View the file

Other files for this federal contract opportunity

Other files attached to Architecture and Engineering (AE) Services Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
W912PM22R0007 CONFORMING THROUGH AMENDMENT 05.pdf PDF
W912PM22R0007 AMENDMENT 04.pdf PDF
W912PM22R0007 AMENDMENT 03.pdf PDF
W912PM22R0007 AMENDMENT 02.pdf PDF
NOTICE OF FORTHCOMING AMENDMENT TO RFP W912PM22R0007 AMENDMENT 01.pdf PDF
W912PM22R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SECTION 4.5 updated - The correct Title of Project is, Architecture and Engineering (AE) Services Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contract (MATOC).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM22R0007

X 9B. DATED (SEE ITEM 11)

13-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2022

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: ANDREA GREEN

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM22R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

RVZ'D INSTRUCTIONS TO OFFERORS

GENERAL INSTRUCTIONS

AMENDMENT 02ADDS -

REVISED 05/17/2022

INSTRUCTIONS TO PROPOSERS

GENERAL INSTRUCTIONS & PROPOSAL FORMAT

SUBJECT: W912PM22R0007, Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Unrestricted Architect-Engineer (A-E) - Design Services to support the US Army Corps of Engineers - Wilmington District.

1. CONTRACT INFORMATION

1.1. This Request for Proposal (RFP) solicits for a Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award

Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of $49M in support of the Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the SAW and South Atlantic Division (SAD) under the North American Industry Classification System (NAICS) code is 541310, Building Architectural Design Services. The selection board will consider the most highly qualified offerors for up to five (5) Indefinite Delivery Contracts (IDC) contracts to be awarded as a result of this solicitation. The duration of the resulting contracts will include a one- (1) year base ordering period and four optional ordering periods of one (1) year each, with an additional six (6) month option under FAR Clause 52.217-8, Option to Extend Services, for a total of five (5) years and six (6) months (if all options are exercised) or until the contract limit is reached, whichever comes first. The estimated award date of the contract is December 2022.

1.2. This solicitation is UNRESTRICTED.

1.3. The wages and benefits of service employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act. The North American Industrial Classification System (NAICS) code for this project is 541310, which has a size standard of $7.5 million in average annual receipts.

1.4. CONTRACTOR MANPOWER REPORTING: The contractor shall report ALL contractor labor hours

(including subcontractor labor hours) required for performance of services provided under their contract via a secure data collection site at http://www.ecmra.mil/. Reporting inputs will be for the labor executed in each Government fiscal year (FY), which runs October 01 through September 30. While inputs may be reported at any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. The contractor may direct questions to the HelpDesk at http://www.ecmra.mil/.

1.5. REGISTRATION: Offerors shall have and maintain an active registration in the following databases:

https://beta.SAM.gov and System for Award Management (SAM) at http://www.sam.gov to be eligible for a Government contract award. It is the responsibility of interested parties to appropriately register SAM and beta.SAM and to monitor for notices, amendments, etc. Prospective Offerors are advised, to be eligible for award of the contract resulting from this solicitation requires an active SAM registration, to include satisfactory completion of the applicable online representation and certifications.

1.6. PROJECT INFORMATION: The firm(s) selected will be required to provide all phases of Planning, Engineering, and Design for military and civil programs which meets the definition of A-E Services as defined in 40 U.S.C. 1101 and FAR 2.101. AMENDMENT 03: Projects implementing requirem ents of UFC 4-010-06 , Cybersec urity of Facility Related Control Systems may be given additional consideration.

Tasks for the Military Program shall include, but are not limited to: Design Charrettes, Design Conferences, Parametric Design Reports, Parametric Estimating, Concept (35%) through Final Design and Submittal, Construction Contract Documents, Preparation of Design–Build Request for Proposal, Design–Build Evaluation Consultation, Interior Design, Architectural Renderings, Permitting, Value Engineering, Other Studies/Reports and Construction Phase Services.

1.6.1. Tasks for the Civil Works Program shall include, but are not limited to: Studies, Investigations, Design, Repairs and new construction in support of the Navigation and Lakes Branches (Falls Lake, Cape Fear Locks and Dams, Jordan Lake, Philpott Lake, W. Kerr Scott, John H. Kerr).

1.6.2. These contract(s) are intended primarily for projects within the geographical boundary of the USACE

South Atlantic Division – Wilmington District.

