTO EXISTING GROUND
VA
R
IE
S
NORMAL LAKE LEVEL
ELEV. =1030'
PROPOSED CUT
PROPOSED FINISHED GRADE
SURFACE STABILIZATION
(TEMP. SEEDING, PERMANENT
SEEDING, MULCHING, ROLLED
EROSION CONTROLLED
PRODUCTS)
NCDOT CLASS I RIP RAP
(2 LAYERS)
MIN. 24"
BEDDING STONE -
NCDOT CLASS A
RIP RAP STONE
12" MIN.
NON-WOVEN GEOTEXTILE FABRIC
PRIME COAT
COMPACTED
BACKFILL
EXIST PAV'T
12"
MIN. VARIES
SAW CUT
EXIST. STONE
BASE COURSE
SAME AS EXISTING
STONE BASE COURSE
6" MIN.
12"
MIN.
SURFACE COURSE
TACK COAT
2" BIT. CONC.
PAV'T EDGE
2'
2'
NCDOT CLASS I RIP RAP
(2 LAYERS)
MIN. 24"
EXISTING GROUND
NON-WOVEN GEOTEXTILE FABRIC
NORMAL LAKE LEVEL
ELEV. =1030'
TOP OF SLOPE
APPROX. ELEV. = 1033'
2'
2'
EXISTING GROUND
BEDDING STONE - NCDOT CLASS A RIP RAP STONE
MIN. 12"
1'
1'
COMPACTED BACKFILL
COMPACTED BACKFILL
SCALE: N.T.S
TYPICAL SECTION DETAIL- BITUMINOUS
PAVEMENT PATCHING
NOTES:
1. PATCH THE AREAS, IN THE OPINION OF THE CONTRACTING OFFICER
AND/OR HIS/HER REPRESENTATIVE, THAT NEED REPAIRING. THE
AREAS TO BE PATCHED WILL BE DELINEATED BY THE CONTRACTING
OFFICER AND/OR HIS/HER REPRESENTATIVE PRIOR TO THE
CONTRACTOR PERFORMING THE REPAIRS.
2. ANY DAMAGE TO THE EXISTING PAVEMENT AS A RESULT OF
COMPLETING THIS PROJECT WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR AT NO EXTRA EXPENSE TO THE GOVERNMENT.
· PLACE ASPHALT CONCRETE BASE COURSE IN LIFTS NOT
EXCEEDING 5.5 INCHES. UTILIZE COMPACTION EQUIPMENT
SUITABLE FOR COMPACTING PATCHES AS SMALL AS 3.5 FEET BY
6 FEET ON EACH LIFT. USE AN NCDOT APPROVED COMPACTION
PATTERN TO ACHIEVE PROPER COMPACTION. IF PATCHED
PAVEMENT IS TO BE OPEN TO TRAFFIC BETWEEN DECEMBER
THRU MARCH OF THE FOLLOWING YEAR, USE ASPHALT
CONCRETE INTERMEDIATE COURSE OR ASPHALT CONCRETE
SURFACE COURSE AS THE TOP LAYER OF THE PATCH.
· SCHEDULE OPERATIONS SO THAT ALL AREAS WHERE PAVEMENT
HAS BEEN REMOVED WILL BE REPAIRED ON THE SAME DAY OF
THE PAVEMENT REMOVAL AND ALL LANES OF TRAFFIC
RESTORED.
CONSTRUCTION METHODS:
VARIES
VARIES
COMPACTED BACKFILL
VARIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
1_
D
ET
AI
LS
.D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
SP
IL
LW
AY
S
O U
TH
A
BU
TM
EN
T
CG501
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
GENERAL SHEET NOTES:
1. RIPRAP STONE SHALL BE PLACED IN ACCORDANCE WITH SPECIFICATION 35 31 19 - STONE, CHANNEL, SHORELINE/COASTAL PROTECTION FOR STRUCTURES.
2. ALL GRADING SHALL BE IN ACCORDANCE WITH SPECIFICATION 31 00 00 - EARTHWORK.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE
MOST RECENT VERSION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL
QUALITY (NCDEQ) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
4. GOVERNMENT SHALL OBTAIN NECESSARY PERMITS NEED TO PERFORM THE WORK, BUT
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOR ALL WORK REQUIRED FOR PERMIT
CLOSE OUT.
5. CONTRACTOR SHALL FIELD VERIFY ELEVATIONS PRIOR TO START OF CONSTRUCTION.
6. GEOTEXTILE FILTER FABRIC SHALL EXTEND TO NEAR THE GROUND SURFACE TO PREVENT
MIGRATION AND/OR LOSS OF EXISTING SLOPE MATERIALS INTO THE RIP RAP AND BEDDING
STONE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
2_
ES
C
_D
ET
AI
LS
.D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
C O
N
ST
R U
C
TI
O N
E N
TR
AN
C E
TE
M P.
