This document summarizes bids received for the Eagle Island Confined Disposal Facility Improvements for Cell 1 project. The U.S. Army Corps of Engineers, Wilmington District solicited bids through solicitation number W912PM20B0024 to improve Cell 1 of the government-owned Eagle Island Confined Disposal Facility. The scope of work includes removing existing spillway systems at three locations and constructing new spillway systems; building exterior toe berms and interior step-in along existing dikes; and regrading and excavating portions of the existing dike. Six bids were received by the March 2nd deadline ranging from $11.4 million to $23.1 million. The government estimate was $16.9 million. Apparent low bidder was Ashridge, Inc. at $11.4 million. Higher bids were received from Barnett Southern Corporation at $11.9 million and Brand Cole Construction Company at $15.3 million.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF BIDS 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
U. S. Department of the Army, Corps of Engineers I CERTIFY that I have opened, read, and Karri Mares, Contracting Officer Wilmington Contracting Office recorded on this abstract all offers received SIGNATURE 69 Darlington Ave. In response to this solicitation.
Wilmington, North Carolina 28403
PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
(WITHOUT PROFIT)
NUMBER OF ADDENDA ISSUED 4 X C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
(INCLUDING PROFIT)
0001 Mobilization and Demobilization 1 Job $274,534.00 $274,534.00 $250,000.00 $250,000.00 $3,193,918.80 $3,193,918.80
0002 Remove Silt Fencing 13,800 Liner Foot $3.85 $53,130.00 $10.00 $138,000.00 $0.90 $12,420.00
0003 Temporary Silt Fencing 13,800 Liner Foot $9.00 $124,200.00 $10.00 $138,000.00 $6.70 $92,460.00
0004 East Exterior Toe Berms 123,510 Cubic Yard $5.85 $722,533.50 $8.00 $988,080.00 $7.60 $938,676.00
0005 West Exterior Toe Berms 212,708 Cubic Yard $5.85 $1,244,341.80 $8.00 $1,701,664.00 $7.60 $1,616,580.80
0006 Spillway 1 Demolition 1 Job $77,226.00 $77,226.00 $200,000.00 $200,000.00 $196,678.60 $196,678.60
0007 Spillway 1 Construction 1 Job $561,537.00 $561,537.00 $504,436.00 $504,436.00 $830,142.90 $830,142.90
0008 Spillway 2 Demolition 1 Job $77,226.00 $77,226.00 $200,000.00 $200,000.00 $203,126.70 $203,126.70
0009 Spillway 2 Construction 1 Job $549,870.00 $549,870.00 $504,436.00 $504,436.00 $878,300.60 $878,300.60
0010 Spillway 3 Demolition 1 Job $77,226.00 $77,226.00 $200,000.00 $200,000.00 $4,325.10 $4,325.10
0011 Spillway 3 Construction 1 Job $541,323.00 $541,323.00 $504,436.00 $504,436.00 $782,909.70 $782,909.70
0012 Interior Dike Embankment Step-in 759,907 Cubic Yard $6.15 $4,665,808.20 $8.00 $6,079,256.00 $7.60 $5,775,293.20
0013 Woven Geotextile for Reinforcement 230,860 Square Yard $7.10 $1,639,106.00 $8.50 $1,962,310.00 $8.40 $1,939,224.00
0014 Clearing 1 Job $94,664.00 $94,664.00 $250,000.00 $250,000.00 $142,446.20 $142,446.20
0015 Seeding 1 Job $246,948.00 $246,948.00 $110,000.00 $110,000.00 $79,515.90 $79,515.90
0016 Pre and Post Construction Surveys 1 Job $235,507.00 $235,507.00 $200,000.00 $200,000.00 $122,761.40 $122,761.40
0017 Performance and Payment Bonds 1 Job $168,744.00 $168,744.00 $17,500.00 $17,500.00 $126,480.50 $126,480.50
0018 Piezometers *Added in Amendment 2* 1 Job $64,371.00 $64,371.00 $11,200.00 $11,200.00 $41,850.50 $41,850.50
$11,418,295.50 $13,959,298.00 $16,977,110.90
CLIN 0012 Total is as read at bid opening. $13,959,318.00* - Calculated Total
$11,425,915.35* - Correct Total
W912PM20B0024 20-Jan-21 2-Mar-21
Yes Yes
Ashridge, Inc.
Washington, GA 30673
Eagle Island Confined Disposal Facility Improvements for Cell 1, (FY21) Brunswick County, North Carolina
Yes
PO BOX 7041418 Spring Grove Road
Yes
Bonneau, SC 29431
Total Amount of Line Items 0001-0018
Barnett Southern Corporation, Inc.
Electronic Equivalent OF1419
PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
NUMBER OF ADDENDA ISSUED 4 X C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
0001 Mobilization and Demobilization 1 Job $250,000.00 $250,000.00 $405,982.00 $405,982.00 $29,144.69 $29,144.69
0002 Remove Silt Fencing 13,800 Liner Foot $1.50 $20,700.00 $1.00 $13,800.00 $0.77 $10,626.00
0003 Temporary Silt Fencing 13,800 Liner Foot $8.00 $110,400.00 $7.00 $96,600.00 $5.68 $78,384.00
0004 East Exterior Toe Berms 123,510 Cubic Yard $5.00 $617,550.00 $6.40 $790,464.00 $9.32 $1,151,113.20
0005 West Exterior Toe Berms 212,708 Cubic Yard $6.00 $1,276,248.00 $6.40 $1,361,331.20 $9.32 $1,982,438.56
0006 Spillway 1 Demolition 1 Job $140,000.00 $140,000.00 $123,000.00 $123,000.00 $110,054.18 $110,054.18
0007 Spillway 1 Construction 1 Job $500,000.00 $500,000.00 $545,000.00 $545,000.00 $511,015.57 $511,015.57
0008 Spillway 2 Demolition 1 Job $140,000.00 $140,000.00 $130,000.00 $130,000.00 $92,662.71 $92,662.71
0009 Spillway 2 Construction 1 Job $575,000.00 $575,000.00 $554,000.00 $554,000.00 $535,647.60 $535,647.60
0010 Spillway 3 Demolition 1 Job $140,000.00 $140,000.00 $134,000.00 $134,000.00 $92,662.71 $92,662.71
0011 Spillway 3 Construction 1 Job $490,000.00 $490,000.00 $504,000.00 $504,000.00 $468,098.49 $468,098.49
0012 Interior Dike Embankment Step-in 759,907 Cubic Yard $6.25 $4,749,418.75 $6.90 $5,243,358.30 $9.32 $7,082,333.24
0013 Woven Geotextile for Reinforcement 230,860 Square Yard $7.50 $1,731,450.00 $8.25 $1,904,595.00 $8.54 $1,971,544.40
0014 Clearing 1 Job $250,000.00 $250,000.00 $14,000.00 $14,000.00 $315,766.93 $315,766.93
0015 Seeding 1 Job $650,000.00 $650,000.00 $100,000.00 $100,000.00 $614,958.05 $614,958.05
0016 Pre and Post Construction Surveys 1 Job $120,000.00 $120,000.00 $50,000.00 $50,000.00 $214,971.25 $214,971.25
0017 Performance and Payment Bonds 1 Job $85,000.00 $85,000.00 $85,020.00 $85,020.00 $93,333.71 $93,333.71
0018 Piezometers *Added in Amendment 2* 1 Job $150,000.00 $150,000.00 $59,000.00 $59,000.00 $12,981.88 $12,981.88
$11,995,766.75 $12,114,150.50 $15,367,737.17
Sneads Ferry, NC 28460Carrolton, GA 30117
Yes
Yes
Brand Cole Construction Company, Inc.
2250 Lovvorn Road
Wilmington, NC 28412
Yes Yes
Total Amount of Line Items 0001-0018
Yes Yes
Eagle Island Confined Disposal Facility Improvements for Cell 1, (FY21) Brunswick County, North Carolina
Civil Works Contracting LLC C.M. Mitchell Construction Co. Inc.
190 Raleigh Street 2256 Hwy 172
PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. BIDDERS
(Check A, B or C and complete D, E and F.)
A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
NUMBER OF ADDENDA ISSUED 4 X C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
0001 Mobilization and Demobilization 1 Job $1,568,000.00 $1,568,000.00 $597,000.00 $597,000.00 $200,000.00 $200,000.00
0002 Remove Silt Fencing 13,800 Liner Foot $2.20 $30,360.00 $1.00 $13,800.00 $0.50 $6,900.00
0003 Temporary Silt Fencing 13,800 Liner Foot $11.00 $151,800.00 $9.80 $135,240.00 $3.00 $41,400.00
0004 East Exterior Toe Berms 123,510 Cubic Yard $12.00 $1,482,120.00 $5.64 $696,596.40 $6.50 $802,815.00
0005 West Exterior Toe Berms 212,708 Cubic Yard $12.00 $2,552,496.00 $5.64 $1,199,673.12 $6.50 $1,382,602.00
0006 Spillway 1 Demolition 1 Job $650,000.00 $650,000.00 $85,000.00 $85,000.00 $224,005.00 $224,005.00
0007 Spillway 1 Construction 1 Job $700,000.00 $700,000.00 $660,300.00 $660,300.00 $647,495.00 $647,495.00
0008 Spillway 2 Demolition 1 Job $650,000.00 $650,000.00 $70,000.00 $70,000.00 $218,755.00 $218,755.00
0009 Spillway 2 Construction 1 Job $700,000.00 $700,000.00 $660,000.00 $660,000.00 $645,476.00 $645,476.00
0010 Spillway 3 Demolition 1 Job $650,000.00 $650,000.00 $80,000.00 $80,000.00 $221,415.00 $221,415.00
0011 Spillway 3 Construction 1 Job $700,000.00 $700,000.00 $660,000.00 $660,000.00 $556,259.00 $556,259.00
0012 Interior Dike Embankment Step-in 759,907 Cubic Yard $12.00 $9,118,884.00 $5.54 $4,209,884.78 $6.50 $4,939,395.50
0013 Woven Geotextile for Reinforcement 230,860 Square Yard $10.00 $2,308,600.00 $8.20 $1,893,052.00 $6.13 $1,415,171.80
0014 Clearing 1 Job $500,000.00 $500,000.00 $1,700,000.00 $1,700,000.00 $289,320.00 $289,320.00
0015 Seeding 1 Job $1,000,000.00 $1,000,000.00 $225,000.00 $225,000.00 $155,400.00 $155,400.00
0016 Pre and Post Construction Surveys 1 Job $200,000.00 $200,000.00 $200,000.00 $200,000.00 $135,000.00 $135,000.00
0017 Performance and Payment Bonds 1 Job $90,000.00 $90,000.00 $125,000.00 $125,000.00 $84,356.00 $84,356.00
0018 Piezometers *Added in Amendment 2* 1 Job $35,000.00 $35,000.00 $131,455.00 $131,455.00 $50,000.00 $50,000.00
$23,087,260.00 $13,342,001.30 $12,015,765.30
Cayce, SC 29033 Darlington, SC 29540Apex, NC 27502
Yes
Yes
Eagle Island Confined Disposal Facility Improvements for Cell 1, (FY21) Brunswick County, North Carolina
L-J, Inc. R.E. Goodson Construction Co. Inc.
2062 Entergy Drive 615 Knox Abbott Dr, Suite 200 457 North Springville Road Kiewit Ingrasturcture South Co.
Total Amount of Line Items 0001-0018