1.6.3. The selected firm must have the capability through in-house staff or consultants to perform Topographic and hydrographic Surveys, Subsurface Investigations, mapping, geotechnical and subsurface utility investigations, and hazardous material testing and abatement/remediation planning in conjunction with Design Task Orders. Unless otherwise indicated, design services and deliverable requirements will be developed using ERDC/ITL TR-12-6 A/E/C CADD Standard, Release 6.0. A variety of software may be utilized, potential software includes but is not limited to SPECSINTACT software for contract specifications, MCACES Second Generation (MII) software for cost estimates and Beach-fx for evaluating the physical performance and economic benefits and costs of shore protection projects or as specified in individual Task Order Scopes of Work. Responses to design review comments will be provided using the Government web-based Design Review and Checking System (DrChecks) located at www.projnet.org.

1.6.4. Projects to be performed under any subsequent awarded IDIQ’s from this solicitation may include project similar in size, scope and complexity listed to those found in the subsequent tables. It is anticipated that any of the below identified MILCON and O&M projects will be accomplishable by the most highly rated offerors with whom to fulfill these task orders.

1.6.5. Wilmington District Military Construction Projects. The planned contracts will provide design services of the below Military Construction projects (values show in thousands):

Table 1: Consolidated AE Requirements

PN # Project Name FY PA * Design Cost *

Charette Pre Design * Commissioning *

100850 SOF Joint Exploitation Training

Course UMMC 23 $4,400 $440 $75 $250 98901 Camp McKall Microgrid 24 $6,600 $660 $75 $250

92062 3rd Group Barracks

(Yarborough) 24 $31,000 $3,100 $75 $250

92397 SOF Operations Facility 26 $60,000 $6,000 $75 $250

92017 SOF Mission Command Center 26 $80,000 $8,000 $75 $250

94023 SOF Operational Ammunition

Supply Point 26 $76,000 $7,600 $75 $250 94765 SOF FOB Freedom Upgrades 26 $24,000 $2,400 $75 $250

92791 SOF Joint Intelligence Center 27 $57,000 $5,700 $75 $250

80777 SOF Battalion Operations

Facility 27 $41,000 $4,100 $75 $250

1.6.6. Wilmington District Military O&M Construction Projects The following table provides 3 year sample of awarded O&M design requirements for the Wilmington district and its customers.

1.7. Multiple Award Task Order Contract (MATOC) under which task orders will primarily include:

Development of Concept and Full Designs, Preparation of Project Definition and Programming Documents, Charrettes, Preparation of Technical Portions of Design-Build and Design-Bid-Build Solicitations, Commissioning and Construction Phase Services, Design Analysis and Detailed Construction Plans and Specifications. Additionally, Military task orders may include: Engineering Studies, Investigations, Life Cycle Cost Analyses (LCCA), Surveying (including topographic, hydrographic, boundary, facility condition assessments, precise alignment/deformation surveys and construction staking), GIS (mapping, analysis, geodatabase development, and application development) and Master Planning.

1.8. In accordance with the Brooks Act procedures, each future task order will require a qualifications-based evaluation of each selected firm from the group of awarded individual delivery contracts. Each firm will be evaluated to perform the services required for each task order using Criteria B, C, D and E (as detailed below). Additionally, the Contracting Officer may consider work completed or substantially complete as part of these awards made herein. To be considered substantially complete 95% of an order must be considered completed and received by the Government.

Evaluations will be conducted prior to the solicitation for each task order during the ordering period as identified at the time of award in FAR 52.216-18 Ordering.

