W912PM20R0002 P00002 Mod.pdf

PDF 636 KB Posted

Attached to
Small Business AE IDIQ Federal contract opportunity
Solicitation number
W912PM20R0002
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

View the file

Other files for this federal contract opportunity

Other files attached to Small Business AE IDIQ, newest first.
File Type Posted
W912PM20R0002 - P00003 Mod SB AE IDIQ.pdf PDF
W912PM20R0002 - P00003 Conform SB AE IDIQ.pdf PDF
W912PM20R0002 P00002 CC.pdf PDF
W912PM20R0002 P00001 CC.pdf PDF
W912PM20R0002 P00001 Mod.pdf PDF
Enclosure 4 - NAVFAC_USACE PPQ.pdf PDF
Enclosures 1-3.pdf PDF
W912PM20R0002 Small Business IDIQ for AE Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912PM20R0002 is hereby amended to incoporate the follow ing:

1. Revised the Instructions to Offerors to provide clarity and consistency in Criteria descriptions.

2. All other Terms and Conditions remain unchanged.

///////////////////////////////////////////////// Last Item \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\

1. CONTRACT ID CODE PAGE OF PAGES

J 1 32

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Dec-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM20R0002

X 9B. DATED (SEE ITEM 11)

18-Nov-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Dec-2019

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM20R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SUBJECT: W912PM20R0002, Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Small Business Architect-Engineer (A-E) - Design Services to support the US Army Corps of Engineers - Wilmington District.

CONTRACT INFORMATION:

The U.S. Army Corps of Engineers - Wilmington District, South Atlantic Division intends to Solicit for an IDIQ Contract in support of the Military and Civil Works Planning and Design Program. It is anticipated that up to four (4) Contracts will be negotiated and awarded. Each award will be a 1 year Base with four 1 year optional periods. The selection board will consider the most highly qualified offerors for up to four (4) Total Small Business Set-Aside awards valued at approximately $6,000,000.00 each. Work under this contract shall be subject to satisfactory negotiation of individual task orders. The maximum task order value is estimated to be $1,000,000.00. In accordance with FAR 52.216-19 a contractor is not obligated to accept a Single Task Order over the established maximum; however they may choose to do so. This IDIQ will have a minimum guarantee of $10,000.00. Rates will be negotiated for each 12-month period of the contract. The estimated award date of the contract is May 2020.

This solicitation is TOTAL SMALL BUISINESS SET-ASIDE.

The wages and benefits of service employees (see FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act. The North American Industrial Classification System (NAICS) code for this project is 541330, which has a size standard of $16.5 million in average annual receipts.

Contractor Manpower Reporting: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under their contract via a secure data collection site at http://www.ecmra.mil/. Reporting inputs will be for the labor executed in each Government fiscal year (FY), which runs October 01 through September 30. While inputs may be reported at any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. The contractor may direct questions to the HelpDesk at http://www.ecmra.mil/.

REGISTRATION: Offerors shall have and maintain an active registration in the following databases: https://beta.SAM.gov and System for Award Management (SAM) at http://www.sam.gov to be eligible for a Government contract award. It is the responsibility of interested parties to appropriately register SAM and beta.SAM and to monitor for notices, amendments, etc. Prospective Offerors are advised, to be eligible for award of the contract resulting from this solicitation requires an active SAM registration, to include satisfactory completion of the applicable online representation and certifications.

PROJECT INFORMATION: The firm(s) selected will be required to provide all phases of Planning, Engineering, and Design for military and civil programs which meets the definition of A-E Services as defined in 40 U.S.C. 1101 and FAR 2.101. Tasks for the Military Program shall include, but are not limited to: Design Charrettes, Design Conferences, Parametric Design Reports, Parametric Estimating, Concept (35%) through Final Design and Submittal, Construction Contract Documents, Preparation of Design–Build Request for Proposal, Design– Build Evaluation Consultation, Interior Design, Architectural Renderings, Permitting, Value Engineering, Other Studies/Reports and Construction Phase Services.

Tasks for the Civil Works Program shall include, but are not limited to: Studies, Investigations, Design, Repairs and new construction in support of the Navigation and Lakes Branches (Falls Lake, Cape Fear Locks and Dams, Jordan Lake, Philpott Lake, W. Kerr Scott, John H. Kerr).

These contract(s) are intended primarily for projects within the geographical boundary of the USACE South Atlantic Division – Wilmington District.