S
EE
D
IN
G S
C H
ED
U
LE
N
C D
EQ
D
ET
AI
LS
A
N D
N O
TE
S
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
L
CG502
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
EROSION & SEDIMENT CONTROL NOTES
PURPOSE:
PROVIDE BANK STABILIZATION TO THE SPILLWAY AND SOUTH ABUTMENT TO
PREVENT ADDITIONAL EROSION ESCARPMENT DUE TO WAVE ACTION AND OTHER
NATURAL OCCURRENCES SUCH AS WIND AND RAIN. THE PROJECT IS LOCATED IN
WILKESBORO, NORTH CAROLINA.
CONTACT PERSONNEL:
UNITED STATES ARMY CORPS OF ENGINEERS
THOMAS NICHOLSON - PHONE NUMBER: 366-921-3390
CONTRACTOR: (COMPANY NAME)
(CONTACT PERSON ON SITE - PHONE NUMBER)
PRELIMINARY CONSTRUCTION SEQUENCE (TO BE FINALIZED BY CONTRACTOR AND
CONTRACTING OFFICER):
· FINALIZE STAGING AREAS AND HAUL ROUTES WITH CONTRACTING OFFICER
AND/OR HIS/HER REPRESENTATIVE.
· INSTALL PROJECT SIGNS AND NOTICES.
· INSTALL TURBIDITY CURTAINS.
· INSTALL CONSTRUCTION ENTRANCES AND STREAM CROSSINGS.
· BEGIN CLEARING AND GRUBBING.
· BEGIN EXCAVATION WORK TO ESTABLISHED GRADES.
· MAINTAIN EROSION AND SEDIMENT CONTROL(S) DURING CONSTRUCTION.
· INSTALL RIP RAP REVETMENT / RIP RAP SLOPE STABILIZATION.
· INSTALL PERMANENT STABILIZATION FOR REMAINING PROJECT SITE, SUCH AS
PERMANENT SEEDING, MULCHING, OR ROLLED EROSION CONTROL PRODUCTS.
· ONCE CONSTRUCTION IS COMPLETE AND ALL PROJECT AREAS ARE
STABILIZED, REMOVE ANY REMAINING EROSION AND SEDIMENT CONTROL
MEASURES AND STABILIZE ANY AREAS DISTURBED BY THEIR REMOVAL.
· CONTRACTOR SHALL PROVIDE MAINTENANCE FOR A MINIMUM PERIOD OF 1
YEAR AFTER NOTICE OF COMPLETION. IF ANY PERMIT IS NOT CLOSED OUT
DURING THIS 1 YEAR PERIOD THE CONTRACTOR WILL BE RESPONSIBLE FOR
MAINTENANCE UNTIL THAT PERMIT IS CLOSED OUT.
LIST OF PROPOSED EROSION AND SEDIMENT CONTROL MEASURES:
· TEMPORARY SEEDING
· PERMANENT SEEDING
· MULCHING
· ROLLED EROSION CONTROL PRODUCTS (RECP)
· RIP RAP
· CONSTRUCTION ENTRANCE/EXIT
· STREAM CROSSING
· TURBIDITY CURTAIN
INSPECTION REQUIREMENTS:
· THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INSPECTIONS TO ENSURE
THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS BEING FOLLOWED.
· ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE PER
WEEK AND AFTER EACH STORM EVENT OF 1.0 INCHES OR MORE IN A 24-HOUR
PERIOD.
· ONCE THE PROJECT IS COMPLETED AND STABILIZED THE CONTRACTOR SHALL
NOTIFY THE CONTRACTING OFFICER OR HIS/HER REPRESENTATIVE, & THE
APPROPRIATE LAND QUALITY OFFICE A MINIMUM OF 10 DAYS IN ADVANCE FOR
A CLOSE OUT INSPECTION.
NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NOTES:
1. NO BUFFER/STREAM DISTURBING ACTIVITY SHALL TAKE PLACE WITHIN THE
TROUT BUFFER ZONE DURING THE TROUT SPAWNING PERIOD OF 15 OCTOBER
- 15 APRIL, UNLESS THE NORTH CAROLINA WILDLIFE RESOURCE COMMISSION
DETERMINES THAT THE MORATORIUM IS NOT APPLICABLE TO THIS PROJECT.