99015 Water Infrastructure Project 25 $4,500 $450 $75 $250

Subtotals $38,450 $750 $2,500

Total $41,700

SC00006-6P Design Contract and S&R

SF00005-16 Renovate Hangar AE Contract

SF00023-15 ATF Overhead Shelter AE Contract

SF00002-16 Parachute Equip Storage AE Contract

SF00004-16 Breachers Roof AE Contract

SF00004-14 Control Room AE Contract

SF-00013-16 Design Contract and S&R

SF00002-16 Parachute Equip Storage AE

3-2847 Design PreAward

ATF Storage Bldg Design

SOLSE Storage Design

F Sqdrn SWA Design

Repair PT Area Design

ISO Range 65 Design

Hangar 722 Dehumid Design Support

Lightning Protection Study & Grounding Loop Study

Mass Notification

Cup Transformer

Range 190C & Range 19E

Shower and Latrine Design

2. SELECTION CRITERIA: The selection criteria for this particular contract are listed below in

DESCENDING order of importance. Criteria A-F are PRIMARY. Criteria G and H are SECONDARY and will be used ONLY as "tie-breakers" among technically equal firms. Primary Criteria will be assigned a rating from “outstanding” to “unsatisfactory,” based on the risk to the Government that the Offeror will successfully perform that evaluated Criteria. An overall rating will also be applied to the proposal submission using the same rating scale. Up to five (5) most highly qualified offerors will be requested to submit a proposal for negotiations. Proposals failing to respond or provide complete information for each Criteria as required by this solicitation will be determined non-compliant and will be removed from further consideration.

For purposes of this solicitation, a stand-alone contract or single task order is considered one project. Separating activities performed under a contract or task order will not be considered multiple projects; conversely, combining activities performed under separate contracts or task orders to produce a single project will not be considered. A single task under an Indefinite Delivery Contract is considered a project, not an Indefinite Delivery Contract itself. Projects in which the AE service is not 100% complete will not be evaluated.

2.1. Criteria A, Professional Qualifications – Key Personnel (SF330, Part I, Section E)

2.1.1. Part 1 – Resumes of Key Personnel (Section E, Blocks 12-18): Offerors must have, either in-house or through consultants or subcontractors, the disciplines listed below. If an individual will serve in more than one discipline, then those disciplines shall be clearly indicated in Block 13, PART I, Section E.

Resumes (Block E of the SF 330) must be provided for these disciplines, including consultants. In the resumes under Project Assignments, use the same discipline nomenclature as is used in this announcement. The evaluation will consider education, training, registration, relevant experience in the type work required, and longevity with the firm. The Offeror must provide licensure or certification number and date for each discipline. All Key Personnel for whom resumes are provided shall be shown on the organizational chart in Section D of the SF330.

Additional staff available for work on this contract shall be indicated on the chart by numbers. The following disciplines are required:

2.1.1.1. Project/Task Order Manager(s)

2.1.1.2. Architect(s) – Registered Architect; LEED Certified

2.1.1.3. Civil Engineer(s) – Professional Engineer, preferred registrations within Wilmington District’s Area of

Responsibility.

2.1.1.4. Structural Engineer(s) – Professional Engineer, demonstrates specialized experience with

Security/Force Protection design experience

2.1.1.5. Mechanical Engineer(s) – Professional Engineer, demonstrates specialized experience with Heating, Ventilation and Air Conditioning and controls

2.1.1.6. Electrical/Communication Engineer(s) - Professional Engineer; Registered Communication

Distribution Design (RCDD)

2.1.1.7. Fire Protection Engineer(s) – Professional Fire Protection Engineer. Demonstrate two years design experience with sprinkler fire protection systems; demonstrate four years of design experience with currently nationally recognized codes such as National Fire Protection Agency (NFPA), with special emphasis on NFPA 101 Life Safety.

2.1.1.8. Interior Designer(s) – Registered Architect or Interior Designer with NCIDQ certification; demonstrate design experience with comprehensive interior design, including space planning, pre-wired workstations, furniture specification, and knowledge of the acquisition process including applicable FAR and funding limitations.

2.1.1.9. Commissioning Authority(ies) – certified as a CxA by AABC, NEBB, or TABB

2.1.1.10. Cost Estimator(s) – Certified AACE, ICEC, PCEA, or equivalent; resumes are required for the firm’s and/or consultant’s cost engineering or estimating specialist(s) for each of the following disciplines:

architectural, structural, civil, mechanical, and electrical; a single resume may demonstrate experience in one or more disciplines, however, competence and experience for each assigned discipline must be clearly demonstrated.

2.1.1.11. Cybersecurity Engineer(s) – AMENDMENT 03 CISSP, CCIE, Network +, and Security GICSP or CISSP or CCNA certification

2.1.1.12. Master Planner(s) – Certified AICP or equivalent; demonstrate experience with area development plans, installation/base development plans, and overall master plans

Note, LEED certification and Security/Force protection design experience requirements may be fulfilled by other disciplines.

