SF00013-19_RTA_PLANS_(LOCKED).pdf
PDF 9 MB Posted
- Attached to
- W912PM20B0017 Pallet Building SF-00013-19
- Solicitation number
- W912PM20B0017
About this file
This solicitation is for construction services for a pre-engineered metal building of approximately 4,500 square feet with a 1,800 square foot mezzanine. The building will be used to store military gear on pallets prior to deployment. Services include site work, concrete work, and installation of metal wall panels, a single slope metal roof, lighting, and fans. The contract will be firm fixed price. The solicitation number is W912PM20B0017 and proposals are due on the date specified in the solicitation. The project is valued between $1-5 million. The solicitation is a 100% HUBZone small business set-aside. Offerors must be registered in SAM to be eligible for award. The agency is the Department of the Army Corps of Engineers Wilmington District.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S U
B M
I T
T E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
S I Z
E x
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
W I L
M I N
G T
D
S
T R
I C
T
D
A R
L I N
G T
V E
N U
E
W I L M
I N
G T
O N
N
O R
T H
C
R
O L
I N
A
G-000
C O
V E
R
S
H E
E T
US Army Corps of Engineers
Wilmington District
S
S
U R
R A
T T
S
S
U R
R A
T T
J
M
A N
N I N
G
A w d C o v e r d w g
C O
N T
R A
FOUO
FOUO
F O
R
O
F F
I C
I A
L
U
L Y
D R
A W
I N
G
C
O D
E
S O
L I C
I T
A T
I O
N
N
W
P M
B
A W
A R
D
D
A T
E
J U
Y
B
D
S O
L
L E
T
B
U I L
D
A
D D
I T
I O
N
F O
R
A
G G
N
C
A
F
E L
I C
I A
N O
G
R A
N D
A
SOTF PALLET BUILD ADDITION
FORT BRAGG, NC
SOLICITATION NO: W912PM20B0017
CONTRACT NO: TBD
AWARD DATE: JULY 2020
STRUCTURALCIVIL ARCHITECTURAL ELECTRICAL
A
M
O
N
T
R
D
M
C
K
E
L
L
A
M
A
N
C
H
E
S
T
P
R
A
L
O
N
G
S
T
R
E
C
O
O
L
Y
VICINITY MAP
PROJECT
SITE
N.T.S.
LOCATION MAP
N
ASHEBORO
BISCOE
ROCKINGHAM
LAURINBURG
DARLINGTON
LUMBERTON
WHITEVILLE
WILMINGTON
ELIZABETHTOWN
WALLACE
CLINTON
MT. OLIVE
GOLDSBORO
SMITHFIELD
WILSON
RALIEGH
DUNN
SANFORD
FAYETTEVILLE
R
O
L
I
N
A
R
O
L
I
N
A
FORT BRAGG
US Army Corps of Engineers
WILMINGTON DISTRICT
801 JONES FRANKLIN ROAD, SUITE 300
RALEIGH, NC 27606-3394
(919) 851-6866
(919) 851-7024 FAX
LICENSE # F-0672
SOLICITATION NO.: XXXXXX-XX-X-XXXX
CONTRACT NO.: XXXXXX-XX-X-XXXX
ISSUE DATE: 06 JULY 2020
FORT BRAGG, NORTH CAROLINA
CONSTRUCT PALLET BUILD FACILITY, SOTF
SF-00013-19
FINAL SUBMITTAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
A L
S
U B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
G-001
C O
V E
R
S
H E
E T
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
G D
W G
01 JULY 2020
6-30-2020
01 JULY 2020
INDEX OF DRAWINGS
SHEET NO. FILE NAME TITLE SHEET NO. FILE NAME TITLE SHEET NO. FILE NAME TITLE
GENERAL
G-001
G-001.DGN COVER SHEET
G-002
G-002.DGN INDEX OF DRAWINGS
G-003
G-003.DGN FORT BRAGG CANTONMENT
G-004
G-004.DGN GENERAL CONSTRUCTION NOTES
G-005
G-005.DGN GENERAL CONSTRUCTION NOTES
SURVEY
VF101 VF101.DGN
EXISTING CONDITIONS AND DEMOLITION PLAN
CIVIL
CS101 CS101.DGN
SITE LAYOUT AND EROSION AND SEDIMENT CONTROL
C-501
C-501.DGN SITE DETAILS
C-502
C-502.DGN SITE DETAILS
STRUCTURAL
S-101
S-101.DGN GENERAL NOTES & 3D VIEWS
S-102
S-102.DGN FOUNDATION AND FRAMING PLANS
S-103
S-103.DGN STRUCTURAL ELEVATIONS
S-104
S-104.DGN STRUCTURAL DETAILS
ARCHITECTURE
AS101 AS101.DGN
FLOOR AND ROOF PLANS
AS102
AS102.DGN ARCHITECTURAL ELEVATIONS
AS103
AS103.DGN SECTIONS
AS104
AS104.DGN DETAIL SECTIONS
LIFE SAFETY
LS101
LS101.DGN LIFE SAFETY PLANS
ELECTRICAL
E-001 E-001.DGN
ELECTRICAL - GENERAL NOTES AND LEGENDS
E-101 E-101.DGN
ELECTRICAL - FLOOR PLANS - LIGHTING AND POWER
EG101 EG101.DGN
ELECTRICAL - ROOF PLAN - LIGHTNING PROTECTION
E-501 E-501.DGN
ELECTRICAL - DETAILS
E-502 E-502.DGN
ELECTRICAL - DETAILS
E-601 E-601.DGN
ELECTRICAL - RISERS AND SCHEDULES
G-002
I N
D E
X
O
F
D
R A
W I N
G S
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
G D
W G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
U B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020
A 24 M
A
24 M
B
C
A
C
B
U
T
N
L
O
N
G
S
T
R
E
G
R
U
B
A
M
E
R
I
C
E
E
W
A
Y
Y
A
D
K
G
R
U
B
L
O
N
G
S
T
R
E
B
U
T
N
H
O
N
E
Y
C
U
H
O
N
E
Y
C
U
B
R
A
G
V
D
B
R
A
V
D
G
R
U
B
M
U
R
C
H
S
R
A
N
D
O
L
K
N
K
N
SIMMONS AIRFIELD
R
E
I L
R
E
I L
R
E
I L
L
A
M
O
C
H
I
C
K
A
D
C
H
I
C
K
A
D
P
L
A
K
A
D
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
B
A
S
T
O
G
I
V
E c
D
A
D c
D
A
D
N
O
R
M
A
N
A
R
D
E
N
N
S
P
O
O
N
M A
IN
E
N T
R A
N C
E
A
R
M
I S
T
E
L
I
T
A
S
E
R
V
A
T
I
O
N
B
O
U
N
D
A
R
Y
POPE ARMY AIRFIELD
ACP #1
ACP #13
ACP #10
ACP #11
B
R
A
V
D
J
A
C
K
S
O
N
ACP #5 ALL AMERICAN VISITOR
CONTROL CENTER
M
C
K
E
L
L
A
ACP #2
USACE SOCOM RESIDENT OFFICE
BLDG. NO. 2-2414 WOODRUFF ST.
FT. BRAGG, NC 28310 (910) 432-8121
PROJECT LOCATION
C
O
O
L
Y
C
O
N
ACP #3
ACP #4
ACP #2A
ACP #8
ACP #16 TRUCK PLAZA AND
VISITOR CONTROL CENTER
W
O
M
A
K
M
Y
M
E
D
I C
N
T
E
R
ACP #18
B R
A G
G
B
L V
D
M
A
N
C
H
E
S
T
DIRECTORATE OF PUBLIC WORKS
BUILDING NO. 3-1631
L
I
L
L
I
N
G
T
Y
ACP #12
ROAD CLOSED WITH GATES
OR BARRIERS
MAJOR ROADS
STREETS
RAILROADS
INSTALLATION BOUNDARIES
INTERSTATE ROUTE
U. S. ROUTE
STATE ROUTE
LAKES
ACP ACCESS CONTROL POINT
LEGEND:
FORT BRAGG CANTONMENT
NOT TO SCALE
FORT BRAGG LAMONT
SOLID WASTE AND
RECYCLING FACILITY
W
O
O
D
R
U
F
F
B
U
K
P
S
Y
O
F
L
O
J
T
H
O
M
P
S t h
MANCHESTER RD.
