W912PM20B00170002.pdf

PDF 547 KB Posted

Attached to
W912PM20B0017 Pallet Building SF-00013-19
Solicitation number
W912PM20B0017
Issued by

About this file

This amendment modifies a solicitation for construction services. The solicitation is to construct a pallet building at Fort Bragg, North Carolina with an estimated price range between $500,000 and $1,000,000. The building will be approximately 4,500 square feet with a 1,800 square foot mezzanine and will include heavy duty shelving and a lockable wire cage. The contract type will be firm fixed price. The solicitation is a 100% HUBZone small business set-aside issued by the Department of the Army Corps of Engineers, Wilmington District. The proposal due date is specified in the solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912PM20B0017 is hereby amended for the follow ing reason:

a) To correct the Magnitude of Construction from Betw een $1,000,000.00 and $5,000,000.00 to Betw een $500,000.00 and $1,000,000.00.

b) All other termis and conditions remain the same.

/////////////////////////////////////////////////////////////////// LAST ITEM \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM20B0017

X 9B. DATED (SEE ITEM 11)

29-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2020

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM20B0017

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization has changed from

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

to

U S ARMY CORPS OF ENGINEERS, WILMINGTON

CONTRACTING - WILMINGTON DISTRICT

69 DARLINGTON AVENUE

WILMINGTON NC 28403

The required performance has changed from W912PM20B0017 SF 00013-19 Pallet Building Addition, Fort Bragg, North Carolina---THIS IS A 100% HUBZONE SMALL BUSINESS SET-ASIDE--- IN ACCORDANCE WITH FAR 36.204(e), THE MAGNITUDE OF CONSTRUCTION FOR THE PROJECT IS BETWEEN $1,000,000.00 and $5,000,000.00. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS

ACQUISITION. NO CONTRACT WILL BE MADE UNTIL THE APPROPRIATE FUNDS ARE MADE

AVAILABLE.VERBAL AND WRITTEN REQUEST FOR INFORMATION MUST BE DIRECTED TO THE

PERSON LISTED IN ITEM 9 ABOVE. INQUIRIES AND REQUEST THAT ARE DIRECTED TO ANY OTHER

PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND THEREFORE. MAY NOT BE

ANSWERED.The contractor shall return the completed section 00 45 00 representation and certifications with the proposal in accordance with the instructions in the solicitation. to W912PM20B0017 SF 00013-19 Pallet Building Addition, Fort Bragg, North Carolina---THIS IS A 100% HUBZONE SMALL BUSINESS SET-ASIDE--- IN ACCORDANCE WITH FAR 36.204(e), THE MAGNITUDE OF CONSTRUCTION FOR THE PROJECT IS BETWEEN $500,000.00 and $1,000,000.00. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS

ACQUISITION. NO CONTRACT WILL BE MADE UNTIL THE APPROPRIATE FUNDS ARE MADE

AVAILABLE.VERBAL AND WRITTEN REQUEST FOR INFORMATION MUST BE DIRECTED TO THE

PERSON LISTED IN ITEM 9 ABOVE. INQUIRIES AND REQUEST THAT ARE DIRECTED TO ANY OTHER

PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND THEREFORE. MAY NOT BE

ANSWERED.The contractor shall return the completed section 00 45 00 representation and certifications with the proposal in accordance with the instructions in the solicitation..

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

DISCLOSURE OF MAGNITUDE

Disclosure of Magnitude of Construction (FAR 36.204 and DFARS 236.204)

The estimated price range for this project is between

$500,000.00 and $1,000,000.00.

(End)

W912PM20B0017

(End of Summary of Changes)

File details come from the government source that posted it. Updated .