2. COMPLIANCE MUST BE MAINTAINED WITH THE SURFACE WATER QUALITY
TURBIDITY STANDARD (10 NTU IN STREAMS, LAKES, OR RESERVOIRS
DESIGNATED AS TROUT WATERS); IF TURBIDITY EXCEEDS THESE LEVELS DUE
TO NATURAL BACKGROUND CONDITIONS, THE EXISTING TURBIDITY LEVEL
SHALL NOT BE INCREASED. IF ANY EXCEEDANCE OCCURS AT ANY TIME
DURING THE PROJECT, ACTIVITY WITHIN THE BUFFER MUST CEASE
IMMEDIATELY. MORE PROTECTIVE EROSION AND SEDIMENTATION CONTROL
MEASURES MAY BE REQUIRED IN ORDER TO COMPLY WITH THIS WATER
QUALITY STANDARD. [G.S 113A-541(A), 15A NCAC 02B .0211 (21)].
3. ALL MATERIALS SHOULD BE ON HAND BEFORE ANY WORK IS STARTED. ALL
MATERIALS MUST BE STORED IN AN ORDERLY MANNER AWAY FROM
VEHICULAR TRAFFIC, NEAR THE CONSTRUCTION ENTRANCE, AND AWAY FROM
WATERWAYS OR STORM DRAINS IN APPROPRIATE CONTAINERS AND/OR
ENCLOSURES.
4. ALL BANK REPAIRS, STABILIZATION, GRADING OR ANY OTHER DISTURBANCES
WITHIN THE 25-FOOT BUFFER ZONE SHALL BE COMPLETED BY THE END OF
EACH DAY. WORK SHALL BE SCHEDULED SO THAT AT THE END OF EACH DAY
BARE GROUND IS NOT EXPOSED AND ALL DISTURBED AREAS INCLUDING
BANKS SHALL HAVE AN ADEQUATE TEMPORARY OR PERMANENT GROUND
COVER IN PLACE.
5. THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL DEVICES
SUFFICIENT TO CONTAIN SEDIMENT AROUND ANY ERODIBLE MATERIAL
STOCKPILE AREAS AS DIRECTED. NO EARTHEN-MATERIAL STOCKPILE OR
STAGING AREA SHALL BE LOCATED WITHIN THE 25-FOOT BUFFER ZONE OF
ANY SURFACE WATER CLASSIFIED AS TROUT WATERS BY THE
ENVIRONMENTAL MANAGEMENT COMMISSION.
6. SILT FENCING SHOULD BE PROVIDED AROUND ALL BORE PITS AND
ASSOCIATED WORK AREAS, INCLUDING SOIL STOCKPILES.
7. PLEASE NOTIFY NCDEQ REGIONAL OFFICE PRIOR TO THE PRE-CONSTRUCTION
CONFERENCE FOR THIS PROJECT BY CALLING (336) 776-9800 AND ASKING TO
SPEAK WITH THE LAND QUALITY INSPECTOR FOR WILKES COUNTY.
PERMISSION MUST BE OBTAINED AND GRANTED FROM NCDEQ - DEMLR PRIOR
TO THE REMOVAL OF ANY ESC MEASURES. [GS 11A-51, 15A NCAC 4B .0120]
8. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST
COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE
REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY
THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM
DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE
DISPOSED OF AT A FACILITY REGULATED BY DIVISION OF SOLID WASTE
MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION
OF WATER RESOURCES RULES AND REGULATIONS. [15A NCAC 4B .0110]
9. ADDITIONAL MEASURES MAY BE REQUIRED - THE APPLICANT IS RESPONSIBLE
FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND
SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE APPLICANT
MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM
LEAVING THIS SITE. [15A NCAC 4B .0115]
TEMPORARY SEEDING MAINTENANCE & SCHEDULE
SEE LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, CHAPTER 6 - II.
SURFACE STABILIZATION, 6.10 TEMPORARY SEEDING FOR COMPLETE GUIDANCE.
MAINTENANCE - RESEED AND MULCH AREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE
EROSION OCCURS, AS SOON AS POSSIBLE.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
3_
ES
C
_D
ET
AI
LS
-2 .D
W G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
PE
R
M
AN
EN
T
SE
ED
IN
G
S C
H
ED
U
LE
S N
C D
EQ
D
ET
AI
LS
ER
O
SI
O N
S
ED
IM
EN
T
C O
N
TR
O L
CG503
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
PERMANENT SEEDING SCHEDULES & MAINTENANCE
SEE LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
CHAPTER 6 - II. SURFACE STABILIZATION, 6.11 PERMANENT SEEDING FOR COMPLETE GUIDANCE.
