A21 - W912PM20R0014 Amendment 1 (Conformed).pdf
PDF 4 MB Posted
- Solicitation number
- W912PM20R0014
About this file
This is a solicitation for operations and maintenance services at the John H. Kerr Reservoir Project located in Virginia. The U.S. Army Corps of Engineers, Wilmington District is seeking proposals for services including facility maintenance, repairs, natural resource management, and visitor services. The solicitation is set aside for section 8(a) small businesses. The North American Industry Classification System code is 561210 with a size standard of $41.5 million. The government intends to award a firm fixed price contract for a one year base period and four one year option periods. The due date for questions is included and proposals are due by 2:00 PM on August 5, 2020. The solicitation includes details on submission requirements and evaluation criteria.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PM20R0014
SEE ADDENDUM
(No Collect Calls)
W912PM20R0014 02-Jul-2020
b. TELEPHONE NUMBER
910-251-4473
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 05 Aug 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912PM9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ASHLEY L STEWART
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W912PM 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
JOHN H. KERR PROJECT
SHANNON CREWS
1930 MAYS CHAPEL ROAD
BOYDTON VA 23917-3922
TEL: 434-738-6143 EXT 6155 FAX: 434-738-6541
910-251-4454FAX:
TEL: 910-251-4700 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$41,500,000
NAICS:
561210
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF256
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Months Transition PeriodFFP
FOB: Destination
PSC CD: S216
NET AMT
0002 5 Months BASE OFF-PEAK Level 1 O&M ServicesFFP
In accordance with the Technical Provisions. Off-Peak months are defined in Technical Provision - 1.20.
0003 7 Months BASE PEAK Level 1 O&M ServicesFFP
In accordance with the Technical Provisions. Peak months are defined in Technical Provision - 1.20.
BASE Level 2 Under $5,000FFP
(Level 2 historically averages an estimated total for CLINs 0004 and 0005 of $360,000.00 in additional non-routine services per year)
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
BASE Level 2 Over $5,000FFP
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
1001 5 Months OPTION OY1 OFF-PEAK Level 1 O&M ServicesFFP
1002 7 Months OPTION OY1 PEAK Level 1 O&M ServicesFFP
OPTION OY1 Level 2 Under $5,000FFP
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
OPTION OY1 Level 2 Over $5,000FFP
Directed Services (including Emergencies) as defined in TP-2.30.2.
2001 5 Months OPTION OY2 OFF-PEAK Level 1 O&M ServicesFFP
2002 7 Months OPTION OY2 PEAK Level 1 O&M ServicesFFP
OPTION OY2 Level 2 Under $5,000FFP
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
OPTION OY2 Level 2 Over $5,000FFP
Directed Services (including Emergencies) as defined in TP-2.30.2.
3001 5 Months OPTION OY3 OFF-PEAK Level 1 O&M ServicesFFP
3002 7 Months OPTION OY3 PEAK Level 1 O&M ServicesFFP
OPTION OY3 Level 2 Under $5,000FFP
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
OPTION OY3 Level 2 Over $5,000FFP
Directed Services (including Emergencies) as defined in TP-2.30.2.
4001 5 Months OPTION OY4 OFF-PEAK Level 1 O&M ServicesFFP
4002 7 Months OPTION OY4 PEAK Level 1 O&M ServicesFFP
OPTION OY4 Level 2 Under $5,000FFP
**DO NOT BID THIS CLIN**
In accordance with the attached Technical Provisions. Unscheduled, Non-Routine Directed Services (including Emergencies) as defined in TP-2.30.2.
OPTION OY4 Level 2 Over $5,000FFP
Directed Services (including Emergencies) as defined in TP-2.30.2.
TOTALS
NAME OF OFFEROR____________________________________
SOLICITATION NUMBER _______________________________
NAME OF PROJECT_____________________________________
SUMMARY OF PRICE FOR BASE AND OPTION YEARS
This must be completed and attached to your cost proposal.