N
PROJECT LOCATION MAP
L A
M
O N
T
R
D
M
C
K
E
L
L
A
N
MUNICIPAL SOLID
WASTE TRANSFER
STATION
Y
O
R
K
T
O
C
T
A
D
SOTF CONSTRUCTION
ENTRANCE GATE
LAMONT ROAD
BORROW PIT
NOTE:
UPON LEAVING SOTF LAMONT
GATE IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE
THE BEST HAUL ROUTE TO THE
FORT BRAGG RECYCLING FACILITY.
ACCESS/HAUL ROUTE
PROJECT
LOCATION
ACCESS/HAUL
ROUTE
ACP #8A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020 G-003
F O
A
N
T O
N M
E N
T
A
O J E
C
A T
I O
N
M
A P
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
G D
GENERAL NOTES:
A. CONTRACTOR SHALL COMPLY WITH CURRENT NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY (DEQ) EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL' AND FORT BRAGG WATER MANAGEMENT BRANCH (WMB) STANDARDS FOR
EROSION CONTROL WORK, IF APPLICABLE.
B. ALL NCDOT STANDARDS REFERENCES WILL BE THE LATEST EDITION. CONTRACTOR MAY
REFER TO HTTPS://CONNECT.NCDOT.GOV, IF APPLICABLE.
C. CONTRACTOR SHALL COMPLY WITH CURRENT UFC, NC BUILDING CODE AND OTHER
APPLICABLE REQUIREMENTS AS INDICATED ON THESE CONTRACT DOCUMENTS.
7. DEMOLITION
A. ALL CONSTRUCTION AFFECTING TRAFFIC SHALL COMPLY WITH THE FORT BRAGG TRAFFIC
CONTROL IDC, MUTCD, AND NCDOT STANDARD DRAWINGS AND SPECIFICATIONS - LATEST
EDITION. AN ALTERNATE EMERGENCY TRAFFIC CONTROL DETOUR MAY BE REQUIRED.
8. TRAFFIC CONTROL
A. UNLESS SPECIFICALLY NOTED TO BE REMOVED, ALL EXISTING BUILDING COMPONENTS
AND OTHER SITE ITEMS SHALL REMAIN INTACT AND BE PROTECTED AGAINST DAMAGE DURING
THE CONSTRUCTION PERIOD.
B. THE CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION OPERATIONS. THE
CONTRACTOR SHALL REPAIR AND RESTORE ALL EXISTING CONSTRUCTION TO REMAIN THAT IS
DAMAGED DURING DEMOLITION OPERATIONS. REPAIRS TO DAMAGED WORK AREAS SHALL
MATCH EXISTING ADJACENT FINISHED SURFACES OR THE CONTRACTOR SHALL REPLACE
DAMAGED CONSTRUCTION WITH NEW WORK.
C. NO KNOWN ASBESTOS EXISTS WITHIN THIS PROJECT AREA. IF CONTRACTOR SUSPECTS
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE PRESENT HE SHALL NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATION IMMEDIATELY.
6. STANDARDS
9. EXISTING UTILITY INTERRUPTIONS
A. EXISTING UTILITIES MAY BE INTERRUPTED FOR A MAXIMUM OF 12 HOURS AT A TIME.
CONTRACTOR IS REQUIRED TO CONTACT THE CONTRACTING OFFICER AND OBTAIN APPROVAL
PRIOR TO ANTICIPATED INTERRUPTION.
B. ALL UTILITY INTERRUPTIONS AND DURATIONS SHALL BE INDICATED ON THE
CONTRACTOR'S SCHEDULE AND COORDINATED WITH THE COR.
C. FIRE ALARM INTERRUPTIONS SHALL BE SCHEDULED IN WRITING WITH THE COR A MINIMUM OF
14 DAYS IN ADVANCE.
10. EXTERIOR UTILITY WORK
A. ANY EXTERIOR ELECTRICAL WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED
WITH SANDHILLS UTILITY SERVICE (SUS). CONTACT MR. BILL CANNON AT (910) 818-3204.
B. ANY EXTERIOR WATER OR SANITARY SEWER WORK PERFORMED BY THE CONTRACTOR SHALL
BE COORDINATED WITH AMERICAN STATES UTILITY SERVICES (ASUS). CONTACT ALLEN
FORRESTER AT (910) 495-1311.
C. ANY EXTERIOR GAS WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED WITH
PEIDMONT NATURAL GAS (PNG).
11. SECURITY POLICIES AND PROCEDURES
A. CONTRACTOR SHALL FOLLOW SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURITY
REQUIREMENTS AT ALL TIMES. REFER TO SPECIFICATION SECTION 01 00 60 FOR ADDITIONAL
INFORMATION.
B. ACCESS TO “FOR OFFICIAL USE ONLY” (FOUO) INFORMATION ON SOTF PROJECTS WILL BE LIMITED
TO U.S. CITIZENS WHO HAVE A VALID "NEED TO KNOW". IN THE EVENT THAT ACCESS TO
CLASSIFIED INFORMATION IS REQUIRED, AN ADDITIONAL SECURITY PROCEDURES GUIDE WILL BE
FURNISHED.
C. TO GAIN ACCESS TO THE SOTF SITE AND/OR PROJECT INFORMATION, A WRITTEN, EMAIL, OR FAX
REQUEST MUST BE MADE TO THE SOTF PROJECT MANAGER AT LEAST 5 BUSINESS DAYS IN
ADVANCE (SEE SPECIFICATIONS FOR REQUIRED FORM). A SEPARATE REQUEST MUST BE MADE
FOR EACH SITE VISIT. REFER TO SPECIFICATIONS FOR REQUIRED INFORMATION.
D. ONCE ACCESS HAS BEEN GRANTED, NO SOTF INFORMATION OR SITE ACCESS WILL BE GIVEN TO
THE INDIVIDUAL UNTIL HE OR SHE HAS SIGNED A SECURITY BRIEFING FORM. UPON SUCCESSFUL
COMPLETION, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT SITE AS SHOWN
ON THE PLANS, HOWEVER, PERIODS MAY BE ENCOUNTERED WHEN NO CONTRACTOR OR
SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION SITE. WORK
STOPPAGES DUE TO THOSE EVENTS WILL BE HELD TO AN ABSOLUTE MINIMUM, AND THE
CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF THE WORK
STOPPAGE AND RESUMPTION WILL BE RELAYED THROUGH THE SOTF ENGINEERING TO THE COR
WHO WILL COMMUNICATE THIS INFORMATION TO CONTRACTOR. SUCH WORK STOPPAGE WILL NOT
BE THE BASIS FOR A CLAIM AGAINST THE GOVERNMENT. THE GOVERNMENT HAS THE RIGHT TO
INSTRUCT THE CONTRACTOR TO EVACUATE THE SITE WITHOUT PRIOR NOTIFICATION AT ANY TIME
AND MAY REFUSE ENTRY OF ANY OR ALL CONTRACTOR PERSONNEL.
E. PERSONNEL ENTERING SOTF WILL BE ESCORTED BY A FACILITY MEMBER OR BY A SECURITY
GUARD. USE OF ESCORTS WITHIN THE FACILITY IS DONE ROUTINELY FOR CONTRACTED AND
OTHER VISITING PERSONNEL REGARDLESS OF THEIR SECURITY CLEARANCE LEVEL.
F. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH
SOTF SECURITY POLICIES AT ALL TIMES.
G. CONTRACTOR/VISITOR SHALL NOTIFY (BY EMAIL OR PHONE) THE GOVERNMENT'S CONTRACTING
OFFICER'S REPRESENTATIVE (COR), PROJECT MANAGER (PM), OR DESIGNATED QA PERSONNEL OF
THEIR ANTICIPATED ARRIVAL TIME ON SOTF EACH DAY OF CONTRACT PERFORMANCE. IF THE
CONTRACTOR DOES NOT ARRIVE AT SOTF WITHIN 90 MINUTES OF THEIR SCHEDULED ARRIVAL
TIME, AND DOES NOT COORDINATE DIRECTLY WITH THE COR, PM, OR QA FOR ANY SUCH LATE
ARRIVAL, THE DESIGNATED ESCORT FOR THE DAY WILL BE RELEASED FOR OTHER DUTIES AND
WILL NO LONGER BE AVAILABLE TO THE CONTRACTOR ON THAT DAY. NO SUCH INSTANCES MAY
BE USED BY THE CONTRACTOR AS GOVERNMENT CAUSED DELAY AND THE GOVERNMENT WILL
NOT EXTEND THE PERIOD OF PERFORMANCE.
H. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0730 TO 1600), MONDAY
THROUGH FRIDAY, EXCLUDES FEDERAL HOLIDAYS. CONTRACTOR PERSONNEL SHALL REPORT TO
THE SOTF LAMONT ROAD VISITOR CENTER AT 0730 TO EXCHANGE VALID PICTURE IDENTIFICATION
FOR A SOTF VISITOR BADGE. ALL CONTRACTOR VEHICLES WILL BE SEARCHED EACH DAY
STARTING AT 0730. ONCE THE BADGE EXCHANGE AND VEHICLE SEARCH IS COMPLETE, THE
CONTRACTOR SHALL CONVOY WITH THE ESCORT TO THE JOB SITE. THE CONTRACTOR MUST EXIT
THE SOTF COMPOUND BY 1600 EACH DAY. EXCEPTIONS, IF APPROVED BY THE PROJECT
MANAGER, MUST BE COORDINATED TWO WORK DAYS IN ADVANCE.
I. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT
FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE
AWAY ANY PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION AND SOTF.
J. FT. BRAGG AND SOTF ARE DESIGNATED AS RESTRICTED AREAS. IMAGERY SURVEILLANCE,
PHOTOGRAPHY AND VIDEO RECORDING ARE PROHIBITED WITHOUT THE INSTALLATION
COMMANDER'S AND SOTF CONSENT.
K. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND
PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION FROM THE
SOTF COMMANDER AND FT. BRAGG COMMANDER.
INSTALLATION:
v AIR QUALITY (GENERATORS) - DPW-ECB AIR QUALITY PROGRAM MANAGER v ARMY RADIATION PERMIT (ARP) - INSTALLATION RADIATION SAFETY OFFICER - VICTOR D. WOOTEN, 910-9088-4138 v BOILERS & GENERATORS PERMIT - DPW-ECB AIR QUALITY - MIKE FISHER, REM v BORROW PIT PERMIT - DPW - ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK) v CONSTRUCTION AND DEMOLITION (C&D) WASTE PERMIT - FOR FORT BRAGG LAMONT ROAD CONSTRUCTION
AND DEMOLITION LANDFILL FACILITY - DPW - ENVIRONMENTAL BRANCH. SEE DPW'S SOLID WASTE AND
RECYCLING REQUIREMENTS, DATED 6 OCT 2016, OR CONTACT JEFF SLOOP AT
JEFFERY.W.SLOOP.CTR@MAIL.MIL OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
v DIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW - FACILITIES ENGINEER (SUBMIT 15 CALENDAR DAYS
PRIOR TO WORK)
v ENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPEC SECTION 01 57 19.
Ø REGULATORY PERMITS
Ø CLEAN AIR ACT (CAA) [FEDERAL, STATE AND LOCAL] - DPW - INSTALLATION ENVIRONMENTAL OFFICE (AIR
PROGRAM MANAGER)
Ø GENERAL USE PERMITTED EQUIPMENT (SEE FAR 52.236-7.)
Ø STREAM CROSSING PERMIT (SEE CLEAN WATER ACT SECTION 404 AND SECTION 401 (WATER QUALITY).
Ø TITLE V AIR PERMITS (BASED ON TYPE OF MATERIAL DUST, BOILERS AND DOMESTIC WATER HEATERS) - DPW
- ENVIRONMENTAL BRANCH, ENVIRONMENTAL COMPLIANCE BRANCH (ECB)
Ø TRANSPORTER AND DISPOSAL FACILITIES PERMITS
v IRRIGATION PERMIT - DPW WATER QUALITY PROGRAM MANAGER, SHANNON WESTON, 910-907-3214.
v CHENEGA GLOBAL SERVICES, LLC, STORAGE TANKS AND WATER QUALITY PROGRAM, FORT BRAGG-DPW-ECB
SHANNON WESTON, 910-907-3214.
v LANDFILL DISPOSAL PERMIT - DPW-ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), 910-396-3372.
v PHOTOGRAPHY - INSTALLATION PERMIT - DIRECTOR OPERATIONS DIRECTORATE DCS G3/5/7 - POC IS MR.
DREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
v TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, 910-907-1759 v UTILITY CONNECTION v UTILITY OUTAGE REQUESTS - FT BRAGG DPW
FEDERAL
v NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1
NC STATE:
v ASBESTOS REMOVAL FOR DEMOLITION/RENOVATION - NCPH, RALEIGH (10 WORKING DAYS PRIOR TO REMOVAL) v AIR QUALITY v DEMOLITION v EROSION & SEDIMENT CONTROL (E&SC) CERTIFICATE OF APPROVAL/PERMIT - DEQ (FORMALLY NCDENR) DEPT
OF WATER QUALITY (DWQ)
v GENERAL STORMWATER DISCHARGE v GEOTHERMAL (POSSIBLE COUNTY INVOLVEMENT) v SEPTIC SYSTEM (POSSIBLE COUNTY INVOLVEMENT) v STORMWATER MANAGEMENT - NCDEQ AND FT BRAGG WATER MANAGEMENT BRANCH v WATER SYSTEM SERVICE (FIRE PROTECTION AND DOMESTIC WATER SERVICE) - NCDEQ.
ASUS :
v WATER AND SANITARY SEWER
COE SAFETY:
v CONFINED SPACE ENTRY PERMIT - (SEE EM 385-1-1, DATED 30 NOV 2014, SECTION 34 (STARTING ON PAGE 34-1) v ENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR ACCEPTANCE. (SEE EM 385-1-1, DATED 30 NOV 14, PARAGRAPH 11.A.02C.
v HOT WORK PERMIT - DEFINED AS HOT RIVETING, WELDING, BURNING, ABRASIVE BLASTING, OR OTHER FIRE- OR
SPARK-PRODUCING OPERATIONS. (SEE EM 385-1-1, DATED 30 NOV 2014, PARA 09.A.04 (PAGE 9-1 & 2) & PAGE
Q-29. THE FORT BRAGG FIRE DEPARTMENT REQUIRES NOTICE 14 CALENDAR DAYS PRIOR TO WORK, FOR:
Ø WELDING
Ø CUTTING
Ø HEATING
12. PERMITS
A. CONTRACTOR SHALL SECURE ALL PERMITS NECESSARY FOR CONSTRUCTION OF THE PROJECT.
DETERMINE FEE BASIS AND PAY ALL FILING FEES AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONSTRUCTION SHALL NOT BEGIN ON ANY PHASE WITHOUT APPROPRIATE PERMITS.
B. PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ONSITE CONSTRUCTION OFFICE,
ORGANIZED IN A 3 RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION BY THE
GOVERNMENT.
D. PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST. CONTRACTORS ARE TO ADD
ADDITIONAL PERMITS, AS THEY BECOME KNOWN. PERMIT SUBMITTALS ARE TO BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND APPROVAL. AVOID OMISSIONS.
2. CONSTRUCTION PHASING & PROJECT SCHEDULES
A. THE CONTRACTOR SHALL ENSURE THAT HIS ACTIVITIES SHALL NOT INTERFERE WITH THE
OPERATIONS CONDUCTED AT SURROUNDING BUILDINGS AND WORK AREAS.
B. CONTRACTOR SHALL NOT BLOCK ACCESS TO EXISTING BUILDINGS, ROADS AND/OR FACILITIES.
C. CONTRACTOR SHALL PROVIDE A PROJECT SCHEDULE TO THE COR PRIOR TO CONSTRUCTION
AND MOBILIZATION. CONTRACTOR SHALL PROVIDE WEEKLY UPDATES ON THE PROJECT
SCHEDULE FOR FULL DURATION OF PROJECT. THE WEEKLY UPDATES SHALL BE PROVIDED
SHOWING THE SCHEDULE FOR THE UPCOMING 2 WEEKS INCLUDE UPDATES REGARDING THE
PHASING OF CONSTRUCTION.
D. ADJACENT AREAS WILL BE OCCUPIED BY GOVERNMENT PERSONNEL THROUGHOUT THE
CONSTRUCTION PERIOD. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION ACTIVITIES TO
DISRUPT ON-GOING GOVERNMENT OPERATIONS.
3. CONTRACTOR STAGING AREA
A. SEE SEDIMENT AND EROSION CONTROL PLAN AND NOTES.
A. THE LAMONT ROAD BORROW PIT IS ANTICIPATED TO BE CLOSED DURING THE ENTIRE
CONSTRUCTION PHASE OF THIS PROJECT.
A. CONTRACTOR SHALL INSTALL TEMPORARY FENCING AROUND THE GENERAL PROJECT SITE.
THE TYPE, MATERIAL, HEIGHT, AND LOCATION OF THE FENCE SHALL BE IN ACCORDANCE
WITH SPECIFICATIONS AND APPROVED BY THE GOVERNMENT PRIOR TO INSTALLATION.
B. ALL WORK ACTIVITIES AND STORAGE SHALL BE CONFINED WITHIN THE ESTABLISHED
PROJECT LIMITS UNLESS SPECIFICALLY AUTHORIZED BY THE COR FOR SPECIFIED PERIODS
OF TIME. CONTRACTOR SHALL COORDINATE EXACT PROJECT LIMITS WITH THE COR.
C. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ONSITE TO RECEIVE AND DIRECT
PLACEMENT OF DELIVERED MATERIALS AND SUPPLIES.
1. CONSTRUCTION METHODS AND PROCEDURES & CONTRACTOR ACCESS
A. THE WORK FOR THIS PROJECT CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT,
TRANSPORTATION, AND MATERIALS NECESSARY TO PERFORM ALL WORK IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, APPLICABLE UNITED STATES ARMY CORPS
OF ENGINEERS (USACE) DRAWINGS, UNIFIED FACILITIES CRITERIA (UFC), SECURITY OPERATIONS
TRAINING FACILITY (SOTF) STANDARDS, FORT BRAGG INSTALLATION DESIGN GUIDELINES (IDG)
AND OTHER CONTRACT DOCUMENTS. THE SCOPE OF WORK OF THIS CONTRACT IS REFERENCED
IN PROJECT SPECIFICATIONS SECTION 01 00 05.
B. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS IN ALL SITUATIONS. THE
CONTRACTOR SHALL BRING CONFLICTS BETWEEN PROJECT SPECIFICATIONS AND PLANS TO THE
ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR RESOLUTION. ALL
MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
C. ALL DIMENSIONS AND CONDITIONS TIED TO OR OTHERWISE RELATED TO EXISTING
CONSTRUCTION WILL BE FIELD VERIFIED BY THE CONTRACTOR. VERIFICATION SHALL BE MADE
PRIOR TO ORDERING, FABRICATING, OR CONSTRUCTING ANY RELATED STRUCTURAL
COMPONENTS. WHERE DISCREPANCIES OCCUR, THE CONTRACTOR SHALL ADVISE THE COR
IMMEDIATELY AND PROVIDE THE COR WITH THE CORRECT DIMENSIONS AND CONDITIONS.
D. THE CONTRACTOR SHALL PROVIDE ONSITE SANITARY FACILITIES FOR HIS WORKERS DURING THE
ENTIRE CONSTRUCTION PHASE. COORDINATE LOCATION WITH COR.
E. THE CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING SITE FEATURES AND FACILITIES
DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL COORDINATE EXACT PROJECT
LIMITS WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR).
F. PRIOR TO ANY DEMOLITION OR NEW WORK COMMENCING THE ELECTRICAL CONTRACTOR SHALL
ARRANGE A MEETING WITH THE CONTRACTING OFFICER AND SOTF REPRESENTATIVE TO DISCUSS
ALL ELECTRICAL OUTAGE PROCEDURES FOR SHUTDOWN OF ANY ELECTRICAL PANELS. THE
ELECTRICAL CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER, IN WRITING, AT LEAST 7
DAYS PRIOR TO ANY ELECTRICAL SHUTDOWN DURING DEMOLITION OR NEW CONSTRUCTION.
G. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE BEST AVAILABLE HAUL ROUTE TO THE
FORT BRAGG LAMONT RECYCLING FACILITY AND SHALL COORDINATE WITH THE COR AS NEEDED.
4. LAMONT ROAD BORROW PIT
5. EROSION AND SEDIMENT CONTROL
12. PERMITS (CONTINUED)
C. THE FOLLOWING PERMITS MAY BE REQUIRED FOR PROJECTS AT FT. BRAGG:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020 G-004
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
G D
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D)
LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D WASTE
AND, ASBESTOS WASTE. THE MUNICIPAL SOLID WASTE (MSW)
TRANSFER STATION AT THE LAMONT LANDFILL FACILITY IS CLOSED
AND WILL NOT ACCEPT MSW AT THE FACILITY.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, AND MSW.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, MSW, AND ALL OTHER FORMS OF
HAZARDOUS OR HARMFUL MATERIALS INCLUDING BUT NOT LIMITED
TO SLURRY FROM HORIZONTAL DIRECTIONAL DRILLING.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL
WASTE DISPOSED AND MATERIALS RECYCLED OFF FORT BRAGG.
THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) REQUIRES
MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND
RECYCLABLES) MANAGED BY FORT BRAGG. THE FORT BRAGG
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
OFFICE IS RESPONSIBLE FOR COMPILING DATA INTO MONTHLY
DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR
THE DA AND THE NC DEQ. A PROVIDED FORM FROM THE SOLID
WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE
FILLED OUT WITH THE TYPE OF WASTE OR RECYCLED MATERIAL, THE
WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE
FACILITY THE WASTE OR RECYCLABLES WERE DELIVERED. THIS
INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH
MONTH. EMAIL TO JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL
OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
THE LAMONT LANDFILL FACILITY WILL ACCEPT RECYCLABLES ITEMS.
1) CONCRETE, BRICK AND BLOCK
- SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED
PAINT TO BE RECYCLED
- SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
- SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2) TREES, LIMBS AND STUMPS
- SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
- IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FT. DIA.) IT
SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP
ROOTS
- WILL EXCEPT GROUND WOOD CHIPS
- LOADS SHALL BE FREE OF TRASH
3) PALLETS
- SERVICEABLE AND NON-SERVICEABLE PALLETS
4) SCRAP STEEL
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
5) SCRAP ALUMINUM
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
6) CARDBOARD TO BE RECYCLED
- A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
- ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG
RECYCLING CENTER AT BLDG 3-1240, BUTNER AND REILLY
ROAD
- SHALL BE CLEAN OF PLASTICS, STYROFOAM, WOOD, METAL,
TRASH, ETC.
7) ALL RECYCLABLE MATERIALS FROM A CONSTRUCTION OR
DEMOLITION JOB IS PROPERTY OF THE GOVERNMENT UNLESS
THE CONTRACT SPECIFIES THAT THE CONTRACTOR CAN OBTAIN
THE MATERIALS. ITEMS SUCH AS HVAC UNITS (FREON REMOVED),
AIR HANDLERS, PIPING, METAL BEAMS, MOTORS, VALVES, COPPER
WIRE, ETC. THESE TYPES OF ITEMS SHALL BE TRANSPORTED TO
DPW RECYCLING CENTER OR THE RECYCLING AREA AT THE
LAMONT LANDFILL FACILITY.
A LANDFILL USAGE PERMIT, FOR CONTRACTORS, SHALL BE
OBTAINED FROM THE DIRECTORATE OF PUBLIC WORKS,
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
PROGRAM AT BLDG 3-1137, (910) 432-6412.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING
OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE
INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON FORT
BRAGG.
SOLID WASTE AND RECYCLING NOTES
APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL
ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS,
APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
1. AREA WILL BE TILLED TO 4" DEPTH.
2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER
ACRE.
3. APPLY 10-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20
POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER
SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF
PLANTING AND THE SECOND HALF AFTER PERMANENT SEED GERMINATES.
4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES
OF SOIL PRIOR TO SEEDING.
5. SEED MIX AND RATE:
FORT BRAGG SEEDING SPECIFICATION
SITE AREA
DESCRIPTION
1) GROUND STABILIZATION *
STABILIZATION
TIME FRAME
PERIMETER DIKES,
SWALES, DITCHES
AND SLOPES
7 DAYS
STABILIZATION TIME
FRAME EXCEPTIONS
NONE
HIGH QUALITY
WATER (HQW)
ZONES
7 DAYS NONE
SLOPES STEPPER
THAN 3:1
7 DAYS
IF SLOPES ARE 10' OR LESS IN
LENGTH AND ARE NOT STEEPER
THAN 2:1, 14 DAYS ARE
ALLOWED.
SLOPES 3:1 OR
FLATTER
14 DAYS
7-DAYS FOR SLOPES GREATER
THAN 50 FEET IN LENGTH AND
WITH SLOPES STEEPER
THAN 4:1
ALL OTHER AREAS
WITH SLOPES
FLATTER THAN 4:1
14 DAYS
NONE (EXCEPT FOR
PERIMETERS AND
HQW ZONES)
* "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY
BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE
COMPLIANCE IMPRACTICABLE." (SECTION II.B(2)(b))
MAINTENANCE DURING ESTABLISHMENT PERIOD
MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE PROTECTING
EMBANKMENTS AND DITCHES FROM SURFACE EROSION; MAINTAINING EROSION
CONTROL MATERIALS AND MULCH; PROTECTING INSTALLED AREAS FROM
TRAFFIC; MOWING; WATERING; AND POST-FERTILIZATION.
MOWING
A. TURF AREAS; TURF AREAS SHALL BE MOWED TO A MINIMUM 3-INCH
HEIGHT WHEN THE TURF IS A MAXIMUM 4 INCHES HIGH. CLIPPINGS
SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT
FROM REACHING THE GROUND SURFACE.
B. EROSION CONTROL AREAS: EROSION CONTROL AREAS SHALL BE
MOVED TO A MINIMUM 4 INCH HEIGHT WHEN THE PLANTS ARE
MAXIMUM 8 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN THE
AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING THE GROUND
SURFACE.
POST-FERTILIZATION
AFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND BETWEEN
THE DATES OF APRIL 15 AND OCTORBER 15, APPLY 425 POUNDS OF
FERTILIZER PER ACRE.
REPAIR OF REINSTALL
UNSATISFACTORY STAND OF GRASS PLANTS AND MULCH SHALL BE
REPAIRED OR REINSTALLED, AND ERODED AREAS SHALL BE REPAIRED
UNTIL A SATISFACTORY STAND OF GRASS RESULTS.
(Rv. 9 JUNE 2017)
TEMPORARY SEEDING
"COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND 28 FEBRUARY 120 POUNDS
PER ACRE WINTER WHEAT (TRITICUM SPELTA)
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 65 POUNDS PER
ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL
MILLET (BRACHIARIA RAMOSUM)
PERMANENT SEEDING "COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER
AND 28 FEBRUARY 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE
(FESTUCA ARUNDINACEA) 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), HULLED 25 POUNDS PER ACRE COMMON BERMUDA
(CYNODON DACTYLON), UNHULLED
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 50 POUNDS
PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA) 25 POUNDS
PER ACRE COMMON BERMUDA (CYNODON DACTYLON), HULLED
STRAW MULCH: APPLY 4,000 POUNDS PER ACRE; LEAVING NO BARE SPOT LARGER
THAN A QUARTER. STRAW MUST BE STABILIZED BY EITHER USE OF EMULSIFIED
ASPHALT OR BY CRIMPING THE STRAW INTO THE GROUND.
EMULSIFIED ASPHALT: EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE
HEAVY ENOUGH THAT THE ENTIRE AREA APPEARS BLACK IN COLOR; WITH
PARTICULAR ATTENTION PAID TO THE EDGES OF AREAS, CRESTS OF RIDGES,
AND BANKS TO PREVENT WIND DAMAGE.
CRIMPING: STRAW MAY BE CRIMPED WITH A MULCH ANCHORING TOOL OR A
WHEEL DISK WITH DULL BLADES SET NEARLY STRAIGHT MAY BE USED AS A
MULCH ANCHORING TOOL. CRIMPING IS NOT PERMITTED ON SLOPES
STEEPER THAN 3:1.
HYDROSEEDING: HYDROSEEDING SHALL ONLYBE ALLOWABLE ON SLOPES
STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. STEPS 1 THROUGH 4 MUST BE
COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN
TOW APPLICATIONS. THE FIRST APPLICATION WILL CONSIST OF
OF THE MULCH
AND
OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF
OF THE
MULCH AND
OF THE SEED. THE MULCH WILL INCLUDE A TRACKIFIER AND WILL BE
APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURER'S
RECOMMENDATION, WHICHEVER IS HIGHER.
6. EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS,
FLOODPLAINS, GENERAL OFFICER QUARTERS AND HISTORIC DISTRICT. CONTACT
THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT 910-396-2301/2823
WHEN SEEDING THESE AREAS.
7. UPON COMPLETION OF THE PROJECT, PRIOR TO LEAVING THE SITE, THE WATER
MANAGEMENT BRANCH SHALL BE NOTIFIED TO INSPECT THE PROJECT. POC MR.
JACK WILSON AT 910-396-2301/2823.
NOTE: G.S. 113A-57 NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE
SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING
MANDATORY REQUIREMENTS:
(1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED
WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER)
FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL
GRADE).
(2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF
GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR
PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
ALL PERIMETER DIKES, DITCHES, SWALES PERIMETER SLOPES OR SLOPES
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS
PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS.
FORT BRAGG SEEDING SPECIFICATION (CONT.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020 G-005
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
G D
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
W
W
W
W
W
W
W
W
W
W
W
W
E
S
E
S
E
S
E
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SOTF-PALLET-3
USMART PID: AHP683
FOUND MAGNAIL
N: 511930.88
E: 1977571.70
EL: 291.08
W W
W
W
W
ES
E S
ES
E S
E
S
S
A
N
S
A
N
SEWER MH
INVERT = 282.74
RIM ELEV = 290.90
C
E
E
S
E
S
E
S
E
S
S
D
S
D
D
S
S
A
N
S
A
N
SEWER MH
INVERT (BOTTOM) = 289.71
RIM ELEV = 294.10
S
S
A
N
S
A
N
SEWER MH
INVERT (BOTTOM) = 284.12
INVERT (8" PVC IN SE) = 287.60
RIM ELEV = 292.47
CO
W
W
W
W
W
W
W
W
W
W
W
W
W
A
C
O1929
O1908
O1936
CONCRETE
PAVEMENT
S
D
S
D
D
C
O
N
E
X
C
O
N
E
X
C
O
N
E
X
C
O
N
E
X
C
O
N
E
X
JERSEY
BARRIERS
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SOTF-PALLET-4
USMART PID: AHP684
SET 8" SPIKE
N: 511809.23
E: 1977653.54
EL: 295.52
5 2
GRAVEL PARKING AREA
E
G
I S
E
G
I S
E
G
I S
E
G
I
S
E
G
I
S
E
G
I
S
E
G
I
S
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
NOTES:
1. THE MOST NORTHERN ELECTRICAL LINE SHOWN PER
GIS ARE APPROXIMATE. GIS DATA IS FROM THE FORT
BRAGG GIS DATABASE. CONTRACTOR SHALL USE
THIRD PARTY UTILITY LOCATOR AND FIELD VERIFY THE
LOCATION OF ALL EXISTING UNDERGROUND UTILITIES
PRIOR TO START OF ANY CONSTRUCTION WORK.
2. CONTRACTOR SHALL FILE A SERVICE REQUEST TO
FORT BRAGG DPW AT 910-396-0325 TO OBTAIN A
DIGGING PERMIT(S) PRIOR TO DIGGING.
3. THE INFORMATION SHOWN HEREON IS BASED ON
ACTUAL FIELD SURVEYS PERFORMED BY USACE
WILMINGTON DISTRICT. SEE SURVEY NOTES.
KEY NOTES :
1. CONEX BOXES WILL BE REMOVED BY GOVERNMENT
PRIOR TO CONSTRUCTION, TYPICAL OF 5.
2. SAWCUT AND DEMOLISH CONCRETE PAVEMENT FOR
FOOTERS AND GROUNDING RODS/LINE. LEAVE CLEAN
AND NEAT EDGES AND INSTALL NEW CONCRETE WITH
EXPANSION JOINT, TYPICAL OF 9 FOOTERS AND
APPROXIMATELY 175 LF OF TRENCH.
3. LIMITS OF DISTURBANCE.
4. PROJECT LIMITS.
5. ELECTRIC LINE TO REMAIN. CONTRACTOR SHALL USE
EXTREME CAUTION AND PROTECT THE LINE DURING
CONSTRUCTION. CONTRACTOR SHALL COORDINATE
WITH SUS AS NECESSARY. SEE NOTE 1.
NORTH
PLAN
A4
EXISTING CONDITIONS AND DEMOLITION PLAN
SCALE: 1" = 20'
T R
VF101
E X
I S
T I N
G
C
O N
D I T
I O
M
O L
I T
I O
N
P
L A
N
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
V F
D
W G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020
EXISTING LEGEND
CONTROL POINT
SANITARY SEWER MANHOLE
DROP INLET
WATER VALVE
SANITARY SEWER LINE
W W
ROAD CENTERLINE
WATER LINE
E E E
UNDERGROUND ELECTRIC
S
D
ROOF DRAIN
W
WATER HANDHOLE
BOLLARD
COMMUNICATION MANHOLE
ELECTRIC MANHOLE
C
E
E
ELECTRIC TRANSFORMER
ELECTRIC HANDHOLE
HVAC
AC
BUILDING
CONCRETE PAVEMENT
SAN
SD
STORM SEWER LINE
SANITARY SEWER CLEANOUT
CO
ELECTRIC STUB OUT
XX
OR
DEMOLISH
DEMOLITION LEGEND:
SURVEY NOTES:
1. SURVEY PERFORMED BY:
JAMES D. JACARUSO, NC PLS L-3706
USACE, WILMINGTON DISTRICT
910-251-4780 (OFFICE)
910-409-8875 ( CELL)
2. HORIZONTAL AND VERTICAL CONTROL:
THE LOCAL PROJECT CONTROL POINT (LPCP) IS SOTF-PALLET-4, A 8"
SPIKE, SET IN NATURAL GROUND (COE PID: AHP684). THE NAD 1983 NC
STATE PLANE COORDINATES, AND NAVD 1988 ELEVATION, IN U.S. SURVEY
FEET FOR SOTF-PALLET-4 ARE AS FOLLOWS:
N: 511,809.23
E: 1,977,653.54
Z: 295.52
THE FIELD SURVEY WAS PERFORMED USING RTK GNSS, WITH A LOCAL
BASE STATION SET UP AT THE LPCP AND ROBOTIC TOTAL STATION. THE
LPCP WAS ESTABLISHED WITH A STATIC SESSION OF 3 1/2 HOURS. THE
POSITION WAS VERIFIED WITH CHECK SHOTS ON STANTEC POINTS 2 AND
1210.
3. NO DETERMINATION HAS BEEN MADE BY THE SURVEYOR AS TO THE
FOLLOWING:
A. 100-YEAR FLOOD LIMITS;
B. WETLANDS;
C. UNDERGROUND STORAGE FACILITIES;
D. GRAVES, CEMETERIES, OR BURIAL GROUNDS;
E. HAZARDOUS WASTE
4. UTILITY LOCATIONS ARE BASED ON DPW MARKINGS ON THE GROUND AND
VISIBLE ABOVE GROUND FEATURES AT THE TIME OF THE FIELD SURVEY.
5. DATE OF FIELD SURVEY: 1 MAY 2020.
TOTAL DISTURBED
AREA = 3,750 SF
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
W
W
W
W
W
W
W
W
W
W
W
W
E
S
E
S
E
S
E
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
ES
E S
ES
E S
E
S
S
A
N
S
A
N
SEWER MH
INVERT = 282.74
RIM ELEV = 290.90
C
E
E
S
E
S
E
S
E
S
S
D
S
D
D
S
S
A
N
S
A
N
SEWER MH
INVERT (BOTTOM) = 289.71
RIM ELEV = 294.10
S
S
A
N
S
A
N
SEWER MH
INVERT (BOTTOM) = 284.12
INVERT (8" PVC IN SE) = 287.60
RIM ELEV = 292.47
CO
W
W
W
W
W
W
W
W
W
W
W
W
W
A
C
O1929
O1908
O1936
CONCRETE
PAVEMENT
S
D
S
D
D
JERSEY
BARRIERS
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
5 2
GRAVEL PARKING AREA
E
G
I S
E
G
I S
E
G
I S
E
G
I
S
E
G
I
S
E
G
I
S
E
G
I
S
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
T
P
F
T
P
F
T
P
F
T
P
F
S
F
S
F
S
F
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
KEY NOTES :
1. INLET PROTECTION, SEE DETAIL G11 ON SHEET C-502.
2. LIMITS OF DISTURBANCE.
3. SEDIMENT FENCE OUTLET, SEE DETAIL G14 ON SHEET
C-501.
4. TREE PROTECTION FENCE, SEE DETAIL A8 ON SHEET
C-501.
5. SEDIMENT FENCE, SEE DETAIL A1 ON SHEET C-501.
6. PROJECT LIMITS.
7. PALLET BUILD FACILITY, SEE ARCHITECTURAL.
8. CONCRETE PAVEMENT, SEE DETAIL E16 ON SHEET
C-502.
9. PROPOSED CONCRETE, MATCH EXISTING GRADE. SEE
STRUCTURAL FOR FOOTINGS.
10.SPLASH BLOCK, SEE DETAIL L5 ON SHEET C-502.
11.PERMANENT BOLLARD (TYPICAL OF 12), SEE
DETAIL F5 ON SHEET C-502.
12.296' CONTOUR LINE. CONTRACTOR TO ENSURE
THERE IS A MINIMUM 3" DROP IN ELEVATION AT EDGE OF
PROPOSED SLAB.
NORTH
PLAN
A4
SITE LAYOUT AND EROSION AND SEDIMENT CONTROL PLAN
SCALE: 1" = 20'
T R
CS101
S I T
E
L
A Y
O U
T
A
O
S I O
N
A
D I M
E N
T
C
O N
T R
A
N
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
C S
D
W G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020
CONCRETE PAVEMENT
SF
SEDIMENT FENCE OUTLET
LEGEND PROPOSED:
INLET PROTECTION
SF
SEDIMENT FENCE OUTLET
PROPOSED FACILITY
(CANOPY ABOVE)
NOTES:
1. UNDER NO CIRCUMSTANCES IS DISTURBANCE
PERMITTED OUTSIDE THE LIMITS OF DISTURBANCE
SHOWN.
2. CONTRACTOR SHALL INSTALL NEW CONCRETE AT
FOOTINGS TO MATCH EXISTING TOP OF PAVEMENT
ELEVATIONS. SLOPE TO DRAIN.
3. CONTRACTOR TO ENSURE THERE IS POSITIVE DRAINAGE
ACROSS SITE TO PREVENT PONDING OF WATER.
4. CONTRACTOR SHALL INSTALL EROSION AND
SEDIMENTATION CONTROL MEASURES AS NECESSARY
TO PREVENT EROSION AND SEDIMENTATION FROM
STORMWATER RUNOFF FROM THE PROJECT LIMITS.
INSTALL PRIOR TO BEGINNING ANY LAND DISTURBING
WORK.
5. SEE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR
PROPOSED CANOPY FLOOR PLANS AND ELEVATIONS.
CONSTRUCTION SEQUENCE:
1. INSTALL EROSION AND SEDIMENT CONTROLS.
2. COMMENCE SITE WORK, DEMOLITION, AND
CONSTRUCTION. ALL EXCAVATION FROM UTILITY
TRENCHING SHOULD BE PLACED ON THE HIGH SIDE OF
THE TRENCH.
3. COMMENCE FINAL SITE STABILIZATION. ALL AREAS
MUST BE STABILIZED WITH FINAL PAVING OR
PERMANENT VEGETATION BEFORE REMOVAL OF
EROSION AND SEDIMENT CONTROLS.
SEDIMENT AND EROSION
CONTROL NOTES:
1. UPON CONSTRUCTION COMPLETION ALL NON-PAVED
DISTURBED AREAS WITHIN PROJECT LIMITS SHALL BE
PERMANENTLY STABILIZED WITH SOD.
TOP OF CONCRETE = +/-296.50'
TOP OF CONCRETE = +/-296.10'
MATCH EXISTING
CONCRETE ELEVATION
MATCH EXISTING
CONCRETE ELEVATION
C-501
I T
E
D
E T
A I L
S
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
C D
W G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020
FILL SLOPE
GROUND LINE
4" MIN.
8" MIN
COMPACTED FILL (8" MIN.)
8' W/STANDARD
FABRIC WITH
WIRE FENCE
MIN. 14 GAUGE
WIRE FENCE
6' W/HIGH
STRENGTH
FABRIC WITHOUT
WIRE FENCE
S T
E E
L
P O
S T
ANCHOR FILTER
FABRIC MIN. 8" DEEP
AND KEY IT IN 4"
HORIZONTALLY
N
5' LONG MIN.
FILTER FABRIC
ELEVATION
SECTION
NOTES:
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR
POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING
TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FENCE SHOULD CONTAIN
ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF
EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 DEG F.
2. STEEL POSTS SHALL BE 5'-0" MIN. IN HEIGHT, 1.33 LB/LINEAR FT STEEL AND SHALL HAVE
PROJECTIONS TO FACILITATE FASTENING TO FABRIC.
3. WIRE FENCE SHALL BE MINIMUM 14 GAUGE AND MAXIMUM MESH SPACING OF 6 INCHES,
FOR USE WITH STANDARD STRENGTH FILTER FABRIC.
MAINTENANCE
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE
ANY REQUIRED REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IT PROMPTLY.
3. ANY SEDIMENT FENCING WHICH HAS BEEN UNDERMINED OR TOPPED MUST BE REPLACED
IMMEDIATELY.
4. REMOVE SEDIMENT DEPOSITS AS NECESSARY AND AT A MINIMUM WHERE
ACCUMULATIONS REACH 1/2" ABOVE GROUND HEIGHT AT SEDIMENT FENCING TO PROVIDE
ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL AND TO REDUCE PRESSURE ON THE
FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
5. REMOVE ALL SEDIMENT FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND
BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA
HAS BEEN PROPERLY STABILIZED, ONLY AFTER THE PROJECT INSPECTOR HAS APPROVED
THE SEDIMENT FENCING REMOVAL.
CONSTRUCTION NOTES FOR SEDIMENT FENCE FABRIC
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH
SYNTHETIC FILTER FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES
ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER
SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.)
3. CONSTRUCT THE FILTER FABRIC FROM CONTINUOUS ROLL CUT TO THE LENGTH OF THE
BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER
CLOTH ONLY AT SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO
THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF
THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF
THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE
STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET
APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF
24 INCHES.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE
MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE
OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH.
7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE
PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT.
THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SEDIMENT SILT FENCE
PERFORMANCE.
10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
STEEL POST
M I N
SEDIMENT FENCE
SCALE: NOT TO SCALE
A1
40"
5'-0" O.C. MAX
NOTES:
1. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL.
2. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED.
3. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS.
4. PLACE A SIGN AT EACH END OF LINEAR TREE PROECTION AND 50' ON CENTER
THEREAFTER.
5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS
THAN ONE SIGN PER PROTECTION AREA.
6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
7. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT.
CONSTRUCTION SPECIFICATIONS:
PLACE BARRIERS TO PREVENT THE APPROACH OF EQUIPMENT WITHIN THE DRIP LINE
OF TREES TO BE RETAINED.
DO NOT NAIL BOARDS TO TREES DURING BUILDING OPERATION.
DO NOT CUT TREE ROOTS INSIDE THE TREE DRIP LINE.
DO NOT PLACE EQUIPMENT, CONSTRUCTION MATERIALS, TOPSOIL, OR FILL DIRT WITHIN
THE LIMIT OF THE DRIP LINE OF TREES TO BE SAVED.
IF A TREE MARKED FOR PRESERVATION IS DAMAGED, REMOVE IT AND REPLACE IT WITH
A TREE OF THE SAME OR SIMILAR SPECIES, 2-INCHES CALIPER OR LARGER, FROM
BALLED AND BURLAPED NURSERY STOCK WHEN ACTIVITY IN THE AREA IS COMPLETE.
DURING FINAL SITE CLEANUP, REMOVE BARRIERS AROUND TREES.
MAINTENANCE:
IN SPITE OF PRECAUTIONS, SOME DAMAGE TO PROTECTED TREES MAY OCCUR. IN
SUCH CASES, REPAIR ANY DAMAGE TO THE CROWN, TRUCK OR ROOT SYSTEM
IMMEDIATELY.
REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM
WITH TREE PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED
ROOTS.
REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREA, TAPER THE
CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT.
CUT OFF ALL DAMAGED TREE LIMITS ABOVE THE TREE COLLAR AT THE TRUNK
OR MAIN BRANCH. USE THREE SEPARATE CUTS TO AVOID PEELING PARK FROM
HEALTHY AREA OF TREES.
WARNING SIGN DETAIL
STEEL POST (1.33 LB/FT)
WOVEN WIRE FABRIC
WARNING SIGN
ORANGE, UV RESISTANT,
HIGH - TENSILE STRENGTH,
POLY BARRICADE FABRIC
(TYPICAL)
GRADE
SIDE VIEW
WARNING SIGN
MIN. 12-1/2 GA.
INTERMEDIATE
WIRES
GRADE
ORANGE, UV RESISTANT, HIGH -
TENSILE STRENGTH, POLY
BARRICADE FABRIC (TYPICAL)
TREE PROTECTION AREA
DO NOT ENTER
MIN. 10 GA.
LINE WIRES
TREE PROTECTION AREA
DO NOT ENTER
FRONT VIEW
TREE PROTECTION FENCE DETAIL
SCALE: NOT TO SCALE
A8
8' 8'
4"
8" MIN.
4" MIN.
3'-0"
M
I N
ELEVATION
3'-0" 3'-0"
3'-0"
8' 8'
3'-0"
PLAN VIEW
SECTION
4'
4'
GROUND LINE
STEEL POST
2x4
3'
3'
NOTES:
1. SEDIMENT FENCE SHALL BE INSTALLED OUTSIDE TOE OF
EARTHFILL EMBANKMENTS.
2. WIRE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL
HAVE A MIN. OF 6 LINE WIRES WITH 12" STAY SPACING.
3. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND
SHALL BE FASTENED SECURELY TO THE WIRE.
4. THE FILTER FABRIC SHALL MEET THE FOLLOWING
REQUIREMENTS:
A) EOS IS NOT LARGER THAN U.S. STANDARD SIEVE NO. 70
B) GRAB STRENGTH 90-120 LB
C) CONFORM TO ASTM D-1682 OR ASTM D-177
5. STEEL POSTS SHALL BE 6'-0" IN HEIGHT AND BE OF
SELF-FASTENER ANGLE STEEL TYPE.
MAINTENANCE:
1. REPLACE STONE AS NEEDED TO ENSURE DEWATERING.
2. SEDIMENT MUST BE REMOVED WHEN HALF OF STONE
OUTLET IS COVERED.
3. ANY SEDIMENT FENCING WHICH HAS BEEN UNDERMINED
OR TOPPED MUST BE REPLACED IMMEDIATELY.
#57 WASHED STONE OVER
CLASS B RIP RAP FRONT
SIDE/ CLASS B RIP RAP
ONLY BACK SIDE
TOP STRAND
MIN. NO. 10
GAUGE
BOTTOM STRAND
MIN. NO. 10 GAUGE
12" MAX WEIR
HEIGHT
FLOW
DIRECTION
EXTRA LAYER FILTER
FABRIC @ SEDIMENT
FENCE OUTLET
ANCHOR FILTER FABRIC MIN. 8"
DEEP AND KEY IT IN 4"
HORIZONTALLY EACH SIDE
COMPACTED FILL EACH SIDE
FLOW
DIRECTION
SEDIMENT FENCE OUTLET DETAIL
SCALE: NOT TO SCALE
G14
C-502
I T
E
D
E T
A I L
S
R
D
O W
N S
M
M
I L E
Y
D
S
A L T
S M
A N
R
D
O W
N S
C D
W G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C A
T E
G O
D
E
F I
M
E
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
C O
N S
T R
U C
T
P
A L L E
T
B
U I
C
I L I T
Y
S
O T
F
S F
F I N
B
M I T
T A
L
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
J U
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
01 JULY 2020
SECURE COMPOST SOCK TO GRATE
WITH RUBBER TIE DOWNS.
CURBSIDE OPTION
"B" PLAN
CURB
CURBSIDE OPTION
"A" PLAN
CATCH
BASIN
CURBSIDE SECTION
CURB
STORM GRATE
12" COMPOST SOCK
EXCESS SOCK MATERIAL
TO BE DRAWN IN AND
TIED OFF TO STAKE AT
BOTH ENDS.
EXCESS SOCK
MATERIAL TO
BE DRAWN IN
AND TIED OFF
TO STAKE AT
BOTH ENDS.
CURB
12" COMPOST SOCK
NOTES:
1. MATERIALS TO BE FILTREXX OR APPROVED EQUAL.
2. ALL MATERIAL AND INSTALLATION TO MEET STATE AND
LOCAL SPECIFICATIONS.
3. 2"X2" OAK OR OTHER DURABLE HARDWOOD STAKES
SHALL BE USED. STAKES SHALL BE PLACES AT A
MAXIMUM INTERVAL OF 4 FEET. STAKES SHALL BE
DRIVEN TO A MINIMUM DEPTH OF 12 INCHES, WITH A
MINIMUM OF 3 INCHES PROTRUDING ABOVE THE
COMPOST SOCKS.
4. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN
SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE
BLOCKS OR SAND BAGS SHALL BE USED BEHIND THE
SOCK TO HOLD IT IN PLACE DURING RUNOFF EVENTS.
5. THE ENDS OF THE SOCKS SHOULD BE TURNED
SLIGHTLY UP SLOPE TO PREVENT RUNOFF FROM
GOING AROUND THE END OF THE SOCKS.
MAINTENANCE NOTES:
1. INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH
SIGNIFICANT RAINFALL EVENT (1/2 INCH OR GREATER).
2. SEDIMENT SHOULD BE REMOVED FROM BEHIND CHECK
DAM ONCE THE ACCUMULATED HEIGHT HAS REACHED
THE HEIGHT OF THE CHECK DAM.
3. THE COMPOST SOCK MUST BE REPLACED IF CLOGGED
OR TORN.
4. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY
NEED TO BE REPLACED WITH A LARGER DIAMETER OR
A DIFFERENT MEASURE.
5. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED
OR DISLODGED.
6. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND
DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE
MEASURE HAS BEEN PERMANENTLY STABILIZED.
COMPOST SOCK INLET PROTECTION
SCALE: NOT TO SCALE
G11
CONCRETE PAVEMENT SECTION
SCALE: NOT TO SCALE
E16
COMPACTED SOIL
SUBGRADE, 98% MAX.
DRY DENSITY (ASTM
D-1557).
PROPOSED 6"
CONCRETE
(3000 PSI)
#4 BAR @ 12"
CENTER TO CENTER
AT TOP 1/3 DEPTH
6" STABILIZED
AGGREGATE BASE
COURSE
EXISTING
CONCRETE SLAB
(FIELD VERIFY
THICKNESS)
CONSTRUCTION
JOINT, SEE DETAIL
A11 ON SHEET C-502
DOWEL
CONCRETE PAVEMENT
CONSTRUCTION JOINT
SCALE: NOT TO SCALE
A11
NEW OR EXISTING PAVEMENT
NEW PAVEMENT
DRILL & GROUT
OF DOWEL
THIS END
h
DOWEL FOR EX. PAVEMENTS
PAINT & OIL
d
D
SEE JOINT SEALANT
D* DENOTES DOWEL DIAMETER = 3/4"
h d
= 6"
PAVEMENT
SURFACE
POURED
JOINT SEALER
3/4"
D
BUTT JOINT
SEPARATING TAPE
JOINT BOTTOM
TAPE JOINT SEALANT
CONSTRUCTION JOINT
PAVEMENT
SURFACE
POURED
JOINT
SEALER
3/4"
D
BUTT
JOINT
BACKER JOINT SEALANT
CONSTRUCTION JOINT
BACKER
MATERIAL
D = DEPTH OF SEALANT (1.0 TO 1.5 x W)
NOTE: DEPTH OF INITIAL SAWCUT OR INSERT TYPE JOINT = 1/4 SLAB THICKNESS
EITHER ONE PIECE OR THREADED
SPLIT-TYPE DOWEL MAY BE USED
8" LONG SPACED 12" ON CENTER
CONCRETE PAVEMENT SECTION.
SEE DETAIL E16 ON SHEET C-502.
1 1/2"
CONCRETE SPLASHBLOCK
CONCRETE SPLASH BLOCK DETAIL
SCALE: NOT TO SCALE
L5
1'-6"
MIN. DIA.
S
L
O
P
E
1/4" X 2" X 10" BENT PLATE
(2 REQD), WELDED TO PIPE
CONCRETE ENCASEMENT
FINISHED GRADE
TOP FINISHED CONCRETE
BOLLARD SHALL BE PAINTED MISSION
BROWN FEDERAL SPECIFICATION COLOR
NUMBER 20059, VERIFY WITH GOVERNMENT
6" SCH 40 STEEL PIPE. GRIND SMOOTH
ALL ROUGH AREAS AND EDGES
FILL WITH CONCRETE & ROUND OFF
TOP WITH GROUT PLUG
PERMANENT BOLLARD
SCALE: NOT TO SCALE
F5
6.00 ABBREVIATIONS
B/ = BOTTOM OF
BOT. = BOTTOM
COL. = COLUMN
E.W. = EACH WAY
E.F. = EACH FACE
MBS = METAL BUILDING SYSTEM
MANUF. = MANUFACTURER
MEZ. = MEZZANINE
CONC. = CONCRETE
CRSI = CONCRETE REINFORCING STEEL INSTITUTE
U.N.O. = UNLESS NOTED OTHERWISE
FNDN = FOUNDATION
FTG. = FOOTING
STL. = STEEL
REINF. = REINFORCING
CONN. = CONNECTION
CONT. = CONTINUOUS
WWF = WELDED WIRE FABRIC
PEMB = PRE-ENGINEERED METAL BUILDING
T/ = TOP OF
T = THICKNESS
T&B = TOP & BOTTOM
V.I.F. = VERIFY IN FIELD
A
A
A
A
WALLS
MONOSLOPE ROOF
WIND PRESSURE DIAGRAMS
COMPONENTS AND CLADDING
NOMINAL DESIGN PRESSURE SCHEDULE
COMPONENT ZONE
EFFECTIVE WIND
AREA (SF)
DESIGN PRESSURE (PSF)
POSITIVE
ROOF
ELEMENTS
MRH=
27.5 ft.
A = 6'-0"A = 6'-0"
EXTERIOR
WALL
ELEMENTS
2'
3'
NOTES:
1. DESIGN WIND PRESSURES SHALL BE USED IN THE
DESIGN OF ALL COMPONENTS AND CLADDING ELEMENTS
COMPRISING THE BUILDING ENVELOPE.
2. REFER TO THE WIND PRESSURE DIAGRAM FOR ZONE
LOCATIONS AND EXTENTS.
3. POSITIVE PRESSURES ACT TOWARD COMPONENT
SURFACES AND NEGATIVE PRESSURES ACT AWAY
FROM COMPONENT SURFACES.
4. LINEAR INTERPOLATION BETWEEN EFFECTIVE WIND
AREAS MAY BE USED TO OBTAIN THE REQUIRED
COMPONENT AND CLADDING DESIGN PRESSURE.
MRH=MEAN ROOF HEIGHT
15.4 -29.9
50 14.1 -29.9 100 13.6 -29.9 10 15.4 -33.5 50 14.1 -32.3 100 13.6 -31.7
10 15.4 -42.6
50 14.1 -35.0
100 13.6 -31.7
10 15.4 -39.0 50 14.1 -37.7 100 13.6 -37.2 10 15.4 -57.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .