A21 - W912PM20R0014 Amendment 1.pdf
PDF 2 MB Posted
- Solicitation number
- W912PM20R0014
About this file
This solicitation requests proposals for operations and maintenance services at the John H. Kerr Reservoir Project in Virginia. The U.S. Army Corps of Engineers, Wilmington District is seeking these services on a firm fixed price basis for a one year base period and four one-year option periods. The North American Industry Classification System code is 561210 and the small business size standard is $41.5 million. This is a 100% small business set-aside determined by the SBA. Proposals are due by the date specified in ProjNet. The solicitation documents and any questions can be accessed through ProjNet. Interested parties should contact the named Contract Specialist or Contracting Officer if needing assistance accessing these materials. The services required include general maintenance, repairs, and operation of facilities such as the visitor center, education center, village house, sewage treatment plants, thirteen recreation areas, and shoreline areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PM20R0014
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This Solicitation is amended to:
1. Edit language w ithin the DOD SAFE text.
2. Update the “Performance Risk Assessment Questionnaires” language and insert the USACE Past Performance Questionnaire at the end of “Instructions/Conditions/Notice”
3. See attached summary of changes. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 172
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM20R0014
X 9B. DATED (SEE ITEM 11)
02-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2020
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
TOTALS
NAME OF OFFEROR____________________________________
SOLICITATION NUMBER _______________________________
NAME OF PROJECT_____________________________________
SUMMARY OF PRICE FOR BASE AND OPTION YEARS
This must be completed and attached to your cost proposal.
0001 Transition – 30 Day 1 Month $___________
0002 BASE – OFF-PEAK Level 1 O&M Services at John H.
Kerr Lake
0003 BASE – PEAK Level 1 O&M Services at John H. Kerr
Lake
BASE TOTAL $___________
1001 OY1 - OFF-PEAK Level 1 O&M Services at John H.
1002 OY1 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 1
TOTAL
2001 OY2 - OFF-PEAK Level 1 O&M Services at John H.
2002 OY2 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 2
3001 OY3 - OFF-PEAK Level 1 O&M Services at John H.
3002 OY3 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 3
4001 OY4 - OFF-PEAK Level 1 O&M Services at John H.
4002 OY4 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 4
5001 6 MONTH EXTENSION $___________
BASE PLUS OPTION YEARS TOTAL $___________
NAME OF OFFEROR____________________________________
Summary of Price by Cost Element for Base and Option Years (Level 1 Services)
Cost Element
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Off Peak
Option Year 4 Peak
Option Year 4
Off Peak Total
Direct Labor: $ $ $ $ $ $ $ $ $ $ $
Total Labor Burden $ $ $ $ $ $ $ $ $ $ $
Total Material & Supplies $ $ $ $ $ $ $ $ $ $ $
Total ODCs: $ $ $ $ $ $ $ $ $ $ $
Total Subcontract Costs: $ $ $ $ $ $ $ $ $ $ $
Total Direct Costs: $ $ $ $ $ $ $ $ $ $ $
G&A Costs $ $ $ $ $ $ $ $ $ $ $
G&A Rates
Total Direct Cost & G&A $ $ $ $ $ $ $ $ $ $ $
Profit:
TOTAL $ $ $ $ $ $ $ $ $ $ $
Summary of Costs by Year by Technical Provision – Level 1 Services
Technical Provision
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Peak
Option Year 4 Peak
Option Year 4
Total
TP 1
TP 2
TP 3
TP 5
TP 6
TP 7
TP 9
TP 10
TP 11
TP 12
TP 13
TP 14
TP 15
TP 16
TP 17
TP 18
TP 19
TP 21
TP 22
Summary of Productive Labor Hours by Technical Provision – Level 1 Services
Technical Provision
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Option Year 4 Peak
Option Year 4
TP 1
TP 2
TP 3
TP 5
TP 6
TP 7
TP 9
TP 10
TP 11
TP 12
TP 13
TP 14
TP 15
TP 16
TP 17
TP 18
TP 19
TP 21
TP 22
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
PRS
Performance Requirement Summary
The contract requirements listed in this Performance Requirements Summary (PRS) summarize specific tasks that are to be performed under this contract.
The Performance Requirements associated with each contract requirement are as shown in the PRS and include:
A. Task or Work Requirements. A series of work requirements associated with particular contract requirements is listed in column 1 of the PRS.