0001 Transition – 30 Day 1 Month $___________
0002 BASE – OFF-PEAK Level 1 O&M Services at John H.
Kerr Lake
0003 BASE – PEAK Level 1 O&M Services at John H. Kerr Lake
BASE TOTAL $___________
1001 OY1 - OFF-PEAK Level 1 O&M Services at John H.
1002 OY1 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 1
TOTAL
2001 OY2 - OFF-PEAK Level 1 O&M Services at John H.
2002 OY2 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 2
3001 OY3 - OFF-PEAK Level 1 O&M Services at John H.
3002 OY3 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 3
4001 OY4 - OFF-PEAK Level 1 O&M Services at John H.
4002 OY4 – PEAK Level 1 O&M Services at John H. Kerr
OPTION YEAR 4
5001 6 MONTH EXTENSION $___________
BASE PLUS OPTION YEARS TOTAL $___________
Summary of Price by Cost Element for Base and Option Years (Level 1 Services)
Cost Element
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Off Peak
Option Year 4 Peak
Option Year 4
Off Peak Total
Direct Labor: $ $ $ $ $ $ $ $ $ $ $ Total Labor Burden $ $ $ $ $ $ $ $ $ $ $ Total Material & Supplies $ $ $ $ $ $ $ $ $ $ $
Total ODCs: $ $ $ $ $ $ $ $ $ $ $ Total Subcontract Costs: $ $ $ $ $ $ $ $ $ $ $
Total Direct Costs: $ $ $ $ $ $ $ $ $ $ $
G&A Costs $ $ $ $ $ $ $ $ $ $ $
G&A Rates Total Direct Cost & G&A $ $ $ $ $ $ $ $ $ $ $
Profit:
TOTAL $ $ $ $ $ $ $ $ $ $ $
Summary of Costs by Year by Technical Provision – Level 1 Services
Technical Provision
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Peak
Option Year 4 Peak
Option Year 4
Total
TP 1
TP 2
TP 3
TP 5
TP 6
TP 7
TP 9
TP 10
TP 11
TP 12
TP 13
TP 14
TP 15
TP 16
TP 17
TP 18
TP 19
TP 21
TP 22
Summary of Productive Labor Hours by Technical Provision – Level 1 Services
Technical Provision
Base Year Peak
Base Year Off
Peak
Option Year 1 Peak
Option Year 1
Off Peak
Option Year 2 Peak
Option Year 2
Off Peak
Option Year 3 Peak
Option Year 3
Option Year 4 Peak
Option Year 4
TP 1
TP 2
TP 3
TP 5
TP 6
TP 7
TP 9
TP 10
TP 11
TP 12
TP 13
TP 14
TP 15
TP 16
TP 17
TP 18
TP 19
TP 21
TP 22
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-OCT-2020 TO
31-OCT-2020
N/A JOHN H. KERR PROJECT
SHANNON CREWS
1930 MAYS CHAPEL ROAD
BOYDTON VA 23917-3922
434-738-6143 EXT 6155
W912PM
0002 POP 01-NOV-2020 TO
31-MAR-2021
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-APR-2021 TO
31-OCT-2021
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 01-NOV-2020 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-NOV-2021 TO
31-MAR-2022
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-APR-2022 TO
31-OCT-2022
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 01-NOV-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-NOV-2022 TO
31-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-APR-2023 TO
31-OCT-2023
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 01-NOV-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-NOV-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-APR-2024 TO
31-OCT-2024
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
3004 POP 01-NOV-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-NOV-2024 TO
31-MAR-2025
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-APR-2025 TO
31-OCT-2025
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
4004 POP 01-NOV-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
Section G - Contract Administration Data
METHOD OF PAYMENT
(a) The Contractor shall submit to the Contracting Officer’s Representative, in such form and reasonable detail as the COR may require, two copies of his invoice for pay period supported by a statement of cost incurred by the Contractor in the performance of this contract and claimed to constitute allowable cost, in accordance with Section I, Contract Clauses.
(b) The Contractor shall submit payrolls in support of invoices if requested.
(c) Promptly after receipt of each invoice or voucher and statement of the cost, the Government shall, except as otherwise provided in this contract, and subject to the provisions of (d) below, pay to the Contractor the cost of such services as determined by the Contracting Officer to be allowable in accordance with Part 31, subsection
31.2 of the Federal Acquisition Regulation (FAR) as in effect on the date of this contract, subject to such further definition and limitations as may be included in this contract, and a pro rata share of the base fee.
(d) At any time or times prior to final payment under this contract, the Contracting Officer may have the invoices and statements of cost audited. Each payment made shall be subject to reduction for amount included in the related invoice or voucher which is found by the Contracting Officer, on the basis of such audit, not to constitute allowable cost. Any payment may be reduced for over-payment, or increased for under-payment, on preceding invoices or vouchers.
(End of Paragraph)
ADMINISTRATIVE DATA
(a) Following award, this contract will be administered by the Wilmington District Contracting Office. The name, address, telephone number, and email address of the Contracting Officer and Administrator are as follows:
Contracting Officer:
Karri Mares 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4863 E-mail: Karri.L.Mares@usace.army.mil
Contract Administrator:
Ashley Stewart 69 Darlington Avenue Wilmington, NC 28403 Phone: 910-251-4785 E-mail: Ashley.L.Stewart@usace.army.mil
(b) The Procuring Contracting Officer (PCO) is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the PCO. In the event the Contractor effects any such change at the direction of any person other than the PCO, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.
