AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Statement of Work has been amended to remove language in the Preservative Treatment section. See the attached Summary of Changes. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM20T0036
X 9B. DATED (SEE ITEM 11)
03-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Sep-2020
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM20T0036
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
STATEMENT OF WORK
Scope of Work Bulkhead Repairs
O&M Support Facilities Falls Lake Dam, Wake Forest, North Carolina
1.0 GENERAL:
The condition of an O&M Support Facilities concrete bulkhead, pavement areas and riprap slope protection have deteriorated due to erosion and need to be repaired. The following is a summary of repairs to be constructed by this Scope of Work:
a. Pavement Repairs: The pavement on the land side of the bulkhead area has eroded due to the effects of varying lake levels. A section of the access road to the bulkhead shows signs of subbase failure and requires repair.
b. Slope Protection: The slope on the land side of the bulkhead paved area will be reinforced with new rip rap.
c. Concrete Bulkhead Repairs: Subsurface soils of the concrete bulkhead is being eroded through weep holes and requires repairs. Wood boat bumpers on the lake side of the concrete bulkhead have deteriorated due to weathering and shall be replaced.
The requirements described in this scope of work and as shown on drawings, included as Attachment A of this scope of work, shall be constructed.
The Contractor shall furnish all materials, supplies, tools, parts, equipment, transportation, labor, supervision, communication, and quality control to complete the work listed below, at the O&M Support Facilities Bulkhead, Falls Lake Dam, located in Wake County, North Carolina.
1.1 PERFORMANCE PERIOD:
Duration is 180 Calendar Days after Notice to Proceed.
1.2 SAFETY:
Applicable provisions of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, will govern all work performed under this task order. The safety manual may be found at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1_2008_Consolidated.pdf?ver=2013-09-04-161030-210
Safety while at the project site will be in compliance with the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes
1.3 SECURITY:
1.3.1 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.3.2 For the CONTRACTOR employees who do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.3.3 Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.3.4 Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
Processing of background checks should be coordinated with the Wilmington District Security Manager.
1.4 PRE-BID SITE VISIT.
An organized site visit has been scheduled for-
15 September 2020 at 11:00 AM.
Participants will meet at:
Address: Visitor's Assistance Center parking lot
11405 Falls of the Neuse Road Wake Forest, NC 27587
POC: Mr. Mark Wilmes Telephone Number: 919-846-9332 x2226 Email Address: Mark.D.Wilmes@usace.army.mil
1.5 COORDINATION
The principal Wilmington District technical point of contact for this contract is the Contracting Officer’s Representative that will be specified at contract award. Submittals shall be made to the Contracting Officer’s Representative. The Contractor shall designate a project manager who shall be the principal point of contact for the Wilmington District in administering this contract.
The Contractor's project manager shall be responsible for all coordination to insure the work is accomplished in a professional manner. Any directions given that are viewed by the Contractor as a change to the scope of work affecting contract fixed price and performance period shall be brought to the immediate attention of the Contracting Officer or the Contracting Officer’s Representative.
1.6 AVAILABILITY AND USE OF UTILITY SERVICES
1.6.1 Temporary Utilities
Provide temporary utilities required for construction. Materials may be new or used, must be adequate for the required usage, not create unsafe conditions, and not violate applicable codes and standards.
1.6.2 Payment for Utility Services
(a) The Contractor shall provide and maintain at his own expense an adequate supply of water for his use for construction and domestic consumption, and to install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. Before final acceptance, temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer.
The Contractor shall carefully conserve any utilities furnished without charge.
(b) All electric current required by the Contractor shall be furnished at his own expense. All temporary lines will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner at his expense prior to final acceptance of the construction.
1.6.3 Meters and Temporary Connections
The Contractor, at its expense and in a manner satisfactory to the Contracting Officer, shall provide and maintain necessary temporary connections, distribution lines, and meter bases.
1.6.4 Telephone
The Contractor shall make arrangements and pay all costs for telephone facilities desired.