DUST CONTROL
SEE LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
CHAPTER 6 - IX. OTHER RELATED PRACTICES, 6.84 DUST CONTROL FOR GUIDANCE.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SF
-0
5-
C G
4_
ES
C
_D
ET
AI
LS
_C O
N T.
D W
G
B.
M
AL
O
N
EY
T.
K
N
IG
H T
T.
K
N
IG
H T
T.
M
U R
PH
Y
M U
LC
H
IN
G
T
U R
BI
D
IT
Y
C U
R
TA
IN
D
ET
AI
LS
(C
O N
TI
N
U
ED
ER
O
SI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
PL
AN
CG504
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
IM
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
O R
TH
C
AR
O
LI
N
A
TB
D
M
AR
C H
D R
AW
IN
G C
O D
E
FI
LE
N
AM
E
AN
SI
D
W
2P M
B0
W . K
ER
R
S C
O
TT
D
AM
R
ES
ER
VO
IR
ER
O
SI
O
N C
O N
TR
O
L
PR
O
JE
C T
W
IL
KE
SB
O R
O , N
O R
TH
C
AR
O
LI
N
A
R
EA
D Y
TO
A
D
VE
R
TI
SE
R
TA
MULCHING MAINTENANCE & APPLICATION RATES
SEE LATEST NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
CHAPTER 6 - II. SURFACE STABILIZATION, 6.14 MULCHING FOR COMPLETE GUIDANCE.
MAINTENANCE: INSPECT ALL MULCHES PERIODICALLY, AND AFTER RAINSTORMS TO CHECK
FOR RILL EROSION, DISLOCATION, OR FAILURE. WHERE EROSION IS OBSERVED, APPLY
ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND
REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED.
TURBIDITY CURTAIN:
SEE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY EROSION AND SEDIMENT CONTROL
HANDBOOK, CHAPTER 3.27 FOR FULL GUIDANCE PERTAINING TO TURBIDITY CURTAINS.
DESIGN CRITERIA:
1. TYPE I (SEE PLATE 3.27-1) SHOULD BE USED IN PROTECTED AREAS WHERE THERE IS NO
CURRENT AND THE AREA IS SHELTERED FROM WIND AND WAVES.
2. TYPE II CONFIGURATION (SEE PLATE 3.27-1) SHOULD BE USED IN AREAS WHERE THERE
MAYBE SMALL TO MODERATE CURRENT RUNNING (UP TO 2 KNOTS OR 3.5 FEET PER
SECOND) AND/OR WIND AND WAVE ACTION CAN EFFECT THE CURTAIN.
3. TYPE III CONFIGURATION (SEE PLATE 3.27-2) SHOULD BE USED IN ARES WHERE
CONSIDERABLE CURRENT (UP TO 3 KNOTS OR 5 FEET PER SECOND) MAY BE PRESENT,
WHERE TIDAL ACTION MAY BE PRESENT AND/OR WHERE THE CURTAIN IS POTENTIALLY
SUBJECT TO WIND AND WAVE ACTION.
4. TURBIDITY CURTAINS SHOULD EXTEND THE ENTIRE DEPTH OF THE WATERCOURSE
WHENEVER THE WATERCOURSE IN QUESTION IS NOT SUBJECT TO TIDAL ACTION AND/OR
SIGNIFICANT WIND AND WAVE FORCES.
5. IN TIDAL AND/OR WIND AND WAVE ACTION SITUATIONS, THE CURTAIN SHOULD NEVER BE
SO LONG AS TO TOUCH THE BOTTOM. A MINIMUM 1-FT "GAP" SHOULD EXIST BETWEEN THE
WEIGHTED LOWER END OF THE SKIRT AND THE BOTTOM AT "MEAN" LOW WATER.
MOVEMENT OF THE LOWER SKIRT OVER THE BOTTOM DUE TO TIDAL REVERSES OR WIND
AND WAVE ACTION OF THE FLOTATION SYSTEM MAY FAN AND STIR SEDIMENTS ALREADY
SETTLED OUT.
6. IN TIDAL AND/OR WIND AND WAVE ACTION SITUATIONS, IT IS SELDOM PRACTICAL TO
EXTEND A TURBIDITY CURTAIN LOWER THAN 10 TO 12 FEET BELOW THE WATER SURFACE.
CURTAINS INSTALLED DEEPER THAN THIS WILL BE SUBJECT TO LARGE LOADS WITH
CONSEQUENT STRAIN ON CURTAIN MATERIALS AND MOORING SYSTEM.
7. TURBIDITY CURTAINS SHOULD BE LOCATED PARALLEL TO THE DIRECTION OF FLOW OF A
MOVING BODY OF WATER.