The selected firm must have the capability through in-house staff or consultants to perform Topographic and hydrographic Surveys, Subsurface Investigations,mapping, geotechnical and subsurface utility investigations, and hazardous material testing and abatement/remediation planning in conjunction with Design Task Orders. Unless otherwise indicated, design services and deliverable requirements will be developed using ERDC/ITL TR-12-6 A/E/C CADD Standard, Release 6.0. A variety of software may be utilized, potential software includes but is not limited to SPECSINTACT software for contract specifications, MCACES Second Generation (MII) software for cost estimates and Beach-fx for evaluating the physical performance and economic benefits and costs of shore protection projects or as specified in individual Task Order Scopes of Work. Responses to design review comments will be provided using the Government web-based Design Review and Checking System (DrChecks) located at www.projnet.org.

Projects to be performed under any subsequent awarded IDIQ’s from this solicitation may include project similar in size, scope and complexity listed to those found in the subsequent tables. It is anticipated that any of the below identified MILCON and O&M projects will be accomplishable by the most highly rated offerors with whom to fulfill these task orders.

Wilmington District Military Construction Projects

PN # Project Name FY PA *

Wilmington District Military O&M Construction Projects The following table provides 3 year sample of awarded O&M design requirements for the Wilmington district and its customers.

SC00006-6P Design Contract and S&R

SF00005-16 Renovate Hangar AE Contract

SF00023-15 ATF Overhead Shelter AE Contract

SF00002-16 Parachute Equip Storage AE Contract

SF00004-16 Breachers Roof AE Contract

SF00004-14 Control Room AE Contract

SF-00013-16 Design Contract and S&R

SF00002-16 Parachute Equip Storage AE

3-2847 Design PreAward

ATF Storage Bldg Design

SOLSE Storage Design

F Sqdrn SWA Design

Repair PT Area Design

ISO Range 65 Design

Hangar 722 Dehumid Design Support

Lightning Protection Study & Grounding Loop Study

Mass Notification

90610 SOF Armsroom Addition 22 $7,900

87447 SOF Supply Support Activity 22 $6,400

91022 SOF Tech Support Detachment Annex 22 $9,000

80850 SOF Renovate Building H-2639 23 $6,419

81893 SOF Deployment Facility 23 $9,000

89187 SOF Multi-Purpose Range Support

(SWC26) 23 $7,900

69252 SOF Range 16 Baffle Containment 24 $7,100

86027 SOF Camp MacKall Company Operations Facility 24 $4,350

81914 SOF Renovate SOF LOGS Building LR $5,500

81911 SOF Deployment Readiness Warehouse LR $7,000

81167 SOF Human Performance Training Center LR $5,844

79450 SOF Human Performance Training Center LR $8,280

Cup Transformer

Range 190C & Range 19E

Shower and Latrine Design

In accordance with the Brooks Act procedures, each future task order will require a qualifications-based evaluation of each selected firm from the group of awarded individual delivery contracts. Each firm will be evaluated to perform the services required for each task order using Criteria B, C, D and E (as detailed below). Additionally, the Contracting Officer may consider work completed or substantially complete as part of these awards made herein. To be considered substantially complete 95% of an order must be considered completed and received by the Government.

Evaluations will be conducted prior to the solicitation for each task order during the ordering period as identified at the time of award in FAR 52.216-18 Ordering.

SELECTION CRITERIA: The selection criteria for this particular contract are listed below in DESCENDING order of importance. Criteria A-F are PRIMARY. Criteria G and H are SECONDARY and will be used ONLY as "tie-breakers" among technically equal firms.

Primary Criteria will be assigned a rating from “outstanding” to “unsatisfactory,” based on the risk to the Government that the Offeror will successfully perform that evaluated Criteria. An overall rating will also be applied to the proposal submission using the same rating scale.

Proposals failing to respond or provide complete information for each Criteria as required by this solicitation will be determined non-compliant and will be removed from further consideration.

For purposes of this solicitation, a stand-alone contract or single task order is considered one project. Separating activities performed under a contract or task order will not be considered multiple projects; conversely, combining activities performed under separate contracts or task orders to produce a single project will not be considered. A single task under an Indefinite Delivery Contract is considered a project, not an Indefinite Delivery Contract itself. Projects in which the AE service is not 100% complete will not be evaluated.

***Amendment 02***

A. Criteria A, Professional Qualifications – Key Personnel (SF330, Part I, Section E)

Criteria A, Part 1 – Resumes of Key Personnel (Section E, Blocks 12-18): Offerors must have, either in-house or through consultants or subcontractors, the disciplines listed below. If an individual will serve in more than one discipline, then those disciplines shall be clearly indicated in Block 13, PART I, Section E. Resumes (Block E of the SF 330) must be provided for these disciplines, including consultants. In the resumes under Project Assignments, use the same discipline nomenclature as is used in this announcement. The evaluation will consider education, training, registration, relevant experience in the type work required, and longevity with the firm.