B. Performance Standards. Specific measures and standards associated with each work requirement are listed in columns 2.
C. Acceptable Quality Level. Column 3 measurement of the maximum number of deficiencies or defects that is considered acceptable per specific task performed under this contract.
D. Method of Assessment. Column 4 outlines the evaluation tools and techniques utilized to assess contractor performance of work requirements to established measures and standards. The Government is not limited to the tools and techniques listed; others may be implemented as required.
E. Performance Incentive. Column 5 describes the motivation incentive and control measures for performing tasks associated with each contract requirement.
TP-1 GENERAL INFORMATION
Task Performance
Standard
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-1.7 Contractor’s furnished equipment.
Purchase equipment necessary to meet the contract requirements.
Mark/decal contractor’s equipment per contract requirements.
Ensure equipment maintains a safe operating condition.
100 % compliance no deviations.
Review and approve proposal.
Contracting Officer may reject contractor’s proposal.
TP-1.8 &1.10
Damaged Government
Furnished Equipment and Safeguarding
Government Property.
Implement security measures to safeguard
Government Property and comply with all
100 % compliance no deviations.
Perform random and routine inspections.
Annually inspect all
Government
Non-compliance will result in deduction in pay, and a negative performance evaluation.
USACE security and safety regulations.
Replace damaged equipment due to negligents.
Furnished
Equipment.
Monitor & document in writing performance.
Contracting Officer may require payment of damaged equipment or property due to contractor’s negelance.
TP-1.11 Key Control Implement and maintain a key control program that protects the Government and
Contractor employees from liabilities.
Report any lost or stolen keys to the
COR immediately.
100 % compliance no deviations.
Annually inspect all
Furnished Keys.
Monitor & document in writing
Non-compliance will result in deduction in pay, and a negative
TP-1.12 Establish and maintain a line of communication.
Establish a line of communication with
30 day of contract award.
Maintain an open line of communication between the contract supervisor and COR.
100 % compliance no deviations.
Monitor & document in writing
Review and Approve contractor’s proposal
Non-compliance will result in a negative
Contracting Officer may reject contractor’s proposal.
TP-1.13 Interruptions of facility, or recreational area.
Keep closures to a minimum due to maintenance or repairs.
Inform COR when facilities or operating system is down for maintenance.
100 % compliance no deviations.
Monitor & document in writing result in a negative
TP-1.16Transporting
Government equipment and Materials.
Transport equipment/materials when requested as a
Level II Service.
100 % compliance no deviations.
Monitor & document in writing
TP-2 MANAGEMENT
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-2.2 Implement & maintain a Quality
Control Plan
QC Plan is submitted for acceptance no later than 30 days after contract is awarded.
Reports are accurate & supplement the contractor’s QC Plan.
deviations.
Review Quality
Control reports.
Perform random & routine inspections to monitor QC Plans effectiveness.
Save all documentation for performance evaluation.
TP-2.6 Minimum
Personnel
Qualifications
Maintains an adequate staff to perform
Contractor employees are skilled & provide good workmanship.
Adhere to applicable laws and regulation.
deviations.
Monitor staff & quality of work.
Perform routine inspections of work completed.
Document & report any contractor personnel issues.
Non-compliance will result in a negative
TP-2.10-2.11
Schedules and Weekly
Work Reports
Submit annual work plan.
Provide COR with weekly schedules as specified in the SOW.
Provide Weekly
Reports of work completed as specified in the SOW.
100 % compliance no deviations.
Deficiencies & errors corrected immediately
Monitor and document
Contractors performance in writing.
Non-compliance will result in a negative performance evaluation.
TP-2.12 The contractor shall provide emergency repairs & services.
Contractor established contact with COR within one hour of notification.
deviations.
Monitor & document response to emergency repairs.
Contractor responds to all service calls within two hours of notification.
Provide a quality service meeting customer needs.
Ensure contractor is providing a timely & efficient service.
Document in writing any unacceptable performance.
TP-2.14 The contractor shall document completed work for
FEM Data System.
Document the price breakdown as required by FEM for each work order.
Provide a work completed summary.
Submit for review in a timely manner.
Receive no more than 5 reporting errors per contract year.
Correct deficiencies in a timely manner.
Review all FEM reports
Inspect completed reports.
Document any failed reporting.
Non-compliance will result in work being redone at Contractor’s expense and a negative performance evaluation.
