A-101_Arch Demo-New Work Plan_REV C.pdf

PDF 215 KB Posted

Attached to
W912PM22B0011 - Repairs to Mission Essential Building 279 at Sunny Point, NC
Solicitation number
W912PM22B0011
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

COD

CHECKER

OFFICE

112SURVEILLANCE

OFFICE

CLOS.

STORAGE

CLOS.

40'-0"

12'-8 1/2" 6'-4" 3'-0" 3'-4" 3'-9 1/2" 6'-4" 4'-6" 9'-6" 9'-6"

1" E.J.

4'-0"

8'-9 1/2" 13'-3 1/2" 3'-7" 14'-3 1/2"

6'-3 1/2" 7'-5 1/2" 7'-7 1/2" 3'-6" 15'-2" 20'-0"

29'-0" 6'-4" 4'-8" 9'-6" 9'-6" 1'-0"

'-4

3'-4"

4' -1

1" 5'

-3

5' -3

COORIDOR

'-5

5'

-6

/2

3' -5

/4

'-1

1/ 2"

8' -4

/2

'-4

/2

'-8

3'

-4

5' -4

6'

-4

4' -7

'-4

1' -0

1'

-0

VESTIBULE

STOR.

JAN.

STOR.

WOMEN

105A

MECH.

/ELECT.

MEN

105B

BREAK AREA

OPEN BAY

A201 A

A201 B

A201 C

A201 D

2 2

A-101

AR

C

H

IT

EC

TU

R

AL

D

EM

O

LI

TI

O

N /N

EW

W

O R

K

PL

AN

R . B

ES

T

S.

S

U R

R

AT

T

J.

M

AN

N

IN

G

R . B

ES

T

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FI

LE

N

AM

E:

C

AT

EG

O

R Y

C O

D E

AN

SI

D

XX

XX

XX

-X

X- X-

XX

XX

XX

XX

XX

-X

X- X-

XX

XX

AP

R

IL

W

IL

M

IN

G

TO

N , N

O R

TH

C

AR

O

LI

N

A

D

AR

LI

N G

TO

N

A

VE

N U

E W

IL

M

IN

G

TO

N

D

IS

TR

IC

T

A D

Q C

/U se r R ev ie w

S U

BM

IT

TA

L

.2

1.

R

TA

C O

N

TR

O

LL

ED

U

N C

LA

SS

IF

IE

D

IN

FO

R

M

AT

IO

N

(C U

I)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

M O

TS

U

R

EP

AI

R

S

TO

M

IS

SI

O

N

ES

SE

N

TI

AL

B U

IL

D

IN

G

S (B

LD

G

M

IL

IT

AR

Y

O C

EA

N

T

ER

M

IN

AL

S

U N

N Y

PO

IN

T (M

O

TS

U

BR

U

N

SW

IC

K

C O

U N

TY

, N

O R

TH

C

AR

O

LI

N

A

B

BC

O

ES

R

EV

IE

W

S U

BM

IT

TA

L

.2

5.

SCALE: 1/4" = 1'-0"1 DEMOLITION/NEW WORK PLAN

GENERAL CONSTRUCTION NOTES

1 CONTRACTOR SHALL FOLLOW ALL FACILITY RULES AND REGULATIONS

WHILE WORKING ON SITE. THIS INCLUDES BUT IS NOT LIMITED TO; ACCESS

ONTO THE FACILITY, SCHEDULED WORKING HOURS, GENERAL SAFETY

PROCEDURES, FIRE SAFETY PROCEDURES, SECURITY AND ENVIRONMENTAL

CONTROL PROCEDURES.

2 ALL PERMITTING REQUIREMENTS MUST BE SATISFIED/OBTAINED PRIOR TO

COMMENCEMENT OF ANY CONSTRUCTION WORK.

3. FIELD VERIFY DIMENSIONS.

4. SEE SPECIFICATIONS SECTION 02 41 00 - DEMOLITION ON SHEET G-101.

CONSTRUCTION NOTES

1 REMOVE EXISTING VCT FLOORING AND PREP SUBSTRATE FOR RECEIVING

NEW RESINOUS EPOXY FLOORING.

REMOVE EXISTING FLOORING & WALL CERAMIC TILE AND PREP SUBSTRATE

TO RECEIVE NEW CERAMIC FLOOR & WALL TILE AND WAINSCOT.2

LEGEND

4" CMU VENEER

6" CMU

NON-RATED STUD WALL TO 4" ABOVE

FINISHED CEILING UNLESS OTHERWISE

NOTED.

FIRE EXTINGUISHER CABINETFEC

GROSS SQUARE FOOTAGE

BUILDING AREA

TOTAL 1,831 SQ. FT.

CONCRETE PADS 80 SQ. FT.

RECESSED ENTRANCES / OPEN BAY

(COUNTED AT SCOPE)

370 SQ. FT.

1381 SQ. FT.

NOTE:

CONTRACTOR SHALL REMOVE ALL CONTENTS FROM THE

BUILDING, STORE, AN RE-INSTALL UPON COMPLETION OF

INTERIOR WORK.

C

AM

EN

D

M

EN

T #3

.1

1.

Sheets and Views
CURRENT A-101

File details come from the government source that posted it. Updated .