MOTSU 22015 Repairs to Mission Essential Bldg 279
Amendment 03 April 11, 2022
TECHNICAL SUMMARY OF CHANGES
1) Note was added to Sheet A-101: “Contractor shall remove all contents from building, store and re-install upon completion of interior work.” Revised Sheet A-101 is included with Amendment 03.
2) Electrical fixtures were revised to match the type fixture existing, i.e. surface mounted fixtures in rooms with gypsum board ceilings will be replaced with surface mounted LED fixtures, exterior entry soffit recessed fixture will be replaced with recessed LED fixtures. Revised Sheets E-001 and E-101 are included with Amendment 03.