View the file

Other files for this federal contract opportunity

Other files attached to Architecture and Engineering (AE) Services Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
W912PM22R0007 AMENDMENT 05.pdf PDF
W912PM22R0007 CONFORMING THROUGH AMENDMENT 05.pdf PDF
W912PM22R0007 AMENDMENT 04.pdf PDF
W912PM22R0007 AMENDMENT 03.pdf PDF
W912PM22R0007 AMENDMENT 02.pdf PDF
NOTICE OF FORTHCOMING AMENDMENT TO RFP W912PM22R0007 AMENDMENT 01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:00 PM local time 14 Jun 2022

A X B X C

D

EX

X G F 63 - 77

78 - 103 X H 104 andrea.m.green@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 104

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912PM 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ANDREA M. GREEN 910-251-4774

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT

PACKAGING AND MARKING

7 - 45 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

47 - 48

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 49 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

50 - 62

PART II - CONTRACT CLAUSES

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: EDWARD A. BODDIE

69 DARLINGTON AVE

WILMINGTON NC 28403

910-251-4804

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

13 May 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912PM22R0007

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Years

AE MATOC BASE YEARFFP

The Base Year of a five (5) year AE Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of an estimated $49M. Each of the most highly qualified offerors, up to five (5), will receive Indefinite Delivery Contracts (IDC) contracts.

The maximum capacity of the MATOC IDIQ is Not-to-Exceed $49,000,000.00. A $2,000 minimum guarantee will be obligated when each IDC is awarded for only the base ordering period, with no minimum guarantee for optional ordering periods. Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will primarily meet the AE requirements for Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the Wilmington District (SAW) and South Atlantic Division (SAD) include all phases of Planning, Engineering, and Design for both civil works and military programs

FOB: Destination

PSC CD: C1JZ

NET AMT

1001 1 Years

OPTION AE MATOC OPTION YEAR ONEFFP

AE MATOC OPTION YEAR ONE:

Optional Year 1 Period of Performance 07 DEC 2023 to 06 DEC 2024 (Period of Performance will be one year and validated at the time of award)

Option Year One of a five (5) year AE Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of an estimated $49M. Each of the most highly qualified offerors, up to five (5), will receive Indefinite Delivery Contracts (IDC) contracts.

The maximum capacity of the MATOC IDIQ is Not-to-Exceed $49,000,000.00. A $2,000 minimum guarantee will be obligated when each IDC is awarded for only the base ordering period, with no minimum guarantee for optional ordering periods. Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will primarily meet the AE requirements for Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the Wilmington District (SAW) and South Atlantic Division (SAD) include all phases of Planning, Engineering, and Design for both civil works and military programs

2001 1 Years

OPTION AE MATOC OPTION YEAR TWOFFP

AE MATOC OPTION YEAR TWO:

Optional Year 2 Period of Performance 07 DEC 2024 to 06 DEC 2025 (Period of Performance will be one year and validated at the time of award)

Option Year One of a five (5) year AE Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of an estimated $49M. Each of the most highly qualified offerors, up to five (5), will receive Indefinite Delivery Contracts (IDC) contracts.

The maximum capacity of the MATOC IDIQ is Not-to-Exceed $49,000,000.00. A $2,000 minimum guarantee will be obligated when each IDC is awarded for only the base ordering period, with no minimum guarantee for optional ordering periods. Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will primarily meet the AE requirements for Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the Wilmington District (SAW) and South Atlantic Division (SAD) include all phases of Planning, Engineering, and Design for both civil works and military programs

3001 1 Years

OPTION AE MATOC OPTION YEAR THREEFFP

AE MATOC OPTION YEAR THREE:

Optional Year 3 Period of Performance 07 DEC 2025 to 06 DEC 2026 (Period of Performance will be one year and validated at the time of award)

Option Year One of a five (5) year AE Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of an estimated $49M. Each of the most highly qualified offerors, up to five (5), will receive Indefinite Delivery Contracts (IDC) contracts.

The maximum capacity of the MATOC IDIQ is Not-to-Exceed $49,000,000.00. A $2,000 minimum guarantee will be obligated when each IDC is awarded for only the base ordering period, with no minimum guarantee for optional ordering periods. Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will primarily meet the AE requirements for Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the Wilmington District (SAW) and South Atlantic Division (SAD) include all phases of Planning, Engineering, and Design for both civil works and military programs

4001 1 Years

OPTION AE MATOC OPTION YEAR FOURFFP

AE MATOC OPTION YEAR FOUR:

Optional Year 4 Period of Performance 07 DEC 2026 to 06 DEC 2027 (Period of Performance will be one year and validated at the time of award)

Option Year One of a five (5) year AE Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) with a total MATOC IDIQ ceiling of an estimated $49M. Each of the most highly qualified offerors, up to five (5), will receive Indefinite Delivery Contracts (IDC) contracts.

The maximum capacity of the MATOC IDIQ is Not-to-Exceed $49,000,000.00. A $2,000 minimum guarantee will be obligated when each IDC is awarded for only the base ordering period, with no minimum guarantee for optional ordering periods. Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will primarily meet the AE requirements for Military Construction, Sustainment, Restoration, and Modernization (SRM), Civil Works and Surveying mission requirements of the Wilmington District (SAW) and South Atlantic Division (SAD) include all phases of Planning, Engineering, and Design for both civil works and military programs

Section C - Descriptions and Specifications

STATEMENT OF WORK

SECTION “C”

STATEMENT OF WORK

FOR

ARCHITECT-ENGINEER MULTIDISCIPLINE DESIGN SERVICES

WILMINGTON, NC

C.1 GENERAL

Work performed under this IDIQ will support the Civil Works and the Military Planning and Design Program. Work will include all phases of Planning, Engineering, and Design for both Civil works and military programs.

Military program task orders may primarily include: Development of Concept and Full Designs, Renovation/Repair Projects, Preparation of Project Definition and Programming Documents, Charrettes, Preparation of Technical Portions of Design-Build and Design-Bid-Build Solicitations, Commissioning and Construction Phase Services, Design Analysis and Detailed Construction Plans and Specifications. Additionally, Military task orders may include:

Engineering Studies, Investigations, Life Cycle Cost Analyses (LCCA), Surveying (including topographic, hydrographic, boundary, facility condition assessments, precise alignment/deformation surveys and construction staking), GIS (mapping, analysis, geodatabase development, and application development) and Master Planning.

Civil Works program task orders may primarily include: Feasibility Report Development, Surveying (including topographic, hydrographic, boundary, precise alignment/deformation surveys and construction staking), GIS (mapping, analysis, geodatabase development, and application development). Additionally, Civil Works task orders may include work performing:

Engineering Designs and Detailed Construction Plans and Specifications and Master Planning.

Types of projects will include both Inland and Coastal to include: site development, utility infrastructure improvements, flood damage reduction, coastal protection and beach nourishment, shoreline and stream bank erosion protection, shallow and deep draft navigation, environmental and eco-system habitat restoration, storm water management, comprehensive watershed evaluations and multipurpose water resources projects.

The AE (AE), as an independent AE and not as an agent of the Government, shall, in accordance with the terms and conditions more particularly set forth below, furnish all labor, management, facilities, supplies, equipment and material (other than those to be furnished by the Government as herein-after provided), and do all things necessary for performance of the work as set forth below. The AE shall furnish the required personnel, equipment, instruments, and transportation as necessary to accomplish required services and furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the AE shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.

C.2 LOCATION OF WORK:

This contract will be used to support Wilmington District customers in the States of North Carolina and Virginia; however, could also be used within any location in the United States that falls under Wilmington District’s AOR.

C.3 NEGOTIATION RESPONSIBILITIES

Task orders will be negotiated and executed by the Wilmington District or assigned Governmental Agent.

C.4 REQUEST FOR PAYMENT SHOULD BE SUBMITTED TO:

USACE, Wilmington

ATTN: CESAW-ECP-AE

69 Darlington Ave Wilmington, NC 28403

C.5 SUBMITTAL SCHEDULE AND REQUIREMENTS:

Delivery of completed work shall be accomplished such that the materials will be protected from handling damage. Each package shall contain a transmittal letter or shipping form, in duplicate, listing the materials being transmitted, being properly numbered, dated and signed. Shipping labels shall be marked as required in the task order.

C.6 PERIOD OF PERFORMANCE

The base IDIQ MATOC will be awarded for a period not to exceed a one- (1) year base ordering period and four optional ordering periods of one (1) year each, with an additional six (6) month option under FAR Clause 52.217-8, Option to Extend Services, for a total of five (5) years and six (6) months (if all options are exercised) or until the contract limit is reached, whichever comes first. The total IDIQ value not to exceed $49,000,000.00 over the five-year life of the contract. The invidual awards to the most highly qualified offerors will have a minimum guarantee of $2,000.00 for the base year only.

The Architect-Engineer shall perform all work and services specified in individual task orders within the performance period specified in each task order.

C.7 WORK TO BE PERFORMED/TECHNICAL CRITERIA AND STANDARDS

GENERAL: The Wilmington District serves a wide variety of customers, within North Carolina and Virginia, throughout the US and overseas. These AE contracts are to provide a wide variety of AE design services, and will be used primarily for the military construction and the support for others programs, but will also provide services for the civil works program. Wilmington District’s area of responsibility includes:

a. federal work for various agencies within the States of North Carolina and Virginia, including but not limited to, the Department of Defense, Department of State and Department of Veteran’s Affairs

b. state agencies and municipalities within the states of North Carolina and Virginia

c. federal agencies throughout the US, including but not limited to, Department of Defense, Defense Logistics Agency DESC, and the Department of Veteran’s Affairs.

1. CRITERIA REFERENCES. The following information and criteria are made a part of this contract by reference:

Unless a specific document version or date is indicated, criteria shall be taken from the most current references as of the date of issue of the contract. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed.

1.1. A/E/C Computer-Aided Design (CAD) Standards, [Release 6.1, dated August 2019] https://cadbimcenter.erdc.dren.mil/

1.2.DA Facility Standard Designs - https://mrsi.erdc.dren.mil/cos/

1.3.Unified Facilities Guide Specifications (UFGS) (https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs)

1.4.Various Government and commercial criteria standards available in the Whole Building

Design Guide library (https://wbdg.org/).

1.5.U.S. Army Publications and Other Information (http://www.hnc.usace.army.mil/).

1.6.Federal Acquisition Regulation (FAR) (https://www.acquisition.gov/browse/index/far)

1.7.UFC 1-200-02, High Performance and Sustainable Building Requirements

(https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-02)

1.8. UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design and Construction, with Change 1, 01 October 2013 (https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-05)

1.9. UFC 4-010-06 Cybersecurity Of Facility-Related Control Systems, With Change 1, 18 January 2017 (https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-010-06)

1.10. Unified Facilities Criteria 4-010-01, Change 1, 1 October 2013, DOD Minimum Anti-terrorist Standards for Buildings are available at (https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc)

1.11. Design–Build Technical Requirements UFC-1-300-07A 1 Mar 2005 (https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-300-07a).

1.12. Unified Facilities Criteria 1-200-01, Change 1, 01 October 2020, DoD Building Code

(https://wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-200-01).

1.13. Savannah District Design Manual (SDDM)

(http://www.sas.usace.army.mil/About/Divisions-and-Offices/Engineering- Division/Engineering-Design-Criteria/Design-Manual-for-Military-Construction/).

1.14. EM 385-1-1 Safety – Safety and Health Requirements, 30 November 2014

(https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM _385-1-1.pdf?ver=7Cpck_22Ct_-w6QSGyOKVQ%3d%3d)

1.15. EM 1110-1-1002 Survey Markers and Monumentation, 1 March 2012

(https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_ 1110-1-1002.pdf)

1.16. EM 1110-1-1003 NAVSTAR Global Positioning System Surveying 28 February 2011

_1110-1-1003.pdf?ver=9itv5_kOc5LTphXdfytz0Q%3d%3d)

1.17. EM 1110-1-1005 Control and Topographic Surveying 1 January 2007

_1110-1-1005.pdf?ver=7p8yphfzUR5LZG5faL9R9A%3d%3d)

1.18. EM 1110-1-2909 Geospatial Data and Systems 1 September 2012

_1110-1-2909.pdf?ver=zCh6ux5UajoxnuUIE-87rg%3d%3d)

1.19. EM 1110-2-1003 Hydrographic Surveying 30 November 2013

_1110-2-1003.pdf?ver=gDGVUj_0XR2sXHiIpQZv2Q%3d%3d)

1.20. EM 1110-2-1009 Structural Deformation Surveying 28 February 2018

_1110-2-1009.pdf?ver=G2HOXOsH3dTpsfJhSQ6kJQ%3d%3d)

1.21. EM 1110-2-6056 Standards and Procedures for Referencing Project Evaluation Grades to National Vertical Datums 31 December 2010

_1110-2-6056.pdf?ver=DNz9CdzRTKwRRxchCmlVvg%3d%3d)

2. DESIGN SERVICES AND SUBMITTAL REQUIREMENTS. Unless otherwise indicated, all designs will be developed using ERDC/ITL TR-12-6 A/E/C CAD Standard, Release 6.1. A variety of software may be utilized, potential software includes but is not limited to SPECSINTACT software for contract specifications, MCACES Second Generation (MII) software for cost estimates, Beach-fx for evaluating physical performance and economic benefits and costs of shore protection projects or as specified in individual Task Order Scopes of Work. Deliverables for each submission shall include at a minimum:

a complete set of Advanced Modeling/CAD files with all reference files intact, a converted set of PDF files with one drawing occupying one PDF file, a combined PDF file including all drawings, and one hard copy of each drawing. An Index of Drawings (typically included as a sheet in the project) shall also be provided in either an Excel Spreadsheet or an ASCII text file. Advanced modeling is required for Centers of Standardization COS designs and other projects as required.

All narrative and text documents, specifications, and cost estimates shall be provided in their electronic format, as appropriate, and one reproducible hard copy. Each deliverable stated below shall be completed in accordance with the SDDM. The AE scope of services required under this contract shall include the following:

2.1.Design Charrette. The AE is required to conduct a design charrette in accordance with

AR 415-15 Army Military Construction and Non-appropriated-Funded Construction Program Development and Execution. The Design charrette will be accomplished and the product submitted on the time schedule specified, and shall be a separate phase of work, independent of any other work included in the contract.

2.2. Parametric Design Report. The AE is required to prepare a Parametric Design Report (PDR) or Parametric Design Report Lite (PDR-lite) in accordance with AR 420-1, Army Facilities Management, Chapter 4 – Army Military Construction and Non-appropriated- Funded Construction Program Development and Execution and ES-07052, Enterprise Standard Instructions for Parametric Design. Additional information regarding PDRs can be found here: https://mrsi.erdc.dren.mil/pdrs/. The PDR/PDR-lite will be accomplished and the product submitted on the time schedule specified, and shall be a separate phase of work, independent of any other work included in the contract.

2.3.Parametric Estimating. All construction costs estimates shall be prepared using the

MCACES Second Generation (MII) estimating software. Estimates should conform to the Military Work Breakdown Structure or Civil Works Breakdown Structure as identified in UFC 3-740-05, Change 2, 21 April 2020. The estimate shall be created using the latest version of the English Costbook for MII.

2.4. Concept (35%) Design and Submittal. The AE will prepare and submit for approval with all requirements outlined in the SDDM. Some submittal requirements include, but are not limited to the drawings, written descriptions, design analyses, cost estimate, and other related and supporting documents. The AE will ensure that the cost estimate is submitted simultaneously with the concept design package. The AE will incorporate concept design review comments as a part of completing the Concept Design submittal. The AE will resubmit a revised cost estimate after the 35% comments have been applied.

2.5.Preliminary Design (65%) and Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. Some submittal requirements include, but are not limited to the drawings, (specifications, design analyses for Preliminary Submittals), quantity take-off, cost estimate, and other related and supporting documents. The AE will ensure that the cost estimate is submitted simultaneously with the preliminary design package. The AE will incorporate preliminary design review comments as part of completing this design submittal. The AE will resubmit a revised cost estimate after the 65% comments have been applied.

2.6.Final Design and Submittal. The AE will prepare and submit for approval in accordance with Government standards the detailed working drawings and specifications necessary for the effective coordination and efficient execution of the construction work together with such design analyses, cost estimate, quantity take-off, unit price schedules, and other related and supporting documentation. The AE will ensure that the cost estimate is submitted simultaneously with the final design package. This includes incorporation of comments from the final design review. The AE will resubmit a revised cost estimate after the final design comments have been applied. The AE shall submit the attached checklist entitled "Checklist for AE Submittal of Final Design" with the 100-percent final design submittal, properly indicating items that have been accomplished (Enclosure 1).

2.6.1. A completed submittal register listing all AE submittals required in the contract specifications. The Submittal Register Form (ENG Form 4288) shall be developed using the SPECSINTACT software.

2.6.2. The AE shall edit each specification section to reflect the review level of submittals required which will generate ENG Form 4288 Submittal Register. If shop drawing review is required by the AE, negotiations for shop drawings review services will held prior to the award of the construction contract.

2.6.3. For military projects, a draft of DD Form 1354, Transfer and Acceptance of

Military Real Property, shall be submitted with the final cost estimate.

2.7.Corrected Final Design Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. The specifications and PDF formatted drawing files submitted by the AE at the corrected final design stage will constitute the construction contract documents for this project. The contract documents will be converted into electronic bid sets (EBS) by the Wilmington District for construction services advertisement. EBS documents will be issued to AEs and suppliers on CD and/or over the internet. Correction of items of noncompliance in the contract documents, whether format or technical errors, is the responsibility of the AE. Also, during the bidding period the AE shall furnish such advice as may be requested to clarify design intent and develop the necessary amendments to document the clarification.

Corrections and amendment packages will be developed within the time allowed by established design and construction bidding schedules as defined by Wilmington District.

2.8.Preparation of Design–Build Request for Proposal (Nominal Criteria): The AE shall prepare and submit for approval the drawings, written descriptions, design analysis, cost estimate, and other related and supporting documents as are more fully specified in UFC 1-300-07A. The AE shall incorporate review comments as part of completing the Design- Build Request for Proposal.

2.9.Preparation of Design–Build Request for Proposal (Partial Criteria): The AE shall estimate, and other related and supporting documents as are more fully specified in UFC

2.10. Preparation of Design–Build Request for Proposal (Full Criteria): The AE shall estimate, and other related and supporting documents as are more fully specified in UFC

2.11. Design–Build Evaluation Consultation: The AE shall participate as a consultant to the Design–Build Evaluation Team by reviewing proposals for compliance with the requirements of the Design-Build Request for Proposal. The AE shall provide the proper design disciplines, as required by the project scope for the review, to serve as nonvoting advisors to the Evaluation Team.

2.12. Review of Design–Build Submittals: The AE shall provide the proper design disciplines required for the review the Design-Build AE’s design. The review shall be conducted for compliance to the technical drawings, specifications and accepted proposal requirements of the Design-Build Request for Proposal. Reviews are not normally for approval. The Design-Build AE assumes design liability. The AE shall provide written comments to the District utilizing the DRCHECKS Internet database system.

2.13. Studies/Reports: The AE shall prepare and submit studies/reports (engineering, life cycle cost analyses, etc.) in accordance with additional Specific Instructions provided within task orders.

2.14. Design Conferences. The AE will be required to attend specified meetings during the design process. The AE’s representatives required to attend the meetings and the meeting locations will be defined for specific task orders. The exact meeting location, date, and time will be provided by the Project Manager. The AE will be responsible for taking notes and preparing the minutes for all conferences after contract award.

Conference/visit minutes will be prepared in typed form, signed by the AE’s Project Manager, and the original furnished to the Wilmington District office (within five days after date of conference) for concurrence and distribution to all attendees. This report shall include the following items as a minimum:

2.14.1. The date and place the conference was held with a list of attendees. The roster of attendees shall include name, organization, telephone number, and E-mail address.

2.14.2. Written review comments presented by attendees shall be attached to each report with the conference action noted. Prior to the next design submittal, all comments will be recorded in the DRCHECKS system and properly annotated by the AE. The DRCHECKS system is an Internet based system and access will be set up by Wilmington District.

2.14.3. Comments made during the conference, or decisions affecting criteria changes, must be coordinated with SAW and recorded in the basic conference notes. Any augmentation of written comments should be documented in the conference notes.

2.15. Topographic Survey. The AE or the government shall be responsible for accomplishing all topographic survey necessary for siting of the project, including location of all utilities. All survey work shall be performed under the responsible charge of a Professional Land Surveyor, licensed within the state of the project location. Specific requirements will be detailed in individual task orders. All requirements for topographic survey work will be in compliance with EM 1110-1-1005.

2.16. Subsurface Investigation. Subsurface investigation shall be accomplished either by the AE or the government, as specified in the project Specific Instructions. If accomplished by the AE, all requirements for full designs are to be in compliance with all USACE regulations. For design build RFP solicitations, additional detail will be provided in the specific task order. The preliminary geotechnical report for design build RFP solicitations do not require the same level of site investigations and geotechnical analysis as required for a full design. Electronic geo-referenced layout plans are also required and will be used for layout and locating of soil borings.

2.17. Geodetic and Control Surveys. Includes surveys in which the figure and size of the earth are considered and is used for precise location of basic points suitable for controlling other surveys. Includes 1st, 2nd and 3rd order horizontal and vertical control surveys in accordance with the latest Standards and Specifications for Geodetic Control Networks published by the Federal Geodetic Control Committee. Conventional, electronic instrumentation, inertial, satellite and other survey methods as applicable may be utilized.

2.18. Route Location Surveys. Roads, railroads, levees, channels, etc.

2.19. Quantity Surveys. Preconstruction and/or final cross sections and computations of quantities for dredging and construction.

2.20. Layout Surveys. Staking of buildings, structures, utilities, roads, railroads, etc.

2.21. Hydrographic Engineering and Construction Surveying. Surveys of channels, lakes, rivers, bays and open coastal waters in support of engineering design, construction and operations and maintenance. Includes acquisition of hydrographic and surveying and mapping data representing three dimensional spatial relationships on the earth's surface.

This data may be required for planning, cost estimating, engineering, dredging, design, construction, sedimentation, master planning, operations and as-built conditions.

Conventional and electronic instrumentation, and remote sensing, inertial, satellite, side scan sonar, subbottom profiling, marine magnetometer, single beam and multi-beam instrumentation, motion sensors and other surveying methods and instrumentation as applicable may be utilized.

2.22. Mapping and Charting. Includes the preparation (i.e., design, compilation, digitizing, plotting and printing) of map and chart products. These depict man-made and natural features on the surface of the earth in their correct positions and at an established scale relative to a coordinate reference system. These may be associated with engineering, land/boundary, geodetic and/or cartographic surveys. CAD and/or GIS software may be utilized as applicable.

2.23. Boundary and Cadastral Surveying. Includes property, boundary and easement surveys, etc. Conventional, electronic instrumentation, satellite, and other survey methods as applicable may be utilized.

2.24. Asbestos/Lead Based Paint Identification and Removal. The AE shall be responsible for surveying and preparing appropriate asbestos and lead based paint abatement documents for existing facilities included in the scope of the project.

2.25. Permits. The AE will ensure that designs comply with all the requirements of the

Clean Air Act, as amended; the Federal Water Pollution Control Act, as amended; and the Safe Drinking Water Act. The AE will, during final design and after consultation with the installation engineering staff, obtain necessary permits, licenses, and approvals from local, state, and federal authorities.

2.26. Architectural Renderings. Renderings may be required for individual task orders. The full size renderings (original and photos) shall be framed and matted. The rendering shall be double matted as follows: upper matte sheet shall be a neutral color with a lower sheet of contrasting and complementary color. Frame shall be a standard aluminum type frame. Matte, frame, and rendering shall be color coordinated.

2.26.1. Provide for approval, a single line perspective sketch showing the three dimensional aspects of the facility with emphasis on the main building features. The perspective sketch must be a minimum of 8”x 10”, and illustrate the view planned for the final color rendering. Include a sample indicating the type of rendering technique proposed for the final perspective. Select the horizon line and viewing point to best present the facility’s character. Generally, a normal eye level view is preferred for single building projects, and an aerial view should be used for multiple building complexes. A professional architectural illustrator showing the view approved from the single line perspective shall prepare the rendering. Details should be appropriate for the military installation (e.g., correct portrayal of personnel and uniforms).

2.26.2. Rendering size shall be appropriately apportioned to illustrate the facility shape, color, patterns of exterior materials, and site development features. The minimum size, as determined by adding the vertical and horizontal dimensions of the rendering (without matte), shall be 42”. Non-glare plastic glazing is required. Titles shall be scaled appropriately and included as part of the matte design. Titles shall identify only the Wilmington District with Corps castle, project name, base, and AE firm.

2.27. Interior Design. Development of a comprehensive interior design package, if required for a specific task order, shall be in accordance with UFC 3-120-10 and the SDDM.

2.28. Color Boards. Color boards may be required for individual task orders. Two sets of color/finish boards giving two distinct options, from which one scheme will be selected by the Installation, should be submitted in a 3-ring binder format along with the final design submittal. Floor plans and elevations shall be included in this document. Three copies of the approved boards shall be submitted with the corrected final design submittal. Finishes shall conform to the Installation’s Design Guide. Additional color boards may be required for individual task orders.

2.29. Photographs. The AE shall submit photographs showing, where possible, all field conditions influencing the design. The AE shall submit a narrative report detailing the general conditions and all special conditions for which it is impractical to submit specific photographs. Each photograph will be specifically labeled to identify the subject and how it is applicable to the design. The report and photographs shall be organized by design discipline and included in the applicable design submittal. Photographs are to be original prints or copies of such quality (size and clarity) to clearly show field conditions and verify quantity of work required.

2.30. Construction Phase Services. The AE will be responsible for assembling contract documents after award. The AE may be asked to check shop drawings, materials, fixtures, equipment, samples, plant materials, and color schedules submitted by the construction AE in accordance with the contract plans and specifications, and to make periodic field visits to answer AE inquiries. Requirements for submittal review and field visits will be negotiated at the completion of the design as a modification to the basic contract. Wilmington District reserves the option to review submittals in lieu of the AE.

The AE may be asked to provide Construction Phase and commissioning services on site.

3. TECHNICAL INSTRUCTIONS. The following technical instructions are applicable to this project:

3.1.Quality Control Plan. For each task order the AE shall provide and maintain a Design Quality Control Plan as an effective quality control program which will assure that all services required by this contract are performed and provided in a manner that meets professional architectural and engineering quality standards. As a minimum, all documents shall be technically reviewed by competent, independent reviewers identified in the DQC Plan and all documents shall be cross referenced using various checklists to assure compatibility. The same element that produced the product shall not perform the independent technical review (ITR) or checklist review. In addition, the DQC Plan shall as necessary incorporate the Lessons Learned database provided by the Government as part of the DRCHECKS system.

The DQC Plan shall be implemented by a Design Quality Control Manager who has the responsibility of being cognizant of and assuring that all documents on the project have been coordinated. This individual shall be a person who has verifiable engineering or architectural design experience and is a registered professional engineer or architect.

While the Design Quality Control Manager can be a person also involved in the production of the product, the DQC Plan shall address the duties and responsibilities of the DQC manager and show adequate staffing and time to perform these duties. The name of the individual and the name of an alternate person assigned to this position shall be listed in the Design Quality Control Plan. Any changes to these personnel require a resubmission of the plan for acceptance.

The AE shall include in the DQC plan the discipline-specific checklists and the cross discipline checklists to be used during the design and quality control of each submittal.

These completed checklists shall be submitted at each design phase as part of the project documentation. Additionally, comments generated by the ITR review shall be written, annotated and included in each design phase as part of the project documentation. The AE shall correct errors and deficiencies in the design documents prior to submitting them to the Government.

The AE shall include in the DQC plan design schedules identifying all major design tasks, including those that control the flow of work. The schedule shall include review and correction periods associated with each items. Internal review periods for Design Quality Control functions shall be listed as well as external review periods.

Acceptance of the AE’s plan is required prior to the start of design. Acceptance is conditional and will be predicated on satisfactory performance during the design. The Government reserved the right to require the AE to make changes in his DQC plan and operations including removal of personnel, as necessary, to obtain the quality specified.

Insure the following items are included:

3.1.1. Project number, description, and location.

3.1.2. A listing of design team members, noting responsibilities, phone numbers and e-mail addresses. NOTE: The AE was selected based on the team members submitted no change shall be made without prior approval.

3.1.3. A CPM or bar chart schedule prepared using an off the shelf NAS software package fully compatible with the Microsoft Windows environment (i.e. Microsoft Project or similar software) indicating required design activities and proposed submission dates.

3.1.4. Brief outline description of the AE’s quality procedures for ensuring a coordinated design between disciplines, coordination between drawings and specifications, internal review processes, and conformance with SAW deliverables requirements as defined in the task order.

3.2.Adapt Government Designs. When appropriate, the AE will adapt Government designs, drawings, specifications, and standards for buildings and other structures as necessary to meet the requirements of the approved layout of the proposed project, and prepare detailed designs, specifications, and drawings in required form for buildings and other structures for which Government designs are incomplete or unavailable. All such drawings and specifications will be corrected to reflect the latest criteria requirements in effect during the project design. Facilities to be used as a basis of design will be identified in the Specific Instructions for each project.

3.3.Adjacent Projects. On-going projects located adjacent to, or nearby a proposed project site will be identified in the Specific Instructions for each task order. The AE shall completely and thoroughly coordinate all aspects of the proposed project and how it interrelates with surrounding facilities.

3.4.Construction Cost Limit. At any time during the design process, should it become apparent to the AE that the construction cost of a project will exceed the amounts set forth for in the task order, he/she shall immediately provide written notice to the Contracting Officer Representative (COR) and Contracting Officer. It is conceivable that the Government established construction cost limit (CCL) of a project can change between the time the project is negotiated and the time final design is completed. The AE will be advised of all changes in the construction cost limit. A change in the CCL shall not categorically constitute a change in scope nor justify any change in the AE’s fee.

The AE is required to design all projects at full scope as indicated on the DD Form 1391 or the Specific Instructions as originally negotiated plus any changes incorporated by contract modification regardless of the fluctuation in the construction cost limit in accordance with subparagraph (c), FAR 52.236-22. In instances where the construction cost for the full scope design exceeds the CCL, despite the AE’s best effort to design the project within the established cost limits, additive or optional construction items will be recommended and incorporated as required.

3.5.Site Visits. When making site inspection visits at the project location, the necessary arrangements for such visits will normally be made with the AE Coordinator. The AE will submit a report of field visit each time a visit is made to an installation. A suggested format for a field visit report is attached (Enclosure 2). The AE is responsible for determining existing site conditions and coordinating the proposed new work with existing conditions and other proposed work. As-built drawings for typical facilities furnished the AE may not necessarily reflect the true existing conditions; therefore, each facility must be field checked and drawings revised to indicate the true existing conditions.

3.6. Accessible Design Criteria. In accordance with the Public Law 90-480, portions of the facility may be required to be designed for use by the physically handicapped. Facilities may be required to be designed in accordance with Architectural Barriers Act Standards.

Guidance can be found at: https://www.access-board.gov/guidelines-andstandards/buildings-and-sites/about-the-aba-standards/aba-standards.If provisions for the handicapped are not included, specific reasons for exemption will be furnished.

3.7. CAD/BIM Drawings. Develop all designs, using Advanced Modeling and Computer Aided Design (CAD) software. Advanced Modeling refers to the use of Building Information Modeling (BIM), Civil Information Modeling (CIM) Computer Aided Design (CAD), and Geospatial Information Systems (GIS) for the development of design and construction deliverables. The AE will develop the contract drawing files using the latest version of CAD software in use by Wilmington District at the time of contract award. Drawing files developed using other graphics and CAD software and then translated into another software shall not be permissible, unless specified on a specific task order. All design drawing files (and their associated data or reference files) developed for a project shall conform to the ERDC/ITL TR-12-6 A/E/C CADD Standard, Release 6.1. These project CAD files shall become Government property and be added to Wilmington District's CAD library. Project files will be delivered on CD/DVD disc with a physical label as to the project location and project name. The CD/DVD must conform to ISO 9660 file standard. See Engineering and Construction Bulletin (ECB) 2018-7: Advanced Modeling. Requirements on USACE Projects.

Guidance can be found here: https://www.wbdg.org/ffc/dod/engineering-andconstruction-bulletins-ecb/usace-ecb-2018-7

3.8. PDF Drawing Files.

3.8.1. The converted PDF drawing files must reflect the exact design drawing scale and line weights. The AE will ensure that the scale of the plot corresponds to the scale of the drawing when generating the PDF file. The PDF files should be scaled to full size ANSI D drawing sheets, English units 22” x 34” or if requested, to half size drawing sheets, English units 11” x 22”.

3.8.2. Sometimes there are subtle differences on prints plotted from PDF files because of pin table selections or different plotter selections. The AE shall review a 10% random sample of PDF file plots prior to their submission to the Wilmington District.

3.9.Index of Drawings. An Index of Drawings (typically included as a sheet in the project) shall also be provided in either an Excel Spreadsheet or an ASCII text file. The file should contain separated columns for the following: Sheet Number, Plate Number, Title of Drawing, the PDF file name, and finally the CAD file name that contains the Sheet/Drawing. There should be a row for each sheet included in the set of drawings.

This file is to aid the solicitation team through solicitation and award processes.

3.10. Computerized Design Analysis. The AE is encouraged to use computer calculations as part of analysis whenever possible. As a minimum, unless the programs are listed as approved, the AE will provide:

3.10.1. The name of the program.

3.10.2. A description of the program. This description must be sufficient to verify the validity of methods, assumptions, theories, and formulas, but does not require source code documentation or other information that would compromise the proprietary rights. The AE is responsible for verifying the results of programs and that programs are used correctly.

3.10.3. A benchmark run validating the program that includes both a computer analysis and hand analysis of a typical or representative problem.

3.11. GIS Deliverables. All GIS deliverables shall conform to the Spatial Data Standards for Facilities Infrastructure and Environment version 4.0 Gold, or as specified in individual Task Order Scopes of Work and delivered in a Personal Geodatabase, File Geodatabase, Shapefiles, Grids, or Surfaces created with ESRI ArcGIS Desktop version 10.6, ArcGIS Pro 2.3 or as specified in individual Task Order Scopes of Work.

3.12. Geospatial Data and System. Geospatial Data related work items shall be created in compliance with the following standards:

3.12.1. National Geospatial Data Clearinghouse. National Geospatial Data Clearinghouse:

Prior to collecting data or databases, the Contractor shall use the Clearinghouse as a tool to locate and acquire any data sets that might meet project needs.

3.12.2. Content Standards for Digital Geospatial Metadata. Contractors must provide metadata for all geospatial data created under Government contracts and this metadata must be compliant with the Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata.

3.12.3. Spatial Data Standards for Facilities Infrastructure and Environment (SDSFIE), GIS Standard. The SDSFIE are content standards for GIS implementation within the Department of Defense (DOD) and Contractors must use this standard as applicable and required for the project. Project specific SDSFIE deliverable information will be provided by the Government upon request.

3.13. Cost Estimate. Cost estimates shall be developed in accordance with ER 1110-3-

1300.

3.13.1. Two cost estimating software packages are acceptable for submittals: Micro- Computer Aided Cost Estimating System (MCACES), Second Generation (MII) Software version 4.2 software (or higher) and the latest version of RS Means Cost Works software. The Government will specify which software shall be used for individual task orders.

3.13.2. It is conceivable that the construction cost limit (CCL) of a project can change between the time the project is negotiated and the time final design is completed. The AE will be advised of all changes in the construction cost limit. A change in the CCL shall not necessarily constitute a change in scope nor justify any change in the AE's fee. The AE is required to design the project at the full scope as indicated on the DD Form 1391 or the Specific Instructions as originally negotiated plus any changes incorporated by contract modification regardless of the fluctuation in the construction cost limit in accordance with Subparagraph (c), FAR 52.236-22.

3.13.3. At any time during the design process, should it become apparent to the AE that the construction cost of the project will exceed the amounts set forth in the Specific Instructions for each task order, the AE shall immediately provide written notice to the Contracting Officer’s Representative (COR) and Contracting Officer.

3.13.4. When an estimate is to be submitted using the MCACES, MII software, it is the

AE's responsibility to use the most current version. An updated cost estimate will be provided simultaneously with each design submittal. The AE shall use RS Means source tags. Using RS means CSI line items is critical because the contract may dictate the use of CSI line items.