The Offeror must provide licensure or certification number and date for each discipline. All Key Personnel for whom resumes are provided shall be shown on the organizational chart in Section D of the SF330.

***Amendment 02***

Additional staff available for work on this contract shall be indicated on the chart by numbers.

The following disciplines are required:

a. Project/Task Order Manager(s)

b. Architect(s) – Registered Architect; LEED Certified

c. Civil Engineer(s) – Professional Engineer, preferred registrations within

Wilmington District’s Area of Responsibility.

d. Structural Engineer(s) – Professional Engineer, demonstrates specialized experience with Security/Force Protection design experience

e. Mechanical Engineer(s) – Professional Engineer, demonstrates specialized experience with Heating, Ventilation and Air Conditioning and controls

f. Electrical/Communication Engineer(s) - Professional Engineer; Registered

Communication Distribution Design (RCDD)

g. Fire Protection Engineer(s) – Professional Fire Protection Engineer.

Demonstrate two years design experience with sprinkler fire protection systems; demonstrate four years of design experience with currently nationally recognized codes such as National Fire Protection Agency (NFPA), with special emphasis on NFPA 101 Life Safety.

h. Interior Designer(s) – Registered Architect or Interior Designer with NCIDQ certification; demonstrate design experience with comprehensive interior design, including space planning, pre-wired workstations, furniture specification, and knowledge of the acquisition process including applicable FAR and funding limitations.

i. Commissioning Authority(ies) – certified as a CxA by AABC, NEBB, or

TABB

j. Cost Estimator(s) – Certified AACE, ICEC, PCEA, or equivalent; resumes are required for the firm’s and/or consultant’s cost engineering or estimating specialist(s) for each of the following disciplines: architectural, structural, civil, mechanical, and electrical; a single resume may demonstrate experience in one or more disciplines, however, competence and experience for each assigned discipline must be clearly demonstrated.

k. Cybersecurity Engineer(s) – Certified Information Systems Security Professional (CISSP) or equivalent.

l. Coastal Engineer(s)

m. Master Planner(s) – Certified AICP or equivalent; demonstrate experience with area development plans, installation/base development plans, and overall master plans

Note, LEED certification and Security/Force protection design experience requirements may be fulfilled by other disciplines.

***Amendment 02*** Criteria A, Part 2 – Relevant Projects (Section E, Block 19): All Key Personnel are required to have a minimum of five (5) years of project experience in their discipline demonstrated by projects with scope, magnitude, and complexity comparable to this solicitation. The definition of a project is as noted in ‘Selection Criteria’ above. Relevant projects are those that reflect experience performing the respective discipline. Relevant Project Information should be brief and highlight specific roles and tasks performed by the Key Personnel, Project Type, Scope, and Costs. No more than five projects should be listed for each resume, and each project listed must have been completed within ten (10) years of publication of this solicitation announcement.

(Note: The projects provided for this factor Criteria A may also be used to address Criteria C Part 2.)

The evaluation of Part 1 will take into consideration the education and current registration, licensure or certification(s), as applicable, of each person named for each discipline. It will also take into consideration the person’s relevant project experience provided in Block 19. More weight will be given to experience with full-design type projects completed within the Southeastern United States, and that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information. This factor Criteria may be assessed Strengths or Weaknesses, as appropriate. Only the Key Personnel disciplines requested in this solicitation will be evaluated. The basis of evaluation for Part 1 of this criteria will be information submitted in Part I, Sections E and G of the SF 330.

***Amendment 02***

***Amendment 02***

B. Criteria B, Specialized Experience and Technical Competence (SF330, Part I, Section F): Offerors are to demonstrate specialized experience and technical competence for the design of facilities and infrastructure for construction which meets the definition of AE Services as defined in 40 U.S.C. 1101 and FAR 2.101. This factor Criteria considers specialized experience and technical competence to support Civil Works Design and Construction as well as Military Design and Construction specific to performing services similar to those described above in the paragraph titled Project Information.

Those firms submitting as Joint Ventures (JV) must follow the same procedures as any other Offeror with the following exception: if the JV (the Offeror) cannot provide at least six (6) projects that demonstrate performance by the JV of 50% of more of a project, as either prime or subcontractor, the JV may provide projects performed by any partner of the offering JV that reflect performance of 50% or more of a project, as either a prime contractor or subcontractor.