8. WHEN SIZING THE LENGTH OF THE FLOATING CURTAIN, ALLOW AN ADDITIONAL 10-20%
VARIANCE IN THE STRAIGHT LINE MEASUREMENTS TO ALLOW FOR ERRORS, EASIER
INSTALLATION, AND REDUCED STRESS FROM POTENTIAL WAVE ACTION DURING HIGH
WINDS.
9. AVIOD EXCESSIVE AMOUNT OF JOINTS IN THE CURTAIN; A MINIMUM CONTINUOUS SPAN OF
50 FEET BETWEEN JOINTS IS A GOOD "RULE OF THUMB".
10. FOR STABILITY REASONS, A MAXIMUM SPAN OF 100 FEET BETWEEN JOINTS (ANCHOR OR
STAKE LOCATIONS) IS ALSO A GOOD RULE TO FOLLOW.
11. THE ENDS OF THE CURTAIN, BOTH FLOATING UPPER AND WEIGHTED LOWER, SHOULD
EXTEND WELL UP INTO THE SHORELINE, ESPECIALLY IF HIGH WATER CONDITIONS ARE
EXPECTED. THE ENDS SHOULD BE SECURED FIRMLY TO THE SHORELINE (PREFERABLY TO
RIGID BODIES SUCH AS TREES) TO FULLY ENCLOSE THE AREA WHERE SEDIMENT MAY
ENTER THE WATER.
CONSTRUCTION SPECIFICATIONS:
1. BARRIERS SHOULD BE A BRIGHT COLOR ("INTERNATIONAL" ORANGE IS RECOMMENDED)
THAT WILL ATTRACT THE ATTENTION OF NEARBY BOATERS.
2. THE CURTAIN FABRIC MUST MEET THE MINIMUM REQUIREMENTS NOTED IN TABLE 3.27-A
3. SEAMS IN THE FABRIC SHALL BE EITHER VULCANIZED WELDED OR SEWN, AND SHALL
DEVELOP THE FULL STRENGTH OF THE FABRIC.
4. FLOATATION DEVICES SHALL BE FLEXIBLE, BUOYANT UNITS CONTAINED IN AN INDIVIDUAL
FLOATATION SLEEVE OR COLLAR ATTACHED TO THE CURTAIN. BUOYANCY PROVIDED BY
THE FLOATATION UNITS SHALL BE SUFFICIENT TO SUPPORT THE WEIGHT OF THE CURTAIN
AND MAINTAIN A FREEBOARD OF AT LEAST 3 INCHES ABOVE THE WATER SURFACE LEVEL.
5. LOAD LINES MUST BE FABRICATED INTO THE BOTTOM OF ALL FLOATING TURBIDITY
CURTAINS. TYPE II AND TYPE III MUST HAVE LOAD LINES ALSO FABRICATED INTO THE TOP
OF THE FABRIC. THE TOP LOAD LINE SHALL CONSIST OF WOVEN WEBBING OR
VINYL-SHEATHED STEEL CABLE AND SHALL HAVE A BREAK STRENGTH IN EXCESS OF
10,000 POUNDS. THE SUPPLEMENTAL (BOTTOM) LOAD-LINE SHALL CONSIST OF A CHAIN
INCORPORATED INTO THE BOTTOM HEM OF THE CURTAIN OF SUFFICIENT WEIGHT TO
SERVE AS BALLAST TO HOLD THE CURTAIN IN A VERTICAL POSITION. ADDITIONAL
ANCHORAGE SHALL BE PROVIDED AS NECESSARY. THE LOAD LINES SHALL HAVE SUITABLE
CONNECTING DEVICES WHICH DEVELOP THE FULL BREAKING STRENGTH FOR
CONNECTING TO LOAD LINES IN ADJACENT SECTIONS (SEE PLATES 3.27-1 AND 3.27-2
WHICH PORTRAY THE ORIENTATION).
6. EXTERNAL ANCHORS MAY CONSIST OF WOODEN OR METAL STAKES (2-x 4-INCH OR
2.5-INCH MINIMUM DIAMETER WOOD OR 1.33 POUNDS/LINEAR FOOT STEEL) WHEN TYPE I
INSTALLATION IS USED; WHEN TYPE II OR TYPE III INSSTALLATIONS ARE USED, BOTTOM
ANCHORS SHOULD BE USED.
7. BOTTOM ANCHORS MUST BE SUFFICIENT TO HOLD THE CURTAIN IN THE SAME POSITION
RELATIVE TO THE BOTTOM OF THE WATERCOURSE WITHOUT INTERFERING WITH THE
ACTION OF THE CURTAIN. THE ANCHOR MAY DIG INTO THE BOTTOM (GRAPPLING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .