Q1. What is the elevation of the weep holes?
R1. The record drawings did not give an elevation of the weep holes. However only the top weep holes are to be repaired and they are approximately elevation 151'.
Q2. Will a tracked milling equipment be allowed to be "walked" down the roadway?
R2. A tracked milling machine could be walked down the roadway, however the Contractor would be responsible for repairing any damaged pavement.
Q3. Does the existing asphalt pavement have to be milled?
R3. The scope does not require the asphalt to be recycled and therefore does not specifically have to be milled. The asphalt can be removed with an excavator.
Q4. Are wooden components of the new boat bumper (both 2x6 and 4x4 lumber) to be white oak?
R4. Yes.
Q5. Is the Contractor or the Government required to perform density testing on aggregate base course?
R5. The scope of work requires that the aggregate base course and asphalt comply with NCDOT specifications. The Contractor is required to perform testing to assure densities meet NCDOT specifications.