In Section F, offerors are to submit up to fifteen (15) projects that best illustrate the proposed team’s qualifications for award of a contract. (Note: The projects provided for Factor 1 Criteria A, Part 2., may also be used to address this Criteria factor.) The definition of a project is as noted in ‘Selection Criteria’ above. For each project use only one page and note the contract or task order number, as applicable. As to content, do not alter the format of Section F.

To demonstrate quality of performance, see instructions in Criteria C below.

When completing Section G, in Block 26, along with the name of key personnel, include the firm with whom the person was associated with at the time the project was performed.

Of the projects submitted as prescribed above, relevant projects are those that reflect the specialized experience and technical competence of the Offeror and/or proposed subcontractor(s), as prime contractors or subcontractors, performing services similar to those described in the paragraph titled Project Information. More weight will be given to project designs that are full-design type projects on military installations or completed within the Southeastern United States, and that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information.

The basis of evaluation for Factor 2 Criteria B will be information submitted in Part I, Sections F and G.

***Amendment 02*** ***Amendment 02***

C. Criteria C, Past Performance: Offerors shall demonstrate in narrative (or other format) a history of customer satisfaction with the Offeror’s quality of work, cost control, and scheduling. Evaluations will be based on established CPARS ratings and other credible documentation included in the SF 330. Customer excerpts or quotes from prior evaluations for the purposes of substantiating the narrative are not desired. The narrative should describe the corporate approach for maintaining success with customer satisfaction with the Offeror’s quality of work, cost control and scheduling. Submit up to 15 example projects completed in the past six years that demonstrate experience listed above. This factor Criteria may be assessed with more weight given to successful performance ratings in these three areas on Department of Defense contracts. To demonstrate quality of past performance, for each project the Offeror must provide a Contract Performance Assessment Reporting System (CPARS). If a CPARS is not available, the Offeror must provide a NAVFAC/USACE Past Performance Questionnaire (PPQ). If a PPQ is provided and there is a CPARS, the CPARS rating will govern.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal,inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS),Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

The basis of evaluation for Criteria C will be information submitted in Part I, Section H.

D. Criteria D, Work Management: In Part I, Section H, the Offeror must provide a proposed work management plan demonstrating its team’s breadth of knowledge and experience with managing design for Civil Works Design and Construction as well as

Military Design and Construction. The narrative should describe the corporate approach, driving criteria, or potential constraints, and examples of successful performance. The narrative should specifically discuss knowledge of, and experience with, work management planning to include quality management, subcontractor management, prior experience of the prime firm and any significant consultant, version control management, proactive internal and external communication protocols, and independent submittal review processes in the context of providing services under multiple task orders.

E. Criteria E, Capacity to Accomplish the Work: The capacity to accomplish at least three

(3) $300,000 individual task orders simultaneously or one (1) $1,000,000 individual task order. Offeror must be able to demonstrate the capability to accomplish both scenarios.

F. Criteria F, Knowledge of Locality: Familiarity with the conditions, control and regulations affecting work in portions of North Carolina and Virginia.

G. Criteria G, Additional Key Personnel: Evaluation will consider education, training, registration, relevant experience in the type work required, and longevity with the firm.

The Offeror must provide licensure or certification number and date for each discipline.

All Key Personnel for whom resumes are provided shall be shown on the organizational chart in Section D of the SF330. Additional staff available for work on this contract shall be indicated on the chart by numbers. The following additional disciplines are required:

a. Landscape Architect(s)

b. Industrial Hygienist(s)

c. Environmental Engineer(s) – Demonstrate specialized experience with Lead

Based Paint (LBP) and Asbestos Containing Material (ACM) Survey and Remediation

d. Certified Value Specialist

e. Geospatial Developer

f. Surveyor(s) – Professional Land Surveyor, required registrations within North

Carolina and Virginia

g. Certified Hydrographer(s) (Professional Land Surveyor with hydrographic qualifications and relative experience will alternatively be considered)

h. Geotechnical Engineer(s) – Professional Engineer or Geologist

H. Criteria H, Geographical Proximity of Contractor: Geographical location of the contractor’s offices/facilities in relation to the primary area covered by the contract’s scope.

Note: Selection of AE firms is not based upon competitive bidding procedures, but rather upon the professional qualifications necessary for the performance of the required services. Firms must be evaluated as Most Highly Qualified in order to be selected for a contract. The wages and benefits of service employees (see FAR 22.10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act.

Technical inquiries: All questions and requests for information (RFI’s) should be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet .

A. Questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

B. To submit and review bid inquiry items, bidders must be a current registered user or self-register into the system. To self-register, go to www.projnet.org\projnet, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click “Continue.” From this page you may view all bidder inquiries or add an inquiry. Offerors questions will be acknowledged via email, followed by an answer to the question after it has been processed by our technical team.

i. The Solicitation Number is: W912PM20R0002

ii. The Bidder Inquiry Key is: 4Y8U7Q-ZFRIK9

C. Bidders/Offerors are requested to review the SF 330 Instructions, the solicitation in their entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public viewing on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of required submission, whether the inquiry was generated by the Bidder/Offeror themselves or another potential Bidder/Offeror.

D. Government responses to questions and RFI’s relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment to the solicitation is issued. In the case of any conflicts, the solicitation governs.

E. The ability to enter questions and RFI’s will be disabled seven (7) days prior to the closing date stated in the solicitation. The Government reserves the right not to respond to questions/inquiries received after that date. No Inquiries will be accepted by the Bidder Inquiry system within seven (7) calendar days prior to the date of bid opening. However, the Bidder Inquiry system may still be accessed to view answers/replies to previous inquiries until the bid opening.

Note: Personal visits to discuss this announcement will not be scheduled. As required by acquisition regulations, interviews for the purpose of discussing prospective contractor's qualifications for the contract will be conducted only after submittal review by the selection board. Interviews will be conducted by telephone.

In Section H, Firms shall present an organization chart and a narrative describing how the organization will function. Those functions to be subcontracted out shall be clearly identified.

Firms may opt to refer to the organizational chart provided in Section D when submitting the required narrative within Section H.

In Section H, describe owned or leased equipment that will be used to perform this contract.

Content contained in cover letters, company literature and extraneous materials is not desired and will not be considered.

Firms must include the DUNS number for the office of the firm performing the work in Section B.5. of the SF 330. Include DUNS numbers for the prime and key subcontractors in the SF330, Page 1, Block 10.

***Amendment 02***

SUBMISSION REQUIREMENTS:

Interested Architect-Engineers firms having the capabilities to perform this work must submit Parts I and II of the SF 330 via email to the following individuals:

Ms. Amy Jenkins at amy.a.jenkins@usace.army.mil Mr. Michael Mullen at michael.m.mullen@usace.army.mil Offerors should also CC the Wilmington District Proposal Inbox at:

SAW-CT-Military-Proposals@usace.army.mil ***Amendment 02***

Title the file(s) in the following format:

W912PM20R0002_COMPANY NAME_SF330

Proposal due Date and Time:

Request For Proposal No: W912PM20R0002 Due Date of Proposal: 18 December 2019 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: Small Business Indefinite Delivery Indefinite Quantity (IDIQ) Contracts for Architect-Engineer (A-E) Services

NO HARD COPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED.

The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided

Time is of the essence, therefore any submissions received after the exact time specified for receipt will be considered late, and will be processed IAW FAR 15.208, Submission, Modification, Revision, and Withdrawal of Proposals. A firm will not be considered if its SF 330 Part I is not signed, unless the SF 330 Part I is accompanied with a signed cover letter, or a current signed SF 330 Part II. If a firm does not submit a SF 330 Part II with its SF 330 Part I, or have one on file through SAM, it will not be considered (FAR 36.603(b)).

The entire submission of the SF 330 must not exceed 2 gigabytes and shall be submitted as one file using Microsoft Word (.doc or .docx) or Adobe Acrobat (.pdf) in a Font 10 point or larger.

Page size shall be standard 8 ½ x 11. Part I of the SF 330 should not exceed 100 150 pages overall.

***Amendment 02***

Resumes in Section E and example projects in Section F shall not exceed one (1) page each.

Indicate in Section C.11 if the prime has worked with the team members in the past five (5) years. In Section G.26, include the firm each of the key personnel is associated with. Cover letters, company literature and extraneous materials are not desired and will not be considered.

Firms are highly encouraged to include a delivery receipt when electronically sending their submissions. Per FAR 15.208, electronic proposals received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals will not be considered “late”. It is the firm’s responsibility to ensure that the submissions are received by the designated time.

STATEMENT OF WORK

STATEMENT OF WORK

Small Business Architect-Engineer (A-E) - Design Services

US Army Corps of Engineers - Wilmington District.

1. GENERAL

1.1. Work performed under this IDIQ will be in support of the Civil Works Program and Military Planning and Design Program. Task orders executed under this IDIQ will be for Architect-Engineering (AE) Services. Work will include all phases of Planning, Engineering, and Design for both Civil Works and Military programs. Additional work may be required in support of Engineering Services, such as survey or GIS services and shall be a lesser portion of individual task orders.