1.7 PROTECTION OF EXISTING FACILITIES
The Contractor shall be responsible for protecting Government property and undisturbed land not intended for modification, from damage. The Contractor shall protect all existing structures, including roads, parking areas, bridges, roadway embankments, utilities and improvements from damage and, in the event of damage as a result of his operations, the Contractor shall be responsible for their repair, restoration, or for all cost of damage resulting therefrom. In addition, the Contractor shall be responsible for any damage to bridge or culvert structures caused by the unauthorized excavation or excavation beyond the project dimensions shown on the plans. The Contractor shall not inflict damage upon land outside the contract area by unwarranted entry upon, passage through, or disposal of material on such land. The Contractor shall repair all damage or disturbance caused by the Contractor’s operations that are outside the direct work area to the satisfaction of the Contracting Officer and at the Contractor’s expense.
1.8 CONTRACTOR FACILITIES AND WORK AREAS
The Contractor shall propose and get approval for all lay down, staging and access areas to be used outside the direct work areas. The Contractor's lay down and staging areas, stockpile storage, and temporary access areas shall be placed in approved areas as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities shall be made only when approved by the Contracting Officer.
2.0 GENERAL SPECIFICATIONS:
The work consists of paving repairs, repaving, and repairs to concrete bulkhead per this scope of work. The asphalt mixture, construction, and placement are to meet the requirements of
North Carolina Department of Transportation (NCDOT) Standard Specifications for Roads and Structures, latest edition, unless otherwise specified in this scope of work. The rip rap and aggregate gradation and placement are to meet the requirements of NCDOT Standard Specifications for Roads and Structures, latest edition, unless otherwise specified in this scope of work.
2.1 PAVEMENT REPAIRS
Areas that are to be resurfaced require milling 2” of existing material prior to a new 2” asphalt course to become the new pavement surface. New finished surface pavement of the bulkhead paved area and the access road shall match existing pavement elevations and areas as shown on the drawings. All asphalt materials, processing, and placing shall meet the NCDOT standards.
Asphalt surface course shall be SF-9.5A. There is an area of the access trail which will need repaired prior to resurfacing. This area should then be resurfaced to maintain uniformity with the rest of the access trail and bulkhead paved area.
The bulkhead paved area has eroded on the land side. The bulkhead paved area shall be restored to the elevations and dimensions as shown on the drawings. Restoration of the elevation to the land side of the bulkhead paved area will require compacted fill material and compacted aggregate base course prior to paving.
a. Compacted fill. Fill materials comprise any materials classified by ASTM D2487 as SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, or SP-SC. Satisfactory materials for grading comprise stones less than 3 inches in any dimension. Fill material shall be compacted using an approved vibratory roller or plate compactor. Loose lifts of fill material shall not exceed 8 inches in thickness when compacted by a roller or 4 inches when compacted by plate compactor. A minimum of 2 full passes shall be made by the compaction equipment across each lift. The compaction shall continue until the lift achieves an unyielding condition (i.e., no rutting or discernable deformations under the load of the compaction equipment) and is approved by the Contracting Officer.
b. Aggregate base course, prime coat and asphalt pavement materials shall meet NCDOT specifications and shall be approved by the Contracting Officer or his/her representative.
c. A prime coat shall be applied to access trail and bulkhead paved area aggregate base course. 2-inches of asphalt NCDOT SF 9.5A shall be spread and struck off with a paver. Any irregularities in the surface of the pavement course shall be corrected directly behind the paver.
See attached site plan for location and details of paving access trail and bulkhead paved area.
c. Ensure 0.05 to 0.15 gallons per square yard Prime coat is used when relaying the base and top courses. Prime coat shall meet the requirements of NCDOT standard specifications.
Emulsified asphalts of either SS-1 or SS-1h shall be used. Ensure the surface is dry, clean, dust-free, and between 40 and 140 °F. On the same day as prime coats are applied repave bulkhead access trail and bulkhead paved area surfaces. When placing adjacent material use a cutting wheel and cut back a minimum of 3” from the top of the course to expose a clean and sound vertical surface for the full depth of the course. All milled material shall become the property of the Contractor and shall be removed from the site, and shall be disposed of in accordance with applicable federal, state and local regulations.
d. Care will be used so that asphalt surfaces will match (same level) with the existing asphalt/at entrance to compound.
e. Immediately after the asphalt pavement has been spread, struck off and surface irregularities adjusted, it shall be thoroughly and uniformly compacted by rolling. All surfaces shall be even, free of dips, potholes, and undulations. Any material that becomes loose, broken, or mixed with dirt shall be removed and replaced with fresh hot material.
f. Material shall be delivered to the site at the correct laying temperature, free from lumps of cool material. The gross vehicle weight of the delivery trucks shall be such to cause no damage or depressions to existing paved roadways. Any spills or waste from vehicles shall be immediately cleaned off the surface of the roadway and shoulders.
g. No work shall be permitted when the ambient air temperature is below 50 degrees F or is predicted to fall below 50 degrees F for the following 24 hours or rain is predicted for that same period. Bituminous material shall not be placed on wet surfaces.
h. The Contractor shall be responsible for traffic control to protect the work area during application and curing. Control methods may include but will not be limited to barricades, warning lights and flag persons.
i. The Contractor shall be responsible for damages to government or private property resulting from negligent Contractor operations during the course of the contract. The Contractor shall have appropriate insurance to cover liability and damages.
j. The Contractor shall submit Asphalt Job Mix Formulation and tests certifying compliance with NCDOT requirements including: percent passing each sieve size, percent asphalt cement, number of blows of hammer compaction per side of molded specimen or number of gyrations for Super pave mixes, compaction temperature, stability pounds, flow: 0.01 in, mean air void target percent, voids in mineral aggregate, combined aggregate gradations.
k. The Contractor shall submit prime coat specifications and certification.
l. Aggregate Shoulder Borrow (ASB) shall comply with the requirements of NCDOT
Standard Specifications for Roads and Structures, 2018 edition (Table 1019-2) and placed as shown on the drawings.
2.2 SLOPE PROTECTION
a. Existing Riprap
Existing rip rap shall be excavated from the areas to receive new riprap as shown on the drawings and temporarily stockpiled. Existing stockpiled riprap shall be reused as “chinking stone” to fill the voids of the surface of the new Class II riprap. See Figure 1 for Record Drawing Slope Protection Detail of existing riprap.
b. Riprap Protection.
Where specified, riprap shall consist of 2.5 feet of NCDOT Class II riprap placed over a 1 foot layer of NCDOT #57 stone and an NCDOT Type 2 geotextile fabric. The bedding stone shall be free of clay, silt, sand or debris and shall be composed of stones reasonably well graded. Some of the areas may require work to be completed below the normal pool elevation.
Riprap stone shall consist of fresh, sound, hard, dense, durable rock, which shall be separated from bedrock by quarrying. The stone shall be of such quality that individual integrity and permanence within the structures is assured under all conditions to which it is subjected. The unit weight, saturated surface dry (SSD), of the stone shall not be less than 160 pounds per cubic foot and the specific gravity not less than 2.58. The stone shall be free from open or incipient cracks, seams, fissures and structural planes of weakness, and other defects that would tend to increase its deterioration from natural causes. The stone shall be furnished in blocky and angular shapes with at least one (1) long edge generally flat. No stone will be permitted which has a longest dimension that is more than three times (3x) or greater than its least dimension. Not more than 1% by weight for inclusion of objectionable quantities of dirt, sand, clay, and rock fines will be permitted. An allowance of 5% by weight for inclusion of spalls will be permitted. Broken concrete from demolished structures shall not be used as rip rap.
c. Placement of Stone
Stone for slope protection shall be placed in such manner as to produce a reasonably well-graded mass of rock with the minimum percentage of voids, and shall be constructed within the specified tolerance to the lines and grades shown on the drawings or staked in the field. Stone shall be placed to its full course thickness at one operation as shown on the plans. The larger stones shall be well distributed and the entire mass of stones in their final position shall be roughly graded to conform to the gradation specified in subparagraph Stone Gradation, hereinabove. The finished stone shall be free from objectionable pockets of small stones and clusters of larger stones. Placing riprap in layers will not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source, or by other methods of placement which will produce the specified results. Rearranging of individual stones by mechanical equipment or by hand will be required to the extent necessary to obtain a reasonably well graded distribution of stone sizes as specified above. The Contractor shall maintain the stone slope protection until accepted and any material displaced by any cause shall be replaced at his expense to the lines and grades shown on the drawings.
2.3 BULKHEAD REPAIRS
a. Weep Hole Repair
Aggregate protection of weep holes above elevation 250 feet shall be replaced. Weep holes are spaced every 5-feet along the concrete bulkhead wall. Each weep hole shall be excavated to and weep hole opening cleared for repair materials.
Each weep hole shall be covered with a 12”x12” square of hardware cloth. Hardware cloth shall be anchored to the fill side of the concrete wall. Hardware cloth shall be plastic with 1/8-inch mesh or galvanized steel wire with 1/8-inch mesh. In addition to the hardware cloth a fabric bag filled with one cubic foot of NCDOT #78 stone shall be positioned at each weep hole. Fabric bags shall be made of NCDOT Type 1 geotextile fabric. The fabric bags with stone and hardware cloth shall be positioned to be centered on the weep hole.
b. Wooden Boat Bumper Repair
The existing wood boat bumpers at elevation 253’ shall be replaced. The 2”x6” members, 4”x4” spacers and the ½-inch diameter anchor bolts shall be replaced new. All existing wood and anchor bolts shall be removed and disposed of at an approved offsite location and in accordance with all federal, state and local regulations. The existing anchor bolts shall be cut flush with the surface of the concrete.
1) Solid Sawn
Provide solid sawn lumber and timbers of stress-rated White Oak with a compressive stress rating (perpendicular to grain) of 800 psi, and identified by the grade mark of a recognized association or independent inspection agency using the specific grading requirements of an association recognized as covering the species used. The association or independent inspection agency must be certified by the Board of Review, American Lumber Standards Committee, to grade the species used. For secondary members use lumber or timbers rated No. 1 or better.
2) Preservative Treatment
Fabricate lumber and timbers before preservative treatment. Each piece of treated lumber or timber must be branded, by the producer, in accordance with AWPA M6. The type of preservative, retention, and penetration must be based on Use Category and species and in accordance with AWPA U1 and AWPA T1. The Contractor shall be responsible for the quality of treated wood products.
For wood not in contact with brackish water, salt water, or salt water splash, treatment must be in accordance with AWPA U1 Commodity Specification A: Sawn Products with water-borne preservative (AWPA P5) except that chromated zinc chlorides, pentachlorophenol-ammoniacal systems, and alkyl ammonium compounds will not be allowed.
3) Field Treatment Lumber must be field treated in accordance with AWPA M4. All cuts, holes and injuries such as holes from removal of spikes or nails which may penetrate the treated zone must be field treated with copper naphthenate conforming to AWPA P34.
4) Anchor Bolts
Anchoring of lumber to concrete bulkhead wall shall be made with 1/2-inch anchor bolts or threaded rod, washers, and nuts that are made from ASTM A 307 material and shall be hot dipped galvanized to meet ASTM A 153/A 153M. New fasteners shall be used to make connections. Certified mill reports shall be submitted to the Contracting Officer's Representative for review and approval. New anchors shall be constructed by use of an adhesive anchoring system. Minimum embedment must be 4 inches.
2.4 MATERIAL ESTIMATES
The paving and bulkhead repair quantities shall be treated as field estimates, and the Contractor shall verify all dimensions.
Mill 2-inch thick asphalt pavement: 220 SY New asphalt paving NCDOT SF-9.5A, 2” thick: 220 SY NCDOT Aggregate Base Course, 8-inch thick: 50 SY NCDOT Prime Coat: 220 SY Rip rap NCDOT Class 2: 110 TNS NCDOT #57 Stone: 45 TNS NCDOT Type 2 Geotextile: 90 SY NCDOT #78 Stone 1 CF in NCDOT Type 1 Geotextile bag: 14 EA Hardware Cloth 12”x12”: 14 EA White Oak 2”x6” lumber: 92 LF White Oak 4”x4”x6” lumber: 20 EA Anchor bolts, ½-inch dia. X 8”: 20 EA
2.5 DISPOSAL OF MATERIALS
The Contractor shall remove all demolition debris and left over construction debris to an approved offsite location licensed to receive/recycle construction debris and in accordance with all federal, state and local regulations. The Contractor shall be responsible for any waste disposal and any permits and fees associated with disposal.
The Contractor shall be responsible for paying any associated fees necessary to haul materials; repair, and repave access trail and bulkhead area. All work shall be coordinated through the COR.
2.6 WARRANTY
The Contractor shall furnish the COR with a minimum of 1-year warranty or standard warranty whichever is greatest on any labor/materials for any defect.
(End of Summary of Changes)