2.2. Part 2 – Relevant Projects (Section E, Block 19): All Key Personnel are required to have a minimum of five

(5) years of project experience in their discipline demonstrated by projects with scope, magnitude, and complexity comparable to this solicitation. The definition of a project is as noted in ‘Selection Criteria’ above. Relevant projects are those that reflect experience performing the respective discipline. Relevant Project Information should be brief and highlight specific roles and tasks performed by the Key Personnel, Project Type, Scope, and Costs. No more than five projects should be listed for each resume, and each project listed must have been completed within ten (10) years of publication of this solicitation announcement. (Note: The projects provided for this factor may also be used to address Part 2.)

The evaluation of Part 1 will take into consideration the education and current registration, licensure or certification(s), as applicable, of each person named for each discipline. It will also take into consideration the person’s relevant project experience provided in Block 19. More weight will be given to experience with full-design type projects completed within the Southeastern United States, and that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information. This factor may be assessed Strengths or Weaknesses, as appropriate. Only the Key Personnel disciplines requested in this solicitation will be evaluated. The basis of evaluation for Part 1 of this criteria will be information submitted in Part I, Sections E and G of the SF 330.

2.3. Criteria B, Specialized Experience and Technical Competence (SF330, Part I, Section F): Offerors are to demonstrate specialized experience and technical competence for the design of facilities and infrastructure for construction which meets the definition of AE Services as defined in 40 U.S.C. 1101 and FAR 2.101.

This factor considers specialized experience and technical competence to support Civil Works Design and Construction as well as Military Design and Construction specific to performing services similar to those described above in the paragraph titled Project Information.

2.3.1. Those firms submitting as Joint Ventures (JV) must follow the same procedures as any other Offeror with the following exception: if the JV (the Offeror) cannot provide at least six (6) projects that demonstrate performance by the JV of 50% of more of a project, as either prime or subcontractor, the JV may provide projects performed by any partner of the offering JV that reflect performance of 50% or more of a project, as either a prime contractor or subcontractor.

2.3.2. In Section F, offerors are to submit up to fifteen (15) projects that best illustrate the proposed team’s qualifications for award of a contract. (Note: The projects provided for Factor 1 may also be used to address this factor.) The definition of a project is as noted in ‘Selection Criteria’ above. For each project use only one page and note the contract or task order number, as applicable. As to content, do not alter the format of Section F.

2.3.3. To demonstrate quality of past performance, for each project the Offeror must provide a Contract

Performance Assessment Reporting System (CPARS). If a CPARS is not available, the Offeror must provide a NAVFAC/USACE Past Performance Questionnaire (PPQ). If a PPQ is provided and there is a CPARS, the CPARS rating will govern. The Government reserves the right to review any official performance evaluation system of records to inform its source selection decision. When completing Section G, in Block 26, along with the name of key personnel, include the firm with whom the person was associated with at the time the project was performed.

2.3.4. Of the projects submitted as prescribed above, relevant projects are those that reflect the specialized experience and technical competence of the Offeror and/or proposed subcontractor(s), as prime contractors or subcontractors, performing services similar to those described in the paragraph titled Project Information. More weight will be given to project designs that are full-design type projects on military installations or completed within the Southeastern United States, and that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information.

The basis of evaluation for Factor 2 will be information submitted in Part I, Sections F and G.

2.4. Criteria C, Past Performance: Offerors shall demonstrate in narrative (or other format) a history of customer satisfaction with the Offeror’s quality of work, cost control, and scheduling. Evaluations will be based on established CPARS ratings and other credible documentation included in the SF 330. Customer excerpts or quotes from prior evaluations for the purposes of substantiating the narrative are not desired. The narrative should describe the corporate approach for maintaining success with customer satisfaction with the Offeror’s quality of work, cost control and scheduling. Submit up to 15 example projects completed in the past AMENDMENT 03: six ten years that demonstrate experience listed above. This factor may be assessed with more weight given to successful performance ratings in these three areas on Department of Defense contracts.

2.5. Criteria D, Work Management: In Part I, Section H, the Offeror must provide a proposed work management plan demonstrating its team’s breadth of knowledge and experience with managing design for Civil Works Design and Construction as well as Military Design and Construction. The narrative should describe the corporate approach, driving criteria, or potential constraints, and examples of successful performance. The narrative should specifically discuss knowledge of, and experience with, work management planning to include quality management, subcontractor management, prior experience of the prime firm and any significant consultant, version control management, proactive internal and external communication protocols, and independent submittal review processes in the context of providing services under multiple task orders.

2.6. Criteria E, Capacity to Accomplish the Work: The capacity to accomplish at least three (3) $400,000 individual task orders simultaneously or one (1) $1,000,000 individual task order. Offeror must be able to demonstrate the capability to accomplish both scenarios.

2.7. Criteria F, Knowledge of Locality: Familiarity with the conditions, control and regulations affecting work in portions of North Carolina and Virginia.

2.8. Criteria G, Additional Key Personnel: Evaluation will consider education, training, registration, relevant experience in the type work required, and longevity with the firm. The Offeror must provide licensure or certification number and date for each discipline. All Key Personnel for whom resumes are provided shall be shown on the organizational chart in Section D of the SF330. Additional staff available for work on this contract shall be indicated on the chart by numbers. The following additional disciplines are required:

2.8.1. Coastal Engineer(s)

2.8.2. Landscape Architect(s)

2.8.3. Industrial Hygienist(s)

2.8.4. Environmental Engineer(s) – Demonstrate specialized experience with Lead Based Paint (LBP) and

Asbestos Containing Material (ACM) Survey and Remediation

2.8.5. Certified Value Specialist

2.8.6. Geospatial Developer

2.8.7. Surveyor(s) – Professional Land Surveyor, required registrations within North Carolina and Virginia

2.8.8. Certified Hydrographer(s)

2.8.9. Geotechnical Engineer(s) – Professional Engineer or Geologist

2.9. Criteria H, Geographical Proximity of Contractor: Geographical location of the contractor’s offices/facilities in relation to the primary area covered by the contract’s scope.

Note: Selection of AE firms is not based upon competitive bidding procedures, but rather upon the professional qualifications necessary for the performance of the required services. Firms must be evaluated as Most Highly Qualified in order to be selected for a contract. The wages and benefits of service employees (see FAR 22.10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act.

3. TECHNICAL INQUIRIES: All questions and requests for information (RFI’s) should be submitted via

Bidder Inquiry in ProjNet at www.projnet.org\projnet .

3.1. Questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

3.2. To submit and review bid inquiry items, bidders must be a current registered user or self-register into the system. To self-register, go to www.projnet.org\projnet, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click “Continue.” From this page you may view all bidder inquiries or add an inquiry. Offerors questions will be acknowledged via email, followed by an answer to the question after it has been processed by our technical team.

3.2.1. The Solicitation Number is: W912PM22R0007

3.2.2. The Bidder Inquiry Key is: EMSZYV-3HAR35

3.3. Bidders/Offerors are requested to review the SF 330 Instructions, the solicitation in their entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public viewing on the report of all Bidder Inquiries.

Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of required submission, whether the inquiry was generated by the Bidder/Offeror themselves or another potential Bidder/Offeror.

3.4. Government responses to questions and RFI’s relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment to the solicitation is issued. In the case of any conflicts, the solicitation governs.

3.5. The ability to enter questions and RFI’s will be disabled seven (7) days prior to the closing date stated in the solicitation. The Government reserves the right not to respond to questions/inquiries received after that date. No Inquiries will be accepted by the Bidder Inquiry system within seven (7) calendar days prior to the date of bid opening. However, the Bidder Inquiry system may still be accessed to view answers/replies to previous inquiries until the bid opening.

Note: Personal visits to discuss this announcement will not be scheduled. As required by acquisition regulations, interviews for the purpose of discussing prospective contractor's qualifications for the contract will be conducted only after submittal review by the selection board. Interviews will be conducted by telephone.

3.6. In Section H, Firms shall present an organization chart and a narrative describing how the organization will function. Those functions to be subcontracted out shall be clearly identified. Firms may opt to refer to the organizational chart provided in Section D when submitting the required narrative within Section H.

In Section H, describe owned or leased equipment that will be used to perform this contract. Content contained in cover letters, company literature and extraneous materials is not desired and will not be considered.

AMENDMENT 03: Delete Firms must include the DUNS number for the office of the firm performing the work in Section B.5. of the SF 330. Include DUNS numbers for the prime and key subcontractors in the SF330, Page 1, Block 10. Replace with: Firms must include the Unique Entity ID Number for the office of the firm performing the work in Section B.5. of the SF 330. Include Uniques Entity ID Numbers for the prime and key subcontractors in the SF330, Page 1, Block 10.

4. AMENDMENT 04 REVISED: SUBMISSION REQUIREMENTS:

ELECTRONIC SUBMISSION. NO HARD COPY, REGULAR MAIL, HAND CARRIED, FACSIMILE, ETC.

