TECHNICAL SUMMARY OF CHANGES Ft. Bragg SATOC.pdf

PDF 284 KB Posted

Attached to
W912PM22B0011 - Repairs to Mission Essential Building 279 at Sunny Point, NC
Solicitation number
W912PM22B0011
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTSU 22015 Repairs to Mission Essential Bldg 279

Amendment 03 April 11, 2022

TECHNICAL SUMMARY OF CHANGES

1) Note was added to Sheet A-101: “Contractor shall remove all contents from building, store and re-install upon completion of interior work.” Revised Sheet A-101 is included with Amendment 03.

2) Electrical fixtures were revised to match the type fixture existing, i.e. surface mounted fixtures in rooms with gypsum board ceilings will be replaced with surface mounted LED fixtures, exterior entry soffit recessed fixture will be replaced with recessed LED fixtures. Revised Sheets E-001 and E-101 are included with Amendment 03.

File details come from the government source that posted it. Updated .