1.2. Military program task orders may primarily include: Development of Concept and Full Designs, Renovation/Repair Projects, Preparation of Project Definition and Programming Documents, Charrettes, Preparation of Technical Portions of Design-Build and Design-Bid-Build Solicitations, Commissioning and Construction Phase Services, Design Analysis and Detailed Construction Plans and Specifications. Additionally, military program task orders may include, but are not limited to, the following support activities required to accomplish AE design task orders: Engineering Studies, Investigations, Life Cycle Cost Analyses (LCCA), Surveying (including topographic, hydrographic, boundary, facility condition assessments, precise alignment/deformation surveys and construction staking), GIS (mapping, analysis, geodatabase development, and application development) and Master Planning.

1.3. Civil Works program task orders may primarily include: Feasibility Report

Development, Engineering Designs and Detailed Construction Plans and Specifications, Preliminary Reconnaissance Phase Studies and Master Planning. Additionally, Civil Works task orders may include, but are not limited to, the following support activities required to accomplish AE design task orders: Surveying (including topographic, hydrographic, boundary, precise alignment/deformation surveys and construction staking), GIS (mapping, analysis, geodatabase development, and application development.

1.4. Types of Civil Works projects will include both Inland and Coastal to include: site development, utility infrastructure improvements, flood damage reduction, coastal protection and beach nourishment, shoreline and stream bank erosion protection, shallow and deep draft navigation, environmental and eco-system habitat restoration, storm water management, comprehensive watershed evaluations and multipurpose water resources projects.

1.5. The AE, as an independent contractor and not as an agent of the Government, shall, in accordance with the terms and conditions more particularly set forth below, furnish all labor, management, facilities, supplies, equipment and material (other than those to be furnished by the Government as herein-after provided), and do all things necessary for performance of the work as set forth below. The AE shall furnish the required personnel, equipment, instruments, and transportation as necessary to accomplish required services and furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the AE shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.

2. LOCATION OF WORK.

This contract will be used to support Wilmington District customers in the State of North

Carolina and Virginia; however, could also be used within any location in the United States that falls under Wilmington District’s AOR.

3. NEGOTIATION RESPONSIBILITIES.

Task orders will be negotiated and executed by the Wilmington District or assigned

Governmental Agent.

4. REQUEST FOR PAYMENT.

Payments should be submitted to:

USAED, Wilmington

ATTN: CESAW-ECP-ET

69 Darlington Ave Wilmington, NC 28403

5. SUBMITTAL SCHEDULE AND REQUIREMENTS.

Delivery of completed work shall be accomplished such that the materials will be protected from handling damage. Each package shall contain a transmittal letter or shipping form, in duplicate, listing the materials being transmitted, being properly numbered, dated and signed.

Shipping labels shall be marked as required in the task order.

6. PERIOD OF PERFORMANCE.

6.1. The base contract will be awarded for a period not to exceed one (1) year with four (4) one (1) year options for a total of five (5) years with the total IDIQ value not to exceed $6,000,000 over the five-year life of the contract. This IDIQ will have a minimum guarantee of $10,000 for the life of the contract.

6.2. The Architect-Engineer shall perform all work and services specified in individual task orders within the performance period specified in each task order.

7. WORK TO BE PERFORMED/TECHNICAL CRITERIA AND STANDARDS.

7.1. The Wilmington District serves a wide variety of customers, within North Carolina and Virginia, throughout the US. These AE contracts are to provide a wide variety of AE design services, and will be used primarily for the military construction and the support for others programs, but will also provide services for the civil works program.

Wilmington District’s area of responsibility includes:

7.1.1. Federal work for various agencies within the State of North Carolina, including but not limited to, the Department of Defense, and the Department of Veteran’s Affairs

7.1.2. State agencies and municipalities within the state of North Carolina and Virginia

7.1.3. Federal agencies throughout the US, including but not limited to, Department of

Defense, Defense Logistic Agency DESC, and the Department of Veteran’s Affairs.

8. CRITERIA REFERENCES.

8.1.Unless a specific document version or date is indicated, criteria shall be taken from the most current references as of the date of issue of the contract. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed. The following information and criteria are made a part of this contract by reference:Tri-Service A/E/C CADD Standards and Advanced Modeling Criteria – (https://cadbim.usace.army.mil/cad)

8.1.2. DA Facility Standard Designs -. (https://mrsi.erdc.dren.mil/cos/)

8.1.3. Unified Facilities Guide Specifications (UFGS) (http://www.wbdg.org)- under the

TECHINFO link.

8.1.4. Various Government and commercial criteria standards available in the Whole

Building

8.1.5. Design Guide library (http://www.wbdg.org).

8.1.6. U.S. Army Publications and Other Information (http://www.hnc.usace.army.mil/).

8.1.7. Federal Acquisition Regulation (FAR) (www.acquisition.gov)

8.1.8. Unified Facilities Criteria (UFC)1-200-01, General Building Requirements.

8.1.9. UFC 1-200-02, High Performance and Sustainable Building Requirements

8.1.10. UFC-1-300-07A, Design–Build Technical Requirements

8.1.11. UFC 4-010-01, DOD Minimum Anti-terrorist Standards for Buildings

8.1.12. UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, And Construction, With Change 1

8.1.13. Savannah District Design Manual (SDDM)

(http://www.sas.usace.army.mil/About/Divisions-and-Offices/Engineering- Division/Engineering-Design-Criteria/Design-Manual-for-Military-Construction/).

8.1.14. EM-385-1-1 Safety - Safety and Health Requirements, 9/15/2008.

9. DESIGN SERVICES AND DELIVERABLES REQUIREMENTS. Unless otherwise indicated, design services and deliverable requirements will be developed using ERDC/ITL TR-12-6 A/E/C CADD Standard, Release 6.0. A variety of software may be utilized, potential software includes but is not limited to SPECSINTACT software for contract specifications, MCACES Second Generation (MII) software for cost estimates and Beach-fx for evaluating the physical performance and economic benefits and costs of shore protection projects or as specified in individual Task Order Scopes of Work. Deliverables for each submission shall include at a minimum: a complete set of Advanced Modeling/Computer- Aided Design (CAD) files with all reference files intact, a converted set of PDF files with one drawing occupying one PDF file, a combined PDF file including all drawings, and one hard copy of each drawing. An Index of Drawings (typically included as a sheet in the project) shall also be provided in either an Excel Spreadsheet or an ASCII text file.

Advanced Modeling is required for Centers of Standardization COS designs and other projects as required.

All narrative and text documents, specifications, and cost estimates shall be provided in their electronic format, as appropriate, and one reproducible hard copy. Each deliverable stated below shall be completed in accordance with the SDDM. The AE scope of services required under this contract may include the following:

9.1. Design Charrette. The AE is required to conduct a design charrette in accordance with

AR 415-15 Army Military Construction and Nonappropriated-Funded Construction Program Development and Execution. The Design Charrette will be accomplished and the product submitted on the time schedule specified, and shall be a separate phase of work, independent of any other work included in the contract.

9.2. Parametric Design Report. The AE is required to prepare a Parametric Design Report

(PDR) or Parametric Design Report Lite (PDR-lite) in accordance with AR 420-1, Army Facilities Management, Chapter 4 – Army Military Construction and Non-appropriated- Funded Construction Program Development and Execution and ES-07052, Enterprise Standard Instructions for Parametric Design. Additional information regarding PDRs can be found here: https://mrsi.erdc.dren.mil/pdrs/. The PDR/PDR-lite will be accomplished and the product submitted on the time schedule specified, and shall be a separate phase of work, independent of any other work included in the contract.

9.3. Parametric Estimating. All construction costs estimates shall be prepared using the

MCACES Second Generation (MII) estimating software. Estimates should conform to the Military Work Breakdown Structure or Civil Works Breakdown Structure as identified in UFC 3-740-05, Change 1 June 2011. The estimate shall be created using the latest version of the English Costbook for MII.

9.4. Concept (35%) Design and Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. Some submittal requirements include, but is not limited to the drawings, written descriptions, design analyses, cost estimate, and other related and supporting documents. The AE will ensure that the cost estimate is submitted simultaneously with the concept design package. The AE will incorporate concept design review comments as a part of completing the Concept Design submittal. The AE will resubmit a revised cost estimate after the 35% comments have been applied.

9.5. Preliminary Design (65%) and Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. Some submittal requirements include, but is not limited to the drawings, (specifications, design analyses for Preliminary Submittals), quantity take-off, cost estimate, and other related and supporting documents. The AE will ensure that the cost estimate is submitted simultaneously with the preliminary design package. The AE will incorporate preliminary design review comments as part of completing this design submittal. The AE will resubmit a revised cost estimate after the 65% comments have been applied.

9.6. Final (100%) Design and Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. Some submittal requirements include, but is not limited to the detailed working drawings and specifications necessary for the effective coordination and efficient execution of the construction work together with such design analyses, cost estimate, quantity take-off, unit price schedules, and other related and supporting documentation. The AE will ensure that the cost estimate is submitted simultaneously with the final design package. This includes incorporation of comments from the final design review. The AE will resubmit a revised cost estimate after the final design comments have been applied. The AE shall submit the attached checklist entitled "Checklist for Architect Engineer Submittal of Final Design" with the

100-percent final design submittal, properly indicating items that have been accomplished (Enclosure 1).

9.6.1. A completed submittal register listing all contractor submittals required in the contract specifications. The Submittal Register Form (ENG Form 4288) shall be developed using the SPECSINTACT software.

9.6.2. The AE shall edit each specification section to reflect the review level of submittals required which will generate ENG Form 4288 Submittal Register. If shop drawing review is required by the AE, negotiations for shop drawings review services will held prior to the award of the construction contract.

9.6.3. For military projects, a draft of DD Form 1354, Transfer and Acceptance of

Military Real Property, shall be submitted with the final cost estimate.

9.7. Corrected Final Design Submittal. The AE will prepare and submit for approval in accordance with all requirements outlined in the SDDM. The specifications and PDF formatted drawing files submitted by the AE at the corrected final design stage will constitute the construction contract documents for this project. The contract documents will be converted into electronic bid sets (EBS) by the Wilmington District for construction services advertisement. EBS documents will be issued to contractors and suppliers on CD and/or over the internet. Correction of items of noncompliance in the contract documents, whether format or technical errors, is the responsibility of the AE.

Also, during the bidding period the AE shall furnish such advice as may be requested to clarify design intent, and develop the necessary amendments to document the clarification. Corrections and amendment packages will be developed within the time allowed by established design and construction bidding schedules as defined by Wilmington District.

9.8. Preparation of Design–Build Request for Proposal (Nominal Criteria): The AE shall prepare and submit for approval the drawings, written descriptions, design analysis, cost estimate, and other related and supporting documents as are more fully specified in UFC 1-300-07A. The AE shall incorporate review comments as part of completing the Design- Build Request for Proposal.

9.9. Preparation of Design–Build Request for Proposal (Partial Criteria): The AE shall prepare and submit for approval the drawings, written descriptions, design analysis, cost estimate, and other related and supporting documents as are more fully specified in UFC 1-300-07A. The AE shall incorporate review comments as part of completing the Design- Build Request for Proposal.

9.10. Preparation of Design–Build Request for Proposal (Full Criteria): The AE shall prepare and submit for approval the drawings, written descriptions, design analysis, cost estimate, and other related and supporting documents as are more fully specified in UFC 1-300-07A. The AE shall incorporate review comments as part of completing the Design-Build Request for Proposal.

9.11. Design–Build Evaluation Consultation: The AE shall participate as a consultant to the

Design–Build Evaluation Team by reviewing proposals for compliance with the requirements of the Design-Build Request for Proposal. The AE shall provide the proper design disciplines, as required by the project scope for the review, to serve as nonvoting advisors to the Evaluation Team.

9.12. Review of Design–Build Submittals: The AE shall provide the proper design disciplines required for the review the Design-Build Contractor’s design. The review shall be conducted for compliance to the technical drawings, specifications and accepted proposal requirements of the Design-Build Request for Proposal. Reviews are not normally for approval. The Design-Build Contractor assumes design liability. The AE shall provide written comments to the District utilizing the DrChecks Internet database system.

9.13. Studies/Reports: The AE shall prepare and submit studies/reports (engineering, life cycle cost analyses, etc.) in accordance with additional Specific Instructions provided within task orders.

9.14. Design Conferences. The AE will be required to attend specified meetings during the design process. The AE’s representatives required to attend the meetings and the meeting locations will be defined for specific task orders. The exact meeting location, date, and time will be provided by the AE Coordinator. The AE will be responsible for taking notes and preparing the minutes for all conferences after contract award. Conference/visit minutes will be prepared in typed form, signed by the AE’s Project Manager, and the original furnished to the Wilmington District office (within five days after date of conference) for concurrence and distribution to all attendees. This report shall include the following items as a minimum:

9.14.1. The date and place the conference was held with a list of attendees. The roster of attendees shall include name, organization, telephone number, and E-mail address.

9.14.2. Written review comments presented by attendees shall be attached to each report with the conference action noted. Prior to the next design submittal, all comments will be recorded in the DrChecks system and properly annotated by the AE. The DrChecks system is an Internet based system and access will be set up by Wilmington District.

9.14.3. Comments made during the conference, or decisions affecting criteria changes, must be coordinated with Wilmington District and recorded in the basic conference notes. Any augmentation of written comments should be documented in the conference notes.

9.15. Asbestos/Lead Based Paint Identification and Removal.

This is the start of the file's text. The full file is on GovTribe.