(c) The Contracting Officers Representative (COR) is the official representative of the Contracting Officer for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract. The COR will be designated in writing upon contract award.
FEDERAL LEGAL HOLIDAYS
The following Federal Legal Holidays are observed by the US Army Corps of Engineers each year:
New Year’s Day 1 January Birthday of Martin Luther King Jr. Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
PERMITS AND RESPONSIBILITIES FOR WORK
The contractor shall, without additional expense to the Government, obtain all licenses and permits required for the prosecution of the work. The contractor shall be responsible for all damages to persons or property that occurs as a result of this fault or negligence in connection with the prosecution of the work.
NOTES
This requirement will be met with a firm fixed price contract.
Invoicing will be monthly per DFARS 252.204-7006 either at the peak or off-peak contract line item (CLIN) unit price for Level I Services. Level II Services will be invoiced monthly for any services that were performed under TP 2.30.2.
**For each 12 month performance period, there are 7 peak months and 5 off-peak months. There are two CLINs for each year to cover these differences in the types of months. Peak and Off Peak months are defined in TP 1.20.
(End of Paragraph)
Section H - Special Contract Requirements
TECHNICAL PROVISIONS
Descriptions and Specifications Technical Provisions
John H. Kerr Reservoir
TABLE OF CONTENTS
Section Section Title
TP-1 General Information
TP-2 Management
TP-3 Cleaning Services
TP-5 Maintain Buildings, Structures, Mechanical, Electrical, Water Supply and Sewage Disposal Systems
TP-6 Maintenance of Grass, Trees and Landscape Areas
TP-7 Maintenance and Repair of Equipment, Boats, Trailers, and Attachments
TP-9 Maintenance and Repair of Earthen Dams, Dikes, Riprap, Ramps, Beaches, Berms and Bulkhead Walls
TP-10 Maintenance and Repair of Signs, Trails, Walkways, Roads, Barricades, Gates, Parking
Areas, Wheel Stops, Fencing and Posts
TP-11 Natural Resource Management
TP-12 Boundary Line Maintenance
TP-13 Aids to Navigation, Refuse Removal, and Courtesy Dock Maintenance
TP-14 Repairs and Shoreline Stabilization
TP-15 Emergency Spill Response Support
TP-16 Operation of Reception Desk & Visitor Center
TP-17 Power plant Cleaning Services
TP-18 Power plant Lighting Systems
TP-19 Power plant - Maintain Buildings, Structures, Mechanical, Electrical, Water Supply and Sewage Systems.
TP-21 Power plant Grounds and Vegetation Maintenance
TP-22 Power plant- Maintenance and Repair of Government Vehicles and Equipment.
ATTACHMENTS Appendix 1 - Government Furnished Equipment Appendix 2 - Project Facility Inventory Appendix 3 - Mowing & Herbicide Area Locations Appendix 4 - Water Sampling Locations
Appendix 5 - Road Ends and Non-developed Fishing and Access Areas Appendix 6 - Operation and Maintenance of Potable Waterworks and Sewage Treatment Works
Appendix 7 - Herbiciding and Pest Control Procedures Appendix 8 - Boundary Line Painting Appendix 9 - Cleaning Schedule Appendix 10 – Lake Map Appendix 11 – Boiler Tank List and Location Appendix 12 – Layout of Contractor Facilities
** NOTE: TPs - 4, 8, and 20 are not applicable, and have been intentionally omitted.
The Appendices 1-12 listed above are to be used in conjunction with the technical provision information to find any quantities for size and number of facilities and frequencies of tasks to be performed that are not listed specifically in the technical provision paragraphs. The appendices are found after the technical provisions**
TP-1 - GENERAL INFORMATION
Operations and Maintenance Descriptions, Specifications and Performance Work Statement
TECHNICAL PROVISIONS (TP)
TP-1.0 Purpose: The purpose of this contract is to provide the maintenance, repairs, and operation of John H. Kerr Reservoir, as described below.
TP-1.1 Intent: It is the intent of the following technical provisions to procure for the Government complete and efficient maintenance and repairs on the John H. Kerr Project. The Project’s facilities include the Visitor Assistance Center, Environmental Education Center (Tanner Center), village house, sewage treatment plant and lift stations, thirteen (13) recreation areas, shoreline areas, approximately 50,000 surface acres of reservoir waters, Visitor Center security & fire systems, numerous operational areas and structures, forestry and wildlife lands, all Corps owned and GSA vehicles, vessels, and equipment, the dam and related structures. The Contractor shall furnish all necessary management, personnel, materials, supplies, replacement parts, fuel, lubricants and other items as necessary to accomplish requirements as specified herein. All materials, supplies and equipment not rented or owned by the Contractor and provided by the Government through this contract will remain the property of the Government. Please refer to Appendix 1 (Government Furnished Equipment) and FAR 52.245-1 for further clarification. Work under this contract shall be performed under the general direction of the Authorized Representative of the Contracting Officer.
The Contractor shall assure that all services are conducted in accordance with the contract and all applicable laws, regulations, codes, or directives. Performance shall be in accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, and Attachments contained herein or incorporated by reference.
Procuring Contracting Officer: The Procuring Contracting Officer (PCO) has the overall responsibility for administration of this contract. The PCO has the authority to administer, terminate, or modify the contract. The PCO is responsible for ensuring that all necessary actions are taken to achieve effective contract administration and that the Contractor complies with the provisions of the contract. Some responsibilities may be delegated to a COR.
Contracting Officer’s Representative (COR)/ Government Representative: The COR provides feedback to the PCO in the administration of the contract requirements. The COR maintains direct communication with the Contractor and verifies that the Contractor performs the technical requirements of the contract. The COR accepts and approves services performed under the contract and may re-direct the Contractor on any item or work requirement pending correction of a deficiency.
Quality Assurance Representative (QAR) and Specialized Inspectors (SI): The QAR/SI receives and reviews the Contractor’s submittals, plans, charts, and reports for accuracy and completeness, and recommends appropriate action to the COR. The QAR/SI performs random inspections to determine if the contract requirements are being met and if the Contractor’s Quality Control Plan is being implemented effectively. The QAR/SI advises the COR of contract status, deficiencies, recommended actions, and other information pertinent to the administration of the contract.
Contractor Employees: All Contractor personnel utilized in performance of the contract shall be legal residents of the United States. Personnel shall be able to read, write, speak, and understand the English language to the extent necessary in adequately reading and understanding regulations and instructions to complete and safely perform the contract services. The Contractor shall provide personnel to perform the contract requirements within specified time frame required by the contract and shall meet all variations, shift schedules and changes as may be required to respond to the requirements of the contract. All persons performing under the contract shall remain employees of the Contractor and not of the Government. The Government has the right to restrict employment under the contract of any Contractor employee, or prospective Contractor employee, who is identified by the COR as a potential threat to the health, safety, security, general well-being or operational mission of the project and its personnel or the general public. The COR may require the Contractor to remove from the job site any employee for misconduct or security reasons. The removal from the job site of such person shall not relieve the Contractor of the requirement to perform. Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the Contractor. Further, the Government will assume no liability or responsibility for the Contractor's compliance or noncompliance with such requirements. Contractor employees working with the John H. Kerr Lake Project will be required to receive a background investigation.
The Contractor will enter information into a database system and coordinate with Wilmington District Security Office to complete requirements. Fingerprints are required and must be taken at the Mecklenburg County Sherriff’s Office or with the District’s fingerprint machine. Contractor employees are allowed to work after information is submitted and can continue to work unless derogatory information is found during background check that necessitates restriction or removal of the employee.
Contract Personnel Identification and Appearance: Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees. The Contractor shall provide each employee with a uniform (i.e. pants and shirt) bearing the name of the corporation located on the left shirt pocket. Uniforms shall be worn by the Prime Contractor employees at all times while performing work under this contract and all Contractor employees (both prime and sub-contractor) shall be distinct from the public and Government personnel.
Employee Conduct: Contractor personnel’s conduct shall not reflect discredit upon the U.S. Government, the Department of the Army, or John H. Kerr Dam & Reservoir. The Contractor shall remove any employee for reasons of misconduct from the job site. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. Any employee removed will not be allowed to return to work for the contractor.
Contract Personnel Status: The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, a change in duty hours, or employment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Contractors ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
Employee Capability: All Contractor employees performing work under the contract shall be physically able to do their assigned work. The Contractor shall not allow any employee(s) under the influence of alcohol or is incapacitated by restricted substances to perform any work.
Cooperation with Other Contractors and Government Personnel: The Contractor shall cooperate with other Contractors and Government personnel performing work on Government property. The Contractor shall be willing to adjust scheduling and performance to accommodate additional support if required by modification. The Contractor shall avoid interfering with the performance of work by other Contractor or Government employees while not compromising health, safety, or security. Any disagreement or cause of delay shall be brought to the attention of the COR.
Non-Personal Services: The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
TP-1.2 Site of Work: John H. Kerr Project is located on the Roanoke River and runs thirty-nine (39) miles upstream from the dam site at Buggs Island. The Project consist of 48,900 surface acres of water and approximately 50,000 acres of adjoining land located within Mecklenburg, Halifax, and Charlotte Counties in Virginia and Vance, Granville, and Warren Counties in North Carolina. The Project is approximately ninety-three (93) miles south of Richmond, VA and seventy (70) miles north of Raleigh, NC.
TP-1.3 Maps, Drawings and Lists: All maps, drawings, and lists made reference to in the following TP’s, including mowing and cleaning areas and general project layout may be reviewed at the John H. Kerr Project Visitor Assistance Center located at 1930 Mays Chapel Road, Mecklenburg County, Virginia during the hours of 8:00 am – 4:30 pm Monday through Friday, excluding Federal Holidays. The Contractor will be allowed to make copies of Government provided maps and drawings using Government equipment during duty hours only. All other reproduction needs of the Contractor will be at their own expense.
TP-1.4 Applicable Documents and References: The following individual standards, codes, manuals, and other documents are incorporated by reference herein and shall apply to performance of the work contracted for:
a. Underwriter’s Laboratories, Inc.
National Electrical Code National Warm Air and Air Conditioning Assn.
National Association of Fan Manufacturers National Fire Protection Association American Society of Heating, Air Conditioning, and Refrigeration Institution Sheet Metal Manufacturers Air Moving and Conditioning Association American Society of Heating, Refrigeration and Air Conditioning Engineers American Welding Society American National Standards Institute American Concrete Institute Portland Cement Associates Asphalt Institute American Institute of Steel Construction National Assn. of Architectural Metal Manufacturers National Plumbing Standards Code Illustrated Architectural Aluminum Manufacturers Assn.
The Aluminum Association American Society for Testing and Materials Flat Glass Marketing Association American Association of Nurserymen, Inc. Architectural Graphic Standards Consumer Product Safety Commission's Public Playground Safety Guideline, Vols. I & II Southern Building Code North Carolina & Virginia Building Code Accessibility Guidelines for Buildings and Facilities
b. Equipment Manufacturer's Repair and Operating Manuals
TP-1.5 Other Contracts: The Government may award contracts for additional or similar work. The Contractor shall cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act of interference in the performance of other Contractors or Government forces.
TP-1.6 The Contractor's Facilities: See Appendix 12 for Maintenance Area layout for Contractors # 8 Corps Boathouse not included as GFP. The Government will furnish the contractor the following buildings:
Building Number Size Comments RM-M02 Approx. 40’x 100’ Garage (Quonset metal) – Vehicle repairs/tool storage -electricity, water toilet facilities RM-S01 Approx. 24’x 121’ Storage Shed (wood)- 10 bays, open one side, storage RM-S03 Approx. 25’x 35’ Tractor Shed (metal)- Open on four sides RM-S05 Approx. 40’x 80’ Warehouse (Quonset metal) – water, electricity, & toilet facilities, storage, office
RM-M03
Approx. 30’x 51’ Carpenter Shop (cinderblock) – water, electricity, shop tools, storage
RM-S06
Approx. 15’x 20’ Paint Shed (cinderblock) – electricity, storage
*RM-M04
Approx. 32’ x 36’ Marine Shop (cinderblock) – electricity, water, tools, storage.
RM-A04 Approx. 24’ x 76’ Office & Canteen – water, electricity, toilets, showers, kitchen appliances
*RM-S12 Approx. 30’ x 40’ Buoy Shed – storage
RM-S04 Approx. 25’ x 50’ Storage/Electric Building
The Government provides utilities for the buildings listed. A chain link security fence with lockable gate encloses all structures (except those denoted *). The contractor may modify these facilities to meet work requirements, following prior approval by the COR. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
When materials are transported for work purposes, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local laws or regulations.
When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
TP-1.6.1 Facility Condition: The Government will provide the facilities in their current condition for use by the Contractor. The Government and Contractor will conduct an inspection of the facilities to be occupied by the contractor before the start and after the completion of the contract to document the condition of the facility. The Contractor shall be responsible for maintenance and repairs of the occupied facilities placed at his disposal other than abatement of lead, asbestos, or similar hazardous materials. The Contractor shall assume full responsibility for the safekeeping of facilities placed at his disposal and shall take adequate precautions to prevent or minimize fire hazards, odors, and vermin. At the completion or termination of the contract, and subsequent to a joint inspection by the Contractor and Government, these facilities shall be returned to the Government in the same condition as received with allowances made for reasonable wear and tear. The Contractor shall be held liable for any incurred repair costs caused through negligence on the part of the Contractor, subcontractor, or employee, to include any administrative and inspection costs necessary to repair the facilities. Any discovery of lead, asbestos, or similar hazardous materials within the facilities shall be reported to the COR and will be handled by the Government separate from this contract.
TP-1.6.2 Custodial Services: The Government does not provide custodial services for areas utilized by the Contractor; however, the Contractor is required to keep the facilities clean. Cleaning of office, shop and restrooms shall be done weekly, as a minimum.
TP-1.6.3 Housekeeping: All work areas operated by the Contractor, specifically the Government Furnished Facilities identified in TP-1.6, shall be inspected daily for adequate housekeeping and findings recorded on QC inspection reports. All work areas and means of access shall be maintained in a safe and orderly condition.
TP-1.7 Contractor’s Equipment: The Government shall furnish the Contractor with boats, some power and hand tools, some supplies, and equipment that can be used by the Contractor, as listed in Appendix 1. All Government furnished equipment, tools and supplies that the Contractor uses to perform any work specified in this contract shall be hand receipted to, used, and maintained by the Contractor during performance of work specified in this contract.
If a Government-furnished equipment item is not available for Contractor use during the contract performance period, the procedures in TP 1.9 will be followed. The Government will not furnish vehicles outside of those listed within Appendix 1.
The Contractor is responsible for all equipment and tools needed to perform the technical provisions of this contract outside of the items listed in Appendix 1. All Contractor furnished equipment must be marked with the Contractor’s name or marked so as to distinguish it from Government-owned equipment. If the GFE or GFP breaks, the government does not have to fix/repair and contractor is still responsible for completing work.
TP-1.7.1 Fuel: The Contractor will be responsible for providing fuel for all Contractor furnished equipment in performance of this contract. The Contractor will pay fuel cost for all Government furnished equipment used by the Contractor in the performance of this contract. Three vehicles the Government furnishes fuel in are the 2 dump trucks and 1 garbage truck. These vehicles have government fuel cards. The government furnishes fuel for the boats. These have government fuel cards.
TP-1.7.2 Vehicle Washing: All Contractor owned vehicles/equipment and Government owned equipment used to perform contract services shall be washed onsite at the Maintenance Compound and kept in a presentable manner.
TP-1.8 Damaged Government Furnished Equipment: In the event the Contractor damages any Government Furnished Equipment due to negligence, it will be the sole responsibility of the Contractor to replace any damaged, broken or lost items at the Contractor’s own expense. The replacement will be of equal or greater quality than initially provided and the replacement(s) remain the property of the Government. GFE’s shall be used only for intended purposes: for example, dump trucks shall be used for hauling brush, rock, pulling trailer, hauling equipment, etc.
TP-1.9 Government Employee Use of Equipment: Government employees may schedule the use of any idle hand-receipted Government furnished equipment as long as the use does not interfere with the Contractor accomplishing all TPs found in this document. The use of Government furnished equipment by Government employees or volunteers are limited to 150 hours per year. In the event an unexpected emergency occurs requiring the use of Government equipment by the Government, the Contractor is expected to relinquish control of the equipment until such time the Government does not need the equipment. In the event that the Government requires the use of Government furnished equipment for longer than 150 hours, a suitable replacement will be provided to the contractor or an allowable Level II Services. The Government is responsible for repair of equipment damaged by Government or volunteer personnel.
TP-1.10 Safeguarding Government Property: The Contractor shall cooperate with Government personnel in safeguarding Government property. The Contractor shall ensure that all contract personnel are aware of the responsibility to be good stewards of Government property entrusted to them. The Contractor may be held liable for damaged, stolen or lost Government property due to negligence. When it is determined that the Government is due compensation, the Contracting Officer will issue a written request to the Contractor. A formal report detailing repair cost shall be made within three (3) business days to the COR. The Contractor shall keep an inventory of all government equipment, tools, etc. and provide it to the COR at the end of each contract year.
Any equipment that breaks and is no longer usable shall be reported to the COR for disposal. If not due to negligence, the item may be replaced at Government discretion and expense. The Contractor shall be responsible for reporting to the COR, QAR, or any ranger on duty, all acts of vandalism, larceny, pilferage, or other damage within twenty-four (24) hours after discovery by the Contractor.
TP-1.11 Key Control: The Government will issue the Project Manager of the Contract keys to be provided to their personnel to all locked areas that will be operated and maintained by the Contractor. The Contractor shall establish and implement methods of ensuring all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. No key issued to the Contractor shall be duplicated. The Contractor shall immediately report any occurrences of lost or duplicated keys to the COR. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees or personnel authorized by the COR. Contract Employees cannot use keys to gain access to government areas while off duty. If keys are lost by the Contractor, it is solely the responsibility of the Contractor to replace the keys and cores that are affected by the loss.
TP-1.12 Communication: Within thirty (30) days of contract award, the Contractor shall procure a telephone line and sufficient cell phones to provide adequate telephone communications. The Contractor will furnish a cellular phone to enable communication between the Government and the Contractor’s superintendent. The Government will furnish two (2) portable (hand-held) radios and to enable communication between the Government and the Contractor's superintendent and communication. Any repairs or replacement of these devices will be the responsibility of the Government.
TP-1.13 Interruptions: All work that requires an interruption of the use of the project, recreation facilities, buildings, or by the visiting public shall be fully coordinated and approved in advance, by the COR. Interruptions shall be kept to an absolute minimum, and all repairs, replacements of equipment or components shall be performed in an expeditious manner.
TP-1.14 Closure of Recreation Areas: Occasionally, recreation areas will be closed in their entirety, or partially, for safety concerns or other reasons. Closures for periods less than sixty (60) days will be communicated by the COR to the Contractor. Temporary closures of facilities or areas greater than sixty (60) days or permanent closures of facilities or areas will be handled by a separate contract action. The COR will notify the Contractor immediately upon knowledge of a closure to allow for proper coordination by the Contractor in determining the need for employees and duties of employees usually working at these locations.
TP-1.15 New or Consolidated Facilities: The John H. Kerr Project is continually undergoing renovation and consolidation of recreation areas, which could cause the temporary or permanent closing of some public use areas or the increase, decrease, or alteration of facilities. The Contractor's work schedule shall be flexible in order to meet these changing requirements. Any additions of recreation facilities or parks, not already included in these technical provisions, will be handled under TP-2.20 Major Repairs or 2.30.2 Level II Services.
TP-1.16 Transporting Equipment & Materials: The Contractor will be required to transport Government Furnished Equipment for the use of Government employees and volunteers. The Contractor will be required to transport Government Furnished Property for Government and Volunteer use up to forty (40) labor hours for transportation and two hundred (200) miles of transportation per year. The COR will notify the Contractor when transport is required.
TP-1.17 Pre-Work Conference: The contractor shall attend a pre-work conference at which the COR will establish the line of authority and Government procedures for contractual, administrative, and work matters. The schedule of required submittals and reports will also be discussed. The contractor shall submit, in completed form, the following items:
(1) Certificates of Insurance (in amounts specified)
(2) Letter of Authority for the Superintendent
(3) Letter(s) Appointing Quality Control Personnel
TP-1.18 Key Personnel & Plans: The contractor shall furnish a list of key personnel and separate plans of operation, along with the proposal, for the following:
a. Quality Control Plan
b. Accident Prevention/Hazardous Analysis Plan
c. Sub-Contracting Plan
d. Cost/Schedule Plan with Work Breakdown Structure
e. Management Plan - Personnel Staffing, Operational Aspects (planning and organizing utilization of equipment and facilities), etc.
f. *Pest Control Plan
g. Security Plan for key control.
h. Oil Spill Plan
i. Hazardous Material Handling/Storage/Disposal Plan
j. Lockout/Tagout Plan
k. Confined Space Entry Plan
l. Safety Plan
a. Include but not limited to:
Personnel required safety equipment Topics for weekly safety meetings Required safety training sessions
m. Blood Bourne Pathogen Plan
n. *Schedule Plan with Work Breakdown Structure
The above shall be in final draft format as part of the Management Proposal. The Government reserves the right through a coordinated effort with the successful bidder to assist in final revisions before approval of the plan(s) after contract award.
*The Schedule Plan (n) and Pest Control Plan (f) shall be updated and resubmitted annually within (30) thirty days after the exercise of an option.
TP-1.19 Emergency Medical Services: Medical services for Contractor personnel are the responsibility of the Contractor.
TP-1.20 Peak/Off-Peak Months: Peak months shall be the (7) seven months from April 1st through October 31st each year and off-peak months shall be the (5) five months from November 1st through March 31st each year. A peak month is a month of services in which it is expected that there will be a seasonal increase in services needed to meet the operations and maintenance requirements due to increased visitor usage of the John H. Kerr Lake area (See appendix 10 for lake map) and its associated campgrounds (see website for maps) https://www.saw.usace.army.mil/Locations/District-Lakes-and-Dams/John-H-Kerr/ and recreational areas.
An off-peak month is a month of services in which it is expected there will be a reduction in services due to the seasonal closure of John H. Kerr Lake campgrounds and recreational areas. The Contractor shall focus on the off-season maintenance needs outlined in the technical provisions to maintain the John H. Kerr Lake area in condition for the beginning of the next recreational high-use season. The Contractor shall determine the appropriate staffing needs to meet the technical provision requirements during the peak and off-peak months.
TP-1.21 Transition: The Contractor shall ensure the continuity of service while implementing its transition plan for all affected activities to preclude any adverse impact on the mission. The Contractor shall implement the actions necessary for a smooth transition of operations. During this period, which shall not exceed fourteen (14) one month, the Contractor shall make all preparations and conduct as many on site investigations as deemed necessary to commence full performance of work under the contract. The Contractor shall provide a sufficient number of personnel to ensure effective transfer of all work in progress so as not to impact mission accomplishment. A Government and Contractor inspection and documentation of the condition of all Government furnished equipment, vehicles, and facilities shall be completed during this time so an accurate account of all items can be documented.
Any item or system requiring replacement or repair will be handled through a separate contract action. The government will ensure that GFE maintenance will be current and in good working condition for the transition upon completion of current contract. The Contractor will ensure that GFE maintenance will be current and in good working condition upon completion of contract.
TP-1.22 Average Yearly Visitation: The following is John H. Kerr Dam & Reservoir’s average yearly visitation per park with opening/closure dates. Visitation numbers are averages only and vary from year to year. Some recreational areas, trailheads, day use areas, and wildlife management areas are not listed below because visitation information cannot be obtained. Total project visitation is approximately 2 million visitors per year. This information is provided only to assist the Contractor in this solicitation.
Park Name Yearly Visitation Open Date/Close Date Visitor Center/Tanner Center 16,371 Open Year Round North Bend Park 167,499 Open Year Round Tailrace Park 55,205 Open Year Round Buffalo Park 23,009 May 1-September 30 Ivy Hill Park 51,199 Open Year Round Bluestone 63,800 Open Year Round Rudds Creek Park 66,653 Open Year Round Staunton View Park 23,785 Open Year Round Buffalo Springs 24,466 Open Year Round Palmer Point 35,801 Open Year Round Island Creek Park 22,109 Open Year Round
Longwood Boat Ramp 84,442 Open Year Round Longwood Park 69,399 April 1-October 31 Eagle Point 6,681 Open Year Round Eastland Creek 21,289 Open Year Round Grassy Creek 25,019 Open Year Round Liberty Hill Trail/Fishing Access 15,149 Open Year Round
TP-2 – MANAGEMENT
Descriptions, Specifications and Scope of Work
TP-2.0 Scope of Work: The Contractor shall provide management services for tasks relating to the operation, maintenance, repair and work requirements set forth in this contract. Management service requirements in this contract regarding maintenance, repair, and operation, may fluctuate due to vandalism, weather, season, and recreational activity.
TP-2.1 Reference and Compliance Documents:
a. ER 1130-2-550 - "Recreation Operations and Maintenance Policies," dated 15 Nov 1996 and companion EP.
b. EM 385-1-1 - "Safety and Health Requirements Manual," (30 Nov 2014)
c. ER 700-1-1 - USACE "Supply Policies and Procedures"
d. EP 1165-2-316 - "Rules and Regulations Governing Public Use of Corps of Engineers Water Resource
Development Project"
e. Sign Standards Manual – EP 310-1-6a
f. CFR Title 36 - Code of Federal Regulations
g. ER 1130-2-540 - “Environmental Stewardship Operations and Maintenance Policies” and companion
EP
TP-2.2 Performance Evaluation Meetings: The Contractor, Superintendent, or both, shall meet with the COR (or a designated representative) weekly or as determined necessary by the COR. However, a meeting shall be held not later than one (1) normal workday after a Contract Discrepancy Report (CDR) is issued. Mutual effort will be made to resolve problems identified.
TP-2.3 Contractor (CQC): Contractor Quality Control (CQC) is the means by which the Contractor ensures that all work complies with the contract requirements. Within thirty (30) days after award of this contract, the Contractor shall develop, implement and maintain an effective CQC plan and program. The plan shall identify personnel and procedures to maintain acceptable productivity and quality levels. The COR shall approve changes to the CQC plan before implementation. The person responsible for CQC operations should be present on the job within thirty (30) days after award.
TP-2.3.1 CQC System: The CQC system shall be staffed with personnel as necessary to perform quality control.
The Contractor's project superintendent may serve as the quality control chief. However, one (1) Contract employee must have primary duties as the full time Quality Control Inspector.
TP-2.3.2 Government Inspectors: Government inspectors will perform quality assurance inspections to assure that CQC is complete. The presence of a Government inspector shall not relieve the Contractor of responsibility for the proper execution of work in accordance with the technical provisions.