SUBMISSIONS WILL BE ACCEPTED.

4.1. Interested Architect-Engineers firms having the capabilities to perform this work may submit Parts I and II of the SF 330 via AMENDMENT 04 by email or by submission through DoD SAFE. Do not duplicate submissions, the offeror shall choose to submit via email or DoD SAFE.

4.2. EMAIL SUBMISSIONS: For offerors choosing to submit by email. Ensure the solicitation number is included in the subject line of the email.

4.2.1. Emails submissions are to be sent, with delivery and read receipt requested to the following individuals:

4.2.1.1. Wilmington District Proposal Inbox at: SAW-CT-MilitaryPorposals@usace.army.mil copy to:

4.2.1.2. Ms. Andrea A. Green at andrea.m.green@usace.army.mil

4.2.1.3. Mr. Edward A. Boddie at edward.a.boddie@usace.army.mil

NOTE: In order to Submit Proposals via Email; Contractors Shall observe a 15 Megabyte (MB) file size limitation. If firms have files sizes that exceed this limitation, they may still submit their SF330 via email using the Microsoft Windows Compression Program (.zip).

4.3. RECEIPT OF EMAILED SUBMISSIONS: The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late.

AMENDMENT 03 Additionally, Firms are authorized to submit SF330’s using CD/DVD Media.

Interested Architect-Engineers firms having the capabilities to perform this work may submit Parts I and II of the SF 330 on a CD/DVD via Mail or Parcel Service with delivery confirmation to:

US Army Corps of Engineers Wilmington District

W912PM22R0007

Attention: Andrea M. Green 69 Darlington Ave Wilmington NC, 28403

4.3.1. Title the file(s) in the following format:

W912PM22R0007_COMPANY NAME_SF330

Proposal due Date and Time:

4.4. DoD SAFE SUBMISSIONS: The Offeror’s proposal submitted electronically through DoD Safe, shall be described below in this section. The Offeror’s bid shall not contain classified data. The use of hyperlinks in bids is prohibited.

NOTE: The only authorized transmission methods for Parts I and II of the SF 330 in response to this solicitation are via email has directed in section 4. SUBMISSION REQUIREMENTS or electronically via SAFE online submission. Offerors shall not duplicate submissions, the offeror shall choose to submit via email. NO OTHER TRANSMISSION METHODS (FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.

4.4.1. SAFE INSTRUCTIONS

4.4.1.1. The Offeror’s Parts I and II of the SF 330 must be received by the Government by the date/time specified in the solicitation. Offerors shall electronically submit their Parts I and II of the SF 330s using the following link:

https://safe.apps.mil/

4.4.1.2. Within SAFE, please send Parts I and II of the SF 330 s to both Contract Specialist Andrea M. Green at andrea.m.green@usace.army.mil and to Contracting Officer Edward A. Boddie at edward.a.boddie@usace.army.mil.

4.4.1.3. Failure to properly submit a Parts I and II of the SF 330 by the time due (4:00 PM Eastern) will render it late, and late Parts I and II of the SF 330 s may not be accepted. As this is an electronic submission subject to internet connectivity and other potential network traffic issues, offerors are cautioned to plan accordingly.

4.4.2. INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPSALS:

4.4.2.1. Proposals submitted electronically through the SAFE site shall be submitted as one file using

Microsoft Word (.doc or .docx) or Adobe Acrobat (.pdf) in a Font 10 point or larger. For Offerors submitting via DoD SAFE the entire submission of the SF 330 must not exceed 8 gigabytes and shall be submitted as one file.

4.4.2.2. REQUEST FOR UPLOAD CODE: In order to electronically submit a bid through DoD SAFE, offerors must email Contract Specialist Andrea M. Green at andrea.m.green@usace.army.mil and to Contracting Officer Edward A. Boddie at edward.a.boddie@usace.army.mil no later than five (5) working days prior to the bid due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission.

4.4.2.3. FILE DESCRIPTION: Include a “File Description” for file(s) you upload. The “File Description” will be W912PM22R0007_COMPANY NAME_SF330. This will be included in the email notice to each of the recipients you choose to have access your file(s).

NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.

4.4.3. INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

4.4.3.1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a Common Access Card (CAC) the option to access the SAFE site as a guest.

4.4.3.2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

4.4.3.3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer.

4.4.3.3.1. The email address for the Contract Specialist for this solicitation is andrea.m.green@usace.army.mil

4.4.3.3.2. The email address for the Contracting Officer for this solicitation is edward.a.boddie@usace.army.mil

4.4.3.4. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Offeror must enter the E-Mail address for both the Contracting Officer and Specialist.

The Offeror can enter an additional E-Mail address if desired. After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your bid is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

4.4.3.5. Even if you successfully upload your bid to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. An Offeror can confirm proper submission by the ‘Drop- Off Completed” screen which generates based on proper file submission.

4.4.4. RECEIPT OF SUBMISSIONS:

4.4.4.1. For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. No proposals larger than the 8GB capacity of the SAFE website and or require multiple file submissions because of size will be accepted by the Government. The onus for ensuring that there was a successful upload, to include the date and time that submission is completely uploaded into the SAFE website rests with the offeror. Do not assume that electronic communication is instantaneous. It can take several minutes or up to hours in some cases for the upload to be recorded as successful.

4.4.4.2. The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

4.4.4.3. Because uploaded documents expire in DoD SAFE, the submission of proposals should only occur during a limited window of time from 4:00 PM on 15 June 2022 to the due date, to ensure that the submitted bids don’t expire before the contracting specialist has time to download the proposals and conduct the preparation/verification of the submitted package.

4.4.4.4. Offerors are responsible for ensuring that they submit the submitted bid does not expire prior to the response date and time: Friday, Tuesday 21 June 2022 at 4:00 PM

4.5. PROPOSAL IDENTIFICATION:

Request For Proposal No: W912PM22R0007 Due Date of Proposal: 21 June 2022 Time by which Proposals are due: 4:00 P.M. (Eastern Time) AMENDMENT 05: Title of Project: Architecture and Engineering (AE) Services Design/Build Services Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order (MATOC) Corrected Title of Project: Architecture and Engineering (AE) Services Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC).

4.6. AMENDMENT 04: If the offeror is a large business concern the presumtpion is that opportunities exist for small businesses, ergo a Small Business Subcontracting Plan will be required of large business concerns.

4.6.1. In order to establish Small Business goals at the IDIQ level to avoid issuing goals and a Small

Buisness Plan per each task order. Offerors are to submitt a Subcontracting Plan to satisfy the requirements of Federal Acquisition Regulations SUBPART 19.7, FAR 52.219-9, and Public Law 95-

507. Note: This plan will not be counted as part of the total page 150 page count.

FY22 SB Goals

Small Business (SB) 51.40% Small Disadvantaged SB (SDB) 22.30% Women Owned SB (WOSB) 14.60% HUBZone SB (HUBZone) 11.00% Service Disabled Veteran Owned SB (SDVOSB) 3.50%

4.6.2. Offerors that have to submit a Small Business Subcontracting plan should submit their goals as proposed for the total contract from date of award through five years from date of award.

4.7. The entire submission of the SF 330 must not exceed 15MB for email submissions if the offeror elects to submit via email, or 8GB for DoD SAFE submissions if the offeror elects to submit via DoD Safe and shall be submitted as one file using Microsoft Word (.doc or .docx) or Adobe Acrobat (.pdf) in a Font 10 point or larger. Page size shall be standard 8 ½ x 11. Part I of the SF 330 should not exceed 150 pages overall.

4.7.1. Resumes in Section E and example projects in Section F shall not exceed one (1) page each. Indicate in

Section C.11 if the prime has worked with the team members in the past five (5) years. In Section G.26, include the firm each of the key personnel is associated with. Cover letters, company literature and extraneous materials are not desired and will not be considered.

4.7.2. The date and time of delivery will be established as discussed above in sections 4.2 and 4.4. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received by the recipients until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided

4.7.3. Time is of the essence, therefore any submissions received after the exact time specified for receipt will be considered late, and will be processed IAW FAR 15.208, Submission, Modification, Revision, and Withdrawal of Proposals. A firm will not be considered if its SF 330 Part I is not signed, unless the SF 330 Part I is accompanied with a signed cover letter, or a current signed SF 330 Part II. If a firm does not submit a SF 330 Part II with its SF 330 Part I, or have one on file through SAM, it will not be considered (FAR 36.603(b)).

4.7.4. Firms are highly encouraged to include a delivery receipt when electronically sending their submissions. Per FAR 15.208, electronic proposals received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals will not be considered “late”. It is the firm’s responsibility to ensure that the submissions are received by the designated time.

(End of Summary of Changes)