TP-2.26-2.27 The contractor shall submit
& maintain an Accident
Prevention Plan, submit monthly exposure reports, protect the safety of the public, provide safety training, & comply with all environmental regulations.
Accident Prevention
Plan is submitted no later than 30 days after contract is awarded.
Establish, implement, & maintain a comprehensive safety program.
Comply with all
Environmental, OSHA, & USACE safety regulations.
Document & submit monthly exposure reports per contract
Ensure public safety.
Receive no
OSHA
reportable violation resulting from contractor’s action or inaction.
Random and routine inspections will occur no less than once per week.
Review monthly exposure reports.
Monitor contractors
Accident Prevention
Plan.
Monitor safety & environmental compliance.
Document violations in writing.
Save all documentation for performance review.
result in negative contractor evaluations.
Stop work order may be issued for negligent violations.
TP-3 CLEANING SERVICES
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-3.1.3 The contractor shall provide
& maintain an effective dumpster & recycling collection service.
Ensure that all dumpsters are emptied
Debris is removed in the surrounded area.
Ensure dumpsters are maintained in a safe, sanitary, & operable condition.
Receive no more than 2 valid customer complaints or observed deficiencies per month.
Perform Random & routine inspections no less than once per week during schedule.
100% inspection performed monthly.
Document deficiencies & valid customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.2-3.3 The contractor will ensure that sanitary facilities, vault toilets, & operation buildings
Facilities & vault toilets maintain a sanitary, clean & neat appearance per SOW
Supplies are adequately stocked and always available to the public.
Ensure dispensers and containers are functioning properly
Receive no more than 2 valid customer complaints or observed deficiencies per month.
Random & routine inspections performed no less than once per week during season.
deficiencies & customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.4-3.6 The contractor shall clean all corps operated shelters, picnic sites, impact sited, campsites.
Ensure that all picnic tables & shelters are cleaned & maintain a safe operating condition.
Contractor performs cleaning services per
Grills, fire rings, campsites & impact sites are cleaned per schedule.
Receive no more than 2 valid customer complaints or observed deficiencies per month.
Perform Random & routine inspections no less than once per week during customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP--3.7 The contractor shall replace trash can liners, remove litter & debris from the grounds, & remove debris from swim beaches.
Trash can liners are replaced per referenced TP
Litter & debris is removed from the grounds per SOW.
Swim beaches are cleaned daily during peak months per
Ensure facilities are clean and safe for public use.
Receive no more than 5 valid customer complaints or observed deficiencies per contract year.
Random inspections performed no less that once per week or per customer complaint.
100 % inspection customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3. 9The contractor shall provide shoreline cleanup twice per year in a COR designated area.
Remove litter & debris from the shoreline twice per year in a designated area directed by the COR.
Perform service in accordance with deviations.
100% inspection when work is
Document contractor performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3. 10Removal of abandoned property & structures from the shoreline
Remove abandoned property & structures when requested by the
COR as a Level II
Service.
100 % compliance no deviations
100% inspection.
Document contractor writing.
Non-compliance will result in negative performance evaluation.
TP-3.11 The contractor shall clean all dump station, sewer lift stations, & pump houses.
Clean, remove litter & debris.
Maintain facility in a safe, sanitary, operating condition.
more than 5 valid customer complaints or observed deficiencies per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-3.12 Remove litter
& debris from boat docks & fishing piers.
Clean debris & litter from all boat docks & fishing piers.
Docks & piers maintain a safe operating condition for customer use.
Perform schedules per contract specifications.
Receive no more than 5 customer complaints or observed deficiencies per contract year.
Random inspections performed no less that once per week or performed monthly
Document deficiencies & valid customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.13 The contractor shall clean all corps & contractor operated buildings.
Ensure all operational buildings are kept clean per contract customer complaints or observed deficiencies per contract year.
Random inspections performed no less that once per week or customer complaints result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3. 14The contractor shall clean road ends and access points
Provide service in deviations.
Routine inspections performed when work is completed.
performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-3. 15 -3.16 The contractor shall provide cleaning services to the
Visitors Assistance
Center & Tanner
Center
Perform cleaning services per TP referenced weekly & annual requirements.
Provide cleaning services per referenced schedule.
Receive no more than 5 customer complaints or observed deficiencies per contract year.
100% inspections performed weekly.
writing.
redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3. 17The contractor shall provide cleaning services to one corps owned houses.
Provide cleaning services per contract more than 2 valid customer complaints or observed deficiencies per month.
Routine inspections performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.21 Provide accident scene cleanup services.
Provide safe & effective cleanup when requested as a
Level II Service.
deviations
Document contractor performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.22 Winter
Camping Services
Perform services per contract requirements.
Receive no more than 2 valid customer complaints or observed deficiencies per month.
Document contractor performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.24-3.25
Amphitheater and Gate
House Cleaning
Services.
Perform services per contract requirements.
Receive no more than 3 valid customer complaints or observed deficiencies per contract year.
Random inspections performed when work is completed
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-3.26 Boat house cleaning services
Perform services per contract requirements.
Receive no more than 3 valid complaints or observed deficiencies per contract year.
Random inspections performed no less than once per month or per staff redone at contractor’s expense, or deduction in pay, and a negative
TP-3.27 Sign cleaning services
Perform services per contract requirements.
Receive no more that 3 valid customer complaints or observed deficiencies per contract year.
Random inspections performed no less than once per month or per customer complaint.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay and a negative
TP-5 MAINTAIN BUILDINGS, STRUCTURES, MECHANICAL, ELECTRICAL,
WATER SUPPLY & SEWAGE DISPOSAL SYSTEMS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-5.2 The contractors shall inspect, maintain, & repair all corps owned operated buildings, & structures.
Perform maintenance, repairs & inspections
Provide quality repairs with good workmanship and comply with all building regulations.
Perform inspections requirements.
Receive no more than 5 customer complaints or observed deficiencies per contract year.
Random inspections performed no less than once per week or per customer redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.3-5.3.3 Other
Facilities and small structures.
Inspect, maintain and repair per contract specifications.
Receive no more than 5 customer complaints or observed deficiencies per contract year.
Random inspections performed no less than once per week redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.4 Insect/Animal
Pests
Perform pest removal services per contract specifications
Receive no more than 2 customer complaints or observed
Random inspections performed no less than once per week or per customer complaint.
Non-compliance will result a negative deficiencies per contract year.
TP-5.5 Painting and
Staining Requirements
Paint structures per contract specifications.
Meet touch-up painting requirements service with good workmanship.
100% deviations.
Routine inspections writing.
Contractor’s failure to meet painting requirements will result in deduction of pay and a negative performance evaluation.
TP-5.6 Maintain, inspect & repair fire extinguishers.
Inspect all fire extinguishers monthly.
Annually service all fire extinguishers.
100% compliance no deviations.
Random & Routine inspections.
performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.7-5.7.10 Repair, inspect & maintain all mechanical, electrical, water systems, waste water treatment systems, HVAC systems & distribution systems
Perform services per
Provide quality repairs workmanship and comply with all building code regulations.
deficiencies of valid customer complaints due to Contractor’s negligent per
Random & routine inspections performed no less that once per week customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.8-5.8.2 Campsite
Maintenance and recreational amenities
Inspect maintain and repair per contract
Replace amenities per
Provide quality service workmanship and
Receive no more than 5 observed deficiencies or customer complaints per contract year.
Random inspections performed no less than once per week customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative replace components with quality products.
TP-5.9 Playground
Maintenance
Perform inspections, maintenance and repairs per SOW.
Meet mulch and sang replenishment workmanship and replace components with quality products.
building code regulations.
Receive no more than 5 customer complaints per contract year.
Random inspections performed no less that once per week customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.10 Walkways, Steps, Handrails, and
Pedestrian Bridges per SOW.
Maintain & repair for safe public use.
Provide quality building codes and safety regulations.
100 % deviations.
Deficiencies & errors corrected immediately.
Random inspections performed no less that once per week customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.14-5.14.1
Generators
Perform maintenance and repairs services specifications.
deviations
Routine inspections performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-5.15 Boat House Provide inspections, maintenance, and repairs per contract requirements.
Receive no more than 3 observed deficiencies per contract year.
Random inspections performed no less than once per month.
redone at contractor’s expense, deduction in pay, & a negative writing.
performance evaluation.
TP-5.17 Inspect, maintain, and repair
Security and Fire
Control Systems
Provide inspections, maintenance, and repairs per contract requirements.
Receive no more than 3 observed deficiencies per contract year.
Random inspections writing.
Non-compliance will result in work being redone at contractor’s expense, deduction in pay, & a negative performance evaluation.
TP-5.18 Maintain all transformers and secondary wiring for an overhead transmission line under Level II
Services
Provide inspections, maintenance, and repairs per contract requirements.
Receive no more than 3 observed deficiencies per contract year.
Random inspections writing.
Non-compliance will result in work being redone at contractor’s expense, deduction in pay, & a negative performance evaluation.
TP-Maintain all dumpsters
Provide inspections, maintenance, and repairs per contract requirements.
Receive no more than 3 observed deficiencies per contract year.
Random inspections writing.
Non-compliance will result in work being redone at contractor’s expense, deduction in pay, & a negative performance evaluation.
TP-5.21 Maintain
Tugboat Dan lighting and appearance
Provide inspections, maintenance, and repairs per contract requirements.
Receive no more than 3 observed deficiencies per contract year.
Random inspections writing.
Non-compliance will result in work being redone at contractor’s expense, deduction in pay, & a negative
TP-6 - MAINTENANCE OF GRASS, TREES & LANDSCAPED AREAS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-6.1-6.6Mowing, Trimming, mowing safety and protecting existing vegetation.
Meets scheduling
Maintain a height not exceeding contract customer complaints or observed deficiencies per contract year.
Random and routine inspections performed no less than once per week
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative service with a neat & attractive appearance.
Preserves existing vegetation.
Ensure equipment is maintained in a safe operable condition.
TP-6.7 Leaf Removal
Services.
Provides a quality service with a neat & attractive appearance.
Maintains a safe and functional operational facility.
Perform services per
Receive no more than 5 customer complaints per contract year.
Random inspections performed no less than once per week redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-6.8 Maintain
Landscaped areas
Perform Routine maintenance monthly.
Maintain a neat appearance.
Meet yearly mulching observed deficiencies per contract year.
Random inspections that once per month writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-6.9 Seeding
Requirements
Meet annually seeding requirements for bare soil areas.
100 %
100 % inspections work is completed.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP- 6.10-6.13 Remove hazardous trees and low lying limbs and driftwood removal
Provide service in requirements.
100 %
Remove hazardous trees and limbs that
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative
Remove low lying limbs prior to recreation season.
threaten safety of property.
100 % inspection performed when requirements are customer complaints, TP-6.14 Provide herbicidal spraying services.
Provide service in accordance with
Herbicidal Control
Plan and manufacturer’s recommendations.
immediately.
customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-7- MAINTENANCE & REPAIR OF EQUIPMENT, BOATS, TRAILERS &
ATTACHMENTS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-7.3 Provide GSA vehicle maintenance & repair services
Provide maintenance
& repair when requested as a Level II
Service.
Install/remove decals, fire extinguishers, and remove radios when requested as a Level II
Service.
100 % immediately.
100 % inspection performance in writing.
Non-compliance will result in a negative performance evaluation.
TP-7.4-7.6 Perform
Preventive & Routine
Maintenance & Repair on Government
Furnished Equipment, Safeguarding
Government Property
Provide maintenance
& repair services per
Ensure equipment maintains a safe
Provide service in
100 % immediately.
100 % inspection performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative manufacturer’s
TP-7.7 Cleaning &
Waxing
Perform service in accordance contract cleaning service.
100% immediately.
100 % inspection performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-7.8-7.9 Perform preventative and routine maintenance on non-GSA Equipment
Perform service in accordance contract
100% immediately.
100 % inspection performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-9 - MAINTENANCE AND REPAIR OF EARTHEN DAMS, RIPRAP, RAMPS,
BEACHES AND BULKHEAD WALLS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-9.1 Maintain Rip
Rap
Perform maintenance of rip rap according to contract specifications
Receive no more than 2 deficiencies observed per contract year.
100 % inspection performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-9.1.1 Herbicide application procedure for Dam and Dikes
Performs vegetation control in accordance with manufacturer’s specification and herbicidal control pan.
Receive no more than 2 deficiencies observed per contract year.
100 % inspection performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-9.2 Maintain
Piezometers, Toe Drain
Manholes and Outfalls, toe of earthen dam, & dam roadway
Perform maintenance according to contract specifications
Receive no more than 2 deficiencies observed per contract year.
100 % inspection redone at contractor’s expense, or deduction in pay, and a negative performance in writing.
performance evaluation.
TP-9.4-9.9 Provide beach maintenance services
Perform weekly inspections per contract specifications
Ensure beaches maintain safe
Perform underwater hazard inspections yearly and in
USACE regulations.
Meet sand
Maintain all life rings, buoy lines, and depth marker.
100 % immediately.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-9.9 Rip Rap
Maintenance
Perform inspections and maintenance per
Contract
Meet annual requirements.
Receive no more than 2 deficiencies observed per contract year.
Random inspections that once per month.
customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-10 – MAINTENANCE AND REPAIR OF SIGNS, TRAILS, WALKWAYS, ROADS,
BARRICADES, GATES, PARKING AREAS, WHEEL STOPS, FENCING AND POSTS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-10.1-10.8
Maintenance of
Roadways and parking areas
Perform services necessary to maintain a safe and operational roadway.
100 %
Random inspections that once per week or
Non-compliance will result in work being redone at contractor’s and services per service using good maintenance procedures.
immediately.
evaluation.
TP-10.9 Boat Launch
Ramps
Perform maintenance and inspections per
Ensure ramps are maintained in a safe operable condition.
Receive no more than 5 valid customer complaints or observed deficiencies per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.11 Install maintain, repair, clean, or replace all corps signs.
Remove vegetation requirements
Install in accordance with Corps sign standard manual.
Perform periodic inspections.
Clean annually.
Replace as directed.
immediately.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.12 Closing
Roads and Trails under
Level II Services
Perform work according to contract requirements
100 % compliance no deviations.
Random inspections performed no less that once per week or
Non-compliance will immediately.
customer complaints in writing.
expense, or deduction in pay, and a negative performance evaluation.
TP-10.13 Replace or repair bumper curbs.
Perform inspections and repairs per
Replace when directed as a Level II Service.
deficiencies observed per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.14-10.19
Maintain repair or replace manual/electric gates, campsite marker post, fencing, high security fencing, guardrails, bollards and guard rock
Maintain in a safe, secure, functional condition.
Paint gates per contract year in accordance with corps safety standards.
Replace components with quality parts.
using good maintenance procedures.
immediately.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.20 Maintain traffic counters.
Maintain to ensure counters are operating properly.
that once per week or
Non-compliance will result in work being immediately.
customer complaints in writing.
in pay, and a negative performance evaluation.
TP10.21 Maintain
Trails
Perform inspections deficiencies observed per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.22 Maintain
Mailboxes
Perform inspections deficiencies observed per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.23 Maintain
Canoe/Kayak Launch under Level II Services
Perform inspections deficiencies observed per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-10.24 Maintain
Flagpoles and Flood
Lights
Perform inspections deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s customer complaints in writing.
TP-11- NATURAL RESOURCE MANAGEMENT
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-11.2 Maintenance of Wildlife management roads.
Perform inspections and maintenance requirements specified in the SOW.
100 % performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-11.3-11.13
Maintain WMA’s, waterfowl impoundments, aquatic species under Level II
Services
Perform work according to work orders
100 % performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-12 BOUNDARY LINE MAINTENANCE
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-12.1-12.17
Brushing & Painting boundary line
Paint miles of boundary line each
Perform service in contract specifications and JHK shoreline management plan.
Report violations performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-13 – AIDS TO NAVIGATION, REFUSE REMOVAL, AND COURTESY DOCK
MAINTENANCE
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-13.2 Repair and maintain courtesy docks.
Ensure docks are safe for public use.
Perform maintenance and inspections per contract requirements.
100 % immediately.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-13.3 Inspect, Maintain and repair buoys
Ensure fishing piers are safe for public use.
Meet annual painting contract requirements.
100 % immediately
Random inspections performed no less that once per week or customer complains in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-13.4 Remove
Floating Debris under
Level II Services
Maintain per contract immediately.
Random inspections performed no less that once per month customer complains in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-14 – MINOR CONSTRUCTION AND SHORELINE STABILIZATION
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-12.3 Work site erosion control
Comply with all applicable rules and regulations.
100 % performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-15 – EMERGENCY SPILL RESPONSE SUPPORT
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-15.1-15.3
Emergency Spill Clean
Up under Level II
Services
Comply with all applicable rules and regulations.
100 % performance in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-16 – OPERATION OF RECEPTION DESK AND VISITOR CENTER
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-16.1-16.7 Operated and maintain receptionist desk
Perform inspections deficiencies observed per contract year.
Random inspections performed no less that once per week or customer complaints in writing.
Non-compliance will result in work being redone at contractor’s expense, or deduction in pay, and a negative
TP-17– POWERPLANT CLEANING SERVICES
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-17.2 Maintain refuse/waste removal
Remove refuse/waste and replace liners per deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-17.3 Furnish Rags
Containers
Furnish rag containers and empty according to contract deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-17.7 Specific
Custodial
Requirements
Maintain a sanitary, clean & neat appearance per SOW
Supplies are adequately stocked and always available to the public.
Ensure dispensers and containers are functioning properly
Receive no more than 2 valid complaints or observed deficiencies per month.
Random & routine inspections performed no less redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-17.8 Absorbent
Replacements
Monitor and place absorbents according to contract specifications
Receive no more than 2 valid complaints or observed deficiencies per month.
Random & routine inspections performed no less redone at contractor’s expense, or deduction in pay, and a negative
TP-18– POWERPLANT LIGHTING SYSTEM
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-18.2-18.3 Light
Bulb and Lamp
Replacement
Replace bulbs and lamps per contract requirements.
Receive no more than 2 deficiencies
Random inspections performed no less that once per week or
Non-compliance will observed per
TP-19– POWERPLANT- MAINTAIN BUILDINGS, STRUCTURES, MECHANICAL,
ELECTRICAL, WATER SUPPLY AND SEWAGE SYSTEMS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-19.2-19.3 Maintain
Water Systems
Maintain water systems per contract deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-19.4 Maintain
Sewage Treatment
System
Maintain sewage treatment system per deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-19.5 Heating, Air
Conditioning and
Ventilation System
Maintain HVAC systems according to manufacturer
Problems will be addressed within 24 hours. Systems will not be off line for more than 3 days unless parts are on order.
Random inspections performed no less that once per week or per complaint.
redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-19.6 Electrical
Systems
Under Level II
Services
Maintain electrical systems
Problems will be addressed within 24 hours. Systems will not be off line for more than 3 days unless parts are on order.
Random inspections performed no less that once per week or per complaint.
redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-19.7 Painting
Services
Paint according to contract specification
Receive no more than 2 deficiencies
Random inspections performed no less that once per week or
Non-compliance will performance evaluation.
TP-19.8 Ring Buoys and Rope
Provide ring buoys and rope as specified in the contract
Receive no more than 2 deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-19.9 American
Flags
Install and remove
American flags as specified in the contract
Receive no more than 2 deficiencies safety violations or violations of
VDOT
procedures
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-21– POWERPLANT- MAINTAINENANCE OF GRASS, TREES, AND LANDSCAPE
AREAS
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-21.1-21.2 Mowing, weeding, grass trimming, and edging
Maintain grass, trees and landscaped areas according to contract specification
Receive no more than 2 deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-21.4-21.5
Protection of Existing
Vegetation, Structures, Utilities and
Improvements
Protect areas according to contract specifications
100 % that once per week or redone (replanting, etc.) at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-21.5 Leaf Removal Remove leaves according to contract specifications
Receive no more than 2 deficiencies
Random inspections performed no less that once per week or
Non-compliance will
TP-22- POWERPLANT- MAINTENANCE AND REPAIR OF GOVERNMENT
VEHICLES AND EQUIPMENT
Acceptable
Quality Level
Method of
Assessment
Performance
Incentive
TP-22.2 GSA Vehicles Maintain GSA
Vehicles according to
GSA Standards
Receive no more than 1 deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-22.3 Vehicle
Washing/Detailing
Clean vehicles according to contract specifications
Receive no more than 2 deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative performance evaluation.
TP-22.4-22.5 Non
GSA Equipment
Preventative
Maintenance and
Routine Maintenance
Maintain Non GSA
Equipment according to contract specifications
Receive no more than 2 deficiencies observed per contract year.
Random inspections performed no less that once per week or redone at contractor’s expense, or deduction in pay, and a negative
TECHNICAL PROVISIONS
Descriptions and Specifications
Technical Provisions
John H. Kerr Reservoir
TABLE OF CONTENTS
Section Section Title
TP-1 General Information
TP-2 Management
TP-3 Cleaning Services
TP-5 Maintain Buildings, Structures, Mechanical, Electrical, Water Supply and
Sewage Disposal Systems
TP-6 Maintenance of Grass, Trees and Landscape Areas
TP-7 Maintenance and Repair of Equipment, Boats, Trailers, and
Attachments
TP-9 Maintenance and Repair of Earthen Dams, Dikes, Riprap, Ramps, Beaches, Berms and Bulkhead Walls
TP-10 Maintenance and Repair of Signs, Trails, Walkways, Roads, Barricades, Gates, Parking
Areas, Wheel Stops, Fencing and Posts
TP-11 Natural Resource Management
TP-12 Boundary Line Maintenance
TP-13 Aids to Navigation, Refuse Removal, and Courtesy Dock Maintenance
TP-14 Repairs and Shoreline Stabilization
TP-15 Emergency Spill Response Support
TP-16 Operation of Reception Desk & Visitor Center
TP-17 Power plant Cleaning Services
TP-18 Power plant Lighting Systems
TP-19 Power plant - Maintain Buildings, Structures, Mechanical, Electrical, Water
Supply and Sewage Systems.
TP-21 Power plant Grounds and Vegetation Maintenance
TP-22 Power plant- Maintenance and Repair of Government Vehicles and Equipment.
ATTACHMENTS Appendix 1 - Government Furnished Equipment
Appendix 2 - Project Facility Inventory
Appendix 3 - Mowing & Herbicide Area Locations
Appendix 4 - Water Sampling Locations
Appendix 5 - Road Ends and Non-developed
Fishing and Access Areas
Appendix 6 - Operation and Maintenance of Potable
Waterworks and Sewage Treatment Works
Appendix 7 - Herbiciding and Pest Control Procedures
Appendix 8 - Boundary Line Painting
Appendix 9 - Cleaning Schedule
Appendix 10 – Lake Map
Appendix 11 – Boiler Tank List and Location
Appendix 12 – Layout of Contractor Facilities
** NOTE: TPs - 4, 8, and 20 are not applicable, and have been intentionally omitted.
The Appendices 1-12 listed above are to be used in conjunction with the technical provision information to find any quantities for size and number of facilities and frequencies of tasks to be performed that are not listed specifically in the technical provision paragraphs. The appendices are found after the technical provisions**
TP-1 - GENERAL INFORMATION
Operations and Maintenance
Descriptions, Specifications and Performance Work Statement
John H. Kerr Reservoir
TECHNICAL PROVISIONS (TP)
TP-1.0 Purpose: The purpose of this contract is to provide the maintenance, repairs, and operation of John H. Kerr
Reservoir, as described below.
TP-1.1 Intent: It is the intent of the following technical provisions to procure for the Government complete and efficient maintenance and repairs on the John H. Kerr Project. The Project’s facilities include the Visitor Assistance
Center, Environmental Education Center (Tanner Center), village house, sewage treatment plant and lift stations, thirteen (13) recreation areas, shoreline areas, approximately 50,000 surface acres of reservoir waters, Visitor Center security & fire systems, numerous operational areas and structures, forestry and wildlife lands, all Corps owned and
GSA vehicles, vessels, and equipment, the dam and related structures. The Contractor shall furnish all necessary management, personnel, materials, supplies, replacement parts, fuel, lubricants and other items as necessary to accomplish requirements as specified herein. All materials, supplies and equipment not rented or owned by the
Contractor and provided by the Government through this contract will remain the property of the Government. Please refer to Appendix 1 (Government Furnished Equipment) and FAR 52.245-1 for further clarification. Work under this contract shall be performed under the general direction of the Authorized Representative of the Contracting Officer.
The Contractor shall assure that all services are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives. Performance shall be in accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, and Attachments contained herein or incorporated by reference.
Procuring Contracting Officer: The Procuring Contracting Officer (PCO) has the overall responsibility for administration of this contract. The PCO has the authority to administer, terminate, or modify the contract. The PCO is responsible for ensuring that all necessary actions are taken to achieve effective contract administration and that the Contractor complies with the provisions of the contract. Some responsibilities may be delegated to a COR.
Contracting Officer’s Representative (COR)/ Government Representative: The COR provides feedback to the
PCO in the administration of the contract requirements. The COR maintains direct communication with the
Contractor and verifies that the Contractor performs the technical requirements of the contract. The COR accepts and approves services performed under the contract and may re-direct the Contractor on any item or work requirement pending correction of a deficiency.
Quality Assurance Representative (QAR) and Specialized Inspectors (SI): The QAR/SI receives and reviews the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .